RSOE Status ReportHungary

Ruse, 05.12.2017

Page 2: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

Danube Transnational Programme projectswith RSOE participation

• Danube STREAM (LP: via donau)

• Danube SKILLS (LP: CERONAV)

• Green Danube (LP: CERONAV)

DTP projects

Page 3: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

Danube STREAM

www.danubeportal.com

Page 4: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

CEF projects

HIR project

Page 5: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

RIS enabled Hungarian Inland Navigation Information System (HIR)

Duration: 2016-2018Interfaces to:• Notices to Skippers• European Hull Database• Electronic Ship Reporting• Vessel Tracking and Tracing

HIR project

Page 6: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

RIS enabled Hungarian Inland Navigation Information System (HIR)

HIR project

Act.1 Act.2 Act.3 Act.4

Project managementDesign of RIS enabled HIR

systemImplementation and testing of RIS enabled HIR system

Trainings and system introduction

1.1 Project management and financial management

2.1 Administrative process design

3.1 System development4.1 Trainings for users and

operators

1.2 Quality management 2.2 IT system designs3.2 Installation of hardware

devices4.2 Handover of system for

operation

1.3 Project dissemination3.3 Systems tests and

validation1.4 Procurement

Page 7: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

• EnHance the Efficiency of Hungarian RIS Operation

• Funded by EU and Hungarian State in the frame of CEF Programme

• Schedule: March 2015 – March 2018

CEF projects

Page 8: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

Enhanced traffic monitoring centre (Budapest)

Improved VHF (19) and microwave network (20)

Optimised and redundant AIS system (16)

New, modern radars for critical stretches (7)

New web cameras for traffic monitoring (13)

Page 9: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

New, modern DGNSS service

Modernisation of water level gauges (25)

New river bed measurement, update of iENC

New meteorological stations (15)

Page 10: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018
Page 11: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018
Page 12: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018
Page 13: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

INTEGRATED PORT INFORMATION SYSTEM IN HUNGARY

Page 14: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

PROJECT FACTS

In the frame of the CEF Programme the project budget is financed by the European Union (85%) and the Hungarian state (15%) Beneficiary: Ministry of National Development Implementing body: RSOE Duration: 01.09.2017 – 31.12.2020 Total budget: 997.500,- EUR

Page 15: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

MAIN HUNGARIAN DANUBE PUBLIC PORTS

CSEPEL FREEPORT, BUDAPEST PORT OF BAJA

PORT OF GYŐR-GÖNYŰ

Page 16: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

PROJECT ACTIVITIES

Page 17: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

PRELIMINARY CONCEPT

Page 18: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

PLANNED SERVICES

VESSEL AND VEHICLE MONITORING AND

MANAGEMENT

STATISTICS SERVICE

PORT FEE CALCULATION AND

INVOICINGCARGO

LOADING/UNLOADING MONITORING

FREIGHT MANAGEMENT AND

TRACKING

Page 19: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

Cooperation with GSA

• Participation at the Maritime&IWT working group• Participation at Galileo User Assembly• Inputs for SEASOLAS, SC24 projects• Based on IRIS Europe III pilot tests• Planning to use EGNOS for enhancing position

service and reliability for AIS• Main reasons:

– Critical section operations – Accident investigations

Page 20: RSOE Status Report Hungarygisforumdanube.org/wp-content/uploads/04_DISC_2017_Status_Repo… · RIS enabled Hungarian Inland Navigation Information System (HIR) Duration: 2016-2018

Crew and Passenger List (PAXLST)• Complying with RIS ERI EG standard• Since March 2014