    BASIC KNOWLEDGE IN ROADCONSTRUCTION

    Chungdu TsheringEngineer, CDB, MoWHS

  • 8/11/2019 Road Construction Works

    2/39

    Types of Road in Bhutan

    1. National Highways2. Dzongkhag Roads3. Farm Roads

  • 8/11/2019 Road Construction Works

    3/39

    1. National Highways

    a. Asian Highway (Currently the existing Phuentsholing-ThimphuHighway)

    b. Primary National Highway (existing East-West Highway)c. Secondary National Highway (Currently District Roads)

    Carriageway3500

    Shoulder 1500

    Shoulder 1500

    L-Drain1000

    Sub base = 190mmBase Course = 150mm

    Hard Shoulder

    Compacted Granular Soil Soling

    Secondary National Highway

    Subgrade CBR = 7%

    Carriageway6500

    Shoulder 1500

    Shoulder 1500

    L-Drain1000

    Sub base = 210mmBase Course = 150mm

    Hard Shoulder

    Compacted Granular Soil Soling

    Primary National Highway

    Subgrade CBR = 7%

    50mm DBM + 25mm AC

    25mm PMC

  • 8/11/2019 Road Construction Works

    4/39

    2. Dzongkhag Roads Currently feeder Roads Connects a Dzongkhag centre and a Dungkhag Centre etc.

    Carriageway3500

    Shoulder 500

    Shoulder 500

    L-Drain600

    Sub base = 150mmBase Course = 150mm

    Hard Shoulder

    Compacted Granular Soil Soling

    Dzongkhag Road

    Subgrade CBR = 7%

  • 8/11/2019 Road Construction Works

    5/39

    3. Farm Roads Roads that link farmland areas/villages.

    Carriageway3500

    Shoulder 500

    Shoulder 500

    L-Drain600

    Sub base = 140mmBase Course = 120mm

    Hard Shoulder

    Compacted Granular Soil Soling

    Farm Road

    Subgrade CBR = 7%

    Note: If the traffice is less than 10-15 vpd, single layer base course should sufice

  • 8/11/2019 Road Construction Works

    6/39

    WHAT

    WE DOIN ROAD CONSTRUCTION

  • 8/11/2019 Road Construction Works

    7/39

    MAJOR ACTIVITIES

    1. FORMATION CUTTIN G2. SUB-GRADE PREPARATION3. BASE COURSE & BLACK TOPPING

    4. SHOULDER5. PERMANENT WORKS6. BRIDGES

  • 8/11/2019 Road Construction Works

    8/39

    1. FORMATION CUTTING

    SLOPEGRADIENTGEOMETRICDISPOSAL OF SPOIL

  • 8/11/2019 Road Construction Works

    9/39

  • 8/11/2019 Road Construction Works

    10/39

    2. SUB-GRADE PREPARATION

    In order to maintain stable and durable sub-grade, uniformconsolidation to be incorporatedSub-grade act as a cushion for other layers i.e. In order to

    achieve durable road sub-grade should be strong

    .Maintain proper Camber

  • 8/11/2019 Road Construction Works

    11/39

    SUB-GRADE PREPARATION

    CAMBER

  • 8/11/2019 Road Construction Works

    12/39

    3. BASE COURSE & BLACK TOPPING

    Type I (Old) Base course = 150 + 100 = 250mm thickness 150mm = 40-63mm, (Rolling) 100mm = 20-50mm, (Rolling)

    Premix = 25mm + blinding material (Rolling by applying water) Sand Seal coat Resurfacing: 20mm

    Type II (New) Granular Sub-Base (GSB) coarse graded (70mm below) Wet Mix Macadam (WMM) (40 mm, 20 mm, 10 mm & Soil) mix

    with water Dense Bitumen Macadam (DBM) 20mm + Bitumen Asphalt Concrete 10mm + Bitumen

    Thickness depends upon the actual design for a road

  • 8/11/2019 Road Construction Works

    13/39

  • 8/11/2019 Road Construction Works

    14/39

  • 8/11/2019 Road Construction Works

    15/39

    Sub-Grade Preparation

    Base Course: 150mm ( 40-63mm),Rolling

    Base Course: 150mm ( 20-50mm),Rolling

    Premix: 10mm + bitumen, Rollingby applying water

    Sand Seal Coat

    Base Course & Type - I

  • 8/11/2019 Road Construction Works

    16/39

    Sub-Grade Preparation

    Granular Sub Grade ( 70mm below),rolling

    Wet Mix Macadam (WMM), 10 to40mm plus soil with water & rolling

    Dense Bitumen Macadam (DBM) 20mm + Bitumen

    Asphalt Concrete 10mm +Bitumen

    Base Course & Type - II

  • 8/11/2019 Road Construction Works

    17/39

    TYPE - I

  • 8/11/2019 Road Construction Works

    18/39

    TYPE - II

  • 8/11/2019 Road Construction Works

    19/39

    4. SHOULDER:

    A hard area at the side of a main road, especially amotorway, where a driver can stop if there is a seriousproblem

    Shoulder should be strong enough to resist any types

    of vehicle

    Maintain proper compaction as per the design

    Width and thickness should be as per the specification

  • 8/11/2019 Road Construction Works

    20/39

    SHOULDER

  • 8/11/2019 Road Construction Works

    21/39

    PERMANENT WORKS

    RETAINING WALLBREAST WALLRCC WALLCULVERTDRAIN

  • 8/11/2019 Road Construction Works

    22/39

    Breast Wall

  • 8/11/2019 Road Construction Works

    23/39

    RCC Wall

  • 8/11/2019 Road Construction Works

    24/39

    Culverts

  • 8/11/2019 Road Construction Works

    25/39

    Culverts

  • 8/11/2019 Road Construction Works

    26/39

  • 8/11/2019 Road Construction Works

    27/39

    CATCH PITCATCH PIT

  • 8/11/2019 Road Construction Works

    28/39

    3. BRIDGE CONSTRUCTIONRCC BRIDGESTEEL BRIDGEBAILEY BRIDGEWOODEN BRIDGE

  • 8/11/2019 Road Construction Works

    29/39

    RCC Bridge

  • 8/11/2019 Road Construction Works

    30/39

    Steel Bridge

  • 8/11/2019 Road Construction Works

    31/39

    Bailey Bridge

  • 8/11/2019 Road Construction Works

    32/39

    Wooden Bridge

  • 8/11/2019 Road Construction Works

    33/39

    MATERIALS REQUIRED IN ROAD

    CONSTN. CEMENT SAND BOULDER AGGREGATES (different sizes) STEEL MESH BITUMEN GEO-TEXTITLE RCC HUME PIPES

  • 8/11/2019 Road Construction Works

    34/39

    CONSTRUCTED WITHOUT SPECIFICATION

  • 8/11/2019 Road Construction Works

    35/39

  • 8/11/2019 Road Construction Works

    36/39

    WE BUILD

    GOOD & DURABLE ROAD

  • 8/11/2019 Road Construction Works

    37/39

    WE PROVIDE TO ROAD USERS

    COMFORT & SAFE RIDING LESS OPERATIONAL COST IN REASONABLE TIME

  • 8/11/2019 Road Construction Works

    38/39

    FOR THE COUNTRY

    BOOST UPCOUNTRYs SOCIO

    -ECONOMYDEVELOPMENT