rmt roofing and waterproofing various locations -...

14
UM CONSULTANT PROCEDURES AND DESIGN GUIDELINES: CURRENT EDITION IBC: 2018 IEBC: 2018 IMC: 2018 IPC: 2018 IFC: 2018 IFGC 2018 NEC: 2017 NFPA 13: 2016 NFPA 14: 2016 NFPA 20: 2016 NFPA 45: 2015 NFPA 72: 2016 NFPA 90A: 2015 NFPA 96: 2017 NFPA 99: 2012 NFPA 101: 2015 NFPA 110: 2016 ASHRAE 90.1: 2016 ASME A17.1: 2005 ADA 2010 UNIVERSITY OF MISSOURI - COLUMBIA SITE MAP CP190861 - VARIOUS LOCATIONS - REPLACE ROOFS - ISSUED FOR - BID 03/07/2019 INDEX OF DRAWINGS REVISION DESCRIPTION REVISION DELTA # 1 2 3 4 5 6 7 8 9 SHEET NUMBER SHEET TITLE 03/07/2019 ISSUED FOR BID G001 COVER SHEET (THIS SHEET) Δ A101 ABNR DEMOLITION PLAN Δ A102 ABNR RENOVATION PLAN Δ A201 CHEMISTRY ADDITION DEMOLITION PLAN Δ A202 CHEMISTRY ADDITION RENOVATION PLAN Δ A301 TROWBRIDGE DEMOLITION PLAN Δ A302 TROWBRIDGE RENOVATION PLAN Δ A401 ABNR DETAILS Δ A402 ABNR DETAILS Δ A403 ABNR DETAILS Δ A501 CHEMISTRY ADDITION DETAILS Δ A502 CHEMISTRY ADDITION DETAILS Δ A503 CHEMISTRY ADDITION DETAILS Δ A601 TROWBRIDGE DETAILS Δ PROJECT NOTES: 1. REFER TO 2. ANY OPERATION WHERE HIGH LEVELS OF NOISE ARE EXPECTED ON THE CONSTRUCTION SITE WILL NEED TO BE COORDINATED AND APPROVED WITH THE OWNER'S REPRESENTATIVE AT LEAST 48 HOURS PRIOR TO THE WORK BEING INITIATED. 3. AREAS NOT UNDER CONSTRUCTION NEED TO BE MAINTAINED FOR PUBLIC ACCESS AND CIRCULATION. PROPER SAFETY PRECAUTIONS TO BE OBSERVED. 4. MAINTAIN AND PROTECT THE EXISTING CONDITIONS IN THE AREA DURING THE CONSTRUCTION PERIOD UNLESS OTHERWISE NOTED. 5. EVERY DIMENSION THAT IS DIRECTLY OR INDIRECTLY RELATED TO EXISTING STRUCTURE OR CONSTRUCTION IS TO BE CAREFULLY MEASURED AND COORDINATED WITH ADJACENT CONDITIONS. ALL BIDDING AND CONSTRUCTION COSTS ARE TO INCLUDE A CAREFUL ANALYSIS OF EACH RELATING TRADE. REPORT DISCREPANCIES WHICH MAY ADVERSELY AFFECT FINISH WORK AND BUILT-IN WORK TO THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING OF CONSTRUCTION. 6. CONTRACTOR SHALL COMPLY WITH ALL DIRECTIVES OF THE OWNER'S REPRESENTATIVE. IF CONFLICTS BETWEEN DRAWINGS, SPECIFICATIONS AND REQUIREMENTS OF BUILDING OWNER AND/OR OPERATORS ARISE, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE IMMEDIATELY. 7. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY, INCLUDING STORAGE OF MATERIAL AND EQUIPMENT, WITHIN THE CONSTRUCTION LIMITS, AT ALL TIMES BEING RESPONSIBLE FOR AND ABIDING BY RULES AND REGULATIONS OF THE OWNER. 8. WHERE EXISTING MECHANICAL EQUIPMENT, PIPE, OR SUPPORTS ARE REMOVED, PATCH AND FINISH THE SURFACE AS REQUIRED TO MATCH THE EXISTING, UNLESS OTHERWISE NOTED. PROJECT NOTES: CONTINUED 9. DISCONNECTION OR INTERRUPTION OF ANY MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS MUST BE COORDINATED WITH OWNER'S REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO WORK BEING PERFORMED. 10. THE CONTRACTOR SHALL TAKE PHOTOGRAPHS OF INTERIOR AND EXTERIOR AREAS DOCUMENTING EXISTING CONDITIONS BEFORE PROCEEDING WITH WORK. ATTENTION SHALL BE FOCUSED ON ANY EXISTING DAMAGE. ANY SUBSEQUENT DAMAGE OCCURRING DURING THE CONSTRUCTION PERIOD SHALL BE REPLACED AT THE CONTRACTORS EXPENSE. LANDSCAPE NOTES: 1. VEHICLES ARE TO USE DESIGNATED CONSTRUCTION ENTRANCES AS INDICATED ON DRAWINGS OR CONSTRUCTION DOCUMENTS. IF NO CONSTRUCTION ROUTE IS INDICATED VEHICLES ARE RESTRICTED TO SIDEWALKS OR PAVED AREAS. ALL CONSTRUCTION EQUIPMENT AND OR VEHICLES SHALL VERIFY THE WEIGHT LIMIT AND RESTRICTION ON PAVEMENT PRIOR TO CONSTRUCTION AND NOTIFY OWNER'S REPRESENTATIVE OF THE PLANNED ROUTE. 2. THERE SHALL BE NO VEHICLE MOVEMENT IN ANY LANDSCAPED, SHRUB OR PERENNIAL AREAS, MULCH BED AND/OR TREE CANOPY DRIP AND ROOT ZONES, WITHOUT PRIOR NOTIFICATION AND APPROVAL FROM LANDSCAPE SERVICES. LANDSCAPE SERVICES REQUIRES ONE WEEK NOTICE PRIOR TO ANY VEHICLE MOVEMENT IN THESE AREAS. 3. WHERE ACCESS TO BUILDING REQUIRES CROSSING TURF, MULCH AREAS, TREE ROOT SYSTEMS, TREE CANOPY ZONES, OR IRRIGATION SYSTEMS, THE CONTRACTOR SHALL USE ALTURNAMATS BY DICA OR APPROVED EQUAL. 4. VEHICLE ACCESS SHALL NOT BREAK OR RUB TREE BRANCHES. OWNER WILL PRUNE TREE BRANCHES TO PROVIDE CLEARANCE AROUND BUILDING ENTRANCE. OWNER REQUIRES ONE WEEK'S NOTICE FOR THIS WORK TO BE DONE. 5. DO NOT COMPACT GRADE WITHIN THE DRIP LINE OF TREES. PROVIDE APPROVED FENCING TO PREVENT DRIVING OR EQUIPMENT PARKING WITHIN DRIP LINE OF TREES, PRIOR TO CONSTRUCTION OR WORK IN THE PROJECT AREA. MU'S CAMPUS STANDARD 6' CHAIN LINK FENCE AND POSTS SHALL BE USED UNLESS OTHERWISE NOTED AND/OR APPROVED BY LANDSCAPE SERVICES. CODES AND STANDARDS DATE: PROJECT NO.: THE CURATORS OF THE UNIVERSITY OF MISSOURI FOR: RMT ROOFING AND WATERPROOFING CONSULTANTS, INC. 410 SOVEREIGN COURT #18 MANCHESTER, MO 63011 (636)-391-2185 VARIOUS LOCATIONS - REPLACE ROOFS COLUMBIA, BOONE COUNTY, MISSOURI 65211 ANHEUSER BUSCH NATURAL RESOURCES, CHEMISTRY ADDITION, TROWBRIDGE MARCH 7, 2019 CP190861 I HEREBY CERTIFY THAT DRAWINGS AND/OR SPECIFICATIONS HAVE BEEN PREPARED BY ME, OR UNDER MU SUPERVISION. I FURTHER CERTIFY THAT TO THE BEST OF MY KNOWLEDGE THESE DRAWINGS AND/OR SPECIFICATIONS ARE AS REQUIRED BY AND IN COMPLIANCE WITH BUILDING CODES OF THE UNIVERSITY OF MISSOURI. SIGNATURE: __________________________________________________________ BASE BID ALT. #1 STAGING & PARKING STAGING TEMP. STAGING AREAS ARCHITECTURAL DRAWINGS AS APPLICABLE, TO DETERMINE EXACT EXTENT OF DEMOLITION REQUIRED BY THOSE DISCIPLINES TO COORDINATE WITH NEW CONSTRUCTION.

