rural electrification corporation limited rural electrification rajiv gandhi grameen vidyutikaran...

62
Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Upload: delilah-hart

Post on 12-Jan-2016

233 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Rural ElectrificationRajiv Gandhi Grameen Vidyutikaran Yojana

(RGGVY)

Hyderabad

29.10.2010

Page 2: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Rural Electrification – Indian Perpsective

A vital programme for socio-economic development of rural areas

To ensure rapid economic development by providing electricity as an input for productive uses in agriculture, rural industries, etc.

To improve the quality of life of the rural people by supplying electricity for lighting of rural homes and hearths, shops, community centres, public places etc.

2

Page 3: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Genesis of India’s RE Programme

Evolution of India’s rural electrification programme can be divided into five distinctive stages.

Stage I

1951-planned electrification of villages taken up with the main objective of providing electricity as a social amenity-

More than 45,000 villages covered.

Stage II

Mid Sixties- focus on the role of electricity as development input with a primary objective of energizing pump sets-

More than 2 lakh villages and more than one crore pump sets energised

Page 4: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Genesis of India’s RE Programme

Stage III

Decade of Eighties- RE seen as a tool for correcting regional inequalities

More than 2.20 lakh villages electrified, around 43 lakh pump sets energised

Stage IV

Decade of Nineties – Deteriorating financial conditions of SEBs break the tempo.

Emphasis on improving system efficiencies rather than extensive coverage

Only 41,000 villages electrified

Page 5: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Genesis of India’s RE Programme

Stage V

2001 onward-

Household electrification rather than village electrification is the new focus of RE programme

Page 6: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Major RE Programmes

Minimum Needs Programme

Started in Vth Plan

Targetted states with village electrification lower than national average

100% loans for last mile connectivity

Discontinued in 2004-05 because of lack of response from States

Page 7: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Major RE Programmes

Kutir Jyoti Programme

Initiated in 1988-89

Single point connection to BPL households

100% grant

Rs. 612 crore released

71.7 lakh BPL household connected in 16 years

Merged with AREP in 2004 and now with RGGVY

Page 8: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Major RE Programmes

Pradhan Mantri Gramodaya Yojana (PMGY)

Launched in 2000-2001

Funding provided for minimum services in rural areas (health, education, drinking water and electrification etc)

Funding as additional central assistance on 90% loan and 10% grant principle

Flexibility to states to decide on inter-allocation amongst basic services

Discontinued from 2005

Page 9: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Major RE Programmes

Accelerated Rural Electrification Programme (AREP)

Launched in 2002

Interest subsidy of 4%

Applicable on loans given through PFC/REC and NABARD

Page 10: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Major RE Programmes

Accelerated Electrification of one lakh villages and one crore households

Launched in 2004

40% capital subsidy and 60% loan

AREP and Kutir Jyoti schemes merged with the programme

Page 11: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Trend in Village Electrification

Achievement per annum in Village Electrification

16599 15511

2410620101

2333 2663

8261

1969-74 1974-80 1980-85 1985-90 1992-97 1997-02 2002-07(P)

Time period

No

. of

Vill

ages

ele

ctri

fice

d

per

an

nu

m

Page 12: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Status of Village Electrification (As per 2001 Census)

593732

474162

119570

0

100000

200000

300000

400000

500000

600000

700000

Total Villages Electrified Villages

Unelectrified Villages

Page 13: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Status of Rural Household Electrification (2001 census)

Number in Crores

13.83

6.02 (44%)

7.81(56%)

Total Households Electrif ied Households Unelectrif ied Households

Page 14: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Characteristics of RE Programme

Utilities view point

High cost per unit

Difficult recovery of cost of operations

Sub-optimal and risky investment

Involves large capital and revenue subsidy

Sustainability

Page 15: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Characteristics of RE Programme

Users view point

Accessibility

Availability

Reliability

Affordability

Quality

Page 16: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Accessibility

States with more the 10% villages to be electrified

• Barring these eight

States, others have

electrified more than

90% of their villages

• Has this apparent

success led to

access of

electricity by the

rural households ?

0%

20%

40%

60%

80%

100%

WB

Orissa

Assam

Bihar

Arunachal

UP

Meghalaya

Jharkhand

Page 17: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

States with > 25% households to be electrified

25%

28%

28%

29%

30%

32%

34%

35% 38%

40%

43% 47%

50% 55%

56%

56%

68%

70%

80%

80%

81%

83%

95%

90%J&

K

K'taka

Guj

TN

Chattisgarh

Andam

an

Kerala

M'tra

MP

AP

Nagaland

Manipur

Uttaranchal

Arunachal

Mizoram

Rajasthan

Tripura

Meghalaya

WB

UP

Orissa

Assam

Jharkhand

Bihar

25%

28%

28%

29%

30%

32%

34%

35% 38%

40%

43% 47%

50% 55%

56%

56%

68%

70%

80%

80%

81%

83%

95%

90%J&

K

K'taka

Guj

TN

Chattisgarh

Andam

an

Kerala

M'tra

MP

AP

Nagaland

Manipur

Uttaranchal

Arunachal

Mizoram

Rajasthan

Tripura

Meghalaya

WB

UP

Orissa

Assam

Jharkhand

Bihar

Availability

Page 18: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Changing Definitions of village Electrification

Prior to October 1997

village was classified as electrified if electricity is being used within its revenue area for any purpose whatsoever.

