Government Initiatives, Issues, Opportunities, and ChallengesEr. Manu Amitabh (Principal Director, New Initiatives & CPM – PWD )
Public Works Department - GNCTD
PWD, Delhi
Road Development in India - State Initiatives
1
The Challenges in Delhi
Rapid Urbanization of NCT Delhi - 97.5% urban population.
Population : 19.9 million (2016) to 23 million (2021).
Population Density : 112.97 pph (2011) to 225 pph (2021).
2103 km of road length per 100 km².
1500 vehicles added to city roads each day – total > 10 m Vehicles
Land Acquisition almost Impossible
Forest & Tree Cover : 20.2 % (2009) aiming for 33%.
Multiplicity of agencies.
Source : MPD 2021; Census of India 2011 ; India State of Forest Report 2009 2
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Lands: PWD Delhi Cantonment Board NCRPB MoUD DDA UTTIPEC MCD Railways Ministry of Defence State Govts (U.P, Haryana)
ROADS PWD MCD NDMC Delhi Cantt Board
Multiplicity of AuthoritiesAgencies Responsible for Policy and Implementation
Policy Implementation Issues: Ownership of land rests with
different departments.
Budget allocations for planning and development.
Inter-related departments under various jurisdictions :
Traffic Police- Central Govt.
Parking:
Planning- MCD, NDMC
Maintenance- PWD
Alternative Sources of Financing:
Advertisement Rights – MCD, NDMC, DMRC.
Absence of Innovative Approaches.
Multiplicity of Different Modes of Transport:
Transport Department DTC DMRC- Metro Railways Taxi Associations 3
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Integrated Road Network Planning
Initiatives by PWD, Delhi
4
Sust
ain
able
Ro
ads
and
Hig
hw
ays
PWD Delhi Roads
5
Sust
ain
able
Ro
ads
and
Hig
hw
ays
PWD- Proposed Corridors & Improvement for Decongestion
S.N CorridorEnd Points
(From & To)
1 Elevated Road along Najafgarh Nallah Kakrola More to Punjabi Bagh
2Elevated Road along supplementary drain (Nangloi drain)
Meerabagh to Mukarba Chowk
3 East – West CorridorAnand Vihar Terminal to Tikri Border along railway track
4 North- South Corridor Wazirabad to Airport
5 Barahpullah Extension INA to NH8/Airport
6 U-G Tunnel NH 24 Bye-pass to Lodi Road
7 MB Road Ext NH2 to Noida Express Way
8 Khazuri Khas to Bhopura Border Khazuri Khas to Bhopura Border
9 Kalindi Kunj Byepass Faridabad to DND
10 Azadpur to Rani Jhansi Rd Azadpur to Rani Jhansi Rd
11 Marginal Bundh RoadShastri Park to Sabhapur(UP) Border via Khajori Khas Jn
12 U-G Tunnel at Purana QuilaPurana Quila to Ring Road at Pragati Maidan
6
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Policy Level Initiatives
Proposals Submitted by PWD for
Decongestion Plan of Delhi to MoUD
7
Sust
ain
able
Ro
ads
and
Hig
hw
ays
S.N Projects ConnectingLength of Corridor
(in KM)Approx Cost
I.SHORT TERM PROJECTS(already in progress)
1Construction of 6-lane road parallel on the side of supplementary drain
From Swaroop Nagar to Jagatpur
9 Km Rs. 200Cr
2 Construction of Barapulla Elevated Road in Phase-II
From JLN Stadium to Aurobindo Marg near INA Market and connecting loops of road construction in Phase-I at Ring Road and Lala Lajpat Rai Marg
3.5 Km Rs. 550Cr
I-A SHORT TERM PROJECTS (About to be Taken up):
1 C/o Barapullah elevated road in Phase-III: From Sarai Kale Khan to Mayur Vihar with a bridge across River Yamuna
4 Km Rs. 1260 Cr
2 Kalindi Bypass and New bridges/roads to Noida: From DND-Ring Road Junction to Faridabad Bypass
14 Km Rs. 2000 Cr
I-B SHORT TERM PROJECTS (identified by Traffic Police):
1 Tunnel road from R/A of RML Hospital to the Upper Ridge Road From R/A of RML Hospital to the Upper Ridge Road
2.5 Km Rs. 900 Cr
2Tunnel between Ring Road and Bhagwan Das road/ Purana Quila road
Between Ring Road and Bhagwan Das road/ Purana Quila road
1.5 Km Rs. 450 Cr
3Underpass from Mandi House/ Tansen Marg to Kotla Road and Mata Sundari Road Across the Railway Tracks.
From Mandi House/ Tansen Marg to Kotla Road and Mata Sundari Road Across the Railway Tracks
1.2 Km Rs. 360 Cr
4Underpass from Safdar Hashmi Marg to Vishnu Digambar Marg across the Railway Tracks
From Safdar Hashmi Marg to Vishnu Digambar Marg across the Railway Tracks.
