RIVERSIDE DR, 155-161 STS Community Board 12 Traffic and Transportation May 4, 2020 1

Upload: others

Post on 27-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

RIVERSIDE DR, 155-161 STS

Community Board 12 Traffic and Transportation

May 4, 2020

1

Page 2: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot 2

1Background

Page 3: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

BACKGROUND

3

• Community request for pedestrian improvements

• Community Engagement

• Walkthrough with Riverside Oval Association

11/15/18

• Walkthrough with representatives of elected officials

and community members 5/31/19 and 1/17/20

• DOT Street Ambassador Outreach 7/31/19 and

8/3/19

• Transit: Bx6 and Bx6 SBS bus stops, near 1 train

Page 4: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

SAFETY DATA

4

Total

Injuries

Severe

InjuriesFatalities KSI

Pedestrian 6 0 0 0

Bicyclists 2 0 0 0

Motor Vehicle

Occupant54 4 0 4

Total 62 4 0 4

Riverside Dr, 155-161 StsInjury Summary, 2013-2017 (5 years)

6 total pedestrian injuries on Riverside Drive

Page 5: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot 5

2Existing Conditions

Page 6: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

EXISTING CONDITIONS

6

A

B

C

D

Page 7: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

EXISTING CONDITIONS

7

Riverside Dr and 155 St

Wide four lane road

with low vehicle

volumes

Large intersection,

allowing for fast

right turns

Long, unmarked

pedestrian crossing

1

2

1

2

3

3

70’

70’

A

Page 8: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

EXISTING CONDITIONS

8

Pedestrian desire to cross Riverside

Drive

No concrete pedestrian ramps on south

side of Riverside Drive at W 157 St

Riverside Dr and 157 St

1

2

2

1

B

Page 9: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

EXISTING CONDITIONS

9

Large, six-legged intersection with

unclear traffic movements

Long pedestrian crossings

41’

84’

1

2

1

2

Riverside Dr and 158 St

73’

“This intersection is terrifying,

the DOT needs to do something

about this” – citizen, DOT

Ambassador Outreach

C

Page 10: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

EXISTING CONDITIONS

10

Riverside Drive is a two

way street with low vehicle

volumes northbound and no

parking on the east side

Riverside Drive W currently

has parking along the

retaining wall

1

2

Riverside Dr W and Riverside Dr

2

1

D

Page 11: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

TOOLKIT

Crosswalks

11

Painted Pedestrian Space with Flexible Delineators

Enhanced Crossing and Signage Concrete Curb Extension

Parking Regulations

Concrete Pedestrian Island

Page 12: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

3Proposed Conditions

12

Page 13: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PROPOSED CONDITIONS

13

A

B

C

D

Page 14: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PROPOSED CONDITIONS

14

Convert to one

travel lane in each

direction

Add painted curb

extensions to clarify

traffic movements

and shorten

pedestrian crossings

Add crosswalk

1

2 1

23 3

40’

A

Page 15: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PROPOSED CONDITIONS

15

Install two enhanced crossings and signage

Build concrete medians to shorten pedestrian crossings and improve visibility

Install painted curb extension to normalize intersection

Install new pedestrian ramps

1

2

3

4

2

3

1

4

B

Page 16: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PARKING

16

+8 parking

spaces

-5 parking

spaces

-1 parking

space

-1 parking

space+2 parking

spaces

-2 parking

spaces

Net change: +1

Page 17: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PROPOSED CONDITIONS

17

Upgrade concrete

pedestrian island

Restrict right turn for

vehicles over 30’

Build concrete curb

extension to shorten

pedestrian crossing

Convert Riverside Drive

(Riverside Drive W to 158

St) from two-way to one-way

SB

1

2

3

2 3

1

38’

41’

30’

28’

C

4

4

Page 18: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PROPOSED CONDITIONS

18

Existing Proposed

Clarify traffic movements

Page 19: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

PROPOSED CONDITIONS

19

Convert Riverside Drive (Riverside Drive W to

158 St) from two-way to one-way SB

Install ~50 parking spaces along the retaining

wall

1

2

Existing

Proposed

D

Page 20: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

SCHEDULE

20

PHASE 1:

• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each

direction

• Install painted curb extensions at 155 St and 157 St

PHASE 2:

• Convert Riverside Drive from 158 St to Riverside Drive West from a two-way to a one-

way southbound, adding ~50 parking spaces

PHASE 3:

• Build concrete curb extensions and islands

• Install Enhanced Crossing at 157 St

• Build pedestrian ramps

Phase 1 might start in Summer 2020. Please note that the timeline for this project is

subject to change due to the COVID-19 pandemic.

Page 21: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

SUMMARY

21

• Convert Riverside Drive (Riverside Drive W to 158 St) to a one-way southbound

• Build one concrete median on Riverside Drive from 157 to 158 St

• Build one concrete pedestrian refuge island at Riverside Drive and 157 St

• Upgrade concrete pedestrian refuge island at Riverside Drive, 158 St and Edward

Morgan Pl

• Build one concrete curb extension on Riverside Drive at 158 St and Edward

Morgan Pl

• Install two painted curb extensions at Riverside Drive and 155 St

• Install one painted curb extension at Riverside Drive and 157 St

• Install two enhanced crossings at Riverside Drive and 157 St

• Install one new crosswalk at Riverside Drive and 155 St

• Restrict right turn from EB 158 St onto SB Riverside Dr for vehicles over 30’

• Add a net of ~51 parking spaces to the area

Page 22: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

BENEFITS

22

• Clarifies traffic movements

• Expands pedestrian network

• Provides safer, shorter pedestrian crossings

• Simplifies street network

• Adds parking

Page 23: RIVERSIDE DR, 155-161 STS...• Reduce Riverside Drive from 155 St to 158 St from two lanes to one lane in each direction • Install painted curb extensions at 155 St and 157 St PHASE

nyc.gov/dot

THANK YOU!

Questions?

23