rock removal on the middle mississippi river
DESCRIPTION
Rock Removal on the Middle Mississippi River. RRAT 2014. Navigation Channel Design. Develop a Reliable, Safe, and Environmentally Sustainable Navigation Channel on the Middle Mississippi River. 1,500 feet long. 9 feet deep. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/1.jpg)
BUILDING STRONG®1
Rock Removal on the Middle Mississippi River
RRAT 2014
![Page 2: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/2.jpg)
BUILDING STRONG®2
9 feet deep
1,500 feet long
Navigation Channel Design
During low water periods required to maintain a 9 feet deep and a minimum of 300 feet wide navigation channel, with
additional width in bends
Develop a Reliable, Safe, and Environmentally Sustainable Navigation Channel on the Middle Mississippi River
![Page 3: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/3.jpg)
BUILDING STRONG®
Why is River Industry Important
3
![Page 4: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/4.jpg)
BUILDING STRONG®
Regulating Works Project Benefits vs. Costs
4
![Page 5: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/5.jpg)
BUILDING STRONG®5
Pools vs Open River
MVS
Pools 300-195
Open River 195-0
![Page 6: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/6.jpg)
BUILDING STRONG®6
Lock & Dam #24, Clarksville, MO
Pools: Impounded Mississippi RiverUpper River (RM 300-195)
![Page 7: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/7.jpg)
BUILDING STRONG®7
Tools To Maintain Navigation(Open River RM 195-0)
Dikes and other Rock Structures
Weirs
Revetments
Dredging
Rock Removal
![Page 8: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/8.jpg)
BUILDING STRONG®8
Rock RemovalWhat are we trying to remove?
MVS N
NThebesGrand Tower
Mississippi River
![Page 9: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/9.jpg)
BUILDING STRONG®9
Problem Statement
Low Mississippi River stages will impact the St. Louis Districts’ ability to maintain the navigation channel at authorized project dimensions, in the Thebes Reach (RM
46-38) and Grand Tower Reach (RM 80-79), in the mid-December 2012.
Pinnacle Rock
Thebes Reach
![Page 10: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/10.jpg)
BUILDING STRONG®10
Phase 1 Engineering AnalysisPinnacle Rock Impacts at Thebes Reach
St. Louis from -5.0 to -7.0A-Minimum
B-Unacceptable
GTA B C D E F G H
-3.0 - -4.0 300+ 300 300 300+ 300+ 300+ 300+ 300-4.0 - -5.0 300 300 300 300 300 300 300+ 300-5.0 - -6.0 300 300 300 190 300 300 NONE 150-6.0 - -7.0 300 150 300 170 300 300 NONE 150
A
M
U
Minimally Acceptable for a 20 (4x5) Barge Tow (300 ft maximum channel or
will have less than 9' depth)
ST. L
OU
IS
GAG
ETHEBES
Acceptable Channel Condition for a 20 (4x5) Barge Tow (300+ ft wide channel)
questionable channel width to flank through bend or for alignment purposes.
Unacceptable Channel Conditions for a 15 (3x5) Barge Tow (channel
C-Minimum
D-UnacceptableE-Minimum
F-Minimum
G-Unacceptable
![Page 11: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/11.jpg)
BUILDING STRONG®11
PHASE 1: • Accomplishes a 300 ft minimum channel in 4 locations that previously had insufficient width and depth.• The resultant channel can only support 15 barge tow. Larger tows must “double-trip” or break their tow apart and take
individual pieces separately through the reach.
PHASE 1 MILESTONES • 7 December 2012 – Decision made to go Urgent & Compelling
- Award 2 contracts based on sources sought query (Newt & Durocher)• 7 December 2012 – Received verbal approval on Justification & Approval• 7 December 2012 – Contract award. Letter contracts 50% ROM, Newt & Durocher • 11 January 2013 – Minimum channel requirements achieved through Thebes Gage 0’ (approx -7’ STL Gage)• 29 January 2013 – Contracts definitized to include modifications• 27 February 2013 – Phase 1 Completed• 1,000 cubic yards of material was removed at a cost of $8M
Rock Pinnacle Removal Phase 1
This what a 20 barge tow may look like trying to navigate through a 300 ft wide channel. Notice that there is no roomfor error considering the boxes along the channel border show additional phases of rock removal.
Acceptable Channel Condition for a 20 (4x5) Barge Tow (300+ ft wide channel)
Minimally Acceptable – at risk for a 20 (3x5) Barge Tow (300 ft maximum) channel or questionable channel width to flank through bend or foralignment purposes.
