river ribble and river brun river restoration audit and options appraisal seb bentley and george...

35
River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Upload: mae-kelley

Post on 23-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

River Ribble and River Brun River Restoration Audit and Options Appraisal

Seb Bentley and George Heritage

Page 2: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

2

Overview

• Initial Audit

• Hydraulic modeling

• Discussion

Page 3: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage
Page 4: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

BACKGROUND

Page 5: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Background

The main river Ribble is 80 miles long, Starting near Ribble Head, flowing to Preston and the Irish Sea.

Known for it’s assets but people, forget (sometimes intentionally) about the less exciting areas…

• URES came about following significant works to improve fish passage in the Calder, including the removal of Padiham and Montford weirs, and fish passes and easements at Barrowford. After achieving this, the next priority areas had to be identified and addressed through Burnley

Page 6: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Background - the problems

Fast Flowing

Narrow

Man made

Limited gravels

Steep

Poor habitat

Page 7: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Background – the opportunities!

• options in terms of making improvements for wildlife

• essential part of the project was that we did not impinge on the needs of people

Page 8: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Background

• Comprehensive study of Calder and Brun

• Restricted to maintaining a lined channel for channel stability, flood risk

Page 9: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

APPROACH

Page 10: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Approach

• To restore some hydromorphic function and ecological habitat to the River Calder and River Brun

• To adjust the present engineering configuration helping to achieve the Water Framework Directive objectives for the failing rivers

• Stage one – A desk and field based hydromorphological audit

• Stage two – Options testing and hydraulic modelling

Page 11: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

HYDROMORPHIC AUDIT AND ASSET SURVEY

Page 12: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Audit and survey

Page 13: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Audit and survey

Page 14: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Audit and survey

Page 15: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

RESTORATION OPTIONS

Page 16: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Current channel geometry

Page 17: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Pool zones

Page 18: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Riffle zone

Page 19: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Point bar zone

Page 20: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Apical pool zone

Page 21: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Low flow riffle/rapid reach

Page 22: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restoration options appraisal

• Backwater reach

Page 23: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

HYDRAULIC MODELLING

Page 24: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling – Study Reaches

Page 25: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling – Proposals

Page 26: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling – 2DBackwater

Page 27: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling – 2DPool

Page 28: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling – 2DLow Flow Riffles

Page 29: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling

• What does this mean in terms of sediment?

Page 30: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling

• What does this mean in terms of fish?

• Assumption – In water velocities >0.7m-1 fish will become tired. Fish 0.25m in length

Velocity Distance travelled

0.5 >100m

1 15m

1.5 7m

2 3m

2.5 struggle

Page 31: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Hydraulic modelling1 in 2yr –Velocities

Page 32: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Flood Risk

Compared pre and post restoration scenarios using 1D-2D linked modelling.

Page 33: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restored Reaches

Page 34: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Restored Reaches

.

Page 35: River Ribble and River Brun River Restoration Audit and Options Appraisal Seb Bentley and George Heritage

Conclusions

Difficult urban setting

Needed to work with sediment dynamics and ecology

Audit vital in understanding system

Modelling provided confidence in restoration design

Two winters suggests successful dynamic equilibrium