Reliability Standard Audit Worksheet 1 PRC-002-NPCC-01 - Disturbance Monitoring Registered Entity: NCR Number: Applicable Function(s): TO, GO, RC Compliance Assessment Date: This section must be completed by the Compliance Enforcement Authority. 1 NPCC developed this Reliability Standard Audit Worksheet (RSAW) language in order to facilitate NERC’s and the Regional Entities’ assessment of a registered entity’s compliance with this Regional Reliability Standard. The NPCC RSAW language is written to specific versions of each NPCC Regional Reliability Standard. Entities using this RSAW should choose the version of the RSAW applicable to the Regional Reliability Standard being assessed. While the information included in this RSAW provides some of the methodology that NPCC has elected to use to assess compliance with the requirements of the Regional Reliability Standard, this document should not be treated as a substitute for the Regional Reliability Standard or viewed as additional Regional Reliability Standard requirements. In all cases, the Regional Entity should rely on the language contained in the Regional Reliability Standard itself, and not on the language contained in this RSAW, to determine compliance with the Regional Reliability Standard. NPCC’s Reliability Standards can be found on NERC’s website at http://www.nerc.com/page.php?cid=2|20 and NPCC’s website at https://www.npcc.org/Standards/SitePages/ApprovedStandardsList.aspx . Additionally, NPCC Reliability Standards may be updated occasionally , and this RSAW may not necessarily be updated with the same frequency. Therefore, it is imperative that entities treat this RSAW as a reference document only, and not as a substitute or replacement for the Regional Reliability Standard. It is the responsibility of the registered entity to verify its compliance with the latest approved version of the Regional Reliability Standards, by the applicable governmental authority, relevant to its registration status. The NPCC RSAW language contained within this document provides a non-exclusive list, for informational purposes only, of examples of the types of evidence a registered entity may produce or may be asked to produce to demonstrate compliance with the Regional Reliability Standard. A registered entity’s adherence to the examples contained within this RSAW does not necessarily constitute compliance with the applicable Regional Reliability Standard, and NERC and the Regional Entity using this RSAW reserves the right to request additional evidence from the registered entity that is not included in this RSAW. Additionally, this RSAW includes excerpts from FERC Orders and other regulatory references. The FERC Order cites are provided for ease of reference only, and this document does not necessarily include all applicable Order provisions. In the event of a discrepancy between FERC Orders, and the language included in this document, FERC Orders shall prevail. Page 1 of 64

Upload: truongkhuong

Post on 01-Feb-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Reliability Standard Audit Worksheet1

PRC-002-NPCC-01 - Disturbance Monitoring

Registered Entity: NCR Number: Applicable Function(s): TO, GO, RC

Compliance Assessment Date:

This section must be completed by the Compliance Enforcement Authority. Compliance Monitoring Method: Names of Auditors:

1 NPCC developed this Reliability Standard Audit Worksheet (RSAW) language in order to facilitate NERC’s and the Regional Entities’ assessment of a registered entity’s compliance with this Regional Reliability Standard. The NPCC RSAW language is written to specific versions of each NPCC Regional Reliability Standard. Entities using this RSAW should choose the version of the RSAW applicable to the Regional Reliability Standard being assessed. While the information included in this RSAW provides some of the methodology that NPCC has elected to use to assess compliance with the requirements of the Regional Reliability Standard, this document should not be treated as a substitute for the Regional Reliability Standard or viewed as additional Regional Reliability Standard requirements. In all cases, the Regional Entity should rely on the language contained in the Regional Reliability Standard itself, and not on the language contained in this RSAW, to determine compliance with the Regional Reliability Standard. NPCC’s Reliability Standards can be found on NERC’s website at http://www.nerc.com/page.php?cid=2|20 and NPCC’s website at https://www.npcc.org/Standards/SitePages/ApprovedStandardsList.aspx . Additionally, NPCC Reliability Standards may be updated occasionally , and this RSAW may not necessarily be updated with the same frequency. Therefore, it is imperative that entities treat this RSAW as a reference document only, and not as a substitute or replacement for the Regional Reliability Standard. It is the responsibility of the registered entity to verify its compliance with the latest approved version of the Regional Reliability Standards, by the applicable governmental authority, relevant to its registration status.The NPCC RSAW language contained within this document provides a non-exclusive list, for informational purposes only, of examples of the types of evidence a registered entity may produce or may be asked to produce to demonstrate compliance with the Regional Reliability Standard. A registered entity’s adherence to the examples contained within this RSAW does not necessarily constitute compliance with the applicable Regional Reliability Standard, and NERC and the Regional Entity using this RSAW reserves the right to request additional evidence from the registered entity that is not included in this RSAW. Additionally, this RSAW includes excerpts from FERC Orders and other regulatory references. The FERC Order cites are provided for ease of reference only, and this document does not necessarily include all applicable Order provisions. In the event of a discrepancy between FERC Orders, and the language included in this document, FERC Orders shall prevail.

Page 1 of 45

Page 2: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Subject Matter ExpertsIdentify Subject Matter Expert(s) responsible for this Reliability Standard. (Insert additional rows if necessary)

Registered Entity Response (Required): SME Name Title Organization Requirement(s)

R1 Supporting Evidence and DocumentationR1. Each Transmission Owner and Generator Owner shall provide Sequence of Event (SOE) recording capability by installing Sequence of Event recorders or as part of another device, such as a Supervisory Control And Data Acquisition (SCADA) Remote Terminal Unit (RTU), a generator plant Digital (or Distributed) Control System (DCS) or part of Fault recording equipment. This capability shall: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

1.1 Be provided at all substations and at locations where circuit breaker operation affects continuity of service to radial Loads greater than 300MW, or the operation of which drops 50MVA Nameplate Rating or greater of Generation, or the operation of which creates a Generation/Load island.Be provided at generating units above 50MVA Nameplate Rating or series of generating units utilizing a control scheme such that the loss of 1 unit results in a loss of greater than 50MVA Nameplate Capacity, and at Generating Plants above 300MVA Name Plate Capacity.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

1.2 Monitor the following at each location listed in 1.1:

1.2.1 Transmission and Generator circuit breaker positions

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Page 2 of 45

Page 3: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

1.2.2 Protective Relay tripping for all Protection Groups that operate to trip circuit breakers identified in 1.2.1.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

1.2.3 Teleprotection keying and receive

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R1This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Provided Sequence of Event (SOE) recording capability by installing: Sequence of Event recorders or as part of another device, such as

o Supervisory Control And Data Acquisition (SCADA),o Remote Terminal Unit (RTU),o a generator plant Digital (or Distributed) Control System (DCS)o part of Fault recording equipment

