25
r{rfl g$fi'fi (GOVERNMENT OF rNDrA) tfi d;nfiT (MINrsrRy oF RArLwAys) ffi Etg (RArLwAy BoARD) No. 20 1 7/RSF I 649 |2/RP-III/RWF dated 0g .10.2017 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore - 560 064. The Principal Chief Materials Manager, All India Railways & P/Units. Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period III/2017-18 (Ocr - Dec, 2017). Minutes of quarterly WTA meeting for the period- llll20l7-18 (Oct - Dec,2017) held with the representatives of RWF/Bangalore and Zonal Railways/PUs in Rail Bhawan, New Delhi on 06.10.17 have been uploaded on Indian Railway's website www.indianrailways.gov.in. To access the Minutes kindly click on "Ministry of Railways"o then click on "Railwaffiard,,, then click on "About Indian Railways" Tab., then click on " Railway Board Directoratesrr, then click on "Stores". Then finally click on "Conferences / Meetings" to open the page containing the minutes of the Meeting. Please ensure that the statement of requirements of WTA items for the Quarter-Mz}V-ll (Jan - March, 2018) reach this office latest by 15.12.17 positively. The exact date and meeting would be advised later on. (Hindi version will follow) Encl.:- As above. DRS(F) RAILWAY BOARD M.No.9717646409 Copy of the Minutes of the Meeting together *irl, ullo.u,ion statement are forwarded for information and necessary action to :- l. CMEs, All India Railways and Production Units. 2. Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. SMMfl)epot, MCF, Lalganj, Rae Bareli (U.p.) 4. IWs BHEL, (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-I10003 5. DG(RS), AM(PU), AM(RS), PED/RS(P), EDRS(C ), EDEE(G), EDME(Chg.), EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W) & DF(S)-I. 6. CWM, Eastern Railway, Kanchrapara, Distt. 24 Parganas (WB). 7. The CMM(B[), Eastern Railway, Fairlie Place, Kolkata - 700 001. qiA.. ISH JAIN)

Upload: phamthien

Post on 24-Jan-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

r{rfl g$fi'fi (GOVERNMENT OF rNDrA)

tfi d;nfiT (MINrsrRy oF RArLwAys)ffi Etg (RArLwAy BoARD)

No. 20 1 7/RSF I 649 |2/RP-III/RWF dated 0g .10.2017

The Chief Mechanical Engineer,Rail Wheel Factory, Bangalore - 560 064.

The Principal Chief Materials Manager,All India Railways & P/Units.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the periodIII/2017-18 (Ocr - Dec, 2017).

Minutes of quarterly WTA meeting for the period- llll20l7-18 (Oct - Dec,2017) held withthe representatives of RWF/Bangalore and Zonal Railways/PUs in Rail Bhawan, New Delhi on06.10.17 have been uploaded on Indian Railway's website www.indianrailways.gov.in. To access theMinutes kindly click on "Ministry of Railways"o then click on "Railwaffiard,,, then click on"About Indian Railways" Tab., then click on " Railway Board Directoratesrr, then click on"Stores". Then finally click on "Conferences / Meetings" to open the page containing the minutesof the Meeting.

Please ensure that the statement of requirements of WTA items for the Quarter-Mz}V-ll(Jan - March, 2018) reach this office latest by 15.12.17 positively. The exact date andmeeting would be advised later on.

(Hindi version will follow)Encl.:- As above.

DRS(F)RAILWAY BOARD

M.No.9717646409

Copy of the Minutes of the Meeting together *irl, ullo.u,ion statement are forwarded for informationand necessary action to :-

l. CMEs, All India Railways and Production Units.2. Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. SMMfl)epot, MCF, Lalganj, Rae Bareli (U.p.)4. IWs BHEL, (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New

Delhi-I100035. DG(RS), AM(PU), AM(RS), PED/RS(P), EDRS(C ), EDEE(G), EDME(Chg.), EDME(W),

EDME (Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W) & DF(S)-I.6. CWM, Eastern Railway, Kanchrapara, Distt. 24 Parganas (WB).7. The CMM(B[), Eastern Railway, Fairlie Place, Kolkata - 700 001.

qiA..ISH JAIN)

Page 2: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Present:

Railway Board:

Plants

Railway Units

PED/RS(P), EDRS(S), DRS(F)

PCMN4/RWF, CME/RWF, PCMM/RWP/BEIA, CME/RWP/B EIA ANd

GM(WAP)SAIL/DSP.

PrincipalChiefMaterialManagers/CMMs/SG/JAGsStores&Mechanical officers of zonalRailways & Production Units.

1.0 General:DRS(F)startedthemeetingbywelcomingalltheparticipantstothethirdquarterlywTA

meeting of 2017-1g held on 06.10.2017 in conference Hall of Rail Bhawan. In view of proposed

shut down of wheel shop of RwF, ZR and pUs were requested to seek allotment of wheels for 3'd

and 4s quarter. He then requested PED/RS(P) to address the august gathering.

2.0 PED/RS(P) :

PED/RS(P) stressed on the importance of reviewing the requirement of LHB wheels and

Diesel Loco wheels by all the zonarRailways and pUs in view of the enhanced production of LHB

coaches and curtailing down the production of Diesel Locomotives in future. He expressed

satisfaction at the performance of both RwF and RWp during the second quarter and desired M/s

SAIL/DSP to improve their performance. sAIL was also advised to gear up production of Electric

Loco wheels in view of it's likely increase in demand due to increased production of Electric

Locomotives. He informed that the next tender for LHB wheels is under finalization and the

quantities being procured was based on the indents submitted by the Railways / PUs' PED/RS(P) also

told RwF, RWp and SAIL/DSP to pack the wheels properly using spindles prior to it's dispatch to

prevent any accident while unloading the same by the consignees.

