NRM 2: Detailed measurement for building works
The RICS new rules of measurement (NRM) is a suite of documents issued by the RICS QuantitySurveying and Construction Professional Group.
The rules have been written to provide a standard set of measurement rules that are understandable byall those involved in a construction project. They provide advice and best practice guidance to RICSmembers involved in the cost management of construction projects worldwide.
This volume, NRM 2: Detailed measurement for building works, provides detailed rules for themeasurement and description of building works for the purpose of obtaining tender prices. The rulesaddress all aspects of bill of quantities production, including setting out the information required from theemployer and other construction consultants to enable a bill of quantities to be prepared, as well asdealing with the quantification of non-measurable work items, contractor designed works and risks.Guidance is also provided on the content, structure and format of bill of quantities, as well as the benefitsand uses of bill of quantities.
Moreover, the rules can be used for bill of quantities for both main contract works and for discrete workpackages – including separate preliminaries for both.
Although written primarily for the preparation of bill of quantities and quantified schedules of works, therules will be invaluable when designing and developing standard or bespoke schedules of rates, or otherquantity-based pricing document.
These rules provide essential guidance to all those involved in the preparation of bill of quantities,quantified schedules of works, schedules of rates and similar pricing documents, as well as those whowish to be better informed about the purpose, use and benefits of adopting detailed measurement oftheir cost control procedures.
The RICS new rules of measurement are based on UK practice but the requirements for a coordinatedset of rules and underlying philosophy behind each volume have worldwide application.
RICS new rules of measurement
RICS new rulesof measurementDetailed measurementfor building works
2D
etailed m
easurement fo
r build
ing w
orks
RICS NEW RULES OF MEASUREMENT
NRM 2: Detailed measurement forbuilding works
1st edition
Acknowledgments
The project stages from the RIBA Outline Plan of Work 2007 are reproduced with the permission of the Royal Institute ofBritish Architects.
Published by the Royal Institution of Chartered Surveyors (RICS)
Surveyor Court
Westwood Business Park
Coventry CV4 8JE
UK
www.ricsbooks.com
No responsibility for loss or damage caused to any person acting or refraining from action as a result of the materialincluded in this publication can be accepted by the authors or RICS.
Produced by the Quantity Surveying and Construction Professional Group of the Royal Institution of CharteredSurveyors.
ISBN 978 1 84219 716 5
Royal Institution of Chartered Surveyors (RICS) April 2012. Copyright in all or part of this publication rests with RICS.No part of this work may be reproduced or used in any form or by any means including graphic, electronic, ormechanical, including photocopying, recording, taping or web distribution, without the written permission of the RoyalInstitution of Chartered Surveyors or in line with the rules of an existing license.
Typeset in Great Britain by Columns Design XML Ltd, Reading, Berks
Printed by Page Bros, Norwich
ContentsForeword vAcknowledgments viIntroduction 1
Status of the RICS new rules of measurement 1The RICS new rules of measurement (NRM) suite of documents in context 2Identity 3Enquiries 3
Part 1: General 51.1 Introduction 71.2 Measurement in context with the RIBA Plan of Work and OGC Gateway Process 71.3 Purpose of NRM 2 91.4 Use of NRM 2 91.5 Structure of NRM 2 91.6 Symbols, abbreviations and definitions 10Part 2: Rules for detailed measurement of building works 152.1 Introduction 172.2 Purpose of bill of quantities 172.3 Benefits of bill of quantities 172.4 Types of bill of quantities 182.5 Preparation of bill of quantities 182.6 Composition of a bill of quantities 192.7 Preliminaries 222.8 Measurement rules for building works 242.9 Non-measurable works 242.10 Risks 272.11 Overheads and profit 282.12 Credits 282.13 Other considerations 282.14 Information requirements for measurement 302.15 Codification of bill of quantities 332.16 Cost management/control 382.17 Analysis, collection and storage of cost data 40Part 3:Tabulated rules of measurement for building works 413.1 Introduction 433.2 Use of tabulated rules of measurement for building works 433.3 Measurement rules for building works 46
Tabulated work sections:1 Preliminaries 502 Off-site manufactured materials, components and buildings 1203 Demolitions 1224 Alterations, repairs and conservation 1255 Excavating and filling 1316 Ground remediation and soil stabilisation 1397 Piling 1428 Underpinning 1459 Diaphragm walls and embedded retaining walls 14710 Crib walls, gabions and reinforced earth 149
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | iii
11 In-situ concrete works 15112 Precast/composite concrete 15913 Precast concrete 16114 Masonry 16415 Structural metalwork 16916 Carpentry 17317 Sheet roof coverings 17618 Tile and slate roof and wall coverings 18119 Waterproofing 18420 Proprietary linings and partitions 18721 Cladding and covering 19222 General joinery 19523 Windows, screens and lights 20024 Doors, shutters and hatches 20225 Stairs, walkways and balustrades 20526 Metalwork 20827 Glazing 21028 Floor, wall, ceiling and roof finishings 21229 Decoration 21830 Suspended ceilings 22031 Insulation, fire stopping and fire protection 22332 Furniture, fittings and equipment 22533 Drainage above ground 22734 Drainage below ground 23035 Site works 23436 Fencing 23837 Soft landscaping 24138 Mechanical services 24539 Electrical services 25040 Transportation 25441 Builder’s work in connection with mechanical, electrical and transportation
installations256
Appendices 261A Guidance on the preparation of bill of quantities 262B Template for preliminaries pricing schedule (condensed) 269C Template for preliminaries pricing schedule (expanded) 270D Template for pricing summary for elemental bill of quantities (condensed) 272E Template for pricing summary for elemental bill of quantities (expanded) 273F Templates for provisional sums, risks and credits 275G Example of a work package breakdown structure 276Bibliography 279Index 280
iv | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
Foreword
The measurement initiative steering group was set up by the RICS quantity surveying and constructionprofessional group to research the problems associated with the measurement of building works at all stagesof the design and construction process. The steering group quickly came to the conclusion that significantimprovements where required.
The development units on measurement set up by the measurement initiative steering group have produceda suite of documents covering all aspects of the measurement and description of a building project – from‘cradle to grave’.
This volume, RICS new rules of measurement: Detailed measurement for building works (‘NRM 2’), providesfundamental guidance on the quantification and description of building works for the purpose of preparingbill of quantities and quantified schedules of works; it also provides a sound basis for designing and developingstandard or bespoke schedules of rates. Direction on how to deal with items that are unquantifiable is alsoprovided – e.g. preliminaries, overheads and profit, contractor designed works, risk transfer and fluctuations.
The RICS new rules of measurement: Detailed measurement for building works provides a uniform basis formeasuring and describing building works and embodies the essentials of good practice.
NRM 2 replaces the Standard Method of Measurement for Building Works (‘SMM’), which was first published byRICS in 1922, with the latest edition being SMM7, published in 1988.
This first edition will become operative on 1 January 2013 and is post dated accordingly.
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | v
AcknowledgmentsThe development of the RICS new rules of measurement: Detailed measurement for building works wasfacilitated by the RICS Quantity Surveying and Construction Professional Group under thedirection of the steering group.
Lead authors:
+ David Benge, Gleeds Cost Management Limited
+ John Davidson, Consultant
Contributors:
+ Simon Cash,Appleyards
+ Graham Hadden,V B Johnson
+ Michael Jewell, MDA Consulting
+ Michael Rickard (Harvey Frost)
+ Justin Sullivan,Adair Associates
+ Keith Tweedy
Steering Group:
+ Chair: Stuart Earl, Gleeds Cost Management Limited
+ David Benge, Gleeds Cost Management Limited
+ Alan Cripps, RICS
+ John Davidson, Consultant
+ Adrian Green, Laing O’Rourke
+ Andy Green, Faithful and Gould
+ Joe Martin, BCIS
+ Alan Muse, RICS
+ Sean Smylie, Shepherd Construction; Contractors Legal Group; UK Contractors Group
+ Roy Stratton, Countryside Properties
The Steering Group express their thanks to the professional institutions and trade bodies, and tothe quantity surveyors and building contractors for their co-operation and advice in the detailedconsultations that have taken place. The steering group and development unit also express theirthanks to the surveyors who have assisted in testing the RICS new rules of measurement: Detailedmeasurement for building works, and to the editors who have had the task of bringing together thefinal document.
vi | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
Introduction
Status of the RICS new rules of measurementThese rules have the status of a guidance note. Where recommendations are made for specificprofessional tasks, these are intended to represent ‘best practice’, i.e. recommendations which inthe opinion of RICS meet a high standard of professional competence.
Although members are not required to follow the recommendations contained in the note, theyshould take into account the following points.
When an allegation of professional negligence is made against a surveyor, a court or tribunal maytake account of the contents of any relevant guidance notes published by RICS in deciding whetheror not the member had acted with reasonable competence.
In the opinion of RICS, a member conforming to the practices recommended in this note shouldhave at least a partial defence to an allegation of negligence if they have followed those practices.However, members have the responsibility of deciding when it is inappropriate to follow theguidance.
It is for each surveyor to decide on the appropriate procedure to follow in any professional task.However, where members do not comply with the practice recommended in this note, they shoulddo so only for a good reason. In the event of a legal dispute, a court or tribunal may require themto explain why they decided not to adopt the recommended practice. Also, if members have notfollowed this guidance, and their actions are questioned in an RICS disciplinary case, they will beasked to explain the actions they did take and this may be taken into account by the Panel.
In addition, guidance notes are relevant to professional competence in that each member should beup to date and should have knowledge of guidance notes within a reasonable time of their cominginto effect.
Document status defined
RICS produces a range of standards products. These have been defined in the table below. Thisdocument is a guidance note.
Type of document Definition Status
RICS practice statement Document that provides members withmandatory requirements under Rule 4 ofthe Rules of Conduct for members
Mandatory
RICS code of practice Standard approved by RICS, and endorsedby another professional body that providesusers with recommendations for acceptedgood practice as followed by conscientiouspractitioners
Mandatory or recommendedgood practice (will beconfirmed in the documentitself)
RICS guidance note Document that provides users withrecommendations for accepted goodpractice as followed by competent andconscientious practitioners
Recommended good practice
RICS information paper Practice based information that providesusers with the latest information and/orresearch
Information and/orexplanatory commentary
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 1
The RICS new rules of measurement (NRM) suite ofdocuments in contextThe RICS new rules of measurement (NRM) is a suite of documents issued by the RICS QuantitySurveying and Construction Professional Group.The rules have been written to provide a standardset of measurement rules that are understandable by anyone involved in a construction project.
The rules provide essential guidance to all those involved in, as well as those who wish to be betterinformed about, the cost management of construction projects. Although the RICS new rules ofmeasurement are principally based on UK practice, the requirements for a coordinated set of rulesand underlying philosophy behind each volume have worldwide application.
+ NRM 1: Order of cost estimating and cost planning for capital building works
+ NRM 2: Detailed measurement for building works
+ NRM 3: Order of cost estimating and cost planning for building maintenance works.
The NRM suite comprises the following three volumes:
NRM 1: Order of cost estimating and cost planning for capital buildingworks
This volume provides indispensable guidance on the quantification of building works for thepurpose of preparing cost estimates and cost plans. Direction on how to quantify other itemsforming part of the cost of a construction project, but which are not reflected in the measurablebuilding work items, is also provided – i.e. preliminaries, overheads and profit, project team anddesign team fees, risk allowances, inflation, and other development and project costs.
NRM 1 is the ‘cornerstone’ of good cost management of construction projects – enabling moreeffective and accurate cost advice to be given to clients and other project team members, as well asfacilitating better cost control.
Although written primarily for the preparation of order of cost estimates and cost plans, the ruleswill be invaluable when preparing approximate estimates.
In addition, the rules can be used as a basis for capturing historical cost data in the form requiredfor order of cost estimates and elemental cost plans, thereby completing the ‘cost managementcycle’.
NRM 2: Detailed measurement for building works
This volume provides fundamental guidance on the detailed measurement and description ofbuilding works for the purpose of obtaining a tender price.The rules address all aspects of bill ofquantities (BQ) production, including setting out the information required from the employer andother construction consultants to enable a BQ to be prepared, as well as dealing with thequantification of non-measurable work items, contractor designed works and risks. Guidance isalso provided on the content, structure and format of BQ, as well as the benefits and uses of BQ.
While written mainly for the preparation of bill of quantities, quantified schedules of works andquantified work schedules, the rules will be invaluable when designing and developing standard orbespoke schedules of rates.
These rules provide essential guidance to all those involved in the preparation of bill of quantities,as well as those who wish to be better informed about the purpose, use and benefits of bill ofquantities.
NRM 3: Order of cost estimating and cost planning for buildingmaintenance works
This volume provides essential guidance on the quantification and description of maintenanceworks for the purpose of preparing initial order of cost estimates during the preparation stages ofa building project, cost plans during the design development and pre-construction stages, anddetailed, asset-specific cost plans during the pre-construction phases of a building project. Theguidance provided by the rules also aids the procurement and cost control of maintenance works.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
2 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
The rules follow the same framework and premise as NRM 1: Order of cost estimating and costplanning for capital building works. Consequently, they give direction on how to quantify and measureother items associated with maintenance works, but which are not reflected in the measurablemaintenance work items – i.e. maintenance contractor’s management and administration charges,overheads and profit, other maintenance-related costs, consultants’ fees and risks in connectionwith maintenance works.
Unlike capital building works projects, maintenance works are required to be carried out from theday a building or asset is put to use until the end of its life.Accordingly, while the costs of a capitalbuilding works project are usually incurred by the building owner/developer over a relativelyshort-term, costs in connection with maintenance works are incurred throughout the life of thebuilding – over the long-term. Consequently, the rules provide guidance on the measurement andcalculation of the time value of money, guidance on using the measured data to inform life cycle ofcost plans and forward maintenance plans, as well as VAT, and taxation.
NRM 3: Order of cost estimating and cost planning for building maintenance works, together with NRM1: Order of cost estimating and cost planning for capital building works, presents the basis of good costmanagement of capital building works and maintenance works – enabling more effective andaccurate cost advice to be given to clients and other project team members, as well as facilitatingbetter cost control.
IdentityThe rules are called NRM 2: Detailed measurement for building works.
EnquiriesEnquiries concerning the rules may be made in the first instance to the Quantity Surveying andConstruction Professional Group at RICS.
RICS QS & Construction Professional Group
The Royal Institution of Chartered Surveyors (RICS)
Parliament Square
London SW1P 3AD
United Kingdom
Any suggestions for future revisions are welcomed and may also be sent to the Quantity Surveyingand Construction Professional Group at RICS.
INTRODUCTION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 3
Part 1: General
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 5
Part 1: General1.1 Introduction
1.1.1 This part places detailed measurement for bill of quantities, schedules of works and work schedulesin context with the RIBA Outline Plan of Work and the OGC Gateway Process; and explains thesymbols, abbreviations and definitions used in the rules.
1.2 Measurement in context with the RIBA Plan ofWork and OGC Gateway Process
1.2.1 Throughout this document, references are made to both the RIBA Plan of Work and the OGCGateway Process and the RIBA Work Stages/OGC Gateways within.
1.2.2 The RIBA Plan of Work is a construction industry recognised framework that organises theprocess of managing and designing building projects and administering building contracts into anumber of key work stages.The RIBA Plan of Work has 11 sequential steps known as ‘RIBA WorkStages’. Despite its apparent linear nature, it should be recognised that the sequence or content ofthe RIBA Work Stages may need to be varied or overlapped to suit the proposed procurementmethod. Consequently, when two or more RIBA Work Stages are combined, it is not alwaystransparent when a building project is moving from one stage to another.As such, it is an ideal tool,provided that it is conceptualised as providing the basic outline of the building project process.
1.2.3 As an alternative to the RIBA Plan of Work, central civil government, the health sector, localgovernment and the defence sector have adopted the OGC Gateway Process as best practice formanaging and designing building projects. The process examines programmes and projects at keydecision-points in their lifecycle. It looks ahead to provide assurance that the employer canprogress to the next stage. Project reviews are carried out under OGC Gateway reviews 1 to 5.Typically, a project will undergo three reviews before commitment to invest, and two looking atservice implementation and confirmation of the operational benefits.
1.2.4 Both the RIBA Plan of Work and the OGC Gateway Process are recognised frameworks formanaging and designing building projects.
1.2.5 The point at which measurement is carried out by the quantity surveyor/cost manager for thepurpose of preparing bill of quantities, or quantified schedule of works, in the context of the RIBAWork Stages and OGC Gateways is shown in Figure 1.1.
1.2.6 Bill of quantities are prepared by the quantity surveyor/cost manager at RIBA Work Stage G(Tender Documentation).
1.2.7 The project stages from the RIBA Outline Plan of Work 2007 (overleaf) are reproduced with thepermission of the Royal Institute of British Architects.
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 7
Figure 1.1:The RICS formal cost estimating and cost planning stages in context withthe RIBA Plan of Work and OGC Gateways (adapted from the RIBA Outline Plan ofWork 2007).
Note: A prerequisite of OGC Gateway Review 3: Investment Decision, is that the design brief, concept designand detailed design have been approved and signed off by the Senior Responsible Owner (SRO). For thepurpose of comparing the OGC Gateway Process with the RIBA Work Stages, these two decision points arereferred to as OGC Gateway 3A (Design Brief and Concept Approval) and OGC Gateway 3B (DetailedDesign Approval); with OGC Gateway 3C representing the final OGC Gateway Review 3 (InvestmentDecision).
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
8 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.3 Purpose of NRM 2
1.3.1 RICS new rules of measurement: Detailed measurement for building works has been written to providea standard set of measurement rules for the procurement of building works that areunderstandable by all those involved in a construction project, including the employer; therebyaiding communication between the project/design team and the employer.
1.3.2 The document provides rules of measurement for the preparation of bill of quantities andschedules of works (quantified).The rules also provide a framework, which can be used to developbespoke and standard schedules of rates.
1.3.3 The rules address all aspects of bill of quantities (BQ) production, including setting out theinformation required from the employer and other construction consultants to enable a BQ to beprepared, as well as dealing with the quantification of non-measurable work items, contractordesigned works and risks. Guidance is also provided on the content, structure and format of BQ
1.3.4 The RICS new rules of measurement suite of documents is based on UK practice but therequirements for a coordinated set of rules and underlying philosophy behind each section haveworldwide application.
1.4 Use of NRM 2
1.4.1 The RICS new rules of measurement: Detailed measurement for building works provides a structuredbasis for measuring building work and presents a consistent approach for dealing with other keycost components associated with a building project when preparing bill of quantities and quantifiedschedule of works.The rules represent the essentials of good practice.
1.4.2 The rules address both the production of bill of quantities (BQ) for entire building project and fordiscrete work packages. They can also be used to prepare quantified schedules of works andquantified work schedules.
1.4.3 In addition, the framework can be used to construct both bespoke and standard schedules of ratesfor the purpose of:
(1) Discrete contracts;
(2) Term contracts; and
(3) Framework arrangements.
1.4.4 Users of the rules are advised to adopt metric units as the standard system of measurement.Where the employer requires reference to imperial units these may be provided as supplementaryinformation (e.g. in parenthesis).
1.4.5 Although the British Standard BS 8888:2006 Technical Product Specification (for defining, specifyingand graphically representing products) recommends the inclusion of a comma rather than a pointas a decimal marker, and a space instead of a comma as a thousands separator, the traditional UKconvention has been adopted in these rules (i.e. a point as a decimal marker and a comma as athousands separator). Users should take care to ensure that this does not conflict with employerrequirements.
1.5 Structure of NRM 2
1.5.1 This document is divided into three parts with supporting appendices:
+ Part 1 places the places measurement for works procurement in context with the RIBA Planof Work and the OGC Gateway Process; and explains the symbols, abbreviations and definitionsused in the rules.
+ Part 2 outlines the benefits of detailed measurement, describes the purpose and uses ofRICS new rules of measurement: Detailed measurement for building works; explains the function of
PART 1: GENERAL
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 9
bill of quantities, provides work breakdown structures for bill of quantities, defines theinformation required to enable preparation of bill of quantities, describes the keyconstituents of bill of quantities, explains how to prepare bill of quantities; sets out the rulesof measurement for the preparation of bill of quantities; and provides the method for dealingwith contractors’ preliminaries, contractors’ overheads and profit, contractors’ design fees,other development/project costs, risks, inflation, and data-gathering for supporting claims fortax incentives.
+ Part 3 comprises the tabulated rules for the measurement and description of building worksfor the purpose of works procurement.
+ Appendices:
Appendix A: Guidance on the preparation of bill of quantities
Appendix B:Template for preliminaries (main contract) pricing schedule (condensed)
Appendix C:Template for preliminaries (main contract) pricing schedule (expanded)
Appendix D:Template for pricing summary for elemental bill of quantities (condensed)
Appendix E:Template for pricing summary for elemental bill of quantities (expanded)
Appendix F:Templates for provisional sums, risks and credits
Appendix G: Example of a work package breakdown structure
1.6 Symbols, abbreviations and definitionsSymbols, abbreviations and certain key words and phrases used in the rules are detailed below.
1.6.1 Symbols used for measurement
ha hectare
hr hour
kg kilogramme
kN kilonewton
kW Kilowatt
m linear metre
m2 square metre
m3 cubic metre
mm millimetre
mm2 square millimetre
mm3 cubic millimetre
nr number
t tonne
wk week
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
10 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.6.2 Abbreviations
BQ bill of quantities
BQBS bill of quantities (or BQ) breakdown structure
CBS cost breakdown structure
OGC Office of Government Commerce
PC sum prime cost sum
PC price prime cost price
RIBA Royal Institute of British Architects
RICS Royal Institution of Chartered Surveyors
WBS work breakdown structure
Note: The names of UK government departments are frequently changed. This applies to theOffice of Government Commerce. Notwithstanding this, the acronym OGC has not been changedas it is a construction industry recognised phrase.
1.6.3 Definitions
Bill of quantities (BQ) – means a list of items giving detailed identifying descriptions and firmquantities of the work comprised in a contract.
Cost breakdown structure (CBS) – in the context of bill of quantities, represents the financialbreakdown of a building project into cost targets for elements or work packages.
Cost target – in the context of bill of quantities, means the total expenditure for an element orwork package.
Credit – means a refund offered by the contractor to the employer in return for the benefit oftaking ownership of materials, goods, items, mechanical and electrical plant and equipment, etc.arising from demolition or strip out works.
Daywork – means the method of valuing work on the basis of time spent by the contractor’sworkpeople, the materials used and the plant employed.
Defined provisional sum – means a sum provided for work which is not completely designedbut for which the following information shall be provided:
– the nature and construction of the work;
– a statement of how and where the work is fixed to the building and what other work is to befixed thereto;
– a quantity or quantities that indicate the scope and extent of the work; and
– any specific limitations and the like identified.
Design team – means architects, engineers and technology specialists responsible for theconceptual design aspects of a building, structure or facility and their development into drawings,specifications and instructions required for construction and associated processes.The design teamis a part of the project team.
Director’s adjustment – means a reduction or addition to the tender price, derived by thecontractor’s estimating team, offered by the director(s) of the contractor.
Employer – means the owner and/or the developer of the building; in some cases the ultimateuser. The terms Senior Responsible Owner (SRO) and project sponsor are used by central civilgovernment and the defence sector; being the representatives empowered to manage the buildingproject and make project-specific decisions. For the purpose of these measurement rules, the term‘employer’ will also be used interchangeably with Senior Responsible Owner (SRO) or projectsponsor.
Fixed charge – is for work, the cost of which is to be considered independent of duration.
PART 1: GENERAL
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 11
Main contractor (or prime contractor) – means the contractor responsible for the totalconstruction and completion process of the building project.The term ‘prime contractor’ is oftenused in central civil government and the defence sector to mean ‘main contractor’.
Main contract preliminaries – are items that cannot be allocated to a specific element,sub-element or component. Main contract preliminaries include the main contractor’s costsassociated with management and staff, site establishment, temporary services, security, safety andenvironmental protection, control and protection, common user mechanical plant, common usertemporary works, the maintenance of site records, completion and post-completion requirements,cleaning, fees and charges, sites services and insurances, bonds, guarantees and warranties. Maincontractors’ preliminaries exclude costs associated with subcontractors’ or work packagecontractors’ preliminaries.
OGC Gateway Process – is a process that examines programmes and projects at keydecision-points in their lifecycle. It looks ahead to provide assurance that the employer canprogress to the next stage. Project reviews are carried under OGC Gateway reviews 1 to 5.Typically, a project will undergo three reviews before a commitment to invest, and two looking atservice implementation and confirmation of the operational benefits.The process is best practice incentral civil government, the health sector, local government and the defence sector.The emphasisof the OGC Gateway Process is to examine the business case, which requires an assessment of thetotal development cost of the building project.
OGC Gateways (or OGC Gateway) – are key decision points within the OGC GatewayProcess.
Other development/project costs – means costs that are not necessarily directly associatedwith the cost of constructing the building, but form part of the total cost of the building project tothe employer (e.g. land acquisition costs, fees for letting agents, marketing costs and contributionsassociated with planning permissions).
Overheads and profit – means the contractor’s costs associated with head office administration,proportioned to each building contact, plus the main contractor’s return on capital investment.
Post tender estimate – means a cost estimate carried out after the evaluation of tenders tocorroborate the funds required by the employer to complete the building project.
Pre-tender estimate – means a cost estimate prepared immediately before calling tenders forconstruction.
Preliminaries – see main contract preliminaries and work package contract preliminaries.
Provisional quantity – means a quantity which cannot be accurately determined (i.e. an estimateof the quantity).
Provisional sum – means a sum of money set aside to carry out work that cannot be describedand given in quantified items in accordance with the tabulated rules of measurement.A provisionalsum will be identified as either ‘defined’ or ‘undefined’ (see definitions of ‘Defined provisional sums’and ‘Undefined’.
Prime cost sum (PC Sum) – means a sum of money included in a unit rate to be expended onmaterials or goods from suppliers (e.g. ceramic wall tiles at £36.00/m or door furniture at£75.00/door). It is a supply only rate for materials or goods where the precise quality of thosematerials and goods are unknown. PC Sums exclude all costs associated with fixing or installation,all ancillary and sundry materials and goods required for the fixing or installation of the materialsor goods, subcontractor’s design fees, subcontractor’s preliminaries, subcontractor’s overheads andprofit, Main Contractor’s design fees, preliminaries and overheads and profit.
Residual risk (or retained risk) – means the risks retained by the employer.
RIBA Outline Plan of Work summarises the deliverables required under each RIBA WorkStage.
RIBA Plan of Work – is a model procedure dealing with basic steps in decision making for amedium-sized building project. The RIBA Plan of Work sets out a logical structure for buildingprojects, starting with the brief and ending with post-occupancy evaluation.The procedures identifythe responsibilities of the design team at each stage of the design and contract administration
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
12 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
process. Each step is referred to as a RIBA Work Stage.The full title of the RIBA Plan of Work isThe Architect’s Plan of Work, published by RIBA, but it is commonly known and referred to as theRIBA Plan of Work in the building construction industry.
RIBA Work Stage – means the stage into which the process of designing building projects andadministering building contracts may be divided. Some variations of the RIBA Work Stages apply fordesign and build procurement.
Statutory undertaker – means organisations, such as water, gas, electricity andtelecommunications companies, that are authorised by statute to construct and operate publicutility undertakings.
Subcontractor – means a contractor employed by the main contractor to undertake specificwork within the building project; also known as specialist, works, trade, work package, and labouronly contractors.
Time-related charge – is for work, the cost of which is to be considered dependent onduration.
Undefined provisional sum – means a sum provided for work that is not completely designed,but for which the information required for a defined provisional sum cannot be provided.
Work breakdown structure (WBS) – in the context of bill of quantities, is used to sub-dividea building project into meaningful elements or work packages.
Work package contractor – a specialist contractor who undertakes particular identifiableaspects of work within the building project; e.g. ground works, cladding, mechanical engineeringservices, electrical engineering services, lifts, soft landscape works or labour only. Depending on thecontract strategy, works contractors can be employed directly by the employer or by the maincontractor.
Work package contract preliminaries – are preliminaries that relate specifically to the workthat is to be carried out by a work package contractor.
PART 1: GENERAL
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 13
Part 2: Rules for detailedmeasurement of building works
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 15
Part 2: Rules for detailedmeasurement of building works2.1 Introduction
2.1.1 Part 2 of the rules describes the purpose and uses of NRM 2: Detailed measurement for buildingworks; describes the types of bill of quantities (BQ); gives guidance on the preparation andcomposition of BQ; and defines the information required to enable a BQ to be prepared. Part 2also sets out the rules of measurement of building items, and the rules for dealing withpreliminaries, non-measurable works, and contractor designed works, as well as risks, overheadsand profit, and credits.
2.1.2 In addition, Part 2 of the rules deals with other aspects of BQ production, including pricefluctuations, director’s adjustments, daywork and value added tax. Guidance is also provided on thecodification of BQ, the use of BQ for cost control and cost management, and the analysis of a BQto provide cost data.
2.2 Purpose of bill of quantities
2.2.1 The primary purposes of a bill of quantities (BQ), which becomes a contract document, are:
+ to provide a co-ordinated list of items, together with their identifying descriptions andquantities, that comprise the works to enable contractors to prepare tenders efficiently andaccurately; and
+ when a contract has been entered into, to:
– provide a basis for the valuation of work executed for the purpose of making interimpayments to the contractor; and.
– provide a basis for the valuation of varied work.
2.2.2 Essentially, a BQ is a list of the items with detailed identifying descriptions and quantities, whichmake up the component parts of a building.
2.3 Benefits of bill of quantities
2.3.1 Irrespective of what contract strategy is used, at some stage in the procurement process one partywill need to quantify the extent of works to be executed; whether it be the employer’s quantitysurveyor/cost manager, the main contractor or the work package contractors for the purpose ofobtaining a price for completing building works, valuing the extent of work complete for purposesof payment, valuing variations in the content or extent of building works, or to support applicationsfor tax or other financial incentives. Consequently, detailed measurement for the purpose of bill ofquantities (BQ) production is beneficial for a number of reasons:
+ it saves the cost and time of several contractors measuring the same design in order tocalculate their bids for competition;
+ it provides a consistent basis for obtaining competitive bids;
+ it provides an extensive and clear statement of the work to be executed;
+ it provides a very strong basis for budgetary control and accurate cost reporting of thecontract (i.e. post contract cost control), including:
– the preparation of cash flow forecasts,
– a basis for valuing variations, and
– a basis for the preparation of progress payments (i.e. interim payments);
+ it allows, when BQ items are codified, reconciliation and any necessary transfers andadjustments to be made to the cost plan;
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 17
+ when priced, it provides data to support claims for tax benefits (e.g. capital allowances andvalue added tax (VAT));
+ when priced, it provides data to support claims for grants; and
+ it provides one of the best sources of real-time cost data, which can be used for estimating thecost of future building projects (i.e. historic cost information (see 2.17)) as it provides a costmodel in a single document.
2.4 Types of bill of quantities
2.4.1 The use of bill of quantities in support of a contract is the traditional and proven means of securinga lump-sum price for undertaking building works. Bill of quantities (BQ) can be:
+ firm (to obtain a lump-sum price for a fully designed building project); or
+ approximate (subject to remeasurement as built).
2.4.2 Firm bill of quantities:
2.4.2.1 The reliability of the tender price will increase in relation to the accuracy of the quantitiesprovided (i.e. the more precisely the work is measured and described). In theory, were there nodesign changes, then a firm BQ would provide a price at tender stage, which would equal the finalcost. In practice there will be changes, and the BQ provides a good basis for cost control, since thedirect cost of change can be assessed with reference to the BQ rates.
2.4.2.2 The firmer the BQ the better it is as a means of financial control.
2.4.3 Approximate bill of quantities:
2.4.3.1 Approximate BQ are used when there is insufficient detail to prepare firm BQ or where it isdecided by the employer that the time or cost of a firm BQ is not warranted. Such contracts donot provide a lump-sum price, but rather tender price totals (i.e. a quantified schedule of rates),since the quantities are subject to re-measurement on completion by the quantity surveyor/costmanager. These contracts are usually subject to greater variation than lump sum contracts andtherefore should only be used where time is a limiting factor or where there is great uncertainty inrespect of certain elements, such as major excavation and earthworks.
2.4.3.2 The initial resource cost of an approximate BQ is likely to be lower than for a firm BQ, but theneed for re-measurement invariably results in an overall higher resource cost.
2.4.3.3 Although the quantities are approximate, the descriptions of work items should be correct.
2.5 Preparation of bill of quantities
2.5.1 Bill of quantities (BQ) are produced at ‘RIBA Work Stage G (Tender Documentation)’ or as anintrinsic part of ‘OGC Gateway 3C (Investment Decision)’.The requirements of RIBA Work StageG, as described in the RIBA Outline Plan of Work, are as follows:
Preparation and/or collation of tender documentation in sufficient detail to enable a tender ortenders to be obtained for the project.
2.5.2 To enable the preparation of BQ, the information resulting from RIBA Work Stages E (TechnicalDesign) and F (Production Information) will be required.The requirements of RIBA Work Stages Eand F, as described in the RIBA Outline Plan of Work, are as follows:
Preparation of technical design(s) and specifications, sufficient to co-ordinate components andelements of the project and information for statutory standards and construction safety.
F1 Preparation of production information in sufficient detail to enable a tender or tenders to beobtained.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
18 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
F2 Application for statutory approvals. Preparation of further information for construction requiredunder the building contract.
Project stages from the RIBA Outline Plan of Work 2007 (Amended November 2008), copyrightRoyal Institute of British Architects, are reproduced here with the permission of the RIBA.
2.5.3 The processes defined by RIBA Work Stages E (Technical Design), F (Production Information) andG (Tender Documentation) are commensurate with the processes required to meet therequirements of OGC Gateway 3C (Investment Decision).
2.5.4 The information and documents required for the preparation of BQ are described in paragraph2.14 of these rules.
2.5.5 BQ required for a lump sum contract based on firm or approximate quantities will normally beprepared by the employer’s quantity surveyor/cost manager, whereas under a design and buildcontract, the employer’s project team will prepare the ‘employer’s requirements’ and the BQ orquantified schedules of work will be prepared by either the main contractor or, more likely, themain contractor’s work package contractors.The choice of who quantifies building works is solelydown to the employer’s preference of contract strategy (see Figure 2.1 below).
Figure 2.1: Responsibility for quantifying building works
Contract strategy Basis of ‘InvitationDocuments’
Preparation by
Traditional lump sum (a) Firm BQ- - - - - - - - - - - - - - - - - - -
Employer’s quantity surveyor/cost manager.
(b) Approximate BQ
Design and build Employer’sRequirements
Employer’s project team (with compilation normally by theemployer’s quantity surveyor/cost manager).Note:Quantification of the Employer’s Requirements will becarried out by either the main contractor or work packagecontractors; who will prepare firm or approximate BQ, orquantified schedules of work as appropriate.
Management (a) Firm BQ- - - - - - - - - - - - - - - - - - -
Employer’s quantity surveyor/cost manager (ormain contractor or work package contractors if‘Invitation Documents’ prepared by employer’squantity surveyor/cost manager or maincontractor, respectively, are based on either‘specification and drawings’ or ‘un-quantifiedschedule of works’ (i.e. un-quantified information).
(b) Approximate BQ
Management (design andmanage)
(a) Firm BQ- - - - - - - - - - - - - - - - - - -
(b) Approximate BQ
Construction management (a) Firm BQ- - - - - - - - - - - - - - - - - - -(b) Approximate BQ
2.5.6 Guidance on the preparation of a bill of quantities (BQ) is given in Appendix A of these rules.
2.6 Composition of a bill of quantities
2.6.1 Bill of quantities (BQ) usually comprise the following sections:
+ Form of Tender (including certificate of bona fide tender);
+ Summary (or Main Summary);
+ Preliminaries, comprising two sections as follows:
– Information and requirements; and
– Pricing schedule;
+ Measured work (incorporating contractor designed works);
+ Risks;
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 19
+ Provisional sums;
+ Credits (for materials arising from the works);
+ Dayworks (Provisional); and
+ Annexes.
2.6.2 Form of tender:
2.6.2.1 This is a document that is used to record the main contractor’s price for completing the buildingproject (i.e. his tender price). If accepted by the employer, the tender price will become the‘contract sum’.The form of tender can be a separate document.
2.6.2.2 A separate ‘certificate of bona fide tender’, which is completed by the main contractor to confirmthat he has not communicated his tender to other parties, is sometimes inserted after the form oftender. Alternatively, the employer’s requirements for confirming that bona fide tender has beensubmitted by the main contractor can be incorporated in the form of tender.
2.6.3 Summary (or main summary):
2.6.3.1 The summary, sometimes called the main summary, is made at either the front or end of the bill ofquantities and comprises a list of the bill that form the entire bill of quantities.The total price foreach section of the bill of quantities (BQ) is carried forwarded and inserted against the applicableitem listed in the summary. For example, a summary for an elemental bill will address all or someof the following:
+ Preliminaries;
+ Measured works (including ‘Contractor Designed Works’:
– Facilitating works
– Substructure
– Superstructure
– Internal finishes
– Fittings, furnishings and equipment
– Services
– Complete buildings
– Works to existing buildings
– External works
+ Risks;
+ Provisional sums:
– Defined
– Undefined
+ Works to be carried out by statutory undertakers;
+ Overheads and profit;
+ Credits (for materials arising from the works);
+ Fixed price adjustment;
+ Director’s adjustment;
+ Dayworks (Provisional);
+ Total price (to Form of Tender).