Provided SOE capability at: all A10 substations

Page 3 of 45

Page 4: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

at locations where circuit breaker operation affects continuity of service to radial Loads greater than 300MW.

o Whether the load is continuous or periodic is immaterial. If continuity of service to greater than 300MW can be affected, SOE recording capability must be provided.

at locations where circuit breaker operation drops 50MVA Nameplate Rating or greater of Generation

at locations where circuit breaker operation creates a Generation/Load islandProvided SOE capability at:

generating units above 50MVA Nameplate Rating or series of generating units utilizing a control scheme such that the loss of 1 unit results in a loss of greater than 50MVA Nameplate Capacity

o The term “control scheme” is not solely applied to protection and extends to the physical configuration and design limitations under various operating conditions that can result in the loss of generation greater than 50 MVA Nameplate Capacity.

at Generating Plants above 300MVA Nameplate CapacityMonitor the following at each location listed in R1.1:

Transmission and Generator circuit breaker positions Protective Relay tripping for all Protection Groups that operate to trip circuit breakers

identified in R1.2.1.o If one or more Protective Relays, that form one Protection Group, perform tripping

solely via the lockout relay, then SOE from the lockout relay is sufficient to satisfy the requirement.

Teleprotection keying and receive.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R1 of this standard. If Audit Period start date is prior to October 20, 2015, refer to Webinar slides 9, and 11 through 14, for explanation and examples of partial implementation requirements.

For GO, SOE capability must be provided if the MVA criteria is met.For TO, SOE capability must be provided if element is associated with A10 busses.

Auditor Notes:

R2 Supporting Evidence and DocumentationR2. Each Transmission Owner shall provide Fault recording capability for the following Elements at facilities where Fault recording equipment is required to be installed as per R3: [Violation Risk Factor: Medium][Time Horizon: Planning and Operations Planning]

R2.1. All transmission lines.

Describe, in narrative form, how you meet compliance with this Requirement.Page 4 of 45

Page 5: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Registered Entity Response (Required):

R2.2. Autotransformers or phase-shifters connected to busses.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

R2.3. Shunt capacitors, shunt reactors.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

R2.4. Individual generator line interconnections.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

R2.5. Dynamic VAR Devices.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

R2.6. HVDC terminals.

Page 5 of 45

Page 6: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R2This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Transmission Owner has provided Fault recording capability for the following Elements at facilities where Fault recording equipment is required to be installed including: All transmission lines. Autotransformers or phase-shifters connected to busses. Shunt capacitors, shunt reactors. Individual generator line interconnections. Dynamic VAR Devices. HVDC terminals.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R2 of this standard.

For TO, applies to elements connected to A10 busses only.

Auditor Notes:

R3 Supporting Evidence and DocumentationR3. Each Transmission Owner shall have Fault recording capability that determines the Current ZeroTime for loss of Bulk Electric System (BES) transmission Elements. [Violation Risk Factor: Medium][Time Horizon: Planning and Operations Planning]

Page 6 of 45

Page 7: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R3This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

o Transmission Owner shall have Fault recording capability that determines the Current Zero Time for loss of Bulk Electric System (BES) transmission Elements.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R3 of this standard.

The pool of NPCC BES Assets in scope is the NPCC A10 List of Transmission Elements PLUS Generation that meets CGS-002 [Ref. Webinar]

Newly defined BES elements as a result of the revised BES definition will be addressed by CGS-005. [Ref. Webinar]

Current Zero is defined in the NERC Glossary of Terms

Auditor Notes:

R4 Supporting Evidence and DocumentationR4. Each Generator Owner shall provide Fault recording capability for Generating Plants at and above 200MVA Capacity and connected through a generator step up (GSU) transformer to a Bulk ElectricSystem Element unless Fault recording capability is already provided by the Transmission Owner.

Page 7 of 45

Page 8: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

[Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Question: Did the Generator Owner have Fault recording capability for Generating Plants meeting the conditions listed above, provided by the Transmission Owner? If yes, provide a list of the Generating Plants for which the Transmission Owner has provided required Fault recording capability for the Generator Owner.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R4This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(GO) provided Fault recording capability for Generating Plants at and above 200 MVA Capacity and connected through a generator step up (GSU) transformer to a Bulk Electric System Element unless Fault recording capability is already provided by the Transmission Owner (TO). (See next item)(GO) responded to the applicability Question with response “Yes” and provided list of generating plants?If “Yes” review documentation confirming that fault recording capability for listed Generating Plants are being provided by the Transmission Owner.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R4 of this standard.

For GO, Fault recording capability must be provided when both of the following conditions exist:

Page 8 of 45

Page 9: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

MVA threshold Facility is connected through GSU to A10 bus or a circuit that connects to an A10 bus.

Auditor Notes:

R5 Supporting Evidence and DocumentationR5. Each Transmission Owner and Generator Owner shall record for Faults, sufficient electrical quantitiesfor each monitored Element to determine the following: [Violation Risk Factor: Medium] [TimeHorizon: Planning and Operations Planning]

5.1 Three phase-to-neutral voltages. (Common bus-side voltages may be used for lines.)

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

5.2 Three phase currents and neutral currents.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

5.3 Polarizing currents and voltages, if used.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

5.4 Frequency.Page 9 of 45

Page 10: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

5.5 Real and reactive power.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R5This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Transmission Owner and Generator Owner shall record for Faults, sufficient electrical quantitiesfor each monitored Element to determine the following: Three phase-to-neutral voltages. (Common bus-side voltages may be used for lines.) Three phase currents and neutral currents. Polarizing currents and voltages, if used. Frequency. Real and reactive power.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the

Page 10 of 45

Page 11: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

terminology and applicability of an entity’s assets to R5 of this standard.

NPCC Compliance Guidance Statement CGS-004 states that the 200 MVA Generating Plant capacity threshold established by Requirement R4 also applies to Requirements R5 and R6

For TO, applies to elements connected to A10 busses only.

