risk assessment template media
TRANSCRIPT
Organisation De Aston School Risk-Assessment number
1
Project Is this it? Name Khem SlawsonAssistants Rachael Halstead and Hayley Jacklin
Date Assessed Thursday 8th December 2011 Locations Bell park
Risk Assessment
Likelihood of occurrence: High, Medium, Unlikely
What hazards have been identified?
What are the potential injuries or
damage?
Severity (1, 2 or 3)
What measures have been taken to prevent injury or
damage?
Number of people at
risk
Who is responsible for action?
Electrical Equipment Tripping or falling (1)Check equipment is not faultyKeep away from water
4 Me
Wet grassSlipping or falling (2) Make sure that we walk and
not run4 Me
Wet swings and play equipment
Slipping or falling(1) Make sure the equipment looks safe to use before we use them
4 Me