3.0 RWF :

pCMM /RwF stated that supply percentage of RWF was 1007o w.r.t allotment during the 2nd

quarter. He informed that RWF required 8000 MT of scrap every month for manufacture of wheels

& axles. CME/RWF expressed concern at the mounting inventory of wheels in the factory and

desired maximum allotment to allow RWF to dispatch the goods'

4.0 RWP, Bela :

PCMIwRwP/Bela apprised that more than 100% compliance was achieved'

5.0 SAIL /DSP :

GM/w&Ap/sAIL informed that SAIL,s compliance percentage was improving with every quarter

and they can take increased load in view of proposed shutdown of wheel shop at RWF in the 4th

quarter. He informed that special care was being taken on the proper packing of wheels to prevent

recurrence of mishaps in future. The issue of delay in issuing advise of receipt of goods sent by road

transport was highlighted that was preventing SAIL from clearance of transporters bills'

Page 3: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

6.0 SuPPlv Position

The position of supplies-1ade.bv nll during the previous quarter i'e' July - sept'' 2017 was

discussed. The same is tabulated as under:-

SUPPLIES DURING JULY'SEPT' 2017

Variation(+) excess(-) shortfall

TotalSupplies(April -

Sept,2017)

Item QuantitYPlanned(JulY -

Sept.,2011)

ActualSupplies(JulY -SePt.,20111

No.

A -144 33853443 3299

(i) BOX'N' Wheels\r//wr -47641F. 0 0

0 0(ii) MG Chg. Wheets

(w/wl-77olR)/\IIAD \I/-N?1\ 17619

s925 6464 )Jv(iii) BG Chg. Wheels

\r//wL-1660/R 29 290

'29

(iv) BG Loco Wheets\r//wr -4q84lR :s I zssz

1816 1851(v) 840 mm dia wheels tor

T-lT a \l/oannc85 4803

2180 226s(vi) EMU/DMU Wheets to

0 00 0

(vii) BGl/^

EMU Wheels tor.. /-^onhes

-s68 0s68 0

(viii) Wheels for Milk Ianr\l/oonn (V\fN)

24 29388r3932 1390U

B -456 1802210484 1 002E

(i) -570 212671ns9 | t tstq(ii)C 0 0

0 0(i) Tor nc ctrg.

u lL ^^l oafc-997 3047ffi I 2ooq 1 003

(ii 473 106754800 527'3

(i ii) BOX'N' W/sets

including WagonBuilders 0 200

200 ' 200(iv) Wheelsets for Cast

steel bogie of BLC\tr/o onn s

0 00 0

(v) EMU W/sets tor1'roiler Cnaches

0 00 o

(vi) | Wheelset tor r vzt0 0

0 Ufvin I Container h lat Z) t

I e*t" load (Braitwa'rte) -s24 139227000 6476

TOTAL W/SE'I'S

Th.?oi;;ffiition (Railwuy *J"lconsignee wise) is given in the enclosed Annexure-

The item-wise ptannPii!';;;o"i:D ii'zotl is shown in Annexure - II'

Page 4: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

,n"O rit a - vis actual supplies made by

ANNEXURE - IiwF/nangalore during the 2nd

Pos

Qu

ition rt :garding quantities Plar

rter ut! - p:y::-"!!:_qTY.TLANNED k(July - SePt, 17) lt

lrY. suppt IED I

Iuly - SePt, 17) I

/ARIATION+) EXCESS-) SIToRTFALL

S.NOS. DRAWING &DESCRIPTION

RLY./ CUNSI(JI\I'I,

wlIIEI,LS

Irr< I

BG Chg. Wheels to

Drg.No.WWL-1660/R

R/MINr65 -35

NWWAII2468 -32

SR/LWPEfuCw/PERJGOC

25UU

SCR/TPTY/LGD 500 lll0 610

SWWUBL/TVTYSS900 871 -29

l 630 30ICF

6464 s39Total I 5925t

r------ol 56 6140 dia wheel for

}LC wagon

UK/tsK561 45

NR/JUDW1000 0

NCR/JHS tUUU

SCR/RYPS),oo 184 -16

50 C

SWR/IVTYSS1851 35

-l-;TJI

lTotalI 1816

/NEI\fI I lcnrvnrl T----- %s 101 5

Wheels to Drg. No. ER/HLR

NR/GZB

255 243 -l

tl'7 IK-4004 IUU

29 2lNWRJAII U

60SCR/LGD

RCF

OU

800 800

otal I 218( E5

QQi (

4 BOX'N'Wheels to

Drg. No. W/WL-47641F.

ETVHLR/LLTUJIvT

ECoR/MCS40c U400

32 2NR/ASRNFRAJBQ

Jt400 400 0

NWWAII 85 71 I

61t47-86

SR/Cw/PERSCR/RYPS 1000 10001 0

SECR/RWSS/RWCR/KTTTotal

-144J44Jl

68 0 -685 Solid cast wheel for

milk tank wagon

(VVN) to Drg. No.

