Page 1: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

CENTER OF TECHNOLOGY AND ENGINEERING FOR NUCLEAR PROJECTS

Romanian Authority for Nuclear Activities

Page 2: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

GENERAL INFORMATION

CITON is part of the Romanian Authority for Nuclear Activities (RAAN) an Romanian state company

CITON main activity is dedicated to Design and Engineering works for Nuclear Projects and to Research and Development studies associated with the implementation of National Nuclear Program.

Page 3: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

GENERAL INFORMATION

The Romanian Authority for Nuclear Activities (RAAN ) structure and organizing chart is presented as follows:

Page 4: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

CITON’S SCOPE OF SERVICES

CITON can provide the entire range of design and engineering products for the fulfillment of power objectives: Research and development studies Technical and Economic Feasibility studies Conceptual technical designs Detail designs (documentation and drawings) Licensing and environmental impact engineering support Equipment manufacturing designs Special Analyses Reports (Nuclear Safety and Performance, Environmental Impact, Stress

Analyses, Accident Analyses, Risk Assessments, Seismic Hazard Assessments, etc) Engineering services for operating nuclear power plants and facilities:

Operation and maintenance support Start-up and commissioning support Plant life extension, upgrading, power up rating, retrofitting and performance enhancement

Expertise and Consulting Reports Quality Assurance and Control Services Technical Training Services Technical Assistance and Field Engineering.

Page 5: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

CITON MAIN DIAGRAM

Page 6: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

CITON CERTIFICATIONS

CITON is licensed to develop activities of research and development studies and design and engineering work for structures, systems, components, products and services for nuclear power plants and other nuclear facilities. The license for the right to develop such activities in the nuclear field has been provided to CITON by Romanian regulatory body CNCAN (The National Commission for Nuclear Activities Control);

CITON has also established and implemented a Integrated Management System certified according to ISO 9001, ISO 14001 and ISO 18001 standards.

Page 7: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (1)

Design and Engineering Services Basic Design Documentation License and Safety Documentation Technical Assistance Consulting services Research and Development Services

Page 8: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (2)

Design and Engineering Services • Studies and Documentation supporting the client’s decision-marketing:

Prefeasibility and Feasibility studies; Technical-Economical evaluation studies; Production profile optimization Site selection studies; Modernization and safety enhancement conceptual studies; Environmental impact studies; Risk evaluation reports Wastes management programs Bids requirements and bids evaluation reports.

Page 9: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (3)

Basic Design Documentation Technical conceptual design as base for technical-economical evaluation

of the investment and as support for regulatory bodies approvals/permits. Detail design documentation:

Documents and drawings required for construction and systems installation;

Basic requirements and design analyses documents (thermal and hydraulic computation, stress reports, radiological consequences of abnormal and accident states);

Manufacturing drawings/documents for selected equipment/components;

Procurement engineering documentation. As-built design documentation for configuration control.

Page 10: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (4)

License and Safety Documentation Licensing documentation:

Initial Safety Analyses report (for site approval); Preliminary Safety Analyses report (for construction permit); Final Safety Analysis Report (for commissioning permit).

Safety support documentation Accident analyses; Safety design matrices; Systems acceptance safety documentation;

Probability analyses for safety and interface systems; Establishment of technical limiting conditions for safe operation; Severe accident analyses and emergency program and associated

procedures.

Page 11: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (5)

Technical Assistance On-site permanent technical assistance group of different

professional disciplines staff as contractually required for field engineering and quality survey;

Technical assistance in all phases on implementing line of the design done by CITON.

Page 12: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (6)

Consulting services Based on Cernavoda NPP and other nuclear projects

experience in Romania CITON can assure the consulting and expertise services in practically all design and engineering areas of projects development and implementation phases.

