In the past decade, Cambodia has seen steady economic growths at around 7% annually.Nevertheless,Cambodiastillneedsmoredevelopmenttoupliftthelivingconditionsofherpeople.The key towardmore sustainable development ismaximizing capabilities of Cambodia’s youth topreparethemforaknowledge-basedeconomy,inwhichresearchisfoundationforrealknowledgeandforpositivechangesofthesociety.
In linewith this awareness, in the 2014-2018 strategic plan, the Royal University of PhnomPenh(RUPP) stated very clearly its intention to be the flagship university of Cambodia in research,communityservices,learningandteaching.Itoutlinesgoalsandstrategiestobedoneintheyearstocome. To achieve this goal, RUPP has worked very closely with all its development partners toreform financial management and human resource management while at the same timerestructuringitsorganisationstructuretobemoreresponsivetocommunityandjob-marketneeds.
It was part of this reform and restructuring process that the Board of Trustees of the universitydecidedtoestablishacultureofresearchamongthefacultymembers.Annualresearchbudgetwassecurelyallocatedandresearchcapacitydevelopmenthavebeenoneofthepriorities.
Noticing the clear strategic plan and strong commitment to be the true flagship university ofCambodia,SwedishInternationalDevelopmentAuthority(Sida)haschosenRUPPtobealong-termdevelopmentpartner.SidaaimsatstrengtheningtheresearchcapacityinRUPPtorespondtobothsocialandacademicsneeds.However, todoresearch, ICT infrastructureneedstobe inplace.ThisICT policy andmaster plan is result of the joint effort between Sida andRUPP to ensure that ICTinfrastructurecanbebroughtintoexistenceinamoresustainablemanner.
The Board of trustees of RUPP has been informed of the ICT policy and master plan and hasapprovedofboththepolicyandplan.WearegratefulthatSidaisgoingtoworkcloselywithRUPPtorealizethefirstsetofprioritiesforgoodgovernanceandresearch.AstheChairofBoardofTrusteesandonbehalfofotherBoardmembers,Iwouldliketoendorsethispolicyandmasterplan.WewilldoeverythingpossibleinourcapacitytomakesuretheplanscanbematerializedsothatRUPPcanbetrulyaflagshipuniversity.
IthankSida,theSwedishembassyinPhnomPenh,andallRUPPerswhoworktirelesslytomakethispolicyandmasterplanareality.
FaithfullyYours,
MeyKalyan,PhDChairofBoardofTrustees
RUPPICTPolicyandMasterPlan–Final,March2017
ii
ForewordbyDr.ChetChealy
RectorofRoyalUniversityofPhnomPenh
Technology ismakinggreatcontribution to improve lifeandsociety.Recently, theMIT technologyreview listedtenbreakthroughtechnologiesof2017.These includereversingparalysis,self-drivingcarsandtrucks,payingwithyourface,practicalquantumcomputers,the360-degreeselfie,hotsolarcells, gene therapy 2.0, the cell atlas, botnets of things, and reinforcement learning. All thesebreakthroughsholdgreatpromisesforthesociety.
At RUPP, we recognize the significances of technology, particularly information communicationstechnologyorICT.WeintendtointegrateICTinallourfunctionsandservices.ICTmakesitpossibletostore, retrieve, transmit, receive,andmanage information to themass ina timelymanner. It issuchasystemthatRUPPisgoingtoadopttomakeresearch,teaching,learning,andstudentservicesresponsiveandreliable.ItstartswithRUPPhavingitsownICTpolicyandmasterplan.
The ICT policy andmaster plan emphasizes on facilitating the following services: connectivity andcommon network services; learning and research; university management and administration;governance,management,control,andmaintenanceofICTresources.Torealizethesepossibilities,the ICT policy and master plan also outlines a careful change management and monitoring andevaluationplans.
IamthankfultothegovernmentofSweden,which,throughtheirdevelopmentauthority,Sida,andtheSwedishembassy inCambodia,workcloselywithRUPPtorealizetheuniversityvision, i.e.,“tobecomeCambodia’sflagshipuniversityinteaching,research,andcommunityservices”.