Upload: others

Post on 31-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

UM CONSULTANT

PROCEDURES AND DESIGN

GUIDELINES: CURRENT EDITION

IBC: 2018

IEBC: 2018

IMC: 2018

IPC: 2018

IFC: 2018

IFGC 2018

NEC: 2017

NFPA 13: 2016

NFPA 14: 2016

NFPA 20: 2016

NFPA 45: 2015

NFPA 72: 2016

NFPA 90A: 2015

NFPA 96: 2017

NFPA 99: 2012

NFPA 101: 2015

NFPA 110: 2016

ASHRAE 90.1: 2016

ASME A17.1: 2005

ADA 2010

UNIVERSITY OF MISSOURI - COLUMBIA SITE MAP

CP

19

08

61

- V

AR

IO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

- IS

SU

ED

F

OR

- B

ID

0

3/0

7/2

01

9

INDEX OF DRAWINGS

REVISION DESCRIPTION

REVISION DELTA # 1 2 3 4 5 6 7 8 9

SH

EE

T

NU

MB

ER

SHEET TITLE

03

/0

7/2

01

9 IS

SU

ED

F

OR

B

ID

G001

COVER SHEET (THIS SHEET)

Δ

A101 ABNR DEMOLITION PLAN Δ

A102 ABNR RENOVATION PLAN Δ

A201 CHEMISTRY ADDITION DEMOLITION PLAN Δ

A202 CHEMISTRY ADDITION RENOVATION PLAN Δ

A301 TROWBRIDGE DEMOLITION PLAN Δ

A302 TROWBRIDGE RENOVATION PLAN Δ

A401 ABNR DETAILS Δ

A402 ABNR DETAILS Δ

A403 ABNR DETAILS Δ

A501 CHEMISTRY ADDITION DETAILS Δ

A502 CHEMISTRY ADDITION DETAILS Δ

A503 CHEMISTRY ADDITION DETAILS Δ

A601 TROWBRIDGE DETAILS Δ

PROJECT NOTES:

1. REFER TO

2. ANY OPERATION WHERE HIGH LEVELS OF NOISE ARE EXPECTED ON

THE CONSTRUCTION SITE WILL NEED TO BE COORDINATED AND

APPROVED WITH THE OWNER'S REPRESENTATIVE AT LEAST 48

HOURS PRIOR TO THE WORK BEING INITIATED.

3. AREAS NOT UNDER CONSTRUCTION NEED TO BE MAINTAINED FOR

PUBLIC ACCESS AND CIRCULATION. PROPER SAFETY

PRECAUTIONS TO BE OBSERVED.

4. MAINTAIN AND PROTECT THE EXISTING CONDITIONS IN THE AREA

DURING THE CONSTRUCTION PERIOD UNLESS OTHERWISE NOTED.

5. EVERY DIMENSION THAT IS DIRECTLY OR INDIRECTLY RELATED TO

EXISTING STRUCTURE OR CONSTRUCTION IS TO BE CAREFULLY

MEASURED AND COORDINATED WITH ADJACENT CONDITIONS. ALL

BIDDING AND CONSTRUCTION COSTS ARE TO INCLUDE A CAREFUL

ANALYSIS OF EACH RELATING TRADE. REPORT DISCREPANCIES

WHICH MAY ADVERSELY AFFECT FINISH WORK AND BUILT-IN WORK

TO THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING OF

CONSTRUCTION.

6. CONTRACTOR SHALL COMPLY WITH ALL DIRECTIVES OF THE

OWNER'S REPRESENTATIVE. IF CONFLICTS BETWEEN DRAWINGS,

SPECIFICATIONS AND REQUIREMENTS OF BUILDING OWNER

AND/OR OPERATORS ARISE, THEY SHALL BE BROUGHT TO THE

ATTENTION OF THE OWNER'S REPRESENTATIVE IMMEDIATELY.

7. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY,

INCLUDING STORAGE OF MATERIAL AND EQUIPMENT, WITHIN THE

CONSTRUCTION LIMITS, AT ALL TIMES BEING RESPONSIBLE FOR

AND ABIDING BY RULES AND REGULATIONS OF THE OWNER.

8. WHERE EXISTING MECHANICAL EQUIPMENT, PIPE, OR SUPPORTS

ARE REMOVED, PATCH AND FINISH THE SURFACE AS REQUIRED TO

MATCH THE EXISTING, UNLESS OTHERWISE NOTED.

PROJECT NOTES: CONTINUED

9. DISCONNECTION OR INTERRUPTION OF ANY MECHANICAL, PLUMBING,

OR ELECTRICAL SYSTEMS MUST BE COORDINATED WITH OWNER'S

REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO WORK BEING

PERFORMED.

10. THE CONTRACTOR SHALL TAKE PHOTOGRAPHS OF INTERIOR AND

EXTERIOR AREAS DOCUMENTING EXISTING CONDITIONS BEFORE

PROCEEDING WITH WORK. ATTENTION SHALL BE FOCUSED ON ANY

EXISTING DAMAGE. ANY SUBSEQUENT DAMAGE OCCURRING DURING

THE CONSTRUCTION PERIOD SHALL BE REPLACED AT THE

CONTRACTORS EXPENSE.

LANDSCAPE NOTES:

1. VEHICLES ARE TO USE DESIGNATED CONSTRUCTION ENTRANCES AS

INDICATED ON DRAWINGS OR CONSTRUCTION DOCUMENTS. IF NO

CONSTRUCTION ROUTE IS INDICATED VEHICLES ARE RESTRICTED TO

SIDEWALKS OR PAVED AREAS. ALL CONSTRUCTION EQUIPMENT AND

OR VEHICLES SHALL VERIFY THE WEIGHT LIMIT AND RESTRICTION ON

PAVEMENT PRIOR TO CONSTRUCTION AND NOTIFY OWNER'S

REPRESENTATIVE OF THE PLANNED ROUTE.

2. THERE SHALL BE NO VEHICLE MOVEMENT IN ANY LANDSCAPED, SHRUB

OR PERENNIAL AREAS, MULCH BED AND/OR TREE CANOPY DRIP AND

ROOT ZONES, WITHOUT PRIOR NOTIFICATION AND APPROVAL FROM

LANDSCAPE SERVICES. LANDSCAPE SERVICES REQUIRES ONE WEEK

NOTICE PRIOR TO ANY VEHICLE MOVEMENT IN THESE AREAS.

3. WHERE ACCESS TO BUILDING REQUIRES CROSSING TURF, MULCH

AREAS, TREE ROOT SYSTEMS, TREE CANOPY ZONES, OR IRRIGATION

SYSTEMS, THE CONTRACTOR SHALL USE ALTURNAMATS BY DICA OR

APPROVED EQUAL.

4. VEHICLE ACCESS SHALL NOT BREAK OR RUB TREE BRANCHES. OWNER

WILL PRUNE TREE BRANCHES TO PROVIDE CLEARANCE AROUND

BUILDING ENTRANCE. OWNER REQUIRES ONE WEEK'S NOTICE FOR

THIS WORK TO BE DONE.

5. DO NOT COMPACT GRADE WITHIN THE DRIP LINE OF TREES. PROVIDE

APPROVED FENCING TO PREVENT DRIVING OR EQUIPMENT PARKING

WITHIN DRIP LINE OF TREES, PRIOR TO CONSTRUCTION OR WORK IN

THE PROJECT AREA. MU'S CAMPUS STANDARD 6' CHAIN LINK FENCE

AND POSTS SHALL BE USED UNLESS OTHERWISE NOTED AND/OR

APPROVED BY LANDSCAPE SERVICES.

CODES AND

STANDARDS

DATE: PROJECT NO.:THE CURATORS OF THE

UNIVERSITY OF MISSOURI

FOR:

RMT ROOFING AND

WATERPROOFING

CONSULTANTS, INC.

410 SOVEREIGN COURT #18

MANCHESTER, MO 63011

(636)-391-2185

VARIOUS LOCATIONS - REPLACE ROOFS

COLUMBIA, BOONE COUNTY, MISSOURI 65211

ANHEUSER BUSCH NATURAL RESOURCES, CHEMISTRY ADDITION, TROWBRIDGE

MARCH 7, 2019 CP190861

I HEREBY CERTIFY THAT DRAWINGS AND/OR SPECIFICATIONS HAVE

BEEN PREPARED BY ME, OR UNDER MU SUPERVISION. I FURTHER

CERTIFY THAT TO THE BEST OF MY KNOWLEDGE THESE DRAWINGS

AND/OR SPECIFICATIONS ARE AS REQUIRED BY AND IN COMPLIANCE

WITH BUILDING CODES OF THE UNIVERSITY OF MISSOURI.

SIGNATURE:

__________________________________________________________

BASE BID

ALT. #1

STAGING &

PARKING

STAGING

TEMP. STAGING AREAS

ARCHITECTURAL

DRAWINGS AS APPLICABLE, TO DETERMINE EXACT EXTENT OF

DEMOLITION REQUIRED BY THOSE DISCIPLINES TO COORDINATE

WITH NEW CONSTRUCTION.

Page 2: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

LEGEND

EXISTING ROOF CONSTRUCTION

CORE 1: STEEL DECK; 2 LAYERS 2” ISO, MECHANICALLY

FASTENED; 1-1.5” ISO 1 - 1/2” PERLITE BOARD - MOPPED

CORE 2: STEEL DECK; 2 LAYERS 2-1/2” ISO, MECHANICALLY

FASTENED; 1 - 1/2” PERLITE BOARD - MOPPED

CORE 3: STEEL DECK; 2 LAYERS 1-2-1/4” ISO, MECHANICALLY

FASTENED; 1 - 1/2” PERLITE BOARD - MOPPED

CORE 4: STEEL DECK; 1 LAYER 2” ISO, 1-2” MECHANICALLY

FASTENED; 1 - 1/2” PERLITE BOARD - MOPPED

CORE 5: STEEL DECK; 1 LAYER 3.5” ISO, 1 LAYER 1.0” ISO MECHANICALLY

FASTENED; 1/2” PERLITE BOARD - MOPPED

CORE 6: STEEL DECK; 2 LAYERS 2” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 7: STEEL DECK; 2 LAYERS 2” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 8: STEEL DECK; 2 LAYERS 2” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 9: STEEL DECK; 2 LAYERS 2” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 10: STEEL DECK; 2 LAYERS 2” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 11: STEEL DECK; 2 LAYERS 3” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 12: STEEL DECK; 2 LAYERS 3” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 13: STEEL DECK; 2 LAYERS 3” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

