REPORT OH GEOCHENICAL <SOIL> SURVEYS AMD PROSPECTIHG OH THE TACHE PROPERTY
OF CHAHPIOH BEAR RESOURCES LTD.
June, 1994 Seymour M. Sears
SUMMARY
The Tache Copper/Nickel Prospect is located on the north margin of the Revell Granitic Complex. Copper /Nickel mineralization on the property is hosted by a pyrrhotite bearing gabbro-diorite lens that occurs between the granitic complex and a belt of mafic volcanic rocks. The main showing was tested by eight drill holes in 1967. Results from only one hole were reported by the Ontario Geological Survey in 1971 (Sklanka). It included two intersections (10 feet of 0.77X Cu, 0.64X Ni; 12 feet of 0.90X Cu, 0.66X, Ni).
A weak geochemical anomaly in 'B-Horizon' soils was found to be associated with the Main Showing area. The true extent of the anomaly is limited due to swampy areas, sample coverage and local sandplain. Additional soil and rock sampling accompanied by detailed geological mapping is recommended prior to drill testing.
Respectfully submitted/
Wawa, Ontario Seymour M. Sears, B.A., B.Sc, June, 1994 Geologist
52F09SE0003 2.155O4 REVELL 01OC
TABLE OF COMT1PAGE
SUMMARY ............INTRODUCTION .........PROPERTY LOCATION AND ACCESS WORK HISTORY. .........REGIONAL AND PROPERTY GEOLOGY . 1994 PROGRAM. .........CONCLUSIONS AND RECOMMENDATIONS REFERENCES ..........STATEMENT OF QUALIFICATIONS . .
i 1 1 1 55678
TABLE OF FIGURES
Fig. 1 REGIONAL LOCATION MAP .............. 2Fig. 2A ' CLAIM MAP - TACHE WEST .............. 3Fig. 2B CLAIM MAP - TACHE EAST .............. 4
LIST OF HAPS
MAP 1A PROSPECTING SKETCH - TACHE WEST ...... Back PocketMAP IB GEOCHEMICAL (SOIL) MAP - TACHE WEST .... Back PocketMAP 2A PROSPECTING SKETCH - TACHE EAST ...... Back PocketMAP 3B GEOCHEMICAL (SOIL) MAP - TACHE WEST .... Back Pocket
1
IIITItODOCTIOB
The Tache Property was acquired by Champion Bear Resources Ltd. in 1992. To date work has included a control grid, ground magnetometer and VLF-EM surveys. This report is a summary of the results from a soil sampling and prospecting program carried out in the immediate area of two reported copper-nickel occurrences.
The work was carried out by personnel of Sears, Barry and Associates Ltd during the period from May 15th to June 25, 1994. Soil samples were analysed by Bondar Clegg and Co. Ltd. of Ottawa, Ontario.
PROPERTY, LOCATION AMD ACCESS
The Tache Property is located approximately 50 kilometres east of Dryden, northwestern Ontario. It consists of two separate claim groups. The main prospect is located near the central part of Revell Township (G-1321). It is referred to in this report as the Tache West property and consists of 10 unpatented mining claims (Fig 2A) numbered as follows:
K 1144909 K 1161537K 1144910 K 1161536K 1144911 K 1161539K 1144912 K 1161540K 1144913 K 1161551
The Basket Lake Forest Access road passes through the property, approximately 3 km north of Highway 17.
The second occurrence is located near the southwest corner of Hyndman Township (G-1314). It is referred to as the Tache East property and consists of 7 unpatented mining claims (Fig 2B) numbered as follows:
K 1161544 K 1161548 K 1161545 K 1161549 K 1161546 K 1161550 K 1161547
Highway 17 passes through the southeast corner of this claim group.
WORK BISTORT
A brief history of the work completed on these properties is presented in earlier reports for Champion Bear Resources Ltd (Petak, 1992). In summary it has included trenching and diamond drilling in 1967, Regional geological mapping by the O6S (Saterly, I960) and ground geophysical surveys on behalf of Champion Bear in 1992 (Petak, 1992).
-55'
SEARS. BARRY a ASSOCIATES INC.
49*
75-
Fig. h Regional Location Map of Ontario.
I /'/•
ah > 4 H
CO r-l •-I
C « O > •H 0a 06e4 -£. *4o eg en
0 z ao x u 0Oi TJc•« E* -H
«0 H J= O O« E H O
(40«M C ̂-H > •o -o £ +J ta ija « « 0z o h6 3•H O « «t >-l 0 O OS
(4
So
u-t
hP
ar-t
o
f
HY
ND
MA
N
TT
OW
NS
Hi:
6M
Scale
1"
=
1/2
m
ile
r9M
.'
Figu
re 2b
t Clai
m Ma
p Sh
owing
Tach
e East Property of Ch
ampi
on Be
arRe
sources
Ltd. (f
rom Cl
aim
Index
Map
G-1314
/ Hyndman
Twp.)
BEGIOML AHD PROPEBTT GEOLOGY
The Tache Copper/Nickel Prospects are located on the north margin of the Revell Granitic Complex, near its contact with a sequence of Archean mafic volcanic rocks. It is generally considered that copper/nickel mineralization in both the Tache East and Tache West properties occurs within a lens of gabbro-diorite that is sandwiched between the granitic batholith and basaltic flows. The host gabbro-diorite is medium to coarse grained, dark greyish black, consisting mainly of plagioclase, hornblende, biotite, pyroxene, and local quartz.
