rural distribution project - world bank...rehabilitation and installation of medium network t/l to...

68
Rural Distribution Project EMIP- Enviroonmef Azeaifno(gyn'et rIan Thanh floa province Rural Distribution Project E1712 VOL. 23 CONSTRUCTION INVESTMENT PROJECT THANH HOA PROVINCE Environment Management Plan Electric conistitcilion and investimeit consultation joillt stock company Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 25-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMIP- Enviroonmef Azeaifno(gyn'et rIan

Thanh floa province

Rural Distribution Project

E1712VOL. 23

CONSTRUCTION INVESTMENT PROJECT

THANH HOA PROVINCE

Environment Management

Plan

Electric conistitcilion and investimeit consultation joillt stock company

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

I I I I I I I i I I I

Page 3: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rurai Distribution Project EtlP- -nvironment Afjnagemerr Plan

Thanli Hea province

Electricity of Vietnam

Power Company I

Rural Distribution Project

SUBPROJECT

RURAL MEDIUM VOLTAGE POWER NETWORK OF THALNH HOA

PROVINCE

ENVIRONMENT MANAGEMENT PLAN

Director

Electric construction and investmentConsultation joint stock company

> CO pH \ 5\l VAND

Hoang Sy Thai

Daze: :Ia .oi, 20/August2007

Electric construction and investment consultation joint stock company

Page 4: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distibution Project -fP- Environment Alanarment Plan

Thanh Hoa provinceCHAPTER I

General introduction

Introduction and project scopeThe Rural Distribution Project (hereinafter called "RD Project"' focuses on rehabilitating

and increasing the capacitv of existincg distribution lines md sub-substations and

standardizing them to 110. 35 and 22kV to meet the zrowing demand on electicity more

efficiently, provide better quality and quantity of electric power for production uses, and

reduce power svstem loss.

The Rural Distnrbution Project is carried out in 113 communes of 8 districts belonging to

Thanh Hoa province.

ANNEX 1- PROJECT SCOPE AND EXECUTIVE SUMN1MARY

1.Project name Rural Distribution Project-Thanh Hoa Province

2. Program name Rural Distribution Project-Thanh Hoa Province

3. New constructionor rehabilitation New construction Renovation Uproject

. Nf+ Dong Son district:4o - Dong Hung, Dong Tan. Dong Xuancommunes where the + Quang Xuong district:substations are - Quang Thang, Quang Loc. Quang Vinh, Quang Truong, Quang

located or the Van, Quang Trung, Quang Thinh. Quarg Long, Quang Tho,powerlines come Quang Phuc, Quang Trach,l through + Nong Cong district:

I - Van Thien, Trung Thanh, Tuong Son. Te Tan. Mirih Nghia, TanKhanh. Tan Phuc. Te Nong, 7hang Binh, TLong Van, Hoang son.-+ Hoang Hoa district:Hoang Trung, Hoang Tan, Hoang Dongz, Haang Phu, Hoang Tlai,Floang Xuyen, Hoang Khe. Hoang Xuar. Hoang tien. HoangThanh.I + Ha trung district:- Ha Toai, Ha Dong, Ha Linh, Ha Ninh, .-ia phong, Ha Tan. HaLam, Ha vinh. Ha phong. Ha thanh.+ Bim Son district:- Ha Lan, Quang Trung.I-+ Nga Son district:- Nga Vinh, Nga Vinh, Nga My, Nga An.+ Hau Loc district:- Loc Son, Thanh Loc, Loc Tan, Dong Loc. Minh Loc, Hung Loc,Phu Loc, My Loc. Tuy Loc, Trieu Loc.+ Yen Dinh district:- Dinh Binh, Yen Phu.

!____ _ |+ Thieu Hoa district:

Electnc construction and investment consuitation joint stock company

Page 5: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMfP- Environment .Vanac'ment Plan

Thanh Hoa province- Thieu Chinh. Thieu Chau. Thieu Tam, Thieu Hoa, Thieu Hoa

j ,Thieu Thinh, Thieu Toan, Thieu Tien. Thieu Van. Thieu Duong,Thieu Khanh.+ Trieu Son district:- Dan Ly, Dong Loi, Minh Dan. Tho Tien. Van Son, Dan Quven.Thai Hoa.+ Cam Thuy district:- Cam Tu, Cam Son, Phuc Do, Cam Thach, Cam Quy, Thanh Van,Quangi Thach, Thach Cam.+ Ngoc Lac district:

I - Quang Trung, Ngoc Son, Thach Lap. Dong Thinh, Thuy Son.NQoc Lien.Ho. Xuan Son, Tho Dien, Tho Nguyen, Nam Giang, Tho 7oc.

Xuan Khanh, My Loc. Tuy Loc, Trieu Loc.+ Tinhi Gia district:- Phu Son, Thanh Son, Ngoc Linh. Binh Minh, Hai Nhan HaiThuong, Nghi Son, Hai Yen, Phu Lam. Tnanh Thuy, Hai Caau.Truong Lam, Tinh Hai, Thanh Son, Tar Bir-h.I + Tho Xuan district:- Xuan Phuc, Xuan Yen. Tho Truong. Tav Ho, Xuan Son, ThoDien, Tho Nguyen, Nam Giang, Tho Lce, Xuan Khanh.+Thuong Xuan district:

Xuan Thang, Xuan Cam.Installation of 35 KV: 48.888 in '6.131 m of 22KVI .Leng-th of power

lines included : branches improved access to energy tosubsubstation overloaded

1. Width of ROW Width of transmission lines: 8.5 m2. Estimated quantity Quantity: 1250 Height of poles: 10, 12,14and height of poles poles.3. Number of new Number: 196substation subsubstation4.Total capacity of - Capacity: 28.455substations KVA

m 5. Commencement Commencementand completion April 2008

Completion March* 2012

6. Construction in -

rainv season Yes Li No

7. Total of HHs in 396 HHsaffected area

8. Total affected land Temporary: Permanent:215,300 m2 16,184 m

I 9. Total cultivation i Temporary: [Permanent:

Electnc construction and investment consultation joint stock company

2

Page 6: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distibution Project lfP- Environnent M4anigement P.zn*

Thanh Hoa proVinceland to be affected 215,300 m' 16,184 m'

by project

10. Area of forest Temporary: 0 ha

land

I I. Area of industry Temporary: 0 ha

land

12. Area of Temporary: 0 haresidential land

13. Other land ETemporary: 0 ha

14. Total cost of Expenditure:project(VND&USD) 90,387,000,00OVND

(lUSD=16.110)I

15.Substations or NoROW are locatedwithin 3 km from

natural reserves orforests'

16. Substations or No

ROW are locatedwithin 300m fromhistorical sites,temples. pagodas or!other cultural sites.

I17. List ofenvironmentalsensitive structuresclaimed in (4) - (5)

No. Name of Name of Distance

* substation/ROW environmentallocation sensitive sites

I . -.

Electrnc construction and investment consultation joint stock company

3

Page 7: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rurl Distribution Project EMP- Ervironmer, VUaragement Plan

Thanh Hoa province2. Project discription

2. 1 Rural Distribution Project (RD)

The Rural Distribution Project of Ninh Binh province aims at a stable electricity supply,

loss reduction, reliability increase for Ninh Binh province and its adjacent areas.

Meanwvhile, the project would enable flexible network operation for the provincial socio-

economic growth.

2.2 Rural Distribution Project (RD) of Thanh Hoa

2.2.1 Brief discription of Thanh Hoa socio-natural conditions in project areas

a, Natural and environmental characteristics

Thanh Hoa province is in the middle land of Northern VietNam. It is about 150 km away

from HaNoi capital and 1560 km away from Ho Chi Minh city. It borders Son La, Hoa

Binh . Thanh Hoa to the north, Nghe An to the south, Hua Phan province of Lao

countrv to the west. Gulf of Tonkin to the east

The total area of Thanh Hoa province is 1.112.003 ha, including 24 rural districts and

Thanh Hoa city, 2 towns ( Bim Son, Sam Son) and is divided into 466 communes.

b, Terrain

Thanh Hoa terrain is diversified; lowered gradually from west to east, divided into 3

region clearly:

- Mouintainous area: Area of natural land: 839,037 ha reaching 75.44% of the provincial

area, everage height of hill is :600-700 in slope is above 250 . everage height of midland

is 150-200 m. slope is 15'-200

Plain region is 162.341 ha reaching 14.61% of the provincial area, everage height is 5-

15 m, slope is above 25", intermigling with hills and independent limestone- Coastline region is 110,655 ha reaching 9.990' of the whole provincial area, the

coastline is 102 Km long, terrain is even. along well-known Sam Son beach and resorts

such as: Hai Tien (Hoang Tien), Hai Hoa (Tinh Gia)...

c, Climate: Thanh Hoa's climate is distinctly with 4 seasons.

An average annual rainfall of 1600-2300mm, each year has about 90-130 rainy days.

Average humidity is 85% - 87%, average sunshine is about 1600-1800 hours. Average

temperature is 23oC-24uCd.

d) Land resources:

Total land of Thanh Hoa Province: 1,112,003 ha, in which: 245,367 ha of aEicultural

land, 553,99 ha of forestry land, 10,157 of aquiculture land, used land: 153.520 ha.

Electric construction and investmeit consultation joint stock company

4

Page 8: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment Management P'an

Thanh Hoa provinceTable 2.3 Land use in Thanh Hoa

Types of lands Area (Ha)

Agricultural land 245.367

Forestrv land 553.99

Agricultural land 19,589,39

Used land 153.520

Source: Statistical yearbook

e) Potential landscape

There are Ben En national park in the West - South region, Phu Hu, Xuan Lien Natural

reserve West-North . where maintained gene bank of valuable and rare animals and

plants, Sam son beach in Sam Son town ... are attractive tourists.

2.2.2 Project area in Thanh Hoa

The Rural Distribution Project of Thanh Hoa province is to improve access to

rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang

Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu Son, Hau Loc, Tinh Gia. Yen

Dinh, Cam Thuy. Thach Thanh. Ngoc Lac, Thuong Xuan, Nhu Thanh, Tho Xuan, Dong

Son, Thieu Hoa, and Bim Son of Thanh hoa province.

3. Description of major pre-construction and construction activities according

to sequence of implementation

* Land clearance:

Ground clearance is mainly on removing of vegetation cover or cut down of trees,

obstructions located in foundation locations, trees above 4 m and houses on ROW

* Houses on ROW would not be affected so no clearance is needed

* Trees at poles locations are mainly crops (rice, maize and sweet potato,

orchards), bamboo, betel, District People's Committee, Provincal People's

Coimmittee project area of are unanimous in our support for implementation of

compensation and ground clearance according, to stipulation in order to ensure

implementation of construction implementation right after crop harvest.

Cutting trees of above 4 m on ROW may be implemented prior to wire oulling.

* Compensation is implemented by electricity of Thanh Hoa.