Auditor Notes:

R6 Supporting Evidence and DocumentationR6. Each Transmission Owner and Generator Owner shall provide Fault recording with the followingcapabilities: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

6.1 Each Fault recorder record duration shall be a minimum of one (1) second.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

6.2 Each Fault recorder shall have a minimum recording rate of 16 samples per cycle

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

6.3 Each Fault recorder shall be set to trigger for at least the following:6.3.1 Monitored phase overcurrents set at 1.5 pu or less of rated CT secondary current or Protective

Relay tripping for all Protection Groups.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

6.3.2 Neutral (residual) overcurrent set at 0.2 pu or less of rated CT secondary current.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Page 11 of 45

Page 12: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

6.3.3 Monitored phase undervoltage set at 0.85 pu or greater.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

6.4 Document additional triggers and deviations from the settings in 6.3.2 and 6.3.3 when localconditions dictate.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R6This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(TO) (GO) provided Fault recording with the following capabilities: Each Fault recorder record duration shall be a minimum of one (1) second. Each Fault recorder shall have a minimum recording rate of 16 samples per cycle. Each Fault recorder shall be set to trigger for at least the following:

o Monitored phase overcurrents set at 1.5 pu or less of rated CT secondary current or Protective Relay tripping for all Protection Groups.

o Neutral (residual) overcurrent set at 0.2 pu or less of rated CT secondary current.o Monitored phase undervoltage set at 0.85 pu or greater.

Page 12 of 45

Page 13: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Documented additional triggers and deviations from the settings in 6.3.2 and 6.3.3 when local conditions dictate.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R6 of this standard.

NPCC Compliance Guidance Statement CGS-004 states that the 200 MVA Generating Plant capacity threshold established by Requirement R4 also applies to Requirements R5 and R6

For TO, applies to elements connected to A10 busses only.

Auditor Notes:

R7 Supporting Evidence and DocumentationR7. Each Reliability Coordinator shall establish its area’s requirements for Dynamic DisturbanceRecording (DDR) capability that: [Violation Risk Factor: Medium] [Time Horizon: Planning andOperations Planning]

7.1 Provides a minimum of 1 DDR per 3,000 MW of peak Load.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

7.2 Records dynamic disturbance information with consideration of the following facilities/locations:7.2.1 Major Load centers.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

7.2.2 Major Generation clusters.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Page 13 of 45

Page 14: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

7.2.3 Major voltage sensitive areas.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

7.2.4 Major transmission interfaces.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

7.2.5 Major transmission junctions.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

7.2.6 Elements associated with Interconnection Reliability Operating Limits (IROLs).

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

7.2.7 Major EHV interconnections between operating areas.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Page 14 of 45

Page 15: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R7This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(RC) established its area’s requirements for Dynamic DisturbanceRecording (DDR) capability that: Provides a minimum of 1 DDR per 3,000 MW of peak Load. Records dynamic disturbance information with consideration of the following facilities/locations:

o Major Load centers.o Major Generation clusters.o Major voltage sensitive areas.o Major transmission interfaces.o Major transmission junctions.o Elements associated with Interconnection Reliability Operating Limits (IROLs).o Major EHV interconnections between operating areas.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R7 of this standard.

Auditor Notes:

R8 Supporting Evidence and DocumentationR8. Each Reliability Coordinator shall specify that DDRs installed, after the approval of this standard,function as continuous recorders. [Violation Risk Factor: Medium] [Time Horizon: Planning andOperations Planning]

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Page 15 of 45

Page 16: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R8This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Specified that DDRs installed after approval date of standard, function as continuous recorders.All DDRs installed after October 20, 2011 must function as continuous recorders.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, Compliance Clarification and Q&A document defining the terminology and applicability of an entity’s assets to R8 of this standard.

“Approval date of this standard…” is October 20, 2011 for US entities and Canadian provinces adhering to the FERC approval date. Otherwise “approval date” is November 4, 2010 the NERC approval date.

Auditor Notes:

R9 Supporting Evidence and Documentation

R9. Each Reliability Coordinator shall specify that DDRs are installed with the following capabilities:[Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

9.1 A minimum recording time of sixty (60) seconds per trigger event.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

9.2 A minimum data sample rate of 960 samples per second, and a minimum data storage rate forRMS quantities of six (6) data points per second.

Page 16 of 45

Page 17: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

9.3 Each DDR shall be set to trigger for at least one of the following (based on manufacturers’equipment capabilities):

9.3.1 Rate of change of Frequency.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

9.3.2 Rate of change of Power.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

9.3.3 Delta Frequency (recommend 20 mHz change).

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

9.3.4 Oscillation of Frequency.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Page 17 of 45

Page 18: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R9This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Each Reliability Coordinator shall specify that DDRs are installed with the following capabilities: Each DDR installed after October 20, 2011 shall

o Function as a continuous recordero Have a minimum data sample rate of 960 samples per second, and a minimum data storage

rate for RMS quantities of six (6) data points per second. Each continuous DDR installed on, or prior to October 20, 2011, shall

o Have a minimum data sample rate of 960 samples per second, and a minimum data storage rate for RMS quantities of six (6) data points per second.

Each non-continuous DDR installed on, or prior to October 20, 2011, shallo Have a minimum recording time of sixty (60) seconds per trigger event.o Have a minimum data sample rate of 960 samples per second, and a minimum data storage

rate for RMS quantities of six (6) data points per second.o Be set to trigger for at least one of the following (based on manufacturers’ equipment

capabilities): Rate of change of Frequency. Rate of change of Power. Delta Frequency (recommend 20 mHz change). Oscillation of Frequency.

Note to Auditor: The NPCC Regional Standard has an Implementation Plan, Webinar, Compliance Clarification and Q&A document defining the terminology and applicability of an entity’s assets to R9 of this standard.

Auditor Notes:

R10 Supporting Evidence and DocumentationR10. Each Reliability Coordinator shall establish requirements such that the following quantities aremonitored or derived where DDRs are installed: [Violation Risk Factor: Medium] [Time Horizon:Planning and Operations Planning]

Page 18 of 45

Page 19: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

10.1 Line currents for most lines such that normal line maintenance activities do not interfere with DDR functionality.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

10.2 Bus voltages such that normal bus maintenance activities do not interfere with DDR functionality.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

10.3 As a minimum, one phase current per monitored Element and two phase-to-neutral voltages of different Elements. One of the monitored voltages shall be of the same phase as the monitored current.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

10.4 Frequency.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

10.5 Real and reactive power.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Page 19 of 45

Page 20: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R10This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Each Reliability Coordinator shall establish requirements such that the following quantities are monitored or derived where DDRs are installed: Line currents for most lines such that normal line maintenance activities do not interfere with

DDR functionality. Bus voltages such that normal bus maintenance activities do not interfere with DDR

functionality. As a minimum, one phase current per monitored Element and two phase-to-neutral voltages of

different Elements. One of the monitored voltages shall be of the same phase as the monitored current.

Frequency. Real and reactive power.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R10 of this standard.

