rising from projects to programs and improve accountability - oracle primavera collaborate 14

63
REMINDER Check in on the COLLABORATE mobile app Rising From Projects to Programs and Improve Accountability Prepared by: Gopal Veeramachaneni Las Vegas Valley Water District Session ID#: 15442

Upload: p6academy

Post on 16-Feb-2017

237 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

REMINDER

Check in on the COLLABORATE mobile app

Rising From Projects to Programs and Improve Accountability

Prepared by: Gopal Veeramachaneni Las Vegas Valley Water District

Session ID#: 15442

Page 2: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Rising From Projects to Programs and Improve Accountability

Gopal Veeramachaneni, P.E.

Page 3: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

AGENDA

• Program/Project Management Rationale

• ProjectVIEW

• Field Mobility – Construction Inspection

• Utility Coordination

Page 4: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Results of a J.D Frame Study of 438 project workers ….

J.D. FRAME STUDY

Page 5: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

On your last project, did you meet your budget target ?

Over Budget 55%

On Budget 27%

Under Budget

18%

J.D. FRAME STUDY

Page 6: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

On your last project, did you achieve the desired specifications?

Specs Not Met 29%

Met Specs 51%

Exceed Specs 20%

J.D. FRAME STUDY

Page 7: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

On your last project, did you achieve your schedule target?

Behind Schedule

69%

On Schedule 22%

Ahead of Schedule

9%

J.D. FRAME STUDY

Page 8: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14
Page 10: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Managers

Give me information that I can use.

INFORMATION OVERLOAD !

Give me information that I can use.

INFORMATION CONTEXT

Page 11: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Engineering Departm

ent

Operations D

epartment

Tick, Tock, Tick, Tock ………..

INFORMATION SILOS

Page 12: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

• Long Cycle Times

• Information Silos / Lack of Collaboration

• Duplicated efforts

• Absence of a means to generate Program level metrics

• Lack of a means to enforce accountability

• No means to achieve repeatable project success

Drivers For Change

Page 13: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Managers

I need a ONE TOOL that combines all Project and Program Data !!!!!

The Solution

Page 14: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

20 %

80 %

Vendor Supported Best of Breed Applications for Line of Business Features and Functions

Internal Customization and Development to support District specific requirements

The Solution

Page 15: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Ecosystem

Financials 11

P6 v7

Contract Manager 13

Payroll

Asset Management

FacilityVIEW

Project Controls Systems - Project Centric

- Easily Navigable

- Intuitive Interface

- Centralized Data Store

- Project Agility

- Repeatable Project

Success

Page 16: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Initiation

Project Life Cycle

Plan and Scope Project

Design and Bid Project

Construct Project

Project Acceptance

and Warranty

Page 17: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Engineering Operations

Schedule

Planning Design Construction

Operation

Executing

Initiating

Planning

Controlling

Closeout

Responsibility Matrix

Page 18: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Fiscal Controls

Schedules

Utility Coordination

Collaboration Engine

Document Automation

ProjectVIEW

ProjectVIEW

Rationale

- Project Centric - Easily Navigable - Intuitive Interface - Central Data Store - Project Agility - Repeatable Project Success

Page 19: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Schedules

Program Level Schedule Rollups

Page 20: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Summary of All Hosted Projects Knowledge

Store

Page 21: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Schedules Program Schedule Data Drives Business Milestones

Page 22: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Program Life C

ycle Gantt

Schedules

Workload Projection by Resource

Page 23: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Schedules

Contextual “Project Portfolio” Milestones for Project Managers

Page 24: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Bids Metrics On Contractor Bids

Page 25: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Document Automation

Comprehensive Project Document Library

Page 26: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Document Automation

Page 27: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Document Automation

Assign E-Mails to Project Sub-Categories

Project E-Mail Capture

Page 28: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Document Automation

Page 29: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Board Agendas

Board Approved Agenda Items Related to a Project

Page 30: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Field Captured Photos Auto-Synchronized

Field Automation

Page 31: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Field Automation

Field Captured Construction Forms Auto-Synchronized

Page 32: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

Category Cost Rollups

Page 33: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

Program Level Rollups

Page 34: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

E-Mail Based Approvals

Page 35: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

Agreement Level Rollup with Invoice Level

granularity

Page 36: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

Workgroup Position Individual

Page 37: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

Project Progress Payments

Page 38: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Fiscal Controls

Project Change Management

Page 39: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Office Automation

Page 40: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Office Automation

Page 41: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Mobility Devices Such as iPad Supported

Page 42: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Fiscal Controls

Schedules

Construction Management

Collaboration Engine

Document Automation

ProjectVIEW

Collaboration Engine

Rationale

- Improved cycle times - Process knowledge capture - Efficient execution - Inherent communication - Context specific - Improved reliability

Page 43: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Manager Initiates Review

Package

Contract Review Cycle

Content Creators Publish Drawings

& Specs

Reviewers Log Comments

Project Manager Responds to

Comments

Project Manager Directs Action

for Content Change

Collaboration Engine

Page 44: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Manager

Content Creator

Division Manager

Team Leader

Staff

Collaboration Engine

Page 45: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Collaboration Engine

Page 46: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Review Drawings & Specifications

Collaboration Engine

Page 47: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Respond to Comments

Project Manager Collaboration

Engine

Page 48: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Monitor Actions on comments submitted

Project Reviewer

Collaboration Engine

Page 49: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project Manager/Consultant Response

Project Manager

Collaboration Engine

Page 50: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Fiscal Controls

Schedules

Construction Management

Collaboration Engine

Document Automation

ProjectVIEW

Inspection Reporting

Rationale

- Real-time Updates - Forms based Data Capture - Flexible Architecture - Remote Connectivity - Secure and Context Specific

Page 51: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

• Brought Automation to the Inspection Reporting Process

• Enabled Real-time Construction Monitoring

• Provided Robust Claims Management Support

• Provided a means to capture granular details of Inspections

Inspection Reporting

Page 52: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Most District projects are located in areas without wireless coverage. Lack of consistent access to the Inspection data set. Data loss due to irregular connectivity.

Inspection Reporting

Page 53: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Page 54: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Project List This area lists the project assigned to the logged on Inspector

Daily Report List This area lists the Daily Reports logged for the selected project.

Detail Window This area displays the details of the selected Daily Report.

Daily Report List UNSYNCHED DAILY REPORTS are shown in RED.

Inspection Reporting

Page 55: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Page 56: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Page 57: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

GPS - Automated Vehicle Location

Benefits

- Dynamic field staff

monitoring.

- Intelligent Routing.

- Asset security

management.

- Fleet speed

management.

Page 58: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Inspection Reporting

Fiscal Controls

Schedules

Utility Coordination

Collaboration Engine

Document Automation

ProjectVIEW

Utility Coordination

Rationale

- Shared Project data among Utilities and Agencies - Project Decisions based on current Community Wide Project Data - Early identification of Partnering Opportunities

Page 59: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Utility Coordination

Page 60: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

CCPW

Pro

ject

Utility Coordination

Page 61: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Utility Coordination

Page 62: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Questions ?

Page 63: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14

Please complete the session evaluation We appreciate your feedback and insight

You may complete the session evaluation either on paper or online via the mobile app