So that, Provincal People"s Committee is required to complete procedure for land

recover and allocation to handover ground to construction units.

Construction of temporary tents:

Electric construction and investment consultation joint stock company

Page 9: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EltP- Snvironment Management Plan

Thanh Hoa provinceTo ensure maintenance of materials, equipment, accommodation for workers. The

temporary structures are constructed include:

+ Close warehouse for cement, electric materials and fittings, cubicles, swiches: 30

m2 x 48 sub projects = 1.440 m2

Open warehouse with fence for transformers, medium voltage conductor,

construction tools, arms, supports. pull tight: 40 m2 x48 subprojects=1920 m

+ Temporarv tents for workers during construction time: 20 m2 x48

subprojects=960 m2

+ Close warehouse and temporary tents are made of bamboo frames, roofs, oil

paper.

Construction materials and equipment etc are transported to the site:

Types .of equipments, materials such as: conductor, insulators bought in Ha Noi

and transported by lorries to central of ROW of each project component (site

pens).

Commodities are transported from Ha Noi to construction site such as:

+ Protection, switching, equipment, insulators, electric cable with small packing,

commodities are collected and transported by car to construction site and unloaded

bv hand.

+ Conductors of large volume are transported by car of 5 tons to construction site

and unloaded or loaded by crane of 5 tons.

+ Concrete poles bought in Ha Noi or Thanh Hoa are transported by specialized

KMAT of 7.5 tons to construction site and unloaded/loaded by crane of 5 tons,

one trip carried 6 pole sections, unloaded or loaded by crane of 5 tons. Poles are

gathered together in ROW and transported along ROW by hand and motorcycle.

+ Other materials such as: spare parts, transverse beams... are exploited and

transported from Ha Noi by truck of 5 tons to construction site and unloaded or

loaded by hand.

+ Cement is bought in districts, transported by trucks of 5 tons to construction site

and unloaded or loaded by hand.

+ Sands and stones are bought in involved districts, 20 km away, transported by

trick of 5 tons to construction site and unloaded or loaded by hand.

Electric construction and investment consultation joint stock company

6

Page 10: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EM?- EnvironmentM anagement Plan

Thanh Hoa province4. Types of equipments, materials

No Describiption Quantity Capacity1 KMAT 03 7.5 tons

Cutter | 03Electric weilding 03 21 KVA

4 Electric generator 035 Water pump 03 3O KVA 20 m'/h

6 Driller 037 Oxyacetylene welding 03 !_.

8 Ram earth 03 1

9 Concrete mixer 03 2501-500110 Windlass 03 Stons

11 Renovation cart 03 0.512 Measure stick 03 1

13 Electricity test pen 0314 Boot, gloves, carpet [ 03

15 Crane 03 j 10 tons

16 Fire extinguisher 03

5. Proposed transportation methods of equipments, materials to construction

site

+ Cement and electric materials, equipment are transported to construction site

from close warehouses along ROW with average interval transportation distance:

450 m for MV lines, 300 m for substations.

+ Centrifugal concrete poles for are transported by renovation cart and by hand to

construction site with average interval transportation equal to that for cement.

+ Other materials are transported bv renovation and by hand :o construction site

from close warehouses with average interval transportation equal to that for

cement.

+ Executive time estimated: 04 months, number estimates of workers concentrates

15 persons which maximum in each site.

Electnc construction and investment consultation joint stock company

7

Page 11: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project IMP- Environment Management Plan

Thanh Hoa provinceCHAPTER II

INSTITUTIONAL AND LEGAL FRAMEWORKThe report on enviromnent impact are prepared basing on:

The Government of Viet Nam promulgates lawvs and regulations on environment

protection. These include:- The constitution of Viet Nam on April, 1992 confirms that state-owned enterprises,

GOV's bodies. cooperations, national defence units are responsible for implementing

policies on environment protection to ensure reasonable use of natural resources and

environment protection.* The Environment protection Law on 29 November 2005. revised and adopted by the

National Assemblv and replaced for 1993 law. which clearlv specify the

responsibility of central governments, organizations, individuals to prevent

environment recession, meanwhile carry out specific functions of environment

protection.* The Lawv on Forest Protection (1992) regulates managemenT, protection, development,

exploitation of forest, prevention of trees cutting, forest destruction.

* GOV's Decree No 80/2006 ND-CP dated 9thf, August. 2006 stipulates in detail and

gives guidance on implementation of the revised Environment protection Law on

2005.* GOV's Decree No 81/2006 ND-CP dated 9th, August. 2006 on iunishment of

violation of The Environment Protection.

* GOV's Decree No 106/1999ND-CP dated 17'. August, 2005 stipulates in detail and

gives guidance on implementation of the Law on Protection of .IV power project

(Addmendment to Decree No.54/1999/ND-CP).

* GOV's Decree No52/1999 ND-CP: Reoulation on construction investment

management with modification, suplementation of environment problems in

construction management.* Circular No 08/2006 TT-BTNMT dated 8h, September, 2006 stipulates in detail and

gives guidance on assessment of environment impact. strategic -nvironment and

undertake environment protection.

* Environment standard of Viet Nam (1995) and other standards of land, water, air.

* . World Bank policies:

World Bank policies are assessed during environrment sc-eening, assessment

and management of project area:OP 4.01: Environment assessment

OP 4.04 Natural habitatOP 4.11 Cultural heritageBP 17.50 Information disclosure

In detail, guidance on impact assessment of transmission lines can be found in:

* - World Bank, 1991. Environmental Assessment Sourcebook, Volume 3; and

IFC. 2007. Environmental, Health, and Safety Guidelines on Electric Power

Transmission and Distribution project.

+ Policies framework on environment protection for the Rural Distribution Project

Electric construction and investment consultation joint stock company

.,I

Page 12: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment .anmgement P.an

Thanh Hoa provinceCHAPTER m

ENVIRONMENTAL SCREENING

IMPACT POTENTIA COMM[IENTSL IMPACT (Comnment on scale and level of impact)

l_ __ YES NO i

3 1. Removal of - Little impacts of ROW clearance of vegetationvegetation cover or to ensure operation safety, > 3m trees withincut down of trees ROW will be cut. The cut trees are estimated in

resulted from construction stage. Clearance is only applied| clearance at the for trees within 4 m. Low trees under the ROW

c substation and or around poles are allowed.0 along. ROW On ROW the following trees in the ROW need

to be cut: Bamboos. rartan. T/Ls do not passl | any primitive forests and planted forest.

2. Injury/fatality risks x All parts of trees that are higher than 4 m are* for birds or loss of cutted. Other trees are kept intact so there

their habitat would be no impact on birds and lost of theirhabitat. There are aimost no activities of birdsin this area.

3. Degradation of x The T,Ls would go hrough plain with rice and.

surface w^-ater crops. The, hydrographical network is mainly

quality at sources ditch. irrigation canal in area. The annual flownearby conrcto scheme is divided into 2 distinct seasons: rainynearbv construction

, . de season and dry season.sItes due t* In dry season, streams have little wvater.from I In flood season (rainy season): because ofexcavation/leveling high rainfall and flood there is plenty of

or workers' Camp water in streams. Sometimes

erosion/landslide happen. Rainy season arein MayI, July. Juiv, August.

In project area, underground water is olentiful.| Depth of underground is from 0.5 - 1.5 m.-However, in project area, a clay stratum isI thick, so excavation and construction of3 foundation holes wculd not affect the

l__ __ _underground water layer.4. Increase of , During construction. vehicles and equipments

localized dust level are used to transport materials on road thati dust standard is acceptable or may beI controlled, transported quantity is low (15-20tons /commune), tra fc density is not neavy ( 1-7 trips / commune). The present quality of roadis good, for transportation of materiai toII_ L tconstruction site.

Electnc construction and Investment consultation joint stock company

I 9

Page 13: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Proiect EMP- Enviror.'neni Marageirent Plan

Thanh Hoa province

Dust level may be minor imnpact on resuientialarea. Transportation takes place in snlorr time. (Materials is transported on ma.n roads andkept together, then transport manually alongsite, time of constrzction of each l.ne is 1-2

- I days! location /pole with 1-2 trips

! . ! respectively...) so the influence is minimum

5. Damage or x Construction mav affect transportation ofdegradation of local public roads because this project presents in

roads, bridges or 113 communes of Tlanh Hoa orovince. Infact,other r influence is only on inter-commune roads; threir

infrastructures l quality is good to afford 5-10 ton ruck totransport marerials to construction size. Interprovincial road is not affected because thisproject is mainly implemented in communeswhich do not have access to the power networkyet.

6. Local sanitation x Little impacts, because temporamy campingproblem resulted site is located veryfarfrom residential

from construction houses. At locations near residential

wastes and wastes houses, construction workers would hire

generated from local labors to carry out manual works or

camping site stay with the locals. Present of camping siteis during construction period. Besides.sanitation structures with prescribedstandard should be construcred next tocamping site, use well-water or by pumpwater from local residents and -o collect

_ __ wastes.

7. Permanent land x Area of permanent land acquisition: 161842

acquisition is m mainly for rice and crops. I.rs purpose isrequired to construct foundation of poles and

l _substations.

8. Temporary land X Area of temporary land acquisition: 215300acquisition m 2 mainly for rice and crops. Purpose is to

.. transport materials, equipment and pullingconductors... Time of acquisition is 4

* -months9. Is relocation x T/L would pass rice and crop fields and

required? would not cross any houses so no

Household need to be relocated

10. If resettlement is x The potential impacts on households arerequired, would the little and T/L would not cross any houses so

Electnc construction and investment consultation joint stock company

140

Page 14: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EAP- Environment Mangenent Plan

Thanh Hoa provinceresettlement site be the influence to environment is also little.

environmentally Resettlement site is not required.

and/or culturallysensitive

1LObstructions to the x Construction could be affected to trafic such as

transportation due materials. moving way lines through roads,

to construction setting up poles near road. However, there are

activities nearby not sites near the roads and moving away lines

public roads by derrick will be not affected means oftransportation.

I 2. Potential conflict x There are about 15 workers gather in each

between camp. Their living condition are quite good

construction with enough equipments, the distance from

workers and local construction site and camps to local houses

people or increased is:-0.5-lkm...risk of diseasedissemination (e.g.H1IVIAIDS, etc.)betweenconstructionworkers and localpeoples?

13.Noise due to traffic x - Consequent noise may have small impact

and equipment, on households living in the project area,

tools used du.ng thus, it should be controlled to avoidconstruction phase c negative impact on the locals.

At locations near local community, it isplaned not to carry out construction works

i at night time and distance from theiraccommodation to local residential area:

, 10.5+1km...