2.6.3.2 Where the measured work has been divided into work sections, the work sections will be listedinstead of elements.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
20 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
2.6.3.3 At the end of the summary, provision is made to total the list to ascertain the total price andtransfer the total to the form of tender, which, subject to verification and any necessaryadjustments, will become the contract sum referred to by the conditions of contract.
2.6.4 Preliminaries:
2.6.4.1 Preliminaries address and communicate to the contractor items that are not directly related to anycomponent, element, or work section (i.e. measured works).The information provided will enablethe contractor to ascertain his or her price for, among other things, management of the buildingproject, site establishment, security, safety, environmental protection and common user mechanicalplant, as well as the employer’s completion and post-completion requirements. Preliminaries aredivided into two sections as follows:
2.6.4.2 Information and requirements:
The purpose of the information and requirements section is to describe the building projectparticulars; the drawings upon which the bill of quantities was based; the work in general; the siteand any adjoining properties; the form of contract and any amendments and/or supplementaryconditions to the form of contract; the employer’s specific requirements; and any specificlimitations or restrictions that might impact on the sequence and/or method of working. It alsocontains information on how to interpret the bill of quantities, including any special methods ofmeasurement (i.e. where the method of measurement has deviated from NRM 2: Detailedmeasurement for building works).
2.6.4.3 Pricing schedule:
The pricing schedule is simply a schedule in which the contractor inserts preliminary costs relatingto the employer’s requirements, and all contractor cost items (including management and staff, siteaccommodation, services and facilities, mechanical plant, and temporary works items). Thequantification of preliminaries is dealt with in paragraph 2.7.
2.6.5 Measured work:
2.6.5.1 This is the main part of the bill of quantities, which lists all the items of work to be undertaken.Thequantities and descriptions of items should be determined in accordance with the tabulated rulesof measurement in Part 3 (Tabulated rules for the measurement of building works) of these rules.Various methods can be used to present the measured work (i.e. bill breakdown structures – seeparagraph A.1 at Appendix A: Guidance on the preparation of bill of quantities).
2.6.5.2 The rules relating to the quantification and description of measured work are given inparagraph 2.8.
2.6.6 Risks:
2.6.6.1 This section comprises a list of residual risks (i.e. unexpected expenditure arising from risks thatmaterialise, for example, disposal of contaminated ground material), which the employer wishes totransfer to the contractor.The contractor is required to provide a lump-sum fixed price for taking,managing and dealing with the consequences of the identified risk should it materialise.
2.6.6.2 The rules relating to the quantification and description of risk are given in paragraph 2.10.
2.6.7 Provisional sums:
2.6.7.1 Provisional sums are sums included for any items of work that are anticipated, but for which nofirm design has been developed, including any sums listed for any items of work that are to beexecuted by a statutory undertaker.
2.6.7.2 This part of the BQ, therefore, lists items of work that cannot be entirely foreseen or detailedaccurately at the time tenders are invited (i.e. non-measurable items). Pre-determined sums ofmoney are set against each item, determined by the quantity surveyor/cost manager, to cover theircost.
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 21
2.6.7.3 The rules relating to provisional sums are given in paragraph 2.9.1.
2.6.8 Credits (for materials arising from the works):
2.6.8.1 This section of the BQ comprises a list of materials arising from the works for which the employerrequires the contractor to offer a credit.
2.6.8.2 The rules relating to the quantification and description of credits are given in paragraph 2.12.
2.6.9 Dayworks (Provisional):
2.6.9.1 This section of the BQ gives provision for the contractor to competitively tender rates and pricesfor works, which might be instructed to be carried out on a daywork basis.
2.6.9.2 The rules relating to time-charged work carried out on the basis of daywork rates are given inparagraph 2.13.3 below.
2.6.10 Annexes:
The annexes comprise information referred to in the BQ where it is not contained in, or to beissued as, a separate document. Examples are: performance specifications (if not included in projectspecification); copies of quotations; and copies of communications with statutory undertakers.
2.7 Preliminaries
2.7.1 For the most part, preliminaries are the cost of administering a project and providing plant, sitestaff, facilities site-based services, and other items not included in the rates for measured works.
2.7.2 Preliminaries are divided into two categories:
(1) preliminaries (main contract)
(2) preliminaries (works package contract).
2.7.3 Preliminaries (main contract) are divided into two discrete sections:
(1) information and requirements; and
(2) pricing schedule.
2.7.3.1 Information and requirements:
This is the descriptive part of the preliminaries (main contract), which:
(1) sets out the project particulars (e.g. the project title, the site address and the names andcontact details of the employer and the employer’s project team);
(2) identifies the drawings upon which the bill of quantities was based;
(3) depicts the boundary of the construction site;
(4) provides information about existing buildings and existing mains services on or adjacent tothe site, and about any existing records that will inform the main contractor of any known orpotential hazards that need to be considered;
(5) identifies known constraints and restrictions that might impact on the main contractor’smethodology for constructing the building or buildings;
(6) describes the building project in general;
(7) specifies the standard form of contract, together with the contract particulars and anyamendments and/or supplementary or special conditions to the standard form of contract,which is to be entered into by the contracting parties; as well as the employer’s requirementsin respect of insurances, parent company guarantees, performance bonds and collateralwarranties;
(8) explains the documents provided, their content and how they are to be used;
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
22 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
(9) confirms the method of measurement (i.e. NRM 2: Detailed measurement for building works),how to interpret the bill of quantities, and any special methods of measurement (i.e. wherethe method of measurement has deviated from the specified rules);
(10) sets out the employer’s specific requirements in respect of:
(a) management of the works by the main contractor, including progress reporting,programme management and cost reporting requirements;
(b) quality standards to be achieved, and quality control requirements, by the maincontractor, including inspection, testing and commissioning requirements;
(c) security, safety and protection measures to be provided by the main contractor;
(d) facilities, temporary works and services required by the employer;
(e) specific requirements such as advertising, the provision of a marketing suite or atopping out event;
(f) specific limitations on method, sequence, timing of the ‘works’ imposed by theemployer, including out of normal hours working and phasing requirements;
(g) operation and maintenance of the finished building, including operation andmaintenance (O&M) manuals, familiarisation training, tools, and spare parts; and
(h) post-completion requirements such as maintenance services.
Instructions to tendering contractors and other information relating to the tender process (e.g.information required to be submitted with tender submission, site visits, confidentiality, etc) formpart of the invitation documents, but will not form part of the contract documents. Therefore,these should be addressed in a separate document (e.g. Conditions of Tender).
The items to be considered when drafting the main contractor’s preliminaries are included in PartA of Table 1 (Preliminaries (main contract)) at Part 3:Tabulated rules for measurement.
2.7.3.2 Pricing schedule (quantification of main contractor’s preliminaries):
It is not possible for the quantity surveyor/cost manager to quantify the main contractor’spreliminaries.This is because it is for the contractor to interpret the information provided as partof the tender invitation documentation. From the information provided, the main contractor willascertain his method of working and the resources required to complete the building project, aswell as identify any other cost items that are to be recovered.
The preliminaries bill is therefore to include a pricing schedule that simply lists the headings underwhich the main contractor is to price his or her preliminaries items. Templates for preliminariespricing schedules (condensed and expanded versions) are included in Appendices B and C,respectively, of these rules.
The pricing schedule is a simple a list of cost centres incorporated in the bill of quantities in whichthe main contractor will insert his charges relating to preliminaries.
The pricing schedule for main contractors’ preliminaries is divided into two main cost centres:
(1) employer’s requirements; and
(2) main contractor’s cost items.
The items that comprise these two cost centres are listed and defined in Part B of Table 1(Preliminaries (main contract)) at Part 3:Tabulated rules for measurement of these rules.
Notwithstanding this, as part of the priced bill of quantities submitted by the main contractor, it isessential that the quantity surveyor/cost manager obtains a full and detailed breakdown that clearlyidentifies the items, shows how the price for each item has been calculated, and how the total pricefor preliminaries has been calculated.
Accordingly, as part of the conditions of tender, the quantity surveyor/cost manager should instructthe main contractor to return along with his or her tender a full and detailed breakdown thatshows how the main contractor’s total price for preliminaries has been calculated. It should berequested that the main contractor append this information to his priced bill of quantities. Toensure that the main contractor’s detailed supporting calculations are presented in an easy-to-read
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 23
and logical format, the main contractor should be instructed to ascertain the price for preliminariesin accordance with the rules of measurement for main contractor’s preliminaries (refer to Part B(Pricing schedule) of Table 1 (Preliminaries (main contract)) at Part 3: Tabulated rules formeasurement of these rules).
It is also essential that the quantity surveyor/cost manager makes it clear to the main contractor inthe preliminaries bill and/or preliminaries pricing schedule that costs relating to items that are notspecifically identified by the main contractor in his or her full and detailed breakdown will bedeemed to have no cost implications or have been included elsewhere within his or her rates andprices.
2.7.4 Preliminaries (works package contract):
2.7.4.1 Information:
The descriptive part of the work package contract preliminaries is prepared in the same way as themain contract preliminaries.The items to be considered when drafting the work package contractsare included in Part A of Table 1 (Preliminaries (works package contract) at Part 3:Tabulated rulesfor measurement of these rules.
2.7.4.2 Pricing schedule:
For the same reasons as for main contractor’s preliminaries, the preliminaries bill for a workspackage shall comprise a pricing schedule that lists the headings under which the work packagecontractor will insert his charges relating to preliminaries items. It is a simple schedule comprisinga list of cost centres.
The pricing schedule for work package contract preliminaries is divided into two main costcentres:
(1) employer’s requirements; and
(2) work package contractor’s cost items.
The items that comprise these two cost centres are listed and defined in Part B of Table 1(Preliminaries (works package contract)) at Part 3:Tabulated rules for measurement of these rules.
Again, as part of the priced bill of quantities submitted by the work package contractor, it isessential that the work package contractor is instructed to provide a full and detailed breakdownthat clearly identifies the items, shows how the price for each item has been calculated, and howthe total price for preliminaries has been calculated.
2.8 Measurement rules for building worksThe rules for measuring and describing building items/components are set out in the tabulatedrules of measurement rules for building works at Part 3 (Tabulated rules of measurement forbuilding works) of these rules.
2.9 Non-measurable works
2.9.1 Provisional sums:
2.9.1.1 Where building components/items cannot be measured and described in accordance with thetabulated rules of measurement they shall be given as a ‘provisional sum’ and identified as either‘defined work’ or ‘undefined work’ as appropriate.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
24 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
2.9.1.2 A provisional sum for defined work is a sum provided for work that is not completely designed butfor which the following information shall be provided:
(1) the nature and construction of the work;
(2) a statement of how and where the work is fixed to the building and what other work is to befixed thereto;
(3) a quantity or quantities which indicate the scope and extent of the work; and
(4) any specific limitations identified.
2.9.1.3 Where provisional sums are given for defined work, the contractor will be deemed to have madedue allowance in his or her programming, planning and pricing preliminaries.
2.9.1.4 Where any aspect of the information required by paragraph 2.9.1.2 above cannot be given, workshall be described as an ‘undefined’ provisional sum. Where provisional sums are given forundefined work, the contractor will be deemed not to have made any allowance in programming,planning and pricing preliminaries.
2.9.1.5 Any provisional sum given for defined work that does not comprise the information requiredunder 2.9.1.2 above shall be construed as a provisional sum for undefined work; irrespective that itwas given in the BQ as a provisional sum for defined work.
2.9.1.6 Provisional sums shall be exclusive of overheads and profit. Separate provision is to be made in theBQ for overheads and profit (refer to paragraph 2.11).
2.9.2 Contractor designed works:
2.9.2.1 Contractor designed works include any works that require the contractor to undertake its design,whether directly or via a subcontractor.The employer shall be deemed responsible for works notclearly identified as contractor designed works.
2.9.2.2 Contractor designed work is sometimes referred to as the ‘Contractor Designed Portion (CDP)’.
2.9.2.3 Where the contractor is required to take responsibility for the design of discrete parts of thebuilding, such as piled foundations, windows, pre-cast concrete components, roof trusses and/ormechanical and electrical engineering services, the work items shall be identified as ‘contractordesigned works’.
2.9.2.4 The method of quantifying contractor designed work is dependent on the nature of the work.
2.9.2.5 Where contractor designed works can be measured and described in accordance with thetabulated rules of measurement (e.g. windows and pre-cast concrete components), theperformance objectives or criteria that the contractor will be required to meet are to be clearlydefined by way of a preamble to the work items that comprise the contractor designed works.Detailed documents defining the performance objectives and/or criteria to be met are to beincorporated as an annex to the bill of quantities (BQ) and clearly cross-referenced in thepreamble.
2.9.2.6 Where contractor designed works comprise a complete element or works package (e.g. the entiremechanical and electrical engineering services for the building), the works are to be measured anddescribed as one or more item. The number of items is at the discretion of the quantitysurveyor/cost manager but must be sufficient to provide an analysis of the price of the contractordesigned works. In the case of elemental BQ, the basis of analysis will be the elements defined inNRM 1: Order of cost estimating and cost planning for capital building works (see Figure 2.2).Irrespective of the structure of the analysis, it is essential that the quantity surveyor/cost managerobtains a full and detailed breakdown that clearly shows how the contractor has calculated hisprice for each item in the analysis.
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 25
Figure 2.2: Price analysis for contractor designed works (based on group element 5(Services) of the RICS new rules of measurement: Order of cost estimating and costplanning for capital building works (NRM 1))
5.1 Sanitary installations £236,000.00
5.2 Services equipment £199,500.00
5.3 Disposal installations £99,000.00
5.4 Water installations £142,000.00
5.5 Heat source £88,000.00
5.6 Space heating and air conditioning £396,000.00
5.7 Ventilation £345,500.00
5.8 Electrical installations £458,000.00
5.9 Fuel installations £163,000.00
5.10 Lift and conveyor installations £689,000.00
5.11 Fire and lightning protection £222,300.00
5.12 Communication, security and control systems £181,500.00
5.13 Specialist installations £148,600.00
5.14 Builder’s work in connection with services £59,600.00
Total (carried to main summary): 3,428,000.00
2.9.2.7 The quantity surveyor/cost manager is to obtain details of performance objectives and/or criteriafrom the relevant design consultant (refer to paragraph 2.14.3.2(2) below).
2.9.2.8 In addition to all costs referred to in paragraph 3.3.3.13 (in Part 3:Tabulated rules of measurementfor building works) of these rules, contractor designed works shall be deemed to include all costsin connection with design, design management, and design and construction risks in connectionwith contractor designed works. Moreover, the contractor will be deemed to have made dueallowance in his programming and planning for all design works in connection with contractordesigned works.
2.9.3 Risks:
The method of dealing with the employer’s residual risks when preparing bill of quantities (BQ) isaddressed in paragraph 2.10.
2.9.4 Works to be carried out by statutory undertakers
2.9.4.1 Works that are required to be carried out by a statutory undertaker are to be given as a‘provisional sum’, with the scope of works to be executed by the statutory undertaker described.
2.9.4.2 The contractor is to be deemed to have made due allowance in his programming, planning andpricing preliminaries for all general attendance on statutory undertakers.
2.9.4.3 Provisional sums for work to be carried out by statutory undertakers are to be exclusive ofoverheads and profit. Separate provision shall be made in the BQ for overheads and profit (refer toparagraph 2.11 for further information).
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
26 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
2.10 Risks
2.10.1 Risks generally:
2.10.1.1 Every building project involves risks and the proper management of risk saves time and money.Risks can occur at any point of a building project and it is essential that they are identified,assessed, monitored and controlled appropriately and effectively.
2.10.1.2 At the time of preparing a bill of quantities, a quantified schedule of works, or other quantity-baseddocuments, whether for a complete building project or discrete works package, there will still be anumber of risks remaining to be managed by the employer and his or her project team – this iscalled the employer’s residual risk exposure (or residual risks). A risk response should only bedecided after its possible causes and effects have been considered and fully understood. It will takethe form of one or more of the following:
+ risk transfer to the contractor;
+ risk sharing by both employer and contractor; or
+ risk retention by the employer.
2.10.1.3 Risks that can be designed out or avoided should have been addressed by this stage of the designdevelopment process. However, if time does not permit these risks to be designed out or properlydealt with, they will need to be dealt with using one of the above risk response strategies.
2.10.2 Risk transfer to the contractor:
2.10.2.1 The object of transferring risk is to pass the responsibility to another party able to control itbetter. If the risk materialises, the consequences are carried by the other party.
2.10.2.2 Whenever a risk is transferred there is usually a premium to be paid (effectively the contractor’svaluation of the cost of the risk). Risk transfer will usually give the employer price/cost certainty forthat aspect of the works. However, in return for price/cost certainty, the employer is required topay the risk premium to the contractor, irrespective of whether the risk transferred does or doesnot materialise.
2.10.2.3 Risks that the contractor is required to manage, should they materialise, are to be fully describedso that it is transparent what risk the contractor is required to manage, and what the extent ofservices and/or works the employer is paying for. Risks to be transferred to the contractor are tobe listed in the BQ under the heading ‘schedule of construction risks’.A template for a ‘schedule ofconstruction risks’ is in Appendix F of these rules.
2.10.2.4 The contractor will be deemed to have made due allowance in his risk allowances forprogramming, planning and pricing preliminaries.
2.10.2.5 Risk allowances inserted by the contractor shall be exclusive of overheads and profit. Separateprovision should be made in the BQ for overheads and profit (refer to paragraph 2.11 for furtherinformation).
2.10.3 Risk sharing by both employer and contractor:
2.10.3.1 Risk sharing occurs when a risk is not entirely transferred and some elements of it are retained bythe employer. It is important that both the employer and the contractor know the value of theportion of the risk for which they are responsible.The objective should be to improve control andto reduce or limit the cost of the risk to the employer, should it materialise.
2.10.3.2 The method of dealing with risks that are to be shared by both employer and contractor willnormally be dealt with using ‘provisional quantities’ with the pricing risk being taken by thecontractor and the quantification risk being taken by the employer.
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 27
2.10.4 Risk retention by the employer:
2.10.4.1 Where risks are to be retained by the employer, the applicable risk allowances included in the costplan will be retained and managed by the employer or, if empowered by the employer, the projectteam.
2.10.4.2 Before deciding to retain a particular risk, the employer might wish to find out what the premiumwill be if the contractor were to be paid for resolving the risk should it materialise. The employercan then decide whether or not to pay a premium for a defined scope of work. If the employer iscontent to pay a premium for transferring the risk, it is dealt with as a risk transfer in accordancewith paragraph 2.10.2 above.
2.10.4.3 Risks retained by an employer are not necessarily controllable.
2.11 Overheads and profit
2.11.1 Provision shall be made in the bill of quantities (BQ) for the contractor to apply their requiredpercentage addition for overheads and profit on the following:
(1) preliminaries;
(2) measured work, including contractor designed works;
(3) risk allowances;
(4) work resulting from the expenditure of provisional sums (i.e. defined provisional sums,undefined provisional sums and works to be undertaken by statutory undertakers).
2.11.2 When required, overheads and profit can be treated as two separate cost items; namely,‘overheads’and ‘profit’.
2.12 Credits
2.12.1 Credits are normally only applicable where the building project comprises the refurbishment orrehabilitation of an existing building, or demolition works. Provision for such provides the employeran opportunity to seek credits for old building materials; components and items; mechanical andelectrical plant; and fittings, furnishings and equipment which arise from the stripping out ordemolition works and for which the employer is content to pass ownership to the contractor forreuse.
2.12.2 Credits can be based on a pre-prepared list of items, which is incorporated in the BQ and thecontractor invited to insert the amount of credit he will give for each item. Alternatively, thecontractor can be invited to list items for which he is willing to offer a credit and the amount ofcredit he will give for each item.
2.12.3 A template for ‘credits’ is provided in Appendix F of these rules.
2.13 Other considerations
2.13.1 Price fluctuations:
2.13.1.1 The cost to the contractor of labour and materials etc. used in the works will alter during thecontract period (i.e. they will be subject to price fluctuations). It might fall but, more usually, it willrise.The risk of fluctuating prices can be dealt with as follows:
(1) contractor to price the risk (a fixed or firm price contract); or
(2) allow provision for contractor to recover full or limited fluctuations on certain prices (afluctuating price contract).
2.13.1.2 Most standard forms of contract conditions allow for either alternative to be used by providingclauses which may be included or deleted.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
28 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
(1) Fixed price contracts:
These are contracts in which the price of labour, materials and plant is not subject tofluctuations. Fixed price contracts are sometimes referred to as ‘fixed price lump sumcontracts’, ‘firm price contracts’, or ‘firm price lump sum contracts’.
In the absence of any provision in the contract, or where the provision for recovering of pricefluctuations has been deleted, the contractor will be required to take the risk (i.e. price therisk) of price fluctuations during the contract period. In order to cover himself, thecontractor will make an estimate of the likely increase in costs and include this in his tenderprice.
Where there is no provision for recovering of price fluctuations, separate provision is to beincorporated in the bill of quantities for the contractor to tender his fixed price adjustmentfor pricing the risk. Such provision is to be referred to as either the ‘main contractor’s fixedprice adjustment’ or the ‘work package contractor’s fixed price adjustment’, whichever isapplicable.
When preparing bill of quantities, the quantity surveyor/cost manager shall ensure that nocontract conditions relating to the recovery of price fluctuations exist.
(2) Fluctuating price contracts:
These are contracts in which adjustment is allowed for fluctuations in the prices of labourand materials etc. Various degrees of fluctuations are allowed under the provisions ofstandard contract conditions. The extent to which fluctuations are allowed will have asignificant effect upon the contractor’s tender price.
Where fluctuations are to be allowed, no provision for ‘main contractor’s fixed price adjustment’ orthe ‘work package contractor’s fixed price adjustment’ is required.
2.13.2 Director’s adjustment:
2.13.2.1 Separate provision is to be incorporated in the bill of quantities for the contractor to insert a‘director’s adjustment’.
2.13.2.2 It is the responsibility of the contractor’s directors, or other senior managers, to secure work forthe company.Therefore, before submitting a tender price, the contractor’s directors will undertakea commercial review of the project and the estimated price. This review might result in thecontractor’s directors requiring adjustment to the estimated price, referred to as a ‘director’sadjustment’. The director’s adjustment will include adjustments for commercial matters such asfinancing charges, cash flow, opportunities and competition.This is a sum added to or omitted fromthe estimated price to arrive at a tender price.
2.13.3 Dayworks (provisional):
2.13.3.1 Daywork is a method of valuing work on the basis of time spent by the contractor’s employees, thematerials used and the plant employed.
2.13.3.2 If required, a schedule of dayworks is to be incorporated in the bill of quantities (BQ).The scheduleof dayworks is to comprise a list of the various classifications of labour, estimates of the number ofhours against each classification of labour, and estimated lump sums for materials and plant, forwhich daywork rates and percentage additions for overheads and profit are to be inserted by thecontractor. A statement of the conditions under which the contractor will be paid for workexecuted on a daywork basis is to be given in either the preliminaries bill or schedule of dayworks.
2.13.3.3 The method of calculating labour time charge rates for work carried out in normal working hours(i.e. productive time) and work carried out outside of normal working hours (i.e. non-productivetime) shall be defined in the schedule of dayworks.The definition of normal working hours shall begiven in either the preliminaries bill or schedule of dayworks.
2.13.3.4 The total amount included for daywork by the contractor shall be omitted from the contract sum.The rates and percentage additions included in the BQ shall be used to calculate the price of extraworks instructed, which are authorised to be valued on a daywork basis.
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 29
Note:The total price derived from the schedule of dayworks can be included within or excludedfrom the contract sum.When included, it is to be treated as a provisional sum.When excluded, itshall be clearly stated that the rates, prices and percentage adjustments tendered are included inthe contract.
2.13.4 Value Added Tax (VAT):
Value added tax (VAT) shall be excluded from bill of quantities (BQ). Notwithstanding this, ifrequired by the employer, provision for the contractor to provide a VAT assessment as part of histender return can be incorporated in the form of tender.
2.14 Information requirements for measurement
2.14.1 The accuracy of bill of quantities (BQ) is dependent on the quality of the information supplied tothe quantity surveyor/cost manager by the employer, designers and other project team members;the more information provided, the more reliable the outcome will be. Where little or noinformation is provided, the quantity surveyor/cost manager will need to seek decisions from theemployer as to how the uncertainty is to be managed and procured (refer to paragraph 2.11).
2.14.2 To enable the quantity surveyor/cost manager to prepare a BQ, the information in paragraphs2.14.3 to 2.14.6 inclusive (below) will be required.
2.14.3 Specification:
2.14.3.1 A specification defines what the employer wishes to buy and, consequently, what the contractor isexpected to supply.
2.14.3.2 The two main types of specification used are:
+ Prescriptive specifications
+ Performance specifications.
(1) Prescriptive specifications:
This form of specification is required to enable a firm bill of quantities to be prepared.Thefunction of a prescriptive specification is to prescribe the materials and workmanshiprequired for a building project in as much detail as possible. Specific products and materialswill be named, and the assembly of the building will be described and supported with drawninformation and schedules (see paragraphs 2.14.4 and 2.14.5 below).Where materials are notnamed, reference will be made to published standards governing their composition (e.g.British standards or other country specific standards).
Where a prescriptive specification is used, the contractor will not carry any designresponsibility.
(2) Performance specifications:
A performance specification describes the requirements of a product (e.g. windows),equipment (e.g. chiller plant), system or installation (e.g. mechanical and electricalinstallations) in terms of the performance objectives or criteria.
The main difference between a performance specification and a prescriptive specification isrelated to design responsibility. With a performance specification, the contractor isresponsible for design development of the specification to meet the performancerequirements.
The benefit to the employer is that design will not need to be advanced forperformance-specified work before inviting tenders from contractors.
It should be noted that some standard forms of contract conditions do not include provisionfor contractor designed work. Therefore, care should be taken to ensure that the contractconditions used for the building project clearly transfer design responsibility for contractordesigned work to the contractor (e.g. by incorporating supplementary contract conditions orother amendment to the standard forms of contract conditions used). Failure to do this willresult in design responsibility remaining with the employer, even though the employer did notundertake the design.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
30 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Usually, the quantity surveyor/cost manager will be faced with a combination of both types ofspecification, which needs to be organised in the BQ (i.e. separated into measured works andnon-measured works).
Insufficient or poorly described information can mislead contractors, resulting in contractvariations and potential time-related and/or cost-related claims.
2.14.4 Drawn information:
2.14.4.1 Drawn information is required to describe the assembly of the building, as well as any temporaryworks. Drawings shall be to a suitable scale.
2.14.4.2 Required drawn information shall include:
+ General arrangement (GA) drawings, comprising:
– a block plan: this shall identify the site and locates the outlines of the building works inrelation to the town plan or other wider context;
– a site plan: this shall locate the position of the building works in relation to the settingout points, the means of access and the general layout of the site; and
– plans, sections and elevations: these shall show the position occupied by the variousspaces in a building and the general construction and location of the principal elementsand components.The extent of elevations and sections shall be as appropriate to coverall major building zones.
General arrangement drawings are sometimes called ‘location’ drawings.
+ Component drawings: these shall show the information necessary for manufacture and assemblyof a component; including key details/interfaces (e.g. interface between curtain walling systemand structure, balconies and the like).
Component drawings are sometimes called ‘detail’ or ‘assembly’ drawings.
+ Schematic drawings: these show how something works and the relation between the parts (e.g.the wiring of an electrical system).
+ Record drawings: these are a set of drawings that depict the actual as-built conditions of anexisting building or structure, including mechanical and electrical engineering services installed.These are required for building projects involving the refurbishment or the demolition (partialor complete) of an existing building or structure.
Record drawings are sometimes called ‘existing’, ‘as-built’ or ‘as-installed’ drawings.
2.14.4.3 Specific requirements for drawn information are further defined in the tabulated rules ofmeasurement in Part 3 of these rules.
2.14.5 Schedules:
2.14.5.1 Schedules which provide the information required by the tabulated rules shall be deemed to bedrawings. Schedules include:
+ Room data sheets (including co-ordinated mechanical and electrical services engineering datasheets);
+ Door schedules, including ironmongery;
+ Window schedules, including ironmongery;
+ Reinforcement (bar bending) schedules
+ Landscaping and planting schedule (for internal and external works);
+ Drainage schedules;
+ Fittings, furnishings and equipment schedules;
+ Luminaires schedules;
+ Control schedules for mechanical and electrical engineering services;
+ Primary mechanical and electrical plant and equipment schedules;
+ Duties, outputs and sizes of primary mechanical and electrical plant and equipment;
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 31
+ Builder’s work in connection with mechanical and electrical engineering services;
+ Other scheduled information necessary to specify the works.
The above list is not meant to be definitive or exhaustive, but simply a guide.
2.14.6 Reports and other information:
Reports and/or other information required for the preparation of bill of quantities (BQ) will bedependent on the nature of the building project. However, such documents normally include someor all of the following:
+ drawings showing the site boundary and all known site constraints and restrictions, includingthe means of access, restrictive covenants, party walls, rights of light issues, and rights of access;
+ a statement of, and drawing(s) detailing, phasing requirements;
+ a statement of, and drawing(s) detailing, construction sequencing requirements;
+ details of residual design development and construction risks (i.e. risk register or risk log);
+ a schedule of gross external areas (GEA), gross internal floor areas (GIFA), net internal areas(NIA – i.e. usable area for shops, supermarkets and offices) and site area (SA).
+ site survey reports, including archaeological survey, ecological survey, invasive plant growthsurvey, etc.;
+ details of wildlife, including protected species, protection measures;
+ geotechnical and report(s) describing the intrusive ground and groundwater investigationscompleted, together with the results (e.g. the results of trial pits, auger holes, windowsamplers, boreholes, cone penetration tests (CPTs), and standard penetration tests (SPTs));
+ environmental report(s) describing the sampling and analysis of soils, together with the results,giving information about the soil, ground water, and gases;
+ details of any other facilitating works (e.g. soil stabilisation measures);
+ remediation plan describing the method of dealing with contaminated materials and/or invasiveplant growth (e.g. Japanese knotweed and giant hogweed), including requirements forpost-remediation validation sampling;
+ refurbishment and demolition survey reports, providing details of any asbestos containingmaterials (ACMs) and/or other hazardous materials, together with the scope of removal orencapsulation works required to be undertaken as part of the building works;
+ details of any other facilitating works (e.g. soil stabilisation measures);
+ details of any party wall awards or other agreements with adjoining owners and statutoryundertakers, specifically detailing any requirements of the award to which the contractorshould comply to ensure that the employer does not breach any agreement;
+ temporary works methodology, drawings and sketches;
+ details of which condition of contract is to be used for the building project;
+ details of any planning conditions or informatives that the contractor is required to complywith;
+ the employer’s requirements in respect of insurances;
+ the employer’s requirements for the contractor to collect and report cost data to supportclaims for capital allowances, grants, value added tax (VAT) recovery, and other tax incentives;
+ the employer’s policy documents, which the contractor will be required to comply with (e.g.site rules and regulations, environmental, corporate social responsibilities, and health and safetypolicies);
+ hoarding requirements, including design where this is an employer’s requirement;
+ details of the employer’s post completion requirements (e.g. operation and maintenance ofcompleted building (i.e. works and services)); and
+ all other information necessary to construct the preliminaries bill for the building project orwork package (refer to Work Section 1 (Preliminaries) at Part 3 (Tabulated rules ofmeasurement for building works) of these rules).
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
32 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
The above list is not meant to be definitive or exhaustive, but merely a guide. It is intended to beused by the quantity surveyor/cost manager to assist in identifying the types of reports and otherinformation required to prepare a robust BQ.
2.15 Codification of bill of quantities
2.15.1 Planning the bill of quantities breakdown structures:
2.15.1.1 Before attempting to prepare a bill of quantities (BQ) for a building project, the composition of thebuilding project needs to be determined and the structure of the BQ planned.The composition ofa BQ can be viewed as a work breakdown structure (WBS).This is a tree structure which can beused to define and divide a building project into key facets. It is developed by starting with the endobjective (i.e. WBS Level 0 – the entire building project) and successively subdividing it into themain components and sub-components that make up the entire building project – providing ahierarchical breakdown. What is more, a WBS initiates the development of the cost breakdownstructure (CBS), which can be used to allocate costs to every facet of the building project at eachlevel of the WBS. Together, the WBS and CBS provide a frame of reference for the costmanagement of a building project during the construction phase (i.e. post contract). In the contextof BQ, the WBS is referred to as BQ breakdown structure (BQBS).
2.15.1.2 There are three principal breakdown structures for BQ.They are:
(1) Elemental:
Measurement and description is done by group elements; following the logic arrangement forelemental cost planning defined in NRM 1: Order of cost estimating and cost planning for capitalbuilding works. Each group element forms a separate section of the BQ, irrespective of theorder of work sections in NRM 2: Detailed measurement for building works. Group elements aresub-divided through the use of elements, which are further sub-divided by sub-elements.
(2) Work section:
Measurement and description is divided into the work sections defined in NRM 2: Detailedmeasurement for building works (refer to the tabulated rules in Part 3 of these rules).
(3) Work package:
Measurement and description is divided into employer or contractor defined work packages.Works packages can be based on either a specific-trade package or a single packagecomprising a number of different trades.
2.15.1.3 Amplification of these three principal BQ breakdown structures is given in paragraph A.1 (Bill ofquantities breakdown structures) at Appendix A (Guidance on the preparation of bill of quantities)of these rules.
2.15.2 Codification of bill of quantities:
2.15.2.1 The work breakdown structure (WBS) for the building project will have been initiated by thequantity surveyor/cost manager when preparing the initial order of cost estimates and developedduring the formal cost planning stages (i.e. the cost plan breakdown structure). As part of thisprocess, the cost breakdown structure (CBS) will have evolved. The key benefit of the cost planbreakdown structure is the ability to uniquely identify by a code all group elements, elements, sub-elements, and components (i.e. building components/items) in a numerical and logical manner –providing a codification framework for the cost management, control and reporting of costs.Witha unique code, all building components/items can be linked to components, components tosub-elements, sub-elements to elements, elements to group elements, and group elements to thecost limit (i.e. the total estimated cost of the building project). This makes it easier to retrieve,manage and restructure information (i.e. costs and building components/items). Details of thecodification framework, including the numbering logic, advocated for cost planning can be found inNRM 1: Order of cost estimating and cost planning for capital building works.
2.15.2.2 For the quantity surveyor/cost manager to manage the cost plan during the procurement andconstruction phases of the building project (i.e. by reconciling tender prices and project outturn
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 33
costs against the cost plan), the codification framework used for cost planning must be used as thebasis for the codification of building components/items and components in the bill of quantities(BQ).
2.15.3 The coding system:
2.15.3.1 The coding system used for a bill of quantities (BQ) will be dependant on the BQ breakdownstructure used.That is:
+ Elemental breakdown structure;
+ Work sectional breakdown structure; or
+ Work package breakdown structure.
(1) Elemental breakdown structure
When preparing elemental BQ, the BQ breakdown structure is based on the group elementsdefined by NRM 1: Order of cost estimating and cost planning for capital building works (i.e.facilitating works; substructure; superstructure; internal finishes; fittings, furnishings andequipment; services; prefabricated buildings and building units, work to existing buildings, andexternal works).
The identification numbers used to formulate codes for cost planning are described in NRM1: Order of cost estimating and cost planning for capital building works. The coding systemadvocated by NRM 1 is numeric. However, both alpha and numeric codes can be used(letters and numbers). It is recommended that the same approach be used in codifyingbuilding components/items (i.e. components and sub-components) in bill of quantities (BQ).
For practical purposes five to six levels of code are considered sufficient in cost planning toachieve the desired level of pre-contract cost control of a building project. The mainidentification numbers levels are as follows:
+ Level 0: Project number – most building projects will be given a project number, together witha project title or name, to distinguish them from all other projects the company might beworking on.
+ Level 1: Cost plan number – where a building project comprises more than one building orfacet, a discrete cost plan will most likely be prepared for each building and key facet;culminating in a ‘summary cost plan’. Therefore, an identification number will be required todistinguish cost plans.This code will not be required for a single cost plan.
The identification numbers for Level 2, Level 3 and Level 4 are pre-defined by NRM 1: Costestimating and cost planning for building works.
+ Level 2: Group element – identification number pre-defined.
+ Level 3: Element – identification number pre-defined.
+ Level 4: Sub-element – identification number pre-defined.
+ Level 5: Component – user defined (building components/items).