Auditor Notes:

R11 Supporting Evidence and DocumentationR11. Each Reliability Coordinator shall document additional settings and deviations from the requiredtrigger settings described in R9 and the required list of monitored quantities as described in R10, and report this to the Regional Entity (RE) upon request. [Violation Risk Factor: Lower] [Time Horizon:Operations Planning]

Question: Did the Reliability Coordinator document any additional settings or deviations from the required trigger settings described in R9 or the required list of monitored quantities as described in R10. If “Yes” provide narrative and evidence below.

Registered Entity Response (Required):

Page 20 of 45

Page 21: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R11This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

Documented additional settings and deviations from the required trigger settings described in R9 and the required list of monitored quantities as described in R10.

Trigger settings and their deviations are not applicable to DDRs installed after October 20, 2011.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R11 of this standard.

Auditor Notes:

R12 Supporting Evidence and DocumentationR12. Each Reliability Coordinator shall specify its DDR requirements including the DDR setting triggersestablished in R9 to the Transmission Owners and Generator Owners. [Violation Risk Factor:Medium] [Time Horizon: Planning and Operations Planning]

Page 21 of 45

Page 22: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R12This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(RC) specified its DDR requirements including the DDR setting triggers established in R9 to the Transmission Owners and Generator Owners.

Trigger settings and their deviations are not applicable to DDRs installed after October 20, 2011.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R12 of this standard.

Auditor Notes:

R13 Supporting Evidence and DocumentationR13. Each Transmission Owner and Generator Owner that receives a request from the Reliability Coordinator to install a DDR shall acquire and install the DDR in accordance with R12. Reliability Coordinators, Transmission Owners, and Generator Owners shall mutually agree on an implementation schedule. [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

Page 22 of 45

Page 23: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Question: Did the entity receive a request from the Reliability Coordinator to install a DDR in accordance with R12? If “Yes” provide evidence for the request. Registered Entity Response (Required):

Describe, in narrative form, how you meet compliance with this Requirement. Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R13This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(TO)(GO) responded to the applicability Question with response “Yes” and provided evidence of request?If “Yes”, review documentation confirming that RC and entity agreed on an implementation schedule.If “Yes”, review documentation confirming that entity has taken action to acquire and install the DDR in accordance with R12 and the agreed implementation schedule.

Note to Auditor:

The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R13 of this standard.

Auditor Notes:

Page 23 of 45

Page 24: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

R14 Supporting Evidence and DocumentationR14. Each Transmission Owner and Generator Owner shall establish a maintenance and testing program for stand alone DME (equipment whose only purpose is disturbance monitoring) that includes: [Violation Risk Factor: Medium] [Time Horizon: Operations Planning]

14.1 Maintenance and testing intervals and their basis.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

14.2 Summary of maintenance and testing procedures.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

14.3 Monthly verification of communication channels used for accessing records remotely (if the entity relies on remote access and the channel is not monitored to a control center staffed around the clock, 24 hours a day, 7 days a week (24/7)).

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

14.4 Monthly verification of time synchronization (if the loss of time synchronization is not monitored to a 24/7 control center).

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

14.5 Monthly verification of active analog quantities.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Page 24 of 45

Page 25: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

14.6 Verification of DDR and DFR settings in the software every six (6) years.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

14.7 A requirement to return failed units to service within 90 days. If a DME device will be out of service for greater than 90 days the owner shall keep a record of efforts aimed at restoring the DME to service.

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R14This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(TO) (GO) established a maintenance and testing program for stand alone DME (equipment whose only purpose is disturbance monitoring). Review evidence showing that program includes:

Maintenance and testing intervals and their basis. Summary of maintenance and testing procedures. Monthly verification of communication channels used for accessing records remotely (if the

entity relies on remote access and the channel is not monitored to a control center staffed around the clock, 24 hours a day, 7 days a week (24/7)).

Monthly verification of time synchronization (if the loss of time synchronization is not monitored to a 24/7 control center).

Monthly verification of active analog quantities. Verify that the quantities are being recorded, not their accuracy.

Verification of DDR and DFR settings in the software every six (6) years. A requirement to return failed units to service within 90 days.

Page 25 of 45

Page 26: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

o Review records of efforts aimed at restoring the DME to service if the DME device was known or assumed to be out of service for greater than 90 days.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R14 of this standard.

Auditor Notes:

R15 Supporting Evidence and DocumentationR15. Each Reliability Coordinator, Transmission Owner and Generator Owner shall share data within 30 days upon request. Each Reliability Coordinator, Transmission Owner, and Generator Owner shall provide recorded disturbance data from DMEs within 30 days of receipt of the request in each of the following cases: [Violation Risk Factor: Lower] [Time Horizon: Operations]

15.1 NERC, Regional Entity, Reliability Coordinator.

Question: Did the Reliability Coordinator, Transmission Owner or Generator Owner receive a request from NERC, the Regional Entity, or a Reliability Coordinator during the audit period to share DME data?

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

15.2 Request from other Transmission Owners, Generator Owners within NPCC.

Question: Did the Transmission Owner, or Generator Owner receive a request from other Transmission Owners, or Generator Owners during the audit period to share DME data?

If yes, provide a list of the events and Registered Entities for which DME data was requested or provided.Registered Entity Response (Required):

Page 26 of 45

Page 27: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R15This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(RC) (TO) (GO) has shared recorded disturbance data from DMEs within 30 days of receipt of request from the following:

NERC, Regional Entity, Reliability Coordinator.o An audit or spot check notification represents a request from the Regional Entity.

other Transmission Owners, Generator Owners within NPCC.o (TO, GO) responded to the applicability Question with response “Yes” and provided

list of events and GOs/TOs for which DME data was shared?

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R15 of this standard.

Auditor Notes:

Page 27 of 45

Page 28: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

R16 Supporting Evidence and DocumentationR16. Each Reliability Coordinator, Transmission Owner and Generator Owner shall submit the data files conforming to the following format requirements: [Violation Risk Factor: Lower] [Time Horizon: Operations]

16.1 The data files shall be capable of being viewed, read, and analyzed with a generic COMTRADEanalysis tool as per the latest revision of IEEE Standard C37.111.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

16.2 Disturbance Data files shall be named in conformance with the latest revision of IEEE StandardC37.232.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

16.3 Fault Recorder and DDR Files shall contain all monitored channels. SOE records shall containstation name, date, time resolved to milliseconds, SOE point name, status.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Page 28 of 45

Page 29: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R16This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(RC) (TO) (GO) has data files conforming to the following format requirements: The data files shall be capable of being viewed, read, and analyzed with a generic

COMTRADE analysis tool as per the latest revision of IEEE Standard C37.111.o data provided in a commonly used format such as txt, csv, or xls is sufficient.

Disturbance Data files shall be named in conformance with the latest revision of IEEE Standard C37.232.