CORE 14: STEEL DECK; 1 LAYER 2” ISO, MECHANICALLY

FASTENED; 1- 1/2” PERLITE BOARD - MOPPED

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

LO

CA

TIO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6521

1

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

AB

NR

D

EM

OL

IT

IO

N P

LA

N

A-101

ARTHUR DOERR BOND

Mo.# A-6301

0

REF:SCALE: 1/16" = 1'-0"A2.0

16'8' 32'

1 DEMOLITION ROOF PLAN

DEMOLITION NOTES: ABNR

1. REMOVE INTERIOR SIDE OF PARAPET FASCIA / COPING

2. LEAVE THROUGH WALL SCUPPERS

3. REMOVE LADDER AND ANCHORS - FOR REATTACHMENT

4. REMOVE EXPAND-O-FLASH DETAILS

5. ROOF 2 & 3 - LEAVE SMALL SHEET METAL RECEIVER

6. ROOF 2 - DOOR THRESHOLD

7. ROOF 2 - REMOVE ROOF SIDE FASCIA

8. ROOF 2 - REMOVE EXPANSION JOINT CAP

9. ROOF 2 - SCUPPER INSERT TO REMAIN. METAL DETAIL ABOVE WINDOW TO REMAIN

10. ROOF 2 - RAILING SUPPORT TO REMAIN

11. ROOF 3 - REMOVE FASCIA

12. ROOF 3 - EXISTING METAL SIDING TO REMAIN

13. REMOVE PITCH PANS AROUND ELECTRICAL CONDUIT

14. ALL SCUPPER INSERTS TO REMAIN

15. ROOF 5 - REMOVE SURFACE MOUNTED COUNTERFLASHING

16. ROOF 4 & 6 - REMOVE EXPANSION JOINT CAP

17. ROOF 6 - REMOVE FASCIA CAP

18. ROOF 7 - REMOVE SURFACE MOUNTED COUNTERFLASHING

19. ROOF 7 & 8 - REMOVE COUNTERFLASHING. DO NOT DISTURB RECEIVER DETAIL

UNDER STONE COPING

20. ROOF 7 & 8 - COPPER FASCIA ONLY TO BE REMOVED AND DISCARD. DO NOT

DISTURB ARCHITECTURAL COPPER METAL FASCIA

21. W2 & W3 - REMOVE SURFACE MOUNTED COUNTERFLASHING

22. W2 & W3 - DO NOT REMOVE OR DISTURB COPPER FASCIA DETAIL

23. W8 - REMOVE COPPER FASCIA DETAIL AT PERIMETER AND DISCARD

24. W8 - DO NOT DISTURB RECEIVER METAL DETAIL ABOVE FLASHING

25. W9 - REMOVE WALL EXPANSION JOINT DETAIL

26. W9 - DO NOT DISTURB RECEIVER METAL DETAIL ABOVE FLASHING

27. W9 - REMOVE FASCIA ON PERIMETER

28. W7 - REMOVE WALL EXPANSION JOINT

29. W6 - RECEIVER UNDER COPING TO REMAIN. DO NOT DISTURB

30. W6 - REMOVE ALL EXISTING SEALANT IN COPING JOINTS

31. W1 & W2 - REMOVE SURFACE MOUNTED COUNTERFLASHING

32. W1 & W2 - REMOVE FASCIA PIECE ONLY. LEAVE ARCHITECTURAL METAL DETAIL

33. W2 & W3 - REMOVE EXPANSION JOINT CAP DETAIL

34. W5 - REMOVE SURFACE MOUNTED COUNTERFLASHING

35. W5 - RECEIVER ABOVE FLASHING TO REMAIN

36. W4 - SURFACE MOUNTED COUNTERFLASHING TO BE REMOVED

37. W4 - WALL EXPANSION JOINT TO BE REMOVED

38. W6 - REMOVE FLASHING BELOW RECEIVER METAL

39. W6 - REMOVE EXISTING METAL DETAIL ON WEST RADIUS WALL BELOW COPING

40. W6 - REMOVE ALL SEALANT IN JOINTS BETWEEN COPINGS

Page 3: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

LEGEND

0

REF:SCALE: 1/16" = 1'-0"A2.0

16'8' 32'

1 RENOVATION ROOF PLAN

RENOVATION NOTES: ABNR1. PRIME METAL ROOF DECK AND INSTALL SELF ADHERED (SA) VAPOR BARRIER.2. ROOF SECTIONS 1,2,7,8, W1A, W2, W3 & W8 - INSTALL MECHANICALLY FASTEN WITH 1-90 FM

REQUIREMENTS 2” LAYER POLY ISO WITH ¼” PER FOOT TAPERED INSULATION LOW RISE FOAMED TOBASE LAYER INSULATION.

3. ROOF SECTIONS 3,4,5,6,W1,W4,W5,W6,W7,W9,W10,W11 & W12 MECHANICALLY FASTEN WITHFM 1-90 FASTENING PATTERN BASE LAYER OF 2” POLYISOCYANURATE INSULATION FOLLOWED BYAPPLYING LOW RISE FOAM TO ADHERE THE SECOND LAYER OF 2” POLYISOCYANURATE WITHFM 1-90 RIBBON METHOD.

4. WITH LOW RISE FOAM, INSTALL 1/2” HIGH DENSITY COVER BOARD ADHERED WITH FM 1-90 RIBBONMETHOD TO TOP LAYER OF INSULATION.

5. INSTALL SINGLE PLY EPDM ROOF MEMBRANE - FULLY ADHERED TO 1/2" HD POLYISO COVERBOARD6. INSTALL ½” PER FOOT TAPERED POLY ISO CRICKETS PRIOR TO THE INSTALLATION OF COVER BOARD.7. APPLY DOUBLE SIDED BUTYL TAPE BELOW THE INSTALLATION OF TERMINATION BAR AND OR

SURFACE MOUNTED COUNTER FLASHING.8. ROOF SECTION 2 - ELIMINATE THROUGH WALL SCUPPERS. BACK FILL SCUPPERS WITH LOW RISE FOAM

OR SUITABLE MATERIAL, REMOVE METAL FASCIA COMPONENTS AND INSTALL 26 GA. SHEET METALOVER THE SCUPPER OPENING. FLASH TYPICAL.

