    WELDING & FABRICATION

    RISK ASSESSEMENT

    THOMPSON AND GRACE INVESTMENTS LIMITED

    NAME OBOT PATRICK I. OKPON LINUS LAWRENCE IYAKNDUE ISAAC AMOS

    DESIGNATION HSE OFFICER WELDING & FAB.

    WORKSHOP FOREMAN

    MANAGER CHAIRMAN/CEO

    SIGNATURE

    DATE January 20, 2011 January 20, 2011 January 20, 2011 January 20, 2011

  • 8/3/2019 Risk Assessement 2011

    2/12

    WELDING & FABRICATION

    LOCATION HAZARD PERSON(S) AT RISK RISK

    H/M/L

    EXISTING CONTROLS FUTHER ACTION

    REQUIRED

    BY WHOME &

    EXPECTED CLOSEOUT

    DATE

    WELDING/FAB.

    WORKSHOP &

    WAREHOUSES 1&2

    1. Fire outbreak/

    explosions

    2. Fall from hight

    3. Slip, trips & fall

    4. Falling &swinging

    objects

    5. Cuts, burns &

    bruises

    6. High noise

    7. Electric shock

    8. Eye irritation &

    damage

    9. Radiation

    10. Theft

    11. Vibrations

    1. Welders/technicians

    2. Visitors

    3. Anyone entering or

    passing through

    H 1. Use of proper

    PPE(minimum of

    hard heart &

    safety

    shoes/boots)2. Visible caution

    signs

    3. Well labeled &

    stored gas

    cylinders

    4. Operational

    procedures

    available &

    understood

    5. Good

    housekeeping6. Electric

    equipments well

    grounded &

    insulated

    7. LOTO

    8. Locked toolboxes

    9. Proper lighting

    10. 3 un-obstructed

    PFEs

    11. Eye wash

    stations

    1. Better waste

    bins

    (lockable)

    Management

    1st

    quarter of 2011

    LEGEND

    H HIGH

    L------ LOW

    M------ MEDIUM

  • 8/3/2019 Risk Assessement 2011

    3/12

    WELDING & FABRICATION

    THOMPSON AND GRACE INVESTMENTS LIMITED

    NAME OBOT PATRICK I. EKONG EKONG B. LAWRENCE IYAKNDUE ISAAC AMOS

    DESIGNATION HSE OFFICER MAINTENANCE

    SUPERVISOR

    MANAGER CHAIRMAN/CEO

    SIGNATURE

    DATE January 20, 2011 January 20, 2011 January 20, 2011 January 20, 2011

  • 8/3/2019 Risk Assessement 2011

    4/12

    WELDING & FABRICATION

    LEGEND

    H HIGH

    L------ LOW

    M------ MEDIUM

    LOCATION HAZARD PERSON(S) AT RISK RISK

    H/M/L

    EXISTING CONTROLS FUTHER ACTION

    REQUIRED

    BY WHOME & EXPECTED

    CLOSEOUT DATE

    Electric power station 1. Fire outbreak/explosions

    2. Slip, trips &

    falls

    3. Spillage

    2. High noise

    3. Electric shock

    4. Eye irritation

    & damage

    5. Radiation6. Theft

    7. Vibration

    Operators H 1Use of proper

    PPE(minimum of

    hard heart & safety

    shoes/boots)

    2.Visible caution

    signs

    3. Operational

    procedures

    available &

    understood.4. Good

    housekeeping

    5.Electric

    equipments well

    grounded & insulated

    6 LOTO

    7 Access control

    8 Eye wash

    stations

    PFE Management

    1st

    quarter of 2011

  • 8/3/2019 Risk Assessement 2011

    5/12

    WELDING & FABRICATION

    THOMPSON AND GRACE INVESTMENTS LIMITED

    NAME EKERE, EDO-ABASI M. EKONG EKONG B. LAWRENCE IYAKNDUE ISAAC AMOS

    DESIGNATION HSE OFFICER MAINTENANCE

    SUPERVISOR

    MANAGER CHAIRMAN/CEO

    SIGNATURE

    DATE JULY 20, 2011 JULY 20, 2011 JULY 20, 2011 JULY 20, 2011

  • 8/3/2019 Risk Assessement 2011

    6/12

    WELDING & FABRICATION

    LOCATION HAZARD PERSON(S) AT RISK RISK

    H/M/L

    EXISTING CONTROLS FUTHER ACTION

    REQUIRED

    BY WHOME & EXPECTED

    CLOSEOUT DATE

    Electric power station 1. Fire outbreak/explosions

    2. Slip, trips &

    falls

    3. Spillage8. High noise

    9. Electric shock

    10. Eye irritation

    & damage

    11. Radiation

    12. Theft

    13. Vibration

    Operators H 1Use of proper

    PPE(minimum of

    hard heart & safety

    shoes/boots)

    2.Visible cautionsigns

    3. Operational

    procedures

    available &

    understood.

    4. Good

    housekeeping

    5.Electric

    equipments well

    grounded & insulated

    6. LOTO7. Access control

    8. Eye wash

    stations

    1. Fire hose reel

    2. VHF radio for

    plant operator

    3. Training of

    plant operatoron CPR & basic

    first Aid

    4. Electronic fire

    alarm system

    Management- Oct 2011

  • 8/3/2019 Risk Assessement 2011

    7/12

    WELDING & FABRICATION

    THOMPSON AND GRACE INVESTMENTS LIMITED

    NAME EKERE, EDO-ABASI M. OKPON LINUS LAWRENCE IYAKNDUE ISAAC AMOS

    DESIGNATION HSE OFFICER WELDING & FAB.