14. Accident risks for x Workers are equipped with labour safety

workers and! means, install warning signs where needed.

community during

construction phase

15. Safety/health risks x Workers are. trained to use equipment

related to operations during construction and operation so risks

of substations are not happened.

and/or transmission

lines

16. Temporary roads x Materials are only transported on existing

for construction roads Temporary road is used when

Electric constnuction and investment consultation joint stock company

Page 15: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EUP- Environment kanagemeri Plan

Thanh Hoa provincen Hmaterials are transported by hand to

construction site, estimated affectedquantity (permanent and temporaryinfluence): 5230 m21480,579 mn2. In whichnumber of plants is affected: (permanentand temporary influence):

. Rice: 5230 m2/480,579 m2So the impact of temporary road is on ricemainly. This would not affect much toThanh Hoa environment.

17. Increase x During construction, quantity of digged soilerosion/landslide to set up site for M/V poles is: 3524 in3 , inrisks which: 2290.6m 3 is back filling, 1233.4 m3

is filling for sunken area or erosion areawhich would affect environment. The areasspilled are allowed by local authorities. Thesoil excavation is carried out in drv seasonand is not implemented in rainy season toavoid erosion. Depth of MNV polefoundations is minor (under 1,5 m) and soilgrade of this area is 3-4, thus risks of land isnot considered. It is meant that lands are noteroded.

18. Electro-magnetic X No impact. Design is in compliant withfield exceed technical design stipulationsstandard of VN

19. Impact of removal x Little impacts of ROW clearance of vegetationof vegetation cover to ensure operation safety, only cut trees withinor cut down of trees 3 m in ROW. The CUt trees are estimated inresulted fromclearance at the construction stage. Type of trees/vegetationsubstations and within 4 m to be cleared. In ROW trees withalong ROW low height are allowed.

Around pole is rice. In ROW the tree cutting ispermissible only for high trees within 3m.T/Ls would not pass primitive and plantedforest.

20. Impact on water x No impact. This is a T/L project so noquality at sources construction of new accommodation fornearby construction workers is necessary.sites due to runofffromexcavation/levelingor workers' camps.

21 Other negative x Solid wastes are result of excavation works.impacts (specify) .

Electric construction and investment consultation joint stock company

Page 16: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project E.3(P- Environment M.nagemenm Plan

Thanlh Hoa province

CHAPTER IV

MIITIGATION PLAN

Phas 1 .Potential [CsPhase impacts Mitigating Measure Cost Responsibility

ConstructionClearance of * Utilize hand clearing of Included ] ContractorROW vegetation if possible; avoid in

mechanical clearing or contractorherbicide use. save as much biddingvegetation as possible. priceDo not allow burning ofremoved vegetable duringcutting and clearance

Impact from * Use existing roadsitracks Included Contractorconstructed- wherever possible. The inactivities for project purpose is to build contractortemporary some new temporary roads. biddingaccess roads Rewarehouse disturbed areas price

with native species, avoidnon-native speciesintroduction

Runoff. * Excavate erosion prone areas Included Contractor I

Sedimentation during dry season. Never inand Soil during rainy conditions contractorErosion from * Design drainage ditches to biddingearthworks .pr.inceavoid afiecting nearby lands r

(Constructio Minimize use of slopesin big slopewhich is * Install dykes for erosionsubject to protectionerosion) * Avoid substation and/or

poles on slopes.

* Keep impact land tominimum andimplementation is carried outonly when construction isstarted.

* Waste land is dissoveled inI place allowed by the local

authorities.

Electric construction and investment consultation joint stock company

I3

Page 17: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Qistribution Project EMP- Environmeri Management Plan

Thanh Hoa province

Phase PotentialPhase Mitigating Measure Cost Responsibility

Air Pollution Insure all machinery using In Contractorfrom combustion engines has and agreementearthworks maintains valid operating withand transport: permits throughout the transporta- Dust project schedule tion and

Insure all trucks transporting constructidusty materials to/from the on units.site are covered

l Water spray dusty area(construction site, roads etc)during hot, dry, windyconditions

* Avoid buming removedvegetable during cutting andclearance

* All construction activity to-Noise be conducted during daytime IncludedN hours. If evenin in

construction is required, contractorpersonification and approval bidding

y local affected groups pricerequired

Disruption to These activities are not able to In Contractortraffic avoidinog impacts. iNo contractormovements implementation of construction cost

resulting from during the rush hour.construction The transportation meansactivities near should be attached projectpublic roads. symbol. May be, reducing speedSafety impact of means is possible in projectto local area.people iscaused bymeansLocal Increase awareness of In Contractorsanitation construction units to preserve contractorproblem environment costresulted from Specific plan of waste treatmentconstruction such as: Install sedimentationwastes and traps to store wastes ... Isolatedwastes sanitation to avoid releasinggenerated wastes randomly. Treatmentfrom camping methods are necessary.site. Theimpact,however, isrenderedinconsiderable

Electric construction and investment consultation joint stock company

Page 18: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Envirorment Management Plan

Thanh Hoa province

Phase Potential Mitigating Measure Cost Responsibilityimpacts

Impact on * Project does not have. In In caseecological, case Arydiscoverics found Artefactshistorical and during construction, are foundcultural Contractor shall protect the duringproperty site and report to the local constructibeneath the authority or cultural on,ground management authority included.

in extrai_ price.

Solid waste of * During construction,construction quantity of solid waste is

little. According tocommitment the remainingquantity of waste will becleared by constructionunits, Repair, rehabilitateroads, bridge or any ruralinfrastructuresdegraded/darnaged byproject constructionI Iactivities, at least to pre-

_ _ construction condition.

OperationElectro Design to meet government Design

i Magnetic standards or international ConsultantField standards to protect human

health (less than 5kV/meter forelectric field and 5 NMicrotel formagnetic field at the edge of theROW

Impact to Do not cut trees below the In Electricity ofecosystem minimal height requirement operation Thanh Hoafrom tree al costcuttingSewage Quantity of oil, additives In(water, oil released during construction operation

1 released may have little effect. Sewage al costduring water is treated before releasingconstruction)

Electric construction and investment consultation joint stock company

15

Page 19: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment Mfanagement Plan

Thanh Hoa provinceEMERGENCY situation AND SOLUTION

During construction and operation phase. artefacts discovery, accident, electricshock... .may be solved.

Vo. Risk Action Responsibilitv1 Artefacts * Contractor shall protect the Commune People's

found site and report to the local Committeeduring museum/cultural Service of culture &excavatio management authority informationn works * Deliver the object found to Construction units

local museum/cultural PMLUmanagement authority.

* Determine whetherconstruction can becontinued or halted forfurther investigation

2 Remains * Protect the site and report to PMIUfound local authority Construction unitsduring | Determine who/where/how Local authorityexcavatio to address and propose nextn works actions

* Implement the proposed-_actions

3 Complain * Fix the problem Contractorts from immediately if possiblecommuni * Take note in project record Contractor, PowertV about book Company and localenvironm * Discuss with the autinorityental Employer/local authorityproblems where conflicts occurrelated toconstructi

I onI___ activities

4 4 Accidents * Carry out first aid if PMtUhappened possible and transfer victim Conistruction unitsto to the nearest hospital asNvorkers soon as possible and ifand local necessarypersons I * Prepare incident notesrelated to

I construction iactivities I

Electric construction and investment consultation joint stock company

f.6

Page 20: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural DiAtribution Project EMtP- £nvironme'it Management Plan

Thanh Hoa province

5 Accidents * Carry out first aid if PMUdue to possible and transfer victim Construction unitsexplosive to the nearest hospital as Local authority

materials soon as possible and ifleft from necessarywar * Protect the site and place

warning site

l * Prepare incident notes

6 Discover * Protect the site Construction units

y * Report to local authority Headquarters of

explosive * Contact the nearest relevant commune, district,

material local army base and ask for provincehelp

7 Others a Carry out first aid where - PMI-

(specify) possible, report to parts - Construction

l related units

'A .

Page 21: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Envirnment Mczageeent Plan

Thanh Hoa province

Chapter VI: PUBLIC CONSULTATION

1 Method of public consultation

CONSULTA DETAILS OF CONSULTATIONTION ACTIVTIES OUTCONIES

METHOD

Date(s) sent Notice/question Date(s) sentNumber sent Number sent

Public Notice Location sent N/A Location sent

Feedback Feedbacksought (Yes sought (YesI

N o)__ _ _ _ _No

Date(s) held From May Meeting Issues discussed15th 2007 to minutes at meetings:May 30' attached - Noise

2007 (Yes / No) - impactsYes - Dust impacts

- Water quality- Treesprotection- Safe operation

Location( s) Communities Attendees - CPCs

held in area of - DPCsinfluence - Women's

Public Invitees - CPCs Union- DPCs - Fatherland

- Women's Front

Union - Youth Union

- Fatherlan - Local

d Front residents- Youth

3 Union- Localresidents

Methods of - Letterinvitation invitationAgendaattached (Yes

. _ /No)Electric construction and investment consultation joint stock company as

Page 22: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EAMP- Environment Mcnagemeni Plan

Thanh Hoa province

2. Public consultation activities implemented so far:Hold public consultation meetings:I Public meetings are held in all districts where project traversed. Attendees

included are : representative of the District People's Committee, project

communes.* Public meetings are held in all communes where project traversed. Attendees are

included: representative of the Commune People's Committee, representative of

department such as: Women's Union, Farmers' Union, Elders' Union...with

Electric construction and investment consultation joint stock company

* Content of meetings: Introduce project, environment impact. mitigation measure,participants' opinion. At meetings, opinions given are concentrated on avoiding

construction at night time which would cause noise that affects local people, that

trucks are properly covered when travelling, watering the roads where dustdensity is too high, asking about plant limit on ROW, compensation policies.

Electric construction and investment consultation joint stock companv A

IA

Page 23: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

ituial DistuibUiitoii lt jc. LAP11- En WIUfljj Ala gt 1n J'Iun

Tlhanh I loa piovilcte

Table 5: Ptiblic consuiltation summary in p!rJect communities

District/ Location Time Attendees Community authorities and PAHs Summary of

No Community discussion/feedback of

-__ -communities

I lloang hlic Iloang Khie 11/6/2007 15 - In which, there are 05 persons of Some farmers agree with

comnuiiiilllc ol Women's Union, Father-land Front, construction of project

I lollg I lo; Youtlh Uniioni and Local r-esidenlLs

district

2 Donlg Xuain Dong Xuan 12/06/2007 20 - In which, there are 06 persons of Agree with construction of

comml-une of Women's Union, Fatherland Front, project, however, pre-project

Dong Son Youth UJnion and Local residents condition must be restored

district

3 Binlh Minh Binh Minh 10/06/2007 14 - In which, there are 06 persons of No comment on project impacts,

commune of Women's Union, Fatherland Front, agreement with project

Tlinh Gial Youth Union anid Local residents im1plementation at the carliest.

district

4 Loc Tani Loc Tan 11/06/2007 13 - In which, there are 06 persons of No comment on project impacts,

co)mminlle of Women's Union, Fatherland Front, agreement with project

Hati T oc Youith IJnion and Local residents implementation at the earliest

district however, pre-project condition

-must be restored

5 Thach Quang Thach Quiang 19/06/2007 19 - In which, there are 06 persons of No comment on project impacts,

of lhach lThanh Women's Union, Fatherland Front, agreement with project

district Youth Union and Local residents implementation at the earliest.

