Route 460 Corridor Improvement Project Independent Review Panel (IRP) Recommendations to the Commonwealth Transportation Board (CTB) Alan S. Witt, Chairman June 20, 2007

Upload: vandieu

Post on 17-Apr-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Route 460 Corridor Improvement Project

Independent Review Panel (IRP)

Recommendations to the Commonwealth Transportation Board (CTB)

Alan S. Witt, ChairmanJune 20, 2007

Page 2: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Project Description

- Located between I-295 (Petersburg) and Route 58Suffolk), South of Existing Route 460

- 55 miles long, four-lane divided, limited access hwy.with nine interchanges

- Part of the National Highway System & Strategic Highway Network

- Existing Route 460 was widened to four lanes in the1950’s and has no medians or shoulders

- New roadway needed to address safety, freight traffic,military connectivity, hurricane evacuation capability, and meet legislative mandates

Page 3: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Background

-Fourteen Member Panel Selected by theSecretary of Transportation

-Received Input from Impacted Jurisdictions-Panel Held Four Meetings to Include OneDedicated to Receiving Public Comments

-Meetings Were Open to the Public andHeld at Various Locations Along the Corridor

Page 4: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Purpose of the IRP

- Review and Evaluate the ThreeConceptual Proposals (Cintra, Itinere,VCP)

- Recommend Proposals to Advance to theDetailed Review Phase

- Provide Recommendations to Support Successful Project Development and Implementation

Page 5: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

IRP Considerations

- Qualified and Capable Proposal Team- Technically Feasible Proposal- Viable Proposal Financial Plan- Input from Affected Jurisdictions- Input from the Public

Page 6: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- All Three Proposals Advance to the Detailed Proposal Phase

- Study the Innovative Option forImprovements to the I-64 Corridor(Richmond to Hampton Roads) Independent from the Route 460 Project

Page 7: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations- VDOT Should Identify Innovative or AcceptableProject Scope Changes to Improve Project orReduce Costs

- Detailed Proposals Should Consider Impacts ofthe Proposed Project Upon:

Adjacent Secondary RoadsAccess to Impacted PropertiesWetlands, Agricultural, historical and Residential Properties

Page 8: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- Corridor InterchangesConduct Operational Analysis of Eastern and Western Termini to Define a More Effective Location and Design Determine Minimum Number and Location of Corridor Interchanges to Facilitate Traffic and Emergency EvacuationDevelop a Methodology to Determine Phased Development of any Additional Future Interchanges

Page 9: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- Determine Project Requirements relatedto the VDOT Policy for Integrating Bicycleand Pedestrian Accommodations

- Detailed Proposals Should IncludeSpecifics on Improvements to Existing Route460 and Associated Costs

- Detailed Proposals Should Include IncentiveOptions to Encourage Freight and throughTraffic to use the new Route 460

Page 10: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- Detailed Proposals Should Identify Activities theProposer is Able to Perform to Keep Project onSchedule and Defer Responsibilities and Costsfrom the Commonwealth

- Detailed Proposals Should Include TechnicalRequirements, such as Hydraulic Analysis andFlood Plain Design Parameters, for BaselineDesign

Page 11: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- Detailed Proposals Should Include aStrong Public Outreach Program

- Detailed Proposals Should Include SpecificToll Rates and Timing/basis for Escalationsover the Life of the Concession

- Detailed Proposals Should Include Planned Start and Completion Dates, Actions to Acceleratethese Dates, and Impacts of these actions

Page 12: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- VDOT Should not Issue a Request forDetailed Proposal until the Project isIncluded in the Appropriate ConstrainedLong Range Plans (CLRP)

- VDOT Should Establish a Relationshipwith the Hampton Roads TransportationAuthority

Page 13: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Recommendations

- VDOT Shall Perform a ComparativeFinancial Analysis of the Various Financing Methods to Determine a Feasible Mix of Sources to Support theCompletion of this Project

Page 14: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Route 460 Independent Review Panel

Any Questions?

Page 15: Route 460 Corridor Improvement Project … 460 Corridor Improvement Project Independent Review Panel ... Long Range Plans ... Route 460 Corridor Improvement Project Independent Review

Route 460 Corridor Improvement Project

Independent Review Panel (IRP)

Recommendations to the Commonwealth Transportation Board (CTB)

Alan S. Witt, ChairmanJune 20, 2007