Rydon: This offer is subject to contract. If Rydon s tender is under consideration, Rydon would need to discuss the conditions of contract wording of the bond and other ancillary documents. Tender is exclusive of VAT. Rydon would wish to see the land title documents before commenting on wayleaves, easements and rights of way. Staged payments/milestone schedules Rydon has priced the scheme as drawn and assume it complies with the Employer's special requirements. Rydon requested drawings to be made available in CAD fonnat and reports to be assigned to them with no charge should they be successful in securing the project. The following are excluding from the tender sum: - (a) Asbestos (Arfelia note: there's already a provisional sum of£100k in the fender) (b) Part^'wall surveyors, fees or works (c) Rights of light surveyors, fees ofworks, insurance or compensation (d) Japanese Knotweed (e) Section 106 payments or commuted sums in respect of any adoption agreement. (f) Planning fees (g) Ordnance removal (h) Costs or delays associated with archaeological interest (j) Contamination Rydor 's supply: ^hain partners are advising that there are further significant cost savings tha t could be achieved. Rydon have made provision for a management trainee, 3 craft apprentices and 20 places on their LiveTrain trade skills programme for employment opportunities for local residents. Artelia_00002646 ART00006410 0001 ART00006410/1

Upload: others

Post on 25-Mar-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Rydon:

• This offer is subject to contract.

• If Rydon s tender is under consideration, Rydon would need to discuss the conditions of contract wording of the bond and other ancillary documents.

• Tender is exclusive of VAT.

• Rydon would wish to see the land title documents before commenting on wayleaves, easements and rights of way.

• Staged payments/milestone schedules

• Rydon has priced the scheme as drawn and assume it complies with the Employer's special requirements.

• Rydon requested drawings to be made available in CAD fonnat and reports to be assigned to them with no charge should they be successful in securing the project.

• The following are excluding from the tender sum: -(a) Asbestos (Arfelia note: there's already a provisional sum of£100k in the fender)

(b) Part^'wall surveyors, fees or works (c) Rights of light surveyors, fees o fworks, insurance or compensation

(d) Japanese Knotweed (e) Section 106 payments or commuted sums in respect of any adoption agreement.

(f) Planning fees (g) Ordnance removal (h) Costs or delays associated with archaeological interest (j) Contamination

Rydor 's supply: ^hain partners are advising that there are further significant cost savings tha t could be achieved.

• Rydon have made provision for a management trainee, 3 craft apprentices and 20 places on their LiveTrain trade skills programme for employment opportunities for local residents.

Artelia_00002646

ART00006410 0001

AR

T00006410/1

Durkan: Comments

• Should Durkan's tender prove of interest, there are a number of points that they wish to discuss further prior to entering into contract.

• The use of a r d restriction to new installations only have been allowed for to meet BREEAIVl Good.

• Assumed that all CDM regulations and requirements of the CDM Co-ordinator have been included in the tender design and have made no allowance for CDMC appointment.

• No allowance for any specific work relating to the affected buildings or for party wall surveyor fees (client's appointment).

• Assumed that the existing adjoining construction site will maintain the existing boundary hoarding throughout the contract period.

• Allowed for demolition as detailed on contract drawings. No aiiowance for any special measures such as noise suppression or alternative demolition methodsto reduce noise,

• Allowance made for asbestos removal to the boxing club and nursery. No allowance for asbestos removal to the existinq other areas.

• Excluding UXB risk.

• No W A C or contamination testing has been completed. Assumed all wastes arising are clean/inert material in respect to muck-awav and waste transfer regulations. No aiiowance for any remediation o f t he site.

• No allowance for disposal of any material not identified in the existing soil investigation.

• Allowed a provisional sum for breaking out obstructions.

• No allowance fo r the removai or treatment of hazardous vegetation (Japanese Knotweed, etc.)

• Allowed to carry out an ecological survey of the site, assume that these surveys can be carried out in line with programme.

