rob & mcm production status and planning

12
ROB & MCM ROB & MCM production status production status and planning and planning David Emschermann David Emschermann Physikalisches Institut Physikalisches Institut Universität Heidelberg Universität Heidelberg Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005 Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Upload: egil

Post on 14-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

ROB & MCM production status and planning. David Emschermann Physikalisches Institut Universität Heidelberg. David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005. ROBs and MCMs. 15. 14. 13. 12. 11. 10. 09. 08. 07. 06. 05. 04. 16. 03. 02. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ROB & MCM  production status  and planning

ROB & MCM ROB & MCM production status production status

and planningand planning

David EmschermannDavid Emschermann

Physikalisches InstitutPhysikalisches Institut

Universität HeidelbergUniversität Heidelberg

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 2: ROB & MCM  production status  and planning

ROBs and MCMsROBs and MCMs

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

17-18 MCMs are used per ROB type17-18 MCMs are used per ROB type

0000010102020303

0404050506060707

0808090910101111

1212131314141515

1616

Page 3: ROB & MCM  production status  and planning

ROB types – C1 chambersROB types – C1 chambers

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

DCSDCSHCMHCM

++OASEOASE

2B2B 1B1B3B3B4B4B

HCMHCM++

OASEOASE

1A1A3A3A4A4A 1A1A

FIBREFIBRE

FIBREFIBRE

there are 7 different ROB types in totalthere are 7 different ROB types in total

Page 4: ROB & MCM  production status  and planning

ROB types – C0 chambersROB types – C0 chambers

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

5 out of 7 ROB types used on small ROCs5 out of 7 ROB types used on small ROCs

DCSDCSHCMHCM

++OASEOASE

2B2B 1B1B3B3B

HCMHCM++

OASEOASE

1A1A3A3A 1A1A

FIBREFIBRE

FIBREFIBRE

Page 5: ROB & MCM  production status  and planning

ROB PCB preseries ROB PCB preseries productionproduction

Readout Boards (7 types total, 50pc each):Readout Boards (7 types total, 50pc each):• Type 1A – submitted, back 11/05Type 1A – submitted, back 11/05• Type 1B – delivered this weekType 1B – delivered this week• Type 2B - deliveredType 2B - delivered• Type 3A – designed, back 12/05Type 3A – designed, back 12/05• Type 3B – designed, back 12/05Type 3B – designed, back 12/05• Type 4A – submitted, back 11/05Type 4A – submitted, back 11/05• Type 4B – submitted, back 11/05Type 4B – submitted, back 11/05

Aim to have all 7 ROB types (at leastAim to have all 7 ROB types (at least1 per type) equipped till Xmas 2005.1 per type) equipped till Xmas 2005.

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 6: ROB & MCM  production status  and planning

ROB production numbersROB production numbers

Readout Boards for 60% TRD :Readout Boards for 60% TRD :

Type 1A 1B 2B 3A 3B 4A 4BType 1A 1B 2B 3A 3B 4A 4BMCMsMCMs 17 17 17 18 18 17 17 17 17 17 18 18 17 17PCBs 680 340 340 340 340 235 235 PCBs 680 340 340 340 340 235 235 ΣΣ 25102510Equipping 600 300 300 300 300 230 230 Equipping 600 300 300 300 300 230 230 ΣΣ 22602260

MCMs used for equipping : MCMs used for equipping : ΣΣ 39020 39020

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 7: ROB & MCM  production status  and planning

MCM productionMCM production

MCMs :MCMs :• For 60% TRD we need ~40000 MCMsFor 60% TRD we need ~40000 MCMs => @ rate of 3000 MCMs/month= 13 months=> @ rate of 3000 MCMs/month= 13 months => @ rate of 2000 MCMs/month= 20 months=> @ rate of 2000 MCMs/month= 20 months• Need 5000 MCMs till end of 2005Need 5000 MCMs till end of 2005• Start of stable MCM production scheduledStart of stable MCM production scheduled for November 2005 (at latest)for November 2005 (at latest)• Continuously need 2100 MCMs per monthContinuously need 2100 MCMs per month for equipping in the companyfor equipping in the company• MCM series production rate still unknown !!MCM series production rate still unknown !!

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 8: ROB & MCM  production status  and planning

ROB statusROB status

• ROBs for first 2 layers are made in KAROBs for first 2 layers are made in KA• ROBs for layers 2-5 done by companyROBs for layers 2-5 done by company• Preseries equipping of ROBs starting nowPreseries equipping of ROBs starting now in two companies (10 ROBs each)in two companies (10 ROBs each) => ROBs will return early December=> ROBs will return early December• equipping of ROBs for layers 2-5 will equipping of ROBs for layers 2-5 will start late Decemberstart late December

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 9: ROB & MCM  production status  and planning

ROB planningROB planning

• before starting the ROB PCB seriesbefore starting the ROB PCB series production, need a 2 layer test in SM01production, need a 2 layer test in SM01 (best case : GO by end of Feb 2006)(best case : GO by end of Feb 2006)• start integration of SM02 and switchstart integration of SM02 and switch integration site to MS in June/July 2006integration site to MS in June/July 2006• at production rate of 2100 MCMs/monthat production rate of 2100 MCMs/month 1+12 lots for ROB equipping necessary1+12 lots for ROB equipping necessary => finish by June 2007=> finish by June 2007

David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 10: ROB & MCM  production status  and planning

Cable boardsCable boards

cheaper offer (for 100% TRD) has arrivedcheaper offer (for 100% TRD) has arrivedDavid Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005David Emschermann Intl. Workshop TRD Present & Future – Cheile Gradistei – 27/09/2005

Page 11: ROB & MCM  production status  and planning

Watch the time !!Watch the time !!

Page 12: ROB & MCM  production status  and planning

Thank youThank you