Robot AutomationTEAM 072017-2018
![Page 2: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/2.jpg)
Nathan Casey (ECE)
Josh Tempelman(ME)
Michael Bissetta(ECE)
The Team
Alex Keizer(ME)
2Intro Old Project New Project Moving Forward
![Page 3: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/3.jpg)
Presentation Outline
Overview
Initial mechanical design
Initial electrical design
Design Change
Final mechanical design
Final electrical design
3Intro Old Project New Project Moving Forward
![Page 4: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/4.jpg)
The Customer
• Specializes in machining, assembly, inspection
• Serves wide variety of industries: automotive, office, medical, and more
• Currently uses little automation
4Intro Old Project New Project Moving Forward
![Page 5: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/5.jpg)
Project overview
• Parts are currently being produced in a lathe operated by a worker.
• The pucks are put into a lathe twice, machined to precise dimensions, and measured.
• Our task was to automate this process, decreasing cost and increasing part quality.
5Intro Old Project New Project Moving Forward
![Page 6: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/6.jpg)
Ethics and Design Norms
Delightful Harmony TransparencyTrust
6Intro Old Project New Project Moving Forward
![Page 7: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/7.jpg)
Initial design requirements
• Manufacture parts with little to no human interference
• Operate robustly and reliably
• Manufacture 120 parts per hour
• Track dimensions of finished parts
• Comply with safety standards
• All designs are owned by Prefferred Quality Services, not Team07
7Intro Old Project New Project Moving Forward
![Page 8: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/8.jpg)
Initial mechanical plan - indexing table
8Intro Old Project New Project Moving Forward
![Page 9: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/9.jpg)
Initial mechanical plan – End of Arm Tool
- Electromagentic Gripping
- Simple Bracket Configuration
9Intro Old Project New Project Moving Forward
![Page 10: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/10.jpg)
Initial electrical plan - Communication
10Intro Old Project New Project Moving Forward
![Page 11: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/11.jpg)
Initial electrical plan - Block Diagram
11Intro Old Project New Project Moving Forward
![Page 12: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/12.jpg)
Anticipated challenges
● Reliable measurements
● Consistent part grabbing
● Lack experience in networking and programming
12Intro Old Project New Project Moving Forward
![Page 13: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/13.jpg)
Project Change
3+ years of production anticipated on the part created by the cell
November 16 the OEM notified PQS that the part will bediscontinued in Q1 of 2018
PQS has assigned a new project to the team to replace this one
OEM
SUPPLIER
PQS
Old Part New Part
13Intro Old Project New Project Moving Forward
![Page 14: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/14.jpg)
New requirements
• New heavier part + how to machine it
• New table
• New electrical hardware and requirements
• No measurement system
14Intro Old Project New Project Moving Forward
![Page 15: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/15.jpg)
Lessons learned
• Scrapped ideas (ex. Gantry robot, two motors for original table design)
• Engineering in industry can be volatile
• Must be able to adapt quickly
• It is important to research deeply as well as broadly
15Intro Old Project New Project Moving Forward
![Page 16: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/16.jpg)
Safety
• Cage keeps employees away from moving parts
• Three Emergency stop buttons
• Safety Relay connects all E-stops and handles emergency procedure
• Safety mat and speaker ensures no one is near table when it rotates.
• Stack lights indicate machine state
16Intro Old Project New Project Moving Forward
![Page 17: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/17.jpg)
Finances
• Cost savings was a important factor for our customer
• With the change of project costs increased significantly and that had to be communicated to the
customer
• We updated our budget regularly and kept the customer informed on all changes
• We saved a lot of the cost by going through several robot suppliers
• We can also save cost in the future by using parts that have long lifespans
17Intro Old Project New Project Moving Forward
![Page 18: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/18.jpg)
New System Design
18 of 30
Key Components:-HAAS Lathe-Fanuc Arcmate 6-Axis Robot-Rotating Part Loading Table-Part Check Ramp-Finished Part Bin-Velox Safety Caging
Intro Old Project New Project Moving Forward
![Page 19: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/19.jpg)
New mechanical plan - indexing table
Key Components:-Oriental Motor-Polycarbonate Shields-E-stop Switch-80/20 Framing
Key Metrics/Decisions:-Modular-Cost Effective-Portability-Safety-Manufacturability
19Intro Old Project New Project Moving Forward
![Page 20: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/20.jpg)
Part Table Progress
20Intro Old Project New Project Moving Forward
![Page 21: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/21.jpg)
New mechanical plan - parts slot
21
Key Components:-80/20 Framing-Low Friction Polycarbonate Slides-Housing for Electrical Hardware-Touch Screen Display
Intro Old Project New Project Moving Forward
![Page 22: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/22.jpg)
New mechanical plan – End of Arm Tool
22
Key Components:-Machined Aluminum Plumbing-Venturi Vacuum Pumps-Two Laser Distance Sensors-Proxy sensor-Homing Rods
Intro Old Project New Project Moving Forward
![Page 23: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/23.jpg)
FEA and Calcs
23
0 0.5 1 1.5 2-60
-40
-20
0
20
40
60
t [s]
To
rqu
eta
ble
[N
*m]
Intro Old Project New Project Moving Forward
![Page 24: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/24.jpg)
New electrical design plan - power distribution
24Intro Old Project New Project Moving Forward
![Page 25: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/25.jpg)
New electrical design plan - Communication
25Intro Old Project New Project Moving Forward
![Page 26: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/26.jpg)
New electrical design plan - software
26Intro Old Project New Project Moving Forward
![Page 27: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/27.jpg)
New electrical design plan - software
27Intro Old Project New Project Moving Forward
![Page 28: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/28.jpg)
New electrical design - Progress
28Intro Old Project New Project Moving Forward
![Page 29: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/29.jpg)
Lessons learned
- Working with distributors can be difficult
- Software can have a lead time
- Inter-team communication is important
- Don’t assume things about the customer
- Solid plans make work go much faster
29Intro Old Project New Project Moving Forward
![Page 30: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/30.jpg)
Moving Forward
• Finish programing
• Wire and power all components once drops are installed
• Finish installation of arm and cage
• Begin working through test plan
30Intro Old Project New Project Moving Forward
![Page 31: Robot Automation - engr.calvinblogs.orgengr.calvinblogs.org/17-18/srdesign07/wp-content/uploads/2018/04/… · Robot Automation TEAM 07 2017-2018. Nathan Casey (ECE) Josh Tempelman](https://reader035.vdocuments.mx/reader035/viewer/2022071003/5fbfda4c896b3f343d48a695/html5/thumbnails/31.jpg)
Questions