In 1997, the definition was modified to provide for the use of electricity to village habitations.

a village will be deemed to be electrified if the electricity is used in the inhabited locality within the revenue boundary of the village, for any purpose whatsoever.

Page 19: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Changing Definitions of village Electrification

February 2004

a village would be declared electrified if:

Basic infrastructure such as distribution transformer and distribution lines are provided in the inhabited locality as well as the dalit basti/hamlet where is exists. (For electrification through non-conventional sources a distribution transformer may not be necessary)

Electricity is provided to public places like schools, panchayat offices, health centres, dispensaries, community centres etc, and

The number of households electrified should be at least 10% of te total number of households in the village.

Page 20: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)

Aims at…

Electrifying all villages and habitations.

Providing access to electricity to all rural households.

Giving Electricity Connection to Below Poverty Line (BPL) families free of charge.

Main Features

All ongoing schemes merged in “Rajiv Gandhi Grameen Vidyutikaran Yojana” (RGGVY)

90% grant and 10% loan

Electrification as per new definition

Franchisee arrangement for revenue sustainability

Page 21: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Through creation of :

Rural Electricity Distribution Backbone (REDB) with 33/11 KV (or 66/11 KV) sub-station of adequate capacity in blocks where these do not exist.

Village Electrification Infrastructure (VEI) with provision of distribution transformer of appropriate capacity in villages/habitations.

Decentralised Distributed Generation (DDG) Systems based on conventional & non conventional energy sources where grid supply is not feasible or cost-effective.

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)

Page 22: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

RGGVY – Implementation FrameworkFor effective and expeditious implementation, REC has prepared-

Guidelines for project formulation

Guidelines for procurement

Tripartite / Quadripartite agreements

MOUs with CPSUs for providing services to states

Specifications of equipment / material

Construction standards

Franchisee guidelines

3rd party quality monitoring guidelines

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)

Page 23: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Role of REC….. Nodal Agency

Project scrutiny and Appraisal

Preparation of specification for equipment & material and Construction standard for erection

Co-ordination with MOP, Implementing agencies/ State Govts.

Release of funds to implementing agencies

Monitoring of projects

Ensuring appointment of the franchisee by SPUs.

Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)

Page 24: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Role of MOPPolicy framework

Sanction of projects through Monitoring Committee

Release of Capital Subsidy

Monitoring of programme

Page 25: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Role of CPSUs

State may opt services of CPSUs for-

Project Formulation

System planning

Design engineering

Procurement of goods and services

Construction/implementation/ Commission

Project monitoring and supervision of quality of work.

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Page 26: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Role of State Govts./state power utility

Appointment of independent agency for monitoring and supervision of quality of works

Deployment of franchisees for the management of rural distribution

Determination of Bulk Supply Tariff to ensure commercial viability of franchisees

Provision of requisite revenue subsidy to the state utilities, as required under Electricity Act, 2003.

Adequate arrangement for supply of electricity

Providing authenticated BPL List

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Page 27: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Role of Monitoring Committee

Ministry of Power has constituted monitoring committee under the Chairmanship of Secretary (Power) with representatives from Planning Commission, Dept. of Expenditure, MNRE, Ministry of Rural Development and Ministry of Panchayti Raj

Monitoring Committee review and monitor the implementation of scheme including sanction of projects, revised cost estimates and issue necessary guidelines from time to time for effective implementation of the scheme.

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Page 28: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Projects No. of Projects

Un-electrified Villages

Intensive Electrification

of Villages

BPL HH covered

Outlay in Rs. Cr.

(Sanctioned cost)

Approved under 10th Plan

235 68763 111936 83.10

Lakh

9733

Approved under 11th Plan

338 49736 243031 163.35 Lakh

16620

Total 573 118499 354967 246.45 Lakh

26353

As on 15.10.2010

Project Outlay and Coverage (All India)

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Page 29: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Projects No. of Projects

Un-electrified Villages

Intensive Electrification

of Villages

BPL HH covered

Outlay in Rs. Cr.

(Sanctioned cost)

Approved under 10th Plan

35 46* 42813 27.64

Lakh

1043

Approved under 11th Plan

49 23* 25905 13.22

Lakh

979

Total 84 69* 68718 40.86

Lakh

2022

As on 15.10.2010

* Revised Coverage in Karnataka

Project Outlay and Coverage (Southern Region)

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Page 30: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

States No. of Projects

Un-electrified Villages (Revised

Coverage)

Intensive Electrification

of Villages

BPL HH covered

Outlay in Rs. Cr. (Sanctioned

cost)

Andhra Pradesh

X Plan 17 - 21623 21.14 Lakh 648

XI Plan 9 - 5858 4.78 Lakh 192

Total 26 - 27481 25.92 Lakh 840

Karnataka

X Plan 17 46* 21152 6.32 Lakh 375

XI Plan 8 23* 7039 2.60 Lakh 225

Total 25 69* 28191 8.92 Lakh 600

Kerala

X Plan 1 - 38 0.18 Lakh 20

XI Plan 6 - 592 0.38 Lakh 114

Total 7 - 630 0.56 Lakh 134

Tamil Nadu

X Plan - - - - -

XI Plan 26 - 12416 5.45 Lakh 447

Total 26 - 12416 5.45 Lakh 447

Total (Southern Region)

