riverhead huapai waimauku kumeū greenhithe · 2019. 8. 4. · greenhithe r e d h i l l s r d d o n...

2
Brigham Creek Rd Spedding Rd r D r o l y a T d e r F Taupaki Rd Nixon Rd Waitakere Rd Hanham Rd Tawa Rd Motu Rd Nelson Rd Rive Station Rd Access Rd Coatesville-Riverhea Hobsonville Rd Royal Rd Hobsonville Whenuapai Taupaki Redhills Massey Te Atatū Peninsula West Harbour Greenhithe R e d H i l l s R d D o n B u c k R d Northside Dr Trig Rd Du n l o p R d Bak e r Lane W a i t a kere Rd Totara Rd B r i g h a m C r e e k R d Mare Rd Triangle Rd D M a k i S t The project described in this profile has been identified by an indicative business case and will require further technical investigation and engagement before its final detail, location or land requirement is confirmed. It is also yet to be prioritised for funding for delivery over the next 10-30 years. SUPPORTING GROWTH PROGRAMME July 2019 0800 4769 255 (GROW AKL) Contact us [email protected] supportinggrowth.govt.nz WHENUAPAI UPGRADED ARTERIALS continues overleaf Purpose Upgrades and extensions are proposed to a number of existing roads in Whenuapai to bring them up to urban standards and provide for future urban growth. To support current and future residents of Whenuapai, these upgrades would provide for walking and cycling, public transport as well as general traffic. The exact form and function of these arterials is still to be determined. For more information on cross sections see What these connections could look like in North West Auckland on our website. Description The Whenuapai arterial road improvements include the following projects: Upgrade and extend Northside Drive from Nixon Road, including a crossing over SH16, and through to Trig Road Upgrade and extend Spedding Road from Fred Taylor Drive to Hobsonville Road, including SH16 and SH18 crossings Upgrade and extend Māmari Road from Northside Drive to Brigham Creek Road Upgrade Brigham Creek Road Upgrade Trig Road from Brigham Creek Road to Hobsonville Road Upgrade Hobsonville Road and Fred Taylor Drive between SH18 and Don Buck Road. Key benefits The key benefits of these improvements include increased accessibility to a large range of transport choices, and increased people movement within the area to provide connections to employment, commercial areas, residential areas and public transport interchanges. These arterial improvements would also reduce through-traffic movement on other local roads which will reduce congestion and make the network safer and more efficient. Current status In 2018, engagement was undertaken regarding options for upgraded and new arterial corridors in Whenuapai.

Upload: others

Post on 31-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Brigham Cr

    eek Rd

    Spedding Rd

    rD r ol yaT der F

    Taup

    aki R

    d

    Nixon Rd

    Wai

    take

    re R

    d

    Hanha

    m Rd

    Tawa Rd

    Motu Rd

    Nelson Rd

    Riverh

    ead Rd

    Stat

    ion

    RdAcce

    ss Rd

    Old North Rd

    Coat

    esvi

    lle-R

    iver

    head

    Hw

    y

    Hobsonvill

    e Rd

    Royal Rd

    Hobsonville

    Whenuapai

    Riverhead

    Taupaki

    Redhills

    Kumeū

    Huapai

    Waimauku

    Massey

    Te Atatū Peninsula

    West Harbour

    Greenhithe

    Red Hills R d

    Don

    Buc

    k Rd

    Northside Dr

    Trig

    Rd

    Dunlop Rd

    Baker Lane

    0 1 2

    KILOMETRESCo

    ates

    ville-

    Rive

    rhea

    d Hw

    y

    Wait

    akere R

    d

    Matua Rd

    Trigg Rd

    Oraha Rd

    Totara

    Rd

    Brigham Creek Rd

    Mar

    e Rd

    Triangle RdDon Buck Rd

    Maki St

    The project described in this profile has been identified by an indicative business case and will require further technical investigation and engagement before its final detail, location or land requirement is confirmed. It is also yet to be prioritised for funding for delivery over the next 10-30 years.

    SUPPORTING GROWTH PROGRAMME

    July 2019

    0800 4769 255 (GROW AKL)Contact us [email protected] supportinggrowth.govt.nz

    WHENUAPAI UPGRADED ARTERIALS

    continues overleaf

    PurposeUpgrades and extensions are proposed to a number of existing roads in Whenuapai to bring them up to urban standards and provide for future urban growth. To support current and future residents of Whenuapai, these upgrades would provide for walking and cycling, public transport as well as general traffic. The exact form and function of these arterials is still to be determined.

    For more information on cross sections see What these connections could look like in North West Auckland on our website.

    Description The Whenuapai arterial road improvements include the following projects:

    • Upgrade and extend Northside Drive from Nixon Road, including a crossing over SH16, and through to Trig Road

    • Upgrade and extend Spedding Road from Fred Taylor Drive to Hobsonville Road, including SH16 and SH18 crossings

    • Upgrade and extend Māmari Road from Northside Drive to Brigham Creek Road

    • Upgrade Brigham Creek Road• Upgrade Trig Road from Brigham Creek Road

    to Hobsonville Road• Upgrade Hobsonville Road and Fred Taylor

    Drive between SH18 and Don Buck Road.

    Key benefitsThe key benefits of these improvements include increased accessibility to a large range of transport choices, and increased people movement within the area to provide connections to employment, commercial areas, residential areas and public transport interchanges. These arterial improvements would also reduce through-traffic movement on other local roads which will reduce congestion and make the network safer and more efficient.

    Current statusIn 2018, engagement was undertaken regarding options for upgraded and new arterial corridors in Whenuapai.

  • 0800 4769 255 (GROW AKL)Contact us [email protected] supportinggrowth.govt.nz

    Following analysis of feedback and technical investigations, indicative upgrades for these corridors were approved mid-2019. We have a general study area for each project within which further investigations will be undertaken.

    Several of these roads already have more detailed plans underway. These include the south section of Trig Road (south of SH18, up to and including part of Hobsonville Road and intersection with Luckens Road), for which the next stage of planning has been funded by the Housing Infrastructure Fund (HIF). Two potential alignments have been assessed for Trig Road South; either using the existing road or, realigning the road into the greenfield land to the east to intersect with Luckens Road. The option of using the existing Trig Road alignment is currently being progressed including engagement with property owners and further technical work. This upgrade is also likely to include an improved signalised intersection at Hobsonville Road, a signalised intersection at Luckens Road, and require some nearby widening along Hobsonville Road. The HIF funding, once plans are finalised, means that construction of these particular upgrades is likely within the next few years.

    The upgrade and extension of Northside Drive has also been reassessed as part of wider plans for long-term future key state highway upgrades. Additional south-facing ramps for SH16 are now planned for this key arterial (refer State Highway 16/18 Connections project profile).

    Next stepsDuring the next phase of work, the project team will consider upgrade options along these key arterial corridors. This will include social, cultural, environmental and technical investigations as well as further engagement with project partners, stakeholders, landowners, and the community.