9. REMOVE PITCH PANS WHEREVER POSSIBLE AND FIELD WRAP IF POSSIBLE. STAINLESS STEEL PITCHPANS AND 2 PART SEALANTS ARE ACCEPTABLE.

10. ROOF SECTIONS W1,W2,W3,W4,W6,W8,W9, 7 & 8 - APPLY SEALANT TO CAULK RECEIVER ON THETOP OF THE COUNTER FLASHING DETAIL TO INTERFACE WITH PRE CAST WALL AND STONE COPING.TOOL SMOOTH.

11. ROOF SECTION W1A - INSTALLATION OF 2” BASE LAYER POLY ISO MECHANICALLY FASTENED TODECK, INSTALL ¼”-12” TAPERED INSULATION WITH LOW RISE FOAMED TO BASE LAYER INSULATION.

12. ROOF SECTION 6 - INSTALLATION OF 2”X6” TREATED WOOD NAILER FASTENED 24 ”O.C. TO THE TOPOF PRE CAST TILT UP CONCRETE WALL PANELS.

13. INSTALLATION OF EPDM FLASHING TO BE INSTALLED UP AND OVER TOP OF PARAPET WALLSTERMINATED INTO WOOD NAILER.

14. INSTALLATION OF 24 GA. CONTINUOUS CLEAT WITH 26 GA. KYNAR COATED COPING ON EXPOSEDPARAPET WALL PANELS.

15. ROOF SECTIONS W4 W6 & W9 - RE-USE COPPER EXPANSION JOINT COVER. RE- WORK ALL CAULKRELATED SEALANTS WITH DOW 790 SEALANT ON FLASHING RELATED DETAILS AND OR MASONRYTRANSITIONS.

16. ROOF SECTIONS 3 & W9 - BASE WITH FLAT STOCK INSULATION FILL BOTTOM FLASHING DETAIL FLUSHWITH WALL PANEL, INSTALL ADHESIVE OVER METAL WALL PANEL/FLAT STOCK INSULATION ANDINSTALL EPDM OVER WALL SURFACE WITH TYPICAL EPDM APPLICATION PROCESS.

17. INSTALL NEW 26 GA. SHEET METAL EXPANSION JOINT DETAILS.18. ROOF SECTIONS 7, 8 & W-8 - INSTALL NEW 16 OZ DRIP EDGE TO MATCH EXISTING REVEAL.19. ROOF SECTION W6 - FLASH TYPICAL.20. INSTALL 4'X8' ½” PLY WOOD AT ALL DOOR EGRESSES AND LADDER ACCESSES.21. INSTALLATION OF NEW WALK PADS AT DOORS AND ALL ROOF TOP EGRESSES.

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

The P

rofessional A

rchitects seal and

signature affixed to this sheet applies only to

the m

aterial and inform

ation show

n on this

sheet. A

ll draw

ings, instrum

ents, or other

docum

ents not exhibiting this seal shall not

be considered prepared by this architect, and

this architect expressly disclaim

s any and all

responsibility for such plans, draw

ings, or

docum

ents not exhibiting this seal.

This D

ocum

ent is intended to be signed

digitally. If no digital signature is attached to

this file, this m

edia should not be considered

a certified docum

ent.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

ULT

AN

TS

, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

LO

CA

TIO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 65211

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

AB

NR

R

EN

OV

AT

IO

N P

LA

N

A-102

ARTHUR DOERR BOND

Mo.# A-6301

Page 4: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

1/8" = 1'-0"A2.0

1

EXISTING ROOF CONSTRUCTION

CORE 1: 2 LAYERS 2” ISO, MECHANICALLY FASTENED; 1 - 1/2” PERLITE BOARD - MOPPED

CORE 2: 2 LAYERS 2” ISO, 1/2”-12” TAPERED ISO SADDLE MECHANICALLY

FASTENED; 1 - 1/2” PERLITE BOARD - MOPPED - 8” TOTAL THICKNESS

CORE 3: 2 LAYERS 2” ISO, MECHANICALLY FASTENED; 1 - 1/2” PERLITE

BOARD - MECHNICALLY FASTENED

CORE 4: 2 LAYERS 2” ISO, 1/2”-12” TAPERED ISO SADDLE MECHANICALLY

FASTENED; 1 - 1/2” PERLITE BOARD - MOPPED - 8” TOTAL THICKNESS

CORE 5: 1 LAYERS 3” ISO, MECHANICALLY FASTENED; 3 - 1/2” PERLITE

BOARD - MECHANICALLY FASTENED

CORE 6: 1 LAYERS 3” ISO, MECHANICALLY FASTENED; 3 - 1/2” PERLITE

BOARD - MECHANICALLY FASTENED

DEMOLITION NOTES - CHEMISTRY ADDITION:

1. DO NOT REMOVE FASCIA ABOVE WINDOWS.

2. REMOVE PRIVACY SCREEN TO REMOVE ROOF. DO NOT REPLACE.

3. CONDUIT TRAY TO BE REMOVED FOR REATTACHMENT AFTER ROOFING WORK

BY CELL PHONE CARRIER

4. EPDM ROOF OVER CLERESTORY TO REMAIN. REMOVE METAL FASCIA.

5. ELECTRICAL CONDUIT AND SENSOR BOX TO BE DISCONNECTED FROM PARAPET

WALL AND REINSTALL OVER NEW COPING.

6. REMOVE EXISTING COUNTERFLASHING ONLY. LEAVE EXISTING SEALANT INTACT.

7. DO NOT REMOVE COMPLETE COPPER FASCIA, ONLY CAP PIECE.

8. REMOVE EXISTING PITCH PANS AND MASTIC, CLEAN TO SHINY METAL.

9. REMOVE EXISTING COPING METAL.

10. CURB COPING METAL - BREAK CORNERS, LIFT METAL.

11. REMOVE WOOD SUPPORTS, CUT LEGS FOR NEW SUPPORTS.

12. REMOVE CONCRETE PAD AT BOTTOM OF STAIRS FROM PLATFORM.

13. REMOVE FLASHING, COUNTERFLASHING, TERM BAR AND SEALANT.

14. REMOVE EXPAND-O-FLASH EXPANSION JOINT COVER.

15. CUT METAL COUNTERFLASHING AT FASTENER LINE

16. DO NOT REMOVE EXISTING METAL COPING.

17. PRIVACY PANELS TO BE REMOVED AND REINSTALLED FOR ROOF

REPLACEMENT.