X Plan 35 46* 42813 27.64 Lakh 1043

XI Plan 49 23* 25905 13.22 Lakh 979

Total 84 69* 68718 40.86 Lakh 2022

Project Outlay and Coverage (Southern Region – State wise)

Page 31: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Physical Achievement so far – As on 15.10.2010 (All India)

Particulars Electrification of UEV Intensive Electrification of Electrified Villages

Connections to BPL H/Hs

Coverage Achievement Coverage Achievement Coverage Achievement

X Plan 68763 62047 (90%) 111936 90743(81%) 83.10 Lakh

68.96 Lakh (83%)

XI Plan 49736 23096(46%) 243031 61000(25%) 163.35 (Lakh)

60.82 Lakh (37%)

Grand Total 118499 85143(72%) 354967 151743(43%) 246.45

(Lakh)

129.78 Lakh

(53%)

31

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

Page 32: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Physical Achievement so far – As on 15.10.2010 (Southern Region)

Particulars Electrification of UEV Intensive Electrification of Electrified Villages

Connections to BPL H/Hs

Coverage Achievement Coverage Achievement Coverage Achievement

X Plan 46* 46 (100%) 42813 37009(86%) 27.64

Lakh

27.73 Lakh (100%)

XI Plan 23* 13(57%) 25905 11128(43%) 13.22

Lakh

10.14 Lakh (77%)

Grand Total

69* 59(86%) 68718 48137(70%) 40.86

Lakh

37.87 Lakh

(93%)

32

Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)

*Revised Coverage in Karnataka

Page 33: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Physical Achievement so far - As on 15.10.2010 (Southern Region – State wise)

States

Electrification of UEVIntensive

Electrification of Electrified Villages

Connections to BPL H/Hs

Revised Coverage

Achd

%Covera

geAchd. % Coverage Achd. %

Andhra Pradesh

X Plan - - - 21623 17773 82% 21.14 Lakh 21.20 Lakh 100%

XI Plan - - - 5858 3421 58% 4.78 Lakh 3.93 Lakh 82%

Total - - - 27481 21194 77% 25.92 Lakh 25.13 Lakh 97%

Karnataka

X Plan 46* 46 100% 21152 19199 91% 6.32 Lakh 6.36 Lakh 100%

XI Plan 23* 13 57% 7039 3636 52% 2.60 Lakh 1.23 Lakh 47%

Total 69* 59 86% 28191 22835 81% 8.92 Lakh 7.59 Lakh 85%

Kerala

X Plan - - - 38 37 97% 0.18 Lakh 0.17 Lakh 97%

XI Plan - - - 592 - - 0.38 Lakh - -

Total - - - 630 37 6% 0.56 Lakh 0.17 Lakh 31%

Tamil Nadu

X Plan - - - - - - - - -

XI Plan - - - 12416 4071 33% 5.45 Lakh 4.98 Lakh 91%

Total - - - 12416 4071 33% 5.45 Lakh 4.98 Lakh 91%

Total(Southe

rn Region)

X Plan 46* 46 100% 42813 37009 86% 27.64 Lakh 27.73 Lakh 100%

XI Plan 23* 13 57% 25905 11128 43% 13.21 Lakh 10.14 Lakh 77%

Total 69* 59 86% 68718 48137 70% 40.85 Lakh 37.87 Lakh 93%

Page 34: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Thank You

Page 35: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

BACK UP SLIDES

Page 36: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

X Plan Projects (Andhra Pradesh)

SL. No. Name of District

Name of State Power Utility and

Implementing agency

Coverage

BPL HH

Total sanctioned project cost

(Lacs)

Total Award project cost

(Lacs)Date of Saction

Award DateUE Villages

IE Villages

1 Anantapur CPDCL - 926 51408 2355.05 2355.05 7-Oct-05 7-Jun-06

2 Mahboob-nagar CPDCL - 1477 220158 5661.54 5661.54 24-Oct-05 20-Aug-06

3 Kurnool CPDCL - 902 135203 3718.15 3718.15 25-Oct-05 10-Apr-07

4 Nalgonda CPDCL - 1124 78352 3140.16 3140.16 26-Oct-05 17-Jan-06

5 Srikakulam EPDCL - 1819 194941 5517.61 5517.61 26-Oct-05 17-Mar-06

6 Vizianangaram EPDCL - 1438 149755 4186.74 4186.74 27-Oct-05 4-Mar-06

7 West Godavari EPDCL - 1141 87831 3273.04 3273.04 28-Oct-05 4-Mar-06

8 Vishakhapatnam ESDCL - 2620 204113 6667.56 6667.56 7-Oct-05 4-Mar-06

9 Khammam NPDCL - 1245 132334 3891.85 3891.85 7-Oct-05 10-Apr-06

Page 37: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

SL. No. Name of District

Name of State Power Utility and

Implementing agency

Coverage

BPL HH

Total sanctioned project cost

(Lacs)

