roadmap to low and zero emissions for urban transport in ...experience with the operation of the...

7
Roadmap to low and zero emissions for urban transport in Drammen 03.09.2019 Terje Sundfjord, Brakar

Upload: others

Post on 25-Dec-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Roadmap to low and zero emissions for urban transport in Drammen

03.09.2019

Terje Sundfjord, Brakar

Page 2: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Electrification phase 1:

• Careful start in route 51

Drammen – Mjøndalen with

6 buses

• Testing of bus and

charging infrastructure

worked satisfactorily

• Full operation with 10 min

frequency in rush from

March

03.09.2019 Bunntekst 2

Page 3: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Experience with the operation of the electric bus• 11,500 trips

• 185 000 km

• 99.9% of scheduled trips have been run (adjusted for other bus failures)

• 91% successful charging operations

• Energy consumption 1.45 kWh / km

• Choose partners who wants you to succeed

03.09.2019 Bunntekst 3

Page 4: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Electrification phase 2:

• Replace old buses with

electric buses

• An application for the

reward scheme for public

transport has been sent- If granted at today's level we

can get up to 25 new electric

buses.

(Erna promise that at Fridays

pressconferanse)

03.09.2019 Bunntekst 4

Page 5: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

New charging stations

• Plans for most city lines to

have partial electrical

operation 2021

• 10-14 new charging stations- Status

- 8 (4) ready for construction

- Investment of NOK 74 million

• Support from Enova of NOK

30 million

03.09.2019 Bunntekst 5

Page 6: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

•03.09.2019 Bunntekst 6

Electrification phase 3:

Zero emissions in new tender in Drammen from 2024

Page 7: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

•03.09.2019 Bunntekst 7

Takk for oppmerksomheten