Fault Recorder and DDR Files shall contain all monitored channels. SOE records shall contain station name, date, time resolved to milliseconds, SOE point name, status.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R16 of this standard.

Auditor Notes:

R17 Supporting Evidence and DocumentationR17. Each Reliability Coordinator, Transmission Owner and Generator Owner shall maintain, record and provide to the Regional Entity (RE), upon request, the following data on the DMEs installed to meet this standard: [Violation Risk Factor: Lower] [Time Horizon: Operations]

17.1 Type of DME.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

17.2 Make and model of equipment.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

17.3 Installation location.

Describe, in narrative form, how you meet compliance with this Requirement.Page 29 of 45

Page 30: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Registered Entity Response (Required):

17.4 Operational Status.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

17.5 Date last tested.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

17.6 Monitored Elements.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

17.7 All identified channels.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

17.8 Monitored electrical quantities.

Describe, in narrative form, how you meet compliance with this Requirement.Registered Entity Response (Required):

Registered Entity Evidence (Required):Provide the following for all evidence submitted (Insert additional rows if necessary):

Page 30 of 45

Page 31: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

File Name, File Extention, Document Title, Revision, Date, Page(s), Section(s), Section Title(s), Description

Audit Team Evidence Reviewed (This section must be completed by the Compliance Enforcement Authority):

Compliance Assessment Approach Specific to PRC-002-NPCC-01, R17This section must be completed by the Compliance Enforcement AuthorityReview the evidence to verify the Registered Entity has:

(RC) (TO) (GO) maintained, recorded and provided to the Regional Entity (RE), upon request, the following data on the DMEs installed to meet this standard:

Type of DME. Make and model of equipment. Installation location. Operational Status. Date last tested. Monitored Elements. All identified channels. Monitored electrical quantities.

Note to Auditor:The NPCC Regional Standard has an Implementation Plan, Webinar, and Q&A document defining the terminology and applicability of an entity’s assets to R17 of this standard.

Auditor Notes:

Compliance Finding Summary This section must be completed by the Compliance Enforcement Authority

Req. NF PV OEA NA Statement123456

Page 31 of 45

Page 32: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

789

1011121314151617

Page 32 of 45

Page 33: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Disturbance Monitoring

A. Introduction1. Title: Disturbance Monitoring

2. Number: PRC-002-NPCC-01

3. Purpose: Ensure that adequate disturbance data is available to facilitate Bulk Electric System event analyses. All references to equipment and facilities herein unless otherwise noted will be to Bulk Electric System (BES) elements.

4. Applicability:

4.1. Transmission Owner

4.2. Generator Owner

4.3. Reliability Coordinator

5. (Proposed) Effective Date: To be established.

B. RequirementsR1. Each Transmission Owner and Generator Owner shall provide Sequence of

Event (SOE) recording capability by installing Sequence of Event recorders or as part of another device, such as a Supervisory Control And Data Acquisition (SCADA) Remote Terminal Unit (RTU), a generator plant Digital (or Distributed) Control System (DCS) or part of Fault recording equipment. This capability shall: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

1.1 Be provided at all substations and at locations where circuit breaker operation affects continuity of service to radial Loads greater than300MW, or the operation of which drops 50MVA Nameplate Rating or greater of Generation, or the operation of which creates a Generation/Load island.

Be provided at generating units above 50MVA Nameplate Rating or series of generating units utilizing a control scheme such that the loss of 1 unit results in a loss of greater than 50MVA Nameplate Capacity, and at Generating Plants above 300MVA Name Plate Capacity.

1.2 Monitor the following at each location listed in 1.1:

1.2.1 Transmission and Generator circuit breaker positions

1.2.2 Protective Relay tripping for all Protection Groups that operate to trip circuit breakers identified in 1.2.1.

1.2.3 Teleprotection keying and receive

Adopted by NERC Board of Trustees: November 4, 2010

Page 33 of 45

Page 34: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring

R2. Each Transmission Owner shall provide Fault recording capability for the following Elements at facilities where Fault recording equipment is required to be installed as per R3: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

2.1 All transmission lines.

2.2 Autotransformers or phase-shifters connected to busses.

2.3 Shunt capacitors, shunt reactors.

2.4 Individual generator line interconnections.

2.5 Dynamic VAR Devices.

2.6 HVDC terminals.

R3. Each Transmission Owner shall have Fault recording capability that determines the Current ZeroTime for loss of Bulk Electric System (BES) transmission Elements. [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

R4. Each Generator Owner shall provide Fault recording capability for Generating Plants at and above 200MVA Capacity and connected through a generator step up (GSU) transformer to a Bulk Electric System Element unless Fault recording capability is already provided by the Transmission Owner. [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

R5. Each Transmission Owner and Generator Owner shall record for Faults, sufficient electrical quantities for each monitored Element to determine the following: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

5.1 Three phase-to-neutral voltages. (Common bus-side voltages may be used for lines.)

5.2 Three phase currents and neutral currents.

5.3 Polarizing currents and voltages, if used.

5.4 Frequency.

5.5 Real and reactive power.

R6. Each Transmission Owner and Generator Owner shall provide Fault recording with the following capabilities: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

6.1 Each Fault recorder record duration shall be a minimum of one (1) second.

6.2 Each Fault recorder shall have a minimum recording rate of 16 samples per cycle

6.3 Each Fault recorder shall be set to trigger for at least the following:

6.3.1 Monitored phase overcurrents set at 1.5 pu or less of rated CT secondary current orProtective Relay tripping for all Protection Groups.

6.3.2 Neutral (residual) overcurrent set at 0.2 pu or less of rated CT secondary current.

6.3.3 Monitored phase undervoltage set at 0.85 pu or greater.

6.4 Document additional triggers and deviations from the settings in 6.3.2 and 6.3.3 when local conditions dictate.

R7. Each Reliability Coordinator shall establish its area’s requirements for Dynamic Disturbance Recording (DDR) capability that: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

Adopted by NERC Board of Trustees: November 4, 2010 Page 34 of 45

Page 35: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring 7.1 Provides a minimum of 1 DDR per 3,000 MW of peak Load.

7.2 Records dynamic disturbance information with consideration of the following facilities/locations:

7.2.1 Major Load centers.

7.2.2 Major Generation clusters.

7.2.3 Major voltage sensitive areas.

7.2.4 Major transmission interfaces.

7.2.5 Major transmission junctions.

7.2.6 Elements associated with Interconnection Reliability Operating Limits (IROLs).

7.2.7 Major EHV interconnections between operating areas.

R8. Each Reliability Coordinator shall specify that DDRs installed, after the approval of this standard, function as continuous recorders. [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

R9. Each Reliability Coordinator shall specify that DDRs are installed with the following capabilities:[Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

9.1 A minimum recording time of sixty (60) seconds per trigger event.

9.2 A minimum data sample rate of 960 samples per second, and a minimum data storage rate forRMS quantities of six (6) data points per second.