0

REF:SCALE:

8'4' 16'

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

CH

EM

IS

TR

Y A

DD

IT

IO

N D

EM

OLIT

IO

N P

LA

N

A-201

ARTHUR DOERR BOND

Mo.# A-6301

DEMOLITION ROOF PLAN

Page 5: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

1/8" = 1'-0"A2.0

1

0

REF:SCALE:

8'4' 16'

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

CH

EM

IS

TR

Y A

DD

IT

IO

N R

EN

OV

AT

IO

N P

LA

N

A-202

ARTHUR DOERR BOND

Mo.# A-6301

DEMOLITION ROOF PLAN

RENOVATION NOTES CHEMISTRY ADDITION:

1. INSTALL SELF ADHERED VAPOR BARRIER TO PRIMED METAL DECK.

2. INSTALL BASE LAYER OF 2.0” POLYISOCYANURATE- MECHANICALLY ATTACHED TO METAL DECK

WITH A 1-90 FASTENING PATTERN.

3. INSTALL SECOND LAYER OF 2.0” POLYISOCYANURATE TO BASE LAYER

OF 2.0” POLYISOCYANURATE-ADHERED WITH LOW RISE FOAM ADHESIVE.

4. INSTALL ½” HD COVERBOARD TO SECOND LAYER OF 2.0” POLYISOCYANURATE- ADHERED WITH

LOW RISE FOAM ADHESIVE.

5. INSTALL SINGLE PLY EPDM ROOF MEMBRANE-FULLY ADHERED TO ½” HD COVERBOARD.

6. REUSE COPING METAL AT TWO LOCATIONS. INSTALL NEW SLIP FLASHING AFTER PARAPET WALL

IS FLASHED.

7. FIELD FABRICATE STAIR CASE SUPPORT.

8. REINSTALL PRIVACY FENCE THAT WAS REMOVED TO ACCESS SMALL AREA OF THE ROOF ALONG

THE EAST PERIMETER.

9. CUT EXISTING ROOF MEMBRANE EVERY 16”. INSTALL NEW ½” HD COVERBOARD-MECHANICALLY

ATTACHED. INSTALL NEW SINGLE PLY EPDM ROOF MEMBRANE-FULLY ADHERED TO ½” HD

COVERBOARD.

10. NEW SOIL STACK FLASHING.

11. ADD NEW WOOD NAILER TO PARAPET WALLS. INSTALL NEW 26 GA. KYNAR COATED METAL

COPING WITH 24 GA. METAL CLEAT.

12. ADD NEW WOOD NAILER TO PENTHOUSE PARAPET WALLS. INSTALL NEW 26 GA. KYNAR COATED

METAL COPING WITH 24 GA. METAL CLEAT.

13. INSTALL NEW 26 GA. KYNAR COATED SURFACE MOUNT COUNTERFLASHING ALONG ALL WALLS.

14. INSTALL NEW 26 GA. KYNAR COATED SLIP FLASHING AT ALL EXHAUST CURBS AND RTUs.

15. INSTALL NEW EPDM FLASHING MEMBRANE AROUND ALL WIDE FLANGE BEAMS.

16. INSTALL NEW TWO PIECE METAL EXPANSION JOINT ALONG THE ENTIRE NORTHWEST PARAPET

WALL.

17. INSTALL DUCT WORK SUPPORTS. CABLE TRAY TO BE INSTALLED BY CELL PHONE CARRIER.

18. CLERESTORY PLYWOOD WALL WILL NEED TO BE PRIMED WITH CAV-GRIP PRIMER BEFORE EPDM

FLASHING IS INSTALLED.

19. INSTALL 48” SUMP AT ALL DRAIN LOCATIONS. NOTE: DRAIN BOWLS ARE 2 INCHES HIGHER THAN

THE ROOF DECK.

20. OVERFLOW DRAINS DO NOT RECEIVE SUMPS. NOTE: OVERFLOW BOWLS ARE 4 INCHES HIGHER

THAN THE ROOF DECK.

21. NEW COPPER DRIP EDGE TO BE INSTALLED ALONG THE CANOPY PERIMETER ROOF AT TWO

LOCATIONS. NOTE: ROOF IS IDENTIFIED AS SECTION 1B.

22. THE GOOSE NECK HOT STACKS TO RECEIVE NEW 26 GA. METAL SLEEVES WITH NEW UMBRELLAS.

23. INSTALL NEW METAL EXPANSION JOINT AT THE WEST WINDOW TRANSITON ON THE CANOPY

ROOF. THREE COURSE ALL CORNER SEAMS WITH MANUFACTURER'S APPROVED LIQUID

FLASHING.

24. EXISTING PENTHOUSE LADDER TO REMAIN. INSTALL ½” PLYWOOD AT ALL EGRESSES.

Page 6: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

LEGEND

0

REF:SCALE: 1/16" = 1'-0"A2.0

16'8' 32'

1 DEMOLITION ROOF PLAN

EXISTING ROOF CONSTRUCTION

CORE 1: TECTUM, 2 PLY NAILED BASE WITH HOT, 4 1/2” TAPERED POLY

ISO, 1” POLY ISO HOT, FULLY ADHERED EPDM (5 ½” TOTAL THICKNESS)

CORE 2: TECTUM, 2 PLY NAILED BASE IN HOT, 1” POLY ISO, 2” POLY

ISO, FULLY ADHERED EPDM (3” TOTAL THICKNESS)

CORE 3: CONCRETE, 2 PLY HOT, 1” POLY ISO, 2” POLY ISO, FULLY ADHERED

EPDM (3” TOTAL THICKNESS)

CORE 4: CONCRETE, 2 PLY HOT, 2” TAPERED POLY ISO, FULLY ADHERED

EPDM (2” TOTAL THICKNESS)

CORE 5: CONCRETE, 2 PLY HOT, 2” TAPERED POLY ISO, 1” TAPERED POLY

ISO, FULLY ADHERED EPDM (3” TOTAL THICKNESS)