I also thankall staff, teachers, and students atRUPPwho contributed to thedevelopmentof thispolicy.Wearegoing towork together to implement the ICTpolicyandmasterplan so thatRUPPcouldbeatruly“Cambodia’sflagshipuniversity”.
RUPPICTPolicyandMasterPlan–Final,March2017
iii
ForewordbyMr.MagnusSaemundsson
Sida’sRepresentative
ThenewICTPolicyandMasterPlanisagreatstepforwardinmakingRUPPaflagshipuniversityofCambodia. Modern and up to date ICT infrastructure is a prerequisite for conducting modernuniversity teaching and learning. Without access to databases and international science journalsscientificresearchcannotbeconductedinlinewithinternationalstandards.
SidaandtheSwedishEmbassyinCambodiawelcomewarmlythisimportantstepthatwebelievewillbeabletofundamentallystrengthenRUPPasahighqualitycomprehensiveuniversity.
YoursSincerely,
MagnusSaemundssonFirstSecretary,EducationandResearchSwedishEmbassy,Cambodia
RUPPICTPolicyandMasterPlan–Final,March2017
iv
Contents
ExecutiveSummary...........................................................................................................v
ListofFigures...................................................................................................................vi
ListofTables....................................................................................................................vii
Abbreviations..................................................................................................................viii
1. Introduction...............................................................................................................9
2. PrioritisedProjectsandProjectManagement...........................................................102.1. PrioritiesandProjectIdentification...............................................................................102.2. KeyProjectElementsineachProject.............................................................................11
2.2.1. DataNetworkProject...................................................................................................112.2.2. ITCProject....................................................................................................................112.2.3. NOC/DataCentreProject............................................................................................122.2.4. Intranet/InternetandAutomationProject..................................................................122.2.5. ManagementInformationSystems..............................................................................132.2.6. EndUserTraining.........................................................................................................14
2.3. ProjectManagement.....................................................................................................14
3. PlanningTimeline.....................................................................................................16
4. PlanningBudget.......................................................................................................18
Acknowledgements.........................................................................................................20
RUPPICTPolicyandMasterPlan–Final,March2017
v
ExecutiveSummaryRUPP’sICTPolicyandMasterPlan(2017-2020),hereafter“policyandplan”,aimsatintegratingICTintoallaspectsofuniversitylifeforstudents,staff,andfacultymembers.Specifically,thepolicyandplanwillmakeitpossibleforICTtofacilitatethefollowingareasforeffectivenessandefficiency:(1)teaching, learning, and research; (2) academic administration and management; (3) libraryadministrationandmanagement;(4)financeadministrationandmanagement;(5)humanresourceadministrationandmanagement.FundedbySidabutdrivenbyallatRUPPfromsupportstafftotopmanagement,thispolicyandplanwill guide the implementation of the infrastructure, databases, information systems, andcorresponding processes and procedures in order to support the functional and policy levelaspirationoftheRoyalUniversityofPhnomPenh.Thepolicyhasthefollowingkeypolicystatements.RUPPshall:
i. ImplementanICTgovernanceenvironmentthatensuresthatallstakeholdershaveasayattheappropriatelevelindeterminingthefunctionality,specification,andservicelevelsofallICTservicesandsystems�
ii. Establish/sustain a specialised ICT Support Unit responsible for the management, controlandmaintenanceofICTsystemsandservicestoensuretheavailabilitytousersattheagreedservicelevels�
iii. EnsurethatICTservicesandsystemsaresustainableby:a)Allocatingsufficientfinancialresources,combinedwithanICTFeechargeabletoevery
student, tocover,asaminimum, the recurrent costsofall ICT servicesandsystemsandalsoprovideforgrowthandcontinuingmodernisation;�
b)EnsuringthattheICTSupportUnitisstaffedwithasufficientrangeofhumanresourceand skills combinedwith remuneration that recognises the reality that RUPPhas tocompete with the private for the kind of technical human resource that is able toensureavailabilityofICTservicesandsystemsattherequiredservicelevels.�
c) Using acquisition policies (for example local development wherever possible asopposed to buying proprietary systems; university-wide open source policies; etc.)thatminimiserecurrentcostswhilealsobuildinglocalcapacity;�
To materialize all components of the policy and plan, a budget around five million US dollars isneeded.Sidawillfundthefirstfewkeycomponentstokickstarttheprocess.Theseprioritizedareasinclude:(1)improvingandexpandingthecampusdatabackbone,(2)improvingandsettingupLANin buildings, (3) strengthening of ITC in terms of personnel, capacity, and equipment, (4)strengtheningtheNetworkOperationCenterandtheDataCenter,(5)intranet/internet(includingE-mailandaccesstointranetandinternetservicesaswellasautomation,(6)academicmanagementIS,(7)librarymanagementIS,(8)humanresourcemanagementIS,(9)financemanagementIS,(10)executivemanagementIS,andfinallytrainingstoallconcernedendusers.(seetable1onpage7ofthe master plan). RUPP will need to fundraise the rest of the money from all stakeholders anddevelopmentpartnerstorealizetheremainingplans.