1.2 Km Rs. 360 Cr
Proposals Submitted by PWD for Draft Decongestion Plan- MoUD
8
Sust
ain
able
Ro
ads
and
Hig
hw
ays
II MEDIUM TERM PROJECTS (identified by PWD):
S.N Projects ConnectingLength of Corridor
Approx Cost
1Elevated Road along Najafgarh Nallah: also include an Ecomobility corridor at the drain level, with dedicated cycle path.
Along Najafgarh drain will connect West Delhi, Dwarka to Central Delhi, Connaught Place and North-East Delhi.
30 Km Rs. 4000 Cr
2Corridor Improvement Mehrauli Badarpur Roads and its extension to NOIDA: Will provide connectivity
From Noida to South Delhi towards Gurgaon and includes a bridge over River Yamuna which will be taken up by Noida Authorities.
18 Km Rs. 2750 Cr
3East-West Corridor: Construction of East-West Corridor.
From Anand Vihar Passenger Terminal to NH-10 via New Delhi Railway Station and Punjabi Bagh.
20 Km Rs. 2500 Cr
4Tunnel at Nizamuddin to Lodhi Road-Mathura Road junction.
From NH24 directly to Mathura road-Lodhi Road jn bypassing Bhairon Marg.
1.5 Km Rs. 600 Cr
5Mahipalpur Bypass to NH-8 to connect with Dwarka Link Roads.
Mahipalpur Bypass Road to Dwarka Link road Across NH-8.
Rs. 630 Cr
6 Direct Link from Airport to Lutyens Delhi:Critical link for connectivity between Lutyens and Airport.
8 Km Rs. 1500 Cr
7 C/o Barapullah elevated road in Phase-IV.Barapullah road till Dhaula Kuan and to Aruna Asaf Ali Marg
6 Km Rs. 1000 Cr
8Direct Link from Brar Square to Dev Prakash Shastri Marg.
From Brar Square to Dev Prakash Shastri Marg
Rs. 450 Cr
9 Elevated Road along Nangloi Drain Meera Bagh to Mukarba Chowk 10 Km Rs. 1500 Cr10 Elevated Road along Western Yamuna Canal Haiderpur to Inderlok 6 Km Rs. 1000 Cr
11 New bridge North of Wazirabad bridge.Connect Outer Ring Road to Tronika City in Ghaziabad
Rs. 1000 Cr
Proposals Submitted by PWD for Draft Decongestion Plan- MoUD
9
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Final
Decongesting
Traffic in Delhi
Report- MoUD
10
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Proposals Considered in Final Decongestion Plan- MoUD
The proposals submitted by PWD have not been included in the final Decongesting Traffic
in Delhi Report-MoUD
11
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Various Inter-state Connectivity Initiatives Roads/Linkages among the NCR
Participating States
12
Sust
ain
able
Ro
ads
and
Hig
hw
ays
NCRPB- Various Inter-state Connectivity Roads/Linkages Among the NCR Participating States
S.No Inter-state Connectivity Roads/Linkages Status/
Agency
I Kalindi By-pass road from Ashram Chowk, Delhi to Faridabad By-pass. Not approved in view of
transfer of land to PWD.
II 80 m Dwarka Link in Zonal Plan K-II connecting Gurgaon (through
NPR having a width of 150 m with 30 m wide green belt).
UTTIPEC, DDA, Haryana
Govt- State Roads and
Bridges Development
Corporation, GNCTD.
III Mehrauli-Gurgaon Road to be developed as NH-236.
IV 75 m wide road link connecting Gurgaon area with Nazafgarh road.
V Existing Gurgaon-Mehrauli road linking Nelson Mandela T-point (Near
Vasant Kunj Flyover) through Delhi ridge.
VI Upgrading Gwal Pahari Mandi Gadiapur-Jaunpur road up to Andheria
Mor in Delhi.
VII 60 m wide road from Education City, Kundli needs to be linked to Delhi
and incorporated in the Zonal plan of Zone -II.
VIII Bawana Auchandi Marg to be extended as SH-18, Haryana.
IX Road from Ring Road (Inder Lok Metro Station) & existing Yamuna
Canal Link Road up to Haryana Border.
New Proposal and to
discuss with Govt of
Haryana
NCT of Delhi - Haryana
13
Sust
ain
able
Ro
ads
and
Hig
hw
ays S.No Inter-state Connectivity Roads/Linkages
Status/
Remarks
X UER-I, Delhi to Khekra City till NH-57 in U.P. and UTTIPEC, DDA,
GNCTDXI UER-II, Delhi to Tronica City till SH-57 in U.P.
XII Construction of second bridge on Yamuna River near Kalindi Kunj
- NOIDA (120 m downstream); and
Not approved in
view of transfer of
land to PWD by
U.P Irrigation
Department
XIII Elevated road along Shahdara drain-alignment form Chilla
Regulator (near Mayur Vihar), Sector-14A to MP-3 road
(Mahamaya Flyover) in Noida
NCT of Delhi - Uttar Pradesh
Haryana - Uttar Pradesh
S.No Inter-state Connectivity Roads/Linkages Status/
Remarks
XIV Bridge connecting Sector 149-A & 150, Noida with Tilori Village,
Faridabad UTTIPEC,
DDA, Govt of
UP, Govt of
Haryana
XV Bridge connecting Sector 168 & 167-A, Noida with Lalpur Village,
Faridabad
XVI Bridge Over Yamuna between Chhaprauli and Hathwada (Village
Panipat, Haryana)
NCRPB- Various Inter-state Connectivity Roads/Linkages Among the NCR Participating States
14
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Promotion of New InitiativesNew Ideas and Innovative Approaches for
Road Design & Development.