Electric construckion andl invcsimenl coispillatlion joint siock comppany

20

Page 24: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EWP- Environment .kanazeme!rt Plan

Thanh Hoa province

Information announcementThe project will be given investment permission only after confirmation of site,

design, capacity or project technology; comply with the requirement on

environment protect and resettlement. To announce requirement of OP4.01. the

responsibility of PC I is as to: Supply a Vietnamese copy of ENIP and investnent

project to each district and commune People's Committee of project area.

Have notice on the local newspaper, means of public communication many times

for over two months. This noticement is about EMP and investment project

Announcement is remained during administrative working hours in local area.

Concrete working with:1. District People's Committee2. Commune People's Committee3. Province power service centre

Vietnamese and English Copies are sent to Vietnam WB Information Centre at 63

Lv Thai To-Hanoi for exposure to NGOs and the public.

r .,

ElcnIosrcinad.ssmntcnutto on tc opnIZ

Page 25: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

1ttRial I)istribultion llrojct I AII'- IL,\l'ouIhR'ei Altietcigetiiuuit /'1Ph,

Thanh I loa 1provinceCHAPTER VII

T'ABLE OF ENVIRONMENAL MONITORING PLAN

Parameter t How is the When is-the parameter to1m1pacts i;lonitored Where to monitor parameter to be be monitored/frequency of Cost Monitor

i_ioinitored i measurements or continuous

Conistrutictionl

1. Right of Way Clearing technique and Along ROW Observation 1 time/Week in the first In Contractorclearance scope At dislposal site month, then monthly contractor

Removed vegetation costdisposal method

11. Rural Traffic Road surface conditioii Alonig trainsportation Observation at Weekly when materials & In Contractorand traffic density routc concentration of equipment are mobilized to contractorQuantity, loads and plants the site intensively, then costintensity of project monthlyvehicles/constructionplants used

III. Runoff, Drainages, sedimentation Within the substation Observation During and after heavy rain Nosedimentation traps weather condition boundary, alongand erosioni (seasoni) , level ol ROW , nearby waler

vegetationi clearance anid sourccs anid slopesslope Nvitllii project aireas

IV. Air Tightness of truck Along - Observation Before departure of filled In designPollution bottom and wlhether transportation route trucks, in hot, dry and windy cost

sanid/soil oni trucks are and nearest house or dayscovered pr oper-ly str-ucturesCheck the uincovered

Electric constructioii and investiiment consultation joint stock compalny

22

Page 26: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

-Rural Distribution Projcct EAlP- Environnlenl A1anagenzent Plan

Thanhil Iloa pr-ovinice-_ _ -_ _ _ _ _ _ _ sp o iis _ _ _ _ _ _ _ _ _ _ _ _ _

V. Noise Noise level generated Nearest house, Listen and While construction In Contractorli-om construction plants community centre interview activities generate high contractorandLI activities, Tliic of alonig thecroutc noise level /whien there are cost

hlec day whell complaintsmaterials/equipment areunlloaded or constructionis going on11

VI. Sanitary in Waste activities, Drainage ditches, Observation Weekly and before acccptance Included in Contractor

project area construiction, sewage, camps, substation of works contractor

at project area and place for waste bidding

-_______ _ - .. - - -treatment price

VII. Safety to Meetinlg on labour Substations, camiips, Observation Contractor

xorOkers anId. safety, equip witli first poles foundationi 1Listen andlocal persons aid kits, use of signs in uinder construction, interview

dangerotus places place where wiretrw a-- pulling toke place -- --

Oper-ation--Elctlric; ad Jllcctic anid Magnietic At lhousc ncrcst to Electro-mi-iagnetic There arc report/comnplaints In ConsultantMa,gnetic Field Field Intetnlsit) ROW iieclcr abouLt IloisC impal)acts operaLiona /designcr

I cost

Noise Noise level, distance to holise owIle(l by Noise Tllere are complaints In PC]comiplained housethold complainier measurement operationa

-instrument I cost

Safety Frequcicy of inspection Al the adminiistraLioni Clheck record Ilalf-yearly or annually In

an(d maintenance works btuilding and within book/plan, operationaFire fighting instruments the stibstation observation I cost

equipped at 35 KV____ ____ ____ ___ s uib statio n _ __i_ _ _

LiC.kAL: Coi1Aluctiolln .uiii 1 b:sliical conisulalmui Joint s1odk cumpa)nIIy23

Page 27: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment .Ianagement Plan

Thanh Hoa province

CHAPTER VIII

RESPONSSIBELITY OF EMIP

Monitoring units:

No Parties Main responsibility Report form1 Contractor - Apply proposed mitigation Reported form V. 1

measures- Report to PMU about the

application of mitigationmeasures.

2 PMU and - Monitor (by observation) and Reported form V.2and PMB of assess of the environmental indexprovince during construction and operation

- Report to PMU,3 Independent - Monitor (by observation) and Reported form V.2

momitoring assess of the environment indexexpert of during construction and operationWB - Public consultation on EMP

4 District/ - Monitor (by observation) and Report form V.2Commune assess environmental qualitylocal based on parameters suggested byauthorities this EMP report.

- Public consultation

V.1 Reference form for independent consultingIndependent consultation of safety would need:

1. Construction monitoring and environment problem is concentrated on:- Waste ollection after construction- Over cutting of trees on ROW in forest area or commune region- Methods are supplied by Contractor after tree clearance- Road condition- Trees restoration in ROW area and foundation- Impacts due to activities of construction ( noise, dust and road destruction due

to land excavation, material transportation...)- Status of construction Camps and their sanitary systems- Suitable distance from house and T/L- Implementation of safe methods ( signs, restrict area, fence...)

2. Implementation of public consultation to:- Assess the interest of local people to solve environment problem (dust, noise,

roads material transportation ...)- To specifv other environment problem and record complaints of PAH affected

by environment.- To report environment complaint or disagreement, if any, of local persons.Electnc construction and investment consultation joint stock company

2't

Page 28: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- EnvironmentAlamwger:ent F!an

Thanh Hoa provinceI. STANDARD OF ENVIRONMENAL MONITORING CRITERA

Impacts Parameter Where to How is the monitored/to be monitor parameter process

monitored to bemonitored

Construction i

Right of Way Clearing Along ROW Observation During ROWclearance technique and

. scope

Removedvegetationdisposalmethod

Rural Traffic Use existing Along ROW Observation Time/monthroad. Site ofConstruction temporarytemporary roadroad wouldaffect cropsproductivitybecause oflandacquisition.

Runoff, Runoff, Within the Observation Time/monthsedimentation sedimentation substation Quanlity of During heavy rain

and erosion and erosion boundary, surface or right afterof project along ROW, water due to construction and3 activities nearby erosion in 1 st -,ears

water (nearbysources and river, lake,slops within stream,project areas etc.),

specially in

rainyseason)Mlfitigation

____ I >feasure

Electric construction and investment consultation joint stock company

Z5

Page 29: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project E.1AP- Environmeit Ma:nagemenr Plca

Thanh Hoa provinceImpacts Parameter NWhere to How is the monitored/

to be monitor parameter processmonitored to be

monitored

ConstructionAir Pollution Check Construction Observation Monthlv in dry

tightness of and windy season

truck bottomand whethersand/soil ontrucks arecoveredproperly

Check theuncovered

spoils

Noise Noise level Distance Observation when there arefrom of complaints

equipment constructionsite: 1 m, site

Nearconstruction

area.Community

centrealong the

route

Impact on All project Construction During

historical and area site construction

cultural sites I

Construction Camps along Camps Observation I During Camp

Camps ROW, along ROW Presancesanitary andsafety ofcamps. _ _

Electric and Noise level At house Electro- There are

Magnetic nearest to magnetic reports/complaintsField ROW meter about noise

I __ I Iimpacts

Electric construction and investment consultation joint stock company

26

Page 30: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Ernvronment:lfanagement Plan

Thanh Hoa provinceTABLE OF ENVIRONMENAL MANAGEMENT

U N Parties Main responsibility Form for report0

I PMU and Ninh - Construction and Once/monthBinh Power Service operation of TiL

2 Independent - All problems related half-yearlvmonitoring to the environment

during constructionand operation

3 District/Commune - - All problems Once/monthlocal authorities related to the

environmental duringc.* construction and

|operation

E!ectnc conqruction and investment consuitation joint stock companv

27

Page 31: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distributioii P'roj'ect 1. I'- Environmrent Actancigeetit Plan

Thanh lHoa provinice

Environmental Mitigation Measure Report Form - prepared by Construction Contractor

Project: Project Location:

Contractor:Reporting date; Construction commencement date:

No Potential ltiipitcis Mitigation Measure Intplementel | Comment I

Cons truc tioii

I . lImpact on vegetables --

_____ Riinottz sedimentation and erosion- --

_._-

3 Air Pollution due to vehicle fume

4 Noise

5 hiistor-ical sites, temples, pagodas or natural reserve

6 Soil and Air Pollultion duie lo uise of dangerous wastes

7 Disrtiption to traffic movements resulting from construction activities

_--_l_ear public roads.

8 Construction Camps

9 Check of clearance of solid waste dturing constrtuction

Prepared by: Position: Telephone number:Address:

Electric consiruction anild investment consultation joint stock company

2a

Page 32: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EM.P- Environment Mtanagement Plan

Thanh Hoa province

Table 5.2 Environmental Monitoring Report Form - prepared by PMU andindependent monitoring consultant

Name of Project: Project Location:

Type of Project:Monthly report (yes/no): Reporting to EVN(yes/no):

Reporting to WB (yes/no): Reporting date

No Parameter Assessment of I Proposal/recommnendationconsultant/community

< ~complaint

Construction c

1 Runoff, sedimentation anderosion __

2 Noise______________3 3 Dust

Tree cutting andl management of temporaryI ___ road l

Solid waste during

I |construction progress andclearance after construction _

6 Accommodation of workerand safety issue

Traffic disruption in projectarea

8 jRoad destruction by project

9 ~Apply of safe methods

10 |Management ofI I construction materialsWild animals and naturalresourcesOperation

12 ROW121

13 Wild animal and naturalresourcesl

* Prepared by: Position:

* PMtI staff: month/timeSMIC: 6 months/time

IElectric construction and investment consultation joint stock company

2g

Page 33: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Diitribution Project E.WP- Environment A tanagemeirt Plan

Thanh Hoa provinceEnvironmental Monitoring Report Form - prepared by Commune

Name of the Project: Location:

Reporting date:Environmental Impacts:

Impact / Mitigation Measure Comments of CommunityCommune Comments

RepresentativeProject vehicles or activitiesincrease ambient dust level

2 IProject vehicles or activitiesincrease ambient noise level

3 Project activities pollute local riversor lakes

4 Project tree cutting causeenvironmental impact5 Project activities create impacts onagricultural and/or residential land

Project activities impacte culturalproperty

Project construction cause traffic7 impact

Project cause negative impact dueto solid waste or liquid waste

I Project cause social and health9 t

I impact on workers

1 1 Accidents I

11 .Dust suppression measures12 Erosion and sediment controls

Use of materials, etc. to avoid13 exacerbation of flood effects,

chemical pollution etc.14 Waste management practices1 E'Project activities cause impact on

birds, animals and rare flora16 Project vehicles damage the roads

17 Others

Recommendations (if any)Signature of Commune Representative:Title of Commune Representative:Date:200...