RUPPICTPolicyandMasterPlan–Final,March2017
vi
ListofFiguresFigure1:OverviewofCambodiaICTMasterPlan...................................Error!Bookmarknotdefined.Figure2:RUPPCampus1(MainCampus)3Dmap...................................Error!Bookmarknotdefined.Figure3:RUPPCampus2map................................................................Error!Bookmarknotdefined.Figure4:RUPPCampus1(MainCampus)buildingsizes.........................Error!Bookmarknotdefined.
RUPPICTPolicyandMasterPlan–Final,March2017
vii
ListofTablesTable1:Majorinformationsystemsrequiredbyauniversity................Error!Bookmarknotdefined.Table2:PrioritisedProjects.................................................................................................................10Table3:ICTImplementationMasterPlanTimeLine...........................................................................17Table4:RUPPFoundationPhasePlanningBudget..............................................................................18Table5:IndicativeSourcesofFundingfortheFoundationalPhase....................................................19
RUPPICTPolicyandMasterPlan–Final,March2017
viii
Abbreviations
Term Description
AWG ArchitectureWorkingGroupCAMREN CambodianResearchandEducationNetworkDNS DomainNameSystemDRC DisasterRecoveryCentreDSL DigitalSubscriberLineICT InformationandCommunicationsTechnologyICT/MP ICTPolicyandMasterPlanITC InformationTechnologyCentre(oftheRoyalUniversityofPhnomPenh)ITU InternationalTelecommunicationsUnionIP InternetProtocolIPR IntellectualPropertyRightsIRM InformationResourceManagementISP InternetServiceProviderKbps KilobitspersecondLAN LocalAreaNetworksLCMS LearningContentManagementSystemNOC NetworkOperationsCentreNREN NationalResearchandEducationNetworkMbps MegabitspersecondMCM Management,Control,andMaintenanceMDA Ministries,DepartmentsandAgenciesMEF MinistryofEconomyandFinanceMoEYS MinistryofEducation,YouthandSportsOPAC OnlinePublicAccessCataloguePoP PointofPresenceRUPP RoyalUniversityofPhnomPenhSida SwedishInternationalDevelopmentCooperationAgency
RUPPICTPolicyandMasterPlan–Final,March2017
9
1. IntroductionThisMasterPlanwasdevelopedbasedonthefoundingandguidingdocument–RoyalUniversityofPhnomPenh ICTPolicy. The full integrationof ICT in anyorganisationmust first and foremostbedrivenbyorganisationalpriorities, focusingon thoseelements thatareclosest to themissionandvisionoftheorganisation.Alotofotherconsiderationshoweveralsocomein.Theseinclude:
i. Pre-requisites (and co-requisites): the data communication infrastructure or a minimumcomponent thereof, for example, must be implemented before Intranet services orinformation systems can be rolled out. Some elements of the Academic and HumanResourcemanagementinformationsystemsmustbeinplace,alongwiththeinfrastructuretosupportutilisation,beforeelectronicidentitycardsareissued.
ii. Humanresource:Foreachserviceorsystemtobeimplemented,theremustbecompetenthuman resource to handle management, control, and maintenance. Users must also betrainedasaconcurrentrequirement(justintimetrainingapproach).