1994 PBOGBAM
The work program involved prospecting and soil sampling over selected areas of existing grids on the two properties. This involved the collection by grub-hoe of 250 'B-Horizon' soils and fourteen days of methodical prospecting.
Tache East
The prospecting program involved systematic traversing of the Tache West grid accompanied by fill in traverses in areas of outcrop. Approximately 80 samples were collected and geologically classified. Efforts were directed towards identifying the trend and orientation of the host unit. Several old shafts and pits were located in areas underlain by sheared mafic rocks with associated barren quartz veins. The data is presented on Hap 1A.
One hundred and fifty soils were collected over two east- northeast trending zones defined from earlier ground magnetometer surveys. The survey data (Map IB) shows a number of scattered anomalous Cu and Zn values within a. general trend extending parallel to the inferred geological trend (east-northeast) from 225 S, L 200 W to 25 N, L-200 E. The highest values were from a sample taken at 50 N, L-050 W (138 ppm, Cu and 99 ppm, Ni). This sample and an adjacent sample (75 N, L 050 W) suggest a possible northwest trend. However, further sampling in this area, along with detailed mapping.
Tache Eaat
On the Tache East property three days were spent prospecting in three different areas to determine the nature of the targets. The limited data is presented on Map 2A. One day was spent in the area of the original East Showing. Copper and Nickel are hosted here by a similar gabbro-diorite to the Main Showing on Tache West. The mineralization is sparse, although the favourable rocks are relatively extensive. Ninety four (94) soil samples collected in this area (Map 3B, Area A)., designed to cover a moderate magnetic 'high' anomaly, defined only a weak southeast trending pattern of scattered anomalous Copper/Nickel. The highest sample on the grid was at 150 S, L 1500 E.
A gold showing was examined on adjoining ground in the northwest part of the claim group (Map 2A) . In thi» area a northwest trending zone of sheared mafic rocks hosts quartz veins with erratic gold values. The veining is up to 2 metres across with an envelope of ankerite and associated sulphides. Sulphides along with minor tourmaline are also scattered through the quartz. The zone was traced into swampy ground in both the north and south directions. An east west soil line (six samples) was sampled (Hap 3B,.Area B) with only background gold values.
A similar vein thought to be the southeast extension of the above prospect was located near 500 N, L 25OO E and again near 200 N, L 2700 E. In the latter area, as well as off the property to the southeast, this quartz-ankerite vein system is up to 10 metres wide.
Twenty samples have been selected for assay, but results are not yet available.
COHCLUSIOBS AMD BECOHMEHDATIOBS
The 1993 geochemical and prospecting program at the Tache Copper/Nickel Property of Champion Bear Resources indicates that the most promising mineralization occurs on the Main Prospect area on the Tache West claim group. Further soil sampling combined with detailed mapping and rock sampling in this area is likely to result in the definition of a worthy drill target.
On the Tache East property, weak copper/nickel mineralization near the Baseline at L 1300 E should also be further evaluated by rock sampling and detailed mapping. The quartz vein system in the eastern part of this claim group should be followed up with detailed sampling and mapping if analytical results from the recent prospecting program warrant.
Should results continue to be encouraging, a stripping program followed by diamond drilling will be required.
June, 1994 Seymour H. Sears, B.A., B.Sc.Geologist
ill ii i ii
Petak, H1992: Summary Report on Magnetic & VLF-EM Surveys over the
Tache Claim Group in Revell Twp. (G-1321), Dryden Area/NW-Ontario, (Kenora Mining Division); an Assessment Report for Champion Bear Resources Ltd., by Independent Exploration Services Ltd.
1992: Summary Report on Magnetic & VLF-EM Surveys over the Tache Claim Group in Hyndman Twp. (G-1314), Oryden Area/NW-Ontario, (Kenora Mining Division); an Assessment Report for Champion Bear Resources Ltd., by Independent Exploration Services Ltd.
Satterly, J1969: Geology of the Dyment Area; in ODM Volume 69, Part 6.
Ontario Geological Survey Map 2443, Kenora-Fort Francis Area, Geological Compilation Series; Scale 1" = 4 miles.
Ontario Geological Survey Assessment Files
8
STA1 IT OF OUALIFICATIOBS
I, Seymour M. Sears, of Wawa, Ontario do certify that:
1. I am a consulting geologist for Sears, Barry and Associates, P.O. Box 2058, Wawa, Ontario.
2. I am a B. Sc. Graduate in Geology and a B. A. Graduate in Psychology from Mount Allison University, Sackville, New Brunswick.
3. I have been practicing my profession continuously since 1972.
4. I am a Fellow of the Geological Association of Canada.
5. I have not received nor do I expect to receive anyinterest or securities, direct or indirect in the Property of Champion Bear Resources Ltd. nor any properties of affiliated companies.
Respectfully submitted.
