rocky's toronto marine museum
TRANSCRIPT
![Page 1: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/1.jpg)
By: Rocky Leong
100702868
![Page 2: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/2.jpg)
The museum complex shall utilize technology
innovations and construction materials that will
combine to create an environmentally friendly
and sustainable building. Its design shall convey
a sense of a ship that is moving from the view
from the highway, while enabling guests in the
complex to have a view of the lake.
![Page 3: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/3.jpg)
Location:351 Lakeshore Blvd.
-Building outlined in red
-Footprint : 913.4 sq.m
-Length : 148m
-Width : 75m
-Height :11m
-The building is arrayed so
that solar panels receive the
most amount of sunlight.
- Grey area designates paved
area
P = Parking Area
D = Drop-off Area
E.P = Employee’s Parking
Area
- Blue area designates water
ponds for launching model
ships created in the museum,
or area for people to skate in
the winter times
P
P
P
D
E.P
![Page 4: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/4.jpg)
![Page 5: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/5.jpg)
![Page 6: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/6.jpg)
![Page 7: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/7.jpg)
![Page 8: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/8.jpg)
Building material include glass curtain walls, stucco finish and
steel cladding for the ship-like structure for the second floor,
and LEED materials
![Page 9: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/9.jpg)
![Page 10: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/10.jpg)
![Page 11: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/11.jpg)
![Page 12: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/12.jpg)
![Page 13: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/13.jpg)
Utilizing a combination
of solar panels and wind
turbines, the building
lowers its dependence
on the city’s power
grid, and can even sell
extra electricity back to
the city.
![Page 14: Rocky's toronto marine museum](https://reader030.vdocuments.mx/reader030/viewer/2022032421/55a64faf1a28ab88348b4764/html5/thumbnails/14.jpg)
GraniteCrete
- Pavement alternative
- Wide range of colours
Pioneer Millworks Engineered Flooring
- Consists of reused wood
- Uses low-VOC glue to put togetherThermaRock XI
- A specialized thermal
resistance drywall
- R value from R-2.5-4.1
compared to standard R-0.5
drywall
Thermafleece- Roll insulation
made from wool
- Can be used for
roofs and walls