runway 10/28 – open phase 1 qrunway 18/36 – open 25 ... 10 presentation-rev3.0.pdf · w/in...

10
Phase 1 25 Calendar Days 8/5 – 8/30/17 CONTRACTOR ACCESS ROUTE CONTRACTOR STORAGE AREA MATERIAL STOCKPILE PERIMETER ROAD GRADING & FENCE RELOCATION BORROW/FILL AREA 20’ HEIGHT GRADE OBSERVATION PARK CONTRACTORS DOUBLE-GATE ACCESS RUNWAY 10/28 CONDUIT\CANS [NIGHT WORK 90 MIN. PPR NOTAM] Q Runway 10/28 – Open Q Runway 10/28 Lights - Available Q Runway 18/36 – Open Q Runway 28 ILS – Available Q Runway 10 VASI – Available Q Runway 10 GPS Approach - Available RUNWAY 18/36 SIGNAGE [NIGHT WORK 30 MIN. PPR NOTAM]

Upload: others

Post on 12-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

Phase 125 Calendar Days

8/5 – 8/30/17

CONTRACTOR ACCESS ROUTE

CONTRACTOR STORAGE AREA

MATERIAL STOCKPILE

PERIMETER ROADGRADING & FENCE

RELOCATION

BORROW/FILL AREA 20’HEIGHT

GRADE OBSERVATION PARK

CONTRACTORS DOUBLE-GATE ACCESS

RUNWAY 10/28CONDUIT\CANS[NIGHT WORK

90 MIN. PPR NOTAM]

Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 VASI – AvailableQ Runway 10 GPS Approach - Available

RUNWAY 18/36 SIGNAGE[NIGHT WORK

30 MIN. PPR NOTAM]

Page 2: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

Phase 26 Calendar Days

8/26-9/1/17

CONSTRUCT PORTION OF TAXIWAY D

CLOSE RUNWAY 18-36

INSTALL SILT FENCE &GRADE PERIMETER ROAD

Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – CLOSEDQ Runway 28 ILS – AvailableQ Runway 10 VASI – AvailableQ Runway 10 GPS Approach – Available

NON-MOVEMENT LINE

PPR – TOWED AIRCRAFT ACCESS

Page 3: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

Phase 310 Calendar Days

9/4-9/14/17

RUNWAY 10-28TEMPORARY THRESHOLD MARKING

AND LIGHTS(6,008’ X 150’)

CONSTRUCT BLAST PAD,MALSR THRESHOLD AND

FOUNDATIONS, RSAGRADING

EXTEND TAXIWAY G

EXTEND TAXIWAY D

VASIs OTS

Q Runway 10/28 – OPEN 6008’Q Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – EST. OTS 9/6Q Runway 10 VASI – OTSQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available

Page 4: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

RUNWAY 18-36CLOSED 2300-0600 HOURS

INSTALL PAPIFOUNDATIONS

(OUTSIDE RWY 18/36 RSA)

TAXIWAY C CLOSED

DAYTIME BACK TAXI ONRUNWAY 18/36

CONSTRUCT PAVED SHOULDERSW/IN RUNWAY 18/36 RSA

[NIGHT WORK90 MIN.PPR NOTAM]

RUNWAY 10-28CLOSED

RESURFACING 5,000’,RECONSTRUCTION OF 800’

PAVEMENT,NEW DISTANCE REMAINING SIGNS,

NEW EDGE LIGHTING SYSTEM

Phase 41.5 Calendar Days

9/15-9/16/17

Q Runway 10/28 – CLOSEDQ Runway 10/28 Lights - OTSQ Runway 18/36 – Open DaytimeQ Runway 28 ILS – OTSQ Runway 10 VASI – OTSQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - OTS

Page 5: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

INSTALL PAPI[NIGHT WORK]

RUNWAY 18-36CLOSED 2300-0600 HOURS

EST. 2 NIGHTS

CONSTRUCT PAVED SHOULDERSWITHIN RSA OF BOTH RUNWAYS

[NIGHT WORK]

CONSTRUCT 115’ EXTENSIONRUNWAY 10-28

RESURFACING 5,000’,RECONSTRUCTION OF 800’

PAVEMENT, RESURFACE SHOULDERS,NEW DISTANCE REMAINING SIGNS,

NEW EDGE LIGHTING SYSTEM,TEMPORARY MARKINGS

Phase 514 Calendar Days

9/15-9/29/17

Q Runway 10/28 – CLOSEDQ Runway 10/28 Lights - OTSQ Runway 18/36 – OpenQ Runway 28 ILS – OTSQ Runway 10 VASI – OTSQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - OTS

Page 6: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

PAVEMENT CURING(~20 Days After Paving)

9/27-10/17/17

RUNWAY 10-28NO RUNWAY GROOVING ORPOROUS FRICTION COURSE

Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available

ILS FLIGHT CHECKEST. 9/29/17

PAPI FLIGHT CHECKEST. 9/29/17

Page 7: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

Phase 616 Calendar Days

(~20 Days After Paving)10/17-11/2/17

GROOVE & PAINT RUNWAY 10-28(~20 DAYS AFTER PAVING)

RUNWAY 10-28CLOSED 2300-0600 HOURS

90 MINUTE PPR

Q Runway 10/28 – DAYTIMEQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available

Page 8: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

Phase 710 Calendar Days

9/13-9/23/17

REMOVE TEMPORARY FENCE ANDCOMPLETE PERIMETER ROAD WORK

Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available

Page 9: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

Phase 821 Calendar Days

9/29-10/20/17

CONSTRUCT MALSR SYSTEM ANDSERVICE ROAD

CONSTRUCT PRIVACY FENCE

Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTSQ Runway 10 Circling - Available

Page 10: Runway 10/28 – Open Phase 1 QRunway 18/36 – Open 25 ... 10 Presentation-rev3.0.pdf · W/IN RUNWAY 18/36 RSA [NIGHT WORK 90 MIN.PPR NOTAM] RUNWAY 10-28 CLOSED RESURFACING 5,000’,

POST CONSTRUCTIONQ Approach Published

(1 Mi.+ Minimums)Dec 2017

Q MALSR OperationalEarly 2018 – Pending Tree

ClearingQ Approach Amendment

(3/4 Mi. Minimums)March 2018

Q Runway 10/28 – OpenQ Runway 10/28 Lights - AvailableQ Runway 18/36 – OpenQ Runway 28 ILS – AvailableQ Runway 10 PAPI – AvailableQ Runway 10 GPS Approach – OTS

until Dec 2017Q Runway 10 Circling - Available