22 Caverhill Street P.O. Box 2058 Wawa, Ontario POS 1KO June, 1994
Seymour M. Sears, B. A., B. Sc. Geologist
GeochemicalBondar Clegg LabInchcape Testing Services Report
REPORT: 094-41946.0 ( COMPLETE ) REFERENCE:
CLIENT: CHAMPION BEAR RESOURCES SUBMITTED BY: S. SEARS PROJECT: NONE DATE PRINTED: 2-JUN-94
NUMBER OF LOWER ORDER ELEMENT ANALYSES DETECTION LIMIT EXTRACTION METHOD
1 Au10 Gold 150 5 PPB Fire assay of 10g ATOMIC ABSORPTION2 Cu Copper 149 1 PPM HCL:HN03 (3:1) ATOMIC ABSORPTION
3 Ni Nickel 149 2 PPM HCL:HN03 (3:1) ATOMIC ABSORPTION
SAMPLE TYPES NUMBER SIZE FRACTIONS NUMBER SAMPLE PREPARATIONS NUMBER
........... . ...^^...................^
REPORT COPIES TO: R. (CANTOR INVOICE TO: R. (CANTOR
SEARS. BARRY I ASSOCIATES
FAX: MR. SEARS
Bondar-Cfegg & Company Ltd.
5420 Canotek Road, Ottawa, Onurio, KIJ 9G2, Canada
Tel: (613) 749-2220, Fax: (613) 749-7170
Bondar CleggInchcape Testing Services
GeochemicalLabReport
REPORT: 094-41946.0 ( COMPLETE )
SAMPLE ELEMENTNUMBER UNITS
Au10PPB
CuPPM
NiPPM
DATE PRINTED: 2-JUN-94 PROJECT: NONE PAGE 1
SAMPLE ELEMENTNUMBER UNITS
Au10PPB
CuPPM
NiPPM
L3+OOU 0+50SL3+OOU 0+755L3+OOU 1+OOSL3+OOU 1+255L3+OOU USDS
<5<5<5<57
4344
21
6<24519
LO+50U 3+75SLO+50U 4+OOSLO+50U 4+25SLO+50U 4+50SLO+50W 4+755
<5<5<5<514
43343
73677
L3+OOU U75SL2+OOU 0+50SL2+OOU 0+7SSL2+OOU 1+OOSL2+OOU 1+25S
<5<5<5<5<5
868510
S9588
LO+50U 5+OOSLO+50U 5+25SLO 1+OONLO 0+75NLO 0+50N
<5<5<5<5<5
339174
74<2104
L2+OOU 1+505L2+OOU 1+7SSL2+OOU 2+005L2+OOU 2+2SSLUSOU 0+50S
<5<55
<5<5
576175
3412264
LO 0+25NLO BLOLO 0+25SLO 0+50SLO 0+75S
<5<5<5<5<5
75912811
122311713
^_ LUSOU 0+75SLUSOU 1+OOSLUSOU 1+25SLUSOU USDSLUSOU 1+755
<5<5<5<5<5
4107126
S5413<2
LO 3+505LO 3+755LO 4+OOSLO 4+25SLO 4+50S
<5<5<5<5<5
33343
55487
LUSOU 2*005LUSOU 4+OOSLUSOU 4+25SL1+50U 4+50SLUSOU 4+75S
10<5<5<5<5
4101044
39665
LO 4+75SLO 5+OOSLO+SOE 1+OONLO+SOE 0+75NLO+SOE 0+50N
<5<5<5<5<5
33111110
76688
LUSOU 5+OOSLUOOU BLOLUOOU 0+255L1+OOU 0+50SL1+OOU 0+75S
<5<5<5<5<5
310154132
631574
LO+SOE 0+25NLO+SOE 3+50SLO+SOE 3+75SLO+SOE 4+OOSLO+SOE 4+25S
<511<513<5
135343
98787
LUOOU 1+OOSL1+OOU 1+255LO+50U 1+OONLO+50U 0+75NLO+50U 0+50N
7<5<566
24161962138
2314151699
LO+SOE 4+50SLO+SOE 4+75SLO+SOE 5+OOSLUOOE BLOL1+OOE 3+505
<59<5<5<5
44437
87767
LO+50U BLOLO+50U 0+255
•~ LO+50U 0+50SLO+50U 0+75SLO+50U 1+OOS
<5<5<5<55
6118811
4117925
L1+OOE 3+75SLUOOE 4+OOSL1+OOE 4+255L1+OOE 4+50SL1+OOE 4+75S
<5<5<5<5<5
23443
<27786
Boodar-Clegg & Company Lid.5420 Canotek Road, Ottawa, Ontario, KIJ 9G2. Canada
Tel: (613) 749-2220, Fax: (613) 749-7170
_ Bondar Clegg^^ Inchcape Testing Services
GeochemicalLabReport
REPORT: 094-41946.0 ( COMPLETE )
SAMPLENUMBER
ELEMENTUNITS
AulOPPB
CuPPM
NiPPM
SAMPLENUMBER
DATE PRINTED: 2-JUN-94 PROJECT: NONE PAGE 2
ELEMENTUNITS
AulOPPB
CuPPM
NiPPM
L1+OOEL1+50EL1+50EL1+50EL1+50E
5+OOS2+OON1+75N1+50N0+50N
<5<5<5<5<5
422772
86353
L3+OOEL4+OOEL4+OOEL4+OOEL4+OOE
3+OOS2+50N2+25N2+OON1+75H
<5<5<5<5<5
32333
53644
L1+50EL1+50EL1+50EL1+50EL1+50E
0+25NBLO3+50S3+75S4+OOS
<5<5<5<5<5
315443
515556
L4+OOEL4+OOEL4+OOEL4+OOEL4+OOE
1+50N2+OOS2+25S2+50S2+75S
<5<5<5<5<5
33333
45436
L1+50EL1+50EL1+50EL1+50EL2+OOE
4+25S4+50S4+75S5+OOS2+OON
<5<5<5<5<5
42446
85873
L4+OOEL5+OOEL5+OOEL5+OOEL5+OOE
3+OOS4+OON3+75N3+50N3+25N
<5<5<5<5<5
32444
4<2<2<2<2
L2+OOEL2+OOEL2+OOEL2+OOEL2+OOE
1+75N1+50N1+25N0+50N0+25N
<5<567
<5
4881115
544716
