road projects - 2040 regional transportation plan

3
Provo Bay Lincoln Point Bird Island Pelican Point U T A H L A K E Utah County Salt Lake County Wasatch ka Rocky Ridge Bluffdale Riverton Draper City Herriman Vineyard Orem Saratoga Springs Cedar Hills Pleasant Grove Lehi American Fork Fairfield Highland Alpine Springville Salem Payson Cedar Fort Genola Elk Ridge Goshen Spanish Fork Mapleton Eagle Mountain Woodland Hills Santaquin Provo Lindon 38 5 22 31 20 30 1 59 35 39 51 66 27 19 72 28 40 58 14 42 65 15 71 56 60 62 8 76 50 24 34 29 47 6 61 45 46 73 21 10 11 32 57 41 67 7 33 3 12 74 4 9 64 48 13 36 2 49 18 75 79 77 44 74 63 78 16 17 25 26 37 54 43 53 55 52 68 69 70 23 73 68 68 92 146 52 265 198 51 147 164 77 75 189 6 89 89 15 15 Road Projects - 2040 Regional Transportation Plan DRAFT PROJECTS 1:166,000 Map Produced by Kory Iman Chief Cartographer Map Production Date: Sept. 2014 0 1 0.5 Miles www.mountainland.org The producer of the map assumes no responsibility for the risks, dangers, and liability that may result from the reader's use of the map. Legend Project Number 10 Interchange / Intersection Freeway Principle / Minor Highway Vision Phase 1 2015 - 24 Phase 2 2025 - 34 Phase 3 2035 - 40

Upload: others

Post on 04-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

P r o v o B a y

L i n c o l nP o i n t

B i r dI s l a n d

P e l i c a nP o i n t

U T A H L A

K E

Utah County

Salt Lake County Wasatch County

Eureka

RockyRidge

Bluffdale

Riverton

DraperCityHerriman

Vineyard

Orem

SaratogaSprings

CedarHills

PleasantGrove

Lehi

AmericanFork

Fairfield

Highland

Alpine

Springville

Salem

Payson

CedarFort

Genola ElkRidge

Goshen

SpanishFork

Mapleton

EagleMountain

WoodlandHills

Santaquin

Provo

Lindon

38

5

22

31

20

30

1

59

35

39

51

66

27

19

72

28

40

58

14

42

65

15

71

56

60

62

8

76

50

24

34

29

47

6

61

45

46

73

21

10

11

32

57

41

67

7

33

3

12

74

4

9

64

48

13

36

2

49

18

75

79

77

44

74

63

78

16

17

25

26

37

54

43

53

55

52

68

69

70

23

73

68

68

92

146

52

265

198

51

147

164

77

75

189

6

89

89

15

15

Road Projects - 2040 Regional Transportation PlanDRAFT PROJECTS

1:166,000

Map Produced by Kory Iman Chief CartographerMap Production Date: Sept. 2014

0 10.5 Mileswww.mountainland.org

The producer of the map assumes no responsibility for the risks, dangers, andliability that may result from the reader's use of the map.

Legend

Project Number10

Interchange / Intersection

Freeway

Principle / Minor Highway

VisionPhase 12015 - 24

Phase 22025 - 34

Phase 3 2035 - 40

Draft MAG RTP Highway Projects-Sep 2014No. Project Description Cost No. Project Description Cost

1American Fork 100 E | SR74State ST to AF 300 N

Widen to 4 Lanes34

Nebo Beltway RD | PaysonI-15 FWY to SR198

Possible New 5 Lanes depending on I-15 Interchange EIS

2I-15 Freeway | Draper to LehiDraper 12300 S to Lehi Main ST (cost UC only)

Reconstruct FWY, & Interchanges, Widen to 10 Lanes + HOV35

Spanish Fork Center ST900 E to US6

Widen to 4 Lanes, Widen RR Bridge

3Lehi 2100 N Freeway | SR85Mountainview FWY to I-15 FWY

New 6 Lanes, Frontage RDs, and System Interchanges36

Springville 1200 W/Canyon Creek PKWY, SpForkProvo 1860 S to US6

New and Widen to 4 Lanes

4Lehi 2300 WTimpanogos HWY to Pioneer Crossing

Widen and New 4 Lanes (6 north of 2100 N) , I-15 FWY Bridge37 Springville Main ST/US89/SR51 Interchange