CORE 6: CONCRETE, 2 PLY HOT, 4” TAPERED POLY ISO, 1 ¾” TAPERED POLY

ISO, FULLY ADHERED EPDM (6” TOTAL THICKNESS)

CORE 7: CONCRETE, 2 PLY HOT, 2” TAPERED POLY ISO, 2” TAPERED POLY

ISO, EPDM FULLY ADHERED (4” TOTAL THICKNESS)

CORE 8: TECTUM, 1 PLY NAILED BASE, 1 PLY HOT, 4 ½” TAPERED POLY

ISO, 1” TAPERED POLY ISO, FULLY ADHERED EPDM (5 ½” TOTAL THICKNESS)

CORE 9: TECTUM, 1 PLY NAILED BASE, 1 PLY HOT, 1 ½” TAPERED POLY

ISO, FULLY ADHERED EPDM (2” TOTAL THICKNESS)

CORE 10: TECTUM, 1 PLY NAILED BASE, 1 PLY HOT, ½” TAPERED POLY

ISO, FULLY ADHERED EPDM (1/2” TOTAL THICKNESS)

DEMOLITION NOTES TROWBIRIDGE:

1. REMOVE EXISTING EPDM ROOF SYSTEM DOWN TO STRUCTURAL

DECK SUBSTRATE.

2. REMOVE VAPOR BARRIER IN ITS ENTIRETY.

3. REMOVE ALL ASSOCIATED SHEET METAL DETAILS.

4. EXISTING ROOF DRAINS TO REMAIN. REMOVE STRAINER AND

CLAMPING RING FOR REINSTALLATION.

5. EXISTING CURB MOUNTED EQUIPMENT TO REMAIN. REMOVE

SURROUNDING FLASHINGS.

6. EXISTING PLUMBING VENTS TO REMAIN. REMOVE ALL ASSOCIATED

FLASHING.

7. EXISTING LADDER TO REMAIN ON WALL.

8. REMOVE FENCE FROM EXTERIOR WALL ON ROOF SECTION 2.

9. DO NOT REMOVE COPPER REGLET ON ROOF SECTIONS 1 & 2, USE

FOR INSTALLATION OF NEW COUNTER FLASHING.

10. COORDINATE ABATEMENT OF TRANSITE SOIL STACK.

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

ULT

AN

TS

, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

TR

OW

BR

ID

GE

D

EM

OLIT

IO

N P

LA

N

A-301

ARTHUR DOERR BOND

Mo.# A-6301

Page 7: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

LEGEND

RENOVATION NOTES - TROWBRIDGE:1. REMOVE BASE SHEET AND NAIL NEW BASE SHEET ON TECTUM ROOF DECK.2. PRIME CONCRETE ROOF DECK AND INSTALL SELF ADHERED (SA) VAPOR BARRIER

TO CONCRETE DECK.3. INSTALL 2” BASE LAYER POLY ISO WITH ¼” PER FOOT TAPERED INSULATION TO

SUBSTRATE.4. WITH LOW RISE FOAM, INSTALL ¼” PER FOOT TAPERED POLY ISO INSULATION

ADHERED WITH FM 1-90 RIBBON METHOD.5. INSTALL SINGLE PLY EPDM ROOF MEMBRANE FULLY ADHERED TO 1

2" HDCOVERBOARD.

6. INSTALL ½” PER FOOT TAPERED POLY ISO CRICKETS PRIOR TO THE INSTALLATIONOF COVER BOARD.

7. LEAVE EXISTING EPDM ON PLYWOOD WALLS AND RE-FLASH WITH NEW EPDM.8. INSTALL EPDM FLASHING UP AND OVER STONE COPING.9. INSTALL 24 GA. CLEAT ON EXTERIOR FACE OF STONE COPING FOR THE

INSTALLATION OF NEW 26 GA. KYNAR COATED COPING.10. RAISE ALL CURB VENTS TO ACHIEVE 8” FLASHING HEIGHT.11. INSTALLATION OF 24 GA. “CONTINUOUS” CLEAT WITH A 26 GA. KYNAR COATED

COPING ANCHORED ON THE INSIDE PORTION OF THE COPING 12” OC.12. INSTALLATION OF TAPERED 4X4 DRAIN SUMPS.13. INSTALLATION OF HIGH PROFILE EXPANSION JOINT WITH FIRE TREATED OR

MARINE GRADE LUMBER AND A SHEET METAL EXPANSION JOINT COVER.14. INSTALLATION OF NEW FLASHING, TERMINATION BAR AND COUNTER FLASHING

BELOW EXISTING COPPER RECEIVER.15. FILL GAP BELOW STONE COPING WITH POLY ISO INSULATION AND FLASH UP

AND OVER STONE COPING.16. INSTALLATION OF SURFACE MOUNTED COUNTER FLASHING DETAIL.17. INSTALLATION OF NEW WALL MOUNTED FENCING AND COPING.18. INSTALLATION OF NEW WALK PADS AT DOORS AND ALL ROOF TOP EGRESSES.19. INSTALL 4'X8' ½” PLY WOOD AT DOOR EGRESSES AND LADDER ACCESSES.20. APPLY DOUBLE SIDED BUTYL TAPE TO ALL SURFACES PRIOR TO THE

INSTALLATION OF TERMINATION BAR OR SURFACE MOUNTED COUNTERFLASHING.

0

REF:SCALE: 1/16" = 1'-0"A203

16'8' 32'

1 RENOVATION ROOF PLAN

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

rofe

ssio

na

l A

rchite

cts se

al a

nd

sig

natu

re a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l an

d in

fo

rm

atio

n sh

ow

n on

th

is

sh

ee

t. A

ll d

raw

in

gs, in

stru

me

nts, or o

th

er

do

cu

me

nts n

ot e

xhib

itin

g th

is se

al sha

ll no

t

be co

nsid

ere

d p

rep

ared

b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xpre

ssly d

isclaim

s a

ny a

nd

a

ll

resp

on

sib

ility for su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xhib

itin

g th

is se

al.