WAP/SK/M-155confirming to IRS

specification No. R-

lqtsz.part III

SCR/TPTY

WR/PL 500 0 -s00

0 -568Iotal 56U

6 BG Loco Wheel lswcoc 0 29

Page 5: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

fotal 0 29 29

TOTALWHEELS Hsjzl l3eosl -24

AXLES

I IPL-6292 Axlerough machined for

WDG-2, WDG 3A,WDM 3D LocosTPL-6293

fotal 311 311 0

2 Drg. No.

06102llll02 fotwDG-2 & WAG-7Loco (Rough

machined)

SR/Lw/PER t2 13 I

WR/DHD 20 20 0

Iotal 32 33 I

J Axles Rough

machined for WAG-9 & WAP-7 locos to

Drg. No. 1209-01-

011-002 Alt. latest

3LW 93s 935 C

SR/L!\'/PER I 13 l2

SCWLGD t2 t2 0

SER/TATA 18 0 l8

Total 918 9s9 19

4 Axle rough GMLoco to EMD Pt.

No.40077315 &DLW Pt. No.

17230019

swR/MYSSruBL-l ---------- 321-----------rrT 0

DLW 505 467 -38

Iotal s37 499 -38

5 Axle (3-Phase) forWAP-5 Loco to

CLW Drg. No.l2l0-01-3 I l-025

CLW 2C 0 -20

WR/DHD I 12 0

Total 32 t2 -20

A.xles rough for NER/IZN 24 22 a

WDG.4 & WDP.4to EMS-840 to Drg.No. D/WL-506l/R

SWWMYSS 45 0 -45

WR/DHD t2 t2 0

Total 81 34 -47

7 Rough Axle for WR/DHD 22 20 a

WAP-5 Locos as PerCLW Drg. No. 1210'

0l-011-002 Alt. Nilor latest or ABBDrg. No. IA-011-001 18 Rev I or

latest

Total 22 20 -2

8 Axle for Dual Mode DLW 3C 30 0

Loco WDAP-5 Drg.

No. 17230408Total 30 30 0

Page 6: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

IOTAL AXLES[1) TO (8) rN NOS.

2023 1898 -125

TOTAL AXLESIN EQUATEDNOS. (x by1.e)=

3844 3606 -237.5

9 BG EMU Motor NWGZB 1C 10 0

uoau[l Axlgs Lo ur5.No. DC/EMU-M-O-l-005

SER/KGP l6 l6 0

Total 26 2( 0

10 Axle for AC MotorCoach to Drg. No.EMUA4C-I-025

ER/HLR 20 2C 0

Total 20 20 0

1l EMU Motor coach

axles to Drg. No.AC/DC-EMU/B-02

ICF l lc ll0 0

RCF lsc 150 0

002 Alt. Al2 item 1

(WAP's Drg. No.WAP-A-087)

Total 261 260 0

t2 EMU Axle to Drg.No. DC/EMU/IzV01/005

CR/PR 8 8 0

Total 8 8 0

t3 Semi finished Axlefor 3 Phase KolkataMotor Coach Bogies(with M/s MedhaElectrics) to Drg.No.AAA0247ItemI Alt. Nil

ICF 10c 93 -7

Total 100 93 n

l4 Axle forMEMU/DMC toDrg. No. EMU/I\4-O-l-025 Alt. a

SCR/LGD 9 9 0

Total 9 9 0

TOTAL EMUAXLES IN NOS.

4t6 -7

TOTAL EMUAXLES INEQUATED NOS.fi bv 1.2)=

508 499 -8

l5 EMU Axles for TC

to Drg. No.AC/DC/EMUIO2-204-0010o/Rwr'-A-157

ER/HLR 25 25 0

NPJGZB 15 15 0

ICF t34 134 0

Total 174 174 0

16 BG EMU Axle to SR/CWPER 34 34 0

Page 7: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Drg. No. WWL-+784/R

Total 34 34 0

t7 Semi finished Axlefor 3 Phase KolkataMotor DTC and TCCoach Bogies (withIWs MedhaElectrics) to Drg.No.AAA02062Item-l Alt. Nil

ICF 100 100 C

Total 100 100

t8 Axles for BOX'N'to CR/PR 4t 39 .,

Drg. No.W/WL-4901/R(WD-8902s/SL-2)

ER/HLR/JMP 195 198 J

NCR/JHS 100 93

NFR/NBQ l0c 106 6

SR/C&w/PER 5( 50 0

SWRA,IYSS/UBL 14 14 0

Total s00 500 0

l9 Axle for BOX'N'/BCN wagon toDrg. No. WD-9203915-l ltem-1,Alt.-2 PL No38064s22

SWR/AP 2C 20 0

WCR/KTT 26C 253

Total 280 'r11 -7

20 Axles for LHBcoaches to Drg.No.LW 02149

R/PR 45 45 0

NR/ruDW 50 50 0

NER/GKP l3 t3 0

\IWR/AII 10 t0 (

SER/KGP 40 40 C

ICF 1200 1200 C

RCF 1200 1200 C

MCF/RBL 1500 1517 l7Total 4058 4075 t7

21 Rough turned Axleto use with UICMTBU to RCF Drg.No.02128 ALT(Nil) (IRY Coaches)

NR/JUDW l2 t2 0

Total t2 t2 0

22 BG Coaching Axlesto Drg. No. CG K-601 5

R/MTN ll0 110 0

SR/GOC/Lw/PER/CW/PER

40s 398 -7

SCR/LGD/TPTY 260 201 -59

SWR/UBL/AP 17s 95 -80

WR/BVP 75 77 2

WCR/BPL 155 121 -34

ICF t20c It84 t6RCF 50c 360 -140

Page 8: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Iotal 2880 2546 -334

TOTAL AXLESS.NOs.15 to 22 INNOS.