iii. ImplementationFunding:Thefundingflowmustbesufficienttoenabletheplannedspeedofimplementation.
iv. Decision processes: The speed of decision making can have severe impact onimplementation timelines if it is slow. This carries the additional risks of buying items atprices well above market value; and getting equipment that is no longer an industrystandard.BotharetheresultoftherapidevolutionofICT.
v. MaintenanceandReplacementFunding:Beforeanyserviceorsystemisimplemented,thereshouldbe steps taken toensure that thereare sufficient funds to supportoperationsandmaintenance,andlaterreplacement.Fundsforexpansionshouldalsobeconsideredatthesametime.
While the implementationMaster Planhas taken these considerations into account to the extentpossible,allthesefactorsneedtobereviewedonanon-goingbasis. ThisMasterPlancoversfouryears,2017–2020:thiscanbeconsideredasthefoundationalphaseforthefullintegrationofICTinallRUPPfunctions.Duringthisfoundationalphase,thefollowingareexpectedtobeachieved:
i. All staff and continuing students will be fully ICT literate, albeit with varying levels ofInternetliteracy,andcommittedtothetransformationofRUPP.
ii. Therewillbeadatanetworkcoveringbothcampusesandoffering“anywhereoncampus”broadbandaccesstoenablecampus,nationalandglobalcommunication.
iii. Therewillbesignificantprogressonthecorecorporateinformationsystems,withatargetofhavingtheacademicmanagementandlibraryinformationsystemsfullyoperational.
iv. ITCwillbefullyestablishedandstaffedasafunctionalIRMunit.
v. ICTrecurrentcostswillbemainstreamedintheuniversitybudget.
ThefoundationalphasewillprovidetheplatformfortakingRUPPtoahigherlevelofexploitingICTcompatiblewithuniversitiesintechnologicallymoredevelopedregions.
RUPPICTPolicyandMasterPlan–Final,March2017
10
2. PrioritisedProjectsandProjectManagement
2.1. PrioritiesandProjectIdentificationTheStakeholders’workshopagreedontheprojectsinTable1thatarelistedaccordingtotheagreedpriority. It should be noted that this is a starting point rather a comprehensive listing of all theinformationsystemsthatwillbeimplementedovertime.TheMasterPlan,likethePolicy,shouldbecontinuallyreviewedtotakeintoaccounttheevolvingenvironment,corporatepriorities,anduser-needs. Itshouldalsobenotedthattheprioritisationdoesnotmeanthattheprojectsaredoneinsequence:Priority2, forexample,will start justastepbehind thestartofPriority1so thatmajorphasesofbothareconcurrent.
Table1:PrioritisedProjects
Item ProjectDescription AgreedPriority
Rating
1 ImprovingandExpandingtheCampusdatabackbone 1
2 ImprovingandSettingupLocalAreaNetworksinBuildings 1
3 StrengtheningofITC(personnel,capacity,andequipment) 1
4 Strengthening the Network Operations Centre and the Data Centre(alongwithpossiblerelocation)
1
5 Intranet/ Internet (IncludesEmail andAccess to Intranet and InternetservicesaswellasAutomation)
2
6 AcademicManagementIS 3
7 LibraryManagementIS 3
8 HumanResourceManagementIS 4
9 FinanceManagementIS 4
10 ExecutiveManagementIS 4
11 TrainingEnd-Users Underlying
throughout
Thefollowingspecificprojectsemergefromtheprioritisation:
i. Data Network Project: Improving and Expanding the Campus data backbone and LANs,includingWi-Fi;
ii. ITC Project: Strengthening ITC in terms of having a sufficient range of expert personnel,requisiteskills,andequipment/facilities;
iii. Network Operations Center/Data Center Project: Improving and Expanding the NOC andDataCenter,alongwithpossiblerelocation;
iv. Intranet/Internet and Automation Project: Includes Email and Access to Intranet andInternet services as well as Automation. Automation refers to the provision of sufficient
RUPPICTPolicyandMasterPlan–Final,March2017
11
computer resourcesasdetailed in thepolicy to studentsand staff toensurea fully onlineenvironmentandsufficiencyofaccess.