Th

is D

ocum

en

t is in

te

nd

ed to

be

sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed to

th

is file

, this m

edia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocum

en

t.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

41

0 S

OV

ER

EIG

N C

OU

RT

#

18

MA

NC

HE

ST

ER

, M

O 6

30

11

(6

36

)-3

91

-21

85

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

TR

OW

BR

ID

GE

R

EN

OV

AT

IO

N P

LA

N

A-302

ARTHUR DOERR BOND

Mo.# A-6301

Page 8: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

The P

rofessional A

rchitects seal and

signature affixed to this sheet applies only to

the m

aterial and inform

ation show

n on this

sheet. A

ll draw

ings, instrum

ents, or other

docum

ents not exhibiting this seal shall not

be considered prepared by this architect, and

this architect expressly disclaim

s any and all

responsibility for such plans, draw

ings, or

docum

ents not exhibiting this seal.

This D

ocum

ent is intended to be signed

digitally. If no digital signature is attached to

this file, this m

edia should not be considered

a certified docum

ent.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

ULT

AN

TS

, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

LO

CA

TIO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 65211

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

AB

NR

D

ET

AIL

S

A-401

ARTHUR DOERR BOND

Mo.# A-6301

Page 9: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

AB

NR

D

ET

AILS

A-402

ARTHUR DOERR BOND

Mo.# A-6301

Page 10: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

AB

NR

D

ET

AILS

A-403

ARTHUR DOERR BOND

Mo.# A-6301

Page 11: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

The P

rofessional A

rchitects seal and

signature affixed to this sheet applies only to

the m

aterial and inform

ation show

n on this

sheet. A

ll draw

ings, instrum

ents, or other

docum

ents not exhibiting this seal shall not

be considered prepared by this architect, and

this architect expressly disclaim

s any and all

responsibility for such plans, draw

ings, or

docum

ents not exhibiting this seal.

This D

ocum

ent is intended to be signed

digitally. If no digital signature is attached to

this file, this m

edia should not be considered

a certified docum

ent.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

LO

CA

TIO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 65211

- A

BN

R, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

CH

EM

IS

TR

Y A

DD

IT

IO

N D

ET

AIL

S

A-501

ARTHUR DOERR BOND

Mo.# A-6301

Page 12: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

The P

rofessional A

rchitects seal and

signature affixed to this sheet applies only to

the m

aterial and inform

ation show

n on this

sheet. A

ll draw

ings, instrum

ents, or other

docum

ents not exhibiting this seal shall not

be considered prepared by this architect, and

this architect expressly disclaim

s any and all

responsibility for such plans, draw

ings, or

docum

ents not exhibiting this seal.

This D

ocum

ent is intended to be signed

digitally. If no digital signature is attached to

this file, this m

edia should not be considered

a certified docum

ent.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

41

0 S

OV

ER

EIG

N C

OU

RT

#

18

MA

NC

HE

ST

ER

, M

O 6

30

11

(6

36

)-3

91

-2

18

5

CP190861

VA

RIO

US

LO

CA

TIO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 65211

AB

NR

, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

CH

EM

IS

TR

Y A

DD

IT

IO

N D

ET

AIL

S

A-502

ARTHUR DOERR BOND

Mo.# A-6301

Page 13: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

Th

e P

ro

fe

ssio

na

l A

rch

ite

cts se

al a

nd

sig

na

tu

re

a

ffixe

d to

th

is sh

ee

t a

pp

lie

s o

nly to

th

e m

ate

ria

l a

nd

in

fo

rm

atio

n sh

ow

n o

n th

is

sh

ee

t. A

ll d

ra

win

gs, in

stru

me

nts, o

r o

th

er

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al sh

all n

ot

be

co

nsid

ere

d p

re

pa

re

d b

y th

is a

rch

ite

ct, a

nd

th

is a

rch

ite

ct e

xp

re

ssly d

iscla

im

s a

ny a

nd

a

ll

re

sp

on

sib

ility fo

r su

ch

p

la

ns, d

ra

win

gs, o

r

do

cu

me

nts n

ot e

xh

ib

itin

g th

is se

al.

Th

is D

ocu

me

nt is in

te

nd

ed

to

b

e sig

ne

d

dig

ita

lly. If n

o d

ig

ita

l sig

na

tu

re

is a

tta

ch

ed

to

th

is file

, th

is m

ed

ia

sh

ou

ld

n

ot b

e co

nsid

ere

d

a ce

rtifie

d d

ocu

me

nt.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

ULT

AN

TS

, IN

C.

410 S

OV

ER

EIG

N C

OU

RT

#18

MA

NC

HE

ST

ER

, M

O 63011

(636)-391-2185

CP190861

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

AB

NR

, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

CH

EM

IS

TR

Y A

DD

IT

IO

N D

ET

AIL

S

A-503

ARTHUR DOERR BOND

Mo.# A-6301

Page 14: RMT ROOFING AND WATERPROOFING VARIOUS LOCATIONS - …operations-webapps.missouri.edu/pdc/adsite/projects/cp190861/pl… · continuous cleat with 26 ga. kynar coated coping on exposed

PROJECT NUMBER

SHEET

DR

AW

N B

Y:

CH

EC

KE

D B

Y:

ARCHITECT -

The P

rofessional A

rchitects seal and

signature affixed to this sheet applies only to

the m

aterial and inform

ation show

n on this

sheet. A

ll draw

ings, instrum

ents, or other

docum

ents not exhibiting this seal shall not

be considered prepared by this architect, and

this architect expressly disclaim

s any and all

responsibility for such plans, draw

ings, or

docum

ents not exhibiting this seal.

This D

ocum

ent is intended to be signed

digitally. If no digital signature is attached to

this file, this m

edia should not be considered

a certified docum

ent.

OF14

RM

T R

OO

FIN

G A

ND

WA

TE

RP

RO

OF

IN

G

CO

NS

UL

TA

NT

S, IN

C.

41

0 S

OV

ER

EIG

N C

OU

RT

#

18

MA

NC

HE

ST

ER

, M

O 6

30

11

(6

36

)-3

91

-2

18

5

VA

RIO

US

L

OC

AT

IO

NS

- R

EP

LA

CE

R

OO

FS

CO

LU

MB

IA

, B

OO

NE

C

OU

NT

Y, M

IS

SO

UR

I 6

52

11

AB

NR

, C

HE

MIS

TR

Y A

DD

IT

IO

N, T

RO

WB

RID

GE

TR

OW

BR

ID

GE

D

ET

AIL

S

A-601

ARTHUR DOERR BOND

Mo.# A-6301