L5+OOEL5+OOEL5+OOEL5+OOEL5+OOE
3+OON2+50N2+25H2+OON1+50N
<5<519<5<5
283IS4
564IS3
L2+OOEL2+OOEL2+OOEL2+OOEL2+OOE
L2+OOEL3+OOEL3+OOEL3+OOEL3+OOE
L3+OOEL3+OOEL3+OOEL3+OOEL3+OOE
BLO3+50S3+75S4+50S4+75S
5+OOS2+75N2+50N2+25N2+OON
1+75N1+50N1+25N1+OON1+50S
9<5<5<5<5
<5<5<5<5<5
<5<5<5<5<5
195443
43422
38724
176666
63<2<2<2
545<24
L6+OOEL6+OOEL6+OOEL6+OOEL6+OOE
L7+OOEL7+OOEL7+OOEL7+OOEL7+OOE
4+OON3+75N3+50N3+2SN3+OON
4+OON3+75N3+50N3+25N3+OON
<5<5<5<5<5
<5<5<5<5<5
1047
2813
44344
357
1112
59483
L3+OOEL3+OOEL3+OOEL3+OOEL3+OOE
1+75S2+OOS2+25S2+50S2+75S
<5<5<5<5<5
54433
37736
.
Bondar-Clcgg A Company Lid.5420 Cunlek Road, Ottawa, Ontario, KIJ 9G2. Canada
Tel: (613) 749-2220, Fax: (613) 749-7170
GeochemicalBondar Clegg Lab
- Inchcape Testing Services Report
REPORT: O94-41952.0 ( COMPLETE ) REFERENCE:
CLIENT: CHAMPION BEAR RESOURCES SUBMITTED BY: S..SEARS PROJECT: NONE DATE PRINTED: 2-JUN-94
NUMBER OF LOUER ORDER ELEMENT ANALYSES DETECTION LIMIT EXTRACTION METHOD
1 AulO Gold 100 5 PPB Fire assay of 10g ATONIC ABSORPTION2 Co Copper 98 1 PPM HCL:HN03 (3:1) ATONIC ABSORPTION
3 Ni Nickel 98 2 PPM HCL:HN03 (3:1) ATONIC ABSORPTION
SAMPLE TYPES NUMBER SIZE FRACTIONS NUMBER SAMPLE PREPARATIONS NUMBER
.".".:".:. ..v;sbji:;z^^
REPORT COPIES TO: R. (CANTOR INVOICE TO: R. (CANTOR
SEARS. BARRY t ASSOCIATES
BondarOegg & Company Lad.
5420 Canolek Road, Ottawa, Ontario, KIJ 9G2, Canada
Td: (613) 749-2220, Fax: (613) 749-7170
Bondar CleggInchcape Testing Services
GeochemicalLabReport
REPORT: 094-41952.0 ( COMPLETE )
SAMPLE ELEMENTNUMBER UNITS
AulOPPB
CuPPM
HiPPM
SAMPLENUMBER
DATE PRINTED:PROJECT: NONE
ELEMENTUNITS
2-JUN-94
PAGE 1
AulOPPB
CuPPM
NiPPM
L8+OOE 4+OONL8+OOE 3+75NL8+OOE 3+50NL8+OOE 3+25NL8+006 3+OON
655
<59
441647
43535
Li 1+006Li 1+006Li 1+006L11+OOELI 1+006
2+OON1+75N1+50N1+25N1+OON
<5722<55
201410640
655518
L9+006 4+OONL9+OOE 3+75NL9+006 3+50NL9+OOE 3+25NL9+OOE 3+OON
78<5<5<5
2081055
135934
Li 1+006L12+006L12+OOEL12+OOEL12+OOE
0+75N3+50N3+25N3+OON2+75N
<5<5<5<5<5
16824177
128964
L9+OOE 2+75NL9+006 2+50NL9+OOE 2+25NL9+OOE 2+OONL9+OOE 1+75N
<5
10<5<5
6
4IS8164
<2
IS<2
3<2
L12+OOEL12+006L12+OOEL12+OOEL12+OOE
2+50N2+25N2+OON1+75N1+50N
<55<5<5<5
6137105
55556
L9+OOE 1+50NL9+OOE 1+25NL9+OOE 1+OONL9+OOE 0+75NLI 0+006 4+OON
<5
5<5<5<5
7196
2117
<23396
L12+OOEL12+OOEL12+OOELi 2+006L12+OOE
1+2SN1+OON0+75N0+50N0+25S
<5<5<5<5<5
82516710
4985
11
L10+OOE 3+75NL10+OOE 3+50NL10+006 3+25NL10+OOE 3+OONL10+006 2+75N
<5<5<55<5
264444
8<2<2<2<2
L12+OOEL12+OOEL13+OOEL13+OOEL13+OOE
0+50S0+75S2+OON1+75N1+50N
<5<5<5<5<5
98141218
71110157
L 10+006 2+50NL10+OOE 2+25NL 10+006 2+OONL 10+006 1+75NLI 0+006 1+50N
7<5<512<5
1421584
93<2<2<2
L13+OOEL13+OOEL13+OOEL13+OOEL13+OOE
1+25N1+OON0+75N0+50N0+25N
<5<55<5<5
45679
49564
L10+OOE 1+25NL10+006 1+OONL10+006 0+75MLi 1+006 3+75NLI 1+006 3+50N
176557
121585013
545
217
L13+OOEL13+OOEL13+OOEL13+OOEL13+OOE
0+00
0+25S0+50S0+75S1+OOS
<55
<5<5<5
2511181710
2451487
L11+OOE 3+25NL11+OOE 3+OONL11+OOE 2+75NLI 1+006 2+50NL11+OOE 2+25N
<5<5<5<55
328142616
27910238
L14+OOEL14+OOEL14+OOEL14+OOEL14+OOE
1+OON0+75N0+50N0+25N0+00
<5<5<510<5
326413
4<24310
Bondar-Clegg A Company Lid.5420 Canolck Road, Ottawa, Ontario, KIJ 9G2, Canada
Tel: (613) 749-2220. Fax: (613) 749-7170
Geochemical_ Boiidar Clegg Lab=^" Inchcape Testing Services Report
DATE PRINTED: 2-JUN-94 REPORT: 094-41952.0 ( COMPLETE ) PROJECT: NONE PAGE 2
