rsm gc advisory renewable purchase obligation (rpo) & renewable energy certificates (rec) - ver5
DESCRIPTION
Renewable Energy Generators in India RPO mandated entities in India Investors seeking to invest in renewable energy generation in IndiaTRANSCRIPT
Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading
www.general-carbon.com
Target Clients
Renewable Energy Generators in India
RPO mandated entities in India
Investors seeking to invest in renewable energy generation in India
2
www.general-carbon.com
About RPO The Electricity Act & National Action Plan on
Climate Change (NAPCC) provide roadmap for increasing renewable energy in total generation
Renewable Purchase Obligation (RPO) – is mandated by SERC for promotion of renewable energy
RPO stipulates minimum percentage of renewable energy in energy mix of♦ Distribution licensee♦ Open Access Consumer♦ Captive consumer
3
National Action Plan on Climate
Change (NAPCC) – June 2008
5% 1
0%
15%
The Electricity Act, 2003
Optimal utilization of resource incl. RE
Tariff regulation for RE power promotion
Specify purchase obligation from RE sources
2010 2015 2020
www.general-carbon.com
Notified RPO by States
4
State Non Solar RPO % (FY 13-14)
Solar RPO% (FY 13-14)
Maharashtra 8.50 0.50
Madhya Pradesh 4.70 0.80
Tamil Nadu* 9.00 0.10
Rajasthan 8.20 1.00
Haryana 3.00 0.10
Gujarat* 6.00 1.00
Chhattisgarh* 5.25 0.50
Karnataka 10.00 0.25
Andhra Pradesh 4.75 0.25
Orissa 5.80 0.20
www.general-carbon.com
Renewable Energy Certificates (REC) REC is a tradable certificate of proof that one MWh of electricity has been injected (or
deemed to have been injected) to grid by an RE generator.
MNRE approved renewable energy sources: Wind, Biomass, Small hydro, Solar, Bagasse based Co-generation, MSW, Biogas,
Black Liquor
REC types & Price band:
5
REC April 2012 - April 2017
Non Solar Rs 1,500 - 3,300
Solar Rs 9,300 – 13,400
www.general-carbon.com
Who is eligible to participate in REC?
6
RE Generator
(1)
Captive Consumption
No Concessional Transmission, Wheeling or
Banking
Eligible
(2)
Open Access or 3rd Party Contract
At Mutually Agreed Price
Eligible
(3)
Bilateral Contract
At Mutually Agreed Price
Eligible
(4)
PPA with DisCom
At Average Power Purchase Cost (APPC)of
DisCom
Eligible
At Preferential Tariff specified by
the SERC
Not Eligible
www.general-carbon.com
REC Eligibility Preferential tariff PPA
♦ Not eligible for 3 years if they cancel PPA ♦ Eligible if DISCOM cancels PPA or after expiry of PPA
Captive consumption♦ Eligible if no promotional benefit
Concessional wheeling/transmission charges Banking facility Electricity duty waiver
♦ Not eligible for 3 years even if generator foregoes benefits♦ Eligible if concessions are withdrawn by SERC
GBI and Accelerated depreciation benefits are not considered concessional7
www.general-carbon.com
REC Eligibility…..continued REC and CDM benefits can coexist
Not available for off grid projects
Auxiliary consumption not eligible
8
www.general-carbon.com
REC Process - Timeline
9
Accreditati
on
•RE Generator applies to the State agency for accreditation upto 6 month before Commissioning
•Process time: ~ 6-8 weeks
Registratio
n
•RE Generator applies for registration of accredited project with NLDC
•Process time: ~ 2-3 weeks
Issuance
•May apply fortnightly basis; within 6 months of injection to grid
•Process time: ~ 3-4 weeks
Redemptio
n
•Last Wednesday of every month between 1300 – 1500 hrs
State AgencyNLDC
Power Exchange
www.general-carbon.com
Demand for RECs DISCOMs
♦ Already procuring under preferential PPAs♦ Impact on their bottom line
Open access consumers♦ Inter-state plus intra-state (small segment)
Captive consumers♦ Large market made up of industrial users (cement, steel, chemical etc.) having
thermal capacity♦ Likely to focus on RE development, RE PPAs or REC
10
www.general-carbon.com
Our Services
11
www.general-carbon.com
Service Insight
12
RPO impact assessment
Development of RPO compliance plan
REC Development Advisory
Accreditation
Registration
IssuanceREC Trading
REC Market Insight
www.general-carbon.com
Assessment of impact of RPO Renewable Purchase Obligation (RPO) is the minimum percentage of renewable
energy share in the area of a ♦ Distribution Licensee♦ Open Access Consumer♦ Captive Consumer
RPO will impact you♦ If you are buying power from the bilateral market or exchanges♦ If you have captive generation capacity at your plants
Existing wind capacity where you are availing preferential wheeling and banking benefits will not be eligible to help you fulfill your RPO?