9.3 Each DDR shall be set to trigger for at least one of the following (based on manufacturers’equipment capabilities):

9.3.1 Rate of change of Frequency.

9.3.2 Rate of change of Power.

9.3.3 Delta Frequency (recommend 20 mHz change).

9.3.4 Oscillation of Frequency.

R10. Each Reliability Coordinator shall establish requirements such that the following quantities are monitored or derived where DDRs are installed: [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

10.1 Line currents for most lines such that normal line maintenance activities do not interfere withDDR functionality.

10.2 Bus voltages such that normal bus maintenance activities do not interfere with DDRfunctionality.

10.3 As a minimum, one phase current per monitored Element and two phase-to-neutral voltages of different Elements. One of the monitored voltages shall be of the same phase as the monitored current.

10.4 Frequency.

10.5 Real and reactive power.

R11. Each Reliability Coordinator shall document additional settings and deviations from the required trigger settings described in R9 and the required list of monitored quantities as described in R10, and

Adopted by NERC Board of Trustees: November 4, 2010 Page 35 of 45

Page 36: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring report this to the Regional Entity (RE) upon request. [Violation Risk Factor: Lower] [Time Horizon:

Operations Planning]

R12. Each Reliability Coordinator shall specify its DDR requirements including the DDR setting triggers established in R9 to the Transmission Owners and Generator Owners. [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

R13. Each Transmission Owner and Generator Owner that receives a request from the Reliability Coordinator to install a DDR shall acquire and install the DDR in accordance with R12. Reliability Coordinators, Transmission Owners, and Generator Owners shall mutually agree on an implementation schedule. [Violation Risk Factor: Medium] [Time Horizon: Planning and Operations Planning]

R14. Each Transmission Owner and Generator Owner shall establish a maintenance and testing program for stand alone DME (equipment whose only purpose is disturbance monitoring) that includes: [Violation Risk Factor: Medium] [Time Horizon: Operations Planning]

14.1 Maintenance and testing intervals and their basis.

14.2 Summary of maintenance and testing procedures.

14.3 Monthly verification of communication channels used for accessing records remotely (if the entity relies on remote access and the channel is not monitored to a control center staffed around the clock, 24 hours a day, 7 days a week (24/7)).

14.4 Monthly verification of time synchronization (if the loss of time synchronization is not monitored to a 24/7 control center).

14.5 Monthly verification of active analog quantities.

14.6 Verification of DDR and DFR settings in the software every six (6) years.

14.7 A requirement to return failed units to service within 90 days. If a DME device will be out of service for greater than 90 days the owner shall keep a record of efforts aimed at restoring the DME to service.

R15. Each Reliability Coordinator, Transmission Owner and Generator Owner shall share data within 30 days upon request. Each Reliability Coordinator, Transmission Owner, and Generator Owner shall provide recorded disturbance data from DMEs within 30 days of receipt of the request in each of the following cases: [Violation Risk Factor: Lower] [Time Horizon: Operations]

15.1 NERC, Regional Entity, Reliability Coordinator.

15.2 Request from other Transmission Owners, Generator Owners within NPCC.

R16. Each Reliability Coordinator, Transmission Owner and Generator Owner shall submit the data files conforming to the following format requirements: [Violation Risk Factor: Lower] [Time Horizon: Operations]

16.1 The data files shall be capable of being viewed, read, and analyzed with a generic COMTRADEanalysis tool as per the latest revision of IEEE Standard C37.111.

16.2 Disturbance Data files shall be named in conformance with the latest revision of IEEE StandardC37.232.

16.3 Fault Recorder and DDR Files shall contain all monitored channels. SOE records shall contain station name, date, time resolved to milliseconds, SOE point name, status.

Adopted by NERC Board of Trustees: November 4, 2010 Page 36 of 45

Page 37: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring R17. Each Reliability Coordinator, Transmission Owner and Generator Owner shall maintain, record and

provide to the Regional Entity (RE), upon request, the following data on the DMEs installed to meet this standard: [Violation Risk Factor: Lower] [Time Horizon: Operations]

17.1 Type of DME.

17.2 Make and model of equipment.

17.3 Installation location.

17.4 Operational Status.

17.5 Date last tested.

17.6 Monitored Elements.

17.7 All identified channels.

17.8 Monitored electrical quantities.

C. MeasuresM1. Each Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it

provided Sequence of Event recording capability in accordance with 1.1 and 1.2. (R1)

M2. Each Transmission Owner shall have, and provide upon request, evidence that it provided Fault recording capability in accordance with 2.1 to 2.6. (R2)

M3. Each Transmission Owner shall have, and provide upon request, evidence that it provided Fault recording capability that determined the Current Zero Time for loss of Bulk Electric System (BES) transmission Elements in accordance with R3.

M4. Each Generator Owner shall have, and provide upon request, evidence that it provided Fault recording capability for its Generating Plants at and above 200 MVA Capacity in accordance with R4.

M5. Each Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it records for Faults, sufficient electrical quantities for each monitored Element to determine the parameters listed in 5.1 to 5.5. (R5)

M6. Each Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it provided Fault recording capability in accordance with 6.1 to 6.4. (R6)

M7. Each Reliability Coordinator shall have, and provide upon request, evidence that it established its area’s requirements for Dynamic Disturbance Recording (DDR) capability in accordance with 7.1 and.2. (R7)

M8. Each Reliability Coordinator shall have, and provide upon request, evidence that DDRs installed after the approval of this standard function as continuous recorders. (R8)

M9. Each Reliability Coordinator shall have, and provide upon request, evidence that it developed DDRsetting triggers to include the parameters listed in 9.1 to 9.3. (R9)

M10. Each Reliability Coordinator shall have, and provide upon request, evidence that DDRs monitor theElements listed in 10.1 through 10.5. (R10)

M11. Each Reliability Coordinator shall have, and provide upon request, evidence that it documented additional settings and deviations from the required trigger settings described in R9 and the required list of monitored quantities as described in R10. (R11)

Adopted by NERC Board of Trustees: November 4, 2010 Page 37 of 45

Page 38: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring M12. Each Reliability Coordinator shall have, and provide upon request, evidence that it specified its DDR

requirements which included the DDR setting triggers established in R9 to the Transmission Owners and Generator Owners in the Reliability Coordinator’s area. (R12)