v. CorporateManagement InformationSystemsProjectwith fivemajor sub-projects, eachofwhichwillbe implementedbyadifferent teambutwithaveryhigh levelof collaborationandcoordinationamongtheteams:
a. Academic
b. Finance
c. Library
d. HumanResource
e. ExecutiveManagement
vi. EndUserTrainingProject
2.2. KeyProjectElementsineachProject
2.2.1. DataNetworkProject
Thishasgotseveralelementsaslistedbelow:
i. Atechnicalaudittoconfirmthatthecurrentnetworkdesignalongwithanyassociatedroutingisconsistentwithawell-engineereddatacommunicationnetwork.
ii. Basedontheaudit,designanddimensionmodificationsand/oradditionstothecampusbackbone (including building LANs) that are consistentwith sufficiency of capacity forprojected needs and utilisation over the next 15 – 20 years, including active devicesscaledforsufficiencyovera5-yearminimumlife-time. Thiswould includephasingtheimplementationaccordingtouniversityprioritiesandresourceenvelope. ItwouldalsoinvolveacquisitionofsufficientpublicIPaddressestoaddresstheforeseeableneedsoftheuniversity.
iii. Assess bandwidth requirements and agree strategies and a growth path for improvedbandwidth, along with delivery of connectivity to the end-user that includes Wi-Fi,Internetkiosks,computerlabs,oraschemeforownedlaptops/tablets.
2.2.2. ITCProject
Thegaps intherangeandskillsofstaffaswellasfacilitieswithintheITChavetobeassessedasabasisforinterventionsthatwillinclude:
i. Areviewoftheorganisationalstructureandtermsofservice;
ii. Recruitment to fill keygaps initially,and tograduallyhavea full staff complementby theendof2020;
iii. Capacitybuildingbasedon“justintime”approachesthroughexposuretobestpracticesinthe management, control, and maintenance of university ICT resources based on
RUPPICTPolicyandMasterPlan–Final,March2017
12
attachmentsandsecondments,and longerduration trainingwhere justified. It shouldbenoted that for the manager level staff in ITC, this should include executive skillsdevelopment.
iv. Provisionofequipmentandtoolstoenabletheirdaytodaywork;
v. Provisionof aworking environment (furniture and facilities) compatiblewith theneed tostaylonghoursonduty.
2.2.3. NOC/DataCentreProject
Establishment of the NOC and Data Centre requires first for an assessment of the switchingrequirements, data storage capacity and 24x7 availability requirements, as well as NetworkOperationsCentre(NOC)requirementstoprovideall-inclusiveservicesthatinclude:
i. Networkoperationsmanagement;
ii. Systems’applicationsanddatabases;
iii. GeneraldatastorageneedsforRUPPanditsunitsaswellasstudentsandstaff;
iv. IntranetaswellasInternetaccess;
v. Securityofthenetworkandthesystems.
ITChasitsmainswitchingcentreandNOCinspaceallocatedintwolargeroomsinBuilding1.Whiletheseare sufficient fornow, the location is far from ideal in termsof access andprotection fromdirect heat. The locations also make the provision of physical security very hard. The firstconsiderationisthereforeapurpose-designedlocationinoneofthenewbuildingscomingup;orabetterlocationinanexistingbuilding.
TheNOCwill requirenetworkandDataCentremonitoringandcontrolstations,alongwithdisplayscreensthatenablevisualmonitoringofthestatusofalllinks,switchingcentres.
Aspart of this project, RUPPwill need to simultaneouslydevelopaDisasterRecoveryCentre in adifferentlocationthatisgeographicallyseparatebuteasilyaccessible.ConsiderationcanbegiventotheInstituteofTechnologyofCambodiaasapossiblelocation,workingonareciprocalbasis.