8038 7714 -324

GRAND TOTALAXLES IN NOS.:

10484 10028 -456

GRANDTOTALAXLES INEQUATED UNITS

12389 1r819 -569.9

WHEELSETS

Wheelsets forBOXN S

Wagon Builders 2000 r 003 -997

Total 2000 1003 -997

2 Wheelset for Cast

Steel Bogie of BLCWagon to Drg No.coNTR-9404-S/12Alt 3

NR/ruDW 100 r00 0

WR/DHD 100 100 0

Total 200 200 0

J BOX N'Wheelsets Wagon Builders 480C s273 473Total 4800 5273 473

IOTALWHEELSETS

7000 6476 -524

Page 9: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

ANNEXURE - IIAllocation sheet for supply of WTA items for the 3rd quarter i.e. Oct -Dec,2017 on RWF/Bangalore

{Allotment of wheels is for two quarters (i.e. 3rd and 4th quarter) and shall remain valid till31.3.2018}

s.Nos. DRAWING &DESCRTPTION

RLYS./ PUs QTY.PLANNED(Oct - Dec,

2017\

Consignee Remarks

WTIEELS

I BG Coaching Wheels to

Drg. No.W/WL-1660/RR 1648 1300-MTN

348-PR

ER 2745 2300-LLH445-HLR

NR 1 600 700-JUDW9OO.AMV

NWR 1200 AIISR 2500 6OO-Lw/PER

I3OO-CWPER600-Goc

SCR 700 TPTY

SWR I 400 6OO-UBL

8OO-MYSS

ICF 700

Total 12493

2 EMU/DEMU Wheels to ER 310 HLR

Drg. No. K-4004 SCR 25 TPTY

SER 57 KGF

ICF 200c

RCF 760

fotal 3152

1 BOX N'Wheels to Drg.No. WWL-4764/R

ER 520 3OO.HLR

22O.LLH

ECOR 800 MCS

NR r 500 JUDW

NER 50 IZN

NFR l 000 NBO

NWR 125 AII

SR 250 Cw/PER

SCR 2200 RYSS

SER 1200 KGP

SECR 330 RAIPUR

SWR 200 1OO-UBL

IOO-MYSS

WR 300 DHD

WCR 480 KTT

Total 8955

4 840 dia Wheel for BLC CR 60 PR

Page 10: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Wagon ER 50 LLHNR 1200 JUDWNCR 1000 JHSSR 192 CWPERSCR 100 RYSSSWR 50 MYSSTotal 2652

5 Solid cast wheel for milktank wagon (VMtl) toDrg. No. WAP/SK/M-155 confirming to IRSspecification No. R-19/93, part.II

WR s00 PL

Total s00

TOTAL WHEELS 277s2

AXLES

I Axle rough turned forWAP4 Loco Drg.No.03/2/l l/55 Alt. I

SER 20 TATA

Total 20

2 TPL-6292 Axle roughmachined for WDG-2,WDG3A, WDM3DLocos TPL-6293

DMW 165

Total 165

J Drg. No. 06102111102 forWDG-2 & WAG-7 Loco(Rough machined)

CR 25 BSLSR 22 Lw/PERSCR 5 SMM/ELS/LGDWR 32 DHDIotal 84

4 Axles rough machined CLW 210for WAG-9 & WAP-7locos to Drg. No.l209-01-01l-002 Alt.

CR 30 BSLSER 12 TATADLW 300

Total 552

5 Axle rough for WDG-4& WDP-4 GM Loco toEMD Pt. No.40077315& DLW PartNo.17230019

NER 10 IZNNR 50 CBWR t76 DHDDMW 30

DLW 300

Total 566

6 Axle (3-Phase) for WAP5 Loco to CLW's Drg.No.l210-01-3ll-025

CLW 40

WR 22 DHDIotal 62

7 D/WL-4973tP.WAP/SK/MA-245 BCDSL Loco

ER t8 KPAIotal 18

Page 11: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Axle rough turned for WRAO 659 Hitachi type

wheelset to Drg. No.SKEL.4516 SKEL-45I1

Collect from CR

5868 Alt.'b'part

AL AXLES (1)

AL AXLES INEQUATED NOS.(X by 1.9)=

Axle for BG EMUMotor Coach Axles toDrg. No. DC/EMU-M-0-l-005

Axle for AC Motor

EMU/MC-I-025

EMU Motor Coach

Axles to Drg. No.AC/DC-EMU IB.O2.OO2

Alt. Al2 item 1 (WAP's

Drg. No. WAP-A-087)

i finished Axle for 3

Phase Kolkata MotorBogies (with M/s

Medha Electrics) to Drg.No.AAA0247Item IAlt. Nil

TOTAL EMU AXLESIN NOS.

TOTAL EMU AXLESIN EQUATED NOS.

EMU Axles for TrailorCoaches to Drg.

No.AC/DC/EMU/02-00100/RwF-A.157

i finished Axle for 3

Page 12: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Phase Kolkata MotorDTC and TC Coach

Bogies (with M/s MedhaElectrics) to Drg.No.AAA02062ltem -l

Axle for BOX'N'iBCNwagon to Drg. No. WD-9203915-l ltem-1, Alt.-2

BOX'N'Axles to Drg.No. WWL-490I/R (W8902slsL-2)

4O.HLR

I75-JMP

Rough tumed Axle touse with UIC MTBU toRCF Drg. No.02128ALT (Nil) (rRY

Axles for LHB Coaches

to Drg. No. LW02l49

BG Coaching Axles toDrg. No. CG K-6015

5O.AVDI

Page 13: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

TOTAL AXLESS.NOS. 14 to 20INNOS.