What Phase 1 Accomplished Thebes A B C D E F G H
3.9 - 3.0 300+ 300+ 300 300+ 300+ 300+ 300+ 300+
2.9 - 2.0 300+ 300+ 300 300+ 300 300 300+ 300+
1.9 - 1.0 300+ 300+ 300 300+ 300 300 300+ 300+
0.9 - 0.0 300+ 300+ 300 300+ 300 300 300+ 300+
A BC
D
G
E F
![Page 12: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/12.jpg)
BUILDING STRONG®12
Rock Pinnacle Removal
Typical view of rock formation impacting the navigation channel
Navigation Channel
DS View - Rock Pinnacles near River Mile 41, Thebes, IL
![Page 13: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/13.jpg)
BUILDING STRONG®13
Rock Pinnacles at River Mile 38.5Thebes Reach
Illinois Missouri
300 ft Minimum Channel
Phase 2 Rock Removal
Highest Pinnacle
Provided Cross Section
![Page 14: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/14.jpg)
BUILDING STRONG®14
Current Water Level
Removal Elevation
River Bed
Low Water Channel
Water Depth at 0 Thebes (9 ft Channel After Removal)0 Thebes (9 ft)
Water Depth at 1-29-13 0800 was 5.8 ft at Thebes
2 Thebes (11 ft)
4 Thebes (13 ft)
6 Thebes (15 ft)
1 Thebes (10 ft)
-1 Thebes (8 ft)
-2 Thebes (7 ft)
3 Thebes (12 ft)
5 Thebes (14 ft)
7 Thebes (16 ft)
8 Thebes (17 ft)
-4 Thebes (5 ft)
-3 Thebes (6 ft)
-5 Thebes (4 ft)
-6 Thebes (3 ft)
-7 Thebes (2 ft)
-8 Thebes (1 ft)
-9 Thebes (0 ft)
Gage Reading (Depth after
Removal)
Geometry of a cross section at RM 38.5 (Not to Scale)
Rock Pinnacles
Cross Section at River Mile 38.5
![Page 15: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/15.jpg)
BUILDING STRONG®
Rock Removal Surveys
15
![Page 16: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/16.jpg)
BUILDING STRONG®
Rock Removal Surveys
16
![Page 17: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/17.jpg)
BUILDING STRONG®17
Rock Removal Methodologies• Environmental Assessment required us to “minimize the impact of the
environment”
16,000 lb hydro-hammer
![Page 18: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/18.jpg)
BUILDING STRONG®18
Rock Removal Methodologies
4.5 ton Grapple Drill & Blast
![Page 19: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/19.jpg)
BUILDING STRONG®
Rock Removal - Drill and Blast Method
Courtesy of NWP19
![Page 20: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/20.jpg)
BUILDING STRONG®
Rock Removal - Drill and Blast Method
Courtesy of NWP20
![Page 21: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/21.jpg)
BUILDING STRONG®21
Rock Removal QA/QC
![Page 22: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/22.jpg)
BUILDING STRONG®
Rock Removal Phase 2 Base FY14
22
• 2 July – Awarded Rock Removal Phase 2 to Massman Construction for contract minimum of $1M
• Includes a base and 3 option years, total contract amount$19M to remove 6,300 cy• NTP given on 27 November.• Massman on site 7 December with removal beginning on 11 December.• Locations have been prioritized to minimize the impacts to navigation during the
months of December and January .• To date approximately 750 cy of material has been removed, 50% of the base
contract.