Because building components/items are described and quantified in greater detail in BQ thanthose for cost planning, a user defined level 6 identification numbers will need to beintroduced for each sub-component of a component that is to be measured in accordancewith NRM 2: Detailed measurement for building works. The way in which a code can beexpanded to include a level 6 identification number for sub-components is shown in thefollowing example.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
34 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Figure 2.3: Example of resultant codes used for codifying components andsub-components in elemental bill of quantities
Level Description Item Identificationnumbers
Resultant codes
0 Project number DPB27
1 Bill number Bill no. 3 3
2 Group element/BQnumber
Substructure 1
3 Element Foundations 1
4 Sub-element Piled foundations 2
5 Component Pile cap 1
6 Sub-component Excavation 1 DPB27-3.1.1.2.1.1
6 Sub-component Disposal 2 DPB27-3.1.1.2.1.2
6 Sub-component Concrete 3 DPB27-3.1.1.2.1.3
6 Sub-component Reinforcement 4 DPB27-3.1.1.2.1.4
6 Sub-component Formwork 5 DPB27-3.1.1.2.1.5
Note: It might not be necessary to prefix the code for components and sub-components with theproject number throughout the BQ.
The resultant codes can be inserted in the right-hand column of the bill paper or in bracketsafter the bill description.
(2) Work sectional breakdown structure
Where a work sectional breakdown structure is used to construct the bill of quantities(BQ), the work sections will be those defined in the work sections in NRM 2: Detailedmeasurement for building works (refer to the tabulated rules in Part 3 of this document).However, for the purposes of cost management and cost control, it is essential that the worksectional breakdown structure can be easily reconciled with the original cost planbreakdown structure.
The method recommended by the rules involves the provision of a secondary code whichacts as a suffix to the primary code used for BQ based on an elemental breakdown structuredescribed in sub-paragraph a) above. Examples of suffix codes are illustrated in Figure 2.4below.
Figure 2.4: Example of suffix codes used for codifying work sections in worksectional BQ breakdown structure
Serial no. Work Section Suffix
1 Preliminaries (main contract) /01
1 Preliminaries (works package contract) /01
2 Off-site manufactured materials, components and buildings /02
3 Demolitions /03
4 Alterations, repairs and conservation /04
5 Excavating and filling /05
6 Ground remediation and soil stabilisation /06
7 Piling /07
8 Underpinning /08
9 Diaphragm walls and embedded retaining walls /09
10 Crib walls, gabions and reinforced earth /10
11 ‘In-situ’ concrete works /11
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 35
Serial no. Work Section Suffix
12 Precast/composite concrete /12
13 Precast concrete /13
14 Masonry /14
15 Structural metalwork /15
16 Carpentry /16
17 Sheet roof coverings /17
18 Tile and slate roof and wall coverings /18
19 Waterproofing /19
20 Proprietary linings and partitions /20
21 Cladding and covering /21
22 General joinery /20
23 Windows, screens and lights /21
24 Doors, shutters and hatches /20
25 Stairs, walkways and balustrades /21
26 Metalwork /20
27 Glazing /21
28 Floor, wall, ceiling and roof finishings /20
29 Decoration /21
30 Suspended ceilings /30
31 Insulation, fire stopping and fire protection /31
32 Furniture, fittings and equipment /32
33 Drainage above ground /33
34 Drainage below ground /34
35 Site works /35
36 Fencing /36
37 Soft landscaping /37
38 Mechanical services /38
39 Electrical services /39
40 Transportation /40
41 Builder’s work in connection with mechanical, electrical and transportationinstallations
/41
Notes:1 Both alpha and numeric codes can be used (letters and numbers).2 As with elemental BQ, it is not be necessary to prefix the code for components and
sub-components with the project number throughout the BQ.
Using the examples of sub-components given in Figure 2.3 above, the resulting codes for awork sectional breakdown structure will be:
• Excavation DPB27-3.1.1.2.1.1/04
• Disposal DPB27-3.1.1.2.1.2/04
• Concrete DPB27-3.1.1.2.1.3/04
• Reinforcement DPB27-3.1.1.2.1.4/04
• Formwork DPB27-3.1.1.2.1.5/04
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
36 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
(3) Work package breakdown structure
Both NRM 1: Order of cost estimating and cost planning for capital building works and NRM 2:Detailed measurement for building works recognise that cost plans will need to be restructuredfrom elements to works packages for the purposes procurement. However, they make noattempt at standardising works packages. This is because the content of work packages islikely to be different from one building project to another – with the content of workpackages often based on the perception of risk to those ultimately liable for the constructionworks. For example, for one building contract it might be deemed appropriate to have allconcrete work carried out under by a single subcontractor. Whereas for another buildingcontract, because of the perceived risks associated with the drainage passing through theground floor construction, it is considered more appropriate to include the construction ofpile caps, ground beams, base slab and below ground drainage in the works package forgroundworks.
For that reason, the number and content of work packages need to be carefully planned bythe cost manager/quantity surveyor before commencing the preparation of the bill ofquantities. Once the work package breakdown structure has been established, the provisionof a secondary code which acts as a suffix to the primary code (i.e. that used for BQ basedon an elemental breakdown structure described in sub-paragraph (a) above) can be applied.
Figure 2.5 provides typical example of part of a work package breakdown structure, to whichsuffix codes have been applied. An example of a full work package breakdown structure isgiven at Appendix G of these rules.The example is not meant to be definitive or exhaustive,but simply for guidance.
Figure 2.5:Typical example of suffix codes used for codifying work packages whena work package BQ breakdown structure is used
Serialno.
Work package title/content Suffix
1 Preliminaries /01
2 Intrusive investigations:Asbestos and other hazardous materialsGeotechnical and environmental investigationsAttendance on archaeological investigations
/02
Preliminaries (main contract) /01.2
3 Demolition works:Asbestos and other hazardous materials removal/treatment worksSoft strip of building components and sub-componentsSoft strip of mechanical and electrical engineering servicesDemolition
/03
Preliminaries (works package contract) /01.2
4 Groundworks:Contaminated ground material removalPreparatory earthworksExcavation and earthworks, including basement excavation, earthwork support anddisposalTemporary works – propping of existing basement retaining wallsBelow ground drainageGround beamsPile capsTemporary works – piling mats/platformsGround bearing base slab construction, including waterproofingBasement retaining wall structures, including waterproofing
/04
Preliminaries (works package contract) /01.2
5 Piling:Piling works
/05
Preliminaries (works package contract) /01.2
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 37
Serialno.
Work package title/content Suffix
6 Concrete works:FrameUpper floors, including roof structureCore and shear wallsStaircases
/06
Preliminaries (works package contract) /01.2
7 Roof coverings and roof drainage /07
8 External and internal structural walls /08
9 Cladding /09
10 Windows and external doors /10
11 Mastic /11
12 Non-structural walls and partitions /12
13 Joinery /13
14 Suspended ceilings /14
15 Architectural metalwork /15
16 Tiling /16
17 Painting and decorating /17
18 Floor coverings /18
19 Fittings, furnishings and equipment /19
20 Combined Mechanical and Electrical Engineering Services /20
21 External works /21
Notes:
1 Only work packages 1 to 6 inclusive have been expanded to illustrate the typical content of thework package.
2 As with elemental BQ, it is not be necessary to prefix the code for components andsub-components with the project number throughout the BQ.
Again, using the examples of sub-components given in Figure 2.3 above, the resulting codesfor a work package breakdown structure will be:
• Excavation DPB27-3.1.1.2.1.1/04
• Disposal DPB27-3.1.1.2.1.2/04
• Concrete DPB27-3.1.1.2.1.3/04
• Reinforcement DPB27-3.1.1.2.1.4/04
• Formwork DPB27-3.1.1.2.1.5/04
As all sub-components relate to the construction of pile caps, they will all be incorporated inthe work package for groundworks and, as a consequence, all be given the same suffix.
2.16 Cost management/control
2.16.1 The main purpose of a bill of quantities (BQ) is to present a co-ordinated list of components/items,together with their identifying descriptions and quantities that encompass the building works sothat the tendering contractors are able to prepare tenders efficiently and accurately. As well asassisting in ensuring parity of tendering. In addition, BQ provide a vital tool, which can be used bythe quantity surveyor/cost manager to manage and control the costs of the building project. Costmanagement and control uses include:
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
38 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
+ Pre-tender estimates;
+ Post tender estimates;
+ Cost planning;
+ Pricing variations; and
+ Interim valuations and payment.
2.16.2 Pre-tender estimate:
Pre-tender estimates are prepared immediately before calling the first tenders for construction.This is the final cost-check undertaken by the cost manager before tender bids for the buildingproject, or any part of the building project, are obtained.When a bill of quantities (BQ) is the basisof obtaining a tender price, the pre-tender estimates will be based on the BQ.
2.16.3 Post-tender estimate:
A post-tender estimate is prepared at RIBA Work Stage H (tender action), or OGC Gateway 3C(investment decision), after all the construction tenders have been received and evaluated. It isbased on the outcome of any post-tender negotiations, including the resolution of any tenderqualifications and tender price adjustments.The post-tender estimate will include the actual knownconstruction costs and any residual risks. The aim of this estimate is to corroborate the fundinglevel required by the employer to complete the building project, including cost updates of projectand design team fees, as well as other development and project costs, where they form part of thecosts being managed by the cost manager.When reporting the outcome of the tendering processto the employer, the quantity surveyor/cost manager should include a summary of the post-tenderestimate(s).The post-tender estimate should be fairly accurate because the uncertainties of marketconditions have been removed. Post-tender estimates are used as the control estimate duringconstruction.
2.16.4 Cost planning:
2.16.4.1 Cost planning is an iterative process, which is performed in steps of increasing detail as moredesign information becomes available.A cost plan provides both a work breakdown structure anda cost breakdown structure which, by codifying, can be used to redistribute works in elements toworks packages for the purpose of procurement and cost control during the construction phase ofthe building project.
2.16.4.2 The third formal cost plan stage (completed at RIBA Work Stages E/F (Technical Design/ProductionInformation) is based on technical designs, specifications and detailed information for construction.Formal cost plan 3 will provide the frame of reference for appraising tenders. It also provides theframe of reference for reconciling ‘actual costs’ against ‘cost targets’. This is particularly beneficialwhere building works are being procured piecemeal (e.g. procuring discrete work packages as theirdesign is completed).The proper use of the cost plan will allow the re-profiling of cost targets asnecessary to ensure that the overall cost limit (i.e. the employer’s authorised budget) is maintainedby the project team.
2.16.5 Pricing variations:
The rates in a priced bill of quantities (BQ) provide a basis for the valuation of varied work.‘Pro-rata’ and ‘analogous’ rates can also be ascertained from the base rates tendered to calculatethe prices of other components not specifically described in the BQ.
2.16.6 Interim valuations and payment:
2.16.6.1 Many building projects require interim payments to be paid to the contractor.This is in order torelieve the contractor of the burden of financing the whole of the building works until completion;works which may take many months or years to complete. Within each contract there will beclauses which set out the administrative rules under which the quantity surveyor/cost manager,architect (or contract administrator or project manager, quantity surveyor/cost manager) employer
PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 39
and contractor must operate. In many contracts, while the completion and calculation of the valueis important, the method and procedure of the interim valuations and payment which thecontractor receives is equally important.
2.16.6.2 A priced bill of quantities (BQ) provides a comprehensive list of building components/items.Consequently, when a contract has been entered into, by assessing the building components/itemsin the BQ, the priced BQ can be used to ascertain periodic valuation of works properly executedin accordance with the provisions of the contract for the purpose of interim valuations andpayment.
2.17 Analysis, collection and storage of cost data
2.17.1 Priced bill of quantities (BQ) make available one of the best sources of real-time cost data, whichcan be used by quantity surveyors/cost managers to provide expert cost advice on the likely costof future building projects. Moreover, they afford a complete cost model in a single document.
2.17.2 The cost data provided in a BQ can be retrieved, analysed, stored and reprocessed in various ways(e.g. as distinct rates, detailed elemental cost analyses, element unit rates (EUR), cost/m2 of grossinternal floor area, and/or functional unit rates) for use in order of cost estimates and cost plans. Itcan also be used for benchmarking purposes.
2.17.3 NRM 1: Order of cost estimating and cost planning for capital building works can be used as a basis formeasuring element unit quantities (EUQ) for the purpose of preparing detailed cost analyses ofbuilding projects.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
40 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Part 3:Tabulated rules ofmeasurement for building works
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 41
Part 3:Tabulated rules ofmeasurement for building works3.1 Introduction
3.1.1 Part 3 of the rules comprise:
(1) the information and requirements for main contractor’s and work package contractors’preliminaries, together with the rules for preparing the preliminaries pricing schedule; and
(2) the rules of measurement for building components/items.
3.1.2 The use of the tabulated rules is also explained.
3.1.3 Bill of quantities (BQ) are to fully describe and accurately represent the quantity and quality of theworks to be carried out. More detail than is required by these rules should be given wherenecessary to define the precise nature and extent of the required work.
3.2 Use of tabulated rules of measurement for buildingworks
3.2.1 General
3.2.1.1 The rules of measurement for building works are set out in tables.The tables are divided into twocategories, namely those dealing with:
+ preliminaries; and
+ measurement of building components/items.
3.2.1.2 The rules are written in the present tense.
3.2.1.3 The symbol ‘/’ used between two or more units of measurement or within text, means ‘or’.
3.2.1.4 Horizontal lines divide the tables and rules into zones to which different rules apply.
3.2.1.5 Where units of measurement or rules are separated by a broken line ( - - - - - ) this denotes achoice of units or choice of ways of measuring the work.The method chosen shall be the best tosuit the particular situation.
3.2.1.6 The use of a hyphen (-) or the phrase ‘to’ between two dimensions in these tables or in a bill ofquantities means a range of dimensions exceeding the first dimension stated but not exceeding thesecond.
3.2.2 Tables: preliminaries
3.2.2.1 Work Section 1 comprises the rules for describing and quantifying preliminaries. It is divided intotwo sub-sections as follows:
+ preliminaries (main contract); and
+ preliminaries (work package contract).
3.2.2.2 Both sub-sections are sub-divided into parts as follows:
+ Part A: Information and requirements (i.e. dealing with the descriptive part of thepreliminaries); and
+ Part B: Pricing schedule (i.e. provides the basis of a pricing document for preliminaries).
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 43
3.2.2.3 The tables for information and requirements for both preliminaries (main contract) andpreliminaries (work package contract) are structured as follows:
(1) Information and requirements are specified under a number of headings, which are givenabove each table (i.e. project particulars; drawings and other documents; and the site andexisting buildings);
(2) The left hand column (sub-heading 1) lists the preliminaries items to be considered undereach main heading;
(3) The second column (sub-heading 2) lists the sub-items to be considered under eachsub-heading;
(4) The third column (information requirements) lists the information which shall be includedwithin the preliminaries descriptions; and
(5) The fourth column (supplementary information/notes) lists supplementary information thatmight need to be included within the preliminaries descriptions, as well as providingadditional guidance on the drafting of preliminaries statements.
3.2.2.4 The pricing schedule tables for both preliminaries (main contract) and preliminaries (work packagecontract) are structured as follows:
(1) The contractor’s pricing of preliminaries are captured under a number of headings, which aregiven above each table (i.e. project particulars; drawings and other documents; and the siteand existing buildings);
(2) The left hand column (component) lists the preliminaries items to be considered under eachmain heading;
(3) The second column (included/notes on pricing) lists the sub-items which form part of eachitem;
(4) The third column (unit) lists the unit of measurement for preliminaries items;
(5) The fourth column (pricing method) stipulates if the component is a ‘fixed charge’, a‘time-related charge’, or a combination of both; and
(6) The fifth column (excluded) describes the items excluded from a component. Whereexclusions are stated, cross references to the appropriate component is given.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
44 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
3.2.3 Tables: building components/items
3.2.3.1 Work sections 2 to 41 comprise the rules of measurement for building components/items. Theyare as follows:
No. Work Section:
234567891011121314151617181920212223242526272829303132333435363738394041
Off-site manufactured materials, components and buildings:Demolitions;Alterations, repairs and conservation;Excavating and filling;Ground remediation and soil stabilisation;Piling;Underpinning;Diaphragm walls and embedded retaining walls;Crib walls, gabions and reinforced earth;In-situ concrete works;Precast/composite concrete;Precast concrete;Masonry;Structural metalwork;Carpentry;Sheet roof coverings;Tile and slate roof and wall coverings;Waterproofing;Proprietary linings and partitions;Cladding and covering;General joinery;Windows, screens and lights;Doors, shutters and hatches;Stairs, walkways and balustrades;Metalwork;Glazing;Floor, wall, ceiling and roof finishings;Decoration;Suspended ceilings;Insulation, fire stopping and fire protection;Furniture, fittings and equipment;Drainage above ground;Drainage below ground;Site works;Fencing;Soft landscaping;Mechanical services;Electrical services;Transportation; andBuilder’s work in connection with mechanical, electrical and transportation installations.
3.2.3.2 Each table is structured as follows:
(1) The title of the work section is given in the heading;
(2) The first two rows set out the:
(a) drawn information required in respect of each work section to enable measurementand shall accompany the bill of quantities when issued,
(b) mandatory information that is to be provided in each work section,
(c) minimum information that shall be shown on the drawings or any other document thataccompany each work section, and
PART 3:TABULATED RULES OF MEASUREMENT FOR BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 45
(d) works and materials that not measured, but are deemed to be included in the buildingcomponents/items measured in each work section;
(3) The left hand column (item) lists the building components/items commonly encountered inbuilding works;
(4) The second column (unit) lists the unit of measurement for building components/items;
(5) The third column (level 1) lists the information, including any dimension requirements, thatshall be included in the description of the building components/items;
(6) The fourth column (level 2) lists the supporting information, including any additionaldimension requirements, which shall be included in the description of the buildingcomponents/items;
(7) The fifth column (level 3) lists the further supporting information, including any additionaldimension requirements, which shall be included in the description of the buildingcomponents/items; and
(8) The sixth column (notes, comments and glossary) explains what work is deemed to beincluded in specific building components/items, clarifies the approach to quantification anddescription of building components/items, and contains definitions of specific terms andphrases used in connection with the building components/items.
The building components/items listed in the tables comprise those commonly encountered inbuilding works; the lists are not intended to be exhaustive.
3.3 Measurement rules for building works
3.3.1 BQ shall fully describe and accurately represent the quantity and quality of the works to be carriedout.Where necessary, more detail than is required by these rules shall be given in order to definethe precise nature and extent of the required work.
3.3.2 Quantities:
The rules for quantifying building components/items are as follows:
(1) Measurement and billing:
(a) Measure work net as fixed in position unless otherwise stated.
(b) Net quantity measured shall be deemed to include all additional material required forlaps, joints, seams and the like, as well as any waste material.
(c) Curved work shall be measured on the centre line of the material unless otherwisestated.
(d) Dimensions shall be measured to the nearest 10mm. 5mm and over shall be regardedas 10mm and less than 5mm shall be disregarded.
(e) Except for quantities measured in tonnes (t), quantities shall be given to the nearestwhole number. Quantities less than one unit shall be given as one unit. Quantitiesmeasured in tonnes (t) shall be given to two decimal places.
(2) Voids:
(a) Unless otherwise stated, minimum deductions for voids refer only to openings orwants within the boundaries of the measured work.
(b) Always deduct openings or wants at the boundaries of measured areas, irrespective ofsize.
(c) Do not measure separate items for widths not exceeding a stated limit where thesewidths are caused by voids.
3.3.3 Descriptions:
3.3.3.1 Each work section of a bill of quantities shall begin with a heading and a description stating thenature and location of the work.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
46 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
3.3.3.2 Headings for groups of building components/items (i.e. components and sub-components) in a billof quantities shall be read as part of the descriptions of the items to which the headings apply.
3.3.3.3 Descriptions shall state the building components/items being measured (taken from the firstcolumn of the tabulated rules) and include all Level 1, 2 and 3 information (taken from the third,fourth and fifth columns respectively) applicable to that item. Where applicable, the relevantinformation from column five shall be included in the description.
3.3.3.4 Unless specifically stated otherwise in the bill of quantities or in these rules, descriptions forbuilding components/items shall include the:
(1) type and quality of the material;
(2) critical dimension(s) of the material(s);
(3) method of fixing, installing or incorporating the goods or materials into the work where notat the discretion of the contractor; and
(4) nature or type of background.
3.3.3.5 Where the nature or type of background is required to be identified, the buildingcomponents/items description shall state one of the following:
(1) timber (the term includes all types of hard and soft building boards);
(2) plastics;
(3) masonry (the term includes brick, concrete, block, natural and reconstituted stone);
(4) metal, of any type;
(5) metal-faced timber or plastics; and
(6) vulnerable materials (the term includes glass, marble, mosaic, ceramics, tiled finishes, materialfinishes and the like).
3.3.3.6 Dimensions given as part of the description shall be:
(1) stated in the sequence: length, width and height.Where ambiguity could arise, the dimensionsshall be identified in the description;
(2) the finished lengths, widths and heights specified or shown on the drawings with noallowance made for overlaps, scarcements and the like.
3.3.3.7 Thicknesses given as part of the description shall be the finished thickness of the material aftercompaction and shall exclude the thickness of adhesives and or bedding materials unless otherwisestated.
3.3.3.8 The use of a hyphen (-) or the phrase ‘to’ between two dimensions in a description shall mean arange of dimensions exceeding the first dimension stated but not exceeding the second.
3.3.3.9 Where the rules require work to be described as ‘curved’ with the radius stated, details shall begiven of the curved work, including if concave or convex, if conical or spherical, if to more than oneradius, and shall state the radius or radii. The radius shall be the mean radius measured to thecentre line of the material unless otherwise stated.
3.3.3.10 The information required by these rules may be given by a precise and unique cross-reference toanother document (e.g. to a specification or to a catalogue).
3.3.3.11 Where other components and sub-components are referred to in other documents (e.g. aspecification states that vinyl sheet flooring is to be laid on a plywood lining), each component andor sub-component shall be measured and described separately (i.e. both the vinyl sheet flooringand the plywood lining are to be measured as separate items).
3.3.3.12 Notwithstanding the requirements of paragraph 3.3.3.11 above, separate components orsub-components may be combined to form single composite building components/items. In suchcases, the description of the composite building components/items shall clearly state what isincluded and how each component and or sub-component is to be incorporated. Any component,
PART 3:TABULATED RULES OF MEASUREMENT FOR BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 47
sub-component or other element of the work not clearly included in the description shall bedeemed not to be included as part of the composite building components/items.
3.3.3.13 Unless specifically stated otherwise in the BQ or in these rules, each building component/item shallbe deemed to include the following:
(1) labour and all costs in connection therewith;
(2) materials and goods together with all costs in connection therewith;
(3) assembling, installing, erecting, fixing or fitting materials or goods in position;
(4) plant and all costs in connection therewith;
(5) waste of goods or materials;
(6) all rough and fair cutting unless specially stated otherwise;
(7) establishment charges; and
(8) cost of compliance with all legislation in connection with the work measured including healthand safety, disposal of waste and the like.
3.3.4 Work of special types:
3.3.4.1 Work of each of the following special types shall be separately identified. Work of special typesincludes:
(1) Work to existing buildings: such work is defined as work on, in or immediately under workexisting before the current building project. Specific details pertaining to work carried out toan existing building shall be given at the start of each applicable work section.
(2) Work carried out and subsequently removed: specific details pertaining to work that is to becarried out and subsequently removed shall be given at the start of each applicable worksection.
(3) Work outside the curtilage of the site: specific details pertaining to work to be executedoutside the curtilage of the site shall be given at the start of each applicable work section.
(4) Work carried out in extraordinary conditions, including:
(a) in, on or under water, stating whether river, canal, lake or sea and, where applicable,stating the mean spring levels of high and low water;
(b) in tidal conditions;
(c) underground, stating mean depth;
(d) in compressed air, stating the pressure and means of entry and exit; and
(e) in other types of extraordinary conditions.
3.3.4.2 Specific details pertaining to work carried out in each condition shall be given at the start of eachapplicable work section.
3.3.4.3 The additional rules for special types of work shall be read in conjunction with the rules in theappropriate work sections.
3.3.4.4 Details of the additional preliminaries that are pertinent to the special types of work shall be givenin the description, drawing attention to any specific requirements due to the nature of the work.
3.3.5 Measurable work not covered by the tabulated rules:
3.3.5.1 Building components/items not covered by the tabulated rules shall, if possible, be measured byrules for similar types of work. Rules of measurement adopted for such building components/itemsshall be clearly stated and fully defined in either the preliminaries or in the bill of quantities (againstthe building components/items or items to which the rule relates). Such rules shall, as far aspossible, conform to those given in the tabulated rules of measurement for similar buildingcomponents/items.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
48 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
3.3.5.2 Where it is not possible to derive the method of measurement from the tabulated rules, the ruleschosen may be bespoke. In such cases, the rule or rules derived shall be reiterated in full in eitherthe preliminaries or in the bill of quantities (above the building components/items or items towhich the rule relates).
3.3.6 Procedure where work cannot be quantified:
For the rules relating to work which cannot be quantified, refer to paragraph 2.9 (Non-measurableworks) at Part 2 of these rules.
3.3.7 Procedure where exact type of product or component is not specified:
3.3.7.1 Where the exact type of product or component cannot be specified, an estimated price for theproduct or component shall be given in the description as a prime cost price (PC price). State, forexample, ‘Allow the PC price of £x per thousand delivered to site’, ‘Allow the PC price of £y perm2 delivered to site’, or ‘Allow £z each delivered to site’.
3.3.7.2 Unless specifically stated otherwise in the bill of quantities or in these rules, the contractor shall bedeemed to have allowed for all items listed in paragraph 3.3.3.13 in his or her priced rate for eachbuilding component/item incorporating a PC price.
3.3.7.3 PC prices shall exclude any allowance for the main contractor’s overheads and profit, which aredealt with separately.
3.3.8 Procedure where quantity of work cannot be accurately determined:
3.3.8.1 Where work can be described and given in items in accordance with the tabulated rules ofmeasurement but the quantity of work cannot be accurately determined, an estimate of thequantity shall be given and identified as a ‘provisional quantity’.
3.3.8.2 Work items identified as a ‘provisional quantity’ shall be subject to remeasurement when they havebeen completed. The ‘approximate quantity’ shall be substituted by the ‘firm quantity’ measured,and the total price for that item adjusted to reflect the change in quantity. Where the variancebetween the ‘provisional quantity’ and the ‘firm quantity’ measured is less than 20 per cent, the ratetendered by the contractor shall not be subject to review.Where the variance is significant (i.e. 20per cent or more), the rate can be reviewed to ensure that the rate is fair and reasonable to boththe employer and contractor.
PART 3:TABULATED RULES OF MEASUREMENT FOR BUILDING WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 49
Tabu
late
dw
ork
sect
ions
1P
relim
inar
ies
(mai
nco
ntra
ct)
Part
A:I
nfor
mat
ion
and
requ
irem
ents
1.1
Pro
ject
part
icul
ars
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Pr
ojec
tpa
rtic
ular
s1
Nam
eof
proj
ect.
Shor
tpr
ojec
ttit
leto
best
ated
.
2N
atur
eof
proj
ect.
Shor
tde
scrip
tion
tobe
stat
ed.
3Lo
catio
nof
proj
ect.
Full
post
alad
dres
sto
best
ated
.
4Le
ngth
ofco
ntra
ct.
Perio
d,in
wee
ks,t
obe
stat
ed.
Whe
reto
best
ated
byth
eco
ntra
ctor
,ins
ert‘
Tobe
conf
irmed
’.
5N
ames
,add
ress
esan
dpo
ints
ofco
ntac
tof
empl
oyer
and
cons
ulta
nts.
Func
tion
(e.g
.arc
hite
ct),
nam
eof
orga
nisa
tion,
addr
ess,
poin
tof
cont
act,
tele
phon
enu
mbe
ran
dem
aila
ddre
ssto
best
ated
Toin
clud
e:(1
)Em
ploy
er.
(2)
Proj
ect
spon
sor
(e.g
.em
ploy
er’s
inte
rnal
proj
ect
man
ager
).(3
)Pr
ojec
tm
anag
er(if
appl
icab
le).
(4)
Prin
cipa
lcon
trac
tor
(und
erC
DM
Regu
latio
ns).
(5)
Pers
onem
pow
ered
byth
eco
ntra
ctto
act
onbe
half
ofth
eem
ploy
er(p
erso
n’s
title
tobe
give
n(e
.g.
cont
ract
adm
inist
rato
r)).
(6)
CD
Mco
-ord
inat
or.
(7)
Qua
ntity
surv
eyor
.(8
)C
onsu
ltant
s(s
epar
atel
yid
entif
ied)
.(9
)C
lerk
ofw
orks
(ifre
quire
dby
the
empl
oyer
).
50 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.2
Dra
win
gs
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1D
raw
ings
1Li
stof
draw
ings
from
whi
chth
ebi
llof
quan
titie
sw
aspr
epar
ed.
Dra
win
gnu
mbe
r,in
clud
ing
revi
sion
stat
us,d
raw
ing
title
,and
auth
orto
best
ated
.Ex
cept
ions
tobe
stat
ed.
2O
ther
docu
men
ts1
Pre-
cons
truc
tion
info
rmat
ion.
Expl
ain
how
pre-
cons
truc
tion
info
rmat
ion
isde
alt
with
(i.e.
with
inth
epr
elim
inar
ies
bill
oras
ase
para
tedo
cum
ent)
.Cro
ss-r
efer
ence
topr
e-co
nstr
uctio
nin
form
atio
ndo
cum
ent
ifse
para
tedo
cum
ent.
2Li
stof
draw
ings
and
othe
rdo
cum
ents
rela
ting
toth
eco
ntra
ctbu
tno
tin
clud
edin
the
tend
erdo
cum
ents
.
(1)
Prov
ide
alis
tof
draw
ings
and
othe
rdo
cum
ents
rela
ting
toth
eco
ntra
ctbu
tno
tin
clud
edin
the
tend
erdo
cum
ents
,whi
chm
aybe
seen
byth
eco
ntra
ctor
durin
gth
ete
nder
perio
d.(2
)D
ocum
ent
title
,ref
eren
ce,r
evisi
on,d
ate
ofiss
uean
dau
thor
tobe
stat
ed.
(3)
Det
ails
ofw
here
docu
men
tsca
nbe
seen
tobe
stat
ed.
1.3
The
site
and
exis
ting
build
ings
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Th
esit
e(1
)D
escr
iptio
nof
the
site.
(2)
Refe
renc
eto
draw
ing,
ordr
awin
gs,s
how
ing
the
site
boun
darie
san
dco
ntra
ctor
’sw
orki
ngar
ea(s
).
2Ex
istin
gbu
ildin
gson
orad
jace
ntto
the
site
Des
crip
tion
ofex
istin
gbu
ildin
gson
orad
jace
ntto
the
site.
3Su
rrou
ndin
gla
nd/b
uild
ing
uses
1A
ddre
ss.
(1)
Sub-
head
ing
2to
iden
tify
land
orbu
ildin
g.(2
)U
seor
activ
ities
carr
ied
out
onth
ela
ndor
inbu
ildin
g(s)
.
4Ex
istin
gm
ains
serv
ices
1O
nth
esit
e.Li
stdr
awin
gsan
dot
her
appl
icab
lein
form
atio
n.
2A
djac
ent
toth
esit
e.
5So
ilsan
dgr
ound
wat
erSt
ate
info
rmat
ion
prov
ided
and
whe
rein
clud
edin
docu
men
tatio
n(e
.g.‘A
nnex
Bof
the
BQ’o
r‘as
ase
para
tedo
cum
ent’)
.Cro
ss-r
efer
ence
asne
cess
ary.
6Si
tein
vest
igat
ion
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 51
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
7H
ealth
and
safe
tyfil
e1
Hea
lthan
dsa
fety
file.
(1)
Ava
ilabi
lity
for
insp
ectio
n.(2
)A
rran
gem
ents
for
insp
ectio
n.2
Oth
erdo
cum
ents
.
8H
ealth
and
safe
tyha
zard
sD
etai
lsof
haza
rds
that
are
orm
aybe
pres
ent
onth
esit
e.W
here
info
rmat
ion
prov
ided
inth
epr
e-co
nstr
uctio
nin
form
atio
n,cr
oss-
refe
renc
eac
cord
ingl
y.
9A
cces
sto
the
site
(1)
Des
crip
tion.
(2)
Lim
itatio
ns.
10Pa
rkin
gD
etai
lsof
empl
oyer
’sre
quire
men
tsin
resp
ect
ofpa
rkin
gan
dpa
ymen
tsof
fees
and
char
ges
inco
nnec
tion
ofpa
rkin
g,in
clud
ing
park
ing
bay
and
park
ing
met
ersu
spen
sions
.
11U
seof
the
site
Det
ails
ofan
ylim
itatio
ns.
12Si
tevi
sits
(1)
Purp
ose.
(2)
Arr
ange
men
tsfo
rsit
evi
sit.
Incl
ude
whe
rein
form
atio
nno
tgi
ven
inth
e‘c
ondi
tions
ofte
nder
’.
1.4
Des
crip
tio
no
fth
eW
ork
s
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Th
eW
orks
Des
crip
tion
ofth
eW
orks
.
2Pr
epar
ator
yw
ork
byot
hers
Des
crip
tion
ofan
yw
ork
that
will
beca
rrie
dou
tby
othe
rsun
der
ase
para
teco
ntra
ctbe
fore
the
star
tof
wor
kon
site
for
this
cont
ract
.
3W
ork
byot
hers
conc
urre
ntw
ithth
eco
ntra
ctD
escr
iptio
nof
the
Wor
ks.
4C
ompl
etio
nw
ork
byot
hers
TABULATED WORK SECTIONS
52 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.5
The
cont
ract
cond
itio
ns
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1C
ondi
tions
ofco
ntra
ct1
Form
ofco
ntra
cttit
leto
best
ated
.(1
)Fu
lltit
leof
the
stan
dard
orbe
spok
efo
rmof
cont
ract
,inc
ludi
nged
ition
,rev
ision
,and
stan
dard
amen
dmen
tsap
plic
able
.(2
)Sc
hedu
leof
clau
se/c
ondi
tion
head
ings
inth
est
anda
rdfo
rmof
cont
ract
(see
note
(1))
.(3
)Re
fere
nce
toan
yam
endm
ents
tocl
ause
s/co
nditi
ons
tost
anda
rdfo
rmof
cont
ract
(see
note
(1))
.(4
)Re
fere
nce
toan
ysu
pple
men
tary
orsp
ecia
lcl
ause
s/co
nditi
ons
tost
anda
rdfo
rmof
cont
ract
.(5
)In
sert
ions
rela
ting
toar
ticle
sof
agre
emen
t,ar
ticle
s,re
cita
lsan
dco
ntra
ctpa
rtic
ular
sor
abst
ract
ofpa
rtic
ular
s(s
eeno
te(1
)).
(6)
Empl
oyer
’sin
sura
nce
resp
onsib
ility.
(7)
Empl
oyer
’sre
quire
men
tsin
resp
ect
ofpe
rform
ance
bond
s.(8
)Em
ploy
er’s
requ
irem
ents
inre
spec
tof
pare
ntco
mpa
nygu
aran
tees
.(9
)Em
ploy
er’s
requ
irem
ents
inre
spec
tof
colla
tera
lw
arra
ntie
s.
(1)
Nei
ther
asc
hedu
leof
clau
se/c
ondi
tion
head
ings
inth
est
anda
rdfo
rmof
cont
ract
nor
refe
renc
eto
any
supp
lem
enta
ryor
spec
ialc
laus
es/c
ondi
tions
tost
anda
rdfo
rmof
cont
ract
orde
tails
ofin
sert
ions
rela
ting
toar
ticle
sof
agre
emen
t,ar
ticle
s,re
cita
lsan
dco
ntra
ctpa
rtic
ular
sor
abst
ract
ofpa
rtic
ular
sis
requ
ired
whe
read
dres
sed
thro
ugh
asc
hedu
leof
amen
dmen
tsto
the
stan
dard
cond
ition
sof
cont
ract
.N
otw
ithst
andi
ngth
is,re
fere
nce
toth
esc
hedu
leof
amen
dmen
tsis
tobe
mad
ein
this
sect
ion
ofth
epr
elim
inar
ies
bill.
(2)W
here
besp
oke,
orun
com
mon
,for
ms
ofco
ntra
ctar
eus
ed–
aco
pyis
tobe
appe
nded
toth
ebi
llof
quan
titie
sor
incl
uded
aspa
rtof
the
tend
er.
1.6
Em
ploy
er’s
requ
irem
ents
:Pro
visi
on,
cont
ent
and
use
of
docu
men
ts
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1D
efin
ition
san
din
terp
reta
tions
1D
efin
ition
s.Ex
plai
nho
wto
inte
rpre
tke
yw
ords
,ter
ms,
phra
ses
and
syno
nym
sus
edin
the
prel
imin
arie
san
dsp
ecifi
catio
n.
2C
omm
unic
atio
n.D
efin
ition
and
form
atof
com
mun
icat
ions
,and
timin
gof
resp
onse
.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 53
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3Pr
oduc
ts.
Def
initi
onan
d/or
mea
ning
.
4Si
teeq
uipm
ent.
5D
raw
ings
.
6C
ontr
acto
r’sch
oice
.
7C
ontr
acto
r’sde
signe
dw
ork.
8Su
bmit
prop
osal
s.
9Te
rms
used
insp
ecifi
catio
n.D
efin
ition
san
d/or
mea
ning
ofke
yw
ords
,ter
ms,
phra
ses
and
syno
nym
sus
edin
the
spec
ifica
tion.