SAMPLE ELEMENT AulO Cu Ni SAMPLE ELEMENT AulO Cu HiNUMBER UNITS PPB PPM PPM NUMBER UNITS PPB PPM PPM
LH+OOE 0+25S <5 5 3LH+OOE 0+50S <5 21 5LH+OOE 0+75S <5 8 6LH+OOE 1+OOS <5 13 8L15+OOE 0+50N <5 7 5
L15+OOE 0+25N <5 5 3L15+OOE 0+00 <5 8 <2L15+OOE 0+25S <5 7 3L15+OOE 0+50S <S 8 3L15+OOE 1+OOS 7 IS IS
L15+OOE 1+25S <5 6 5L15+OOE 1+50S <5 64 45L15+OOE 1+75S <5 10 4L15+OOE 2+OOS <5 12 6L17+OOE 12+50N <5 7 4
L17+OOE 12+2SN <5 9 4L17+25E 12+25N <5 17 8L17+50E 12+25N <5 7 3L17+75E 12+25N <5 8 6L18+OOE 12+25N <5 10 9
Boodar-Qegg A Company Ltd.
5420 Canotek Road, Ottawa, Onurio, KIJ 9G2, Canada
Tel: (613) 749-2220. Fax: (613) 749-7170
Ministry ofNorthern Developmentand Mines
Ontario
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number
I* 061
Personal infcnitation collected on this form is oMaiirtur^this collection should be directed to the Provincial Manager. Mining Lands. Ministry of Northern Development and Mines. Fourth Floor. 159 Cedar Street.Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.
Instructions: Please type or print and submit in duplicate- Refer to the Mining Act and Regulations
Recorder.- A separate copy of this form must be cor- Technical reports and maps must accomi- A sketch, showing the claims the work is
2.15504
52F09SE0003 2 155O4 REVELL900
Work Performed (Check One Work Group Only)
r
i
Work Group
Geotechnical Survey
Physical Work. Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from ; Reserve
-ST.,V &*+J*-
Type
•c'Ji 5l^*~i //^^O f
RECEIVED
JUL 1 9 i994
MINING LANDS BRANCH
^OJ/»ax://^7J :
i
!
Total Assessment Work Claimed on the Attached Statement of Costs 9 7 ?
Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recoroed holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
Por/kV
(attach a schedule If necessary)
Certification of Beneficial Interest * Note No. 1 on reverse side
1 certify that at the time the work was performed, the claims covered in this work
by the current recorded holder.
Dale Recorded Holder or Agent (Signature)
Certification of Work ReportI certify that I have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after
I its completion and annexed report is true.______________________ Na-ne arc Aooress of Person Certifying "
Sc Certified By (Signature)
For Office Use Only_______Tola: . a-e C' Recorded ' Date Recorded
Deemed Aporovai Date /• Date Apo'oved
Date Notice tor Arrifendmens Sent
•j w "••• -•, . ov. •- • > £
i log.-
* 2 j -~'.i.
"• o
i !
7T
?! IT,
as
hON Os r>
TV
ON•s
U» •O
ON Ui0 -0
if If
X tv CQ i3 S o :3S~i
i If o o
NJ
o c-
\
oo
\
-O 0
XJ cO
m
0o O
o o 0
Coo
COo o X O 'II!
\
1 I alu* lgned omClaim
0o o
C OQ
Si
fc
Credits you a - e : =. mmg m this report may be cut back In order to minimize the adverse effects of such deletions, please indicate fro— whict claims .C- <vish to pnorize the deletion of credits. Please mark (^) one of the following:
1. Z Creeps are to be cut back starting with the claim listed last, working backwards
{ 2. Z Credits are to be cut back equally over all claims contained in this report of work.
j 3. Z Credos are to be cut back as priorized on the attached appendix.
In the event rat you have not specified your choice of priority, option one will be implemented
Note 1: Examples of beneficial interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respec: to the mining claims.