M13. Each Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it acquired and installed the DDRs in accordance with the specifications contained in the Reliability Coordinator’s request, and a mutually agreed upon implementation schedule. (R13)

M14. Each Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it has a maintenance and testing program for stand alone DME

(equipment whose only purpose is disturbance monitoring) that meets the requirements in 14.1 through 14.7. (R14)

M15. Each Reliability Coordinator, Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it provided recorded disturbance data from DMEs within 30 days of the receipt of the request from the entities listed in 15.1 and 15.2. (R15)

M16. Each Reliability Coordinator, Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it submitted the data files in a format that meets the requirements in 16.1 through 16.3. (R16)

M17. Each Reliability Coordinator, Transmission Owner and Generator Owner shall have, and provide upon request, evidence that it maintained a record of and provided to NPCC when requested, the data on DMEs installed meeting the requirements 17.1 through 17.8. (R17)

D. Compliance1. Compliance Monitoring Process

1.1. Compliance Enforcement Authority

NPCC Compliance Committee

1.2. Compliance Monitoring Period and Reset Time Frame

Not Applicable

1.3. Data Retention

The Transmission Owner and Generator Owner shall keep evidences for three calendar years forMeasures 1, 5, 6, 13, 16 and 17.

The Transmission Owner shall keep evidence for three years for Measures 2 and 3.

The Generator Owner shall keep evidence for three years for Measure 4.

The Reliability Coordinator shall keep evidence for three years for Measures 7, 8, 9, 10, 11, 12,16 and 17.

The Transmission Owner and Generator Owner shall keep evidences for twenty-four calendar months for Measures 14 and 15.

The Reliability Coordinator shall keep evidence for twenty-four calendar months for Measure15.

Adopted by NERC Board of Trustees: November 4, 2010 Page 38 of 45

Page 39: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring If a Transmission Owner, Generator Owner or Reliability Coordinator is found non-compliant, it shall keep information related to the non-compliance until found compliant.

The Compliance Enforcement Authority shall keep the last audit and all subsequent record.

1.4. Compliance Monitoring and Assessment Processes

- Self-Certifications- Spot Checking- Compliance Audits- Self-Reporting- Compliance Violation Investigations- Complaints

1.5. Additional Compliance Information

None

2. Violation Severity Levels

R # Lower VSL Moderate VSL High VSL Severe VSLR1The TransmissionOwner or Generator Owner provided the Sequence of Event recording capability meeting the bulk of R1 but missed…

Up to and including 10%of the total set, which is theproduct of the total number of locations in 1.1times the total number ofparameters in1.2.

More than 10% and up to and including20% of the total set, which is the productof the total number of locations in 1.1 times the totalnumber of parameters in 1.2.

More than 20% and up to and including30% of the total set, which is the productof the total number of locations in 1.1 times the totalnumber of parameters in 1.2.

More than 30% of the total set, which is theproduct of the total number of locations in1.1 times the total number of parameters in1.2.

R2The TransmissionOwner provided the Faultrecordingcapability meeting the bulkof R2 butmissed…

Up to and including 10% of the total set,which is the total number of Elements at alllocations required to beinstalled as per R3 that meet the criterialisted in 2.1 through 2.6.

More than 10% and up to and including20% of the total set,which is the total number of Elements at all locations required to be installed as per R3 that meet the criteria listed in 2.1 through2.6.

More than 20% andup to and including30% of the total set, which is the total number ofElements at all locations required to be installed as per R3 that meetthe criteria listed in2.1 through 2.6.

More than 30% of the total set, which is thetotal number of Elementsat all locations required to be installed as per R3 that meet the criteria listed in 2.1 through 2.6.

Adopted by NERC Board of Trustees: November 4, 2010 Page 39 of 45

Page 40: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring R3The Transmission

Not applicable. Not applicable. Not applicable. Fault recording capabilitythat determines the

Adopted by NERC Board of Trustees: November 4, 2010 Page 40 of 45

Page 41: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring Owner failed to provide…

current zero time for loss of transmission Elements.

R4The Generator Owner failed to provide Fault recording capability at…

Up to andincluding 10% of its Generating Plants at and above 200MVA Capacity and connected to a Bulk Electric System Element ifFault recording capability for that portion of the system is inadequate.

More than 10% andup to and including20% of itsGenerating Plants at and above 200 MVA Capacity and connected to a Bulk Electric System Element if Fault recording capability for that portion ofthe system is inadequate.

More than 20% andup to 30% of its Generating Plants at and above 200 MVA Capacity and connected to a Bulk Electric System Element if Fault recording capability for that portion ofthe system is inadequate.

More than 30% of itsGenerating Plants at and above 200 MVA Capacity and connectedto a Bulk Electric SystemElement if Fault recording capability forthat portion of the systemis inadequate.

R5The TransmissionOwner or

Generator Owner failed to record for the Faults…

Up to and including 10%of the total set of parameters,which is the product of the total number ofmonitoredElements and the number ofparameterslisted in 5.1 through 5.5.

More than 10% and up to and including20% of the total set of parameters, whichis the product of the total number of monitored Elementsand the number of parameters listed in5.1 through 5.5.

More than 20% and up to and including30% of the total set of parameters, whichis the product of the total number of monitored Elementsand the number of parameters listed in5.1 through 5.5.

More than 30% of the total set of parameters,which is the product of the total number ofmonitored Elements and the number of parameters listed in 5.1 through 5.5.

R6The TransmissionOwner or Generator Owner failed …

To provideFault recording capability forup to andincluding 10%of the total set of requirements, which is the product of thetotal number of monitored Elements and the totalnumber of capabilitiesidentified in 6.1

To provide Fault recording capabilityfor more than 10% and up to and including 20% of thetotal set of requirements, whichis the product of the total number of monitored Elementsand the total number of capabilitiesidentified in 6.1 through 6.2.ORFailed to document additional triggers or

To provide Fault recording capabilityfor more than 20% and up to and including 30% of thetotal set of requirements, whichis the product of the total number of monitored Elementsand the total number of 6.1 through 6.2.ORFailed to document additional triggers ordeviations from the settings stipulated in

To provide Fault recording capability formore than 30% of the total set of requirements, which is the product ofthe total number of monitored Elements andthe total number of capabilities identified in6.1 through 6.2.ORFailed to document additional triggers ordeviations from thesettings stipulated in 6.3 through 6.4 for more thanten (10) locations.