Total Award project cost

(Lacs)Date of

SanctionAward DateUE

VillagesIE

Villages

10 Nizamabad NPDCL - 1050 60036 2639.28 2639.28 5-Mar-08 10-Apr-06

11 Adilabad NPDCL - 1760 103184 4202.24 4202.24 24-Oct-05 10-Apr-06

12 Guntur SPDCL - 694 135273 3180.80 3180.80 7-Oct-05 2-Aug-06

13 Chittoor SPDCL - 1274 120186 3653.20 3653.20 24-Oct-05 23-Feb-06

14 Krishna SPDCL - 1005 87774 2776.05 2776.05 24-Oct-05 23-Feb-06

15 Kadapa SPDCL - 954 104205 3146.58 3146.58 24-Oct-05 23-Feb-06

16 Prakasham SPDCL - 1067 127633 3384.85 3384.85 24-Oct-05 23-Feb-06

17 Nellore SPDCL - 1127 121931 3420.91 3420.91 24-Oct-05 10-Mar-06

17 Total (Ar.P.)     21623 2114317 64815.60 64815.60    

X Plan Projects (Andhra Pradesh)

Page 38: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

XI Plan Projects (Andhra Pradesh)

Sr.No.Name of the District(s)

Name of Implementing

Agency

Coverage

BPL HHSanctioned Project Cos

t (Lacs)

Total Award project cost

(Lacs)Date of

approvalStatus of Award

UE Villages

IE Villages

1 3 4 5 6 7 8 9 10 11

1 Medak CPDCL 0 1061 34367 2176.46 2973.12 22-Jan-08 Awarded 23-02-10

2 Ranga Reddy CPDCL 0 893 14883 940.83 1358.36 22-Jan-08 Awarded 23-02-10

3 East Godavari EPDCL 0 1323 245334 8021.12 9322.34 22-Jan-08 Awarded 23-09-06

4 Karimnagar NPDCL 0 935 19417 1903.84 1297.12 22-Jan-08 Awarded 10-04-06

5 Warangal NPDCL 0 1003 71199 3177.61 1569.83 22-Jan-08 Awarded 10-04-06

6Anakapalle(Visha

khapattnam)RE-coop society 0 143 39368 1094.00 1094.00 22-Jan-08 Awarded 04.02.09

7Cheepurupalli (Vizianagaram)

RE-coop society 0 104 29200 804.13 804.13 22-Jan-08 Awarded 08.12.08

8 Kuppam(Chittor) RE-coop society 0 223 14835 594.20 594.20 22-Jan-08 Awarded 18.12.08

9Sircilla

(Karimnagar)RE-coop society 0 173 9220 481.67 481.67 22-Jan-08 Awarded 20.01.09

9     0 5858 477823 19193.86 19494.77    

Page 39: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

X Plan Projects (Karnataka)

SL. No.

Name of District

Name of State Power Utility

and Implementing

agency

Coverage

BPL HHTotal

sanctioned project cost

Date of Saction

Award DateUE Villages

IE Villages

1 Tumkur BESCOM 10* 3224 26094 1626.24 14-Sep-05 17-Mar-06

2 Bangalore (Rural) BESCOM -  2043 39406 2604.31 14-Sep-05 17-Mar-06

3 Kolar BESCOM -  3307 36744 2201.02 14-Sep-05 17-Mar-06

4 Davangere BESCOM -  795 50472 2972.00 14-Sep-05 27-Mar-06

5 Chitradurga BESCOM 2 1174 36188 2923.54 14-Sep-05 17-Mar-06

6 Hassan CESCOM 34* 2471 41565 3253.64 4-Oct-05 2-Jan-06

7 Mandya CESCOM -  1404 8760 819.03 4-Oct-05 2-Jan-06

8 Mysore CESCOM -  1478 92345 3741.88 4-Oct-05 2-Jan-06

9 Bidar GESCOM -  613 25863 1673.53 4-Oct-05 3-Feb-06

10 Koppal GESCOM -  624 28515 1732.68 4-Oct-05 3-Feb-06

11 Raichur GESCOM -  814 28335 2178.25 4-Oct-05 3-Feb-06

12 Bellary GESCOM -  537 45889 2253.91 4-Oct-05 3-Feb-06

13 Dharwad HESCOM -  388 21936 1329.37 14-Sep-05 20-Jan-06

14 Haveri HESCOM -  690 39429 1961.37 4-Oct-05 20-Jan-06

15 Bijapur HESCOM -  665 48899 2329.21 4-Oct-05 20-Jan-06

16 Gadag HESCOM -  321 27911 1382.01 4-Oct-05 20-Jan-06

17 Bagalkot HESCOM -  604 33477 2557.08 4-Oct-05 20-Jan-06

17 Total (Karnataka)   46* 21152 631828 37539.07    

*Revised Coverage

Page 40: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

XI Plan Projects (Karnataka)

Sr.No.Name of the District(s)

Name of Implementing

Agency

Coverage

BPL HHSanctioned Project Cost

Date of Sanction Status of Award UE

VillagesIE

Villages

1 Chamrajnagar CESCOM 0 422 22781 1131.81 22-Jan-08 Awarded 27.09.08

2 Kodagu CESCOM 0 296 39669 3839.09 04-Aug-09 Awarded 04.08.09

3 Gulbarga GESCOM 0 1344 58973 4325.24 22-Jan-08 Awarded 08.02.06

4 Belgaum HESCOM 5 1131 62430 4580.21 22-Jan-08 Awarded 13.02.07

5 Uttar Kannada HESCOM 18* 1219 19657 2487.24 22-Jan-08 Awarded 13.02.07

6 Hukeri HESCOM 0 123 14074 721.80 13-Mar-08 Awarded 13.02.07

7 Shimoga MESCOM 0* 1471 23098 2344.15 22-Jan-08 Awarded 02.03.09

8 Chickmagulur MESCOM 0* 1033 19429 3041.15 22-Jan-08 Awarded 02.03.09

8Total (karnataka)

 23* 7039 260111 22470.69    

*Revised Coverage

Page 41: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

X Plan Projects (Kerala)

SL. No.

