Page 1: Rne Basics

11

Page 2: Rne Basics

Page 2

All rights reserved © 2005, Alcatel

GSM NETWORK

Page 3: Rne Basics

Page 3

All rights reserved © 2005, Alcatel

BTS ARCHITECTURE

Page 4: Rne Basics

Page 4

All rights reserved © 2005, Alcatel

SMALL CONFIGURATIONS

Page 5: Rne Basics

Page 5

All rights reserved © 2005, Alcatel

LARGE CONFIGURATIONS

Page 6: Rne Basics

Page 6

All rights reserved © 2005, Alcatel

Antennas & Accessories

ANCG

BPFBPF

ANCD

DBC DBC

AA = Antenna

DBC = Dual Band Combiner

BPF = Band Pass Filter

ANCG = Antenna Network Combiner GSM

ANCD = Antenna Network Combiner DCS

CONCENTRIC CELL CASE

Page 7: Rne Basics

Page 7

All rights reserved © 2005, Alcatel

GSM Frequency Band

Page 8: Rne Basics

Page 8

All rights reserved © 2005, Alcatel

SWAP Activity

TEAMS INVOLVED & RESPOSIBILITIES

BSS Team : Installation & Commissioning of the BTS & making it On-Air

OMCR Team : Creation of the Site Hardware & Definition of Logical Radio Parameters

RNE Team : Preparation of Work Order for the Definition of Logical Radio Parameters & Validation of the Site Coverage, Quality , Radio Parameters after the site is On-Air

Page 9: Rne Basics

Page 9

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

1 SITE FUNCTIONALITY : OMCR Team Responsibility

OMCR Team should check the alarms appearing in OMCR after the site is created & made On-Air by the BSS Team

OMCR Team should be available at OMCR until the site is finally cleared by RNE team

Page 10: Rne Basics

Page 10

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

2 CALL SETUP TEST : BSS Team Responsibility

Case A: Call cannot be established Signal Level should be verified by checking VSWR Creation of LAC/CI should be verified at BSS & NSS ends

Case B: Call is established but NO AUDIO / VOICELESS calls Mainly Transmission problem

Case C: Call is established but voice quality is not good Mainly Radio Link problem

Page 11: Rne Basics

Page 11

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

3 RADIO PARAMETERS VERIFICATION : RNE Team Responsibility

Radio Parameters are checked using the Drive Test tool for all the cells of the site so as to verify the implementation of the Work Order

Important Radio Parameters include: LAC, CI, BSIC, BCCH FREQ, TCH FREQs, MA LIST, HSN, MAIO

Page 12: Rne Basics

Page 12

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

4 COVERAGE TEST : RNE Team Responsibility

RNE Team conducts Drive Test to check the DL Signal Level of all the sectors of the site

If Signal Level is not good ! Path Loss is occurring due to problem in Antenna,

Feeders, Lighting Arrestors, Dual Band Combiners & Band Pass Filters.

Jumpers are wrongly connected to the Feeders resulting in Cross-Sector or Cross-Feeder

Page 13: Rne Basics

Page 13

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

5 QUALITY TEST : RNE Team Responsibility

RNE Team conducts Drive Test to check the DL Quality of all the sectors of the site

If Signal Quality is not good ! DL Level is not good DL Interference exists

Page 14: Rne Basics

Page 14

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

6 HANDOVER TEST : RNE Team Responsibility

RNE Team conducts Drive Test to check the Neighbor Definition & execution of Handovers from all the cells of the site to neighboring cells & vice versa.

If Handovers are not occurring ! Neighbors Definition is not done by OMCR Team Site Hardware (mainly SUMA board) is malfunctioning

Page 15: Rne Basics

Page 15

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

7 CSSR / CDR TEST : RNE Team Responsibility

RNE Team conducts Drive Test to check the CSSR (Call Setup Success Rate) and CDR (Call Drop Rate)

Automatic Call Setup feature of the Drive Test tool is activated and multiple calls are made for a certain duration (normally 1 minute) in all the 3 sectors.

Then the log file is analyzed for computing the CSSR & CDR

CSSR should not be less than 95% CDR should not be more than 2%

Page 16: Rne Basics

Page 16

All rights reserved © 2005, Alcatel

SWAP Activity

SITE CLEARANCE

8 FINAL CLEARANCE : RNE Team Responsibility

RNE Team has to inform the BSS Team & OMCR Team that the site is properly integrated into the ALCATEL network.

IMPORTANT !!!

BSS Team & OMCR Team should not leave until the clearance is given by RNE Team

Page 17: Rne Basics

Page 17

All rights reserved © 2005, Alcatel

www.alcatel.com