Page 13: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

SERVICES OFFERED (7)

Research and Development Services Nuclear safety – developing accidents management

strategies and radiation protection; Nuclear power technology-supporting technological

upgrading and advances; Back-end of the fuel cycle-safe and efficient

management of spent nuclear fuel and highly radioactive wastes;

Nuclear policy – supporting the establishment of the national nuclear policy.

Page 14: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

EXPERIENCE (1)

CITON provided Design and Engineering services as main contractor or General Design Authority for the following major projects and customers: Design and engineering services for the Institute of Atomic Physics (nuclear

research center) located in Bucharest-Magurele:

Design and engineering services for the Institute of Nuclear Research in Pitesti-Mioveni (former Institute for Nuclear Power Reactors, a nuclear research and production center).

Design and technical assistance services for the Nuclear Fuel Factory for CANDU-6 type nuclear fuel production unit (former Institute for Nuclear Power Reactors).

Design, technical assistance and consulting services for the National Society "Nuclearelectrica" for the implementation in all phases of the Cernavoda Nuclear Power Plant 5 units x 700 MWe equipped with CANDU-6 nuclear power reactors

Page 15: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

EXPERIENCE (2)

Design, technical assistance and expertise services for ROMAG - Drobeta Turnu Severin for the heavy water fabrication plant

Design and consulting services for National Uranium Company related to uranium ore processing and concentration units up-grading.

Design and technical assistance for the Institute of Physics and Nuclear Engineering "Horia

Hulubei" (Bucharest-Magurele) for the retrofitting and upgrading of the low and intermediate level radioactive wastes storage repository located in Baita-Bihor.

Development studies for the former Ministry of Electrical Power and State Committee for Nuclear Energy for the implementation of second romanian NPP.

Research and Development Studies for the Ministry of Economy and Trade / RAAN within yearly approved Research Program as support for National Nuclear Program (new technology adaptation and development, nuclear safety and radiation protection improvement, radioactive wastes management, operational reliability enhancement, extension of service life, etc).

Page 16: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (1)

Design and Engineering Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979-1991) and as Design and Engineering main contractor (1992-2013). Major works: NPP program development study (optimum type of reactor, establishment of unit power, integration in national power

grid, etc); Site selection study; Optimum lay-out certification study; Feasibility study; Safety and licensing support documentation; Environmental impact studies; Probabilities safety analysis (PSA) level1 study (Unit 1); Project documentation (based on CANDU-6 reactor license and in cooperation with AECL (Canada) and Ansaldo

(Italy), conceptual technical design and detail design for all disciplines) for construction/installation and commissioning of the units (Unit 1 - commercial operation since 1996, Unit 2 - under construction, 2007 planned start-up, Unit 3,4 and 5 - in preservation).

Procurement engineering for components supply by Romanian manufacturers; On-site permanent technical assistance (field engineering and quality survey, integration in Project Management

team); As-built documentation (Unit 1); Operation engineering support services (Unit 1); Technical assistance on manufacturing line for components designed by CITON Precontractual works for Cernavoda 3&4 project

Page 17: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (2)

Design and Engineering Institute for Atomic Physics (Institute for Physics and Nuclear Engineering, IFIN-HH) CITON - General Design and Engineering Authority Major recent works: Support designs for the assessment of the VVR-S nuclear research reactor

decommissioning strategy and schedule; Feasibility study and support safety documentation for the VVR-S

decommissioning; Conceptual technical documentation for Radioactive Water Treatment Plant;

Upgrading; Conceptual technical documentation and Detail Design for the construction

and commissioning of Gamma Irradiator Facility, including Safety and Licensing support documentation and technical assistance;

Technical-economical study for the up-grading of National Low and Intermediate Radioactive Wastes Storage Repository in Baita-Bihor.

Page 18: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (3)

Design and Engineering ROMAG - Drobeta Turnu Severin heavy water plant (Subsidiary

of RAAN) CITON - General Design and Engineering Authority Recent works: Conceptual and detail design to implement a new survey

and control system for the H2S leakage detection; Studies related to service life extension of the existing

assets; Support design documentation for the up-grading of the

process systems; Technical assistance and Expertise service.

