Team Brief 6 Traincrew
S.T.A.R. CAMPAIGN 2012
Initiative lead by the CDM team to promote the various control measures that are available to help prevent stop short incidents
![Page 2: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/2.jpg)
Team Brief 6 Traincrew THE FACTS
• Between 5/1/09 and 30/12/11 Southern drivers had 151 stop shorts with 148 releasing the doors and two passengers alighting.
• During the same period there were 53 wrong side door releases
![Page 3: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/3.jpg)
Team Brief 6 Traincrew
![Page 4: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/4.jpg)
Team Brief 6 Traincrew TRACTION TYPE
![Page 5: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/5.jpg)
Team Brief 6 Traincrew EXPERIENCE AND CAUSE
![Page 6: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/6.jpg)
Team Brief 6 Traincrew
IS THIS THE BIGGEST RISK FOR SOUTHERN?
• Second to collisions this is currently a very high priority in terms of risk.
• Flashing lights and audible indicators mean the public believe that when the doors are released it is safe to alight. This is known as exportation of risk, where a persons actions will put others at risk..
• Someone could fall from the train, injure or electrocute themselves to say the least.
![Page 7: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/7.jpg)
Team Brief 6 Traincrew USE YOUR TOOL KIT
FORMATION REMINDER CARDS
![Page 8: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/8.jpg)
Team Brief 6 Traincrew TOOL KIT IDEAS
USE YOURSCHEDULECARD ANDWRITE THELENGTH OFTRAIN ON IT
![Page 9: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/9.jpg)
Team Brief 6 Traincrew TOOL KIT IDEAS
RISKFOCUSSED
COMMENTARY
Offside
door
release
![Page 10: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/10.jpg)
Team Brief 6 Traincrew TOOL KIT IDEAS
LOOK ATMITRAC TOCONFIRM THELENGTH OFYOUR TRAIN
![Page 11: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/11.jpg)
Team Brief 6 Traincrew RESULTS SINCE THE START OF THE S.T.A.R. CAMPAIGN
![Page 12: S t a r campaign](https://reader036.vdocuments.mx/reader036/viewer/2022062312/556ac507d8b42acd348b4b92/html5/thumbnails/12.jpg)
Team Brief 6 Traincrew HOT SPOTS