6841

GRAND TOTALAXLES IN NOS.=

8797

GRAND TOTALAXLES IN EQUATEDUNITS =

1029t

WHEELSETSI BOX'N'Wheelsets Wagon

Builders900 Consignee to be advised

bv DRS(W)NFR 100 NBQIotal r000

2 Wheelsets for Cast Steel

Bogie of BLC wagonNR 40c JUDWTotal 400

EMU Wheelsets forMotor Coaches

CR 300 MTNTotal 300

4 Wheelsets for BOXN S

to Drg. No.CONTR-9404-3/12 Att.3

Wagon

Builders3000 Consignee to be advised

by DRS(W)Total 3000

IOTAL WHEELSETS 4700

Page 14: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

trr{fi g{fi'R(GOVERNMENT OF INDIA)

til dTrdrq (MINISTRY oF RAILwAYS)

W iltg (RATLwAY BoARD)

No. 20 1 7/RSF I 649 I 2 IRP-IIVRWP

The Chief Administrative Officer,Rail Wheel Plant (Bela),P.O. Arvind Nagar, Distt. Saran,

Bihar - 841 221

The Principal Chief Materials Manager,All India Railways & P/Units.

Please ensure that the statement of(Jan - Mar, 2018) reach this office latest

meeting would be advised later on.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period-Ill/2017-18 (Oct - Dec, 2017).

Minutes of quarterly WTA meeting for the period- Illl20l7-18 (Oct - Dec, 2017) held with the

representatives of RWP/Bela and Zonal Railways/PUs in Rail Bhawan, New Delhi on 06.10.17 have

been uploaded on Indian Railway's website www.indianr:ailways.gov.in. To access the Minutes kindlyclick on "Ministry of Railways", then click on *Railway Board", then click on "About IndianRailways" Tab., then click on " Railway Board Directorates", then click on o'Stores". Then finallyclick on "Conferences / Meetings" to open the page containing the minutes of the Meeting.

dated A3.10.2017

requirements of WTA items for the Quarter-IVl2}l7-L9by 15.12.17.positively. The exact date and venue of the

(Hindi version will follow)Encl.:- As above.

Copy of the Minutes of the Meeting together with allocation statement are forwarded for informationand necessary action to:-

1. CMEs, ER, ECR, ECoR, NER, NFR, SCR & SER.

2. Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. DG(RS), AM(PU), AM(RS), PED/RS(P), EDRS(C ), EDEE(G), EDME(Chg.), EDME(W),

EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W) & DF(S)-l.

7,\qUH JAIDRS(

BOAI76464

RAILWAYM.No.971

I,J;rs(F)ARD

,lv1

ilr:F)LD

09

,;1,"1H JATNDRS(F

BOART7646401

Page 15: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

Miputes gf the 3'd Quartqrtv (i.e. 9gf - Dec) wrA Mqetine hel4 on 6tl,october.2017

Present:

Railway Board:

Plants

PED/RS(P), EDRS(S), DRS(F)

PCMM/RWF, CME/RWF, PCMM/RWP/BeIa, CME/RWP/BeIa and

GM(WAP)SATLiDSP.

Principal Chief Material Managers/CMMs/SG/JAGs Stores &

Mechanical Officers of Zonal Railways & Production Units.

Railway Units

1.0 General:

DRS(F) started the meeting by welcoming all the participants to the third quarterly WTA

meeting of 2017-18 held on 06.10.2017 in Conference Hall of Rail Bhawan. In view of proposed shut

down of wheel shop of RWF, ZR and PUs were requested to seek allotment of wheels for 3'd and 4th

quarter. He then requested PED/RS(P) to address the august gathering.

2.0 PED/RS(P) :

PED/RS(P) stressed on the importance of reviewing the requirement of LHB wheels and Diesel

Loco Wheels by all the Zonal Railways and PUs in view of the enhanced production of LHB coaches

and curtailing down the production of Diesel Locomotives in future. He expressed satisfaction at the

performance of both RWF and RWP during the second quarter and desired M/s SAIL/DSP to improve

their performance. SAIL was also advised to gear up production of Electric Loco wheels in view of it's

likely increase in demand due to increased production of Electric Locomotives. He informed that the

next tender for LHB wheels is under finalization and the quantities being procured was based on the

indents submitted by the Railways / PUs. PED/RS(P) also told RWF, RWP and SAIL/DSP to pack the

wheels properly using spindles prior to it's dispatch to prevent any accident while unloading the same

by the consignees.

3.0 RWF 2 ,

PCMM /RWF stated that supply percentage of RWF was 100% w.r.t allotment during the 2"d

quarter. He informed that RWF required 8000 MT of scrap every month for manufacture of wheels &

axles. CME/RWF expressed concern at the mounting inventory of wheels in the factory and desired

maximum allotment to allow RWF to dispatch the goods.

4.0 RWP, Bela :

PCMM/RWP/Be1a apprised that more than 100% compliance was achieved.

5.0 SAIL /DSP :

GM/W&AP/SAIL informed that SAIL's compliance percentage was improving with every quarter

and they can take increased load in view of proposed shutdown of wheel shop at RWF in the 4th

quarter. He informed that special care was being taken on the proper packing of wheels to prevent

Page 16: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

recurrence of mishaps in future. The issue of delay in issuing advise of receipt of goods sent by road

transport was highlighted that was preventing SAIL from clearance of transporters bills.

6.0 Supplv Position

The position of supplies made by RWP/Bela during the previous quarter i.e. July - Sept., 2017 was

discussed. The same is tabulated as under:

SUPPLIES DURING JULY _ SEPT, 2017

S.Nos. Item QuantityPlanned(July -

Sept,2017)

ActualSupplies(July -Sept,2017)

Variation(+) excess(-) shortfatl

TotalSupplies(April -

Sept,2017)

A WHEELS(i) BOX'N'

Wheels toDrg. No.wwL-47641P.