Durkan: Comments

Artelia_00002646 ART00006410 0002

AR

T00006410/2

• A provisional allowance for licences { highway issues, road closures/hoarding licence/traffic restrictions/crane licence). No allowance for the installation or application for any new parking bays outside the site boundary/on the public highway. Assumed licenses will be granted to working areas where retaining structures are required to the site boundaries.

• No aiiowance for legal fees for Section agreement 185/278

• No allowance for rail/underground

• Durkan recommend that the Ciient and the existing design team undertake ali measures to ensure the rights of way/covenants/rights of Ight issues have been addressed prior to the commission o f t he contractor. Durkan's tender Is qualified to remove any responsibility for any such inherent design. As part of the pre-commission consultations, Durkan is happy to discuss the merit o l an insurance policy to be put in place by the Clieni. No allowance for any works or payments in regard to covenants that may be in place or required, assume the Clieni has designed such works into the scheme concept and that payments are lo be organised by the Clieni outside o f t h e coniract.

• Excluding archaeology

fi No report has been provided for Fire strategy. No allowance for sprinkler system, pressurised systems, firefighting iifl S

etc.

No allowance for preparation of the existing surfaces for new cladding system.

Assumed windows will be cleaned from the inside and accordingly have not included for ladder fixings, cradles,

Insulation is to meel BR and CFSH requirements.

• Allowed for Wincona windows and doors • Allowed for Wincona windows and doors

• No allowance for heating in the corridors or communal spaces and overheating in common areas.

• Provisional sums for general signage. Signage identified on drawings has been allowed forwi lh in the bid.

Durkan: Comments • No allowance for emergency lighting and sprinklers within new flals.

Artelia_00002646 ART00006410 0003

AR

T00006410/3

• Provisional sums for kitchen and worktop.

• No allowance for roads to adoptabie standards.

• Allowed 8 nr new lighting columns forstreet lightings.

• Unable to ascertain the presence of adopted drainage on the site, any stopping up diversions or build-over notices required.

• Allowed 4 new connections from the new surface water drainage to the existing.

• No allowance made for pumping and attenuation.

• Allowed to carry out a flood risk assessment to meet BREEAIVl requirements. No allowance for any flood protection measures.

• No allowance for any tree works.

• No allowance for any service diversions, new connections, substation, water boosting pumps, data cabling.

• Assumed all existing services which are connecting into are suitable, in full working order and have been tested and certified to current requlations.

• Provisional sum for alterations to existing lifts to Incorporate additional floors/landings.

• Assumed conditions will be discharged within a reasonable timescale, the Client will cover all costs relating to achieving planning approval should the need arise. Allowed for the cost of submission for 11 conditions as detailed in planning.

• No allowance for any further surveys, any sums for section 106 planning or CIL costs, and NHBC Buildmark Choice cover.

D u r k a n ; Comments

Artelia_00002646 ART00006410 0004

AR

T00006410/4

• Provisional saving of £168,900.00 within the bid, due to the uncertainty regarding ECO funding, Durkan unable to go firm at this stage.

• Allowed 10% performance bond on it expiring at practical completion. Require the reinstatement of Clause 2.26.13 - Extension of time for delay in receipt of any permission or approval of a statutory to be deleted. Clause 2 26.14 - Extension of time clause for force maleure to be deleted

• The current design needs further development to fully firm up current provisional allowances.

• No allowance fo r the requirements o f the HCA Empioyment and Skills Plan.

Artelia_00002646 ART00006410 0005

AR

T00006410/5

Mulallev: Comments

• Contract sum analysis not fully populated.

• There are a number of points that need to discuss prior to entering into a contract

• No offer on alternative design solut ion for A lumin ium cladding.

• Al lowed provisional sum for K.A .L .C Preconstruct ion works at £5,000.00.

Artelia_00002646 ART00006410 0006

AR

T00006410/6