RT-100 CaskCertificate of CompliancePre-Application Meeting
14 November 2011 RT-100 Pre-Application Meeting
14 November 2011
Robatel Technologies, LLCRoanoke, VA
1
Agenda
IntroductionsDesign & Licensing ExperienceRT-100 Conceptual Design
OverviewDesign – ConceptualDesign – DimensionsDesign – Characteristics & Contents
14 November 2011 RT-100 Pre-Application Meeting
gMaterials
Licensing ApproachStructural AnalysisThermal AnalysisShielding AnalysisModeling
Schedule for Application Submittal
2
Introductions
Mr. Teo Grochowski Robatel Technologies, Chief Operating Officer
Mr. George JobsonRobatel Technologies, Vice-President
Mr. Jack Rollins
14 November 2011 RT-100 Pre-Application Meeting
Robatel Technologies, Licensing ManagerMr. Fabien Labergri
Robatel Industries, Technical ManagerMr. Jean-Francois Damon
Robatel Industries, Cask EngineerNRC Staff
3
Design & Licensing Experience
Cask ExperienceRobatel has 60 years cask design, licensing, and fabrication experienceDesigned and licensed over 70 designs and fabricated more than 800 casks [Type A, Type B (U/M)]In-house Drop Test Facility
Engineering Experience
14 November 2011 RT-100 Pre-Application Meeting
Engineering ExperienceExtensive use of ANSYS and LS-DYNA for analysisThermal, Structural and Shielding
USNRC Licensing ProcessAware of USNRC expectations in our meeting the 10CFR71 Licensing RequirementsPast Experience w/B&W on BR-100 MPC & Transport Cask
4
Overview
Applicant – ROBATEL Technologies, LLC
New Cask (RT-100)
Waste: treated spent resins & filters
(Cask designed for additional type contents)
14 November 2011 RT-100 Pre-Application Meeting
Capacity: 160 cf , (10) 55-gallon drums
~15,000 lbs payload
Certificate Type B (U)
5
Overview
Steel – Lead – Steel Cylinder Construction
Toroidal Impact Limiters
PayloadLLRW Resins & Filters
lb f l l d
14 November 2011 RT-100 Pre-Application Meeting
~15,000 lbs useful load
Type B quantity NTE 2000 times Type A quantity
Loaded Weight w/Impact Limiters: ~75,000 lbs
Overweight, Not Oversize
6
Design - Conceptual
14 November 2011 RT-100 Pre-Application Meeting 7
Designs - Dimensions
Nominal Dimensions Inches(approximately)
Overall Length w/Impact Limiters 130
Overall Length w/o Impact Limiters 90
Outside Diameter w/Impact Limiters 100
Outside Diameter w/o Impact Limiters 79
14 November 2011 RT-100 Pre-Application Meeting
Outside Diameter w/o Impact Limiters 79
Cavity Length 77
Cavity Diameter 68
Weight lbs(approximately)
Empty Weight w/Impact Limiters 60,000
Loaded Weight w/Impact Limiters 75,000
8
Design – Characteristics and Contents
Cask CharacteristicsLarge Cavity Size – 160 cfTwo Lifting TrunnionsRoad Transport – OverweightImpact Limiters: wood or foam
14 November 2011 RT-100 Pre-Application Meeting
ContentsResins in linersFilters in linersType B Quantity 2000 times Type AThermal: 100 watts
9
Materials
Structural: ASME/ASTM-A240 304 L Stainless Steel
all structural components
Shielding – 4.5” Pb equivalent on all sides
Stainless Steel
14 November 2011 RT-100 Pre-Application Meeting
Stainless Steel
Lead
Impact Limiters
Considering wood or foam
10
Licensing Approach
SAR Format: Regulatory Guide 7.9Structural Analysis
Use of ANSYS for General Conditions (71.43-45)LS-DYNA confirmed by Benchmark data for NCT (71.71) and HAC (71.73) analyses
Thermal Anal sis
14 November 2011 RT-100 Pre-Application Meeting
Thermal AnalysisUse of ANSYSAnalysis using maximum decay heat of resin payload
Shielding AnalysisUse of MicroShield, MCNPNo credit taken for Impact Limiters
11
Modeling
Computational Analysis Use of Benchmark data from testing of similar casks
over 10 yearse.g, R73 Type B(U) Cask and R74 Type B(U) Cask Approach qualified by previous Drop-Test data and cross-checked with LS-DYNA results
M d li
14 November 2011 RT-100 Pre-Application Meeting
Modeling Free Drops (LS-DYNA plus Benchmark)Puncture Drops (LS-DYNA plus Benchmark)Thermal (1,475⁰ for 30 minutes) (ANSYS)Immersion (50 ft) (ANSYS)Shielding (MicroShield, MCNP)
12
Representative Robatel Designs
14 November 2011 RT-100 Pre-Application Meeting 13
SAR Submittal Schedule
Action Date
SAR Completion and Submittal Goal: March 2012
I f C ifi f C li G l A /S b 2012
14 November 2011 RT-100 Pre-Application Meeting
Issuance of Certificate of Compliance Goal: August/September 2012