OVERVIEW:• SB 1 Projects in Riverside County
• Current and Upcoming RCTC Projects
• Upcoming Procurements
• How to do business with RCTC
SB 1 in Riverside CountyFY 17/18 Funding: $57,956,158
FY 18/19 Funding: $141,124,175
Funding for:
• Local Streets and Roads ~1,000 projects
• Transit and Rail
• Highways
• Active Transportation
• Freeway Service Patrol
SB 1-Funded Projects• I-15 French Valley Parkway
• SR-60 Truck Climbing Lanes
• I-15 Railroad Canyon Road Interchange
• I-15 Express Lanes Extension (PA&ED)
• 71/91 Interchange (revalidate PA&ED)
• SR-91 HOV/Pachappa Underpass
• Temescal Canyon Road Widening
• Metrolink Signal Modernization
• Freeway Service Patrol Extension
• CV Link (CVAG)
• Avenue 66 Grade Separation Bypass (CVAG)
• SR-60 Truck Safety and Efficiency Project Phase 1A (Moreno Valley)
• County Line Road Transportation Corridor (Calimesa/Yucaipa)
I-15 Express Lanes
Description: 15 miles, two lanes in each direction, multiple entry/exit points
Lead Agency: RCTC
Status: Under construction, completion 2020
Contractor: Skanska-Ames
15/91 Express Lanes ConnectorDescription: Tolled express lane connector between 91 Express Lanes and future 15 Express Lanes
Agency: RCTC
Status: Preliminary engineering and environmental studies underway, completion Summer 2022
Contractor: Skanska-Ames
Metrolink Station ImprovementsRiverside-La Sierra Station
Description: Adding 446 parking spaces, six bus bays, signalized driveway onto Indiana Avenue
Status: Under construction, completion October 2018
Hunter Park, March Field, Perris-Downtown Stations
Description: Canopy installation
Status: Under construction, completion November 2018
SR-60 Truck
Climbing/Descending Lanes
• Eastbound truck climbing lane, westbound truck descending lane, upgrade shoulders to standard widths. 4.5 miles in length.
• RCTC will advertise, award, administer
• Planning on August CTC allocation
• Construction Cost: $110M
• Federal, state funding
• In badlands area east of
Moreno Valley
Mid County Parkway• New 4 lane freeway, San Jacinto to Perris
• Lead Agency: RCTC
• Status: Will be built in separate construction packages, first is I-215/Placentia Interchange
• Seeking funding
• Legal challenge- almost nearly very very close to being settled.
MCP: Wetland creation project• Grading and Planting project located south of MCP
just east of San Jacinto River Crossing
• Project will create 10 acres of wetland and stockpile dirt for future MCP mainline embankment
• Mitigation for MCP
• RCTC will advertise, award, administer
• Construction Cost: $3M
• Locally funded.
MCP: I-215/Placentia IC• New interchange at I-215 / Placentia Avenue in Perris
• RCTC will advertise, award, administer
• Construction Cost: $34.3M +?
• Locally funded. Seeking state funding
• Legal challenge- almost nearly imminently very very close to being on the verge of being settled.
I-15/Railroad Canyon IC• New ramps/modify ramps at Railroad Canyon/I-15
Interchange in Lake Elsinore
• RCTC will advertise, award, administer
• Construction Cost: $23.5M
• State funded.
Upcoming Procurements (Construction management)
Project Construction Estimate
DBE Goal Advertise Date*
SR-60 Truck Climbing Lanes Construction Management
$110 M 15%+ June 28, 2018
Wetland Mitigation Project Construction Management
$3 M N/A July 5, 2018
Placentia Interchange Construction Management
$32.3 M N/A July 28, 2018
Railroad Canyon/I-15 IC Construction Management
$23.5 M N/A January 2019
Visit: RCTC.org, Doing Business/RFPs
Upcoming Procurements (Construction)
Project Estimated cost Date
RCTC Toll Building $1.5 M July 16, 2018
Riverside Layover facility
$2.7 M August 2018
Pachappa Underpass Project
$15 M September 2018
SR-60 Truck Climbing Lanes
$110 M Late summer 2018
Placentia/215Interchange
$32.3 M Summer 2019
Visit: RCTC.org, Doing Business/RFPs
DOING BUSINESS
Doing Business with RCTCRegister as a Vendor
• Visit RCTC.org/doing-business
• Click on “Click Here” to become a vendor. It will take you to planetbids.com to begin the registration process.
Search for Bid Opportunities• Visit RCTC.org/doing-business
look under “Current Bid Opportunities”.