Hazard Persons who may be harmed
Property that could be damaged
Risk controls that are already in place
Risk Assessment, LOW, MODERATE, HIGH, EXTREME
Further action required to control risk
Dropping equipment when moving it
All team, cast and the general public
Camera and tripod Make sure that we are all sensible. Also, we will transport the equipment properly by using lifts and not running
Moderate Make sure we act maturely and no running
Equipment falling over or not being stable
All team and cast Camera and tripod Make sure everything is secure and stabilized
Low Be co-operative with each other and act maturely
Tripping over wires in the TV studio
Cast and crew Camera and tripod Do not go near the wires or other equipment if possible, and see where the wires are situated
Moderate Act sensibly and maturely.; also no running
FILM PRODUCTION RISK ASSESSMENT