1018 1 082 64 5463

(ii) BG CoachingWheels toDrg. No.wwL-1660/R

4580 4572 -8 7927

The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.

The item-wise planning for Oct - Dec, 2017 is shown in Annexure - II.

Page 17: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

ANNEXURE . IPosition regarding quantities planned vis a - vis actual supplies made by RWP/BELA duringthe 2nd Quarter (July - Sept, 2017).

S.NOS DRAWING &DESCRIPTION

RLY./CONSIGNEE

QTY.PLANNED(July - Sept,2017\

QTY.SUPPLIED(July - Sept,2017\

VARIATION(+) EXCESS(-) SHORTFALL

1 BOX'N'Wheelsto Drg. No.wlwL-47641R

SER/KGP 450 445 -5

SWR/UBL/AP 168 172 4

NFRAIBO 0 44 44

WR/DHD 400 42t 21

TOTAL 1018 1082 64

2 BG Coaching ER/LLH 1 530 1522 -8

Wheels to Drg.No. WWL-1660/R

ECR/HRT 300 275 -25

ECoR/MCS 500 s08 8

NR/AMV t200 1233 33

NER/IZN 350 339 -11

NFR/DBRT 400 390 -10

NWR/JU 300 30s 5

TOTAL 4580 4572 -8

TOTALWHEELS

5598 5654 56

Page 18: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

ANNEXURE IIuartei i'e' Oct - Dec' 2017 on RWP/Bela

{Anotment of wheels is for two quarters (i.e. 3rd and 4th quarter) and shall remain valid till

31.3.2018) , , r , rr, I ,

S.NOS. DRAWING &DESCRIPTION

RLYS./PUs QTY.PLANNI'D(Oct - Dec,2017)

Uonsrgnee I(emarKS

--7661LLH

1 BG Coaching

Wheel to Drg. No.

wwl-l660/R

ERECR 400 HRT

ECoR 1000 MCS

NER 3003 GKP

NFR 400 NBQ

SCR 700 TPTY

SER 500 KGP

TOTAL 6403JMP

2 BOX'N'Wheels ER OU

TOTAL 60

6463TOTALWHEELS

Page 19: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

ffiffi8IRA' g{'fi (GOVERNMENT OF INDIA)

ta dTrfir (MrNrsrRY oF RArLwAys)

W +5 (RAtr,wAy BoARD)

No. 20 I 7/RSF I 649 |2|RP-IIVDSP dated OS .10.2017

1. M/s Steel Authority of India Ltd.,Central Marketing Organisation,S&RM Division, Ispat Bhawan,40-Jawahar Lal Nehru Marg,Kolkata -700 071.

2 The Principal Chief Materials Manager,All India Railways & PiUnits.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period-IlV2017-18 (Oct - Dec,2017).

Minutes of quarterly WTA meeting for the period- III12017-18 (Oct - Dec, 2017) held with therepresentatives of SAIL/DSP and Zonal Railways/PUs in Rail Bhawan, New Delhi on 06.10.17 have beenuploaded on Indian Railway's website www.indianrailways.gov.in. To access the Minutes kindly click on"Ministry of Railways", then click on "Railway Board", then click on "About Indian Railways" Tab.,then click on " Railway Board Directorates", then click on "Stores". Then finally click on "Conferences/ Meetings" to open the page containing the minutes of the Meeting.

Please ensure that the statement of requirements of WTA items for the Quarter-IV/2017-18 (Jan -Mar,2018) reach this office latest by 15.12.17 positively. The exact date and venue of the meeting wouldadvised later on.

(Hindi version will follow)Encl.:- As above.

Copy of the Minutes of the Meeting together with allocation statement are forwarded for information andnecessary action to :-

l. CMEs, All Indian Railways/Production Units.2. Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. GM (BBM & WAP), M/s SAIL/DSP, Durgapur -713203.4. DGM I/C, WAP, IWs SAIL/DSP, Durgapur -713203.5. Chief Marketing Manager, IWs SAIL/DSP, SCOPE MINAR (17th floor), North Block, Laxmi Nagar

District Centre, Delhi - ll0 092.6. Shri Vijay Kumar, Dy.GM,lWs SAIL/DSP, SCOPE MINAR (20th floor), North Block, LaxmiNagar

District Centre, Delhi - ll0 092.7. Shri Atul Mishra, DGM (Marketing), SAIL, Comml. Dte., SCOPE MINAR (17th Floor), Laxmi

Nagar Distt. Centre, Delhi-110 0928. GM(l), M/s RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56, CR

Avenue, 3'd Floor, Kolkata -7OO 012.9. S.I.E(M) Incharge, Inspection Wing, M/s RITES c/o DSP, Durgapur-713203.10. DG(RS), AM(PU), AM(RS), PED/RS(P), EDRS(C ), EDEE(G), EDME(Chg.), EDME(W), EDME

(Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W) & DF(S)-1.

RAILWAYM.No.97l

Page 20: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

utes of the 3'd Oct - Dec) W held

PED/RS(P), EDRS(S), DRS(F)

PCMM/RWF, CME/RWF, PCMM/RWP/B ela, CME/RWp/Bela and

GM(WAP)SArL/DSP.

Principal Chief Material Managers/CMMs/SG/JAGs Stores &

Mechanical Officers of ZonalRailways & Production Units.

Present:

Railway Board:

Plants

Railway Units

1.0 General:

DRS(F) started the meeting by welcoming all the participants to the third quarterly WTA meeting of2017-18 held on 06.10.2017 in Conference Hall of Rail Bhawan. In view of proposed shut down of wheel

shop of RWF, ZR and PUs were requested to seek allotment of wheels for 3'd and 4th quarter. He then

requested PED/RS(P) to address the august gathering.

