road c_bishopmasaba_road

Upload: kintu-joel

Post on 03-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Road C_BishopMasaba_Road

    1/4

    District & Urban Road

    District/City

    Code:

    District/City

    Name:

    Municipality/To

    wn Code:

    Municipality/To

    wn Name:

    Road Code Road Name:Road

    Class:

    Start

    Village:

    Surveyed by: Survey Date:Survey

    Vehicle:Weather:

    Road Length: 2.30 kmGarmin Raw Data

    File Name:

    Track

    Name:

    Survey

    Direction:

    start end (km) left right left right

    (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x)

    Calculated as (iii) -

    (ii)

    Stop and

    perform Check

    Based on

    Average Speed

    (xxiv)

    1 0.00 0.20 0.20 3 3 3 0 0 1

    2 0.20 0.50 0.30 3 3 3 0 0 1

    3 0.50 1.00 0.50 3 4 4 4 4 1

    4 1.00 1.30 0.30 3 4 4 4 4 1

    5 1.30 2.30 1.00 3 4 4 4 4 1

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    NA

    12/6/2013

    Road

    Surface

    Type

    Drainage Condition

    Factor

    TR_BishopMasaba_Ro

    ad.gpx

    BishopMasaba_Road

    Road Sectiton

    No.

    Road Section Chainage

    (km)

    Road Section

    Length

    Shoulder Condition

    Factor

    KINTU JOEL M

    (v) Road Surface Type

    1.Earth: Not graveled in last 5 years

    2.Gravel: Graveled in last 5 years

    3.Paved

    (vi) & (vii) Drainage

    Condition Factor

    1-Good/2-Fair/3-Poor/4-Bad

    (viii) & (ix) Shoulder

    Condition Factor

    1-Good/2-Fair/3-Poor/4-Bad

    Record Odometer Reading in GPS (Start)

    (x) Road Surfa

    Factor

    1-Good/2-Fair/

    BSHP MSB 16:28:02

    Stop and perform Visual Check

    Roughness

    Surface

    Conditon

    Factor

    Stop and perform Visual Check

    ROAD SEC

    4WD

    NA

  • 8/12/2019 Road C_BishopMasaba_Road

    2/4

    District & Urban Road

    District/City

    Code:

    District/City

    Name:

    Municipality/To

    wn Code:

    Municipality/

    wn Name:

    Road Code Road Name:Road

    Class:

    Start

    Village:

    Surveyed by: Survey Date:Survey

    Vehicle:Weather

    Road Length: 2.30 kmGarmin Raw Data

    File Name:

    Track

    Name:

    Survey

    Direction

    start end (km) left right left right

    (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x)

    Calculated as (iii) -

    (ii)

    Stop and

    perform Check

    Based on

    Average Spee(xxiv)

    NA

    12/6/2013

    Road

    Surface

    Type

    Drainage Condition

    Factor

    TR_BishopMasaba_Ro

    ad.gpx

    BishopMasaba_Road

    Road Sectiton

    No.

    Road Section Chainage

    (km)

    Road Section

    Length

    Shoulder Condition

    Factor

    KINTU JOEL M

    Record Odometer Reading in GPS (Start)

    BSHP MSB 16:28:02

    Stop and perform Visual Check

    Roughnes

    Surface

    Conditon

    Factor

    Stop and perform Visual Check

    ROAD SE

    4WD

    NA

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    2.30 2.30

    (x) Road Su

    Factor

    1-Good/2-Fa

    (v) Road Surface Type

    1.Earth: Not graveled in last 5 years

    2.Gravel: Graveled in last 5 years

    3.Paved

    (vi) & (vii) Drainage

    Condition Factor

    1-Good/2-Fair/3-Poor/4-Bad

    (viii) & (ix) Shoulder

    Condition Factor

    1-Good/2-Fair/3-Poor/4-Bad

  • 8/12/2019 Road C_BishopMasaba_Road

    3/4

  • 8/12/2019 Road C_BishopMasaba_Road

    4/4

    Form

    (Dry or Wet)

    km/hrs

    (xxvi) (xvii)Record from GPS

    the Speed - Moving

    Avg.

    Average SpeedRemarks