Name of District

Name of State Power Utility

and Implementing

agency

Coverage

BPL HHTotal

sanctioned project cost

Date of Saction

Award DateUE

VillagesIE

Villages

1 Idukki KSEB - 38 17834 1975.95 5-Aug-05 27-Jan-07

1 Total (Kerala)   38 17834 1975.95    

Page 42: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

XI Plan Projects (Kerala)

SL. No.

Name of DistrictName of

Implementing agency

Coverage

BPL HHTotal

sanctioned project cost

Date of SanctionUE

VillagesIE

Villages

1 Kozhikode KSEB - 87 11920 1692.93 23-Feb-10

2 Kannur KSEB - 78 5136 1971.40 23-Feb-10

3 Mallapuram KSEB - 122 7897 3263.46 23-Feb-10

4 Kasargod KSEB - 113 4194 1460.71 23-Feb-10

5 Pallakad KSEB - 144 3955 1635.40 23-Feb-10

6 Wyanad KSEB - 48 5415 1433.44 23-Feb-10

6 Total (Kerala) - 592 38517 11457.32  

Page 43: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

XI Plan Projects (Tamil Nadu)

Sr.No.Name of the District(s)

Name of Implementing

Agency

Coverage

BPL HHSanctioned Project Cost

(Lacs)

Total Award Project Cost

(Lacs)

Date of Sanction

Status of Award / Award expected to

be finalisedUE

VillagesIE Villages

1 Karur TNEB 0 154 16679 950.820 950.820* 04-Feb-08 Awarded 18.06.08

2 Salem TNEB 0 380 27586 2075.34 2075.34* 04-Feb-08 Awarded 18.06.08

3 Trichirapalli TNEB 0 451 23047 2353.20 2353.20* 04-Feb-08 Awarded 18.06.08

4 Coimbatore TNEB   388 27935 1731.82 1731.82* 22-Jan-08 Awarded 18.06.08

5 Cuddalore TNEB   685 37703 2451.82 2451.82* 22-Jan-08 Awarded 18.06.08

6 Dindigul TNEB   337 13321 1118.31 1118.31* 22-Jan-08 Awarded 18.06.08

7 Erode TNEB   343 17369 1336.86 1336.86* 22-Jan-08 Awarded 18.06.08

8Kancheepura

mTNEB   904 18723 2475.82 2475.82* 22-Jan-08 Awarded 18.06.08

9Kanya Kumari

TNEB   81 3095 269.81 269.81* 22-Jan-08 Awarded 18.06.08

10 Krishnagari TNEB   345 8602 1038.55 1038.55* 22-Jan-08 Awarded 18.06.08

11 Madurai TNEB   425 16152 1891.78 1891.78* 22-Jan-08 Awarded 18.06.08

12Nagapattina

mTNEB   424 32252 1254.20 1254.20* 22-Jan-08 Awarded 18.06.08

13 Namakkal TNEB   300 13981 889.31 889.31* 22-Jan-08 Awarded 18.06.08

Page 44: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

XI Plan Projects (Tamil Nadu)

Sr.No.

Name of the District(s)

Name of Implementing

Agency

Coverage

BPL HH

Sanctioned

Project Cost

(Lacs)

Total Award Project

Cost (Lacs)

Date of Sanction

Status of AwardUE

Villages

IE Villages

14 Perambalur TNEB  - 346 16826 1612.21 1612.21* 22-Jan-08 Awarded 18.06.08

15 Pudukkottai TNEB - 765 27073 2749.70 2749.70* 22-Jan-08 Awarded 18.06.08

16 Ramnathpuram TNEB - 385 18931 1518.54 1518.54* 22-Jan-08 Awarded 18.06.08

17 Sivaganga TNEB - 445 12862 1571.49 1571.49* 22-Jan-08 Awarded 18.06.08

18 Thanjavur TNEB - 589 35525 2392.04 2392.04* 22-Jan-08 Awarded 18.06.08

19 Theni TNEB - 133 7333 594.09 594.09* 22-Jan-08 Awarded 18.06.08

20 Thiruvannmalai TNEB - 860 35106 2189.11 2189.11* 22-Jan-08 Awarded 18.06.08

21 Thiruvar TNEB - 413 19175 1319.90 1319.90* 22-Jan-08 Awarded 18.06.08

22 Tiruvallur TNEB - 539 16543 2133.29 2133.29* 22-Jan-08 Awarded 18.06.08

23 Tuticorin TNEB - 408 528 1029.81 1029.81* 22-Jan-08 Awarded 18.06.08

24 Vellore TNEB - 762 32517 2476.92 2476.92* 22-Jan-08 Awarded 18.06.08

25 Villupuram TNEB - 1104 55674 3509.60 3509.60* 22-Jan-08 Awarded 18.06.08

26 Virudhunagar TNEB - 450 10973 1806.70 1806.70* 22-Jan-08 Awarded 18.06.08

26     - 12416 545511 44741.03 44741.03*  

Page 45: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)Un/De-

electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11 Andhra Pradesh X Plan              

