Ronald A. Jones Vice President New Nuclear Operations September 25, 2014 NND-14-0449 10 CFR 50.90 10 CFR 52.63 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Combined License Nos. NPF-93 and NPF-94 Docket Nos. 52-027 & 52-028 Subject: LAR 14-05 S1 License Amendment and Exemption Request: Containment Internal Structural Wall Module Design Details Reference: 1. Southern Nuclear Operating Company, ND-14-0748, Vogtle Electric Generating Plant Units 3 and 4 LAR-14-001 R0 License Amendment Request: Containment Internal Structural Wall Module Design Details 2. South Carolina Electric & Gas Company (SCE&G) LAR 14-05 Request for License Amendment: Containment Internal Structural Wall Module Design Details July 17, 2014 (NND-14-0390) [ML14202A088] 3. South Carolina Electric & Gas Company (SCE&G) PAR 14-05-A Request for Preliminary Amendment: Containment Internal Structural Wall Module Design Details September 25, 2014 (NND-14-0582) In accordance with the provisions of 10 CFR 50.90, South Carolina Electric & Gas Company (SCE&G) requests an amendment to the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 combined licenses (COLs) numbers NPF-93 and NPF-94, respectively. Pursuant to the provisions of 10 CFR 52.63(b)(1), an exemption from elements of the design as certified in the 10 CFR Part 52, Appendix D, design certification rule is also requested for the plant-specific DCD Tier 1 material departures. The purpose of this letter is to notify the NRC of a change of scope for this LAR and Exemption Request with respect to the original submittal in letter NND-14-0390 dated July 17, 2014 (Reference 2). The requested change in scope effectively eliminates the CA02 containment internal structural wall module from the scope of this LAR and Exemption Request. Calculation APP-CA02-S3C-004, “CA02 Module Detailed Analysis and Qualification Report,” which evaluates the out-of-plane shear loadings on the CA02 in-containment structural wall module has been completed. This calculation addresses mechanical loading only; a separate SCE&G New Nuclear Deployment ● P. O. Box 88 ● MC 800 ● Jenkinsville, South Carolina 29065 ● www.sceg.com

Upload: others

Post on 11-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ronald A. Jones New Nuclear Operations · by transmitting a copy of this letter and enclosures to the designated State Official. Should you have any questions, please contact Mrs

Ronald A. Jones Vice President

New Nuclear Operations

September 25, 2014 NND-14-0449

10 CFR 50.90 10 CFR 52.63

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Combined License Nos. NPF-93 and NPF-94 Docket Nos. 52-027 & 52-028 Subject: LAR 14-05 S1 License Amendment and Exemption Request: Containment

Internal Structural Wall Module Design Details Reference: 1. Southern Nuclear Operating Company, ND-14-0748, Vogtle Electric

Generating Plant Units 3 and 4 LAR-14-001 R0 License Amendment Request: Containment Internal Structural Wall Module Design Details

2. South Carolina Electric & Gas Company (SCE&G) LAR 14-05 Request for License Amendment: Containment Internal Structural Wall Module Design Details July 17, 2014 (NND-14-0390) [ML14202A088]

3. South Carolina Electric & Gas Company (SCE&G) PAR 14-05-A Request for Preliminary Amendment: Containment Internal Structural Wall Module Design Details September 25, 2014 (NND-14-0582)

In accordance with the provisions of 10 CFR 50.90, South Carolina Electric & Gas Company (SCE&G) requests an amendment to the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 combined licenses (COLs) numbers NPF-93 and NPF-94, respectively. Pursuant to the provisions of 10 CFR 52.63(b)(1), an exemption from elements of the design as certified in the 10 CFR Part 52, Appendix D, design certification rule is also requested for the plant-specific DCD Tier 1 material departures.

The purpose of this letter is to notify the NRC of a change of scope for this LAR and Exemption Request with respect to the original submittal in letter NND-14-0390 dated July 17, 2014 (Reference 2). The requested change in scope effectively eliminates the CA02 containment internal structural wall module from the scope of this LAR and Exemption Request.

Calculation APP-CA02-S3C-004, “CA02 Module Detailed Analysis and Qualification Report,” which evaluates the out-of-plane shear loadings on the CA02 in-containment structural wall module has been completed. This calculation addresses mechanical loading only; a separate

SCE&G New Nuclear Deployment ● P. O. Box 88 ● MC 800 ● Jenkinsville, South Carolina 29065 ● www.sceg.com

Page 2: Ronald A. Jones New Nuclear Operations · by transmitting a copy of this letter and enclosures to the designated State Official. Should you have any questions, please contact Mrs

Document Control Desk N N D-14-0449 Page 2 of 3

analysis is being performed to address the thermal stresses on the module in accordance with the methodology previously provided. These analyses evaluate the out-of-plane shear loadings on the in-containment CA02 structural wall module that will determine the size of the steel plates, structural shapes, reinforcement bars, or tie bars and their embedment lengths needed to meet the applicable requirements of ACI 349 and AISC N690.

The thermal load calculation has been delayed and is expected to be completed and archived by November 7, 2014. Therefore, SCE&G is removing in-containment structural wall module CA02 from the scope of this LAR and Exemption Request. The change in scope strictly applies to the request for the use of steel plates, structural shapes, reinforcement bars, or tie bars between module faceplates for in-containment structural wall module CA02 to support localized loads and ensure compliance with applicable codes.

The requested amendment proposes to depart from Tier 2* information in the Updated Final Safety Analysis Report (UFSAR), plant-specific Tier 1 and corresponding COL Appendix C information, and involved UFSAR Tier 2 information to address changes in the UFSAR and design documents related to containment internal structural wall module design details.

This supplemental letter does not impact the conclusions of the technical evaluation, regulatory evaluation (including significant hazards consideration determination), or environmental considerations of the original LAR or exemption request.

In order to support the VCSNS Unit 2 construction schedule, a PAR (Reference 3) will be requested concurrently with this letter.

This letter contains no regulatory commitments.

In accordance with 10 CFR 50.91, SCE&G is notifying the State of South Carolina of this LAR by transmitting a copy of this letter and enclosures to the designated State Official.

Should you have any questions, please contact Mrs. April Rice by telephone at (803) 941-9858, or by email at [email protected].

I declare under penalty of perjury that the foregoing is true and correct.

on A. Jones Vice President New Nuclear Operations

MMD/RAJ/mmd

Page 3: Ronald A. Jones New Nuclear Operations · by transmitting a copy of this letter and enclosures to the designated State Official. Should you have any questions, please contact Mrs

Document Control Desk NND-14-0449 Page 3 of 3 copy (with enclosures):

Denise McGovern Ravindra Joshi David Jaffe [email protected]

copy (without enclosures):

Tom Fredette Victor McCree Jim Reece Stephen A. Byrne Jeffrey B. Archie Ronald A. Jones April Rice Alvis J. Bynum Kathryn M. Sutton Justin Bouknight Dean Kersey Mohamed Mory Diané Matthew Kunkle Matthew Presson Brian Bedford Margaret Felkel Cynthia Lanier Amy Aughtman Christopher Levesque Dan Churchman Joel Hjelseth Brian McIntyre Zach Harper Joseph Cole Curt Castell Ken Hollenbach Susan E. Jenkins William M. Cherry Rhonda O’Banion VCSummer2&[email protected] vcsummer2&[email protected]