Over the past century, Griffith Company has built, paved, graded and widened more miles of freeway, streets and roads than any contractor in the region. Our road and bridge contracts have allowed us the opportunity to work on virtually every highway and freeway in Southern California. As the region continues to rapidly develop, our crews have been required to build and reconstruct in highly developed areas. This comes with a set of significant challenges, which Griffith Company continually and successfully confronts. We complete our road and bridge projects on time, and on budget, with minimal disruption to heavily trafficked areas. Roads and Bridges Stockdale Highway & Enos Lane (SR 43) Roundabout, 2020 $5.2mil Wheeler Ridge – Route 5/99 Separation To Millux Road, 2019 $6.7mil North Spring Street Viaduct Widening and Rehabilitation, 2018 $27mil C Street Interchange, 2017 $21.6mil Universal Pedestrian Bridge, 2016 $26mil Ortega Highway Widening, 2010 $25.5mil Fairmont Ave Extension, 2010 $29mil Rte 134 in Burbank, 2010 $30mil Replace HOV Lanes Rte 10, 2009 $15.5mil Brea Canyon Grade Separation, 2008 $40mil Victoria Ave Bridge Retrofit, 2006 $9.6mil Grand Ave Realignment, 2004 $10.4mil

Upload: others

Post on 24-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Roads and Bridges and Bridges.pdfRoads and Bridges Hacienda Blvd, 1996 $7.9mil Seaside Ave/Navy Way, 1997 $36.8mil Grand Ave Realignment, 2004 $10.4mil Beverly Hills Street Improvements,

Over the past century, Griffith Company has built, paved, graded and widened more miles of freeway, streets and roads than any contractor in the region. Our road and bridge contracts have allowed us the opportunity to work

on virtually every highway and freeway in Southern California. As the region continues to rapidly develop, our crews have been required to build and reconstruct in highly developed areas. This comes with a set of significant challenges,

which Griffith Company continually and successfully confronts. We complete our road and bridge projects on time, and on budget, with minimal disruption to heavily trafficked areas.

Roads and Bridges

Stockdale Highway & Enos Lane (SR 43) Roundabout, 2020 $5.2milWheeler Ridge – Route 5/99 Separation To Millux Road, 2019 $6.7milNorth Spring Street Viaduct Widening and Rehabilitation, 2018 $27milC Street Interchange, 2017 $21.6milUniversal Pedestrian Bridge, 2016 $26mil

Ortega Highway Widening, 2010 $25.5milFairmont Ave Extension, 2010 $29milRte 134 in Burbank, 2010 $30mil Replace HOV Lanes Rte 10, 2009 $15.5mil Brea Canyon Grade Separation, 2008 $40mil Victoria Ave Bridge Retrofit, 2006 $9.6mil Grand Ave Realignment, 2004 $10.4mil