10M
anuf
actu
rer
and
prod
uct
refe
renc
es.
(1)
Def
initi
onof
term
s.(2
)Ver
sion
ofm
anuf
actu
rer’s
tech
nica
llite
ratu
reap
plic
able
tote
nder
and
cont
ract
(e.g
.cur
rent
onth
eda
teof
invi
tatio
nto
tend
er).
11Su
bstit
utio
nof
prod
ucts
.(1
)D
efin
ition
and/
orm
eani
ngof
subs
titut
e/al
tern
ativ
epr
oduc
ts.
(2)
Proc
ess
for
acce
ptan
cean
dre
ject
ion
ofsu
bstit
ute/
alte
rnat
ive
prod
ucts
.
12C
ross
-ref
eren
ces.
Expl
ain
met
hod
ofcr
oss
refe
renc
ing
used
.
13Re
fere
nced
docu
men
ts.
Ord
erof
prec
eden
ceof
refe
renc
eddo
cum
ents
.
14Eq
uiva
lent
prod
ucts
.D
efin
ition
and/
orm
eani
ng.
15Su
bstit
utio
nof
stan
dard
s.(1
)D
efin
ition
and/
orm
eani
ng.
(2)
Proc
ess
for
acce
ptan
cean
dre
ject
ion
ofsu
bstit
ute
stan
dard
s.
16C
urre
ncy
ofdo
cum
ents
.Ve
rsio
nof
publ
ished
docu
men
ts,i
nclu
ding
revi
sions
and
amen
dmen
ts,a
pplic
able
tote
nder
and
cont
ract
(e.g
.cur
rent
onth
eda
teof
invi
tatio
nto
tend
er).
17Pr
oduc
tsiz
es.
(1)
Gen
eral
defin
ition
ofpr
oduc
tsiz
es.
(2)
Exce
ptio
nsto
gene
rald
efin
ition
.Pr
oduc
tsto
besp
ecifi
edby
thei
rco
-ord
inat
ing
size.
Exce
ptio
nsto
this
rule
tobe
stat
ed.
TABULATED WORK SECTIONS
54 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
2D
ocum
ents
prov
ided
onbe
half
ofem
ploy
er1
Add
ition
alco
pies
ofdr
awin
gsan
ddo
cum
ents
.D
escr
ibe
proc
edur
e.
2D
imen
sions
.Ex
plai
now
ners
hip
ofsc
aled
dim
ensio
ns
3M
easu
red
quan
titie
s.Ex
plai
npr
eced
ence
ofm
easu
red
quan
titie
s.
4Th
esp
ecifi
catio
n.(1
)Re
fere
nce
the
spec
ifica
tion,
orsp
ecifi
catio
ns,t
hepr
elim
inar
ies.
(2)
Expl
ain
the
met
hod
used
tocr
oss
refe
renc
esp
ecifi
catio
ncl
ause
son
orin
othe
rte
nder
/con
trac
tdo
cum
ents
.
5D
iver
genc
efro
mth
est
atut
ory
requ
irem
ents
.M
etho
dfo
rde
alin
gw
ithdi
verg
ence
from
the
stat
utor
yre
quire
men
tssh
ould
they
occu
r.
6Em
ploy
er’s
polic
ydo
cum
ents
.Re
quire
men
tsin
resp
ect
ofco
mpl
ianc
ew
ithth
eem
ploy
er’s
polic
ies.
Exam
ples
incl
ude:
–en
viro
nmen
tal.
–su
stai
nabi
lity.
–co
rpor
ate
soci
alre
spon
sibilit
ies
(CSR
).–
heal
than
dsa
fety
.
3D
ocum
ents
prov
ided
byth
eco
ntra
ctor
,sub
cont
ract
ors
and
supp
liers
1D
esig
nin
form
atio
n.(1
)G
ener
alre
quire
men
ts,i
nclu
ding
desig
nm
anag
emen
tan
dpr
ogra
mm
ing
requ
irem
ents
.(2
)Sp
ecifi
cre
quire
men
tsin
resp
ect
ofde
sign
docu
men
tsan
din
form
atio
n.(3
)Fo
rmat
.(4
)N
umbe
rof
copi
es.
(5)
Subm
issio
nre
quire
men
ts.
2Pr
oduc
tion
info
rmat
ion.
(1)
Gen
eral
requ
irem
ents
inre
spec
tof
prod
uctio
nin
form
atio
n.(2
)Fo
rmat
.(3
)N
umbe
rof
copi
es.
(4)
Subm
issio
nre
quire
men
ts.
3A
s-bu
ilt/a
s-in
stal
led
draw
ings
and
info
rmat
ion.
(1)
Gen
eral
requ
irem
ents
.(2
)Su
bmiss
ion
requ
irem
ents
.(3
)N
umbe
rof
copi
es.
4Te
chni
call
itera
ture
.(1
)Li
tera
ture
tobe
mai
ntai
ned.
(2)
Requ
irem
ents
for
liter
atur
eto
beav
aila
ble
onsit
e.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 55
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
5M
aint
enan
cein
stru
ctio
nsan
dgu
aran
tees
.(1
)In
form
atio
nre
quire
men
ts.
(2)
Form
at.
(3)
Num
ber
ofco
pies
.(4
)Su
bmiss
ion
requ
irem
ents
.(5
)St
orag
ean
din
form
atio
nm
anag
emen
t.(6
)Re
quire
men
tsin
resp
ect
ofem
erge
ncy
and/
orou
tof
norm
alw
orki
ngca
ll-ou
tse
rvic
es,i
nclu
ding
requ
irem
ents
for
cont
act
deta
ilsan
dex
tent
ofco
ver.
Requ
irem
ents
rela
ting
to‘m
anag
emen
tin
form
atio
nsy
stem
s’to
best
ated
unde
rst
orag
ean
din
form
atio
nm
anag
emen
tre
quire
men
ts.
6En
ergy
ratin
gca
lcul
atio
ns.
(1)
Info
rmat
ion
requ
irem
ents
.(2
)N
umbe
rof
copi
es.
(3)
Subm
issio
nre
quire
men
ts.
7En
viro
nmen
tala
sses
smen
tin
form
atio
n.(1
)Sc
hem
ety
pe.
(2)
Envi
ronm
enta
ltar
gets
(inre
spec
tof
site
activ
ities
and
the
wor
ks).
(3)
Info
rmat
ion
requ
irem
ents
.(4
)Fo
rmat
.(5
)N
umbe
rof
copi
es.
(6)
Subm
issio
nre
quire
men
ts.
8D
ocum
ents
requ
ired
befo
rePr
actic
alC
ompl
etio
n.Sp
ecifi
cre
quire
men
ts.
4D
ocum
ent
and
data
inte
rcha
nge
1El
ectr
onic
data
inte
rcha
nge
(ED
I).(1
)Typ
esan
dcl
asse
sof
com
mun
icat
ion.
(2)
Part
ies
com
mun
icat
ion
betw
een.
(3)
Requ
irem
ents
.
TABULATED WORK SECTIONS
56 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.7
Em
ploy
er’s
requ
irem
ents
:Man
agem
ent
of
the
wo
rks
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Em
ploy
er’s
requ
irem
ents
–ge
nera
lly1
Supe
rvisi
on.
Spec
ific
requ
irem
ents
.
2C
onsid
erat
eco
nstr
ucto
rssc
hem
e.(1
)Re
gist
ratio
nre
quire
men
ts.
(2)
Con
tact
deta
ils.
(3)
Com
plia
nce
requ
irem
ents
.
3In
sura
nce.
(1)
Doc
umen
tary
evid
ence
requ
ired.
(2)W
hen
requ
ired.
4In
sura
nce
clai
ms.
(1)
Requ
irem
ents
for
notif
ying
even
ts.
(2)
Requ
irem
ents
for
inde
mni
fyin
gth
eem
ploy
er.
5C
limat
icco
nditi
ons.
Reco
rds
tobe
mai
ntai
ned
byco
ntra
ctor
.
6O
wne
rshi
pof
mat
eria
ls/pr
oduc
tsar
ising
from
the
wor
ks.
Requ
irem
ents
inre
spec
tof
owne
rshi
p,an
dre
mov
alfro
msit
e.W
here
tobe
com
eth
epr
oper
tyof
the
cont
ract
or;
cons
ider
seek
ing
cred
itfo
rm
ater
ials/
prod
ucts
arisi
ngfro
mth
ew
orks
.
2Pr
ogra
mm
e/pr
ogre
ss1
Prog
ram
me.
(1)
Form
atan
dco
nten
t.(2
)Ex
clus
ions
.(3
)D
ocum
ent
cont
rolr
equi
rem
ents
.(4
)Su
bmiss
ion
requ
irem
ents
.
2Re
vise
dpr
ogra
mm
e.Sp
ecifi
cre
quire
men
tsfo
rre
-pro
filin
gan
dre
issui
ngpr
ogra
mm
e.
4C
omm
ence
men
tof
wor
k.N
otic
epe
riod
tobe
give
nbe
fore
the
com
men
cem
ent
ofw
ork
onsit
e.
5M
onito
ring
prog
ress
.(1
)Em
ploy
er’s
spec
ific
requ
irem
ents
inre
spec
tof
repo
rtin
gan
dav
oidi
ngpo
tent
iald
elay
.(2
)Li
stan
dde
scrip
tion
ofke
ype
rform
ance
indi
cato
rs(K
PIs)
tobe
mai
ntai
ned
byco
ntra
ctor
.(3
)Re
quire
men
tsfo
rre
port
ing
agai
nst
KPIs.
(4)
Act
ions
ofco
ntra
ctor
ifKP
Isno
tac
hiev
ed.
6N
otifi
catio
nof
com
pens
atio
nev
ent(
s).
Empl
oyer
’ssp
ecifi
cre
quire
men
tsin
resp
ect
ofco
ntra
ctor
notif
ying
even
tsth
atco
mpe
nsat
epo
tent
ial
dela
y.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 57
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
7Pr
ojec
tpr
ogre
ssm
eetin
gs.
(1)
Gen
eral
requ
irem
ents
.(2
)Pr
opos
edag
enda
.(3
)Fr
eque
ncy.
(4)
Loca
tion.
(5)
Acc
omm
odat
ion
avai
labi
lity.
(6)
Att
ende
es.
(7)
Cha
irper
son.
8C
ontr
acto
r’spr
ogre
ssre
port
.(1
)Fo
rman
dco
nten
tof
repo
rt.
(2)
Met
hod
ofpr
esen
tatio
n.(3
)Su
bmiss
ion
requ
irem
ents
.
9C
ontr
acto
r’ssit
em
eetin
gs.
Gen
eral
requ
irem
ents
.
10Ph
otog
raph
icre
cord
s.(1
)Im
age
form
at.
(2)
Freq
uenc
y.(3
)N
umbe
rof
loca
tions
.(4
)N
umbe
rof
imag
esfro
mea
chlo
catio
n.(5
)O
ther
requ
irem
ents
.
11Ea
rlypo
sses
sion.
Empl
oyer
’ssp
ecifi
cre
quire
men
tsfo
rea
rlypo
sses
sion
and
taki
ngov
erpa
rts
ofth
ew
orks
befo
repr
actic
alco
mpl
etio
n.
12N
otic
eof
com
plet
ion.
(1)
Gen
eral
requ
irem
ents
.(2
)M
inim
umpe
riod
ofno
tice
tobe
give
nby
cont
ract
orto
best
ated
.
13Ex
tens
ions
oftim
e.(1
)Re
quire
men
tsin
resp
ect
ofno
tific
atio
nby
the
cont
ract
or.
(2)
Subm
issio
nre
quire
men
ts.
3C
ost
cont
rol
1C
ash
flow
fore
cast
.(1
)Ba
sisof
cash
flow
fore
cast
.(2
)Fr
eque
ncy.
(3)
Subm
issio
nre
quire
men
ts.
2Re
mov
al/r
epla
cem
ent
ofex
istin
gw
ork.
(1)
Loca
tion.
(2)
Exte
nt.
(3)
Requ
irem
ents
inre
spec
tof
exec
utio
n.
TABULATED WORK SECTIONS
58 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3Pr
opos
edin
stru
ctio
ns.
(1)
Requ
irem
ents
inre
spec
tof
estim
ates
.(2
)C
onte
ntof
estim
ates
.(3
)O
ther
requ
irem
ents
.
4M
easu
rem
ent
ofco
vere
dw
ork.
(1)
Gen
eral
requ
irem
ents
.(2
)N
otic
epe
riod
tobe
give
nby
cont
ract
orbe
fore
cove
ring
wor
ksw
hich
are
tobe
mea
sure
d.
5D
ayw
ork
vouc
hers
.(1
)N
otic
epe
riod
tobe
give
nby
cont
ract
orbe
fore
com
men
cem
ent
ofw
ork
tobe
carr
ied
out
ona
dayw
ork
basis
.(2
)Su
bmiss
ion
requ
irem
ents
.
6In
terim
appl
icat
ions
,val
uatio
nsan
dpa
ymen
ts.
(1)
Proc
ess
for
agre
eing
inte
rimpa
ymen
tsan
dpa
ymen
tda
tes.
(2)
Con
tent
and
subm
issio
nre
quire
men
tsfo
rco
ntra
ctor
’sin
terim
appl
icat
ions
for
paym
ent.
(3)
Empl
oyer
’ssp
ecifi
cin
voic
ing
requ
irem
ents
.
7Pa
ymen
tfo
rpr
oduc
tsno
tin
corp
orat
edin
toth
ew
orks
.In
form
atio
n/ev
iden
ceof
freed
omfro
mtit
lere
quire
dfro
mco
ntra
ctor
inre
spec
tof
prod
ucts
stor
edon
-site
befo
repa
ymen
tis
tobe
cons
ider
edby
empl
oyer
.
8Pa
ymen
tfo
rpr
oduc
tsst
ored
off-s
ite.
Info
rmat
ion/
evid
ence
offre
edom
from
title
requ
ired
from
cont
ract
orin
resp
ect
ofpr
oduc
tsst
ored
off-s
itebe
fore
paym
ent
isto
beco
nsid
ered
byem
ploy
er.
9La
bour
and
equi
pmen
tre
turn
s.(1
)Re
cord
sto
bem
aint
aine
dby
the
cont
ract
or.
(2)
Con
tent
ofre
cord
s.(3
)Su
bmiss
ion
ofre
cord
s.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 59
1.8
Em
ploy
er’s
requ
irem
ents
:Qua
lity
stan
dard
san
dqu
alit
yco
ntro
l
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1St
anda
rds
ofpr
oduc
tsan
dex
ecut
ions
1In
com
plet
ein
form
atio
n.(1
)Re
quire
men
tsfo
rde
alin
gw
ithpr
oduc
ts/m
ater
ials
are
not
fully
spec
ified
.(2
)St
atus
ofw
orks
whe
reth
eex
tent
isno
tfu
llydo
cum
ente
d.(3
)St
atus
ofom
issio
nsor
erro
rsin
desc
riptio
nan
d/or
quan
tity.
2W
orkm
ansh
ipsk
ills.
Requ
irem
ents
inre
spec
tof
:(1
)A
ppro
pria
tene
ssof
cont
ract
or’s
oper
ativ
es.
(2)
Regi
stra
tion
sche
mes
tow
hich
cont
ract
or’s
oper
ativ
essh
ould
belo
ng.
(3)
Evid
ence
ofsc
hem
ere
gist
ratio
nre
quire
men
ts.
(4)
Oth
erre
quire
men
ts.
3Q
ualit
yof
prod
ucts
.Re
quire
men
tsin
resp
ect
of:
(1)
Usin
gne
wan
dre
cycl
edpr
oduc
ts.
(2)
Supp
lyof
prod
ucts
.(3
)Tol
eran
ces.
(4)
Det
erio
ratio
npr
even
tion.
(5)
Oth
erre
quire
men
ts.
4Q
ualit
yof
exec
utio
n.Re
quire
men
tsin
resp
ect
of:
(1)
Fixi
ng,a
pplic
atio
nan
din
stal
latio
nof
prod
ucts
,in
clud
ing
alig
nmen
t.(2
)C
olou
rba
tchi
ng.
(3)
Dim
ensio
ns.
(4)
Fini
shed
wor
k.(5
)Lo
catio
nan
dfix
ing
ofpr
oduc
ts.
(6)
Oth
erre
quire
men
ts.
5C
ompl
ianc
e.Re
quire
men
tsin
resp
ect
of:
(1)
Com
plia
nce
with
prop
rieta
rysp
ecifi
catio
ns.
(2)
Com
plia
nce
with
perfo
rman
cesp
ecifi
catio
ns.
(3)
Oth
erre
quire
men
ts.
TABULATED WORK SECTIONS
60 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
6In
spec
tions
.Re
quire
men
tsfo
rin
spec
ting
prod
ucts
and
wor
kex
ecut
ed.
7Re
late
dw
ork.
Requ
irem
ents
inre
spec
tof
co-o
rdin
atin
gw
orkm
ansh
ipof
trad
es.
8M
anuf
actu
rer’s
reco
mm
enda
tions
/inst
ruct
ions
.(1
)Re
quire
men
tsin
resp
ect
ofco
mpl
ianc
e.(2
)Ver
sion
ofm
anuf
actu
rer’s
reco
mm
enda
tions
/in
stru
ctio
nsap
plic
able
tote
nder
and
cont
ract
(e.g
.cu
rren
ton
the
date
ofin
vita
tion
tote
nder
).
9W
ater
for
the
wor
ks.
Gen
eral
requ
irem
ents
.
2Sa
mpl
es/A
ppro
vals
1Sa
mpl
es.
Requ
irem
ents
inre
spec
tof
sam
ples
ofpr
oduc
ts,w
ork
exec
uted
and
moc
k-up
s.
2A
ppro
valo
fpr
oduc
tsa
mpl
es.
(1)
Gen
eral
requ
irem
ents
(incl
udin
gpr
ogra
mm
ing
requ
irem
ents
)fo
rsu
bmiss
ion
of,i
nspe
ctio
nof
,and
test
son
sam
ples
.(2
)D
efin
ition
ofap
prov
alin
cont
ext
ofsa
mpl
es.
(3)
Rete
ntio
nof
com
plyi
ngsa
mpl
es,i
nclu
ding
stor
age
requ
irem
ents
.(4
)O
ther
requ
irem
ents
.
3A
ppro
valo
fw
ork
exec
uted
/moc
k-up
s.(1
)G
ener
alre
quire
men
ts(in
clud
ing
prog
ram
min
gre
quire
men
ts)
for
subm
issio
nof
,ins
pect
ion
of,t
ests
on,w
ork
exec
uted
and
moc
k-up
s.(2
)D
efin
ition
ofap
prov
alin
cont
ext
ofw
ork
exec
uted
and
moc
k-up
s.(3
)Re
tent
ion
ofco
mpl
ying
wor
kex
ecut
edan
dm
ock-
ups,
incl
udin
gst
orag
ere
quire
men
ts.
(4)
Oth
erre
quire
men
ts.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 61
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3A
ccur
acy/
Sett
ing
out
1A
ccur
acy
ofin
stru
men
ts.
Gen
eral
requ
irem
ents
.
2Se
ttin
gou
t.
3A
ppea
ranc
ean
dfit
.Re
quire
men
tsin
resp
ect
ofto
lera
nces
and
dim
ensio
ns.
4C
ritic
aldi
men
sions
.D
etai
lsof
criti
cald
imen
sions
.
5Le
vels
ofst
ruct
ural
floor
s.M
axim
umto
lera
nces
for
desig
ned
leve
lsto
best
ated
.
6Re
cord
draw
ings
.(1
)Re
quire
men
tsin
resp
ect
ofre
cord
ing
deta
ilsof
grid
lines
,set
ting-
out
stat
ions
,ben
chm
arks
and
prof
iles.
(2)
Info
rmat
ion
rete
ntio
nre
quire
men
ts.
(3)
Subm
issio
nre
quire
men
ts.
(4)
Oth
erre
quire
men
ts.
4Se
rvic
es1
Serv
ices
regu
latio
ns.
Gen
eral
requ
irem
ents
.
2W
ater
regu
latio
ns/b
yela
ws
notif
icat
ion.
3W
ater
regu
latio
ns/b
yela
ws
cont
ract
or’s
cert
ifica
te.
(1)
Con
tent
ofce
rtifi
cate
.(2
)Su
bmiss
ion
requ
irem
ents
.(3
)O
ther
requ
irem
ents
.
4El
ectr
ical
inst
alla
tion
cert
ifica
te.
(1)
Subm
issio
nre
quire
men
ts.
(2)
Oth
erre
quire
men
ts.
5G
as,o
ilan
dso
lidfu
elap
plia
nce
inst
alla
tion
cert
ifica
te.
(1)
Con
tent
ofce
rtifi
cate
.(2
)Su
bmiss
ion
requ
irem
ents
.(3
)O
ther
requ
irem
ents
.
6M
echa
nica
land
elec
tric
alse
rvic
es.
(1)
Requ
irem
ents
inre
spec
tof
final
test
san
dco
mm
issio
ning
.(2
)Re
quire
men
tsin
resp
ect
ofBu
ildin
gRe
gula
tions
notic
e.(3
)O
ther
requ
irem
ents
.
5Su
perv
ision
/insp
ectio
n/de
fect
ive
wor
k1
Supe
rvisi
on.
(1)
Gen
eral
requ
irem
ents
.(2
)N
otic
epe
riod
for
repl
acem
ent
ofco
ntra
ctor
’spe
rson
inch
arge
byco
ntra
ctor
.
2C
o-or
dina
tion
ofm
echa
nica
land
elec
tric
alen
gine
erin
gse
rvic
es.
(1)
Gen
eral
requ
irem
ents
.(2
)Re
quire
men
tsfo
rdo
cum
enta
ryev
iden
ceof
cont
ract
or’s
staf
f.
TABULATED WORK SECTIONS
62 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3O
vert
ime
wor
king
.G
ener
alre
quire
men
ts.
4D
efec
tsin
exist
ing
wor
k.(1
)Pr
oces
sfo
rde
alin
gw
ithun
docu
men
ted
defe
cts.
(2)
Proc
ess
for
deal
ing
with
docu
men
ted
rem
edia
lw
ork.
5A
cces
sfo
rin
spec
tion.
Gen
eral
requ
irem
ents
.
6Te
sts
and
insp
ectio
ns.
(1)T
imin
gre
quire
men
ts.
(2)
Reco
rds
requ
ired.
(3)
Subm
issio
nre
quire
men
ts.
(4)
Oth
erre
quire
men
ts.
7A
irpe
rmea
bilit
y.(1
)M
etho
d.(2
)Pe
rform
ance
requ
irem
ents
.(3
)Su
bmiss
ion
requ
irem
ents
(res
ults
).(4
)O
ther
requ
irem
ents
.
8C
ontin
uity
ofth
erm
alin
sula
tion.
(1)
Gen
eral
requ
irem
ents
.(2
)C
onte
ntof
repo
rts.
(3)
Subm
issio
nre
quire
men
ts.
(4)
Num
ber
ofco
pies
.(5
)O
ther
requ
irem
ents
.
9Re
sista
nce
topa
ssag
eof
soun
d.(1
)M
etho
d.(2
)C
ompl
ianc
ere
quire
men
ts.
(3)
Subm
issio
nre
quire
men
ts.
(4)
Oth
erre
quire
men
ts.
10En
ergy
perfo
rman
cece
rtifi
cate
.(1
)G
ener
alre
quire
men
ts.
(2)
Form
atof
cert
ifica
tean
dre
port
.(3
)Su
bmiss
ion
requ
irem
ents
.(4
)O
ther
requ
irem
ents
.
11Pr
opos
als
for
rect
ifica
tion
ofde
fect
ive
prod
ucts
/exe
cutio
ns.
Gen
eral
requ
irem
ents
.
12M
easu
res
toes
tabl
ishac
cept
abilit
y.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 63
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
13Q
ualit
yco
ntro
l.(1
)Pr
oced
ural
requ
irem
ents
.(2
)Re
cord
sre
quire
d.(3
)C
onte
ntof
reco
rds.
(4)
Oth
erre
quire
men
ts.
6W
ork
ator
afte
rco
mpl
etio
n1
Wor
kbe
fore
com
plet
ion.
(1)
Gen
eral
requ
irem
ents
.(2
)C
lean
ing
requ
irem
ents
,inc
ludi
ngcl
eani
ngm
ater
ials
and
met
hods
ofcl
eani
ng.
(3)
Requ
irem
ents
for
rect
ifyin
gm
inor
faul
ts.
(4)
Requ
irem
ents
inre
spec
tof
mov
ing
part
s.(5
)O
ther
requ
irem
ents
.
2Se
curit
yat
com
plet
ion.
(1)
Gen
eral
requ
irem
ents
.(2
)Re
quire
men
tsin
resp
ect
ofke
ys.
3M
akin
ggo
od/r
ectif
icat
ion
ofde
fect
s.(1
)A
cces
sar
rang
emen
ts.
(2)
Not
ice
perio
ds.
(3)
Com
plet
ion
requ
irem
ents
.
4H
ighw
ay/s
ewer
adop
tion.
(1)
Des
crip
tion
ofw
ork
tobe
adop
ted.
(2)
Requ
irem
ents
inre
spec
tof
wor
kfo
rad
optio
n.
1.9
Em
ploy
er’s
requ
irem
ents
:Sec
urit
y,sa
fety
and
pro
tect
ion
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Se
curit
y/he
alth
and
safe
ty1
Pre-
cons
truc
tion
info
rmat
ion.
Loca
tion
ofin
form
atio
n.
2Ex
ecut
ion
haza
rds.
(1)
Man
agem
ent
requ
irem
ents
for
com
mon
haza
rds.
(2)
Det
ails
ofsig
nific
ant
haza
rds
inco
rpor
ated
inth
ede
sign
ofth
epr
ojec
t.
3Pr
oduc
tha
zard
s.(1
)Re
quire
men
tsin
resp
ect
ofha
zard
ous
subs
tanc
es.
(2)
Man
agem
ent
requ
irem
ents
for
com
mon
haza
rds.
(3)
Det
ails
ofsig
nific
ant
haza
rds
insp
ecifi
edco
nstr
uctio
nm
ater
ials.
TABULATED WORK SECTIONS
64 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
4C
onst
ruct
ion
phas
ehe
alth
and
safe
typl
an.
(1)
Gen
eral
requ
irem
ents
.(2
)C
onte
nt.
(3)
Subm
issio
nre
quire
men
ts.
5Se
curit
y.(1
)Re
quire
men
tsfo
rpr
otec
ting
the
site,
the
wor
ks,
prod
ucts
,mat
eria
ls,an
dex
istin
gbu
ildin
gsaf
fect
edby
the
wor
ks,f
rom
dam
age
and
thef
t.(2
)Re
quire
men
tsfo
rpr
even
ting
unau
thor
ised
acce
ssto
the
site,
the
wor
ks,a
ndad
join
ing
prop
erty
.(3
)D
escr
iptio
nof
any
spec
ials
ecur
ityre
quire
men
ts.
6St
abilit
y.Re
quire
men
tsfo
rm
aint
aini
ngth
est
abilit
yan
dst
ruct
ural
inte
grity
ofth
ew
orks
and
adjo
inin
gpr
oper
tydu
ring
the
cont
ract
.
7O
ccup
ied
prem
ises.
(1)
Exte
ntex
istin
gbu
ildin
gsw
illbe
occu
pied
and/
orus
eddu
ring
the
cont
ract
.(2
)M
etho
dof
wor
king
.(3
)Re
quire
men
tsin
resp
ect
ofov
ertim
ew
orki
ng.
8Pa
sses
.(1
)D
etai
lsof
cont
rolle
dar
eas.
(2)
Proc
edur
esfo
rob
tain
ing
and
retu
rnin
gpa
sses
.
9O
ccup
ier’s
rule
san
dre
gula
tions
.(1
)G
ener
alre
quire
men
ts.
(2)
Loca
tion
ofru
les
and
regu
latio
ns.
(3)
Arr
ange
men
tsfo
rin
spec
tion.
10U
seof
mob
ilete
leph
ones
.Re
quire
men
tsre
latin
gto
use
ofm
obile
tele
phon
eson
-site
.
11Em
ploy
er’s
repr
esen
tativ
essit
evi
sits.
(1)
Safe
tyre
quire
men
ts.
(2)
Prot
ectiv
ecl
othi
ngan
d/or
equi
pmen
tre
quire
men
ts.
12W
orki
ngpr
ecau
tions
/res
tric
tions
.(1
)D
etai
lsof
haza
rdou
sar
eas.
(2)
Perm
itto
wor
kre
quire
men
ts.
2Pr
otec
tion
agai
nst
1Ex
plos
ives
.(1
)U
se.
(2)
Det
ails
ofre
stric
tions
.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 65
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
2N
oise
cons
ent
bylo
cala
utho
rity.
(1)
Gen
eral
requ
irem
ents
.(2
)Sp
ecia
lreq
uire
men
ts.
3N
oise
cont
rol.
4Po
llutio
nco
ntro
l.
5Pe
stic
ides
.(1
)U
se.
(2)
Det
ails
ofre
stric
tions
.(3
)D
ispos
alre
quire
men
ts.
(4)
Ope
rativ
esco
mpe
tenc
yre
quire
men
ts.
6N
uisa
nce.
(1)
Gen
eral
requ
irem
ents
.(2
)Sp
ecia
lreq
uire
men
ts.
7A
sbes
tos
cont
aini
ngm
ater
ials
(AC
M)s
.
8A
ntiq
uitie
s.
9Fi
repr
even
tion.
(1)
Gen
eral
requ
irem
ents
.(2
)D
etai
lsof
stan
dard
sto
whi
chco
ntra
ctor
isto
com
ply.
10Sm
okin
gon
-site
.(1
)G
ener
alre
quire
men
ts.
(2)
Spec
ialr
equi
rem
ents
.11
Burn
ing
on-s
ite.
12M
oist
ure.
(1)
Requ
irem
ents
for
prev
entin
gw
etne
ssan
dda
mpn
ess.
(2)
Requ
irem
ents
for
dryi
ngou
t.
13In
fect
edtim
ber/
cont
amin
ated
mat
eria
ls.G
ener
alre
quire
men
ts.
14W
aste
.(1
)D
efin
ition
ofw
aste
.(2
)G
ener
alre
quire
men
ts,i
nclu
ding
min
imiz
ing
was
te,
rem
ovin
gw
aste
and
excl
udin
gw
aste
from
void
san
dca
vitie
sin
the
cons
truc
tion.
(3)
Requ
irem
ents
inre
spec
tof
‘site
was
tem
anag
emen
tpl
ans’
(SW
MP)
.(4
)D
ocum
enta
tion
requ
irem
ents
.(5
)D
etai
lsof
key
perfo
rman
cein
dica
tor
(KPI
)da
tato
bepr
ovid
ed.
(6)
Info
rmat
ion
and
docu
men
tatio
nsu
bmiss
ion
requ
irem
ents
.
TABULATED WORK SECTIONS
66 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
15El
ectr
omag
netic
inte
rfere
nce.
Gen
eral
requ
irem
ents
.
16La
ser
equi
pmen
t.
17Po
wer
actu
ated
fixin
gsy
stem
s.
18In
vasiv
esp
ecie
s.(1
)G
ener
alre
quire
men
tsfo
rth
epr
even
tion
ofin
vasiv
esp
ecie
s(e
.g.p
lant
san
dan
imal
s).
(2)
Det
ails
ofan
ysp
ecia
lpre
caut
ions
requ
ired.
(3)
Requ
irem
ents
inre
spec
tof
disc
over
yan
dre
port
ing.
3Pr
otec
tion
1Ex
istin
gse
rvic
es.
(1)
Requ
irem
ents
inre
spec
tof
notif
ying
serv
ices
auth
oriti
es,s
tatu
tory
unde
rtak
ers
and/
orad
join
ing
adja
cent
owne
rs.
(2)
Requ
irem
ents
for
iden
tific
atio
nof
exist
ing
serv
ices
.(3
)Re
quire
men
tssh
ould
dam
age
occu
rto
exist
ing
serv
ices
.(4
)O
ther
requ
irem
ents
.
2Ro
ads
and
foot
path
s.(1
)G
ener
alre
quire
men
ts.
(2)
Requ
irem
ents
shou
ldda
mag
eoc
cur
toex
istin
gro
ads
and/
orfo
otpa
ths.
(3)
Oth
erre
quire
men
ts.
3Ex
istin
gto
psoi
land
subs
oil.
(1)
Requ
irem
ents
for
prev
entin
gov
erco
mpa
ctio
nof
exist
ing
tops
oila
ndsu
bsoi
l.(2
)D
etai
lsof
prot
ectiv
em
easu
res.
4Re
tain
edtr
ees,
shru
bsan
dgr
asse
dar
eas.
(1)
Det
ails
ofpr
otec
tive
mea
sure
s.(2
)Re
quire
men
tssh
ould
dam
age
occu
rto
reta
ined
tree
s,sh
rubs
and
gras
sed
area
s.(3
)O
ther
requ
irem
ents
.
5A
reas
ofre
tain
edtr
ees.
Det
ails
ofpr
otec
tive
mea
sure
s.
6W
ildlif
esp
ecie
san
dha
bita
ts.
(1)
Gen
eral
requ
irem
ents
.(2
)D
etai
lsof
prot
ectiv
em
easu
res.
(3)
Oth
erre
quire
men
ts.
7Ex
istin
gfe
atur
es.
(1)
Det
ails
ofpr
otec
tive
mea
sure
s.(2
)Sp
ecia
lreq
uire
men
ts.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 67
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
8Ex
istin
gw
ork.
(1)
Det
ails
ofpr
otec
tive
mea
sure
s.(2
)Re
quire
men
tsfo
rre
mov
ing
and
repl
acin
gex
istin
gw
ork.
9Bu
ildin
gin
terio
rs.
Det
ails
ofpr
otec
tive
mea
sure
s.
10Ex
istin
gfu
rnitu
re,f
ittin
gsan
deq
uipm
ent.
(1)
Det
ails
ofpr
otec
tive
mea
sure
s.(2
)Ex
tent
ofre
mov
alw
ork
tobe
carr
ied
out
byth
eem
ploy
er.
11Es
peci
ally
valu
able
and
vuln
erab
leite
ms.
(1)
Det
ails
ofpr
otec
tive
mea
sure
s.(2
)Ex
tent
ofre
mov
alw
ork
tobe
carr
ied
out
byth
eem
ploy
er.
12A
djoi
ning
prop
erty
.Pe
rmiss
ion
requ
irem
ents
.
13A
djoi
ning
prop
erty
rest
rictio
ns.
(1)
Prec
autio
nsto
beta
ken
byth
eco
ntra
ctor
.(2
)C
onse
quen
ceof
dam
age.
14Ex
istin
gst
ruct
ures
.G
ener
alre
quire
men
ts.
15M
ater
ials
for
recy
clin
gan
d/or
reus
e.(1
)So
rtin
gan
dda
mag
epr
even
tion
requ
irem
ents
.(2
)St
orag
ere
quire
men
ts.
1.10
Em
ploy
er’s
requ
irem
ents
:Spe
cific
limit
atio
nso
nm
etho
d,se
quen
cean
dti
min
g
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1G
ener
alSt
atem
ent
expl
aini
ngth
atlim
itatio
nsde
scrib
edin
this
sect
ion
ofth
epr
elim
inar
ies
bill
are
supp
lem
enta
ryto
limita
tions
desc
ribed
orim
plic
itin
info
rmat
ion
give
nin
othe
rse
ctio
nsor
onth
edr
awin
gs.
2D
esig
nco
nstr
aint
sD
etai
lsof
any
desig
nco
nstr
aint
s.
3M
etho
d/se
quen
ceof
wor
kSp
ecifi
clim
itatio
nsre
latin
gto
met
hod
and
sequ
ence
ofw
orki
ng,i
nclu
ding
phas
ing
requ
irem
ents
tobe
incl
uded
inth
epr
ogra
mm
e.
4U
seor
disp
osal
ofm
ater
ials
foun
dSp
ecifi
clim
itatio
ns.
TABULATED WORK SECTIONS
68 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
5U
seor
disp
osal
ofm
ater
ials
foun
dSp
ecifi
clim
itatio
ns.
6W
orki
ngho
urs
(1)
Def
initi
onof
wor
kho
urs.
(2)
Def
initi
onof
norm
alw
orki
ngho
urs.
7C
ompl
etio
nof
any
sect
ion
orpa
rtof
the
wor
ks1
Empl
oyer
requ
irem
ents
for
poss
essio
n.(1
)G
ener
alre
quire
men
ts.
(2)
Spec
ialr
equi
rem
ents
.
2Re
mai
nder
ofth
ew
orks
.Re
quire
men
tsin
resp
ect
of:
(1)
Prov
ision
ofse
rvic
es.
(2)
Fire
prec
autio
ns.
(3)
Mea
nsof
esca
pean
dsa
feac
cess
.(4
)O
ther
requ
irem
ents
.
1.11
Em
ploy
er’s
requ
irem
ents
:Sit
eac
com
mo
dati
on/
serv
ices
/faci
litie
s/te
mpo
rary
wo
rk
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1G
ener
ally
1Sp
oilh
eaps
,tem
pora
ryw
orks
and
serv
ices
.Re
quire
men
tsin
resp
ect
ofth
esit
ing
ofsp
oilh
eaps
and
the
mai
nten
ance
,alte
ratio
n,m
ovem
ent
and
rem
oval
ofte
mpo
rary
wor
ks.