Reconstruct Interchange

5Lehi 1200 WTimpanogos HWY to Lehi 2100 N

Widen to 4 Lanes38

SR198 | Spanish Fork/Salem/PaysonArrowhead Trail to Payson 800 S

Widen to 4 Lanes

6Lehi Main ST | SR73State ST to Lehi 850 W

Widen to 7 Lanes39

US6 | Spanish ForkPowerhouse RD to Diamond Fork RD (cost in MPO only)

Widen to 4 Lanes

7Lehi Main ST/Crossroads BLVD | Lehi to Saratoga SpringsCommerence DR to Lehi 500 W

Widen to 4 Lanes40

US89 |MapletonMapleton 1600 N to Maple ST

Widen to 4 Lanes

8Meadows Connection RD, American ForkState ST to Pioneer Crossing

New 2 Lane Road, New I-15 Bridge

No. Project Description Cost

9Mountainview FWY | SR85 | UT/SL Co. line to S. SpringsDaybreak to SR73 FWY

New 6 Lanes, Frontage RDs Lanes Vary

10Pony Express PKWY | Eagle MountainMountain Ash WY to EMtn 5600 N

Widen to 4 Lanes

11Pony Express PKWY | Eagle Mtn to Saratoga SpringsSmith Ranch RD to Redwood RD

Widen to 4 Lanes41

Airport RD | Eagle MountainSR73 to Pony Express PKWY

New 4 Lanes

12Redwood RD | SR68 | Saratoga SpringsSSprings 400 S to Sweet Water PKWY

Widen to 4 Lanes42

Highland BLVDHighland 11800 N to Timpanogos HWY

Widen to 4 Lanes

13SR73 Freeway | Eagle Mountain to Saratoga SpringsAirport RD to Mountainview FWY

New 6 Lanes FWY, Frontage RDs Lanes Vary43 I-15/Traverse Mountain Interchange, Lehi

New Interchange into Traverse Mountain

14State ST | US89 | American Fork to Pleasant GroveAF 500 E to Pleasant Grove BLVD

Widen to 6 Lanes44

Mountainview FWY Extension | SR85 | Saratoga SpringsSR73 FWY to Harbor PKWY

New 4 Lanes, Interchanges North of Still Water PKWY

15State ST | US89 | Lehi to American ForkLehi Main ST to American Fork Main ST

Widen to 6 Lanes45

Pacific DR/American Fork 500 EPioneer Crossing to State ST

Widen to 4 Lanes

46Pleasant Grove BLVDVineyard Connector RD to State ST

New and Widen Varries 4-6 Lanes

16 I-15/Orem 800 S InterchangeNew HOV Interchange to UVU

47Pony Express PKWY | Eagle MountainEMtn 5600 N to Eagle Mountain BLVD

New 4 Lanes

17 I-15/Provo 820 N InterchangeNew Interchange

48Pony Express PKWY | Saratoga Springs to PlGroveRedwood RD to Vineyard Connector RD

New 4 Lanes

18Lakeview PKWY | Orem to ProvoGeneva RD to I-15/University AVE Interchange

New Lanes Vary 2-449

Vineyard Connector RD | SR52 | Vineyard to Am. ForkVineyard Main ST to Pioneer Crossing

