rq de rampa niveladora.xls

6
METRADO DE FIERRO ITEM: ACERO CORRUGADO FY= 4200 KG/CM2 DISEÑO ELEMENTO NUMERO NUMERO LONG. LONGITUD (MET ELEMENTO Ø ELEMENTOS PIEZAS POR POR PZA IGUALES ELEMENTO (M) M M 1 3/4" 2 1/2" 1 82 1.60 0.00 0.00 3 1/4" 4 5/8" 1 3 5.60 0.00 0.00 5 3/4" 6 1" 7 1/2" 1 40 0.92 0.00 0.00 8 1/4" 9 3/8" 1 30 3.50 0.00 105.00 10 5/8" 11 5/8" 12 3/8" 1 3 4.85 0.00 14.55 1/2" 1 28 2.78 0.00 0.00 1/2" 1 12 0.92 0.00 0.00 1/2" 1 64 0.62 0.00 0.00 3/8" 1 18 3.50 0.00 63.00 0.00 0.00 0.00 0.00 0.00 0.00 SUBTOTAL(ML) 0.00 182.55 1/4" 3/8"

Upload: nicasc-sosa

Post on 07-Nov-2015

263 views

Category:

Documents


1 download

TRANSCRIPT

aceroMETRADO DE FIERROITEM:ACERO CORRUGADO FY= 4200 KG/CM2DISEO ELEMENTONUMERONUMEROLONG.LONGITUD (METROS LINEALES DE VARILLAS)ELEMENTOELEMENTOSPIEZAS PORPOR PZA1/4"3/8"1/2"5/8"3/4"1"IGUALESELEMENTO(M)MMMMMM# de varillas13/4"0.0021/2"1821.600.000.00131.200.000.000.0014.631/4"0.000.000.000.00045/8"135.600.000.000.0016.800.000.00053/4"0.00061"071/2"1400.920.000.0036.800.000.000.004.181/4"0.000.000.000.00093/8"1303.500.00105.000.000.000.000.0011.7105/8"0.000.000115/8"0.000.000123/8"134.850.0014.550.000.000.000.0001/2"1282.780.000.0077.840.000.000.008.71/2"1120.920.000.0011.040.000.000.001.3LONGITUD DELACERO9m1/2"1640.620.000.0039.680.000.000.004.5463.053/8"1183.500.0063.000.000.000.000.000TOTAL0.000.000.000.000.000.00423.00879.20.000.000.000.000.000.00c/u en soles14.1c/u en soles25.120.000.000.000.000.000.003035SUBTOTAL(ML)0.00182.55296.5616.800.000.0099# VARILLAS33.002700.563150.99PESO (KG/MT) POR DIAMETRO VARILLA0.250.560.991.552.244.04TOTAL KGS421.86KG0.00102.23293.5926.040.000.00total kgs 3/8"151.2total KGS 1/2"311.85ALAMBRE(LONGITUD)60cmes el 10% al 20%en este casopara la rampaalambre509.35550.9355kga utilizar

Hoja1REQUERIMIENTOS DE MATERIALES PARA EL PROCESO CONSTRUCTIVO DE LA BASE PARA LA INSTALACION DE LA RAMPA# de varillasKgrequerimiento de la varilla de 3/8"30151.2requerimiento de la varilla de 1/2"35311.85m. linealesPARA COSTO EN SOLES DE MATERIALESuso de cortadora26.4arena gruesa(m3)s/. =45m3arena fina (m3)s/. =42volumen a excavar con su esponjamiento11.5piedra de 1/2 (m3)s/. =54.9cemento (bls)s/. =18.2materiales para la zapata1.72m3SOLADO PARA ZAPATAS CORRIDASMATERIALES PARA LA LOSAMATERIALES PARA PLACA CARAVISTAMATERIALES PARA VIGA DE CIMENTACIONMATERIALES TOTAL A PEDIRcemento(bls)arena gruesa (m3)piedra chancada (m3)5333.1