2.2.4. Intranet/InternetandAutomationProject
This project is focused on ensuring access to all services (according to access levels) by staff andstudentsandwillinclude
i. AccesstotheIntranetandtheInternet;
ii. Automation:thisensures“Lastinch”access,toensurethateachmemberofstaffandeachstudenthassufficientaccesstoacomputertoenabletheirdaytodayactivitiesthroughtheprovision of dedicated computers, or shared computers in computer labs (See Error!Referencesourcenotfound.)
iii. Emailservicesiii. Emailservices
RUPPICTPolicyandMasterPlan–Final,March2017
13
iv. Accesstointernalapplicationsandresources(informationsystemsandservicesthatincludelibraryservices,e-learning,etc.)alongwiththeassociatedcorporatedatabases
v. Access to applications (with identified priority software with a sufficient number of userlicenses)
vi. OtherservicestobeidentifiedduringthePolicyandMasterPlanexercise.
2.2.5. ManagementInformationSystems
Implementation of information systems will be guided by policy, systems analysis and re-engineering,andrequirementsstatementsledbythetechnicalpeopleineacharea(studentrecords,humanresource,finance,andlibrary).Itshouldbenotedthateffectivesystemsre-engineeringalsoleads to organisational changes, and that change management as detailed in the ChangeManagement Policy (Chapter Error! Reference source not found.) will be a major element inimplementing information systems. A key consideration in procurement will be the need toexchangeinformationbyoperatingfromcorporatedatabasesthatareabletoexchangeinformationattheback-end.
TheimplementationofInformationSystemswillfollowthefollowingthreephases.TheimplementationofInformationSystemswillfollowthefollowingthreephases.
Thefirstphase:
a) Creating awareness and getting involvement and ownership of functional staff and otherstakeholders;
b) Systems analysis and business process redesign, including approval by universitymanagementofconsequentialpolicyandstructuralchanges;
c) Functionalspecifications;
d) Decisiononmakeorbuy;
e) IfMake, followingdirectawardof contract toan internal team. Awardof contract in thiscontextmeansthatevenaninternalteammustbesubjecttocontractualrequirementsthatincludeconformingtothefunctionalrequirements,deliverables,andtimelines.
f) If Buy, Request for Proposals; evaluation of bids; contract negotiations; and award ofcontract.
The major deliverables of this stage are: the final decision about the specific software package(internallydevelopedorprocuredfromoutside);servicelevels,andcontractterms.
Thesecondphase:
a) Procurementofthehardwarefacilities;
b) DevelopmentORprocurementofapplicationsoftwareandotherresources;and
c) Implementationoftheinformationsystem.
The main deliverables of this stage is an operational information system along with complete,documentationandtrainedpersonnel.
RUPPICTPolicyandMasterPlan–Final,March2017
14
Thethirdphase(transitioning):
a) Evenaftercommissioning,majorapplicationsarepronetoinconsistenciesandglitchesthatneed to be fully identified through live operations under full load. Business continuitydemandsmayrequirethattheassociatedrisksbeaddressedbyrunningboththeoldmanualsystemandthecomputerisedsysteminparallelforsometime.
b) While every effort must be made to have data in electronic form before the electronicinformation systems are brought on line, it is a reality that data migration will take aconsiderable amount of time (and may run for several years) because of the resourcedemands it imposes. This means, for example, that a current final year student will gothrough their graduation based on themanual systemwhile a new first year studentwillhave all their data captured in electronic form and will be administered through thecomputerisedsystemthroughouttheirstay.
2.2.6. EndUserTraining
TheEnd-UserTrainingProjectTeamwilladdressthefollowingcoreactivities:
i. Carryoutacomprehensiveassessmentofthetrainingneedsofstudentsandstaffinordertodevelopsuitablecurriculaforaddressingtheneedsofbothgeneralandspecialisedusers;
ii. Identifyanddevelopthecapacityofasufficientnumberoftrainersfromamongthecurrentuniversitystafforseniorstudents;
iii. Develop trainingcontentmainlybasedonanonlineself-led learningapproaches,butwithprovision of initial direct training for thosewho lack basic computer skills (especially firstyearstudentsandsomeofthecontinuingstaff);
iv. WorkwiththeAutomationsub-projecttoensurethatalltraineeswillgetsufficientaccesstocomputersthroughgeneralcomputers;
v. Conducttrainingtoachievethepolicyobjectives.