New 4 Lanes

19Orem 1600 NOrem 1200 W to Orem 400 W

Widen to 4 LanesCENTRAL PROJECTS

20Orem Center STGeneva RD to I-15 FWY

Widen to 4 Lanes50

Orem Center STI-15 FWY to State ST

Widen to 6 Lanes

21Provo 820 NGeneva RD to University AVE

Widen to 4 Lanes51

Provo 2230 NProvo Canyon RD to Temple DR

Widen to 4 Lanes

22Provo Center ST | SR114Geneva RD to Provo 1600 W

Widen to 4 Lanes52 University AVE/Orem 800 N Intersection

Intersection Modification

23 State ST/University PKWY, OremNew Grade Separated Intersection SOUTH PROJECTS

24University PKWY | SR265 | Orem to ProvoOrem 800 E to University AVE

Widen to 6 Lanes53 I-15/Spanish Fork Center ST Interchange

New Interchange

54 I-15/Springville 1600 S/SpFork 2700 N InterchangeNew Interchange

25I-15/Payson Main ST InterchangeInterchange Modification

Possibly add Connections to Main ST and SR19855 I-15/UC 8000 S Interchange

Interchange Modification

26 I-15/Santaquin Main ST InterchangeInterchange Modification

56Nebo Beltway RD | PaysonSR198 to Elk Ridge DR

New 2 Lanes

27Payson Main ST | SR115I-15 FWY to Payson 100 N

Possibly Widen to 5 Lanes depending on I-15 Interchange EIS57

Spanish Fork 1100 ESpanish Fork Center ST to UC 8800 N

New and Widen, Lanes Vary 2-4 Lanes

28Santquin Main ST | US6Santaquin 500 W to I-15 FWY

Widen to 4 Lanes58

Spanish Fork 2300 ESR198 to UC 8800 N

New and Widen 2 Lanes

29Springville 1400 N | SR75I-15 FWY to Springville Main ST

Widen to 4 Lanes, 2 Bridges Reconstructed59

Springville 1600 S/Spanish Fork 2700 NSpanish Fork Main ST to US89

New and Widen to 4 Lanes, New RR Bridges

30Springville 400 S | SR77I-15 FWY to SF Main ST

Widen to 5 Lanes60

SR198 | PaysonPayson 800 S to UC 12400 S

Widen to 4 Lanes

31Springville 400 S | SR77Springville Main ST to 400 E

Widen to 4 Lanes, Additional Turn Lanes at Main ST61

UC 8000 S | Spanish ForkArrowhead Trail to Spanish Fork 2300 E

New 2 Lanes

32Elk Ridge DR | SalemUC 8000 S to SR198

New 2 Lanes62

US6 Expressway | Spanish ForkI-15 FWY to Spanish Fork Center ST

4 Lane Expressway, 2-2 Lane Frontage RDs

33Maple Mountain PKWY | Spanish ForkCanyon CR PKWY to Canyon RD

New and Widen to 4 Lanes

NORTH PROJECTS

Phase 1 | 2025 Phase 1 | 2025NORTH PROJECTS SOUTH PROJECTS Cont…

Phase 2 | 2035

CENTRAL PROJECTS

SOUTH PROJECTS

No. Project Description Cost

63 Pioneer Crossing/Vineyard EXPWY | Vineyard to LehiConnect Two Roads, Widen to 6 Lanes

64SR73 | Eagle Mountain/Cedar FortEM 3400 N to Airport RD

Widen to 4 Lanes

65Orem 800 N | SR52Orem 800 E to University AVE, Provo

Widen to 7 Lanes

66Orem 800 E Orem Center ST to Orem 800 S

Widen to 4 Lanes

67University AVE | US189, PovoProvo 2230 N to Orem 800 N

Widen to 7 Lanes

68University AVE Viaduct | US189, ProvoProvo 500 S to 900 S

Reconstruct Bridge, Widen to 6 Lanes

69 I-15/Payson 800 S InterchangeInterchange Modification

70 I-15/UC12400 S Interchange | SantaquinNew Interchange

71Spanish Fork Main ST Spanish Fork 2700 N to I-15 FWY

Widen to 4 Lanes

72Springville 400 S | SR77I-15 FWY to Springville 950 W

Widen to 6 Lanes

73UC 12400 S | SantaquinSantaquin Center ST to SR198

Widen to 4 Lanes

No. Project Description Cost

74Cedar Valley Corridor | Eagle Mounatin to SantaquinHWY 73 FWY, Eagle Mountain to I-15 Santaquin

Possible west valley bypass FWY to I-15

75Nebo Beltway RD | Elk Ridge to Spanish ForkElk Ridge DR to US-6, Spanish Fork

Possible 4 Lane Arterial

76Point of the Mountain FWY, LehiI-15 to Mountain View FWY

Possible 6 Lane FWY, Bridge

77Redwood RD South Corridor | Saratoga Springs to ElbertaUtah Lake Bridge to US-6

Possible west bypass FWY to I-15

78South Wasatch CorridorI-15 FWY, Provo/Orem to I-15, Payson

Possible Provo Bay crossing between Provo and Payson

79Utah Lake Bridge | Provo/Orem to Saratoga SpringsI-15 FWY, Provo/Orem to Mountain View FWY, Stga. Springs

Possible east/west FWY link bridge over Utah Lake

CENTRAL PROJECTS

SOUTH PROJECTS

Vision Options (not phased)

Phase 3 | 2040NORTH PROJECTS