1 Anantapur CPDCL 7-Jun-06 - 926 51408   904 1018032 Mahboob-nagar CPDCL 20-Aug-06 - 1477 220158   1117 1215773 Kurnool CPDCL 10-Apr-07 - 902 135203   575 1267794 Nalgonda CPDCL 17-Jan-06 - 1124 78352   1124 710274 Total CPDCL     4429 485121   3720 4211865 Srikakulam EPDCL 17-Mar-06 - 1819 194941   1702 1536956 Vizianangaram EPDCL 4-Mar-06 - 1438 149755   1349 1189007 West Godavari EPDCL 4-Mar-06 - 1141 87831   834 815338 Vishakhapatnam EPDCL 4-Mar-06 - 2620 204113   2620 1416354 Total EPDCL     7018 636640   6505 4957639 Khammam NPDCL 10-Apr-06 - 1245 132334   955 92139

10 Nizamabad NPDCL 10-Apr-06 - 1050 60036   538 8692711 Adilabad NPDCL 10-Apr-06 - 1760 103184   1314 1178343 Total NPDCL `   4055 295554   2807 296900

12 Guntur SPDCL 2-Aug-06 - 694 135273   416 18829013 Chittoor SPDCL 23-Feb-06 - 1274 120186   1025 16689714 Krishna SPDCL 23-Feb-06 - 1005 87774   725 13071415 Kadapa SPDCL 23-Feb-06 - 954 104205   890 12157816 Prakasham SPDCL 23-Feb-06 - 1067 127633   688 15935017 Nellore SPDCL 10-Mar-06 - 1127 121931   997 1398896 Total SPDCL     6121 697002   4741 906718

17 Total (Ar.P. X Paln)     21623 2114317   17773 2120567

Page 46: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)Un/De-

electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11                   

Andhra Pradesh XI Plan              1 Medak CPDCL 23-Feb-10 - 1061 34367   528 444992 Ranga Reddy CPDCL 23-Feb-10 - 893 14883   495 271842 Total CPDCL     1954 49250   1023 716833 East Godavari EPDCL 23-Sep-06   1323 245334   448 1105631 Total EPDCL     1323 245334   448 1105633 Karimnagar NPDCL 10-Apr-06   935 19417   723 886124 Warangal NPDCL 10-Apr-06   1003 71199   858 817832 Total NPDCL     1938 90616   1581 170395

5Anakapalle(Vish

akhapattnam)RE-coop society 4-Feb-09   143 39368   76 18925

6Cheepurupalli (Vizianagaram)

RE-coop society 8-Dec-08   104 29200   57 9673

7 Kuppam(Chittor) RE-coop society 18-Dec-08   223 14835   176 6336

8Sircilla (Karimnagar)

RE-coop society 20-Jan-09   173 9220   60 5961

4 Total RE-coop     643 92623   369 408959 Total (Ar.P XI Plan)     5858 477823   3421 393536

26 Total (Ar.P. X Paln & XI Plan)     27481 2592140   21194 2514103

Page 47: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)Un/De-

electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11Karnataka X Plan              

1 Tumkur BESCOM 17-Mar-06 10* 3224 26094 10 2849 283792 Bangalore (Rural) BESCOM 17-Mar-06   2043 39406   1793 351033 Kolar BESCOM 17-Mar-06   3307 36744   3248 421654 Davangere BESCOM 27-Mar-06   795 50472   755 412665 Chitradurga BESCOM 17-Mar-06 2 1174 36188 2 1113 395715 Total BESCOM   12 10543 188904 12 9758 1864846 Hassan CESCOM 2-Jan-06 34* 2471 41565 34 2274 600627 Mandya CESCOM 2-Jan-06   1404 8760   1216 301098 Mysore CESCOM 2-Jan-06   1478 92345   1122 881093 Total CESCOM   34* 5353 142670 34 4612 1782809 Bidar GESCOM 3-Feb-06   613 25863   610 23978

10 Koppal GESCOM 3-Feb-06   624 28515   438 2797911 Raichur GESCOM 3-Feb-06   814 28335   680 2833512 Bellary GESCOM 3-Feb-06   537 45889   526 383614 Total GESCOM     2588 128602   2254 118653

13 Dharwad HESCOM 20-Jan-06   388 21936   388 2193614 Haveri HESCOM 20-Jan-06   690 39429   682 3993915 Bijapur HESCOM 20-Jan-06   665 48899   583 3243916 Gadag HESCOM 20-Jan-06   321 27911   318 2135117 Bagalkot HESCOM 20-Jan-06   604 33477   604 364275 Total HESCOM     2668 171652   2575 152092

17 Total (Karnataka X Plan)   46* 21152 631828 46 19199 635509

Page 48: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)Un/De-

electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11Karnataka XI Plan              

1 Kodagu CESCOM 4-Aug-09   296 39669   108 35162 Chamrajnagar CESCOM 27-Sep-08   422 22781   364 367802 Total CESCOM     718 62450   472 402961 Gulbarga GESCOM 8-Feb-06   1344 58973   545 30141 Total GESCOM     1344 58973   545 30141 Belgaum HESCOM 13-Feb-07 5 1131 62430   921 42373