Electnc construction and investment consultation joint stock company

30

Page 34: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural. Distribution Project EAIP- Environmenl Mflantagement Plan

Tlianih I loa province

Chalpter IX: Monitoring and reporting systeiim

Issues tosbend rd

Ieportod b't r -eporting level 2B reporting level 3 reporting level

Prepared by Received Freque Received Capacity Prepared Received Capacity

Site By: To: Power One timeenvironmental Contractor network beforemanagemiieiit iTanhagee at construction,

Board. (PNMB) Monithly- Thanh HIoaPower Service. .

Envirlonmeniital By: Techniical To: Power Monthly PCI EVN Quarterly EVN World Bank Quarterly

monitoring supervisors of network (WB)the Power managementnetwork Board (PNMB)nianag,enient - Tlianihi I-loaBoard Power Service(PNMB) - and PCl .Tliaiih I loaPowerService.SIMC World Bank Half-yearly

-_ (WB)Envirolnllituz To: Po\vcr To: PC I I al r-yeally PC] EVN Ycarly EVN World 13ank Yearly

monitoring network (WB)

during managementoperatioll Board

(PNMI) -

Thanh HoaPowerService.

Electric coOisiruction and investiileint consultanioni joint stock comipaniy31

Page 35: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Prloject F-IAIP- Environmewnt Anauigemient Plt,

Ihl anhl Iloa province

CHAPTER X:Enhancement of environment management manpower

--- to Atteiidants Number ofTopicsvbe (Who slould be atterdof When Location Organizer Costs

covered (Wosol. attendants.Ira iied)

Training on 11 3 days 2/2008 Ha Noi EVN and technical * Daily cost:

mitigationi, consultant 70,000x 11 x3=2,3 1 0,OOOVND

fiofitOunriig * Accommodation costenvlrormnilel

50,OOOxl Ilx3=1,650,OOOVND

* Travel of attendants

45,000x 1 lx2=990,OO0VND

(Thanh Tloa to Ha Noi)

* Travel costs fromdestination toAccommodatin

I 0,OOOx I I x2=220,000VND

* Cost for lecturer oftraining

5 00,OOOx I x3=1 ,500,OOOVND

. Total: 6,670,OOOVND

Electric consirictioni and invesinieni consiultation joint stock company32

Page 36: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EXP- Environment Management PlanThanh Hoa province

CHAPTERXI: Cost estimates for EMPTable 6: Implementation cost estimates (VND)

No item Construction Operation (20 years ofo Ilife cycle)

1 Mitigation measures The costs are covered in The cost is covered inContract with production cost of theConstruction Contractors provincial power service

I 2 Monitoring costs for The cost is covered in The cost is covered inI substations, lines. running cost of PMU running cost of EVNI (By consultation PMU)

3 Monitoring costs for 3 men /stage x 1 man/month/year xsubstation (SMIC) 80,000,000/stage x 2 10,000,000 x 20 years =(2times /stage, 2 stages = 160,000,000 200,000,000times/MV project, oneat construction and onebefore transfer

4 Training cost for 6,670,000VNDmanagementenvironment . .

TOTAL 166,670,000 200,000,000 VND

GRAND TOTAL 3FOR WHOLEI 366,670,000VNDPROJECT

Electric construction and investment consultation joint stock company

I3

Page 37: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment Management Plan

Thanh Hoa province

CHAPTER XII: IMPLEMENTATION ARRANGEMENTATION

UROLE RESPONSIBILITIES ORGAINIZATION

Project Owner . Ultimately responsible for overall EVN

project management, including

environmental management.

Environmental . Responsible for preparation of EMP - Power network

Consultant report. management Board(PNMB) -. Thanh HoaPower Service andPCI.

Overall Project . Responsible for coordination and Overall Project

Management management of overall project Managementimplementation, including guiding and

supervising implementation of the

EMP.

Environmental . Specific responsibility and point of Environmental Officer,

Officer contact person for environmental Thanh Hoa Power

issues. Service and PCI.

Project . Responsible for day-to-day project Department 8 of PCI

Implementation implementation. Activities include:

and a, Planning and implementation of

Organization environmental management

activities during construction

b, Coordinating with other parties

in relation to environmental

mnanagement activities.

c, Carrying out internal monitoringI and supervising independentmonitoring

d, Supervising and providingbudget for monitoring activities.

e, Reporting on environmental

information to concerned parties l

Electric construction and investment consultation joint stock company

-35

Page 38: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project -UP- Enwv-onment .llanagement Plan

Thanh Hoa province

Civil Works . Responsible for construction works constractor

Contractor and following contracterspecifications outlined in the ENP.This includes:

a, Applying construction-phasemitigation measures.b, Ensuring safety of constructionworkers and local people durin2construction.c, Following Vietnam and WorldBank policies on environmentalprotection during construction.

Construction . Responsible for supervision of civl Power network

Supervision works contractors during constructior, management Board

including implementation of (PN--MB) - Thanh Hoa

environmental management activities Power Service and

under the EMP PC1.

Project . Responsible for operation of the Thanh Hoa Power

Operator project including operation stage Service

environmental management andmonitoring activities.

Safeguard . Responsible for independert PC 1

Independent monitoring of EMIP implementationMonitor(SIMC)

En,

Electrnc construction andi investment con.sultation joint stock company

I3

Page 39: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment Mlanagenent Plan

Thanh Hoa province

l ANNEX: A

LIST OF PARTICIPANTS

.Electric construction and investment consultation joint stock company

Page 40: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

I i I ! ! I I I I

Page 41: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment Management Plan

Thanh Hoa province

ANNEX: A

LIST OF PARTICIPANTS

1. Compiler : Hoang Thi Xuan Huong

2. Project manager : Hoang Quoc Hung

E t ,

1.etn comptucinadner ten Honslating Thin Xuccm any Hon

Page 42: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

I I

Page 43: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Rural Distribution Project EMP- Environment Management Plan

Thanh Hoa province

ANNEX B

COM\NUNITY CONSULTATION SCHEDULE

Electric constructioii and investment consultation joint stock company

Page 44: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

{lI f I

Page 45: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

U'Y BAN NHAN DAN CONG HOA XA HOI CHU NGHIL \ IET NANI

HUEN N H.A TRUNG Dc. lap - Tur do - Hanh phuc

S6: 935/UBND-TNMT Hit Trum,g mgav 08 thicim, 11 ndni 2007

GIAY XSAC NHkN DANG KY'

BAN CANM KET BAO yVE MOI TRIJONG

DU AN: LU(OI DIEN PHAiN I'HOI NONG THON RD TINH THANH HOA

UY BAN NHAN DAN HUYEtEN HA TRUNG

X.AC NHAN

Dieu 1. Chu diu an 1 D)ien Itc Thanh Hoa, da c6 van ban so: 3627

IDL1/DLTH-QLXD, ngay 10/10/2007 ve viec dang ky ban cam ket bao ve goi

trtrsng cua du an: Lu6i dien phan ph6oi nong thon RD tinh Thanh Hoa

Dieu 2. Chu du an c6 trach nhiem thurc hien dung va day du nhung noi dung

ve bao ve N16i truixng neu trong ban cam ket bao ve Mli trua:n.

Dieu 3. Ban cam ket bao ve Moi truang cia dui an la cca so de cac ca quan

quan 1 nha nua6c ve bao ve Moi truabng giam sat, kirm tra, thanh tra viec thuic hien

bao ve Moi truirng cua du an.

Dieu 4. Giay xac nhan nay c6 gia trk' ntu ngzv k•!./.

Noi rzhan: TM. ULY BAN NHAN DAN

-Chu duan K;-T-CljH1 TICH

-S6 TNMT (De bao cao); PH6 C-HA TICH-LWm \P -TN\NIT-. rt

-I ,? ', Lr- ,, u

Page 46: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

CONG HOA XA HOI CHO NGHIA VIET NAMDMc lap - Tir do - Hanh phuc

BIEN BAN THAM VAN CONG DONGBAO CAO DANH GIA TAC DONG MOI TRU6NG

Thanh Hoci, ngay .1 thang G nam 2007I. Thinh phan tham dir:

1. Dai dien chu dau tt:: Ong: L...Njl..lt.Lt... Chuc vu: R t .ZL' X 6

2. Dai dien dan vi tit van: Ong: flnt..S.ATo,i': Chuc vu: ...GSiw,K% ... de.

3. Dai diien UBND xa: Ong: .l...L&q.Q > Chuc vu: ..C.T..U ID..Xn..

4. Dai dien/ ngucdi dCrng dau cac nh6m dan toc tieu so (neu c6)

Ong/Ba ......... ......... Dan tc: ........................

5. Dai clien cac hoi, doan the dia phuxng:a. Ong/iM: LL .ao k Chilc vu: .J.b. Oncg/Ba: ........ .... TL ......... ......b. Ong/Ba:> . rtX.... .& .Chucvu ..e.rH0>la

C. Ong/la: ....................... Chle vu:......... . ...........

d. Ong/Bi: ................... Ch-k vu:......................

e. Ong/Bai: . .................. Chuc vu: .....................6. Dai clien cac ho gia dinh .lS7. Nguti, trong d6 so' ngwti dan toc thieu so6: ...

II. Nidi duing thaiii van:1. Dan vi tu van th6ng bcio ve':- Noi dung dtr an: Lucti dien trung Ap tinh Thanh Hoa gom 113 xa tren 18 huyen,tong khoi lucng DZ 35kV =77.,l.J.tm, DZ 22kV Y&.Avi tong so' TBA

35/0,4kV - . TBA 22(10)/0,4kV = L•.. tram, TBA 22(6)/0,4kV -

. ..... . tram .- Hang muc: Lu6'i dien trung ap xa: .tl. 4 . htr huyen H.Qc...- tinh

Thanh Hod.- Ly do daiu tu: Chong qua tai cho lirui dien trung ap hien c6, nang cao chatIL(ong s' dun- dien.- Quy uo cong trinh Lrd' di&n trungaxa ...p .. . gom DZ 2.K.V.UJ2S4 5q

............... in . ... AZ {..L ./.p .....L......2.......................................................................................................... .................