Note 2: If work has been performed on patented or leased land, please complete the following:
I ce«..*y thai fi -=-:: - cea loice- hac a oe-e- : a- - n:e-»s! in :»e ca:?->teo Da:e
!
5
-i
fj 4
1il VakM Work Don*
||*
?
TH~x,i «^Ll
^3
x-
•x.
"""•
i
^* •
5
>\
Nl
^ N
(N
N
Ox
s:
«N
V
*
OX
N
£\
•^i^
s
X
0
IX
5
C Cc c
\ii
>
-xl
1 Cb
1
°
PO
"X.
0
i
;
,
O O
*
o o
*.
r> O
^
s«»\rr
r
1u*N
X X
N
UM Ci
-c
1
X.
o S
8 s SV5 t
^?
CD |Si"?
*i
i
f
^
o
"*
O 0
a
o O
G\
O
o
^
M oO
^.
^00
^
vj
Cft
^
*
^
e,
I
?l-*i
1*i
^J m
-o
C^
^s
J >
Oc»
xj
^NJ
o0
VJo0
-
-
%. *S 00
S
v/j/^1)
NJO
«q*
Iff!
j?f.flfJ
f
Credits you are claiming n t- s report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from ;which claims you wish tc pr orize the deletion of credits. Please mark (^) one of the following: •
1. £J Credits are to be cut back starting with the claim listed last, working backwards.2. G Credits are to be cut back equally over all claims contained in this report of work.t 1 1 f*ra/4ite ara In ha nit ha/-k ac nrinri-raei nn tho aNarhoH artnanrliv
In the event that you have not specified your choice of priority, option one will be implemented.
Note 1: Examples of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.
Note 2: If work has been performed on patented or leased land, please complete the following:
| I certify that the recorded Kc ce- "ad a t ' or leased land at tfe tirr.e -? * -.-* * a'-
' .riercst IP : Signature
Ontario
Ministry o>Northern Developmentand Mines
Miniateredu Devetoppement du Nord et det mines
Statement of Costs for Assessment Credit
£tat des coOts aux fins du credit devaluation
Mining Act/Lol sur les mines
Transaction No/N* do transaction
Personal information collected on this forr- s obtained under the authority of the Mining Act. This information writ be -sed to maintain a record and ongoing status of the mining claimfs) Ouesrcns about this collection should be directed to the Provincial Manager. Mir -$s Lands. Ministry of Northern
Floor. 159 Ceca- Street. Sudbury. iP3E 6A5. telephone (705) 670-7264
Les renseignements personnels contenus dans to presente formute sont recueriks en vertu de to Lol sur lea mines et serviront a tenir a jour un registre des concessions mimeres. Adresser toute quesiton sur la coltece de ces renseignements au chef provincial des terrains minters. ministere du Devetoppement du Nord et des Mines. 159. rue Cedar. 4« etage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.
1. Direct Costs/Couts directs
Type
Wage* SaJaJrea
Contractor's and Consultant's Fees Drottsde ('entrepreneur et de ('expert-
DescnptionAmount
Labour Main-d'oeuvre
Totals Total global j
Field Supervision Supervision sur te tersr
Type
juppHea Used FoumttunM
Type37*32
Equipment Rental Location de
Type
Total Direct Costs Total des couts directs
2. Indirect Costs/Couts indirects* * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work. Pour le remboursement des travaux de rehabilitation, tes couts indirects ne sont pas admissibtes en tant que travaux d'evaluation.
Type
Transportation Transport
Description
Type t'ciMc/r (Mil—*
Amount Montant
3£0 **
Totals ' Total global
•
i
Food andLodging Nountture et
Mobttution WK! Demobilization MobWaatlonet demobilisation i
Sub Total of Indirect Costs Total partiel des couts imfrects
Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pea 20 H dea couts directs)
Total Value of Assessment Credit (Total of Direct and Allowable indirect coata)
Vatour tolate du creditd'evehiatton(TownetMbi
JfeO
/260
Note: The recorded holder will be requires :c *=- fy expenditures claimed in this statement of costs witmn 30 days - a request for verification If verification is not made, the Minister <?> -eject for assessment worn all or part of the assessment work su=~~ea
Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans te present etat des couts dans les 30 jours suivant une demande a eel effet Si la vehfication n'est pas effectuee. le ministre peut rejeter lout ou une partie des travaux d'evaluation presentes.
Filing Discounts Remises pour depot
1 . Work filed within two years of compteton is claimed at 100% of the above Total Value of Assessme^- Credit.
i . Les travaux deposes dans les deux ans suivant tour achevement sont remboursesa 10u%delavaleurMatosusinenbonne8ducfedttd'evakation
2. Work filed three, four or five years after completion is claimed at 50% of the above Total Value of Assessment Credit. See calculations below:
i Total Value of Assessment CradiT 'otaJ Assessment Claimed i
x 0.50
2. Les travaux deposes trois. quatre ou cinq ans apres leur achevement sont rembourses a 50 % de la valeur totate du credit d'evaluation susmentionne. Voir tes calculs ci-dessous.