Adopted by NERC Board of Trustees: November 4, 2010 Page 41 of 45

Page 42: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring

R7The ReliabilityCoordinatorfailed to establish its area’srequirementsfor…

through 6.2. ORFailed to documentadditional triggers ordeviations from the settings stipulated in 6.3through 6.4 for up to 2locations.Up to and including 10% of the required DDR coverage for its area as per 7.1and 7.2.

deviations from the settings stipulated in6.3 through 6.4 for more than two (2)and up to and including five (5)locations.

More than 10% and up to and including20% of the requiredDDR coverage for its area as per 7.1and 7.2.

6.3 through 6.4 for more than five (5) and up to and including ten (10) locations.

More than 20% and up to and including30% of the requiredDDR coverage for its area as per 7.1and 7.2.

More than 30% of the required DDR coverage for its area as per 7.1 and7.2.

R8The Reliability Coordinator failed to specify

that DDRs installed…

Not applicable. Not applicable. Not applicable. Function as continuous recorders.

R9The ReliabilityCoordinator failed to specify that DDRs areinstalled

without…

Not applicable.

Not applicable. Not applicable. The capabilities listed in9.1 through 9.3.

R10The ReliabilityCoordinator failed to ensure that the

Not applicable. Not applicable. Not applicable. Where DDRs are installed.

quantities listed in 10.1 through 10.5 are monitored orderived…R11The Reliability Coordinator failed to document and report to the Regional Entity upon request

Up to two (2) facilities within the Reliability Coordinator’s area that have a DDR.

More than two (2) and up to five (5) facilities within the Reliability Coordinator’s area that have a DDR.

More than five (5) and up to ten (10) facilities within the Reliability Coordinator’s area that have a DDR.

More than ten (10) facilities within the Reliability Coordinator’s area that have a DDR.

additional settings and deviations from the requiredtrigger settings described in R9

Adopted by NERC Board of Trustees: November 4, 2010 Page 42 of 45

Page 43: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

Standard PRC-002-NPCC-01— Di sturbance Monitoring and the required list of monitored quantities as described in R10 for…

R12The Reliability Coordinator faile to specify to the Transmission Owners and Generator Owner its DDR requirements including the DD triggers established in R9 but missed…

Not applicable.

d

s

R setting

Not applicable. Not applicable. Established settingtriggers.

R13The TransmissionOwner or

Generator Owner failed to comply with the Reliability Coordinator’s request installing the DDR in accordance with R12 for…

Up to and including 10%of the requirement set of theReliabilityCoordinator’s request toinstall DDRs,with the requirement setbeing the totalnumber ofDDRsrequested times the number ofsetting triggersspecified for each DDR.

More than 10% and up to 20% of therequirement set requested by the ReliabilityCoordinator for installing DDRs,with the requirement set being the total number of DDRsrequested times the number of settingtriggers specified for each DDR.

More than 20% and up to 30% of therequirement set requested by the ReliabilityCoordinator for installing DDRs,with the requirement set being the total number of DDRsrequested times the number of settingtriggers specified for each DDR.

More than 30% of the requirement set requestedby the ReliabilityCoordinator andinstalling DDRs, with the requirement set being thetotal number of DDRsrequested times the number of setting triggers specified for each DDR ORThe ReliabilityCoordinator, Transmission Owners, and Generator Owners failed to mutually agree on an implementation schedule.

R14The TransmissionOwner or Generator Owner…

Established a maintenanceand testing program for stand aloneDME but providedincomplete data for any one (1) of 14.1 through

Established a maintenance andtesting program for stand alone DME but providedincomplete data for more than one (1)and up to and including three (3)of 14.1 through 14.7.

Established a maintenance andtesting program for stand alone DME but providedincomplete data for more than three (3)and up to and including six (6) of14.1 through 14.7.

Did not establish any maintenance and testingprogram for DME; ORThe Transmission Owneror Generator Owner established a maintenance and testingprogram for DME but did not provide any data that

Adopted by NERC Board of Trustees: November 4, 2010 Page 43 of 45

Page 44: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

NERC Reliability Standard Audit Worksheet

14.7. meets all of 14.1 through14.7.

R15The ReliabilityCoordinator, TransmissionOwner orGenerator Owner provided recorded disturbance data from DMEs but was late for…

Up to and including fifteen (15)days in meeting the requests ofan entity, or entities in 15.1, or 15.2.

More than fifteen (15) days but less than and includingthirty (30) days in meeting the requestsof an entity, or entities in 15.1 or15.2.

More than 30 days but less than and including forty-five(45) days in meeting the requests of anentity, or entities in15.1 or 15.2.

More than forty-five (45) days in meeting the requests of an entity, orentities in 15.1 or 15.2.

R16The ReliabilityCoordinator,

Transmission Owner or Generator Owner failed to submit…

Up to and including two(2) data files in a format thatmeets the applicable formatrequirements in16.1 through16.3.

More than two (2)and up to and including five (5)data files in a formatthat meets the applicable format requirements in 16.1 through 16.3.

More than five (5)and up to and including ten (10)data files in a formatthat meets the applicable format requirements in 16.1 through 16.3.

More than ten (10) data files in a format thatmeets the applicable format requirements in16.1 through 16.3.

R17The Reliability Coordinator, Transmission Owner or Generator Owner failed to maintain or provide tothe Regional Entity , upon request…

Up to andincluding two (2) of the items in 17.1 through17.8.

More than two (2)and up to and including four (4) of the items in 17.1 to17.8.

More than four (4)and up to and including six (6) of the items in 17.1 through 17.8.

More than six (6) of theitems in 17.1 through17.8.

E. Associated Documents

Version History

Version Date Action Change Tracking

NERC Reliability Standard Audit Worksheet Compliance Enforcement Authority: ____NPCC_____Registered Entity:_____________________________NCR Number:_______________________________ Compliance Assessment Date:__________________ RSAW Version: RSAW_PRC-002-NPCC-01_2013_v1Revision Date: March, 2014

Page 44 of 45

Page 45: RSAW PRC-002-NPCC-01 Rev 0 (Word version) Standard RS…  · Web viewStandard PRC-002-NPCC-01— Disturbance Monitoring. NERC Reliability Standard Audit Worksheet. Adopted by NERC

NERC Reliability Standard Audit Worksheet

1 November 4,2010

Adopted by NERC Board of Trustees New

1 October 20,2011

FERC Order issued approving PRC-002-NPCC-01 (FERC’s Order became effective on October 20, 2011)

NERC Reliability Standard Audit Worksheet Compliance Enforcement Authority: ____NPCC_____Registered Entity:_____________________________NCR Number:_______________________________ Compliance Assessment Date:__________________ RSAW Version: RSAW_PRC-002-NPCC-01_2013_v1Revision Date: March, 2014

Page 45 of 45