2 Hukeri HESCOMNot

awarded  123 14074      

3 Uttar Kannada HESCOM 13-Feb-07 18* 1219 19657 13 668 184143 Total HESCOM   23* 2473 96161 13 1589 607871 Shimoga MESCOM 2-Mar-09 0* 1471 23098   695 123052 Chickmagulur MESCOM 2-Mar-09 0* 1033 19429   335 61222 Total MESCOM   2504 42527   1030 184278 Total (Karnataka XI Plan)   23* 7039 260111 13 3636 122524

25 Total (Karnataka X & XI Plan) 69* 28191 891939 59 22835 758033

Page 49: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)Un/De-

electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11Kerala (X Plan)              

1 Idukki KSEB 27-Jan-07 - 38 17834   37 17238                   1 Total (Kerala X Plan)     38 17834   37 17238

               Kerala (XI Plan)              

1 Kozhikode KSEBNot

awarded  87 11920      

2 Kannur KSEBNot

awarded  78 5136      

3 Mallapuram KSEBNot

awarded  122 7897      

4 Kasargod KSEBNot

awarded  113 4194      

5 Pallakad KSEBNot

awarded  144 3955      

6 Wyanad KSEBNot

awarded  48 5415      

6 Total (Kerala XI Plan)     592 38517      7 Total (Kerala X & XI Plan)   630 56351   37 17238

Page 50: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)

Un/De-electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11

Tamil Nadu XI Plan              

1 Karur TNEB 18-Jun-08   154 16679   74 6937

2 Salem TNEB 18-Jun-08   380 27586   169 16396

3 Trichirapalli TNEB 18-Jun-08   451 23047   243 18056

4 Coimbatore TNEB 18-Jun-08   388 27935   338 24553

5 Cuddalore TNEB 18-Jun-08   685 37703   290 42758

6 Dindigul TNEB 18-Jun-08   337 13321   72 11938

7 Erode TNEB 18-Jun-08   343 17369   224 15960

8 Kancheepuram TNEB 18-Jun-08   904 18723   208 18780

9 Kanya Kumari TNEB 18-Jun-08   81 3095   70 6381

10 Krishnagari TNEB 18-Jun-08   345 8602   102 11423

11 Madurai TNEB 18-Jun-08   425 16152   92 19223

12 Nagapattinam TNEB 18-Jun-08   424 32252   30 23737

13 Namakkal TNEB 18-Jun-08   300 13981   84 7774

14 Perambalur TNEB 18-Jun-08   346 16826   57 14907

Page 51: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project Wise Coverage and Achievement

Sl. No. Name of DistrictName of

Implementing agency

Award Date

Proposed Coverage Cumulative Achievement

(15-10-2010)

Un/De-electrified Villages

Electrified Villages

BPL HH`sUn/De-

electrified Villages

Electrified Villages

BPL HH`s

1 2 3 4 6 7 8 9 10 11

15 Pudukkottai TNEB 18-Jun-08   765 27073   210 22382

16 Ramnathpuram TNEB 18-Jun-08   385 18931   21 6305

17 Sivaganga TNEB 18-Jun-08   445 12862   101 10814

18 Thanjavur TNEB 18-Jun-08   589 35525   76 39200

19 Theni TNEB 18-Jun-08   133 7333   131 8541

20 Thiruvannmalai TNEB 18-Jun-08   860 35106   144 37756

21 Thiruvar TNEB 18-Jun-08   413 19175   65 19461

22 Tiruvallur TNEB 18-Jun-08   539 16543   260 18798

23 Tuticorin TNEB 18-Jun-08   408 528   40 6504

24 Vellore TNEB 18-Jun-08   762 32517   383 29810

25 Villupuram TNEB 18-Jun-08   1104 55674   451 50786

26 Virudhunagar TNEB 18-Jun-08   450 10973   136 8323

26 Total (Tamil Nadu XI Plan)   12416 545511   4071 497503

Page 52: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Salient Features of DDG Projects under DDG

Guidelines for DDG Projects under RGGVY issued by MOP on 12.01.2009.

Capital subsidy of Rs 540 crore for DDG projects during XI th Plan

Projects can be based on conventional or renewable sources

REC to be the Nodal Agency

Ownership with State Governments

Implementing agencies would be SREDAs / Depts. dealing with renewable / State Utilities / CPSUs

Projects will be approved and monitored by Monitoring Committee of MoP

Page 53: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Selection of villages / hamlets

List to be finalized by SREDA/ Depts. dealing with renewable in consultation with state utilities and MNRE

Villages / hamlets with population less than 100 to be excluded

Villages / hamlets included in MNRE plans to be excluded

Page 54: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Selection of Technology

Technology choices for DDG

Small / Mini Hydro

Diesel generating sets powered by biofuels (non-edible vegetable oils such as Jatropha, Pongamia, etc)

Biogas

Solar Photo Voltaic

Wind / diesel / hybrid / new technology etc

Page 55: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Pattern of payment

90% of capital cost + DPR cost to be paid as subsidy

Balance 10% to be arranged by implementing agency at their own or loan from any FI/REC.

Page 56: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

Project implementation procedure

Implementing Agencies will invite tenders on Build, Operate, Maintain & Transfer (BOMT) basis.

Successful developer to run the project for a period of 5 years.

Successful developer to collect the tariff from villagers.