2Si
teac
com
mod
atio
n1
Room
for
mee
tings
.(1
)Sp
ecifi
cre
quire
men
ts,i
nclu
ding
furn
iture
and
equi
pmen
t,to
best
ated
.(2
)C
lean
ing
and
mai
nten
ance
requ
irem
ents
.2
Site
offic
es.
3O
ff-sit
eof
fices
/roo
mfo
rm
eetin
gs.
(1)
Spec
ific
requ
irem
ents
,inc
ludi
ngfu
rnitu
rean
deq
uipm
ent.
(2)
Prep
arat
ory
wor
ks,i
nclu
ding
pain
ting,
deco
ratio
nan
dap
plie
dfin
ishin
gs(e
.g.c
arpe
t).
(3)
Cle
anin
gan
dm
aint
enan
cere
quire
men
ts.
4Sa
nita
ryac
com
mod
atio
n.Sp
ecifi
cre
quire
men
ts,i
nclu
ding
furn
iture
and
equi
pmen
t.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 69
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
5U
seof
acco
mm
odat
ion/
land
not
incl
uded
inth
esit
e.(1
)Id
entif
icat
ion
ofac
com
mod
atio
nan
dor
land
that
may
beus
edby
the
cont
ract
orfo
rth
edu
ratio
nof
the
cont
ract
with
out
char
ge.
(2)
Lim
itatio
ns/r
estr
ictio
nson
use.
(3)
Requ
irem
ents
for
tem
pora
ryad
apta
tions
.(4
)C
lean
ing
and
mai
nten
ance
requ
irem
ents
.(5
)A
ccom
mod
atio
n/la
ndus
e.(6
)Lo
catio
nof
acco
mm
odat
ion/
land
.(7
)Re
inst
atem
ent
requ
irem
ents
onva
catio
nof
acco
mm
odat
ion/
land
.
6C
arpa
rkin
g.Sp
ecifi
cre
quire
men
tsfo
rth
epr
ovisi
onof
car
park
ing
for
repr
esen
tativ
esof
the
empl
oyer
.
3Se
rvic
esan
dfa
cilit
ies
1Li
ghtin
g.Sp
ecifi
cre
quire
men
tsfo
rth
epr
ovisi
onte
mpo
rary
light
ing
for
finish
ing
wor
kan
din
spec
tion.
2Li
ghtin
gan
dpo
wer
.(1
)Re
quire
men
tsin
resp
ect
of:
(a)
Use
ofem
ploy
er’s
mai
nssu
pply.
(b)
Resp
onsib
ility
for
cont
inui
tyof
supp
ly.(2
)M
eter
ing
requ
irem
ents
.(3
)Lo
catio
nof
supp
lypo
int.
(4)
Ava
ilabl
eca
paci
ty,f
requ
ency
,pha
sean
dcu
rren
tty
pe.
(5)
Con
ditio
ns/r
estr
ictio
nsim
pose
don
the
cont
ract
or.
3W
ater
.(1
)Re
quire
men
tsto
best
ated
inre
spec
tof
(a)
Use
ofem
ploy
er’s
mai
nssu
pply.
(b)
Resp
onsib
ility
for
cont
inui
tyof
supp
ly.(2
)M
eter
ing
requ
irem
ents
.(3
)So
urce
ofsu
pply.
(4)
Loca
tion
ofsu
pply
poin
t.(5
)C
ondi
tions
/res
tric
tions
impo
sed
onth
eco
ntra
ctor
.
4C
ontr
acto
r’son
-site
tele
phon
es.
(1)
Dat
eto
bein
stal
led.
(2)
Resp
onsib
ility
for
payi
ngin
stal
latio
nan
dal
lren
tal
char
ges,
incl
udin
gpa
ying
the
cost
ofca
lls.
(3)
Requ
irem
ents
for
diss
emin
atin
gte
leph
one
num
ber.
(4)
Oth
erre
quire
men
ts.
TABULATED WORK SECTIONS
70 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
5M
obile
tele
phon
es.
Requ
irem
ents
inre
spec
tof
:(1
)C
ontr
acto
r’sst
aff
requ
ired
tobe
prov
ided
with
mob
ilete
leph
ones
.(2
)Re
spon
sibilit
yfo
rpa
ying
inst
alla
tion
and
allr
enta
lch
arge
s,in
clud
ing
payi
ngth
eco
stof
calls
.(3
)Re
quire
men
tfo
rdi
ssem
inat
ing
tele
phon
enu
mbe
rs.
(4)
Oth
erre
quire
men
ts.
6Te
leph
ones
.(1
)Sy
stem
requ
irem
ents
.(2
)D
ate
tobe
inst
alle
d.(3
)Re
spon
sibilit
yfo
rpa
ying
inst
alla
tion
and
allr
enta
lch
arge
s,in
clud
ing
payi
ngth
eco
stof
calls
.(4
)O
ther
requ
irem
ents
.7
Fax
inst
alla
tion.
8C
ompu
ters
.(1
)Sy
stem
requ
irem
ents
,inc
ludi
ngco
mpu
ters
,so
ftwar
e,pr
inte
rs,c
able
san
dco
nsum
able
s.(2
)Re
spon
sibilit
yfo
rpa
ying
the
cost
ofco
nsum
able
s.(3
)D
ate
tobe
inst
alle
d.(4
)O
ther
requ
irem
ents
.
9Em
aila
ndin
tern
etfa
cilit
ies.
(1)
Syst
emre
quire
men
ts.
(2)
Dat
eto
bein
stal
led.
(3)
Resp
onsib
ility
for
payi
ngin
stal
latio
nan
dal
lren
tal
char
ges.
(4)
Oth
erre
quire
men
ts.
10Ph
otoc
opie
r.Em
ploy
er’s
requ
irem
ents
.
11Te
mpe
ratu
rean
dhu
mid
ity.
Leve
lsto
bem
aint
aine
dby
the
cont
ract
or.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 71
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
12U
seof
perm
anen
the
atin
gsy
stem
s.(1
)C
onfir
mat
ion
orot
herw
iseth
atth
eco
ntra
ctor
ispe
rmitt
edto
use
perm
anen
the
atin
gsy
stem
sfo
rdr
ying
out
the
wor
ks,s
ervi
ces
and
cont
rollin
gte
mpe
ratu
rean
dhu
mid
ityle
vels.
(2)
Requ
irem
ents
for
oper
atio
n,m
aint
enan
cean
dre
med
ialw
ork.
(3)
Requ
irem
ents
for
cont
ract
orto
arra
nge
supe
rvisi
onof
use
bysu
bcon
trac
tor
and
inde
mni
ficat
ion
ofsu
bcon
trac
tor.
(4)
Oth
erre
quire
men
ts.
13Be
nefic
ialu
seof
perm
anen
tin
stal
led
syst
ems.
Det
ails
ofse
rvic
essy
stem
s,in
clud
ing
lifts
and
sani
tary
inst
alla
tions
,whi
chca
nbe
used
byth
eco
ntra
ctor
toco
mpl
ete
the
wor
ks.
14M
eter
read
ings
.Re
quire
men
tsfo
rob
tain
ing
met
erre
adin
gs.
15Th
erm
omet
ers.
Requ
irem
ents
for
prov
idin
gm
axim
uman
dm
inim
umth
erm
omet
ers
for
mea
surin
gat
mos
pher
icsh
ade
tem
pera
ture
.
16Su
rvey
ing
equi
pmen
t.Re
quire
men
tsfo
rpr
ovid
ing
surv
eyin
geq
uipm
ent.
17Pe
rson
alpr
otec
tive
equi
pmen
t.Sp
ecifi
cre
quire
men
tsfo
rth
ose
actin
gon
beha
lfof
the
empl
oyer
.
18O
ther
requ
irem
ents
.Sp
ecifi
cre
quire
men
ts.
4Te
mpo
rary
wor
ks1
Road
s,ha
rdst
andi
ngs
and
foot
path
s.Re
quire
men
tsin
resp
ect
ofpe
rman
ent
road
s,ha
rdst
andi
ngs
and
foot
path
son
the
site,
incl
udin
gre
stric
tions
onus
ean
dpr
otec
tive
and/
orre
med
ial
mea
sure
s.
2Te
mpo
rary
wor
ks.
Spec
ific
requ
irem
ents
(e.g
.fen
ces,
hoar
ding
s,sc
reen
san
dro
ofs)
.
TABULATED WORK SECTIONS
72 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3Te
mpo
rary
prot
ectio
nm
easu
res
toex
istin
gtr
ees/
vege
tatio
n.(1
)Lo
catio
nof
tem
pora
rypr
otec
tion
(by
refe
renc
eto
draw
ing)
(2)
Stan
dard
sof
prot
ectiv
eba
rrie
rsan
dan
yot
her
appl
icab
leph
ysic
alpr
otec
tion
mea
sure
s.(3
)D
esig
nde
tails
ofph
ysic
alpr
otec
tion
mea
sure
s(b
yre
fere
nce
todr
awin
g).
(4)
Are
asof
stru
ctur
alla
ndsc
apin
gto
bepr
otec
ted
from
cons
truc
tion
oper
atio
ns.
(5)
Requ
irem
ents
for
mai
ntai
ning
inte
grity
ofpr
otec
tion
for
the
dura
tion
ofth
ew
orks
.(6
)Re
quire
men
tsfo
rre
mov
ing
prot
ectio
non
com
plet
ion
ofth
ew
orks
.
4N
ame
boar
ds.
Spec
ific
requ
irem
ents
.
5A
dver
tisin
g.
6O
ther
requ
irem
ents
.
1.12
Em
ploy
er’s
requ
irem
ents
:Ope
rati
on/
mai
nten
ance
of
finis
hed
build
ing
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1O
pera
tion
and
mai
nten
ance
man
ual
1G
ener
ally.
(1)
Purp
ose.
(2)
Scop
e.(3
)Re
spon
sibilit
yfo
rpr
epar
atio
n.(4
)In
form
atio
nto
bepr
ovid
edby
othe
rs.
(5)
Revi
ewpr
oces
s.(6
)N
umbe
rof
copi
es.
(7)
Late
stda
tefo
rsu
bmiss
ion
offin
alm
anua
l.(8
)A
s-bu
ilt/a
s-in
stal
led
draw
ings
:(a
)fo
rmat
and
stan
dard
(b)
num
ber
ofco
pies
.
The
oper
atio
nan
dm
aint
enan
cein
form
atio
n,th
ehe
alth
and
safe
tyfil
e,an
dal
loth
erin
form
atio
nca
nbe
com
bine
das
asin
gle
docu
men
t.In
this
case
,the
docu
men
tca
nbe
refe
rred
toas
the
‘bui
ldin
gm
anua
l’.
2C
onte
nt.
Spec
ific
requ
irem
ents
.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 73
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
2H
ealth
and
safe
tyfil
e1
Gen
eral
ly.(1
)Pu
rpos
e.(2
)Sc
ope.
(3)
Resp
onsib
ility
for
prep
arat
ion.
(4)
Info
rmat
ion
tobe
prov
ided
byth
eco
ntra
ctor
,w
here
not
resp
onsib
lefo
rpr
epar
atio
n.(5
)Re
view
proc
ess.
(6)
Num
ber
ofco
pies
.(7
)La
test
date
for
subm
issio
nof
final
file.
2C
onte
nt.
Spec
ific
requ
irem
ents
.
3W
eb-b
ased
info
rmat
ion
man
agem
ent
syst
emSp
ecifi
cre
quire
men
ts.
4Pr
esen
tatio
nof
docu
men
ts1
Ope
ratio
nan
dm
aint
enan
cem
anua
l.Sp
ecifi
cre
quire
men
tsin
resp
ect
offo
rmat
and
pres
enta
tion.
2H
ealth
and
safe
tyfil
e.
3O
ther
docu
men
ts.
Spec
ific
requ
irem
ents
.
5O
ther
empl
oyer
spec
ific
requ
irem
ents
1M
aint
enan
cese
rvic
es.
Spec
ific
requ
irem
ents
for
post
com
plet
ion
mai
nten
ance
(pla
nned
and
reac
tive)
.
2In
form
atio
nfo
rco
mm
issio
ning
serv
ices
.Sp
ecifi
cre
quire
men
ts.
3Tr
aini
ng.
4Sp
are
part
s.
5To
ols.
6O
ther
info
rmat
ion
Spec
ific
requ
irem
ents
.
TABULATED WORK SECTIONS
74 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1P
relim
inar
ies
(mai
nco
ntra
ct)
Part
B:P
rici
ngsc
hedu
le
1.1
Em
ploy
er’s
requ
irem
ents
1.1.
1S
ite
acco
mm
oda
tio
n
Com
pone
ntIn
clud
ed/n
otes
onpr
icin
gU
nit
Pric
ing
met
hod
Excl
uded
1Si
teac
com
mod
atio
nSi
teac
com
mod
atio
nfo
rth
eem
ploy
eran
dth
eem
ploy
er’s
repr
esen
tativ
esw
here
sepa
rate
from
mai
nco
ntra
ctor
’ssit
eac
com
mod
atio
n,in
clud
ing:
–sit
eof
fices
.–
sani
tary
acco
mm
odat
ion.
–w
elfa
refa
cilit
ies.
–fo
unda
tions
tosit
eac
com
mod
atio
n.–
tem
pora
rydr
aina
geto
acco
mm
odat
ion.
–te
mpo
rary
serv
ices
.–
intr
uder
alar
ms.
Type
and
exte
ntof
acco
mm
odat
ion
tobe
prov
ided
tobe
stat
ed;
with
each
type
sepa
rate
lyqu
antif
ied.
Site
acco
mm
odat
ion,
furn
iture
and
equi
pmen
t,te
leco
mm
unic
atio
nan
dIT
syst
ems
for
the
empl
oyer
and
the
empl
oyer
repr
esen
tativ
esw
here
anin
tegr
alpa
rtof
the
mai
nco
ntra
ctor
’ssit
eac
com
mod
atio
n(in
clud
edin
sect
ion
1.2:
inco
ntra
ctor
’sco
stite
ms,
asap
prop
riate
).
1Br
ingi
ngto
site
and
inst
allin
g,in
clud
ing
allt
empo
rary
drai
nage
,se
rvic
esan
din
trud
eral
arm
s.ite
mFi
xed
char
ge.
2A
dapt
atio
ns/a
ltera
tions
durin
gw
orks
.
3D
isman
tling
and
rem
ovin
gfro
msit
e,in
clud
ing
rect
ifyin
gan
yda
mag
e.
4M
aint
aini
ng.
wee
ksTi
me-
rela
ted
char
ge.
5C
lean
ing.
6C
harg
es.
7O
ff-sit
ere
nted
tem
pora
ryac
com
mod
atio
n.
8Re
ctify
ing
dam
age
toof
f-site
rent
edte
mpo
rary
acco
mm
odat
ion.
item
Fixe
dch
arge
.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 75
Com
pone
ntIn
clud
ed/n
otes
onpr
icin
gU
nit
Pric
ing
met
hod
Excl
uded
2Fu
rnitu
rean
deq
uipm
ent
Furn
iture
and
equi
pmen
tfo
rth
eem
ploy
eran
dth
eem
ploy
er’s
repr
esen
tativ
esw
here
sepa
rate
from
mai
nco
ntra
ctor
’ssit
eac
com
mod
atio
n.Fo
rex
ampl
e,de
sks,
chai
rs,m
eetin
gta
ble
and
chai
rs,c
upbo
ards
,ket
tles,
coffe
em
aker
,pho
toco
pier
and
cons
umab
les.
1Br
ingi
ngto
site
and
inst
allin
g.ite
mFi
xed
char
ge.
2C
lean
ing.
wee
kTi
me-
rela
ted
char
ge.
3C
harg
es.
4D
isman
tling
and
rem
ovin
gfro
msit
e.ite
mFi
xed
char
ge.
3Te
leco
mm
unic
atio
nsan
dIT
syst
ems
Tele
com
mun
icat
ion
and
ITsy
stem
sfo
rth
eem
ploy
eran
dth
eem
ploy
er’s
repr
esen
tativ
esw
here
sepa
rate
from
mai
nco
ntra
ctor
’ssit
eac
com
mod
atio
n,in
clud
ing
tele
phon
es,f
axm
achi
nes,
phot
ocop
ier,
com
pute
rs,p
rinte
rsan
dco
nsum
able
s.
1Pu
rcha
sech
arge
s.nr
Fixe
dch
arge
.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3C
onsu
mab
les.
1.1.
2S
ite
reco
rds
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
tere
cord
s1
Ope
ratio
nan
dm
aint
enan
cem
anua
ls.ite
mFi
xed
char
ge.
2C
ompi
latio
nof
heal
than
dsa
fety
file.
2W
eb-b
ased
info
rmat
ion
man
agem
ent
syst
em1
Prov
ision
ofsy
stem
.
2U
ploa
ding
ofda
ta.
3Tr
aini
ngof
build
ing
user
’sst
aff
inth
eop
erat
ion
ofth
ew
eb-b
ased
man
agem
ent
syst
em.
TABULATED WORK SECTIONS
76 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.1.
3C
om
plet
ion
and
post
-co
mpl
etio
nre
quir
emen
ts
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1H
ando
ver
requ
irem
ents
1Tr
aini
ngof
build
ing
user
’sst
aff
inth
eop
erat
ion
and
mai
nten
ance
ofth
ebu
ildin
gen
gine
erin
gse
rvic
essy
stem
s.ite
mFi
xed
char
ge.
2Pr
ovisi
onof
spar
epa
rts
for
mai
nten
ance
ofbu
ildin
gen
gine
erin
gse
rvic
es.
3Pr
ovisi
onof
tool
san
dpo
rtab
lein
dica
ting
inst
rum
ents
for
the
oper
atio
nan
dm
aint
enan
ceof
build
ing
engi
neer
ing
serv
ices
syst
ems.
2O
pera
tion
and
mai
nten
ance
serv
ices
1O
pera
tion
and
mai
nten
ance
ofbu
ildin
gen
gine
erin
gse
rvic
esin
stal
latio
ns,m
echa
nica
lpla
ntan
deq
uipm
ent
and
the
like
durin
gth
ede
fect
slia
bilit
ype
riod,
perio
dfo
rre
ctify
ing
defe
cts,
mai
nten
ance
perio
dor
othe
rsp
ecifi
edpe
riod
(i.e.
addi
tiona
lse
rvic
esth
atar
eno
rmal
lyre
quire
dby
the
cont
ract
).
wee
kTi
me-
rela
ted
char
ge.
3La
ndsc
ape
man
agem
ent
serv
ices
1M
aint
enan
ceof
inte
rnal
and
exte
rnal
plan
ting.
1.2
Mai
nC
ont
ract
or’
sco
stit
ems
1.2.
1M
anag
emen
tan
dst
aff
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Pr
ojec
t-sp
ecifi
cm
anag
emen
tan
dst
aff
Mai
nco
ntra
ctor
’spr
ojec
tsp
ecifi
cm
anag
emen
tan
dst
aff
such
as:
1Pr
ojec
tm
anag
er/d
irect
or.
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.1
Secu
rity
staf
f(in
clud
edin
sect
ion
1.2.
4:Se
curit
y).
2C
onst
ruct
ion
man
ager
.
3Su
perv
isors
,inc
ludi
ngw
orks
/tra
depa
ckag
em
anag
ers,
build
ing
serv
ices
engi
neer
ing
man
ager
s/co
-ord
inat
ors
and
off-s
itepr
oduc
tion
man
ager
s.
4H
ealth
and
safe
tym
anag
er/o
ffice
rs.
5C
omm
issio
ning
man
ager
(bui
ldin
gen
gine
erin
gse
rvic
es).
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 77
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
6Pl
anni
ng/p
rogr
amm
ing
man
ager
and
staf
f.
7Se
nior
/man
agin
gqu
antit
ysu
rvey
or.
8Pr
ojec
t/pa
ckag
equ
antit
ysu
rvey
ors.
9Pr
ocur
emen
tm
anag
er.
10D
esig
nm
anag
er.
11Pr
ojec
ten
gine
ers.
12En
viro
nmen
talm
anag
er.
13Te
mpo
rary
wor
ksde
sign
engi
neer
s.
14M
ater
ials
man
agem
ent
staf
f(e
.g.s
tore
man
).
15A
dmin
istra
tive
staf
f,in
clud
ing
secr
etar
y,do
cum
ent
cont
rolle
rs,
finan
cecl
erks
and
the
like.
16O
ther
man
agem
ent
and
staf
f.
2V
isitin
gm
anag
emen
tan
dst
aff
1M
anag
ing
dire
ctor
,reg
iona
ldire
ctor
,ope
ratio
nsdi
rect
or,
com
mer
cial
dire
ctor
and
the
like.
1V
isitin
gm
anag
emen
tan
dst
aff
for
whi
chan
allo
wan
ceha
sbe
enm
ade
with
inth
em
ain
cont
ract
or’s
over
head
s.2
Qua
lity
man
ager
.
3C
ontr
acts
/com
mer
cial
man
ager
.
4H
ealth
and
safe
tym
anag
er.
5En
viro
nmen
talm
anag
er/c
onsu
ltant
.
6O
ther
visit
ing
man
agem
ent
and
staf
f.
3Ex
trao
rdin
ary
supp
ort
cost
s1
Lega
ladv
ice
cost
s(i.
e.so
licito
rs).
item
Fixe
dch
arge
.1
Extr
aord
inar
ysu
ppor
tco
sts
for
whi
chan
allo
wan
ceha
sbe
enm
ade
with
inth
em
ain
cont
ract
or’s
over
head
s.
2Re
crui
tmen
tco
sts.
3Te
ambu
ildin
gco
sts.
4O
ther
extr
aord
inar
ysu
ppor
tco
sts.
5D
aytr
ansp
ort.
wee
k(n
umbe
rof
days
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
6Pe
rson
nelt
rans
port
(i.e.
tran
spor
tatio
nof
wor
kop
erat
ives
tosit
e).
TABULATED WORK SECTIONS
78 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
7Te
mpo
rary
livin
gac
com
mod
atio
n(e
.g.l
ong/
med
ium
term
acco
mm
odat
ion
cost
s).
wee
k(n
umbe
rof
staf
fby
num
ber
ofda
yspe
rw
eek
bynu
mbe
rof
wee
ks)
8Su
bsist
ence
paym
ents
.
9O
utof
norm
alho
urs
wor
king
,inc
ludi
ngno
n-pr
oduc
tive
over
time
allo
wan
ces.
4St
aff
trav
elC
osts
asso
ciat
edw
ithof
f-site
visit
ssu
chas
:
1V
isits
toem
ploy
er’s
and
cons
ulta
nts’
offic
es.
nr(n
umbe
rof
occa
sions
)Fi
xed
char
ge.
2V
isits
tosu
bcon
trac
tors
’offi
ces/
wor
ks.
3O
vers
eas
visit
s.
4A
ccom
mod
atio
nch
arge
san
dov
erni
ght
expe
nses
.
1.2.
2S
ite
esta
blis
hmen
t
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
teac
com
mod
atio
nM
ain
cont
ract
or’s
and
com
mon
user
tem
pora
rysit
eac
com
mod
atio
nsu
chas
:–
offic
es.
–co
nfer
ence
/mee
ting
room
s.–
cant
eens
and
kitc
hens
.–
dryi
ngro
oms.
–to
ilets
and
was
hroo
ms.
–fir
stai
dro
om.
–la
bora
torie
s.–
wor
ksho
ps.
–se
cure
stor
es.
–co
mpo
unds
,inc
ludi
ngco
ntai
ners
for
mat
eria
lsto
rage
.–
secu
rity
cont
rolr
oom
.–
stai
rsan
dof
fice
stag
ing.
1Em
ploy
er’s
acco
mm
odat
ion,
whe
reno
tan
inte
gral
part
ofth
em
ain
cont
ract
or’s
site
acco
mm
odat
ion
(incl
uded
inse
ctio
n1.
1.1:
Site
acco
mm
odat
ion)
.2
Tem
pora
ryba
ses,
foun
datio
nsan
dpr
ovisi
onof
drai
nage
and
serv
ices
tote
mpo
rary
site
acco
mm
odat
ion
(incl
uded
inco
mpo
nent
1.2.
2.2:
Tem
pora
ryw
orks
inco
nnec
tion
with
site
esta
blish
men
t).
3Se
rvic
epr
ovid
er’s
char
ges
for
tem
pora
ryse
rvic
es(in
clud
edin
sect
ion
1.2.
12:F
ees
and
char
ges)
.4
Rate
sfo
rte
mpo
rary
serv
ices
(incl
uded
inse
ctio
n1.
2.12
:Fee
san
dch
arge
s).
Type
and
exte
ntof
acco
mm
odat
ion
tobe
prov
ided
tobe
stat
ed,
with
each
type
sepa
rate
lyqu
antif
ied.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 79
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Pu
rcha
sech
arge
s.ite
mFi
xed
char
ge.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3Em
ploy
er’s
acco
mm
odat
ion,
whe
rean
inte
gral
part
ofth
em
ain
cont
ract
or’s
site
acco
mm
odat
ion.
4D
eliv
ery
ofte
mpo
rary
site
acco
mm
odat
ion
tosit
e,er
ectio
n,co
nstr
uctio
nan
dre
mov
al.
item
Fixe
dch
arge
.
5Te
mpo
rary
acco
mm
odat
ion
mad
eav
aila
ble
byth
eem
ploy
er.
wee
kTi
me-
rela
ted
char
ge.
6In
trud
eral
arm
s.ite
mFi
xed
char
ge.
7La
nd/p
rope
rty
rent
alw
here
site
acco
mm
odat
ion
loca
ted
off-s
ite.
wee
kTi
me-
rela
ted
char
ge.
8A
ltera
tions
and
adap
tatio
nsto
site
acco
mm
odat
ion,
incl
udin
gpa
rtiti
onin
g,do
ors,
pain
ting
and
deco
ratin
g,an
dth
elik
e.ite
mFi
xed
char
ge.
9Re
loca
tion
and
alte
ratio
nsof
tem
pora
ryac
com
mod
atio
ndu
ring
cons
truc
tion
stag
e.
10Re
inst
atin
gte
mpo
rary
site
acco
mm
odat
ion
toor
igin
alco
nditi
onpr
ior
tore
mov
alfro
msit
e.
11Re
mov
alof
site
acco
mm
odat
ion
and
tem
pora
ryw
orks
inco
nnec
tion
with
site
acco
mm
odat
ion.
2Te
mpo
rary
wor
ksin
conn
ectio
nw
ithsit
ees
tabl
ishm
ent
1Te
mpo
rary
base
san
dfo
unda
tions
for
site
acco
mm
odat
ion,
incl
udin
gm
aint
enan
cean
dre
inst
atem
ent
ofex
istin
gsu
rface
son
com
plet
ion
ofth
ew
orks
.
m2
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1Pr
ovisi
onof
tem
pora
ryse
rvic
esto
site
esta
blish
men
t(in
clud
edin
sect
ion
1.2.
3:Te
mpo
rary
serv
ices
).2
Prov
ision
ofte
mpo
rary
drai
nage
tosit
ees
tabl
ishm
ent
(incl
uded
inse
ctio
n1.
2.3:
Tem
pora
ryse
rvic
es).
3H
oard
ings
,fan
s,fe
ncin
gan
dth
elik
eto
site
boun
darie
san
dto
form
site
com
poun
ds(in
clud
edin
sect
ion
1.2.
4:Se
curit
y(H
oard
ings
,fen
ces
and
gate
s).
2C
onne
ctio
nsto
tem
pora
ryse
rvic
e,in
clud
ing
mai
nten
ance
and
rem
oval
onco
mpl
etio
nof
the
wor
ks.
nr
3C
onne
ctio
nsto
tem
pora
rydr
aina
ge,i
nin
clud
ing
mai
nten
ance
and
rem
oval
onco
mpl
etio
nof
the
wor
ks.
nr
4Te
mpo
rary
site
road
s,pa
ths
and
pavi
ngs
(incl
udin
gon
-site
car
park
ing)
,inc
ludi
ngre
inst
atem
ent
ofex
istin
gsu
rface
son
com
plet
ion
ofth
ew
orks
.
m
5Te
mpo
rary
surfa
cew
ater
drai
nage
tote
mpo
rary
site
road
s,pa
ths
and
pave
men
ts,i
nclu
ding
mai
nten
ance
and
rem
oval
onco
mpl
etio
nof
the
wor
ks.
m
TABULATED WORK SECTIONS
80 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
3Fu
rnitu
rean
deq
uipm
ent
1W
orks
tatio
nsfo
rst
aff,
incl
udin
gm
aint
enan
ce.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.1
Tele
phon
ean
dfa
xin
stal
latio
ns(in
clud
edin
sect
ion
1.2.
3:Te
mpo
rary
serv
ices
).2
Com
pute
rsan
dIT
asso
ciat
edeq
uipm
ent
(incl
uded
inco
mpo
nent
1.2.
2.4:
ITsy
stem
s).
2G
ener
alof
fice
furn
iture
,inc
ludi
ngm
aint
enan
ce.
item
3C
onfe
renc
e/m
eetin
gro
omfu
rnitu
re,i
nclu
ding
mai
nten
ance
.
4Ph
otoc
opie
rs,i
nclu
ding
purc
hase
/ren
tal,
mai
nten
ance
and
othe
rru
nnin
gco
sts.
5C
ante
enfu
rnitu
re,i
nclu
ding
mai
nten
ance
.
6C
ante
eneq
uipm
ent,
incl
udin
gpu
rcha
se/r
enta
l,m
aint
enan
cean
dot
her
runn
ing
cost
s.
7Fl
oor
cove
rings
,inc
ludi
ngm
aint
enan
ce.
8W
ater
disp
ense
rs,i
nclu
ding
purc
hase
/ren
tal,
mai
nten
ance
and
othe
rru
nnin
gco
sts.
9H
eate
rs,i
nclu
ding
mai
nten
ance
ofhe
ater
s.
10O
ther
offic
eeq
uipm
ent,
incl
udin
gm
aint
enan
ce.
11Re
mov
alof
furn
iture
and
equi
pmen
t.
12M
aint
enan
cefu
rnitu
rean
dflo
orco
verin
g.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 81
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
4IT
syst
ems
1C
ompu
ter
hard
war
e,in
clud
ing
purc
hase
/ren
tal,
inst
alla
tion,
initi
alse
tup
,mai
nten
ance
and
runn
ing
cost
s,su
chas
:–
desk
top
com
pute
rsan
dla
ptop
com
pute
rs.
–C
AD
stat
ions
.–
serv
eran
dne
twor
keq
uipm
ent.
–pr
inte
rsan
dpl
otte
rs.
–ot
her
com
pute
rsy
stem
hard
war
e.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1C
ompu
ter
and
prin
ter
cons
umab
les
(incl
uded
inco
mpo
nent
1.1.
2.5:
Con
sum
able
san
dse
rvic
es).
2D
ocum
ent
man
agem
ent,
incl
udin
gel
ectr
onic
data
man
agem
ent
syst
ems
(ED
MS)
(incl
uded
inco
mpo
nent
1.1.
2.6:
Brou
ght
inse
rvic
es).
2So
ftwar
ean
dso
ftwar
elic
ence
s.
3M
odem
lines
,mod
ems
and
conn
ectio
ns(i.
e.em
aila
ndin
tern
etca
pabi
lity)
.
4W
AN
lines
and
conn
ectio
ns(if
onW
AN
).
5Li
nere
ntal
char
ges.
wee
kTi
me-
rela
ted
char
ge.
6In
tern
et/w
ebsit
ead
dres
ses.
nrFi
xed
char
ge.
7In
tern
etse
rvic
epr
ovid
er(IS
P)ch
arge
s.
8Li
neca
llsch
arge
s.w
eek
Tim
e-re
late
dch
arge
.
9IT
supp
ort
and
mai
nten
ance
.
5C
onsu
mab
les
and
serv
ices
1St
atio
nery
.w
eek
Tim
e-re
late
dch
arge
.
2C
ompu
ter
and
prin
ter
cons
umab
les
(e.g
.ink
cart
ridge
s).
3Po
stag
e.
4C
ourie
rch
arge
s.
5Te
a,co
ffee,
wat
erbo
ttle
san
dth
elik
e.
6Fi
rst
aid
cons
umab
les.
7Ph
otoc
opie
rco
nsum
able
s(e
.g.p
aper
and
tone
rs).
8Fa
xco
nsum
able
s(e
.g.p
aper
and
tone
rs).
9D
raw
ing
prin
ter
cons
umab
les
(e.g
.ink
cart
ridge
s).
TABULATED WORK SECTIONS
82 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
6Br
ough
t-in
serv
ices
Serv
ices
outs
ourc
edby
the
mai
nco
ntra
ctor
such
as:
1C
ater
ing.
wee
kTi
me-
rela
ted
char
ge.
2Eq
uipm
ent
mai
nten
ance
.
3D
ocum
ent
man
agem
ent,
incl
udin
gm
anag
emen
tin
form
atio
nsy
stem
san
del
ectr
onic
data
man
agem
ent
syst
ems
(ED
MS)
.
4Pr
intin
g(p
urch
asin
g),i
nclu
ding
repo
rts
and
draw
ings
.
5St
aff
tran
spor
t.
6O
ff-sit
epa
rkin
gch
arge
s.
7M
eetin
gro
omfa
cilit
ies.
8Ph
otog
raph
icse
rvic
es.
9O
ther
.
7Su
ndrie
s1
Mai
nco
ntra
ctor
’ssig
nboa
rds.
item
Fixe
dch
arge
.
2Sa
fety
and
info
rmat
ion
notic
ebo
ards
.
3Fi
repo
ints
.
4Sh
elte
rs.
5To
olst
ores
.
6C
rane
signa
ge.
7Em
ploy
er’s
com
posit
esig
nboa
rds.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 83
1.2.
3Te
mpo
rary
serv
ices
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Te
mpo
rary
wat
ersu
pply
1Te
mpo
rary
conn
ectio
ns.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Dist
ribut
ion
equi
pmen
t,in
stal
latio
nan
dad
apta
tions
.ite
m
3M
eter
char
ges.
wee
k
2Te
mpo
rary
gas
supp
ly1
Gas
conn
ectio
n.nr
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2D
istrib
utio
neq
uipm
ent,
inst
alla
tion
and
adap
tatio
ns.
item
3C
harg
es.
wee
k
4Bo
ttle
dga
s.
3Te
mpo
rary
elec
tric
itysu
pply
1Te
mpo
rary
conn
ectio
ns.
nrFi
xed
char
ge.
2Te
mpo
rary
elec
tric
alsu
pply
for
tow
ercr
anes
.ite
m
3C
harg
es–
pow
erco
nsum
ptio
nfo
rsit
ees
tabl
ishm
ent.
item
Tim
e-re
late
dch
arge
.
4C
harg
es–
pow
erco
nsum
ptio
nfo
rth
ew
orks
.
5D
istrib
utio
neq
uipm
ent,
inst
alla
tion
and
adap
tatio
ns.
item
Fixe
dch
arge
.
6A
tten
danc
e.nr
(num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
7U
nint
erru
pted
pow
ersu
pply
(UPS
).ite
mFi
xed
char
ge.
8Te
mpo
rary
subs
tatio
nm
odifi
catio
ns.
4Te
mpo
rary
tele
com
mun
icat
ion
syst
ems
1La
ndlin
es(in
clud
ing
conn
ectio
nan
dre
ntal
char
ges)
,inc
ludi
ng:
–te
leph
one
and
fax
lines
–IS
DN
lines
.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1Fa
xco
nsum
able
s(in
clud
edin
com
pone
nt1.
1.2.
5:C
onsu
mab
les
and
serv
ices
).
2Te
leph
one
and
facs
imile
equi
pmen
t(in
clud
ing
conn
ectio
nan
dre
ntal
char
ges)
,inc
ludi
ng:
–PA
BXeq
uipm
ent.
–ha
ndse
ts,i
nclu
ding
purc
hase
orre
ntal
.–
fax
mac
hine
s,in
clud
ing
purc
hase
orre
ntal
.–
inst
alla
tion
ofeq
uipm
ent.
–m
aint
enan
ceof
equi
pmen
t.
TABULATED WORK SECTIONS
84 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
3M
obile
(cel
lula
r)ph
ones
,inc
ludi
ng:
–m
obile
phon
es,i
nclu
ding
purc
hase
orre
ntal
and
conn
ectio
nch
arge
s.–
spar
eba
tter
ies.
–m
obile
phon
ech
arge
s.
4Te
leph
one
char
ges,
incl
udin
g:–
tele
phon
eca
llch
arge
s.–
fax
char
ges.
–fa
xan
dte
leph
one
cons
umab
les.
5Ra
dios
(incl
udin
gpu
rcha
seor
rent
alch
arge
s),i
nclu
ding
:–
base
set.
–ha
ndse
tsan
dch
arge
rs.
–re
pairs
and
mai
nten
ance
.–
licen
ces.
–sp
are
batt
erie
s.