Page 19: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (4)

Design and Engineering Institute for Criogenics and Isotope Separation -ICSI - Ramnicu Valcea CITON - General Design and Engineering Authority Recent works: Conceptual technical design and detail design for the

construction and commissioning of The Detrititation Pilot Plant

Studies and design for the implementation of the Detritiation Plant at Cernavoda NPP.

Support Safety and Licensing documentation for these Detritiation Plants;

Page 20: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (5)

Design and Engineering Other Cernavoda NPP Platform Facilities (Owner - CNEPROD, subsidiary of S.N. Nuclear Electrica S.A.) CITON - Main Design and Engineering Contractor Major works: Conceptual technical design (in cooperation with CAE - Canada), detail

design and technical assistance for the Cernavoda NPP Personnel Training Center equipped with full scope simulator;

Safety and Licensing documentation, Conceptual technical design (in cooperation with AECL - Canada), Detail design and technical assistance for the Cervanvoda NPP (Unit 1 and 2) Spent Fuel Intermediate Day Storage Facility;

Development and sitting studies for the Final Radioactive Wastes Treatment and Storage Facility near Cernavoda NPP Platform (Client - ANDRAD).

Page 21: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (6)

Design and Engineering Institute for Nuclear Research - Pitesti (Subsidiary of RAAN) and Nuclear Fuel Factory - Pitesti (Subsidiary of S.N. Nuclearelectrica S.A.) CITON - Main Design and Engineering Contractor Recent works: Studies related to existing facilities retrofitting,

up-grading, safety enhancement and service life extension

Page 22: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (7)

Domestic R&D Programs and Projects CITON is involved constantly in the Ministry of Economy and Trade's R&D Programs supporting the National Nuclear Programme and Ministry of Education and Research's R&D Projects in the energy and environment protection field.

Page 23: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

REFERENCE PROJECTS (8)

International Research and Development Cooperation Programs SITON has active and fruitful international cooperation relations with foreign nuclear-related institutes and organizations. A significant feature of the international cooperation during last years was the technical – scientific activity realised through the Romanian participation in the EU 5th and 6th Framework Programmes (FP), PHARE projects and bilateral cooperation with EU institutes. It is worth mentioning the traditional cooperation of CITON with the International Atomic Energy Agency (IAEA) through national and regional technical cooperation projects or through participation in coordinated research projects. An important element of international cooperation was the continuous participation of CITON experts in a series of IAEA Advisory Groups, Technical Committees and International Symposia and Conferences.

Page 24: Romanian Authority for Nuclear Activities CENTER OF ... · Cernavoda NPP - 5x700 MWe (S.N. Nuclear electrica S.A.) CITON acted as General Design Authority (1979 -1991) and as Design

CITON INTERNATIONAL CO-OPERATIONS

Adequate results and high-standard cooperation with well-known partners have made CITON a reliable and attractive partner. AECL (Canada) ,Ansaldo Impianti (Italy) and General Electric (USA) for Cernavoda Nuclear Power Plant Units 1 and 2 General Atomic (USA) for The Institute of Nuclear Research Pitesti concerning Triga Research Reactor Ateliers et Chantiers de Bretagne (France) for The Institute of Nuclear Research, Hot Cells and Post – Irradiation Lab (LEPI) PEC (France) for The Institute of Nuclear Research, Radwaste Treatment Plant Agreement with General Society for New Technology - SGN (France) - for radwaste treatment CAE Canada for "full scope" simulator - for Cernavoda NPP personnel training AECL ( Canada) for Spent Fuel Intermediate Dry Storage for Cernavoda NPP – Units 1 and 2 Agreement with SKB (Sweden) in the radwaste storage field. Cooperation within Europe Union’s research programs (FP5, FP6, Phare) and IAEA (Vienna)technical assistance projects