V i trf: _uy-n DZ.22.4V ... .Z.ito -,.A r.i; ... _U,vlj p2<ud., ef0 ..r Zi ......i

.~_ . X tj ... 5Usiu-* *t. .Y .W, ,,... /v *5 -9 r <

...... l-.aL .o. . "S

Dien tich chlVirn dILit vinl vitl gom m6n- cbt difn, vi tri TBA nh6,lblg .. mn diTn fich deft thu hoi tarn thdi: ........ m2, khoi lruncr vat tu ft, thMi

IIn thi Ucn° nKw 7 tir thinH \;'. \ loItn Hho coing trinii.

Page 47: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

IC6 nhieu bien phap de giArn thi'el tac d6ng rnoi truang nhu': Van chuyen

vat tu,, thiet bi phai che b,at kin, toc do xe chiam, bo trI khong don dap, xay dung

nha a, lan trai cho cong nhan phAi c6 day dcu cong trinh ve sinh.

- Chinh sach ve moi tru6ng: ap dung luat moi truong ciua nu'dc cong hoa xa hoi

chui nghla Vit Nam so: 08/2006/TT-BTNMT ng$iy 8 thang 9 nam 2006.

2. Y ki£'n tham van c6ng d6ng:

2.1. .VhaXt ... O & dQa phA c l4 ... at

Lw 9 q?2v^M51Xt,.. .. ........- ..

................11Lt~ .~ ia ............ . . ............ .. ................ ........... ..

1-.'.............................. ......... ........ . . . . . . . . . . ..........................................................

2.2. Tham v.^in c'lia cong do6ng ve nhiing tac dong tich ctc cila du an d'i vOi moi

tru'ong.+ TrtuOc khi xay dIng: .c . i i

* './hCttl vi 4 Xj C- u

-jkt.. uti.y._ L U-- ,vao-q .c.-. q L5'........... .va zi.. .. . z

.. .....a .... ..... ...... ...... h. .... . . .......... ..... ....... .... .....

± SaTro khi xay dung d..rSn ma ida cXlia .

t ..

1; , .. XLli . ItlUs.e . lOm .... .cw ' 3Q.;>" 1A Ss!. ........ ..... Yn

.. . .. . .. . .. . ... .. .. . .. .. .. . .. ............. ....... . ........................

-- ;- . --. -- -.. .. .... f.. ..... h ........... . , ..... .

I1 ta ../.b A BK!XC.iAIJ%j

Ka -... .... 'UZ LfYad . ....... .........................

. ..- +Saui khi, xay dun d rnh rnua lua cua nihan dan.

-4

g4 ..- f thlX 2euw < . u G1' il aca... xd........................ ArL

a... LaL.

'^' C ... ,L ...................

J §~~~~~~~~. ' s lt 5U. 9................. ,c6. .l.d . ..... T.................. . . .. . .

i t,,t, ,................ ............... ..................................................................................... ..........

I Ii

X a i:.................................. .................................. .......................................... ..................

S t'^-2.3. DU anl se gay ra mot so tac donor nhur

x - . 2>;..! .. , , ,,,, ,,,,, ,,e .......... I.......).. 1, ... cv/e.,.... ...3

.- ........ t'. :r^.,,,,,-,-K.S Z^C4e..L . f!tv lSwt (.a/v9,SdY4, . Wr. :....

S '. . . .. . .. .. . . . . .. . . . .

Page 48: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

LIVAL

af .. t L .(&C. -kkL A -. .)4 ' Tt.C ...CAl?

~~~~..... L.l. ................ c....................... ! .'.

DE2N LUC THANH HOA DAQAN Tr VAN/~~D UA ANJ9 4- /4/fi- Gtt\,,

'V07G

~, ,,, . ,,LOJZC';

I,,M7EN UBND YLC NH2AN CU,A XAC NHA~N CU.A HOI XAC NHAN CUA

- .<. HOI NONG DAN .NGUGI CAO TUOI - -- HU NC

~~~~~C I Si r70 A t

'~ 4 .J~%~~* -CV4 / ...c

Page 49: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

1), X,\il II s( li ).1 DAll I IIF IJl T AMDO

x ....... q .. I IUYN... .1;)Q .LQ2t1.O )- tifli Tlianh H-oa

. STT T'n chili ho Dia chii K( teni

J / Ar,¢ I 4/_r

-- -EM[ / I an , 2'-.:

., 1 7LzS -- 7-1

. ) og - 1/qoy//zc /m 4w - ..I-w

_ha_zh / Hot gY thn d 2007

7 S t7JQA AA /Pcbu _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _r

,,--.Xc nlian cua UBND S;i Call bo di'eu tra

-' .-

47

Page 50: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

CONG HOA XA HQI CH-U NGHI.A VIET NANIDOc lap - Tr do - Hanh phuic

BIEN BAN THAM VAN CONG DONGBAO CAO DANH GIA TAC DONG MOI TRU6NG

Thanh Hod, ngay 14 thang c nam 2007

I. Thlanh phan tham dii:

1l Dai dien chui dau ttr: Ong: i .. ?½Žf Churc vuAG .yz^...,•

2. D ai die n d on vi tr v a n: O n g fi I tz << .v - . C hiic vu:-Zm,22....i..

3. Dai die n UBND xa: O ngr-z. Chuc

4. Dai dien/ ngu ri dcung dau cac nh6m d2an toc tieu so (n(eu c6)

On g/Ba . .................. Dan toc :. ...... . ...............

5. Dai dienc ac hoi, doan the dia phtu an g:

-a. O n gIa Szzc;......r f<yz-4Z5~>... C h uc 5 ;7?,.SZC27,gk,,tQ,SQ

b. Ong/c,/B5i: B i. ............ Chuc vu: .. ....

C. IL . . Chikc vu: .........c. Ong/E3a: 2 . . .~.. C hfuc vii: 6pZC'd. Ong/BOi: ......................... ChCxc vui:...............................

e. Ong/Ba: .......... .............. CChuc vu ......................

6. Dai dien cdc ho gia d'inhG,.. Nguci, trong d6 so nguri dan toc thieu so: ...

H. Noi dung tham van:1. Don vi tit vdn thong bao ve':

- Noi dung diu dn: Lu6i dien trung dp tinh Thanh Hod g6m 113 xa tren 18 huyen,

tong khoi lircng DZ 35kV -/Q .ZJ&>-t DZ 22kV ..-.. &L$tong so TBA

35/0,4kV = j;T. -. , TBA 22(10)/0,4kV = .. tram, TBA 22(6)/0,4kV =

O..g. tram.- Hang muc: Li.6i dien trung ap x a:z7 na, uyen t;A44 ...... Jnh

Thanh Hoa.- L do dau tu: Chong qud tai cho luai dien trung ap hien c6, nang cao chnt

luang sur dung dien.

- Quy m cong trinh hu6i dien trung ap xa ...... gom DZ-Ae.<&.-3j

......... ........ ........ ........

-Vi tri: Tuyen DZ .

...................................................................................................... ...........................

.................................................................................................................................

Dien tich chie'm Mat vinh vien gom m6ng cOt dien, vi tni TBA nho

K.Z.m2, dien tich d6t thu hoi tam th6i: ....... m2, khoi lhang vat tu it, thai

gial thi cong ngan tiu 2 den 3 thng 1l xong toan bo cong trinh.

I-IZD Z

Page 51: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Co nhieu bien phap cl giam thi'u tac donc moi truang nhtr: Van cnuy

vat tir, thie6t bi. phai che bat kin, toc 1o xe cham, bo' tri khbng don dap, xay drng

nha , lan trai cho cong nhan phai c6 d'ay diu cong trmih ve sinh.

- Chinh sach ve moi trurYng: ap dung luat moi trudng c'ua nu6c cOng hoa xa hoi

chu nghia Viet Nam so: 08/2006fTT-BTNMT ngly 8 thang 9 nam 2006.

2. Y kien tham van c6ng d6ng:

I ...-. 14..4 .-Ze%.h

(z' l S E

-7iv o

;,4rXy>$4~

.. X.o...a..X;..FaS......'..............................................

....... I......... . . . ..........................................................................................

2.2. Tham van c'ua cong d6ng ve nhung tac dong tich curc cuia du an co'i v6i m6i

trlkYng /

+ TrLxc khi xay durng: ........ i...

* +-4J...v.2 2;C;ts 'X?j

-S t*

.......................................................... ...........................................................................

+ Trong khi xay dung: t. z.* . -4

...... ., ..... ......................

+ Sau khi. x.Ay dLmg,: de' trdnh mi1a Ida ciia nhan dan.

77 g.... . .. . .. . .. . .. . .. . .. . .. . .. . .. . ... /./....

' .' ................................................. A./.A.-.a..../.--.7.... ......... . . . . . . . . . . . . . .. . . . . . . . . . . . . .

..................... ** ws s* 6............................................................................................... ............

2. D.Da gn .ay ra mt so' tac d6n nhu:

. . .. A.........

-e. Z,7.Xt ...... 4................ 2t . . . .. H......................v... , 4 .............

YteIa

Page 52: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

/,oZ .f ,.. .. . . . .. . . . .. . ............ . . ..j . . ..i .2 . ...... ..... ..... ..... ..... ..... ..... ..... ..... .....

~71*. a= 2< 7'-. 6- /7 -)l 4

DIA,N LUC THANH HOA, DAI DITN CO QUAN TUT VAN

/6/

H AP. GM 06c XDCs

Oiv

/-Z

DAI DIAN UBND - XC NHAN CUA XAC NHAN CUA HOI XAC NHAN CUAID -: e6NG DAN NGU4tfI CAO TUOI 5 NU

ON(, f-P-W

IX4n

Ira*S ZfO

Page 53: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

tPu naip 6q1 ur

ZOOZ lXln7i -9 RuYnli;rp/ i~? SuAr7y'notj ilumlj,

7 I?"1 (-7AI I

M, ,/- // y'Sb77 ?, ,S9{i///A-

-lr g v vfo, *zi'ffi .19 J 7) /y4 B @ >g

;~7/-77( 7f ~ ~ ~ ~ ~ ~ ~~Z /j2r/sy .2w (I't/','/, "tX 74X '

s-r C//v?o77 g2gt )22 'fk9 6']/-� 'QA 7/* g - -7/f Iz/ Z2,2g

3, 4Z,vz<,,X, B ,,,, ,,,;,,. S , z,2 ,,.,v

77

< /X ,7/Z 'iw R 2 ':x/ &/</Z7 ;2/ij N1-{ Zff 7/.f/ V/

/ /

~ L(ig d7

4 - i{j/2 -''

14y/5 rl~,fsr A'I/' I)trw 3ByCA//

?1- S '2z,- Z-v4X'),2> *Xt ~Szg ;z8>z>

g) L~~5 aKE 7)1/' '9 .z / A ><~ -~~r 7 -.k -4t) 7z L)

U?1 4)L ItlP "J w'I '7'P "La uS

roH qIumljL :'imjL m,4 S: ll.nIl //2/ XL7 e

lU FmIaI.I. flIf 18 II3DS lINVU I

Page 54: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

CONG HOA XA HbI CHU' NGHIA VIET NAMDoc lap - Ttr do - Hanh phuc

BIJEN BAN THAM VAN CONG DONGBAO CAO DANH GIA TAC DONG MOI TRUONG

Thanh Hota, ngay JD thang 6 nam 2007

I. Thanh phan thain diu:1. Dai dien chu dau ttr: Ong: LN./Vl... WQII... Chuc vu: p./GtS..cI&.XDC6

2. Dai dien don vi tr van: Ong: HQ.cy.. J. ThaC Chic vu:

3. Dain L y.m vu: dinUBNDx 6n4. Dai dien/ ngu'di dtung clau cac nh6m dan toc tieu so (neu c6)

Ong/Ba ....... ........... Dan toc: ........................5. Dai dien cac hoi, doan the dia phuong:a. Ong/Bai: /SqlwDW2y Chuc v:..S6'5sw% &

b. Ong/Wi:- N. LChicV ............vu: ......

c. Ong/I .. L R u .... .CILL .... Chuc vu: .C. ..........

d. Ong-/Ba:........................ Chixc vu: ..............................

e. Ong/Bla: ........ .................. CChhc vu: .......................6. Dai dien cac ho gia dinh .4f. Nguchi, trong d6 so ngucAi dan toc thieu so: Q.