Vatour Wate du credit d'evaluation
x 0.50
Evaluation totato dernandee
Certification Verifying Statement o' Costs Attestation de I'etat des couts
I hereby certify:that the amounts shown are as accurate 23 possible and these costs
J atteste par la presente :que les montants indiques sont le plus exact possible et que ces
were incurred while conducting assessme^~ work on the lands shown depenses ont ete engagees pour effectuer les travaux d'evaluation on the accompanying Report of Work »c' sur les terrains indiques dans la formule de rapport de travail ci-joint
v\J~that as
(BeccKaed Hotoe- Ager! »cs-:' - Z:—-*-,I am authorized Et qu'a titre de. je suis autonse
st-e 'epreseman!. poste occupe cans la comoagme:
a faire cette anestation.
S S'.a:jrc i Dale
MM - l.AV -.
''73 9 10 11 12 1 234 ', 6"'"a Za~? re:ie (or^-_ e -:'sa- • oes 5'e ;e= esr uMse a_
OntarioMinistry of Ministere duNorthern Development Developpement du Nordand Mines et des Mines
Geoscience Approvals Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5
Telephone: (705) 670-5853 Fax: (705) 670-5863
Our File: 2.15504 Transaction /: W9410.00070
September 20, 1994
Mining RecorderMinistry of Northern Developmentand Mines808 Robertson streetBox 5200Kenora, OntarioP9N 3X9
Dear Mr. Rivett:
RE: APPROVAL OF ASSESSMENT WORK ON MINING CLAIMS K1144909 ET AL. IN REVELL AND HTNDMAN TOWNSHIPS.
The assessment credits for Prospecting and Geochemistry, sections 9 and 13 of the Mining Act Regulations, as listed on the original Report of Work, have been approved as of September 20, 1994.
Please indicate this approval on the claim record sheets.
If you have any questions concerning this submission please contact Dale Messenger at (705) 670-5858.
ORIGINAL SIGNED BY/Ron C. GashinskiSenior Manager, Mining Lands Section ining and Land Management Branch ines and Minerals Division
EM/jl closures:
cc: i/Assessment Files Office V Sudbury, Ontario
Resident Geologist Kenora, Ontario
Ontario
PLAN
6-1321TOWNSHIP
THE INFORMATION THAT APPEARS ON THIS-MAEHAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE WISHING TO STAKE MIN- ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HEREON.
G2562 S ZANNE LAKE
c-- ^•'-*'- \ *<•' I
CW506 )9 |
«•«•* SM 310-
£ - __ _ _ J
4 J N
,~fc-~:x « ;
I 40? - 1i^-. L
•••••••••••BBBBBBBBBRBBBIBBBIPBIIBBIIBHHBBB^^HI^MIIM^M*
\V,L " j H:.-J UiY^-i > "v \ 1 *>- ) v i\"
• 4,'..W_ V V /^U>'
Ministry of Ministry ofNatural Northern DoveiopmentResources and Mines
" 3
REVELL
M.NB ADMINISTRATIVE D IS1HCT
IGNACEMINING DIVISION
KENORALA.iu i ITLES/REGISTRY DIV.SION
KENORA
_ 000
1000
1MO 1WM
UC 7 _ M»tr«t
MOO 100M
Contour Interval 10 Metres
SYMBOLSBoundary
Township, Mr -dian, baseline. .....
Road allowance; surveyed.........shoreline.........
Lot/Concession; surveyed..........-^unsurveyed .......
Parcel; surveyed ... unsurveyed.
Right-of-way; road railway
ion.Cliff, Pit, Pile
ContourInterpolated....................Approximate ...... ......... .*.Depression......................
Control point (horizontal) ...... ............................... A
Flooded land...................................... i-^=-z==-=-i=i-i-ic
Mine head frame ............ ................................. a
Pipeline (above ground).......................... .—— ——
Railway; single track........ ...................... -—————_
abandoned....... ....................... -»
Road; highway, county, town- hip .................... =access ...... . . ......... ... -* - --===trail, bush......... ......................... —— ————
Shoreline (original)...... ......................... ..-•-----.......
Transmission line.................... .... .... . — ——•—
IWbodedarea......... ......... .. ...1 . .. '7 ^^
DISPOSITIO?: OF CROWN LANDSPatent
Surface & Mining Rights .......... .........................Surface Rights Only........................................ .6Mining Rights Only..........................................O
LeaseSurface & Mining Rights .................... ..................Surface Rights Only.........................................HMiningRightsOnly................................ .... . ...Q
Licence of Occupation .........................................T
OrdeMn-Coundl.............................................. OC
Cancelled .....................................................
Reservation. .................................................®
Sand & Gravel ...................................,...........©
Bwnch, Ministry of Natural Resources. »,
AREAS WITHDRAWN FROM DISPOSiTlpN
MRO- Mining Rights O.,lySRO- Surface Rights OnlyM + S - Mining and Surface Rights
OntorNe. DM* F •
REVELL TWP.
G. 1321
The disposition of land, location of iol fabric and parcel boundariM on this index was compiled for administrative purposes only.
HIGHWAY A£D ROUTE No. OTHER ROADS TRAILS SURVEYED LINES:
TOWNSHIPS, BASE LINES. ETC. •LOTS, MINING CLAIMS. PARCELS, ETC
UNSURVEYIO LINES:LOT LINESPARCEL BOUNDARYMINING CLAIMS ETC.