    WORKSHOP FOREMAN

    MANAGER CHAIRMAN/CEO

    SIGNATURE

    DATE January 20, 2011 January 20, 2011 January 20, 2011 January 20, 2011

  • 8/3/2019 Risk Assessement 2011

    8/12

    WELDING & FABRICATION

    LEGEND

    H HIGH

    L------ LOW

    M------ MEDIUM

    LOCATION HAZARD PERSON(S) AT RISK RISK

    H/M/L

    EXISTING CONTROLS FUTHER ACTION

    REQUIRED

    BY WHOME &

    EXPECTED CLOSEOUT

    DATE

    WELDING & FAB.

    WORKSHOP &

    WAREHOUSES 1&2

    1 Fire outbreak/

    explosions

    2 Fall from hight

    3 Slip, trips & fall

    4 Falling &swinging

    objects

    5 Cuts, burns &

    bruises

    6 High noise

    7 Electric shock

    8 Eye irritation &

    damage

    9 Radiation

    10 Theft

    11 Vibrations12 Sparks

    1 Welders/technicians

    2 Visitors

    3 Anyone entering or

    passing through

    H 6 Use of proper

    PPE(minimum of

    hard heart &

    safety

    shoes/boots)7 Visible caution

    signs

    8 Well labeled &

    stored gas

    cylinders

    9 Operational

    procedures

    available &

    understood

    10 Good

    housekeeping11 Electric

    equipments well

    grounded &

    insulated

    12 LOTO

    13 Locked toolboxes

    14 Proper lighting

    15 3 un-obstructed

    PFEs

    16 Eye wash

    stations

    1 Better waste

    bins

    (lockable)

    2 PDA

    3 Fire hose reel4 PTW system

    Management

    1st

    quarter of 2011

  • 8/3/2019 Risk Assessement 2011

    9/12

    WELDING & FABRICATION

    THOMPSON AND GRACE INVESTMENTS LIMITED

    NAME Obot Patrick I. Obot, Ini-etop Lawrence Iyakndue Isaac Amos

    DESIGNATION HSE OFFICER ACCOUNT EXECUTIVE MANAGER CHAIRMAN/CEO

    SIGNATURE

    DATE January 20, 2011 January 20, 2011 January 20, 2011 January 20, 2011

  • 8/3/2019 Risk Assessement 2011

    10/12

    WELDING & FABRICATION

    LEGEND

    H HIGH

    L------ LOW

    M------ MEDIUM

    LOCATION HAZARD PERSON(S) AT

    RISK

    RISK

    H/M/L

    EXISTING CONTROLS FUTHER ACTION

    REQUIRED

    BY WHOME &

    EXPECTED

    CLOSEOUT DATE

    ADMINISTRATIVE

    BLOCK

    1 Cold

    2 Theft

    3 Electric shock4 Fire outbreak

    5 Slip, trips & falls

    6 Ergonomics

    7 LED

    8 Entanglement

    9 Flood

    10 Eye & neck injury

    11 Bumping into

    superstructures

    Workers &

    Visitors

    M 1 Good housekeeping

    2 Visible caution signs

    3 Access control4 Functional PFEs

    available at

    strategic positions

    5 Proper lighting

    6 Waste bins properly

    labeled & managed

    7 Clear exits

    1. Renovation &

    installation of fire

    alarm & smokedetector system

    2. Company policy

    board

    3. Locker/ change

    rooms

    Management-

    1st

    quarter of

    2011

  • 8/3/2019 Risk Assessement 2011

    11/12

    WELDING & FABRICATION

    THOMPSON AND GRACE INVESTMENTS LIMITED

    NAME Ekere, Edo-Abasi M. Dickson Savior Lawrence Iyakndue Isaac Amos

    DESIGNATION HSE OFFICER QA/QC MANAGER CHAIRMAN/CEO

    SIGNATURE

    DATE JULY 20, 2011 JULY 20, 2011 JULY 20, 2011 JULY 20, 2011

  • 8/3/2019 Risk Assessement 2011

    12/12

    WELDING & FABRICATION

    LEGEND

    H HIGH

    L------ LOW

    M------ MEDIUM

    LOCATION HAZARD PERSON(S) AT

    RISK

    RISK

    H/M/L

    EXISTING CONTROLS FUTHER ACTION

    REQUIRED

    BY WHOME &

    EXPECTED

    CLOSEOUT

    DATE

    ADMINISTRATIVE

    BLOCK

    1. Cold

    2. Theft

    3. Electric shock

    4. Fire outbreak5. Slip, trips & falls6. Ergonomics

    7. LED

    8. Entanglement

    9. Flood

    10. Eye & neck injury

    11. Bumping into

    superstructures

    12. Arson

    13. Community/staff

    unrest

    Workers &

    Visitors

    M 1. Good housekeeping

    2. Visible caution signs

    3. Access control

    4. Functional PFEsavailable at

    strategic positions

    5. Adequate lighting

    6. Waste bins properly

    labeled & managed

    7. Clear exits

    1. Renovation &

    installation of fire

    alarm & smoke

    detector system2. PDA3. Installation of

    emergency light in

    all offices & offices

    4. Installation of CCTV

    in & out of the

    building & the Entire

    Compound

    5. Set up of staff

    canteen

    6. Lockable waste bins

    7. Emergency drills &

    HSE awareness

    trainings/programs

    Management-

    Oct 2011

    HSE- Aug 2011