2.3. ProjectManagement
Each of these projects, and each major sub-project, will be assigned to a Team that has thefunctional knowledge and technical capacity to plan and implement the project, including tacticalandstrategicchangesintheimplementationplanbasedonasoundframeworkformonitoringandevaluation.Thiswillmaketen(10)ProjectTeams.Foravoidanceofdoubt,eachteamwillbeledbyaperson trained in themajor functionsofunit and is alsoempowered to take keyadministrativedecisions: as an example, the Library Management Information System should be led by theLibrarian.Eachteamwillbecomposedofindividualswithexpertiseinthearea(forexampleFinanceandAccounting)aswellasend-users.
EachTeamshallbe required toprepare forapproval adetailed implementationplananddetailedbudget,alongwithaclearidentificationofassumptions/risksandhowthesewillbedealtwith.
Thismultiplicityofteamsworkingtowardsacommonendwillcallforclosecoordinationatdifferentlevels:
RUPPICTPolicyandMasterPlan–Final,March2017
15
i. RUPPICTCommittee:ItwillberequiredthatallTeamsreporttothisCommitteeataformalmeeting once a month or, in the worst case, once every twomonths during the projectphase.
ii. Consultation with the ArchitectureWorking Group (when in place) for assurance that allplansconformtotheagreedinformationarchitecture.
iii. Inter-Committee consultations as often as needed to ensure that pre-requisites and co-requisitesarealwaysinplaceintimeforsuccessfulimplementation.
The RUP ICT Committee will appoint an overall Project Coordinator with both the ability andexperience to lead and manage this major project. This person should ideally be one of themembersofstaffofRUPPwhowillbeablegivethisassignmentfulltimeduringtheprojectphase.TheProjectCoordinatorshouldalsobepositionedtohaveeasyreachtoallofficersoftheuniversity.
RUPPICTPolicyandMasterPlan–Final,March2017
16
3. PlanningTimelineTable 2 below gives the indicative planning time line. This timeline will need to be adjustedperiodicallybasedonarealisticinternalassessmentthattakesintoaccount:
i. The sufficiency and range of skills to carry out implantation, especially the applicationsdevelopmentforthemajorinformationsystems;
ii. Availability of funding, both for implementation as well as recurrent funding forsustainability;
iii. Thespeedwithwhichdecisionscanbetaken,especiallyrelatingtomajorchangesasthesewillinvolveconsultationswithgovernment.
Itisassumedthatforeachproject,thefirstsixmonthswillbeusedforprojectplanninganddesign(includesbothtechnicaldesignandprojectplanningasappropriate).
RUPPICTPolicyandMasterPlan–Final,March2017
17
Table2:ICTImplementationMasterPlanTimeLine
Project
Sub-Projects 2017(DesignandPlanning)
2018 2019 2020
1 DataNetwork 1.1 Campusbackbone 1.2 LocalAreaNetworks 1.3 Wi-Fi 2 ITCenter StaffCapacityBuilding EquipmentandFurniture 3 NOCandDataCenter 4 Intranet/Internet/Automation 4.1 Intranet 4.2 InternetAccess 4.3 Automation 5 CorporateMIS 5.1 Academic 5.2 Library 5.3 Finance 5.4 HumanResource 5.5 Executive 6 EndUserTraining
RUPPICTPolicyandMasterPlan–Final,March2017
18
4. PlanningBudgetTable3showsthePlanningBudgetfortheFoundationPhaseICTimplementation.Table4isgiventoshowtheindicativecommitmentbySidatothisphaseofimplementationandthereforeidentifyhowmuchmoreRUPPshouldraiseinternally,orfromgovernment;orfromotherlocalandforeigndevelopmentpartners.Thebackgroundtothefiguresusedhereisprovidedinaseparateworkbookalongwithexplanatorynotes.