The reimbursement of gap between O&M cost and revenue recovery from villagers will be paid out of service charges of Implementing Agencies (@ 8% for State Governments and 9% for CPSUs)

Page 57: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

State-wise Projects Sanctioned under 10th plan

Sl StateNo. of

Projects

No. of un-ElectrifiedVillagescovered

No. ofelectrified villages covered

No. of BPL households

covered

Total Sanctioned Project Cost

(Rs. Cr)

1 2 3 4 5 6 7

1 Andhra Pr. 17 0 21623 2114317 648.15

2 Arunachal Pr. 2 237 321 4377 43.30

3 Assam 3 903 1746 148971 158.03

4 Bihar 26 17125 0 843499 1495.80

5 Chhattisgarh 3 117 3504 122326 148.94

6 Gujarat 3 0 2409 188471 60.84

7 Haryana 4 0 1075 49198 48.48

8 Himachal Pr. 1 0 1118 647 25.02

9 J & K 3 103 1444 59731 97.62

10 Jharkhand 13 8727 4379 942319 1287.67

Page 58: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

State-wise Projects Sanctioned under 10th plan (Contd…)

Sl. StateNo. of

Projects

No. of

un-electrified

villages

covered

No. of

Electrified

villages

covered

No. of

BPLhouse

holds

covered

Total

Sanctioned

Project Cost

(Rs. Cr.)

1 2 3 4 5 6 7

11 Karnataka 17 49 21152 631828 375.39

12 Kerala 1 0 38 17834 19.75

13 M. P. 8 115 9653 311295 395.57

14 Maharashtra 4 0 4052 262538 78.86

15 Manipur 2 186 270 14447 64.07

16 Meghalaya 2 174 797 23676 45.99

17 Mizoram 2 90 209 8618 41.75

18 Nagaland 2 12 279 14290 16.25

19 Orissa 4 2602 4637 335080 434.10

20 Punjab 0 0 0 0 0

Page 59: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

State-wise Projects Sanctioned under 10th plan (cont..)

Sl. StateNo. of

Projects

No. of un-

electrified

villages

covered

No. of

Electrified

villages

covered

No. of BPL

households

covered

Total

Sanctioned

Project Cost

(Rs. Cr)

1 2 3 4 5 6 7

21 Rajasthan 25 1705 15608 699951 453.23

22 Sikkim 2 16 158 3724 26.09

23 Tamilnadu 0 0 0 0 0

24 Tripura 1 48 72 13119 19.57

25 Uttar Pradesh 64 30802 3287 1120648 2719.51

26 Uttarakhand 13 1469 14105 281615 643.89

27 West Bengal 13 4283 0 97847 385.03

Total 235 68763 111936 8310366 9732.90

Page 60: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

State-wise Projects Sanctioned under 11th plan

Sl StateNo. of

Projects

No. of un-ElectrifiedVillagescovered

No. ofelectrified villages covered

No. of BPL households

covered

Total Sanctioned Project Cost

(Rs. Cr)

1 2 3 4 5 6 7

1 Andhra Pr. 9 0 5858 477823 191.94

2 Arunachal Pr. 14 1892 1435 36433 494.39

3 Assam 20 7622 11584 842685 1501.97

4 Bihar 17 6086 6651 1918956 1480.09

5 Chhattisgarh 11 1015 12829 654839 956.27

6 Gujarat 22 0 15525 766679 299.59

7 Haryana 14 0 4910 174875 148.92

8 Himachal Pr. 11 93 9548 11801 180.23

9 J & K 11 180 4606 76999 538.31

10 Jharkhand 9 11010 3243 749478 1374.94

Page 61: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

State-wise Projects Sanctioned under 11th plan (Contd…)

Sl. StateNo. of

Projects

No. of

un-electrified

villages

covered

No. of

Electrified

villages

covered

No. of

BPLhouse

holds

covered

Total

Sanctioned

Project Cost

(Rs. Cr.)

1 2 3 4 5 6 7

11 Karnataka 8 83 7039 260111 224.71

12 Kerala 6 0 592 38517 114.57

13 M. P. 24 691 24441 1064947 1137.77

14 Maharashtra 30 6 36240 1613853 634.58

15 Manipur 7 696 1108 92922 293.72

16 Meghalaya 5 1769 2739 92771 244.42

17 Mizoram 6 47 361 18799 62.50

18 Nagaland 9 93 873 55610 94.92

19 Orissa 27 15293 24355 2850783 3141.01

20 Punjab 17 0 11840 148860 154.59

Page 62: Rural Electrification Corporation Limited Rural Electrification Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Hyderabad 29.10.2010

Rural Electrification Corporation Limited

State-wise Projects Sanctioned under 11th plan (Contd…)

Sl. StateNo. of

Projects

No. of un-

electrified

villages

covered

No. of

Electrified

villages

covered

No. of BPL

households

covered

Total

Sanctioned

Project Cost

(Rs. Cr)

1 2 3 4 5 6 7

21 Rajasthan 15 2749 19233 1050167 801.26

22 Sikkim 2 9 260 7734 31.01

23 Tamilnadu 26 0 12416 545511 447.41

24 Tripura 3 112 570 181611 111.89

25 Uttar Pradesh 0 0 0 0 0

26 Uttarakhand 0 0 0 0 0

27 West Bengal 15 290 24775 2601887 1959.60

Total 338 49736 243031 16334651 16620.61