II. N6i dung tham van:1. Dorn vi tit va"n thong baio ve.:- Not dung dur an: Lui di6n trung ap tbnh Thanh Hod gom 113 xa tren 18 huyen,t'ong khc^'i hrong D)Z 35kV D..v.> Z 22kV %/-J-SIKw to'ng so^ TBA35/0,4kV = ... tJt,TBA 22(10)/0,4kV = .l.l6. tram, TBA 22(6)/0,4kV=........tram.- Hang muc: Lucyi dien trung ap xa: zia..N"., huyen .. t' ; ...... - tinhThanh Hod.- Ly do daiu tu: Chong qua tai cho lifi ctien trung ap hien c6, nang cao chatIong su clung dien.-Quy mO cOng trinh luoi dien trung ap x a .. ...... .o'm DZ r;M2.4+.09S.. ........... .... .c .b... ..... Q f K..1.14.. ...... .t... . . . . .

........................................... P . . . . . . . . . . . . ............ . . .. .. . . .. . . .. . . .. . .

-Vi tri: Tuyen DZ-. .. Q. I C.. dtm..Ck/....

..J7135.A.d. 4t..L . ..

... .X <... ........................... ....................................................................................Dien tich chiem da?t v-inh vi^en gom m6ng cot dien, vi tri TBA nho

. ... m2, dien tich da't thu hoi tam thii: ..47-00.... .m2, khoi lu.ang vat tu it, thaigian thi cong ngan tur 2 de'n 3 thaing la xong toan bo cOng trinh.

ZIZ!

Page 55: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

C6 nhie2 u blen phap dd gia'm thiedu tac dongm mOi trung nhu: Van chuyen

vat tur, thiet bi ph'ai che bat kfn, t6c do xe cham, bo' trf khong do'n dap, xay dung

nha 6, lani trai cho conga nhan ph"ai c6 d'ay clu cong trinh ve~ sinh.

- Chinh sach ve moi truiing: ap dung Iuat moi trudng ciua nu6c cong hoa xa hoi

chu nghia Viet Nam so: 08/2006/TT-BTNMT ngay 8 thang 9 nam 2006.

. Y ki6i tham van cong d6ng:2. 1. _fVh dn.. I-,. dft... phdKq ... \I'ttq.. .....a2..d.5.g.L h^9 i

.CiL.. d t. d e. .. .,> .icXdd .'LA ,. .n M .plocq . .XC.. Ali&.QL.. - .e E . . ... .n@ Cld. ..

.. 9M... . . AY... ......L.. . . .b......... . .................................

2.2. Tham van ciua cong dong ve nhfrng tac dong tich cuc ciua du an doi v6i moi

truong.+ Tru6c khi xay dung: ..C-...qucuLt-.. dd..{ - Ci'- 7M..

.. b.ia.r [....r.t ho. kS. d..ve P..Xt.3<E. ..X.. A..A.

* . b . .f t. . .. A.M...P. Q....X......t ......q.B ... ciA.:r.oq.. .uR ...etE .. EIcu...is .e..l'd..i ...x.h4..b.... .... ............*...... ....................................... . .p

+ 'iroilg klhi xay durng: ..GAp~. .Vil.. L.. v. .. Lo.. tyu.Ji..L Adl'

+.l.. ....... .... .............. ..

.....A....... _....

~~~~. .h.w .. a.0.. a ..s a. .>e. ...X.. ..d.o.. . @y..G. .. ...d.v.. nI .... .. . . ... . . . .. . . . .. . . . .

+ Sau khi xaIy datg:~ trTnh mila LIda cilia nh;in dan.

1...t a ..D O t4.

.. .. L . 1C&fCA.A.. L ... ai. .. O_0l /..k..

....................VL..L ........ .L"........ 1.. .......................... ......

A , .. .........................................................

2.3.+ Da i gayd ra mot so' tic d cn u nh adn

................... ... ...................I............. . .......... ........

O A.... ... ... .. ... ... ... .. ... . . .. . . .. . . .. . . .. . . .. ....... t ...... 6.... . . . . . . . . . . . . . . . . . .

2.3. Du an, se a4A.U ra otso ta ¢nhL- 4 Rt2jt}Sv4ir e C t /ei; Kr /... e..5:M(%..T.tR-nq. ....5Q..C Luvl ... JW'LP A. .1'- 0k

.SA;Q .ADQj.2bVJ..dXt . c ... .r.,, fr .. rz,,,a ....hA1........................

Page 56: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

-2--i- tA9 -&..Q..qe..CO.-L..;tetl....................& @ 9

.. ...... ........ ... -k E q.L l. 2.... ;. .t@ op.ptc'.&w

................. ...... j .kt .ti 1.k'' e .z ' -. X............ .........................

DIfN LUC TIANH HOA DAI DLN CO QiUAN TV VAN

A .HOI NONG DAN .NG CAO TUQr H0L PHU NC

G. ; - .

I -,--.,

* // 1 t4o n

Page 57: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

1JANII1 AcIl DAf B11 I'T I D1A;'l ii1

XA j/V 4 7 . A2/2{t/ ............ .tinlh Thlani Hoad

* STT Ten chu ho Dia chi Kj tei-

. j Az/&zr///< X> b- /L,*'z 1i______, ___7n1r A___

__7_/_

/F4 7 1'

-A -___ fi 7_ _ _ _ _ __ 7 7 w >

J7/,/z'' &-" l' - ' "g 7-L)-,v

V

/? / ;r, t I .Es2s gD /}'A7n,(

7/ /I.2 ft ttrl g 2< //; <, 9/14 z#Y1?24' J

I/ ii 1; 9 Si/j;'^ S7•-7 /2 7L,/'/) /Z cqll>

Thanhi Hod, ngdy lC thang 6 7zCm 2007

Xac nhan cuia UBND xa Can b6 dieu tra

1 1 Y ' r Crng>

55

Page 58: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

CONG HOA XA HOI CHU NGHIA VIET NAMDoc lap - Ttr do - Hanh phuic

BIEN BAN THAM VAN CONG DONGBAO CAO DANH GIA TAC DONG MOI TRIJNG

Thanh Hod, ngay Al thng C nam 2007I. Tlianh phan tham dtr:

1. Dai dien chu dau tt: Ong: .. vuCh . (t.e2. Dai dien don vi ttr van: Ong: . Churc vu:3. Dai dien UBND xa: g:ATh .4 f\..Y.P. Chuc vu: .4. Dai dien/ ngikii dung dau cac nh6m dan toc tidu so (neu c6)

Ong/B . ................. Dan tOc: ......................5. D3al dien cac ho.i, doan the' dia phtuang:a. OnD /Ba : h ...... R .. ... Chu c vu.: ............b. a..... Chuc vu: ........

,c. Ong/Ba: 5 ....... CH..... .... hcv:.... \f .S.X

d. Ong/Ba: ................................ Ch

e. Ong/Ba: ................. Ch....u .........6. Dai dien cac ho gia dinh -43 Nguabi, trong do so' ngLuai dan toc thie'u so6: .Q

II. Noi dung tham van:1. Dow vi tit van thong bao ve':- No.i dung dir an: Lua6i dien truncg ap tinh Thanh Hod go'm 1 1 3 xa tre,n I 8 huyen,tong khoi luang DZ 35kV = DZ 22kV X.6b\I.i, tong s6 TBA35/0,4kV = X1............. TBA 22(10)/0,4kV = ML&.. tram, TBA 22(6)/0,4kV=

.9..tram.Hang muc: Li6i die n trung ap xa: ........, TBA 2./.V , huye n ....tram,. T.A. .)/ t3nh

Thanh Hod.-Ly do da'u tur: Cho'ng qua t'ai cho lua6i dien trung ap hien c6, natng cao chat

3c.ng s.r dung dietrn.-Quy m cng trinh lu6i dien trung ap xa.. .... .......... \i gonm DZh.. .

- .t..tV. !o.*W...-.td.W->Xn................................................................................................................................. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . .

-Vi tri: Tuly6n DZ. q.A.lK.t2.A&>..i.iAa.2f.t.A; 9 . . lL...f .. t. & .. .fig 3 . .. X ...............................

................................................................................................................................

.................................................................................................................................

..................................................................................................... I............................Dien tich chie'm dgt vimh vien gom m6ng cot dien, vi trf TBA nh'o

4h,$Sr ... m2, dien tich dat thu ho'i tam tMri: ,l.1 ...... .............vm2, kho'i lua(ng vat tvu ft, thMiaian thi cdon n-i:n tn 2 den 3a thich oai doAn bt cong trinh.

Page 59: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

C6 nhieu bien phap de gi'am thieu tac d6ng moi truing nhux: Van chuyen

vat tu, thi6t bi phai che bat kin, t6c do xe cham, bo tri khong don dap, xay dung

nha C, Ian trai cho c6ng nhan phai c6 day dfu cong trinh ve sinh.

- Chinh sach ve moi tru6ng: ap dung luat moi truLng ciua nu6c cong hoa xa hoi

ch'u nghla Viet Nam s6: 08/2006/Tr-BTNMT ngay 8 thang 9 nam 2006.

2. Y kie'n tham "n co5ng dong:2. 1 uQit.. .i..t, .. ...w.D1.:s ..g .>..4 X0 .$i4,. 3l.. ..W. t.0.G...-..... .G?.\WMg

LI xv** .t. . .. Y. . .. ....................................................

........................................................................................... I......................................

.................................................................................................................................

2.2. Tham van cua cong dong ve nhfmng tac dong tich cuic ciua dua in doi v6i moi

trtkrng.+ Truc6c khi xay dutg: _

l *a *- .. -- ............... ......................

.................................................................................................................................

........................................................................... I......................................................

+ Trong khi xay dung: .

\,A .w.......................

X X t .< Si .W SttSkZ & '.i 3'< l.Wu), Seui.....L..\......................

*- 4*sJ iW 8La@ *AR* d WLhS* t @ a.....N w.. ....... L o, . ... L......

.8.B 9v.. iS.2.kE .Ap.;.s ......................................................................................................................................................................................................................

+ Sau khi xay dung: de tranh muia Ia ciua nhan dan.

2.. u nsega S 6ts6ta on nu

I£ 5 ;X.As.k.w.S\. .i. . .% .. ... t...W.t...J..gz2..9Xf3 .A.&A S........ ... <.. .......... ............. .. .. .. .. .. . ..................................

.X....... ......................................................... M + . ............. +...<. .......

..................................... ....................................................................................................................... *

2I.Drd ~gy~ 6 6tcdo hfIM

Page 60: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

LA itl ar aa.tt ; &u ... x tLOA g IL.5 1a...S

~~~~~~~~~~~~~~~~~~~.......lj . ;.;;. ...... ;r ..tMlh\igz. 6)J4.3 .wP. ............................................................................................................................................................. f - ... . . . . . . . . . . . . . . . . . . . . . . . . . . .