5Te
mpo
rary
drai
nage
1Te
mpo
rary
mai
ns.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Se
ptic
tank
s.nr
3O
n-sit
etr
eatm
ent
plan
t.ite
m
4H
oldi
ngta
nks.
nr
5Se
wag
epu
mpi
ng.
6D
istrib
utio
npi
pew
ork,
etc.
item
7D
rain
age
inst
alla
tion
and
adap
tatio
ns.
8D
ispos
alch
arge
s(i.
e.ra
tes)
.w
eek
Tim
e-re
late
dch
arge
.
9D
ispos
alco
sts
(i.e.
tank
erch
arge
s).
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 85
1.2.
4S
ecur
ity
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Se
curit
yst
aff
1Se
curit
ygu
ards
(day
and
nigh
t).
nr(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
).
Tim
e-re
late
dch
arge
.1
Secu
rity
staf
fac
com
mod
atio
n(in
clud
edin
sect
ion
1.1.
2:Si
tees
tabl
ishm
ent)
.
2W
atch
men
(day
and
nigh
t).
2Se
curit
yeq
uipm
ent
1Si
tepa
ssiss
ueeq
uipm
ent,
incl
udin
gm
aint
enan
cean
dre
mov
al.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Si
tepa
ssco
nsum
able
s.
3C
CTV
surv
eilla
nce
inst
alla
tion,
incl
udin
gm
aint
enan
cean
dre
mov
al.
4Te
mpo
rary
vehi
cle
cont
rolb
arrie
rs,i
nclu
ding
mai
nten
ance
and
rem
oval
.nr
3H
oard
ings
,fen
ces
and
gate
s1
Perim
eter
hoar
ding
san
dfe
ncin
gan
dth
elik
eto
site
boun
darie
san
dto
form
site
com
poun
ds.
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
2A
cces
sga
tes,
incl
udin
gfr
ames
and
ironm
onge
ry.
nr
3Pa
intin
gof
hoar
ding
s,fe
ncin
g,ga
tes,
and
the
like.
m
4Te
mpo
rary
door
s.nr
5M
odifi
catio
nto
line
ofho
ardi
ngan
dfe
ncin
gdu
ring
cons
truc
tion.
6D
isman
tling
and
rem
oval
ofho
ardi
ng,f
enci
ng,g
ates
,and
the
like.
m
TABULATED WORK SECTIONS
86 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.2.
5S
afet
yan
den
viro
nmen
tal
pro
tect
ion
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Sa
fety
prog
ram
me
Wor
ksre
quire
dto
satis
fyre
quire
men
tsof
CD
MRe
gula
tions
:1
Hea
lthan
dsa
fety
man
ager
/offi
cers
.nr
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
Tim
e-re
late
dch
arge
.1
Hea
lthan
dsa
fety
man
ager
/offi
cers
(incl
uded
inse
ctio
n1.
2.1:
Man
agem
ent
and
staf
f).2
Wel
fare
faci
litie
s(in
clud
edin
sect
ion
1.2.
2:Si
tees
tabl
ishm
ent)
.
2Sa
fety
audi
ts,i
nclu
ding
safe
tyau
dits
carr
ied
out
byex
tern
alco
nsul
tant
.nr
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
3St
aff
safe
tytr
aini
ng.
item
4Si
tesa
fety
ince
ntiv
esc
hem
e.
5N
otic
esan
din
form
atio
nto
neig
hbou
rs.
6Pe
rson
alpr
otec
tive
equi
pmen
t(P
PE),
incl
udin
gfo
rem
ploy
eran
dco
nsul
tant
s.nr
(set
s)
7PP
Efo
rm
ulti-
serv
ice
gang
s.
8Fi
repo
ints
.nr
9Te
mpo
rary
fire
alar
ms.
10Fi
reex
tingu
isher
s.
11St
atut
ory
safe
tysig
nage
.ite
m
12N
urse
.nr
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
Tim
e-re
late
dch
arge
.
13Tr
affic
mar
shal
s.
2Ba
rrie
rsan
dsa
fety
scaf
fold
ing
1G
uard
rails
and
edge
prot
ectio
n(e
.g.t
oed
ges
ofsu
spen
ded
slabs
and
roof
s).
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Te
mpo
rary
stai
rcas
eba
lust
rade
s(i.
e.to
new
stai
rcas
esdu
ring
cons
truc
tion)
.
3Li
ftsh
aft
prot
ectio
n.
4Pr
otec
tion
toho
les
and
open
ings
ingr
ound
floor
slabs
,su
spen
ded
slabs
and
the
like.
5D
ebris
nett
ing/
plas
ticsh
eetin
g.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 87
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
6Fa
npr
otec
tion.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
7Sc
affo
ldin
spec
tions
.nr
8H
oist
run-
offs
.ite
m
9Pr
otec
tive
wal
kway
s.
10O
ther
safe
tym
easu
res.
3En
viro
nmen
talp
rote
ctio
nm
easu
res
1C
ontr
olof
pollu
tion.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Re
sidua
lcon
trol
ofno
ise.
3En
viro
nmen
talm
onito
ring.
4En
viro
nmen
talm
anag
er/c
onsu
ltant
.nr
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
Tim
e-re
late
dch
arge
.
5En
viro
nmen
tala
udits
,inc
ludi
ngsa
fety
audi
tsca
rrie
dou
tby
exte
rnal
cons
ulta
nt.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
1.2.
6C
ont
rol
and
pro
tect
ion
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Su
rvey
,ins
pect
ions
and
mon
itorin
g1
Surv
eys.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1En
viro
nmen
talm
onito
ring
(incl
uded
inse
ctio
n2.
2.5:
Safe
tyan
den
viro
nmen
tal
prot
ectio
n).
2To
pogr
aphi
cals
urve
y.
3N
on-e
mpl
oyer
dila
pida
tion
surv
ey.
4St
ruct
ural
/dila
pida
tions
surv
eyad
join
ing
build
ings
.
5En
viro
nmen
tals
urve
ys.
6M
ovem
ent
mon
itorin
g.
7M
aint
enan
cean
din
spec
tion
cost
s.
TABULATED WORK SECTIONS
88 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
2Se
ttin
gou
t1
Sett
ing
out
prim
ary
grid
s.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Grid
tran
sfer
san
dle
velc
heck
s.
3M
aint
enan
ceof
grid
s.
4Ta
keov
erco
ntro
land
inde
pend
ent
chec
ks(i.
e.on
chan
geof
subc
ontr
acto
rs).
5In
stru
men
tsfo
rse
ttin
gou
t.
3Pr
otec
tion
ofw
orks
1Pr
otec
tion
offin
ished
wor
ksto
proj
ect
hand
over
.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
2Pr
otec
tion
ofst
airs
,bal
ustr
ades
and
the
like
wor
ksto
proj
ect
hand
over
.
3Pr
otec
tion
offit
tings
and
furn
ishin
gsw
orks
topr
ojec
tha
ndov
er.
4Pr
otec
tion
ofen
tran
cedo
ors
and
fram
esw
orks
topr
ojec
tha
ndov
er.
5Pr
otec
tion
oflif
tca
rsan
ddo
ors
wor
ksto
proj
ect
hand
over
.
6Pr
otec
tion
ofsp
ecifi
cally
vuln
erab
lepr
oduc
tsto
proj
ect
hand
over
.
7Pr
otec
tion
ofal
lsun
dry
item
s.
4Sa
mpl
es1
Prov
ision
ofsa
mpl
es.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Pr
ovisi
onof
sam
ple
room
.
3M
ock-
ups
and
sam
ple
pane
ls.
4Te
stin
gof
sam
ples
/moc
k-up
s,in
clud
ing
test
ing
fees
.
5O
n-sit
ela
bora
tory
equi
pmen
t.
6M
ock-
ups
ofpr
efab
ricat
edun
its(e
.g.r
esid
entia
luni
ts,s
tude
ntac
com
mod
atio
nun
its,h
otel
acco
mm
odat
ion
and
the
like)
.
5En
viro
nmen
talc
ontr
olof
build
ing
1D
ryou
tbu
ildin
g.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Tem
pora
ryhe
atin
g/co
olin
g.
3Te
mpo
rary
wat
erpr
oofin
g,in
clud
ing
over
roof
s.
4Te
mpo
rary
encl
osur
es.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 89
1.2.
7M
echa
nica
lpl
ant
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1G
ener
ally
Com
mon
user
mec
hani
calp
lant
and
equi
pmen
tus
edin
cons
truc
tion
oper
atio
ns.
Plan
tan
deq
uipm
ent
used
for
spec
ific
cons
truc
tion
oper
atio
ns,s
uch
as:
1Ea
rthm
ovin
gpl
ant.
2Pi
ling
plan
t.3
Pavi
ngan
dsu
rfaci
ngpl
ant.
4W
heel
spin
ners
,and
road
swee
pers
(incl
uded
inse
ctio
n1.
2.11
:Cle
anin
g).
5A
cces
ssc
affo
ldin
g(in
clud
edin
sect
ion
1.2.
8:Te
mpo
rary
wor
ks).
2To
wer
cran
esTy
peof
cran
eage
tobe
prov
ided
shal
lbe
stat
ed;w
ithea
chty
pese
para
tely
quan
tifie
d.
1H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.1
Tem
pora
ryel
ectr
ical
supp
lyto
tow
ercr
ane
(incl
uded
inse
ctio
n1.
2.3:
Tem
pora
ryse
rvic
es).
2C
rane
oper
ator
.w
eek
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
3O
vert
ime
for
cran
ean
dop
erat
or.
4Pi
les
for
tow
ercr
ane
base
s,in
clud
ing
mai
nten
ance
rem
oval
.nr
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
5Te
mpo
rary
base
sfo
rto
wer
cran
es,i
nclu
ding
anch
ors,
mai
nten
ance
;rem
oval
and
rein
stat
emen
ton
com
plet
ion
(size
,in
m2,t
obe
stat
ed).
6Ti
es.
wee
kTi
me-
rela
ted
char
ge.
7C
onne
ctio
nsto
tem
pora
ryel
ectr
ical
supp
ly.nr
Fixe
dch
arge
.
8Br
ing
tosit
e,er
ectio
n,te
stan
dco
mm
issio
n.
9Pe
riodi
csa
fety
chec
ks/in
spec
tions
.w
eek
Tim
e-re
late
dch
arge
.
10D
isman
tling
and
rem
ovin
gfro
msit
e.nr
Fixe
dch
arge
.
TABULATED WORK SECTIONS
90 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
11O
ther
cost
ssp
ecifi
cto
tow
ercr
ane
such
as:
–ch
ain
pack
and
sund
ries
–re
lief
oper
ator
–ba
nksm
an–
man
cage
.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
12Te
mpo
rary
void
sin
build
ing
stru
ctur
efo
rcr
anea
ge,h
oist
san
dth
elik
ein
clud
ing
fillin
gvo
ids
afte
rre
mov
al.
nrFi
xed
char
ge.
3M
obile
cran
esTy
peof
cran
eage
tobe
prov
ided
shal
lbe
stat
ed;w
ithea
chty
pese
para
tely
quan
tifie
d.1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
1M
obile
cran
ehi
rech
arge
s,in
clud
ing
driv
er/o
pera
tor
char
ges.
wee
k
2A
tten
danc
e.nr
(num
ber
ofm
anho
urs
per
visit
bynu
mbe
rof
visit
s)
3O
ther
cost
ssp
ecifi
cto
mob
ilecr
ane
hire
.ite
m
4H
oist
sTy
peof
hoist
tobe
prov
ided
shal
lbe
stat
ed;w
ithea
chty
pese
para
tely
quan
tifie
d.
1G
oods
and
pass
enge
rho
ists,
incl
udin
gpr
otec
tion
cage
san
dem
bedm
ent
fram
es.
wee
kTi
me-
rela
ted
char
ge.
1Te
mpo
rary
serv
ices
toho
istin
stal
latio
ns(in
clud
edin
sect
ion
1.2.
3:Te
mpo
rary
serv
ices
).
2H
oist
base
s.nr
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
3Br
ingi
ngto
site,
erec
ting,
test
ing
and
com
miss
ioni
ng.
nrFi
xed
char
ge.
4D
isman
tling
and
rem
ovin
gfro
msit
e.
5Pr
otec
tion
syst
ems.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
6H
oist
oper
ator
,inc
ludi
ngov
ertim
e.w
eek
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
Tim
e-re
late
dch
arge
.
7Be
amho
ists.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 91
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
8Pe
riodi
csa
fety
chec
ks/in
spec
tions
.m
onth
Tim
e-re
late
dch
arge
.
9O
ther
cost
ssp
ecifi
cto
tem
pora
ryho
istin
stal
latio
ns.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
5A
cces
spl
ant
1Fo
lklif
ts.
wee
k1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Sciss
orlif
ts.
3Lo
adin
gpl
atfo
rms.
4M
aint
enan
ceof
mec
hani
cala
cces
seq
uipm
ent.
5O
ther
cost
ssp
ecifi
cto
mec
hani
cala
cces
seq
uipm
ent.
item
6C
oncr
ete
plan
t1
Con
cret
epl
ant.
wee
k1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.1
Tem
pora
ryse
rvic
eto
conc
rete
plan
t(in
clud
edin
sect
ion
1.2.
3:Te
mpo
rary
serv
ices
).
2Pl
ant
oper
ator
.w
eek
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
Tim
e-re
late
dch
arge
.
3O
vert
ime
for
plan
tan
dop
erat
or.
4Ba
ses
for
conc
rete
plan
t.nr
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
5Po
wer
conn
ectio
ns,i
nclu
ding
cabl
ing
and
stat
utor
yun
dert
aker
’sch
arge
sfo
rte
mpo
rary
conn
ectio
nto
thei
rsu
pply.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
6Br
ing
tosit
e,er
ectio
n,te
stan
dco
mm
issio
n.nr
Fixe
dch
arge
.
7M
aint
enan
ceof
conc
rete
plan
t.w
eek
Tim
e-re
late
dch
arge
.
8D
isman
tling
and
rem
ovin
gfro
msit
e.nr
Fixe
dch
arge
.
TABULATED WORK SECTIONS
92 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
7O
ther
plan
t1
Smal
lpla
ntan
dto
ols.
wee
kTi
me-
rela
ted
char
ge.
1.2.
8Te
mpo
rary
wo
rks
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1A
cces
ssc
affo
ldin
gC
omm
onus
erac
cess
scaf
fold
ing
(typ
eof
acce
sssc
affo
ldin
gto
besp
ecifi
ed):
–ac
cess
scaf
fold
ing
toel
evat
ions
,lift
shaf
tsan
dth
elik
e,in
clud
ing:
fans
and
mes
hsc
reen
s.–
stru
ctur
alsc
affo
ldin
g(e
.g.t
opa
rty
wal
ls).
–bi
rdca
gesc
affo
ldin
g.–
cant
ileve
rac
cess
scaf
fold
ing.
–st
airc
ase
plat
form
s.–
prim
ary
load
ing
plat
form
s.–
trav
ellin
gac
cess
plat
form
s.
1Sc
affo
ldin
gsp
ecifi
cto
wor
kspa
ckag
es(in
clud
edin
appr
opria
teel
emen
tor
sub-
elem
ent)
.2
Scaf
fold
insp
ectio
ns(in
clud
edin
sub-
elem
ent
1.2.
5:Sa
fety
and
envi
ronm
enta
lpro
tect
ion)
.
1Br
ingi
ngto
site,
erec
ting
and
initi
alsa
fety
chec
ks.
nrFi
xed
char
ge.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3A
lterin
gan
dad
aptin
gdu
ring
cons
truc
tion.
nrFi
xed
char
ge.
4D
isman
tling
and
rem
ovin
gfro
msit
e.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 93
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
2Te
mpo
rary
wor
ksC
omm
onus
erte
mpo
rary
wor
ks:
–su
ppor
tsc
affo
ldin
gan
dpr
oppi
ng.
–cr
ash
deck
s.–
tem
pora
rypr
otec
tion
toex
istin
gtr
ees
and/
orve
geta
tion.
–flo
odlig
hts.
1Te
mpo
rary
wor
ksde
sign
(incl
uded
inse
ctio
n1.
1.1:
Man
agem
ent
and
staf
f).2
Tem
pora
ryba
ses,
drai
nage
and
serv
ices
tosit
eac
com
mod
atio
n(in
clud
edin
sect
ion
1.2.
2:Si
tees
tabl
ishm
ent)
.3
Tem
pora
ryro
ads,
path
san
dpa
vem
ent,
incl
udin
gon
-site
car
park
ing
(incl
uded
inse
ctio
n1.
2.2:
Site
esta
blish
men
t(i.
e.Bu
ilder
’sw
ork
inco
nnec
tion
with
site
acco
mm
odat
ion)
).4
Hoa
rdin
gs,f
ans,
fenc
ing
and
the
like
tosit
ebo
unda
ries
and
tofo
rmsit
eco
mpo
unds
(incl
uded
inse
ctio
n1.
2.4:
Secu
rity
(hoa
rdin
gs,f
ence
san
dga
tes)
.5
Tem
pora
ryea
rthw
ork
supp
ort
base
men
tex
cava
tions
.6
Tem
pora
rypr
ops
and
wal
ings
tosu
ppor
tco
ntig
uous
bore
dpi
lew
allo
fba
sem
ent
exca
vatio
ns.
7Tr
affic
man
agem
ent,
incl
udin
gtr
affic
mar
shal
san
dte
mpo
rary
traf
ficlig
hts
(incl
uded
inse
ctio
n1.
2.5:
Safe
tyan
den
viro
nmen
talp
rote
ctio
n).
1Br
ingi
ngto
site,
erec
ting
and
initi
alsa
fety
chec
ks.
nrFi
xed
char
ge.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3A
lterin
gan
dad
aptin
gdu
ring
cons
truc
tion.
nrFi
xed
char
ge.
4D
isman
tling
and
rem
ovin
gfro
msit
e.
1.2.
9S
ite
reco
rds
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
tere
cord
sU
nles
sot
herw
isein
dica
ted,
cost
sas
soci
ated
with
the
follo
win
gsh
all
bede
emed
tobe
incl
uded
inm
anag
emen
tan
dst
aff
cost
s:
1Ph
otog
raph
y:–
cam
era
purc
hase
.–
cons
umab
les.
–pr
intin
gan
dpr
esen
tatio
n.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
TABULATED WORK SECTIONS
94 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
2W
orks
reco
rds:
–pr
ogre
ssre
port
ing.
–sit
ese
ttin
gou
tdr
awin
gs.
–co
nditi
onsu
rvey
san
dre
port
s.–
oper
atio
nan
dm
aint
enan
cem
anua
ls.–
as-b
uilt/
inst
alle
ddr
awin
gsan
dsc
hedu
les.
–co
-ord
inat
ing,
gath
erin
gan
dco
mpi
ling
heal
than
dsa
fety
info
rmat
ion
and
pres
enta
tion
toC
DM
co-o
rdin
ator
.–
com
pila
tion
ofhe
alth
and
safe
tyfil
e(if
requ
ired)
.
1.2.
10C
om
plet
ion
and
post
-co
mpl
etio
nre
quir
emen
ts
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Te
stin
gan
dco
mm
issio
ning
plan
Cos
tsas
soci
ated
with
the
follo
win
gsh
allb
ede
emed
tobe
incl
uded
inse
ctio
n1.
2.1:
Man
agem
ent
and
staf
fco
sts:
1Te
stin
gan
dco
mm
issio
ning
ofse
rvic
es.
1Pr
epar
atio
nof
Com
miss
ioni
ngPl
an.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2H
ando
ver
Unl
ess
othe
rwise
indi
cate
d,co
sts
asso
ciat
edw
ithth
efo
llow
ing
shal
lbe
deem
edto
bein
clud
edin
sect
ion
1.2.
1:M
anag
emen
tan
dst
aff
cost
s:
1Pr
epar
atio
nof
Han
dove
rPl
an.
2Tr
aini
ngof
build
ing
user
’sst
aff
inth
eop
erat
ion
and
mai
nten
ance
ofth
ebu
ildin
gen
gine
erin
gse
rvic
essy
stem
s.
3Pr
ovisi
onof
spar
epa
rts
for
mai
nten
ance
ofbu
ildin
gen
gine
erin
gse
rvic
es.
4Pr
ovisi
onof
tool
san
dpo
rtab
lein
dica
ting
inst
rum
ents
for
the
oper
atio
nan
dm
aint
enan
ceof
build
ing
engi
neer
ing
serv
ices
syst
ems.
5Pr
e-co
mpl
etio
nin
spec
tions
.
6Fi
nali
nspe
ctio
ns.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 95
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
3Po
st-c
ompl
etio
nse
rvic
es1
Supe
rviso
ryst
aff
(em
ploy
er/t
enan
tca
re).
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
2H
andy
man
.
3M
inor
mat
eria
lsan
dsu
ndry
item
s.ite
mFi
xed
char
ge.
4In
sura
nces
.
5O
ther
post
-con
stru
ctio
nst
aff.
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
1.2.
11C
lean
ing
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
tetid
y1
Cle
anin
gsit
eac
com
mod
atio
n–
inte
rnal
,inc
ludi
ngcl
eani
ngte
leph
one
hand
sets
,oth
erof
fice
furn
iture
and
equi
pmen
tan
dw
indo
wcl
eani
ng.
wee
kTi
me-
rela
ted
char
ge.
2Pe
riodi
cm
aint
enan
ceof
site
acco
mm
odat
ion,
incl
udin
gre
deco
ratio
n(in
tern
alan
dex
tern
al).
3W
aste
man
agem
ent,
incl
udin
gru
bbish
disp
osal
(incl
udin
gco
mpa
ctor
visit
s;sk
ips
and
was
tebi
ns;r
oll-o
ff,ro
ll-on
was
tebi
ns)
and
othe
rdi
spos
al.
4Pe
stco
ntro
l.
2M
aint
enan
ceof
road
s,pa
ths
and
pavi
ngs
1M
aint
enan
ceof
tem
pora
rysit
ero
ads,
path
s,an
dpa
vem
ents
.w
eek
Tim
e-re
late
dch
arge
.
2M
aint
enan
ceof
publ
ican
dpr
ivat
ero
ads,
incl
udin
gw
heel
spin
ners
and
road
swee
pers
.
3Bu
ildin
gcl
ean
1Fi
nalb
uild
er’s
clea
n.ite
mFi
xed
char
ge.
TABULATED WORK SECTIONS
96 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.2.
12Fe
esan
dch
arge
s
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Fe
es1
Build
ing
cont
rolf
ees,
whe
reno
tpa
idby
the
empl
oyer
.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.1
Build
ing
cont
rolf
ees,
whe
repa
idby
the
empl
oyer
.2
Ove
rsai
ling
fees
,whe
repa
idby
the
empl
oyer
.3
Sche
me
regi
stra
tion
fees
orsim
ilar
fees
,w
here
paid
byth
eem
ploy
er.
2O
vers
ailin
gfe
es,w
here
not
paid
byth
eem
ploy
er.
3C
onsid
erat
eC
onst
ruct
ors’
Sche
me
fees
(or
alte
rnat
ive
sche
me
oper
ated
bylo
cala
utho
rity)
.
4Sc
hem
ere
gist
ratio
nfe
esor
simila
rfe
es,w
here
not
paid
byth
eem
ploy
er.
2C
harg
es1
Rate
son
tem
pora
ryac
com
mod
atio
n.w
eek
Tim
e-re
late
dch
arge
.1
Stat
utor
yun
dert
aker
’sch
arge
sin
conn
ectio
nw
ithpe
rman
ent
serv
ices
toth
ebu
ildin
g.2
Stat
utor
yun
dert
aker
’sch
arge
sin
conn
ectio
nw
ithte
mpo
rary
serv
ices
.
2Li
cenc
esin
conn
ectio
nw
ithho
ardi
ngs,
scaf
fold
ing,
gant
ries
and
the
like.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
3Li
cenc
esin
conn
ectio
nw
ithcr
osso
vers
,par
king
perm
its,p
arki
ngba
ysu
spen
sions
and
the
like.
1.2.
13S
ite
serv
ices
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Te
mpo
rary
wor
ks1
Tem
pora
ryw
orks
that
are
not
spec
ific
toan
elem
ent.
item
/nr/
m/m
2/m
31
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.1
Tem
pora
rysc
reen
sin
conn
ectio
nw
ithm
inor
dem
oliti
onw
orks
and
alte
ratio
nw
orks
.2
Supp
orts
tosm
allo
peni
ngs
cut
into
exist
ing
wal
lsor
afte
rre
mov
alof
inte
rnal
wal
lsor
the
like
inco
nnec
tion
with
min
orde
mol
ition
wor
ksan
dal
tera
tion
wor
ks.
3Te
mpo
rary
orse
mi-p
erm
anen
tsu
ppor
tfo
run
stab
lest
ruct
ures
orfa
cade
s–
faca
dere
tent
ion
wor
ks(i.
e.st
ruct
ures
not
tobe
dem
olish
ed).
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 97
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
2M
ulti-
serv
ice
gang
1G
ange
r.w
eek
(num
ber
ofst
aff
bynu
mbe
rof
man
hour
spe
rw
eek
bynu
mbe
rof
wee
ks)
Tim
e-re
late
dch
arge
.
2La
bour
.
3Fo
rklif
tdr
iver
.
4Se
rvic
ega
ngpl
ant
and
tran
spor
t.
1.2.
14In
sura
nce,
bond
s,gu
aran
tees
and
war
rant
ies
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1W
orks
insu
ranc
e1
Con
trac
tor’s
‘all
risks
’(C
AR)
insu
ranc
e.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Con
trac
tor’s
plan
tan
deq
uipm
ent
insu
ranc
e.
3Te
mpo
rary
build
ings
insu
ranc
e.
4Te
rror
ismin
sura
nce.
5O
ther
insu
ranc
esin
conn
ectio
nw
ithth
ew
orks
.
6In
sura
nce
prem
ium
tax
(IPT)
.
7A
llow
ance
for
reco
very
ofal
lor
part
ofin
sura
nce
prem
ium
exce
ss.
2Pu
blic
liabi
lity
insu
ranc
e1
Non
-neg
ligen
cein
sura
nce.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Pr
ofes
siona
lind
emni
tyin
sura
nce.
3In
sura
nce
prem
ium
tax
(IPT)
.
4A
llow
ance
for
reco
very
ofal
lor
part
ofin
sura
nce
prem
ium
exce
ss.
3Em
ploy
er’s
(mai
nco
ntra
ctor
’s)lia
bilit
yin
sura
nce
1M
anag
emen
tan
dst
aff,
incl
udin
gad
min
istra
tive
staf
f.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Wor
ksop
erat
ives
.
3In
sura
nce
prem
ium
tax
(IPT)
.
4A
llow
ance
for
reco
very
ofal
lor
part
ofin
sura
nce
prem
ium
exce
ss.
TABULATED WORK SECTIONS
98 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
4O
ther
insu
ranc
es1
Empl
oyer
’slo
ssof
liqui
date
dda
mag
es.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2La
tent
defe
cts
cove
r.
3M
otor
vehi
cles
.
4O
ther
insu
ranc
es.
5In
sura
nce
prem
ium
tax
(IPT)
.
6A
llow
ance
for
reco
very
ofal
lor
part
ofin
sura
nce
prem
ium
exce
ss.
5Bo
nds
1Te
nder
bond
s(if
appl
icab
le).
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Pe
rform
ance
bond
s.
6G
uara
ntee
s1
Pare
ntco
mpa
nygu
aran
tees
.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Prod
uct
guar
ante
es,i
nsur
ance
back
edgu
aran
tees
.
7W
arra
ntie
s1
Col
late
ralw
arra
ntie
s.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Fund
er’s
war
rant
ies.
3Pu
rcha
ser’s
and
tena
nt’s
war
rant
ies.
4O
ther
war
rant
ies.
1 PRELIMINARIES (MAIN CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 99
1P
relim
inar
ies
(wo
rks
pack
age
cont
ract
)
Part
A:I
nfor
mat
ion
and
requ
irem
ents
1.1
Pro
ject
part
icul
ars
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Pr
ojec
tpa
rtic
ular
s.1
The
proj
ect.
Shor
tpr
ojec
ttit
le.
2N
atur
eof
wor
kpa
ckag
ew
orks
.Sh
ort
desc
riptio
nto
best
ated
.
3Lo
catio
nof
proj
ect.
Full
post
alad
dres
sto
best
ated
.
4Le
ngth
ofw
ork
pack
age
cont
ract
/sub
-con
trac
t.Pe
riod,
inw
eeks
,to
best
ated
.W
here
tobe
stat
edby
the
cont
ract
or,i
nser
t‘to
beco
nfirm
ed’.
5N
ames
,add
ress
esan
dpo
ints
ofco
ntac
tof
cont
ract
or,e
mpl
oyer
and
cons
ulta
nts.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
1.2
Dra
win
gsan
do
ther
docu
men
ts
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1D
raw
ings
1Li
stof
draw
ings
from
whi
chth
ebi
llof
quan
titie
sw
aspr
epar
ed.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).Ex
cept
ions
tobe
stat
ed.
2O
ther
docu
men
ts1
Pre-
cons
truc
tion
info
rmat
ion.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
TABULATED WORK SECTIONS
100 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
2Li
stof
draw
ings
and
othe
rdo
cum
ents
rela
ting
toth
ew
ork
pack
age
orsu
b-co
ntra
ctbu
tno
tin
clud
edin
the
tend
erdo
cum
ents
.
(1)
Prov
ide
list
ofdr
awin
gsan
dot
her
docu
men
tsre
latin
gto
the
wor
kpa
ckag
eor
sub-
cont
ract
but
not
incl
uded
inth
ete
nder
docu
men
ts,w
hich
may
bese
enby
the
cont
ract
ordu
ring
the
tend
erpe
riod.
(2)
Doc
umen
ttit
le,r
efer
ence
,rev
ision
,dat
eof
issue
and
auth
orto
best
ated
.(3
)D
etai
lsof
whe
redo
cum
ents
can
bese
ento
best
ated
.
1.3
The
site
and
exis
ting
build
ings
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Th
esit
e(1
)A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
Cro
ssre
fere
nce
tom
ain
cont
ract
or’s
prel
imin
arie
s.
2Ex
istin
gbu
ildin
gson
orad
jace
ntto
the
site
(2)
Add
ition
alde
tails
rele
vant
toth
ew
ork
pack
age.
3Ex
istin
gm
ains
serv
ices
1O
nth
esit
e.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2A
djac
ent
toth
esit
e.
4H
ealth
and
safe
tyha
zard
sA
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
5Si
tevi
sits
Arr
ange
men
tsfo
rsit
evi
sits.
Incl
ude
whe
rein
form
atio
nno
tgi
ven
inth
e‘C
ondi
tions
ofTe
nder
’.
1.4
Des
crip
tio
no
fth
eW
ork
s
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Th
eW
orks
Des
crip
tion
ofth
eW
orks
(or
entir
ebu
ildin
gpr
ojec
t).
2Pr
epar
ator
yw
ork
byot
hers
Des
crip
tion
ofan
yw
ork
that
will
beca
rrie
dou
tby
othe
rsun
der
ase
para
teco
ntra
ctbe
fore
the
star
tof
wor
kon
site
for
this
cont
act.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 101
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3Su
bcon
trac
tw
ork
Des
crip
tion
for
the
wor
ksco
mpr
ising
the
wor
kspa
ckag
e.4
Com
plet
ion
wor
kby
othe
rs
1.5
The
cont
ract
cond
itio
ns
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1C
ondi
tions
ofco
ntra
ct1
[For
mof
cont
ract
title
tobe
stat
ed]
(1)
Full
title
ofth
est
anda
rdor
besp
oke
form
ofco
ntra
ct/s
ub-c
ontr
act,
incl
udin
ged
ition
,rev
ision
,and
stan
dard
amen
dmen
tsap
plic
able
.(2
)Re
fere
nce
toan
yam
endm
ents
tocl
ause
s/co
nditi
ons
tost
anda
rdfo
rmof
cont
ract
/sub
-con
trac
t(s
eeno
te(1
)).
(3)
Refe
renc
eto
any
supp
lem
enta
ryor
spec
ial
clau
ses/
cond
ition
sto
stan
dard
form
ofco
ntra
ct/s
ub-c
ontr
act.
(1)W
here
besp
oke
orun
com
mon
form
sof
cont
ract
are
used
,aco
pyis
tobe
appe
nded
toth
ebi
llof
quan
titie
sor
incl
uded
aspa
rtof
the
tend
er.
1.6
Pro
visi
on,
cont
ent
and
use
of
docu
men
ts
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1D
efin
ition
san
din
terp
reta
tions
1D
efin
ition
s.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2C
omm
unic
atio
n.
3Pr
oduc
ts.
4Si
teeq
uipm
ent.
5D
raw
ings
.
6C
ontr
acto
r’sch
oice
.
7C
ontr
acto
r’sde
signe
d.w
orks
8Su
bmit
prop
osal
s.
9Te
rms
used
insp
ecifi
catio
n.
TABULATED WORK SECTIONS
102 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
10M
anuf
actu
rer
and
prod
uct
refe
renc
es.
11Su
bstit
utio
nof
prod
ucts
.
12C
ross
-ref
eren
ces.
13Re
fere
nced
docu
men
ts.
14Eq
uiva
lent
prod
ucts
.
15Su
bstit
utio
nof
stan
dard
s.
16C
urre
ncy
ofdo
cum
ents
.
17Pr
oduc
tsiz
es.
2D
ocum
ents
prov
ided
onbe
half
ofem
ploy
er1
Add
ition
alco
pies
ofdr
awin
gsan
ddo
cum
ents
.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2D
imen
sions
.
3M
easu
red
quan
titie
s
4Th
esp
ecifi
catio
n.
5D
iver
genc
efro
mth
est
atut
ory
requ
irem
ents
.
6Em
ploy
er’s
polic
ydo
cum
ents
.
3D
ocum
ents
prov
ided
byth
eco
ntra
ctor
,sub
cont
ract
ors
and
supp
liers
1D
esig
nan
dpr
oduc
tion
info
rmat
ion.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2D
raw
nan
dot
her
info
rmat
ion.
3A
s-bu
ilt/in
stal
led
draw
ings
and
info
rmat
ion.
4Te
chni
call
itera
ture
»
5M
aint
enan
cein
stru
ctio
nsan
dgu
aran
tees
.
6C
ode
for
Sust
aina
ble
Hom
es.
7En
viro
nmen
tala
sses
smen
tm
etho
d.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 103
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
4D
ocum
ent
and
data
inte
rcha
nge
1El
ectr
onic
data
inte
rcha
nge
(ED
I).A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
1.7
Man
agem
ent
of
the
wo
rks
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Em
ploy
er’s
requ
irem
ents
–ge
nera
lly1
Insu
ranc
e.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2Pr
ofes
siona
lind
emni
ty.i
nsur
ance
Spec
ific
requ
irem
ents
.
3In
sura
nce
clai
ms.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Pr
ogra
mm
e/pr
ogre
ss1
Prog
ram
me.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Re
vise
dpr
ogra
mm
e.
3C
omm
ence
men
tof
wor
kon
site.
4W
ork
pack
age
cont
ract
or’s
prog
ress
repo
rt.
3C
ost
cont
rol
1Re
mov
al/r
epla
cem
ent
ofex
istin
gw
ork.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Pr
opos
edin
stru
ctio
ns.
3M
easu
rem
ent
ofco
vere
dw
ork.
4D
ayw
ork
vouc
hers
.
5In
terim
valu
atio
nsan
dpa
ymen
ts.
6Pa
ymen
tfo
rpr
oduc
tsno
tin
corp
orat
edin
toth
ew
orks
.
7Pa
ymen
tfo
rpr
oduc
tsst
ored
off-s
ite.
4A
tten
danc
es1
Gen
eral
atte
ndan
ces
Det
ails
ofge
nera
latt
enda
nces
prov
ided
byth
em
ain
cont
ract
or.
2Sp
ecia
latt
enda
nces
.m
etho
dof
deal
ing
with
wor
kpa
ckag
eco
ntra
ctor
’sad
ditio
nalr
equi
rem
ents
.
TABULATED WORK SECTIONS
104 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.8
Qua
lity
stan
dard
san
dqu
alit
yco
ntro
l
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1St
anda
rds
ofpr
oduc
tsan
dex
ecut
ions
1In
com
plet
ein
form
atio
n.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2W
orkm
ansh
ipsk
ills.
3Q
ualit
yof
prod
ucts
.
4Q
ualit
yof
exec
utio
n.
5C
ompl
ianc
e.
6In
spec
tions
7M
anuf
actu
rer’s
reco
mm
enda
tions
/inst
ruct
ions
.
2Sa
mpl
es/a
ppro
vals
1Sa
mpl
es.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
3A
ccur
acy/
sett
ing
out
1A
ccur
acy
ofin
stru
men
ts.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Se
ttin
gou
t.
3A
ppea
ranc
ean
dfit
.
4C
ritic
aldi
men
sions
.
5Le
vels
ofst
ruct
ural
floor
s.
6Re
cord
draw
ings
.
4Se
rvic
es1
Serv
ices
regu
latio
ns.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2W
ater
regu
latio
ns/b
yela
ws
notif
icat
ion.
3W
ater
regu
latio
ns/b
yela
ws
cont
ract
or’s
cert
ifica
te.
4El
ectr
ical
inst
alla
tion
cert
ifica
te.
