rsoe status report hungary belgrade, 03.12.2013. roles of rsoe in iwt projects projectrsoe role wp5...
TRANSCRIPT
RSOE Status ReportHungary
Belgrade, 03.12.2013
Roles of RSOE in IWT projects
Project RSOE role
WP5 Leader, Partner
WP5 Leader, Partner
Communication Leader, Partner
SuAc. Leader, Partner
Partner
Expert Group Coordinator
Feasibility Study Project Coordinator
Project Coordinator
NEWADA duo involvement
• ICT services coordination• WLAN installation in Port of
Győr• FIS Portal development
RSOE in IRIS Europe 3
• 150 pcs inland AIS transponders (IRIS II)
• Cca. 150 pcs inland ECDIS viewer + cca. 10-15 pcs inland ECDIS viewer with radar function (navigation mode)
• On-shore pilot IT equipments
• DGNSS pilot monitoring service
• Aim: Establishing Danube Law Enforcement Cooperation Platform (police, customs, disaster mgt.)
• 2-years project (start Sept 2013)
• Kick-Off Conference: Danube Ministries of Interior has adopted a joint declaration to cooperate
• Activities:
– 5 Expert Groups (5th EG is about Information Exchange & RIS)
– 3 joint operations
– High level conference at the end
Kick-Off Conference, Budapest, 17 September 2013(MOI State Secretaries represented the Danube countries)
DARIF Kick-Off Conference
Feasibility Study - Transport Operational Programme Project
• PannonRIS infrastructure update (VHF, microwave uplink, AIS)
• Inland ECDIS production including survey
• On-shore radar and camera system
• Meteorological information system
• Marking system and AtoN concept
• DGNSS for Danube navigation concept
• Waste management concept
• Integrated logistics information system
RIS on-shore infrastructure
AIS PSS
AIS DGNSS
WLAN
RADAR
Dense AIS traffic
Web shiptracker
ESRI map - ECDIS overlay possibility
Thank you for your attention!