13
www.general-carbon.com
Assessment of impact of RPO … continued RPO regulations vary by state and distribution company; understand what applies to
your units.
Assess total power consumption and identify power sourced from:♦ Open Access (Bilateral or Exchange)♦ Captive Generation
Compute any renewable power in your mix
Compute your RPO and therefore your shortfall
14
www.general-carbon.com
Development of RPO compliance plan Assess the options available
♦ Buy vs BuildTechnology (Wind, Solar, Biomass, Small Hydro etc.)Suitability of TechnologyCost of power from shortlisted technology
Regulatory support♦ Petitioning / facilitate in regulatory clarification (e.g. inclusion of WHR /
cogeneration projects as renewable) RPO compliance cost
♦ Likelihood of enforcement♦ Cost of procurement of REC
Finalize RPO plan
15
www.general-carbon.com
RPO Compliance
We help the obligated entities fulfill their RPO by assisting them:♦ build their own renewable energy assets, ♦ acquire old assets, tie-up with renewable energy IPPs♦ purchase of RECs from the exchanges.
16
www.general-carbon.com
REC Development AdvisoryWe advice and help Clients with accreditation, registration, issuance of REC projects. Specifically
included in our services:
Completeness check and Due diligence for eligibility: ♦ Performing a thorough check for all mandatory requirements and a total quality control of the
documentations that are to be submitted to State and Central Regulatory bodies. Advising Clients for every necessary action to be taken to fulfill the REC eligibility criteria.
Accreditation and Registration Support: ♦ Assisting Clients with the entire accreditation and registration procedure with the state &
central agency respectively.
Assistance in Issuance of REC: ♦ Assisting Clients in filing application & compliance report for successful issuance of REC.
17
www.general-carbon.com
REC Trading and Market Insight We are deeply engaged in the REC market - We help clients with appropriate trading
strategies and provide monetization support for their RECs. We provide assistance for trading of the RECs on Power Exchange/s. We are Members on both the approved Power Exchanges i.e. IEX and PXIL certified for
trading RECs. We trade RECs on behalf of:
♦ Eligible Entities (Registered RE generator)♦ Obligated Entities (Discom, Captive Power Producer & Open Access Consumer)♦ Voluntary Entities (Voluntary Corporates / Organisation / Individuals / etc)
18
Membership Facilitation under RSM GC Advisory
on Exchange
Open new bank account OR link
current operating Account
Trading on last Wednesday of every month
Put Buy / Sell Bids: Quantity &
Price (Anonymous
Bidding)
Bid matched based on approved exchange algorithm
www.general-carbon.com
Advantages RSM GC Thought leaders
♦ Participated in regulation formulation (states as well as central)♦ Sharing Insights through Monthly Newsletter: REC Market Update♦ Invited to speak at major RE trade fairs, seminars, conferences & workshops
Helped in capacity building exercise in major states for REC
Managing over INR 750 million worth yearly REC transaction portfolio (buy & sell)
Some of the first & largest REC projects in their category
Shortest time for accreditation to registration19
www.general-carbon.com
Experience Experience with over 8000 MWs power project portfolio
♦ Wind projects of over 2000 MWs across India♦ Over 350 MW of REC projects across India
Client list includes some of the largest IPPs & CPPs in India♦ Tata Power, Lanco, GVK, GMR, Renew, GreenKo, JSW, Mahindra, etc.
Broad spectrum of technological expertise♦ Wind, solar, hydro, biomass, Waste to Energy, etc.
Executed projects under various structures♦ APPC + REC, Captive, Third party sale, other exotic structures, etc
20
www.general-carbon.com 21
Select Clients
www.general-carbon.com
Contact Us
22
Mumbai – Mr. Rameez Shaikh
5th floor, Great Social Building60, Sir Pherozeshah Mehta Road, FortMumbai 400001
Phone: +91 22 2266 3201/3301 Mobile: +91 99200 33866
Email: [email protected]
Chennai – Ms. Priya Ranganayaki
E-3, 4th Floor, "RM Towers“108 Chamiers Road, NandanamChennai 600018
Phone: +91 44 42167331 Mobile: +91 99625 26876
Email: [email protected]
www.general-carbon.com www.astuteconsulting.com
Thank You