5G
as,o
ilan
dso
lidfu
elap
plia
nce
inst
alla
tion
cert
ifica
te.
6M
echa
nica
land
elec
tric
alse
rvic
es.
5Su
perv
ision
/insp
ectio
n/de
fect
ive
wor
k1
Supe
rvisi
on.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2D
efec
tsin
exist
ing
wor
k.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 105
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
3Pr
opos
als
for
rect
ifica
tion
ofde
fect
ive
prod
ucts
/exe
cutio
ns.
4Pr
opos
als
for
rect
ifica
tion
ofde
fect
ive
prod
ucts
/exe
cutio
ns.
5Q
ualit
yco
ntro
l.
6W
ork
ator
afte
rco
mpl
etio
n1
Com
miss
ioni
ngan
dte
stin
g.Sp
ecifi
cre
quire
men
ts.
1.9
Sec
urit
y,sa
fety
and
pro
tect
ion
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Se
curit
y/he
alth
and
safe
ty1
Pre-
cons
truc
tion
info
rmat
ion.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Ex
ecut
ion
haza
rds.
3Pr
oduc
tha
zard
s.
4O
ccup
ied
prem
ises.
5Pa
sses
.
6O
ccup
ier’s
rule
san
dre
gula
tions
.
7U
seof
mob
ilete
leph
ones
.
8W
orki
ngpr
ecau
tions
/re
stric
tions
.
2Pr
otec
tion
agai
nst
1N
oise
cont
rol.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Po
llutio
nco
ntro
l.
3Fu
els,
lubr
ican
tsan
dhy
drau
licflu
ids.
4N
uisa
nce.
5A
sbes
tos
cont
aini
ngm
ater
ials
(AC
M)s
.
6A
ntiq
uitie
s.
7Fi
repr
even
tion.
8Sm
okin
gon
site.
9M
oist
ure.
TABULATED WORK SECTIONS
106 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
10In
fect
edtim
ber/
cont
amin
ated
mat
eria
ls.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
11W
aste
.
12El
ectr
omag
netic
inte
rfere
nce.
3Pr
otec
tion
1Ex
istin
gfe
atur
es.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2Ex
istin
gw
ork.
3Bu
ildin
gin
terio
rs.
4Ex
istin
gst
ruct
ures
5M
ater
ials
for
recy
clin
gan
d/or
reus
e.
6Pr
otec
tion
ofw
ork
pack
age
cont
ract
or’s
wor
k.Sp
ecifi
cre
quire
men
ts.
1.10
Spe
cific
limit
atio
nso
nm
etho
d,se
quen
cean
dti
min
g
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1G
ener
ally
As
for
Prel
imin
arie
s(m
ain
cont
ract
).
2U
seor
disp
osal
ofm
ater
ials
3W
orki
ngho
urs
Spec
ific
requ
irem
ents
.
1.11
Sit
eac
com
mo
dati
on/
serv
ices
/faci
litie
s/te
mpo
rary
wo
rks
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1Se
rvic
esan
dfa
cilit
ies
1Li
ghtin
gan
dpo
wer
.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2G
as.
3W
ater
.
4M
obile
tele
phon
es.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 107
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
5Te
mpe
ratu
rean
dhu
mid
ity.
6Be
nefic
ialu
seof
perm
anen
tin
stal
led
syst
ems.
7M
eter
read
ings
.
8O
ther
requ
irem
ents
.Sp
ecifi
cre
quire
men
ts.
2Te
mpo
rary
wor
ks1
Nam
ebo
ards
.Sp
ecifi
cre
quire
men
ts.
2A
dver
tisin
g.
3O
ther
requ
irem
ents
.
1.12
Ope
rati
on/
mai
nten
ance
of
finis
hed
build
ing
Sub-
head
ing
1Su
b-he
adin
g2
Info
rmat
ion
requ
irem
ents
Supp
lem
enta
ryin
form
atio
n/no
tes
1O
pera
tion
and
mai
nten
ance
man
ual
1G
ener
ally.
As
for
Prel
imin
arie
s(m
ain
cont
ract
).Th
eop
erat
ion
and
mai
nten
ance
info
rmat
ion,
the
heal
than
dsa
fety
file,
and
allo
ther
info
rmat
ion
can
beco
mbi
ned
asa
singl
edo
cum
ent.
Inth
isca
se,t
hedo
cum
ent
can
bere
ferr
edto
asth
e‘b
uild
ing
man
ual’.
2C
onte
nt.
2O
pera
tion
and
mai
nten
ance
man
uali
nfor
mat
ion
Spec
ifyin
form
atio
nan
ddo
cum
ents
tobe
prov
ided
.
3H
ealth
and
safe
tyfil
e1
Gen
eral
ly.A
sfo
rPr
elim
inar
ies
(mai
nco
ntra
ct).
2C
onte
nt.
4H
ealth
and
safe
tyin
form
atio
nSp
ecify
info
rmat
ion
and
docu
men
tsto
bepr
ovid
ed.
5O
ther
info
rmat
ion
Spec
ific
requ
irem
ents
.
TABULATED WORK SECTIONS
108 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1P
relim
inar
ies
(wo
rks
pack
age
cont
ract
)
Part
B:P
rici
ngsc
hedu
le
1.1
Man
agem
ent
and
staf
f
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Pr
ojec
tsp
ecifi
cm
anag
emen
tan
dst
aff
Wor
kpa
ckag
eco
ntra
ctor
’spr
ojec
t-sp
ecifi
cm
anag
emen
tan
dst
aff.
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
2St
aff
trav
elC
osts
asso
ciat
edw
ithof
f-site
visit
ssu
chas
:
1V
isits
toem
ploy
er’s
and
cons
ulta
nt’s
offic
es.
nr(n
umbe
rof
occa
sions
)Fi
xed
char
ge.
2V
isits
tom
ain
cont
ract
ors’
offic
es/w
orks
.
3O
vers
eas
visit
s.
4A
ccom
mod
atio
nch
arge
san
dov
erni
ght
expe
nses
.
1.2
Sit
ees
tabl
ishm
ent
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
teac
com
mod
atio
nW
ork
pack
age
cont
ract
or’s
proj
ect-
spec
ific
site
acco
mm
odat
ion.
Type
and
exte
ntof
acco
mm
odat
ion
tobe
prov
ided
tobe
stat
ed;w
ithea
chty
pese
para
tely
quan
tifie
d..
1Pu
rcha
sech
arge
s.ite
mFi
xed
char
ge.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3D
eliv
ery
ofte
mpo
rary
site
acco
mm
odat
ion
tosit
e,er
ectio
n,co
nstr
uctio
nan
dre
mov
al.
item
Fixe
dch
arge
.
4In
trud
eral
arm
s.
5La
nd/p
rope
rty
rent
alw
here
site
acco
mm
odat
ion
loca
ted
off-s
ite.
wee
kTi
me-
rela
ted
char
ge.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 109
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
6A
ltera
tions
and
adap
tatio
nsto
site
acco
mm
odat
ion,
incl
udin
gpa
rtiti
onin
g,do
ors,
pain
ting
and
deco
ratin
g,an
dth
elik
e.
item
Fixe
dch
arge
.
7Re
loca
tion
and
alte
ratio
nsof
tem
pora
ryac
com
mod
atio
ndu
ring
cons
truc
tion
stag
e.
8Re
mov
alof
site
acco
mm
odat
ion
and
tem
pora
ryw
orks
inco
nnec
tion
with
site
acco
mm
odat
ion.
2Te
mpo
rary
wor
ksin
conn
ectio
nw
ithsit
ees
tabl
ishm
ent
1Te
mpo
rary
base
san
dfo
unda
tions
for
site
acco
mm
odat
ion,
incl
udin
gm
aint
enan
cean
dre
inst
atem
ent
ofex
istin
gsu
rface
son
com
plet
ion
ofth
ew
orks
.
m2
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2C
onne
ctio
nsto
tem
pora
ryse
rvic
e,in
clud
ing
mai
nten
ance
and
rem
oval
onco
mpl
etio
nof
the
wor
ksnr
3C
onne
ctio
nsto
tem
pora
rydr
aina
ge,i
nin
clud
ing
mai
nten
ance
and
rem
oval
onco
mpl
etio
nof
the
wor
ks.
3Fu
rnitu
rean
deq
uipm
ent
1W
orks
tatio
nsfo
rst
aff.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
2G
ener
alof
fice
furn
iture
.ite
m
3Fl
oor
cove
rings
.
4H
eate
rs,i
nclu
ding
mai
nten
ance
ofhe
ater
s.
5O
ther
offic
eeq
uipm
ent,
incl
udin
gm
aint
enan
ce.
6Re
mov
alof
furn
iture
and
equi
pmen
t.
7M
aint
enan
ceof
furn
iture
and
floor
cove
ring.
TABULATED WORK SECTIONS
110 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
4IT
syst
ems
1C
ompu
ter
hard
war
e,in
clud
ing
purc
hase
/ren
tal,
inst
alla
tion,
initi
alse
tup
,mai
nten
ance
and
runn
ing
cost
s,su
chas
:–
desk
top
com
pute
rsan
dla
ptop
com
pute
rs–
CA
Dst
atio
ns–
serv
eran
dne
twor
keq
uipm
ent
–pr
inte
rsan
dpl
otte
rs–
othe
rco
mpu
ter
syst
em/h
ardw
are.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2So
ftwar
ean
dso
ftwar
elic
ence
s.
3M
odem
lines
,mod
ems
and
conn
ectio
ns(i.
e.em
aila
ndin
tern
etca
pabi
lity)
.
4W
AN
lines
and
conn
ectio
ns(if
onW
AN
).
5Li
nere
ntal
char
ges.
wee
kTi
me-
rela
ted
char
ge.
6In
tern
et/w
ebsit
ead
dres
ses.
nrFi
xed
char
ge.
7In
tern
etse
rvic
epr
ovid
er(IS
P)ch
arge
s.
8Li
neca
llsch
arge
s.w
eek
Tim
e-re
late
dch
arge
.
9IT
supp
ort
and
mai
nten
ance
.
5C
onsu
mab
les
and
serv
ices
1St
atio
nery
.w
eek
Tim
e-re
late
dch
arge
.
2C
ompu
ter
and
prin
ter
cons
umab
les
(e.g
.ink
cart
ridge
s).
3Po
stag
e.
4co
urie
rch
arge
s.
5Te
a,co
ffee,
wat
erbo
ttle
s,et
c.
6Fi
rst
aid
cons
umab
les.
7Ph
otoc
opie
rco
nsum
able
s(e
.g.p
aper
and
tone
rs).
8Fa
xco
nsum
able
s(e
.g.p
aper
and
tone
rs).
9D
raw
ing
prin
ter
cons
umab
les
(e.g
.ink
cart
ridge
s).
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 111
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
6Su
ndrie
s1
Wor
kpa
ckag
eco
ntra
ctor
’ssig
nboa
rds.
item
Fixe
dch
arge
.
1.3
Tem
pora
ryse
rvic
es
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Te
mpo
rary
wat
ersu
pply
1Te
mpo
rary
conn
ectio
ns.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Dist
ribut
ion
equi
pmen
t,in
stal
latio
nan
dad
apta
tions
.ite
m
3M
eter
char
ges.
wee
k
2Te
mpo
rary
gas
supp
ly1
Gas
conn
ectio
n.nr
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2D
istrib
utio
neq
uipm
ent,
inst
alla
tion
and
adap
tatio
ns.
item
3C
harg
es.
wee
k
4Bo
ttle
dga
s.
3Te
mpo
rary
elec
tric
itysu
pply
1Te
mpo
rary
conn
ectio
ns.
nrFi
xed
char
ge.
4Te
mpo
rary
tele
com
mun
icat
ion
syst
em1
Land
lines
(incl
udin
gco
nnec
tion
and
rent
alch
arge
s),
incl
udin
g:–
tele
phon
ean
dfa
xlin
es–
ISD
Nlin
es.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1Fa
xco
nsum
able
s(in
clud
edin
sect
ion
1.2.
5:C
onsu
mab
les
and
serv
ices
).
2Te
leph
one
and
facs
imile
equi
pmen
t(in
clud
ing
conn
ectio
nan
dre
ntal
char
ges)
,inc
ludi
ng:
–PA
BXeq
uipm
ent
–ha
ndse
ts,i
nclu
ding
purc
hase
orre
ntal
–fa
xm
achi
nes,
incl
udin
gpu
rcha
seor
rent
al–
inst
alla
tion
ofeq
uipm
ent
–m
aint
enan
ceof
equi
pmen
t.
3M
obile
(cel
lula
r)ph
ones
,inc
ludi
ng:
–m
obile
phon
es,i
nclu
ding
purc
hase
orre
ntal
and
conn
ectio
nch
arge
s–
spar
eba
tter
ies
–m
obile
phon
ech
arge
s.
TABULATED WORK SECTIONS
112 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
4Te
leph
one
char
ges,
incl
udin
g:–
tele
phon
eca
llch
arge
s–
fax
char
ges
–fa
xan
dte
leph
one
cons
umab
les.
5Ra
dios
(incl
udin
gpu
rcha
seor
rent
alch
arge
s),i
nclu
ding
:–
base
set
–ha
ndse
tsan
dch
arge
rs–
repa
irsan
dm
aint
enan
ce–
licen
ces
–sp
are
batt
erie
s.
1.4
Co
ntro
lan
dpr
ote
ctio
n
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Su
rvey
,ins
pect
ions
and
mon
itorin
g1
Surv
eys.
item
1Fi
xed
char
ge2
Tim
e-re
late
dch
arge
.1
Envi
ronm
enta
lmon
itorin
g(in
clud
edin
sect
ion
1.2.
5:Sa
fety
and
envi
ronm
enta
lpr
otec
tion)
2To
pogr
aphi
cals
urve
y.
3N
on-e
mpl
oyer
dila
pida
tion.
surv
ey
4St
ruct
ural
/dila
pida
tions
surv
eyad
join
ing
build
ings
.
5En
viro
nmen
tals
urve
ys.
6M
ovem
ent
mon
itorin
g.
7M
aint
enan
cean
din
spec
tion
cost
s.
2Se
ttin
gou
t1
Sett
ing
out
prim
ary
grid
s.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Grid
tran
sfer
san
dle
velc
heck
s.
3M
aint
enan
ceof
grid
s.
4Ta
keov
erco
ntro
land
inde
pend
ent
chec
ks(i.
e.on
chan
geof
subc
ontr
acto
rs).
5In
stru
men
tsfo
rse
ttin
gou
t.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 113
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
3Pr
otec
tion
ofW
orks
1Pr
otec
tion
offin
ished
wor
ksto
proj
ect
hand
over
.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Prot
ectio
nof
stai
rs,b
alus
trad
esan
dth
elik
eto
proj
ect
hand
over
.
3Pr
otec
tion
offit
tings
and
furn
ishin
gsto
proj
ect
hand
over
.
4Pr
otec
tion
ofen
tran
cedo
ors
and
fram
esto
proj
ect
hand
over
.
5Pr
otec
tion
oflif
tca
rsan
ddo
ors
topr
ojec
tha
ndov
er.
6Pr
otec
tion
ofsp
ecifi
cally
vuln
erab
lepr
oduc
tsto
proj
ect
hand
over
.
7Pr
otec
tion
ofal
lsun
dry
item
s.
4Sa
mpl
es1
Prov
ision
ofsa
mpl
es.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Pr
ovisi
onof
sam
ple
room
.
3M
ock-
ups
and
sam
ple
pane
ls.
4Te
stin
gof
sam
ples
/moc
k-up
s,in
clud
ing
test
ing
fees
.
5O
n-sit
ela
bora
tory
equi
pmen
t.
6M
ock-
ups
ofco
mpl
ete
units
(e.g
.res
iden
tialu
nits
,st
uden
tac
com
mod
atio
nun
its,h
otel
acco
mm
odat
ion
and
the
like)
.
5En
viro
nmen
talc
ontr
olof
build
ing
1D
ryou
tbu
ildin
g.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.2
Tem
pora
ryhe
atin
g/co
olin
g.
3Te
mpo
rary
wat
erpr
oofin
g,in
clud
ing
over
roof
s.
4Te
mpo
rary
encl
osur
es.
TABULATED WORK SECTIONS
114 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.5
Mec
hani
cal
plan
t
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1M
echa
nica
lpla
ntTy
peof
plan
tto
bepr
ovid
edsh
allb
est
ated
;with
each
type
sepa
rate
lyqu
antif
ied.
1Ba
ses.
nr1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
2Br
ingi
ngto
site,
erec
ting,
test
ing
and
com
miss
ioni
ng.
nrFi
xed
char
ge.
3D
isman
tling
and
rem
ovin
gfro
msit
e.
4Pr
otec
tion
syst
ems.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
5O
pera
tor/
driv
er,i
nclu
ding
over
time.
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
6Pe
riodi
csa
fety
chec
ks/in
spec
tions
.m
onth
Tim
e-re
late
dch
arge
.
7O
ther
cost
s’sp
ecifi
cch
arge
s.ite
m1
Fixe
dch
arge
.2
Tim
e-re
late
dch
arge
.
1.6
Tem
pora
ryw
ork
s
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1A
cces
ssc
affo
ldin
gA
cces
ssc
affo
ldin
gsp
ecifi
cally
requ
ired
byw
ork
pack
age
cont
ract
or(t
ype
ofac
cess
scaf
fold
ing
tobe
spec
ified
):–
acce
sssc
affo
ldin
gto
elev
atio
ns,l
iftsh
afts
and
the
like,
incl
udin
g:fa
nsan
dm
esh
scre
ens.
–st
ruct
ural
scaf
fold
ing
(e.g
.to
part
yw
alls)
.–
bird
cage
scaf
fold
ing.
–ca
ntile
ver
acce
sssc
affo
ldin
g.–
stai
rcas
epl
atfo
rms.
–pr
imar
ylo
adin
gpl
atfo
rms.
–tr
avel
ling
acce
sspl
atfo
rms.
1Br
ingi
ngto
site,
erec
ting
and
initi
alsa
fety
chec
ks.
nrFi
xed
char
ge.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3A
lterin
gan
dad
aptin
gdu
ring
cons
truc
tion.
nrFi
xed
char
ge.
4D
isman
tling
and
rem
ovin
gfro
msit
e.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 115
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
2Te
mpo
rary
wor
ksTe
mpo
rary
wor
kssp
ecifi
cally
requ
ired
byw
ork
pack
age
cont
ract
or:
–su
ppor
tsc
affo
ldin
gan
dpr
oppi
ng–
cras
hde
cks
–te
mpo
rary
prot
ectio
nto
exist
ing
tree
san
d/or
vege
tatio
n–
flood
light
s.
1Br
ingi
ngto
site,
erec
ting
and
initi
alsa
fety
chec
ks.
nrFi
xed
char
ge.
2H
irech
arge
s.w
eek
Tim
e-re
late
dch
arge
.
3A
lterin
gan
dad
aptin
gdu
ring
cons
truc
tion.
nrFi
xed
char
ge.
4D
isman
tling
and
rem
ovin
gfro
msit
e.
1.7
Sit
ere
cord
s
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
tere
cord
sU
nles
sot
herw
isein
dica
ted,
cost
sas
soci
ated
with
the
follo
win
gsh
allb
ede
emed
tobe
incl
uded
inm
anag
emen
tan
dst
aff
cost
s:
1Ph
otog
raph
y:–
Cam
era
purc
hase
–C
onsu
mab
les
–Pr
intin
gan
dpr
esen
tatio
n
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
TABULATED WORK SECTIONS
116 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
2W
orks
reco
rds:
–Pr
ogre
ssre
port
ing
–Si
tese
ttin
gou
tdr
awin
gs–
Con
ditio
nsu
rvey
san
dre
port
s–
Ope
ratio
nan
dm
aint
enan
cem
anua
ls–
as-b
uilt/
inst
alle
ddr
awin
gsan
dsc
hedu
les
–co
-ord
inat
ing,
gath
erin
gan
dco
mpi
ling
heal
than
dsa
fety
info
rmat
ion
and
pres
enta
tion
toC
DM
co-o
rdin
ator
–co
mpi
latio
nof
heal
than
dsa
fety
file
(ifre
quire
d).
1.8
Co
mpl
etio
nan
dpo
st-c
om
plet
ion
requ
irem
ents
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Te
stin
gan
dco
mm
issio
ning
plan
Cos
tsas
soci
ated
with
the
follo
win
gsh
allb
ede
emed
tobe
incl
uded
inse
ctio
n1.
1:M
anag
emen
tan
dst
aff
cost
s:
1Pr
epar
atio
nof
com
miss
ioni
ngpl
an.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1Te
stin
gan
dco
mm
issio
ning
ofse
rvic
es
1H
ando
ver
Unl
ess
othe
rwise
indi
cate
d,co
sts
asso
ciat
edw
ithth
efo
llow
ing
shal
lbe
deem
edto
bein
clud
edin
sect
ion
1.1:
Man
agem
ent
and
staf
fco
sts:
1Pr
epar
atio
nof
Han
dove
rPl
an.
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
2Tr
aini
ngof
build
ing
user
’sst
aff
inth
eop
erat
ion
and
mai
nten
ance
ofth
ebu
ildin
gen
gine
erin
gse
rvic
essy
stem
s.
3Pr
ovisi
onof
spar
epa
rts
for
mai
nten
ance
ofbu
ildin
gen
gine
erin
gse
rvic
es.
4Pr
ovisi
onof
tool
san
dpo
rtab
lein
dica
ting
inst
rum
ents
for
the
oper
atio
nan
dm
aint
enan
ceof
build
ing
engi
neer
ing
serv
ices
syst
ems.
5Pr
e-co
mpl
etio
nin
spec
tions
.
6Fi
nali
nspe
ctio
ns.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 117
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
3Po
st-c
ompl
etio
nse
rvic
es1
Supe
rviso
ryst
aff
(em
ploy
er/t
enan
tca
re).
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
2H
andy
man
.
3M
inor
mat
eria
lsan
dsu
ndry
item
s.ite
mFi
xed
char
ge.
4In
sura
nces
.
5O
ther
post
-con
stru
ctio
nst
aff.
wee
k(n
umbe
rof
staf
fby
num
ber
ofm
anho
urs
per
wee
kby
num
ber
ofw
eeks
)
Tim
e-re
late
dch
arge
.
1.9
Cle
anin
g
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1Si
tetid
y1
Cle
anin
gsit
eac
com
mod
atio
n–
inte
rnal
,inc
ludi
ngcl
eani
ngte
leph
one
hand
sets
,oth
erof
fice
furn
iture
and
equi
pmen
tan
dw
indo
wcl
eani
ng.
wee
kTi
me-
rela
ted
char
ge.
2Pe
riodi
cm
aint
enan
ceof
site
acco
mm
odat
ion,
incl
udin
gre
deco
ratio
n(in
tern
alan
dex
tern
al).
3W
aste
man
agem
ent,
incl
udin
gru
bbish
disp
osal
(incl
udin
gco
mpa
ctor
visit
s;sk
ips
and
was
tebi
ns;r
oll-o
ff,ro
ll-on
was
tebi
ns)
and
othe
rdi
spos
al.
4Pe
stco
ntro
l.
TABULATED WORK SECTIONS
118 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.10
Fees
and
char
ges
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1C
harg
es1
Rate
son
tem
pora
ryac
com
mod
atio
n.w
eek
Tim
e-re
late
dch
arge
.
1.11
Insu
ranc
es,b
ond
s,gu
aran
tees
and
war
rant
ies
Com
pone
ntIn
clud
edU
nit
Pric
ing
met
hod
Excl
uded
1In
sura
nces
item
1Fi
xed
char
ge.
2Ti
me-
rela
ted
char
ge.
1 PRELIMINARIES (WORKS PACKAGE CONTRACT)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 119
2O
ff-s
ite
man
ufac
ture
dm
ater
ials
,co
mpo
nent
so
rbu
ildin
gs
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
s.2
Plan
s.3
Sect
ions
.4
Elev
atio
ns.
5In
stal
latio
nde
tails
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials.
2M
etho
dof
fixin
gor
inst
allin
g.3
Con
nect
ing
toot
her
wor
kan
dse
rvic
es.
4Sp
ecia
lfin
ishes
.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1M
ajor
dim
ensio
nsof
com
pone
nt,s
truc
ture
orun
it.2
Loca
tion
ofco
mpo
nent
,st
ruct
ure
orun
it.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llfa
ctor
yap
plie
dfin
ishes
.2
Tran
spor
tfro
mfa
ctor
yto
site.
3O
ffloa
ding
and
stor
ing
onsit
e.4
Sett
ing,
hoist
ing
and
plac
ing
infin
alpo
sitio
n.5
All
conn
ectio
nan
djo
int
mat
eria
ls.6
All
serv
ice
conn
ectio
ns.
7D
ispos
alof
allp
acka
ging
and
prot
ectiv
em
ater
ials.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
ompo
nent
nr1
Ove
rall
dim
ensio
ns.
1D
escr
iptio
nof
com
pone
nt.
1M
etho
dof
fixin
g/in
stal
ling.
2H
eigh
tab
ove
stru
ctur
algr
ound
floor
leve
l.3
Serv
ices
conn
ectio
ns.
1Th
ese
are
pref
abric
ated
prop
rieta
ryco
mpo
nent
sth
atar
eno
tad
equa
tely
cove
red
byth
eot
herW
ork
Sect
ions
inth
isdo
cum
ent.
TABULATED WORK SECTIONS
120 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
2Pr
efab
ricat
edst
ruct
ures
nr1
Ove
rall
dim
ensio
ns.
1Ro
ofs.
2Ex
tern
alw
alls.
3In
tern
alw
alls/
part
ition
s.4
Floo
rs.
5St
airs
.6
Brid
ges.
7M
asts
.8
Oth
er,t
ype
stat
ed.
1Th
ese
are
com
plet
eor
subs
tant
ially
com
plet
ebu
ildin
gel
emen
tsof
prop
rieta
ryco
nstr
uctio
n,la
rgel
ypr
efab
ricat
ed.T
hefix
ing
ofite
ms
supp
lied
only
aspa
rtof
the
prop
rieta
rypa
ckag
eis
incl
uded
here
.O
ther
wor
kno
tfo
rmin
gpa
rtof
the
prop
rieta
rypa
ckag
eis
mea
sure
dse
para
tely
inth
eap
prop
riate
Wor
kSe
ctio
n.
3Pr
efab
ricat
edbu
ildin
gun
itsnr
1To
ilet/
bath
room
units
.2
Soun
dpr
oof
room
s.3
Col
dro
oms.
4Sp
ray
boot
hs.
5Ki
osks
.6
Oth
er,t
ype
stat
ed.
1Th
ese
are
com
plet
eor
subs
tant
ially
com
plet
ero
omun
its,u
sual
lyof
prop
rieta
ryco
nstr
uctio
n,fo
rin
corp
orat
ion
into
build
ings
,str
uctu
res
orsit
ewor
ks.T
helis
tis
not
exha
ustiv
e.
4Pr
efab
ricat
edbu
ildin
gsnr
1D
escr
iptio
nof
build
ing.
1Th
ese
are
com
plet
eor
subs
tant
ially
com
plet
ebu
ildin
gsu
pers
truc
ture
sof
prop
rieta
ryco
nstr
uctio
n,la
rgel
ypr
efab
ricat
ed.T
hefix
ing
ofite
ms
supp
lied
only
aspa
rtof
the
prop
rieta
rypa
ckag
eis
incl
uded
here
.O
ther
wor
kno
tfo
rmin
gpa
rtof
the
prop
rieta
rypa
ckag
eis
mea
sure
dse
para
tely
inth
eap
prop
riate
Wor
kSe
ctio
n.
2 OFF-SITE MANUFACTURED MATERIALS, COMPONENTS OR BUILDINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 121
3D
emo
litio
nsD
emol
ition
sSh
orin
g,fa
cade
rete
ntio
nan
dte
mpo
rary
wor
ks
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Loca
tion
draw
ings
.2
Dra
win
gsof
exist
ing
stru
ctur
esto
show
full
exte
ntof
dem
oliti
on.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Br
ief
desc
riptio
nan
dsiz
eof
stru
ctur
eto
bede
mol
ished
.2
Any
limita
tions
due
topr
esen
ceof
toxi
cor
haza
rdou
sm
ater
ials.
3Ex
tent
ofpa
rts
ofst
ruct
ure
tobe
tem
pora
rily
reta
ined
.4
Asb
esto
ssu
rvey
s.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Lo
wes
tle
velo
fde
mol
ition
.2
Exte
ntof
any
tem
pora
ryw
orks
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.3
Posit
ion
and
exte
ntof
any
tem
pora
rysc
reen
s,ro
ofs
and
the
like.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llte
mpo
rary
wor
ksun
less
stat
edot
herw
ise.
2Te
mpo
raril
ydi
vert
ing,
mai
ntai
ning
orse
alin
gof
fex
istin
gse
rvic
es.
3D
ispos
alof
alld
ebris
unle
ssst
ated
othe
rwise
.4
Met
hod
ofde
mol
ition
unle
ssst
ated
othe
rwise
.5
All
tem
pora
rysu
ppor
tle
ftto
the
disc
retio
nof
the
cont
ract
or.
6C
lear
ing
away
allt
empo
rary
wor
ks.
7D
ispos
ing
ofra
inw
ater
.8
Mak
ing
good
allw
ork
dist
urbe
d.
1Th
elo
wes
tle
velw
illin
clud
eba
sem
ents
.2
Ifa
floor
slab
isto
bere
mov
edth
enth
elo
wes
tle
velm
ust
best
ated
asto
the
unde
rsid
eof
that
slab.
TABULATED WORK SECTIONS
122 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1D
emol
ition
site
m1
All
stru
ctur
es.
2In
divi
dual
stru
ctur
es.
3Pa
rts
ofst
ruct
ures
.
1D
escr
iptio
nof
build
ing(
s)or
part
sof
build
ing(
s).
2Lo
wes
tle
velt
ow
hich
stru
ctur
e(s)
tobe
dem
olish
ed.
1Li
mita
tions
ondi
spos
alof
mat
eria
ls.2
Any
mat
eria
lto
bere
tain
edfo
rre
-use
.3
Any
mat
eria
lto
rem
ain
the
prop
erty
ofth
eem
ploy
er.
1C
ontr
acto
rsh
ould
bead
vise
dto
insp
ect
the
stru
ctur
e(s)
tobe
dem
olish
ed.
2Te
mpo
rary
supp
ort
ofst
ruct
ures
,ro
ads
and
the
like
item
1Pa
rts
ofex
istin
gbu
ildin
gto
bere
tain
ed.
2A
djoi
ning
build
ings
not
form
ing
part
ofth
ew
orks
.3
Road
san
dot
her
surfa
ces
tobe
reta
ined
.4
Any
othe
rex
istin
gfe
atur
eto
bere
tain
ed.
1D
escr
iptio
nof
build
ing(
s)or
part
sof
build
ing(
s)or
road
orot
her
surfa
ceor
feat
ure
tobe
reta
ined
.2
Type
ofsh
orin
g.3
Leng
thof
expo
sed
edge
ofsu
rface
tobe
reta
ined
and
aver
age
heig
ht(s
).
1Su
ppor
tis
for
part
sof
the
stru
ctur
eth
atm
ust
bere
tain
ed.I
tdo
esno
tm
ean
any
type
ofsu
ppor
tre
quire
das
inci
dent
alto
the
dem
oliti
ons.
3Te
mpo
rary
wor
ksm
21
Roof
s.2
Scre
ens.
3Fl
oors
.4
Road
s.
1W
eath
erpr
oof.
2W
ater
tight
.3
Dus
tpro
of.
4Fi
repr
oof.
5A
nyot
her
requ
irem
ent:
type
stat
ed.
1M
etho
dof
cons
truc
tion
ifno
tat
the
disc
retio
nof
the
cont
ract
or.
2M
aint
aini
ng:d
urat
ion
stat
ed.
3A
dapt
ing
durin
gco
urse
ofw
orks
.4
Cle
arin
gaw
ay.
5D
ispos
ing
ofra
inw
ater
:det
ails
stat
ed.
6Pr
ovid
ing
open
ings
:det
ails
stat
ed.
1In
orde
rto
ensu
reth
efu
llex
tent
and
scop
eof
this
wor
kth
esu
rvey
orm
ayne
edto
prov
ide
addi
tiona
linf
orm
atio
nif
not
read
ilyas
cert
aine
dfro
mth
edr
awin
gs.
3 DEMOLITIONS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 123
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4D
econ
tam
inat
ion
item
1Re
mov
alof
haza
rdou
sm
ater
ials.
2D
econ
tam
inat
ion
ofex
istin
gpr
emise
s.3
Infe
stat
ion
rem
oval
.
1Sc
ope
ofw
ork.
2Ty
peof
cont
amin
atio
n.3
Prio
rto
dem
oliti
on.
4D
urin
gde
mol
ition
orre
pair
proc
ess.
5Re
cycl
ing
item
1D
etai
led
desc
riptio
nof
type
ofm
ater
ialt
obe
recy
cled
and
any
limita
tions
impo
sed
byem
ploy
eror
loca
laut
horit
y.
1To
beco
llect
edby
loca
lau
thor
ity2
Tobe
tran
spor
ted
tore
cycl
ing
depo
t,de
tails
and
loca
tion
stat
ed.
TABULATED WORK SECTIONS
124 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
4A
lter
atio
ns,r
epai
rsan
dco
nser
vati
on
Alte
ratio
nw
ork
toex
istin
gbu
ildin
gsR
epai
rs/c
lean
ing/
reno
vatin
gan
dco
nser
ving
Dec
onta
min
atio
nR
e-cy
clin
g
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Loca
tion
draw
ings
.2
Dra
win
gsof
exist
ing
stru
ctur
es.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1D
escr
iptio
nof
oper
atio
nsw
here
not
left
todi
scre
tion
ofth
eco
ntra
ctor
.2
Spec
ific
loca
tion
ofea
chite
mof
wor
kre
lativ
eto
the
exist
ing
build
ing.
3D
etai
lsof
allm
ater
ials
tobe
set
asid
efo
rsu
bseq
uent
re-u
sein
clud
ing
mea
nsof
stor
age.
4D
etai
lsof
allm
ater
ials
tore
mai
nth
epr
oper
tyof
the
empl
oyer
incl
udin
gm
eans
ofst
orag
e.5
Any
rest
rictio
nson
met
hod,
sequ
ence
and/
ortim
ing
ofth
ew
orks
.6
Any
rest
rictio
nson
met
hods
ofst
orag
eof
mat
eria
lsto
bere
-use
dor
tore
mai
npr
oper
tyof
the
empl
oyer
.7
Any
rest
rictio
nson
met
hod
orlo
catio
nof
disp
osal
ofw
aste
.8
Com
plia
nce
with
allr
egul
atio
nsre
latin
gto
the
hand
ling,
tran
spor
tan
ddi
spos
alof
haza
rdou
sw
aste
mat
eria
ls.9
Asb
esto
ssu
rvey
s.
Not
es,c
omm
ents
and
glos
sary
4 ALTERATIONS, REPAIRS AND CONSERVATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 125
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sc
ope
and
loca
tion
ofw
ork
rela
tive
toex
istin
gst
ruct
ures
.W
orks
and
mat
eria
lsde
emed
incl
uded
.1
All
tem
pora
ryw
orks
incl
udin
gsh
orin
gan
dsc
affo
ldin
gin
cide
ntal
toth
ew
ork
excl
udin
gth
ose
liste
dbe
low
.2
Mak
ing
good
allw
ork
dist
urbe
d.3
Exte
ndin
gan
dm
akin
ggo
odex
istin
gfin
ishes
.4
Disp
osal
ofal
lwas
tem
ater
ials.
5A
llw
ork
and
mat
eria
lsin
cide
ntal
toth
eite
ms
ofal
tera
tion.
6M
ater
ials
requ
ired
for
bond
ing
new
wor
kto
exist
ing.
1Th
eru
les
with
inth
isse
ctio
nap
ply
tow
orks
toex
istin
gbu
ildin
gsas
defin
edin
clau
se3.
3.4.
1of
the
Mea
sure
men
tRu
les
for
Build
ing
Wor
ks.
2In
sert
ing
new
wor
kin
clud
esre
-fixi
ngor
re-u
sing
rem
oved
mat
eria
ls.3
All
mat
eria
lsar
ising
from
thes
ew
orks
beco
me
the
prop
erty
ofth
eco
ntra
ctor
unle
ssot
herw
isest
ated
.4
The
rule
sw
ithin
this
sect
ion
dono
tap
ply
tote
mpo
rary
wor
ksex
cept
asth
ose
liste
din
Rule
24of
this
sect
ion.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1W
orks
ofal
tera
tion
item
1D
imen
sione
dde
scrip
tion
suffi
cien
tto
iden
tify
exte
ntan
dlo
catio
nof
wor
k.
1Ex
tent
,nat
ure
and
scop
eof
wor
kde
scrib
edin
clud
ing
type
and
thic
knes
sof
exist
ing
stru
ctur
e.
1D
etai
lsm
ust
begi
ven
ofal
lwor
kin
volv
edin
each
item
incl
udin
gm
etho
dof
oper
atio
nw
here
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.