RAILWAY AND RIGHT OF WAY UTILITY LINES NON-PERENNIAL STREAM FLOODING OR FLOODING RIGHTS SUSDIVISION OR COMPOSITE PLAN RESERVATIONS ORIOtNAL SHORE LINE MARSH OR MUSKEG MINIS TRAVIRBf MONUMENT
DISPOSmON OF CROWN LANDS
TYPE OF DOCUMENT SYMBOL
eQ
, SURFACI ft MINING RIGHTS .„„.„..„.„." , SURPAQi RIGHTS ONLY....-.,..__........" , MINING RIOHTf ONLY -..,—....—..„.„.
LEAK, SUHFACt ft M4WING RKJHT|,..__.._._......—.. •" ,SURFAC8 RWHt«ONiY......,..-...........,_. B
, MINING RK»HT80NLY..,.,r......,_.—..—.... BLICENCf Of OCCUPATION .——...................„„_.. TORDER-W-COUNCIL _...,,..........................^. OCRiSIRVATION „...„,_.„„.„„.,..._„....„„„..„. ©CANdLLID __.,...„.....„....,...„..„.....„... 9SANOftflRAVEL —................................. £>
REFERENCES
TH€ WFQfl* AP*iAP» Of HAS BfEN
WtftHWG TOCLAIMS G
SUlt WTTH fWOQMMR, I NORTHERN
_ MENTANDM1 TpfATIVE DISTRICT DiTIQNAk
ON THf STA LANDS SNOWDRYDEN
Mining iivnioiKENORAl*M Tinil^mQIITRY BIVI
KENORA
MNtlryof MWttry ofNorthern D«vdopnrMntBV10 MSIM
HODGSON TWP. G-I3I4
52F09SE0003 2 15504 REVELL 210TRIM UNC
uo ois
GOO H
500 N
400 N
4OO S
S
V-
l_
T
SIMPLIFIED LEGEND
GABDRO: Massive, black, lediui to coarse grained.
GABBRO-DIORITE: Massive, greyish black, lediui grained.
DIORITE: Massive, grey, •ediui to Cine grained.
SHEARED MAFIC: Variably sheared ufic to intermediate rocks, licaceous, fine to lediui grained, carbonated.
PIIE 6UIKD HIFIC TO IDTHMEDIATE ROCKi Poiiibly chiliad of tltovc mitt or rift of country roeka.
SYMBOLS
Claim Post
>• Trenches
^ SwampCi Sh«-f^ » r *••>
Scale 1:2500
100m
CHAMPION BEAR RESOURCES LTD-
TACHE WEST
(Revel1 Townahlp, Ontario)
PROSPECTING SKETCH
M«ms>
&^ ILJ.
52FOOSE0003 2 16604 REVELU 220
,r\.
;
. A
\
A
' A
A
A
Ln
I cn
.
cn
Ln
fcn
SIMPLIFIED LEGEND
6ABBRO: Massive, black, iediui to coarse grained.
GABBRO-DIOR1TE: Hassive, greyish black, lediui grained.
DIORITE: Hassive, grey, lediui to fine grained.
SHEARED HAFIC: Variably sheared lafic to intermediaterocks, ilcaceouR, fine to lediui grained, carbonated.
FINE GRAINED NAFIC TO INTERMEDIATE ROCK: Possibly chilled •argin of above units or raft of country rocks.
Map 2, Area B
To. c Jc /^ f IPrat pec. te.1
CHAMPION BEAR RESOURCES LTD
TACHE EAST PROPERTY
(Hyndnan Townahlp* Ontario)
PROSPECTING SKETCH
400 N
W
O O
M
O O
uO O 0)H
*O f)
<5 7 4 -^
1200 M1 : :j_^_^_!\ <5 9 4
<5 10 9
(\
Aul Cu Hi ............
006
100 M
.— *~ <5 7 2——— — — - __ ̂
s 19 3 c;<5 6 3 ^
<5 21 9
•*«^^^^^^^^^PBPB^^B^^WBI<5 4 2 ^ ̂̂____^^
6 15 1 ,^'-
5 8 5 -^
Baaellna C
N<>
KUmHHUDO62F08SE0003 2.18604 REVELL
1
— — ——— )
<5 6 5
"~5 "4V 18
-
00) ___
<S5^ H
<5 8 4
<5 25 9
<5 16 8 '
<5 7 5
<5 10 11f "^
<5 8 11
-
1OO S
^^ — til<5 4 4
<5 5 9
565
<5 7 6
<5 9 4 C^
<&V25 24J XJ <*"•"^ o5 11 5
r<5 IB 14 x;
<5 17 8 H
<5 10 7
OO U1
<5 3 4 H
<5 2 2
(564
^0\4 3
<S 13 10 —————————
<5 5 3X<5 21 5
<5 8 6
<5 13 8
'^•^
200 S
<5 7 5
<5 5 3
-*5_4- -J-
<5 7 3
<5 8 3
7 is is
<S 6 5V
§!S<5 12 6
'•^^^^^^^••^••••^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^•iBI^^^^^HHPMFr9^^ *r^y * '- *HHy ^y j^w™" i
Scale 1:2500•\^.
aO 'vk-ay
> A
OHANP xoN BEAR RESOURCES ....>-
T flli f^ w j ^^* K«* a^. ^C5 *TP* "1^^ aC9 ^^^ ir^ '^^^ "VZfr *W ^^^ ^L. 4T«k ^i— r M A W^~r F TT ** *^9 -»- .». «^L> ^— * ̂ _ »^- m^k. _•- -K-
(Hyndman Townahip. Ontmrio)
C3EOCHEMICAL CSOIL> SURVEY
^Jll.-'f