risk description
TRANSCRIPT
Risk description Risk (1-5) Severity (1-5) Prevention of riskTripping over equipment
Damage equipment
verbal argument with interviewees
2
2
1
2
3
3
To ensure this doesn’t happen I’m going to make sure there is a distance in between any equipment people in the studio. I will ask everybody to stay away from any equipment. If this does happen I will make sure the person is ok and give them an ice pack and elevate their leg. If it’s severe I will take the person to the local hospital and inform an adult.
To prevent this from happening I will make sure my team and I will take care of the equipment and won’t unnecessarily fiddle with it.
I’m going to be interviewing a past offender as well as a victim. There’s a risk that they will get angry with my questions resulting in an argument. To stop this from taking place instead of having a face to face conversation I’m going to conduct the interview over a phone call instead to take away any risks.
Location address:41-47 Bow RoadLondon, E3 2BS
Production name: Flash FMReporter: Tasnim AliInterview with: victim, lawyer, police officer and offender
Doing a risk assessment has allowed me to identify any risks as well as plan how I can prevent these from happening and minimise the risk of them taking place.