2.0 PED/RS(P):

PED/RS(P) stressed on the importance of reviewing the requirement of LHB wheels and Diesel Loco

Wheels by all the Zonal Railways and PUs in view of the enhanced production of LHB coaches and

curtailing down the production of Diesel Locomotives in future. He expressed satisfaction at the

performance of both RWF and RWP during the second quarter and desired IWs SAILiDSP to improve their

performance. SAIL was also advised to gear up production of Electric Loco wheels in view of it's likely

increase in demand due to increased production of Electric Locomotives. He informed that the next tender

for LHB wheels is under finalization and the quantities being procured was based on the indents submitted

by the Railways / PUs. PED/RS(P) also told RWF, RWP and SAILiDSP to pack the wheels properly using

spindles prior to it's dispatch to prevent any accident while unloading the same by the consignees.

3.0 RWF' :

PCMM /RWF stated that supply percentage of RWF was 100% w.r.t allotment during the2"d quarter.

He informed that RWF required 8000 MT of scrap every month for manufacture of wheels & axles.

CME/RWF expressed concern at the mounting inventory of wheels in the factory and desired maximum

allotment to allow RWF to dispatch the goods.

4.0 RWP, Bela :

PCMM/RWP/BeIa apprised that more than 100% compliance was achieved.

5.0 SAIL /DSP :

GM/W&AP/SAIL informed that SAIL's compliance percentage was improving with every quarter and they

can take increased load in view of proposed shutdown of wheel shop at RWF in the 4ft quarter. He informed

that special care was being taken on the proper packing of wheels to prevent recurrence of mishaps in future.

The issue of delay in issuing advise of receipt of goods sent by road transport was highlighted that was

preventing SAIL from clearance of transporters bills.

Page 21: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

6.0 Supply Position

The position of supplies made by IWs SAIL/DSP during the previous quarter i.e. July. - Sept., 2017

was discussed. The same is tabulated as under:-

suPPI,r4S DURING JULY - SPPT. 2017

S.Nos. Item QuantityPlanned

(July - Sept,20171

Actual {

Supplies(July - Sept,

2017\

Variation(+) excess(-) shortfall

Total Supplies(April - Sept,

2017)

A LOOSE WHEELS(i) BG Chg. Wheels

wwI--I660/R7910 685 1 -r059 t0202

(ii) BG Loco WheelswwL-4948/R

1 150 n21 -29 2184

(ii i) BG Loco Wheels"S" Shaned

3187 2757 -430 4499

(iv) WAG-9 Locowheels

2543 2t65 -378 4343

(v) WAP-5 LocoWheels

272 260 -12 443

(vi) MG Loco Wheelswwl--4gss/R

21 0 -21 0

(vii) EMU/DEMUWheels to Drg.No.K-4004

2169 2048 -121 4839

(viii) NG Wheel disc 3ll 3ll 0 642TOTALWHEELS

17563 tssl3 -2050 27152

B LOOSE AXLES(i) l6T BG Coaching

Axles CG-K-60151 103 983 -120 2214

(ii) Axles forgings(heat treated andtempered butwithout machinins)

0 0 0 0

TOTAL AXLES 1103 983 -120 2214

The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.

The item-wise planning for Oct - Dec, 2017 is sh6wn in Annexure - II.

Page 22: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

-

ANNE'\'TTDE T

Quarter (July - Sept,2017).t'--

2nd

S.NOS. DRAWING &DESCRIPTION

RLY./ CONSIGNEE QTY.PLANNED(July - Sept,2017)

QTY.SUPPLIED(July - Sept,2017)

VARIATION(+) EXCESSG) SHORTFALL

AXLES

I BG Chg. Axles toDrg. No. CG K-601 5

ER/HLR 80 80 0ECR/HRT 63 56 -7ECoR/MCS 2t0 210 0NR/AMV 318 244 -74NCR/JHS 46 46 0NER/GKP/IZN 180 172 -8NFR/r{BQ 50 50 0NWR/AII 56 55 -1SER/KGP 100 70 -30TOTAL 1103 983 -120

TOTAL AXLES 1103 983 -120

WHBELS

BG Chg. Wheelsto Drg.No.WWL-1660/R

CR/MTN 400 373 -27ER/HLR/LLH 940 928 -12ECoR/MCS 500 3s0 - 150NR/JUDW 520 520 0NCR/JHS 200 0 -200NER/GKP 1050 988 -62NWR/JU/AII/BKN 1522 r322 -200SCR.LGD 600 600 0SER/KGP s00 439 -61SECR/RWSS t67 0 -167WR/PLlBVP 378 259 -1 l9WCR/BPL J-)-' 272 -6rICF 800 800 0TOTAL 7910 6851 -r059

,) BG Loco Wheels/DSL MonoBlock RoughmachinedWDM2, WDM3and WAG5 toDrg. No. D/WL-4948tP.