DNDI L,-TANH HOA DAID O QUAN Tf VAN

C* NG.

P. G0 D6 XDCB

--- AI DI N UBND XAC NHQN CUA XAC NHZN CUA HOI X CUA-XA L . HOI NONG DAN NJWCAO TU6 OI P r3-,u CT 1C: i ,'

1~ ,V~ CA

Page 61: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

D):AJMNI S^\tCl DAI I IBU 1TIA\'NI M)Yr

X, .... L;" ...... Ff UYEtX-'4C. .... LQC ...... Einh Tl]anh Hod

STT Ten chlu ho Dia chi K' ten

PAf fil' (VIL^ Ij ' TrLi

tipantLYu )2T.~ ~ Y& x L 6'S i. (r F'1 IzZ.T P -r,15n, I Du VM &v'n T.'n2v %o( 16> Tr'

A '- , AA

Lt, I n '. rK^~~ l ^ ta... I1Ae T.(2 |f~. AS ^, l' (6;, ~14 .d L>,| S

9 Hod, It,. y ! thbin ndm 20 I

Xc n_i_ n ciaUBND .x Cn v 4b 'Adi e u T r,a .

_____ ~.& u kf.1 , ~rj TL O (a' T> 1 59;.1 I I-

I . .

-\, .-. -i-----*e

1JI-L.~f~fI.~. I _________________________________

Page 62: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

CONG HOA XA HOI CHU NGHIA VAST NAMOoc lap - Tu do - Hanh phuic

BIEN BAN THAM VAN CONG DONG

BAO CAO DANH GIA TAC ONG MOI TRULNG

Thanh Hoa, ngay J9 thang 4 nam 2007

I. Thanh phan tham du: ,

1. Dai dien chu dau ti: Ong: J$ ...N Chuic vu: .P..9 O.e.t.XODe2. Dai dien don vi tir van: Ong: t09......t. .....hc vu:.

-- ng: ChfLc u: .23. Dai die.n UBND xa: 6U. .

4. Dai dien/ ngir6i dEng dau cac nhom dan toc tidu s6 (n6u c6)

.ng/BDan t6c .............................

5. Dai dien cac hoi, doan the dia phtring:

a. Ong,/Ba: PXA' .. . ../.' Chuc vu: ..C ... t ..... tSb. Ong/Ba: . Chuc vu: O, ..............

c. On,/Ba: 5 ... .TAn .. Chuc vu: ..w.............

d. Ong/B . .................. Chuc vu-.. ..... '

e. Ong/Ba: . .................. Chk vu. ........ ............

6. Dai dien cac ho gia dinhl . Ngu'ri, trong d6 so noWri dAn toc thieu so: .

II. Noi dung tham van:1. Don vi ti van thong bao ve:- Noi dung dir dn: Lu6i di&n trung dp tinh Thanh Hoa gom 113 xa tren 18 huyen,

t6ng khoi uTong DZ 35kV D DZ 22kV .Lj'KKl, t6ng s6 TBA

35/0,4kV = ..... TBA 22(10)/0,4kV = JI.A... tram, TBA 22(6)/0,4kV =

...-.tram.- Hang muc: Ltr6i dien trung ap xa: l huyen 1E 4...7-4 - tinh

Thanh Hoa.- L do dau tu: Ch6ng qua tai cho luri dien trung ap hien c6, nang cao chit

lhxng siu dunng dien.- Quy mo cong trinh lt6i didn trung ap xa 0 gom 3I . .* . 4J. . ..............................................................................................................................

-Vi trf: Tuyen DZ 3a-K\) ...... ,.

. .. ... .......... . . .... .. .. ................................

I f. .. d....-- -- .--...........................

Dien tich chiem da vinh vien gom m6ng cot dien, vi tri TBA nho

...A...m2, dien tich daot thu hoi tam th6i: . .m2, khoi luirang vat ti it, thbi

gian thi cong ngan tir 2 den 3 thang la xong toan b6 cong trinh.

60

Page 63: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

IC6 nhie'u bien phap de giarm thidu tac dong moi trunng nhu: Van chuyen

vat tui, thi6t bi. phai che bat kin, t6c do xe cham, b6 tri khOng d6n dap, xay ding

nha c, Ian trai cho cong nhWn phai c6 day diu cong trinh ve sinh.

- Chinh sach ve mdi trtr6ng: ap dunng luat moi truZing cua nudc cong hoa xa hoi

chii nghia Viet nam so: 0812006f1T-BTNMT ngay 8 thang 9 nam 2006.

2. Y kiln thain van cong dong:2.1.

I 2.l. ~~~~~~~~~~~~~pl AI ?hM ..............e^clLa.l..X h.*>.

.Le4.. a. ......... .d.D'...... ' '.:.g.... e... , ... .. .... .. ... . ... .. .... .. ... . .

...................... ...........................................................................................................2.2. Tham vain cua c6ng dong ve nhuing tac d6ng tich cuc cua du an doi vdi moi

trtlcYng.+ Tronc khi xay dung: 1A.J. ^

jz,- ,^6 v ;X . . Y1.Q A. ...i* 4

. ... ........................................

Z-- 6w. -4- A. .S . wG,Z d~. .a AvA 'hl ...

~~. ......................................................... ................,

*+g ......................... .........

4 , ..W v.A L- AJ.

i 2 A , {a t l ; ' & i. .................................. ... ... ... . ..... ... . .. . .

..... .. i;.... .... .... ....-.... .... .... .... .... .... ..... .... ........ .... .... ..... .... .... r... .... .... ....

....................... .... .... ........

.............. ....... ....... ..............~~~~-L ... s .. :.....*... *.....

I 61

Il

Page 64: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

*^ . .4.t. 1L . .c . .cd .J e. E .& L.4. . 2'.1 n

aja±8..i L.. ejaw 1. '..fi.ev.e .+ .a- ...; QikO.t.9 L......;....

... ...... ...., x. ........+e.......... ...&P ..... ~4....... Qc... ...................................

UDN LUfC THANH HOA DAI DIgN CO QUAN TniVAN

I I tt* AQJA...U., l

OIAL MC7 -S - - ,. 'CON

, ENLUB XA.NA CU XA NANCUDHI HN U

$ 2,a, M *3(, 2

-- : I662

''JI N UBND XAC NHAN CUJA XAC NH,&N CUJA H61 XAC NH,&N CU'A

* hvx...*L G DkN .NGOI CAO TuOiPHNl

XA .

11A JkH

I6

Page 65: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

DANH SACH DAI BItU THANI DtJ

Xa: 4f Huyen: ; Tinh: Thanh H6a

STT Ten chi ho Dia chi Ky ten

-I -<; / / ^ v g / ; /r.' -' ,

4 ,r;F g/ -t ,, r 7 -

v'-

C >y,"N' -Y ,.,E <.,<g/4w<. ,/XW

I f eI

I1 L ;k v & ./fZ7-','4, , -> (;iZ 2 w,,,,//* , j6 Evyrf * , < f

Ig //f/t*2f S2 >7/;7rfwd; -g< 7e/+<t7>*

;Than h6a,Z ngc7zy /t tz 6 n 2007

I Can2/Z/ ho,< dieu/ 'f,./f<tr/g7zn/pf7/a f

Z 77 C*

14-

Thzanh h6a, ng;iy A1 thang 6 nam 2007Cain bo dieu tra

I<I oSAH

Page 66: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

I Rural Distribution Project EMP- Environment Management Plan

Thanh Hoa province

I.

l ANNEX C:

I MAP OF PROJEC TAREAS

ll

I.

| ~Electric construction and investment consultation joint stock company

I, _ _ _

Page 67: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

Existing and proposed protected areas in Thanh Hoa provinceCac khu bao vi hien co va de xuaft a tinh Thanh H6a

.W1u# f* I, w uoZ Tie s uong Son

iAf6ng Lbt ,ft -t "^

W so , Pu 'NgocS S

N JUI 9 Van LLorr S aig5I goch LLe

'Ye a -I; nIASl^^ einu Tarn^^ Quv a' Trieu,

Ho if r ano ___ L

-4 . S onju-- <u~A3 - -wNhetlThanh N ^<x0gG

A A

hc TChh - Bn h -Hon - M

TL^TrT Pu i Husa Me ; GifiLo!-;on (marine)

Vegetation type I Kieu rufng Legend / Chu giai* Evergreen foresi1 Ritng lhifdng xanh Prolecled area ( Khu bao ve

|I. Coniferous foresl1 Ritng Ia kim Provincial border I Ranh gkdi linhDeciduous foresl1 RingB rung la (khop) - - - lJslrcl border I Ranh gi6i huyen

* Semi-deciduous fores1 J Ring nua rungT la|E * Limeslone fores1 I RLing flui da *L Cuic xLl n. dntr>l kUf il

Bamboo I Ring 1re n(fa - Ar* Planlalion fores1 I Ritng Irbng tU Grassland and scrub I £U1 lr6nga

Agricullural land f £1 nong nghiep W 4lRUil Waler bodies t MM1 nudoc* Mangrove u Rnnng nhIp man

MetaleIuca I Ring 1ram

IngS~iir:~n

Page 68: Rural Distribution Project - World Bank...rehabilitation and installation of medium network T/L to 17 disticts and a town: Hoang Hoa, Quang Xuong, Nong Cong, Ha Trung, Nga Son, Trieu

I

II

l III

I IIIIIIIIIIIIIII