Table3:RUPPFoundationPhasePlanningBudget
Project AMOUNT(USD)
REMARKS
1 DataNetwork 900,000 Allprovisional:ITCtoverifypricesandquantities2 ITCentre 400,000 Allprovisional:ITCtoverifypricesandquantities3 NOCandDataCentre 900,000 Allprovisional:ITCtoverifypricesandquantities4 Intranet/Internet/Automation 1,600,000 Allprovisional:ITCtoverifypricesandquantities5 ManagementInformationSystems 200,000 Allprovisional:ITCtoverifypricesandquantities6 EndUserTraining 100,000 Allprovisional:ITCtoverifypricesandquantities7 ITCStaffImplementationcosts 100,000 AsestimatedbyRUPP
Contingencysum(about10%ofitems1-6) 400,000 Total(rounded) 4,600,000
RUPPICTPolicyandMasterPlan–Final,March2017
19
Table4:IndicativeSourcesofFundingfortheFoundationalPhase
Category Amount(USD)
EstimatedInternally orotherfunded(USD)
EstimatedRequest toSida(USD)
IndicativeRequesttoSida(SEK)
1 DataNetwork 900,000 400,000 500,000 5,000,000
2 ITCentre 400,000 100,000 300,000 3,000,000
3 NOCandDataCentre 900,000 400,000 500,000 5,000,000
4 Intranet/Internet/Automation 1,600,0001,100,000 500,000 5,000,000
5 CorporateMIS 200,000 50,000 150,000 1,000,000
6 EndUserTraining 100,000 50,000 50,000 1,000,000
7 ITCStaffImplementationCosts 100,000 100,000 - -
ContingencySumofabout10%ofitems1-6 400,000 400,000 Total(Rounded) 4,600,000 2,600,000 2,000,000 20,000,000
RUPPICTPolicyandMasterPlan–Final,March2017
20
AcknowledgementsThe Royal University of Phnom Penh would like to acknowledge the following who have beeninvolved inandhavecontributedtothe formulationof the ICTPolicyandMasterPlan indifferentways:
SteeringCommittee
1. H.EDr.ChetChealy,Rector,Chairperson2. Dr.AfzalSher,SIDASeniorAdvisor,Advisor3. Mr.PhalDes,ViceRector,Coordinator4. Mr.PonnChhay,ViceRector,Member5. Dr.SokVanny,ViceRector,Member6. Dr.OumRavy,ViceRector,Member7. Mr.ChhunHok,ViceRector,Member8. Mr.SomRatana,ViceRector,Member9. Dr.NithBunlay,DeputyDirectorGeneralofHigherEducation,Member10. Mr.MeakKamerane,DeanofFacultyofScience,Member11. Ms.MeasVanna,DirectorofIFL,Member12. Dr.NgounphanPheakdey,DeanofFacultyofEngineering,Member13. Mr.KhounThavouth,DirectorofCKCC,PermanentMember14. Dr.SokSoth,DeanofFacultyofEducation,Member15. Dr.UnLeang,DeanofFacultyofSocialScienceandHumanities,Member16. Dr.RathSethik,ActingDeanofFacultyofDevelopmentStudy,Member17. Dr.KhimLeang,ActingDirectorofCJCC,Member
TechnicalWorking
1. Mr.KeanTak,ViceDeanofFacultyofEngineering,TeamLeader2. Eng.Dr.TusuTusubira,InternationalConsultant,Secretary3. Mr.NgornMoi,ActingHeadofITCenter,PermanentMember4. Dr.CheyChanOeurn,ViceDeanofFacultyofScience,Member5. Mr.VengChhang,HeadofStudyOffice,Member6. Mr.ChiKuong,HeadofITDepartment,Member7. Mr.OurChenda,HeadofAccountingOffice,Member8. Mr.VongChorvy,HeadofIROffice,Member9. Mr.ThouReno,HeadofResearchOffice,Member10. Dr.SrunSovila,ActingHeadofITEngineeringDepartment,Member11. Mr.HengSokha,ActingHeadofTelecommunicationandElectronicDepartment,Member12. Mr.ThannMengLeap,ActingHeadofPersonnelOffice,Member13. Mr.ChhiemKan,DeputyHeadofLibrary,Member14. Dr.KhimChamroeun,StaffofITCenter,Member15. Mr.MengHann,StaffofITCenter,Member
Funding for the Process
1. SwedishInternationalDevelopmentAgency(SIDA)2. HigherEducationQualityandCapacityImprovementProject(HEQCIP)