CB
D E
![Page 23: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/23.jpg)
BUILDING STRONG®
C
B
Rock Removal Phase 2 ThebesRiver Miles 46-43Massman Construction
AB
D
E
F
G
C
Removal CompleteUnder ConstructionNot Started
D
Minimum 300 feet Navigation Channel
PinnacleID
PinnacleLocation
PinnacleQuantity (cys) Date Started
%Complete
DateCompleted
RemovalMethod
C-100 B 312 3-Feb-2014 50% MechanicalC-101 B 16 3-Feb-2014 50% MechanicalC-102 C 116 0%C-103 C 117 0%C-104 C 312 0%C-105 D 1 14-Jan-2014 100% MechanicalC-106 D 174 11-Dec-2013 100% MechanicalC-107 D 114 12-Dec-2013 95% MechanicalC-108 D 333 14-Jan-2014 90% MechanicalC-109 D 11 14-Jan-2014 91% MechanicalC-110 D 18 0%C-111 E 3 0%
![Page 24: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/24.jpg)
BUILDING STRONG®
Rock Removal Phase 2 ThebesRiver Miles 46-43
Massman Construction
AB
D
E
F
G
C
Removal CompleteUnder ConstructionNot Started
Minimum 300 feet Navigation Channel
E
PinnacleID
PinnacleLocation
PinnacleQuantity (cys) Date Started
%Complete
DateCompleted
RemovalMethod
C-100 B 312 3-Feb-2014 50% MechanicalC-101 B 16 3-Feb-2014 50% MechanicalC-102 C 116 0%C-103 C 117 0%C-104 C 312 0%C-105 D 1 14-Jan-2014 100% MechanicalC-106 D 174 11-Dec-2013 100% MechanicalC-107 D 114 12-Dec-2013 95% MechanicalC-108 D 333 14-Jan-2014 90% MechanicalC-109 D 11 14-Jan-2014 91% MechanicalC-110 D 18 0%C-111 E 3 0%
![Page 25: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/25.jpg)
BUILDING STRONG®
Sites B, C, D, E ThebesRiver Miles 46-43
Massman Construction Update (As of 2-27-2014)
Hydro Hammer at C-106
Excavation at C-106
![Page 26: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/26.jpg)
BUILDING STRONG®
Rock Removal Phase 2 Option 1 ThebesRiver Miles 44-42
Massman Construction
AB
D
E
F
G
C
Removal CompleteUnder ConstructionNot Started
Minimum 300 feet Navigation Channel
E
PinnacleID
PinnacleLocation
PinnacleQuantity (cys)
Date Started
%Complete
DateCompleted
RemovalMethod
C-100 E 337 0%C-101 E 3 0%C-102 E 21 0%C-103 E 10 0%C-104 E 11 0%C-105 E 1 0%C-106 E 1 0%C-107 E 179 0%C-108 E 38 0%C-109 E 145 0%C-110 E 16 0%C-111 E 7 0%C-112 E 3 0%C-113 E 7 0%C-114 E 3 0%
![Page 27: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/27.jpg)
BUILDING STRONG®
Rock Removal Phase 2 Option 1 ThebesRiver Miles 44-42
Massman Construction
AB
D
E
F
G
C
Removal CompleteUnder ConstructionNot Started
Minimum 300 feet Navigation Channel
F
PinnacleID
PinnacleLocation
PinnacleQuantity (cys)
Date Started
%Complete
DateCompleted
RemovalMethod
C-115 F 46 0%C-116 F 178 0%C-117 F 75 0%C-118 F 12 0%C-119 F 14 0%C-120 F 16 0%C-121 F 1 0%C-122 F 31 0%C-123 F 1 0%C-124 F 150 0%
![Page 28: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/28.jpg)
BUILDING STRONG®
Rock Removal Stage Requirement
28
![Page 29: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/29.jpg)
BUILDING STRONG®29
Rock Removal at RM 44.8
![Page 30: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/30.jpg)
BUILDING STRONG®30
Rock Removal at RM 44.8June 2006 Survey
![Page 31: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/31.jpg)
BUILDING STRONG®31
Rock Removal at RM 44.8October 2012 Survey
![Page 32: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/32.jpg)
BUILDING STRONG®32
Rock Removal at RM 44.8February 2013 Survey
![Page 33: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/33.jpg)
BUILDING STRONG®33
Reporting Incorrect Information
![Page 34: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/34.jpg)
BUILDING STRONG®34
Current Water Level
Removal Elevation
River Bed
Low Water Channel
Water Depth at 0 Thebes (9 ft Channel After Removal)0 Thebes (9 ft)
Water Depth at 1-29-13 0800 was 5.8 ft at Thebes
2 Thebes (11 ft)
4 Thebes (13 ft)
6 Thebes (15 ft)
1 Thebes (10 ft)
-1 Thebes (8 ft)
-2 Thebes (7 ft)
3 Thebes (12 ft)
5 Thebes (14 ft)
7 Thebes (16 ft)
8 Thebes (17 ft)
-4 Thebes (5 ft)
-3 Thebes (6 ft)
-5 Thebes (4 ft)
-6 Thebes (3 ft)
-7 Thebes (2 ft)
-8 Thebes (1 ft)
-9 Thebes (0 ft)
Gage Reading (Depth after
Removal)
Geometry of a cross section at RM 38.5 (Not to Scale)
Rock Pinnacles
Cross Section at River Mile 38.5
![Page 35: Rock Removal on the Middle Mississippi River](https://reader037.vdocuments.mx/reader037/viewer/2022110101/5681324e550346895d98c6ad/html5/thumbnails/35.jpg)
BUILDING STRONG®35
Questions ?