15
16
PWD Delhi Flyovers with Multiple Piers - 1
12 mts
17
PWD Delhi Flyovers with Multiple Piers – 2
(Munirka Flyover - 2009)
12 mts
18
PWD Delhi Elevated Road on Single Pier – 1( Prembari Pul to Azadpur – Inaugurated in Nov. 2015)
4 mts
19
20
PWD Delhi Elevated Road on Single Pier – 1( Prembari Pul to Azadpur – Inaugurated in Nov. 2015)
Isometric view of Elevated Corridor on Central Pier
21
Savings in Construction Costs with New Technology (For Elevated Road Corridors)
• Old Segmental Technology (Single Segment -Single Pier for each 3 lane carriageway)
~ Rs. 60,000 per sq. m
• New Technology (Separate Spine & Wing Segments for 6 lanes on Single Pier on Central Verge)
~ Rs. 43,000 per sq. m
• Savings in Structure Costs ~ 25% (Rs. 600 Crores)
• Savings in Land Costs ~ Rs. 210 Crores
22
Rainwater Harvesting System with Recycled PVC Modular Cells
23
Govt. of Delhi Initiatives - 1
PWD C&D waste plants proposed at two locations - Libaspur & Tikri Border - 500 TPD capacity each.
Mandatory for all Delhi Government agencies to use minimum 2% processed/recycled products from C&D waste in building works and 10% in road works.
Advisory issued to All ULBs in Delhi to mandate 5% use of recycled products for non-structural applications while approving building plans.
24
Govt. of Delhi Initiatives - 2
GNCTD Committee on C&D Waste Products -
Recommendations :
Use Recycled Products for kerb stone, paver tiles in footpath,
silt/earth for filling in plinth, embankments, bricks in non-load
bearing partition walls, boundary walls, toe walls, recycled
aggregates in RCC of kitchen shelf, almirah shelf etc.
Milling and reusing the bituminous material recovered by
milling of existing bituminous pavement layers.
For Redevelopment Projects costing more than Rs. 500
crores, installation of a C&D Waste processing plant.
25
Govt. of Delhi Initiatives - 3
Approval of the “Swiss Challenge” Method for
New Infrastructure & Services in -
Transportation, Communication, Housing, Re-
development, Roads, Water, Social Waste
Management, Tourism, Environment and Security.
New Initiatives in PPP for Alternate Funding Routes
in -
Public Conveniences, FoBs, Roads, Flyovers and
in Creation of new assets.
26
Green Sheet for Elevated Corridor Projects - 1
27
Green Sheet for Elevated Corridor Projects - 2
28
COST BENEFIT ANALYSIS – AZADPUR TO PREMBARI PUL
Elevated Corridor
-400
-200
0
200
400
600
800
1000
13 14 15 16 17 18 19 20 21 22 23 24 25 26
Am
ou
nt
(In
Cr.
)
Year
Economic Assessment
Cost of the project Rs. 247 Crores
Thus cost of the project recovered in three years i.e. by July 2018.
29
Overall Return Period of Investment of Rs. 2300 Crores on Ongoing Elevated Corridor Projects of PWD, Delhi.
30
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Swiss Challenge Method
Objective:Enhancing the Efficiency of Public Procurement for development works for
new ideas and innovative projects. (Unsolicited Proposal (UNP)
Through PPP)
Fields Applicable:• Development of Infrastructure and services in the fields of :
• Transportation
• Communication
• Housing
• Re-Development
• Roads
• Water
• Social Waste Management
• Tourism
• Environment
• Security
31
Stages for Swiss Challenge Method- PWD
Stage 8-Techno-Economic Credentials
The techno-economic credentials shall be assessed before the “In- Principle” approval.
Stage 7- Proposal BiddingProposal called for bidding, if competing bidder provides best financial offer, original proponent is given an
opportunity to match the same.
Stage 6- DPR Examination
DPR examined by E-in-C for technical inputs and submitted to committee for approval.
Stage 5 – Submission of DPR by project proponent
Upon approval from Council of Ministers PPP Cell shall advise project proponent to submit DPR.
Stage 4- Council of Ministers Approval
Before “In Principle” approval the committee shall obtain approval from Council of Ministers of GNCTD .
Stage 3-Technical Inputs
After Technical Inputs from E-in-C UNP is placed before the Committee for “In Principle” approval.
Stage 2- Comments from Concerned Depts
PPP Cell will obtain comments from concerned departments.
Stage 1- Preliminary Report
Submission of Preliminary Project Report & Techno Economic Credentials to PPP Cell .
32
Sust
ain
able
Ro
ads
and
Hig
hw
ays
Integrated Road Re-Designing Plan- PWD
33