CR/BSL/PR 200 180 -20ER/KPA/JMP 600 s91 -9SER/KGP/TATA 3s0 3s0 0

TOTAL 1150 lt2l -29

1J BG Loco Wheels"S" Shaped toDrg. No. D/WL-5060/R

CR/PR/BSL 200 100 -100ECoR/VSKP 100 76 -24NR/CB/ASR 860 673 -187NCR/CNB 110 91 -19SR/Lw/PER/GOC 900 859 -41SWR/MYSS 50 0 -50

Page 23: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

WR/DHD s50 541 -9DMW 4t7 4t7 0TOTAL 3187 2757 -430

4 MG Loco Wheelto Drg. No.wwl-49ss/R

NER/IZN 21 0 -21

TOTAL 2t 0 -21

5 WAP-5 LocoWheels to Drg.No.1210-01-111003

NR/GZB r92 r80 -12CLW 80 80 0

TOTAL 272 260 -12

6 WAG 9 Locowheel to Drg. No.1209.01.1 I 1 .003

CR/BSL 82 82 0

ER/KPA 180 180 0

SR/Lw/PER 56 36 -20

SCR/LGD 222 176 -46

SER/TATA 53 53 0

SECR/Bhilai 29 0 -29

WR/DHD 35 0 -35

CLW 1 886 I 638 -248

Total 2543 2t6s -378

7 EMU/DEMUWheels to Drg.No. K-4004

CR/MTN 1045 I 005 s60ER/HLR 445 445 195NR/CB/GZB 250 208 t79NWR/AN 29 0 -400RCF 400 390 -1779TOTAL 2169 2048 -lzt

8 NG CoachingWheels to Drg.No.A1/005.00.000/90366 (Rev.A)

NR/KLK 311 3ll

TOTAL 311 311 0

TOTALWHEELS

17s63 1s513 -20s0

Page 24: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

ANNEXURE - II

Allocation sheet for supply of WTA items for the 3rd quarter i.r

{Allotment of wheels is for two quarters (i.e. 3rd and 4th quartt:. Oct - Dec, 2017 on M/s SAIL/DSPrr) and shall remain valid till 31.3.2018)

s.Nos. DRAWING &DESCRIPTION

RLYS./PUs QTY. PLANNED(Oct - Dec, 2017)

Consignee

AXLES

3C Chg. Axles to

)rg. No. WTAC-3-)2-303

ER 175 85- Dy. CMM/HLR90-Dv. CMM/LLH

ECoR 210 SMM/CRWA4CS

NR 365 235-Dy. CMM/AMV-LKO100- Dy. CMM/JUDW

30- Dy. CMM/ASR

NER 149 79-Dy.CMM/DepoVGKI70-Dv. CMM/Depot/IZIr

NFR l6c 100-Dy.CMMA{B(60-Dv. CMM/DBRI

SER 75 KGP

WCR 13i BPL

RCF 44{

rOTAL 1709

WHEELS

I BG Chg. Wheels to

Drg. No.WAML-1660/R

CR 1000 Dv. CMM(CWEYMTN

ER 500 Dv. CMM/LLH

ECoR 1 000 SMM/CRW/MCS

NR 1500 700-Dy. CMM/JUDW800-Dv. CMI\flAMV-LKO

{CR r0( Dy. CMM/GSD/JHS

NER 610 Dv. CMM./Deoot/ZN

)JFR 600 DY. CMM/DBRT

NWR 200 Dv. CMM/BKN

SCR 600 Dv. CMM/ELS/LGD

SER 1 s00 Dv. CMM/WS/KGI

SECR 428 Dv. CMM/RWSSE

WR 1730 I 150- AMM(C)/Lower Pare

530-AMM(C-BGyBVI50-AMM(LyDHr

WCR t25{ DY. CMM.D(CRWSYBPI.

TOTAL 1101t

BG Loco Wheels

/DSL Mono BlockRough machinedWDM2, WDM3and WAG5 to Drg.No. WWL-4948/R

BHEL 190 Dy. GM/CRIVBHEL/JHS

TOTAL 190

J BG Loco Wheel'S'Shaped to Drg. No.

D/WL-s060/R

CR 675 400-Dy. CMM(AC)/Loco/BSL275-Dv. CMM/PR

ER 7'75 485-SM]\{/D/KPA290-Dv. CMIWJMP

NR 1200 800-Dy. CMIWCB400-Dy. CMM/ASR

NCR 180 SMM(ETDYCNB

NER 50 Dy. CMM/Depot/IZN

SR I l0c 600-Dy. CMM/LW/PEF500-Dv. CMM/MSD/GO(

SCR l4t 60-Dy. CMM/ELS/LGD88-

SER 68( Dv. CMM/WS/KGP

Page 25: :s I - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/RWF... · 6.0 SuPPlv Position The position of supplies-1ade.bv nll during the previous quarter i'e

swR 45 Dy. CMM/MYSS

WR I 000 AMM(L)/DHD

rOTAL 5853

4 WAG-9 LocoWheels to Drg. No.

1209-0 1-l I l-003Alt 2 or latest

CR 236 Dy. CMM(AC)&ooo/BSL

ER ll SMM/D/KPA

SCR 3l Dy. CMM/ELS/LGI

SER 5( SMM/ELS/TATA

SECR 9i AMIWELS/Bhilai.

DLW 600 Dy. CMM(D)/DLW

CLW 600 SMM(RBYCLW

TOTAL 2004

5 WAP-5 LocoWheels to Drg. No.

1210-01 -1 1 l-003

CR 46 Dv. CMM(AC)/Loco/BS[

WR lll AMM(LYDHD

lLw 63 SMM(RBYCLW

TOTAL 220

6 EMU/DEMUWheels to Drg. No.

K-4004

R I 000 DY. CMM(CWEYMTN

ER 430 Dv. CMM/FILR

NR 9l AMM/EMU/GZE

NWR 6C AMM/DSL/AI]

SCR 85 60-Dy. CMM/ELS/LGI25-Dv. CMM/CRS/TPT\

SER 149 133-DY. CMM/IVS/I(GP

l6-Dy. CMM/WS/KGP(16 nos. to be transfered toSECR)

WR 302 AMM(CYPt

ICF 400 Dy. CMM/Shell/DepoVICI

TOTAL 2517

TOTAL WHEELS 21802