2Re
mov
ing
item
----
-m
2
----
-m --
---
nr ——
1Fi
ttin
gsan
dfix
ture
s.2
Plum
bing
item
sor
inst
alla
tions
.3
Elec
tric
alite
ms
orin
stal
latio
ns.
4Fi
nish
es.
5C
over
ings
.6
Pavi
ngs.
1D
etai
lssu
ffici
ent
for
iden
tific
atio
nto
best
ated
.--
----
----
----
----
----
2A
ppro
xim
ate
area
orsiz
eof
area
ofea
chty
peof
finish
,co
verin
gor
pavi
ng.
1D
iscon
nect
ing
and,
ifre
quire
d,su
bseq
uent
re-c
onne
ctio
nof
plum
bing
and
elec
tric
alor
othe
rse
rvic
esin
stal
latio
nsis
deem
edin
clud
ed.
2Th
esu
rvey
orsh
allc
hoos
eth
eun
itm
ost
suita
ble
for
the
type
ofw
ork
bein
gre
mov
ed.
3C
uttin
gor
form
ing
open
ings
4C
uttin
gor
form
ing
rece
sses
5C
uttin
gba
ck6
Fillin
gin
open
ings
7Fi
lling
inre
cess
es
item
----
-m
2
----
-m --
---
nr ——
1D
imen
sione
dde
scrip
tion.
2Ty
pean
dth
ickn
ess
ofex
istin
gst
ruct
ure.
3M
etho
dof
perfo
rmin
gth
ew
ork
ifno
tle
ftto
disc
retio
nof
the
cont
ract
or.
1Re
-use
ofex
istin
gm
ater
ials
stat
ed.
2Ty
pean
dsiz
e(s)
ofne
wm
ater
ials
stat
ed.
1D
etai
lsgi
ven
ofne
ww
ork
are
tobe
the
equi
vale
ntof
thos
ede
tails
requ
ired
byth
eru
les
for
the
mea
sure
men
tof
the
sam
ein
othe
rW
ork
Sect
ions
.2
The
surv
eyor
shal
lcho
ose
the
unit
mos
tsu
itabl
efo
rth
ety
peof
wor
kbe
ing
cut
orfil
led.
TABULATED WORK SECTIONS
126 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
8Re
mov
ing
exist
ing
and
repl
acin
gite
m--
---
m2
----
-m --
---
nr ——
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Wid
than
dth
ickn
ess
stat
ed.
----
----
----
----
----
--3
Leng
th,w
idth
and
thic
knes
sst
ated
.--
----
----
----
----
----
4D
imen
sione
dde
scrip
tion.
1Br
ickw
ork.
2C
oncr
ete.
3St
onew
ork.
4Ti
mbe
r.5
Gla
ss.
6O
ther
,typ
est
ated
.
1Tr
eatm
ent
ofex
pose
dso
und
surfa
ce(s
)st
ated
.2
Trea
tmen
tof
expo
sed
rein
forc
emen
tor
othe
rm
ater
ial
stat
ed.
3M
akin
ggo
odw
ithne
wm
ater
ials
othe
rth
anto
mat
chex
istin
gto
bede
scrib
ed.
4Bo
ndin
gne
wto
exist
ing.
1Fo
rmw
ork
and
any
othe
rfo
rmof
tem
pora
rysu
ppor
tis
deem
edin
clud
ed.
2Th
eun
itof
mea
sure
men
tsh
allb
ele
ftto
the
disc
retio
nof
the
surv
eyor
but
shal
lref
lect
the
size
and
exte
ntof
the
wor
k.3
Mak
ing
good
isde
emed
tobe
tom
atch
exist
ing
unle
ssde
scrib
edot
herw
ise.
9Pr
epar
ing
exist
ing
stru
ctur
esfo
rco
nnec
tion
orat
tach
men
tof
new
wor
k
nr1
Dim
ensio
ned
desc
riptio
n.1
Des
crip
tion
suffi
cien
tto
dete
rmin
esc
ope
and
loca
tion.
1N
atur
eof
exist
ing
stru
ctur
eto
rece
ive
new
wor
k.1
This
will
incl
ude
prep
arin
gst
ruct
ural
stee
lsec
tions
for
atta
chm
ent
tone
wst
eelf
ram
ing
and
the
like.
10Re
pairi
ngm
2
----
-m --
---
nr ----
-ite
m
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Wid
than
dth
ickn
ess
stat
ed.
----
----
----
----
----
--3
Leng
th,w
idth
and
thic
knes
sst
ated
.--
----
----
----
----
----
4D
imen
sione
dde
scrip
tion.
1N
atur
eof
surfa
ceto
bere
paire
dst
ated
.1
Met
hod
ofre
pairi
ngst
ated
.1
The
unit
ofm
easu
rem
ent
shal
lbe
left
toth
edi
scre
tion
ofth
esu
rvey
orbu
tsh
allr
efle
ctth
esiz
ean
dex
tent
ofth
ew
ork.
11Re
poin
ting
join
tsm
1N
atur
eof
exist
ing
join
t.2
Type
ofpo
intin
g.1
Mat
eria
lsre
quire
dst
ated
.1
Wid
than
dde
pth
stat
ed.
1Re
mov
alof
exist
ing
join
tm
ater
iala
ndpr
epar
atio
nof
expo
sed
surfa
ces
deem
edin
clud
ed.
4 ALTERATIONS, REPAIRS AND CONSERVATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 127
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
12Re
poin
ting
m2
----
-m --
---
nr
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Wid
than
dth
ickn
ess
stat
ed.
----
----
----
----
----
--3
Leng
th,w
idth
and
thic
knes
sst
ated
.
1N
atur
eof
exist
ing
surfa
ce.
2Si
zeof
exist
ing
com
pone
nts.
3Bo
ndof
exist
ing
join
ts.
4Ty
peof
new
poin
ting.
5W
idth
and
dept
hof
raki
ngou
tof
exist
ing
join
ts.
1C
ompo
sitio
nan
dm
ixof
mor
tar
and/
orot
her
join
tm
ater
ial(s
).
1Ty
pes
ofsu
rface
wou
ldin
clud
ebr
ickw
ork,
bloc
kwor
k,st
onew
ork
and
the
like.
2A
reas
each
less
than
1m2
tobe
enum
erat
ed.
3Li
near
item
sw
ould
incl
ude
reve
als,
wal
len
dsan
dth
elik
e.4
The
unit
ofm
easu
rem
ent
shal
lbe
left
toth
edi
scre
tion
ofth
esu
rvey
orbu
tsh
allr
efle
ctth
esiz
ean
dex
tent
ofth
ew
ork.
13Re
sinor
cem
ent
impr
egna
tion/
inje
ctio
nm
2
----
-m --
---
nr ----
-ite
m
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Wid
than
dth
ickn
ess
stat
ed.
----
----
----
----
----
--3
Leng
th,w
idth
and
thic
knes
sst
ated
.--
----
----
----
----
----
4D
imen
sione
dde
scrip
tion.
1M
etho
dof
impr
egna
tion
orin
ject
ion
stat
ed.
2N
atur
eof
exist
ing
mat
eria
l.3
Nat
ure
ofex
istin
gfin
ishw
here
appl
icab
le.
4Th
ickn
ess
orde
pth
oftr
eatm
ent.
1C
entr
esor
spac
ings
ofdr
illing
hole
s.2
Loca
lised
rem
oval
offin
ishes
.
1W
ork
isde
emed
toin
clud
em
akin
ggo
odho
les
and
finish
eson
com
plet
ion.
2O
vera
llre
mov
alof
finish
espr
ior
toth
isw
ork
wou
ldbe
mea
sure
del
sew
here
.3
The
unit
ofm
easu
rem
ent
shal
lbe
left
toth
edi
scre
tion
ofth
esu
rvey
orbu
tsh
allr
efle
ctth
esiz
ean
dex
tent
ofth
ew
ork.
14In
sert
ing
new
wal
lstie
sm
2
nr1
Size
and
type
ofne
wtie
s.1
Met
hod
ofin
sert
ion.
2N
atur
ean
dth
ickn
ess
ofou
ter
skin
.3
Nat
ure
ofex
istin
gfin
ishw
here
appl
icab
le.
1C
entr
esor
spac
ings
ofdr
illing
hole
s.2
Loca
lised
rem
oval
offin
ishes
.
1W
ork
isde
emed
toin
clud
em
akin
ggo
odho
les
and
finish
eson
com
plet
ion.
2O
vera
llre
mov
alof
finish
espr
ior
toth
isw
ork
wou
ldbe
mea
sure
del
sew
here
.
15Re
-dre
ssin
gex
istin
gfla
shin
gsan
dth
elik
em --
---
nr
1G
irth
and
thic
knes
sst
ated
.--
----
----
----
----
----
2Le
ngth
,wid
than
dth
ickn
ess
stat
ed.
1D
imen
sione
dde
scrip
tion
offla
shin
g.2
Des
crip
tion
ofne
wpr
ofile
.
1Ra
king
out
exist
ing
join
t.2
Repo
intin
gw
ithne
wm
ater
ial:
met
hod
and
type
ofpo
intin
gm
ater
ials
tate
d.
1Th
egi
rths
and
leng
ths
stat
edar
ene
t.N
oal
low
ance
tobe
mad
efo
rad
ditio
nalm
ater
ials
requ
ired
for
labo
urs.
2Re
mov
al,c
lean
ing,
re-s
hapi
ng,t
rimm
ing
and
re-fi
exist
ing
flash
ing
isde
emed
incl
uded
.
TABULATED WORK SECTIONS
128 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
16D
amp-
proo
fco
urse
rene
wal
17D
amp-
proo
fco
urse
inse
rtio
nm
1M
etho
dof
rene
wal
orin
sert
ion
stat
ed.
2N
atur
ean
dth
ickn
ess
ofex
istin
gw
all.
3N
atur
eof
exist
ing
finish
esw
here
appl
icab
le.
4Th
ickn
ess
orde
pth
oftr
eatm
ent.
1C
entr
esor
spac
ings
ofdr
illing
hole
s.2
Loca
lised
rem
oval
offin
ishes
.
1C
hem
ical
.2
Inje
ctio
nm
orta
r.3
Elec
tro
osm
osis.
4O
ther
mec
hani
calm
etho
ds.
1W
ork
isde
emed
toin
clud
em
akin
ggo
odho
les
and
finish
eson
com
plet
ion.
2O
vera
llre
mov
alof
finish
espr
ior
toth
isw
ork
wou
ldbe
mea
sure
del
sew
here
.
18C
lean
ing
surfa
ces
19Re
mov
ing
stai
ns20
Art
ifici
alw
eath
erin
g
m2
----
-m --
---
nr ----
-ite
m
1O
ver
500m
mw
ide.
----
----
----
----
----
--2
Not
exce
edin
g50
0mm
wid
e:w
idth
stat
ed.
----
----
----
----
----
--3
Leng
than
dw
idth
stat
ed.
----
----
----
----
----
--4
Dim
ensio
ned
desc
riptio
n.
1N
atur
eof
surfa
ceto
betr
eate
dst
ated
.2
Requ
ired
finish
edap
pear
ance
.
1Tr
eatm
ent
mat
eria
lsta
ted.
2M
etho
dof
trea
ting
stat
ed.
1Th
eun
itof
mea
sure
men
tsh
allb
ele
ftto
the
disc
retio
nof
the
surv
eyor
.2
Any
repa
iran
dre
med
ialw
orks
requ
ired
toth
esu
rface
prio
rto
trea
tmen
tto
bem
easu
red
sepa
rate
ly.
21Re
nova
ting
m2
----
-m --
---
nr ----
-ite
m
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Wid
than
dth
ickn
ess
stat
ed.
----
----
----
----
----
--3
Leng
th,w
idth
and
thic
knes
sst
ated
.--
----
----
----
----
----
4D
imen
sione
dde
scrip
tion.
1Br
ickw
ork.
2C
oncr
ete.
3St
onew
ork.
4Ti
mbe
r.5
Oth
er:t
ype
stat
ed.
1D
etai
lsan
dna
ture
ofth
ere
nova
tion
stat
ed.
2M
ater
ials
requ
ired
stat
ed.
3M
etho
dof
reno
vatio
nst
ated
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
1Th
eun
itof
mea
sure
men
tsh
allb
ele
ftto
the
disc
retio
nof
the
surv
eyor
but
shal
lref
lect
the
size
and
exte
ntof
the
wor
k.
22C
onse
rvin
gm
2
----
-m --
---
nr ----
-ite
m
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Wid
than
dth
ickn
ess
stat
ed.
----
----
----
----
----
--3
Leng
th,w
idth
and
thic
knes
sst
ated
.--
----
----
----
----
----
4D
imen
sione
dde
scrip
tion.
1Br
ickw
ork.
2C
oncr
ete.
3St
onew
ork.
4Ti
mbe
r.5
Oth
er:t
ype
stat
ed.
1D
etai
lsan
dna
ture
ofth
eco
nser
vatio
nst
ated
.2
Mat
eria
lsre
quire
dst
ated
.3
Met
hod
ofco
nser
vatio
nst
ated
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
1Th
eun
itof
mea
sure
men
tsh
allb
ele
ftto
the
disc
retio
nof
the
surv
eyor
but
shal
lref
lect
the
size
and
exte
ntof
the
wor
k.
4 ALTERATIONS, REPAIRS AND CONSERVATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 129
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
23D
econ
tam
inat
ion
item
1Re
mov
alof
toxi
c/ha
zard
ous
mat
eria
ls.2
Dec
onta
min
atio
nof
exist
ing
prem
ises.
3In
fest
atio
nre
mov
al/e
radi
catio
n.4
Fung
usre
mov
al/e
radi
catio
n.
1Sc
ope
and
loca
tion
ofw
ork.
2Ty
peof
cont
amin
atio
n/in
fest
atio
n/fu
ngus
tobe
trea
ted.
1Pr
epar
ator
yw
orks
.1
Suffi
cien
tin
form
atio
nm
ust
begi
ven
tofu
llyde
scrib
eth
eca
use
ofth
eco
ntam
inat
ion
orin
fest
atio
nto
geth
erw
ithsu
chin
form
atio
nas
isap
prop
riate
toal
low
the
cont
ract
orto
fully
trea
tth
eco
nditi
onde
scrib
ed.
2(E
xclu
ding
deco
ntam
inat
ion
ofex
istin
ggr
ound
:thi
sw
ork
ism
easu
red
inW
ork
Sect
ion
5:Ex
cava
ting
and
Fillin
g.)
24Te
mpo
rary
wor
ksRo
ads.
m2
1Ro
ofs.
2Sc
reen
s.3
Floo
rs.
1W
eath
erpr
oof.
2W
ater
tight
.3
Dus
tpro
of.
4Fi
repr
oof.
5A
nyot
her
requ
irem
ent:
type
stat
ed.
1M
etho
dof
cons
truc
tion
ifno
tat
the
disc
retio
nof
the
cont
ract
or.
2M
aint
aini
ng:d
urat
ion
stat
ed.
3A
dapt
ing
durin
gco
urse
ofw
orks
.4
Cle
arin
gaw
ay.
5D
ispos
ing
ofra
inw
ater
:det
ails
stat
ed.
6Pr
ovid
ing
open
ings
:det
ails
stat
ed.
1In
orde
rto
ensu
reth
efu
llex
tent
and
scop
eof
this
wor
kth
esu
rvey
orm
ayne
edto
prov
ide
addi
tiona
linf
orm
atio
nif
not
read
ilyas
cert
aine
dfro
mth
edr
awin
gs.
25Re
cycl
ing
item
1D
etai
led
desc
riptio
nof
type
ofm
ater
ialt
obe
recy
cled
and
any
limita
tions
impo
sed
byem
ploy
eror
loca
laut
horit
y.
1To
beco
llect
edby
loca
lau
thor
ity.
2To
betr
ansp
orte
dto
recy
clin
gde
pot,
deta
ilsan
dlo
catio
nst
ated
.
TABULATED WORK SECTIONS
130 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
5E
xcav
atin
gan
dfil
ling
Site
clea
ranc
e/pr
epar
atio
nEx
cava
tions
Dis
posa
lFi
lling
sM
embr
anes
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
(s)
show
ing
allm
ajor
exca
vatio
ns.
2Lo
catio
nsof
spoi
lhea
psif
not
left
toth
edi
scre
tion
ofth
eco
ntra
ctor
.3
Exist
ing
site
surv
ey.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Lo
catio
nof
wor
ksin
acco
rdan
cew
ithcl
ause
3.3.
3.1
ofth
eM
easu
rem
ent
Rule
sfo
rBu
ildin
gW
orks
.2
Dat
eof
exist
ing
site
surv
ey.
3G
roun
dco
nditi
ons
incl
udin
gan
ticip
ated
stab
ility
ofex
cava
tions
.4
Gro
und
wat
erle
vel(s
)an
dda
te(s
)es
tabl
ished
.5
Nat
ure
ofan
ykn
own
haza
rdou
sco
ntam
inat
ion
onth
esit
eor
inth
egr
ound
incl
udin
gan
yre
stric
tions
ondi
spos
alof
surfa
ceor
grou
ndw
ater
.6
Star
ting
leve
lof
each
type
ofex
cava
tion.
7Le
vels
ofro
ckw
here
appl
icab
le.
Not
es,c
omm
ents
and
glos
sary
1Q
uant
ities
rela
teon
lyto
the
dept
hsan
ddi
men
sions
show
non
the
draw
ings
and
over
dig
isno
tin
clud
ed.
This
appl
ies
toas
soci
ated
Extr
aov
erite
ms
and
back
fillin
g.
5 EXCAVATING AND FILLING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 131
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
oran
yot
her
docu
men
tsth
atac
com
pany
this
sect
ion
ofm
easu
rem
ent.
1O
rigin
alan
dpr
opos
edgr
ound
leve
ls.2
Any
item
(s)
that
mus
tre
mai
non
site
durin
gth
ew
orks
and
bepr
otec
ted
from
dam
age.
3A
nyite
m(s
)ad
jace
ntto
site
that
may
impa
cton
the
wor
ks.
4D
etai
lsof
tria
lpits
orbo
reho
les
incl
udin
gth
eir
loca
tion.
5D
etai
lsof
live
over
orun
derg
roun
dse
rvic
esin
clud
ing
thei
rlo
catio
n.6
Pile
sizes
and
thei
rlo
catio
nsw
here
appl
icab
le.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1D
ispos
alof
alls
urfa
cew
ater
.2
Supp
ort
tofa
ces
ofex
cava
tion
unle
ssno
tat
the
disc
retio
nof
the
cont
ract
or.
3W
orki
ngsp
ace.
4Ex
cava
tion
and
fillin
gfo
rte
mpo
rary
wor
ksun
less
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.5
Leve
lling,
grad
ing,
trim
min
gan
dco
mpa
ctin
gsu
rface
sex
pose
dby
the
exca
vatio
ns.
6C
urve
dw
ork.
7M
ultip
leha
ndlin
gof
exca
vate
dm
ater
ials
onsit
eun
less
spec
ified
.8
All
exca
vate
dm
ater
iali
sde
emed
tobe
iner
tun
less
desc
ribed
othe
rwise
.
1Th
egr
ound
wat
erle
velm
ust
bere
-est
ablis
hed
atth
etim
eea
chex
cava
tion
isca
rrie
dou
tan
dis
defin
edas
the
post
-con
trac
tgr
ound
wat
erle
vel.
2G
roun
dw
ater
leve
lssu
bjec
tto
perio
dic
chan
ges
due
totid
alor
simila
ref
fect
sar
eto
beso
desc
ribed
givi
ngth
em
ean
high
and
low
wat
erle
vels.
3Th
equ
antit
ies
give
nfo
rex
cava
tion
and
fillin
gar
eth
ebu
lkbe
fore
exca
vatin
gor
the
net
void
tobe
fille
d.N
oal
low
ance
ism
ade
for
subs
eque
ntva
riatio
nsto
bulk
orfo
rth
eex
tra
spac
eta
ken
upby
wor
king
spac
eor
eart
hwor
ksu
ppor
tun
less
the
type
ofba
ckfil
lis
not
left
toth
edi
scre
tion
ofth
eco
ntra
ctor
.Thi
sal
soap
plie
sto
the
quan
titie
sgi
ven
for
any
subs
eque
ntEx
tra
over
item
slis
ted
inRu
le7.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
elim
inar
ysit
ewor
kite
mnr
1Lo
catin
gun
derg
roun
dse
rvic
es.
2Tr
ialp
itsto
loca
teex
istin
gse
rvic
esor
dete
rmin
egr
ound
cond
ition
s.
1M
axim
umde
pth
and
type
ofse
rvic
est
ated
.1
Spec
ified
loca
tion(
s)st
ated
.2
Mea
nsof
loca
ting
serv
ice
ifno
tle
ftto
disc
retio
nof
cont
ract
or.
nr3
Bore
hole
sto
dete
rmin
egr
ound
cond
ition
s.1
Dia
met
er.
2M
axim
umde
pth
stat
ed.
1D
estin
atio
nof
core
sam
ples
stat
ed.
2Ty
pean
dex
tent
ofre
port
requ
ired.
TABULATED WORK SECTIONS
132 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
2Re
mov
ing
tree
s3
Rem
ovin
gtr
eest
umps
nr1
Gir
th50
0mm
to1,
500m
m.
2G
irth
1,50
0to
3,00
0mm
.3
Gir
thov
er3,
000m
m,s
tate
din
1,50
0mm
stag
es.
1Fi
lling
mat
eria
lsta
ted.
1Re
mov
ing
tree
sis
deem
edto
incl
ude
rem
ovin
gth
est
ump
and
root
sun
less
othe
rwise
stat
ed.
2Tr
eegi
rths
are
mea
sure
dat
ahe
ight
of1.
00m
abov
eor
igin
algr
ound
leve
l.3
Stum
pgi
rths
are
mea
sure
dat
the
top.
4Th
isw
ork
isde
emed
toin
clud
e:gr
ubbi
ngup
root
s,di
spos
alof
fsit
eof
allm
ater
iala
risin
g,an
dfil
ling
void
s.
4Si
tecl
eara
nce
m2
1C
lear
site
ofal
lveg
etat
ion
and
othe
rgr
owth
and
disp
ose
off
site.
1D
escr
iptio
nsu
ffici
ent
toid
entif
ysc
ope
and
loca
tion
ofw
ork.
1A
llgr
owth
incl
udes
tree
san
dtr
eest
umps
less
than
500m
mgi
rth,
bush
es,
scru
b,he
dges
and
the
like
unle
sssp
ecifi
cally
desig
nate
dto
rem
ain.
2Th
ere
mov
alof
inva
sive
vege
tatio
nsu
chas
Japa
nese
knot
wee
dor
the
like
shou
ldbe
spec
ifica
llym
entio
ned
inth
ede
scrip
tion.
5Si
tepr
epar
atio
nm
21
Lifti
ngtu
rffo
rpr
eser
vatio
n:th
ickn
ess
stat
ed.
1M
etho
dan
dlo
catio
nof
pres
erva
tion
stat
ed.
m2
2Re
mov
eto
psoi
l:de
pth
stat
ed.
m2
3Re
mov
eha
rdsu
rface
pavi
ng:
thic
knes
sst
ated
.1
Des
tinat
ion
stat
ed.
2Ty
peof
pavi
ngst
ated
.1
Met
hod
ofbr
eaki
ngup
ifno
tle
ftto
disc
retio
nof
cont
ract
or.
1Ex
clud
esan
yha
rdco
rebe
dsbe
low
the
pavi
ngs.
2Re
mov
alof
the
hard
core
istr
eate
das
redu
ced
leve
lexc
avat
ion.
5 EXCAVATING AND FILLING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 133
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5Si
tepr
epar
atio
n—co
nt.
nr4
Rem
ove
spec
ific
item
s.1
Dim
ensio
ned
desc
riptio
nsu
ffici
ent
toid
entif
ysiz
ean
dlo
catio
nof
each
item
.
1A
nyex
istin
gite
ms
onsit
eno
tsp
ecifi
cally
desig
nate
dto
rem
ain
incl
udin
gal
ltyp
esof
rubb
ishsu
chas
aban
done
dca
rs,f
ridge
san
dth
elik
e.2
This
excl
udes
allb
utth
esim
ples
tof
build
ing
stru
ctur
esw
hose
dem
oliti
onis
cove
red
inW
ork
Sect
ion
3:D
emol
ition
s.3
Rem
oval
ofan
yas
soci
ated
foun
datio
ns,
fixin
gs,s
uppo
rts,
fast
enin
gsan
dth
elik
eis
deem
edin
clud
ed.
6Ex
cava
tion,
com
men
cing
leve
lsta
ted
ifno
tor
igin
algr
ound
leve
lm
31
Bulk
exca
vatio
n.1
Not
exce
edin
g2m
deep
.2
Ove
r2m
not
exce
edin
g4m
deep
.3
And
ther
eafte
rin
stag
esof
2m.
1D
etai
lsof
obst
ruct
ions
ingr
ound
tobe
stat
ed.
1Bu
lkex
cava
tion
incl
udes
exca
vatin
gto
redu
cele
vels
orto
form
base
men
ts,
pool
s,po
nds
orth
elik
e.Fo
rcl
arity
each
type
ofex
cava
tion
may
bem
easu
red
and
desc
ribed
sepa
rate
ly.2
Obs
truc
tions
will
bepi
les,
man
hole
san
dth
elik
eth
atm
ust
rem
ain
undi
stur
bed.
m3
2Fo
unda
tion
exca
vatio
n.1
Foun
datio
nex
cava
tion
incl
udes
exca
vatin
gfo
rst
ripan
dpa
dfo
unda
tions
,pile
caps
and
allo
ther
type
sof
foun
datio
ns.
2Fo
rcl
arity
each
type
ofex
cava
tion
may
bem
easu
red
and
desc
ribed
sepa
rate
ly.
TABULATED WORK SECTIONS
134 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
7Ex
tra
over
allt
ypes
ofex
cava
tion
irres
pect
ive
ofde
pth
m3
1Ex
cava
ting
in.
1H
azar
dous
mat
eria
l,de
tails
stat
ed.
2N
on-h
azar
dous
mat
eria
l,de
tails
stat
ed.
3Be
low
grou
ndw
ater
leve
l.4
Inru
nnin
gw
ater
.5
Uns
tabl
egr
ound
.
1H
azar
dous
mat
eria
lsar
ean
ym
ater
ial
that
requ
iresp
ecia
lpre
caut
ions
take
nw
hen
hand
ling,
tran
spor
ting
ordi
spos
ing.
2G
roun
dw
ater
isan
yw
ater
enco
unte
red
belo
wth
ees
tabl
ished
wat
erta
ble
leve
l.It
does
not
incl
ude
wat
erfro
mun
derg
roun
dst
ream
s,br
oken
drai
nsor
culv
erts
orw
ater
arisi
ngfro
msu
rface
flood
ing.
3Ru
nnin
gw
ater
isa
sprin
g,st
ream
orriv
er.
4U
nsta
ble
grou
ndis
runn
ing
silt,
runn
ing
sand
,loo
segr
ound
and
the
like.
m3
2Br
eaki
ngup
.1
Rock
.2
Rein
forc
edco
ncre
te.
3C
oncr
ete.
4M
ason
ryor
ston
ewor
k.
1Ro
ckis
any
hard
mat
eria
lwhi
chis
ofsu
chsiz
eor
loca
tion
that
itca
non
lybe
rem
oved
byth
eus
eof
wed
ges,
rock
ham
mer
s,sp
ecia
lpla
ntor
expl
osiv
es.
2A
boul
der
≤5m
3in
volu
me
oron
eth
atca
nbe
lifte
dou
tin
the
buck
etof
anex
cava
tor
will
not
cons
titut
ero
ck.
3D
egra
ded
orfr
iabl
ero
ckth
atca
nbe
scra
ped
out
byth
eex
cava
tor
buck
etdo
esno
tco
nstit
ute
rock
.4
Trim
min
gex
pose
dfa
ces
ofro
ckis
deem
edin
clud
ed.
5Br
eaki
ngup
hard
surfa
cepa
ving
sis
mea
sure
din
acco
rdan
cew
ithru
le5.
3of
this
sect
ion.
5 EXCAVATING AND FILLING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 135
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
7Ex
tra
over
allt
ypes
ofex
cava
tion
irres
pect
ive
ofde
pth—
cont
.m
3Ex
cava
ting
alon
gsid
eex
istin
gun
derg
roun
dse
rvic
es.
1Ty
pe,s
izean
dde
pth
ofse
rvic
est
ated
.1
Nat
ure
ofpr
ecau
tion
requ
ired.
1Th
ese
item
sar
em
easu
red
whe
reth
ere
isa
risk
ofth
eex
istin
gse
rvic
ebe
ing
affe
cted
byth
eex
cava
tion
proc
ess.
The
met
hod
ofpr
otec
tion
isle
ftto
the
disc
retio
nof
the
cont
ract
or.
2If
indo
ubt
the
surv
eyor
mus
tm
easu
rean
item
givi
ngth
ena
ture
ofth
eliv
ese
rvic
e.
nr4
Exca
vatin
gac
ross
exist
ing
unde
rgro
und
serv
ices
8Su
ppor
tto
face
(s)
ofex
cava
tion
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or
m2
1M
axim
umde
pth
stat
ed.
1Lo
catio
nst
ated
.1
Met
hod
offo
rmin
gsu
ppor
tw
here
not
left
todi
scre
tion
ofth
eco
ntra
ctor
.
1Th
isw
ork
shal
lonl
ybe
mea
sure
dw
here
itha
sbe
ensp
ecifi
cally
spec
ified
inth
eco
ntra
ctdo
cum
ents
orif
the
cont
ract
orha
sbe
enin
stru
cted
byth
eco
ntra
ctad
min
istra
tor
topr
ovid
eth
esu
ppor
tdu
ring
the
cour
seof
the
wor
ks.
9D
ispos
alite
m1
Gro
und
wat
er.
1D
epth
belo
wor
igin
algr
ound
leve
lsta
ted.
2Po
llute
dw
ater
desc
ribed
ifkn
own.
1If
the
post
-con
trac
tw
ater
leve
ldi
ffers
from
the
pre-
cont
ract
leve
lthe
mea
sure
men
tsm
ust
bere
vise
dac
cord
ingl
y.
1Th
em
etho
dan
dpl
ace
ofdi
scha
rge
left
toth
edi
scre
tion
ofth
eco
ntra
ctor
unle
ssst
ated
othe
rwise
.
2Ex
cava
ted
mat
eria
loff
site.
1D
estin
atio
nif
not
atth
eco
ntra
ctor
’sdi
scre
tion.
2H
azar
dous
mat
eria
l.3
Non
-haz
ardo
usm
ater
ialw
here
itre
quire
sto
bedi
spos
edto
asp
ecifi
clo
catio
n.
1Irr
espe
ctiv
eof
whe
reex
cava
ted
mat
eria
lorig
inat
es.
10Re
tain
ing
exca
vate
dm
ater
ialo
nsit
em
31
Top
soil.
2A
llot
her
exca
vate
dm
ater
ial.
1To
tem
pora
rysp
oilh
eaps
.2
Ave
rage
dist
ance
tosp
oilh
eap
stat
ed.
1Sp
ecifi
edha
ndlin
g:de
tails
stat
ed.
1If
the
dist
ance
tosp
oilh
eap
isno
tst
ated
the
loca
tion
isle
ftto
the
disc
retio
nof
the
cont
ract
or.
TABULATED WORK SECTIONS
136 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
11Fi
lling
obta
ined
from
exca
vate
dm
ater
ial
m2
1Fi
nalt
hick
ness
offil
ling
not
exce
edin
g50
0mm
deep
,fin
ished
thic
knes
sst
ated
.
1So
urce
,dist
ance
,des
tinat
ion
and
met
hod
stat
ed.
2M
axim
umor
aver
age
dept
hof
laye
rsst
ated
.
1Tr
eatm
ent
ofm
ater
ialp
rior
tode
posit
ing
infin
allo
catio
n.1
This
incl
udes
tops
oila
ndan
yot
her
mat
eria
laris
ing
from
the
exca
vatio
nsth
atha
vebe
ensp
ecifi
edto
rem
ain
onsit
e.2
The
thic
knes
sst
ated
will
beth
ataf
ter
com
pact
ion.
3D
estin
atio
nsw
illco
mpr
isege
nera
lar
eas
tom
ake
uple
vels,
back
fillin
gfo
unda
tions
,lan
dsca
ping
area
s,pl
ante
rbe
dsan
dth
elik
e.4
Com
pact
ing
laye
rsan
dsu
rface
sar
ede
emed
incl
uded
irres
pect
ive
ofde
pth
and
num
ber
ofla
yers
.5
Sour
cew
illbe
eith
erdi
rect
from
exca
vatio
nsor
from
tem
pora
rysp
oil
heap
s.
m3
2Fi
nalt
hick
ness
offil
ling
exce
edin
g50
0mm
deep
.
12Im
port
edfil
ling
m3
1Bl
indi
ngbe
dno
tex
ceed
ing
50m
mth
ick,
finish
edth
ickn
ess
stat
ed.
1Le
vel,
tofa
lls,c
ross
falls
orca
mbe
rs,s
tate
d.2
Slop
ing
not
exce
edin
g15
°fro
mho
rizon
tal.
3Sl
opin
gov
er15
°fro
mho
rizon
tal.
1D
estin
atio
nst
ated
.Max
imum
orav
erag
ede
pth
ofla
yers
stat
ed.
1A
llty
pes
ofsu
rface
trea
tmen
tsar
ede
emed
incl
uded
.2
The
thic
knes
sst
ated
will
beth
ataf
ter
com
pact
ion.
3C
ompa
ctin
gla
yers
and
surfa
ces
are
deem
edin
clud
edirr
espe
ctiv
eof
dept
han
dnu
mbe
rof
laye
rs.
m3
2Be
dsov
er50
mm
thic
kbu
tno
tex
ceed
ing
500m
mde
ep,
finish
edth
ickn
ess
stat
ed.
m3
3Be
dsex
ceed
ing
500m
mde
ep.
5 EXCAVATING AND FILLING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 137
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
13G
eote
xtile
fabr
ic14
Rado
nba
rrie
r15
Met
hane
barr
ier
16D
amp
proo
fm
embr
ane
17G
roun
dm
ovem
ent
prot
ectio
nbo
ards
18A
nyot
her
fabr
ic,m
embr
ane
orbo
ard:
type
stat
ed19
Gro
und
stab
ilisat
ion
mes
hes
and
the
like,
type
stat
ed
m1
Not
exce
edin
g50
0mm
wid
e,th
ickn
ess
orga
uge
stat
ed.
----
----
----
----
----
--
1H
orizo
ntal
.2
Slop
ing.
3Ve
rtic
al.
1Pr
otec
tive
fleec
esor
boar
ds,
type
stat
ed.
2M
etho
dof
anch
orin
gst
ated
.
1A
lltu
rn-u
ps,t
urnd
owns
,lap
san
djo
ints
deem
edin
clud
ed.
2Fo
rmin
gho
les
deem
edin
clud
ed.
----
-
m2
2O
ver
500m
mw
ide,
thic
knes
sor
gaug
est
ated
.
20C
uttin
gof
fto
psof
pile
sirr
espe
ctiv
eof
leng
thnr
1Si
zest
ated
.1
Cut
ting
off
tops
ofpi
les
isde
emed
toin
clud
epr
epar
atio
nan
din
tegr
atio
nof
rein
forc
emen
tin
topi
leca
por
grou
ndbe
aman
ddi
spos
alof
alld
ebris
.
TABULATED WORK SECTIONS
138 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
6G
roun
dre
med
iati
on
and
soil
stab
ilisa
tio
n
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
(s)
show
ing
loca
tion
ofw
ork(
s).
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1G
roun
dco
nditi
ons.
2G
roun
dw
ater
leve
l(s)
and
date
(s)
esta
blish
ed.
3N
atur
eof
any
know
nno
n-ha
zard
ous
orha
zard
ous
cont
amin
atio
non
the
site
orin
the
grou
nd.
4St
artin
gle
velo
fea
chty
peof
exca
vatio
n.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
oran
yot
her
docu
men
tsth
atac
com
pany
this
sect
ion
ofm
easu
rem
ent.
1O
rigin
alan
dpr
opos
edgr
ound
leve
ls.2
Any
item
(s)
that
mus
tre
mai
non
site
durin
gth
ew
orks
and
bepr
otec
ted
from
dam
age.
3A
nyite
m(s
)ad
jace
ntto
site
that
may
impa
cton
the
wor
ks.
4D
etai
lsof
tria
lpits
orbo
reho
les
incl
udin
gth
eir
loca
tion.
5D
etai
lsof
live
over
orun
derg
roun
dse
rvic
esin
clud
ing
thei
rlo
catio
n.6
Pile
sizes
and
thei
rlo
catio
nsw
here
appl
icab
le.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1D
ispos
alof
fsit
eof
alls
urpl
usex
cava
ted
mat
eria
l.2
Disp
osal
ofal
lsur
face
wat
er.
3Su
ppor
tto
face
sof
exca
vatio
nun
less
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.4
Wor
king
spac
e.5
Exca
vatio
nan
dfil
ling
for
tem
pora
ryw
orks
unle
ssno
tat
the
disc
retio
nof
the
cont
ract
or.
6Le
vellin
g,gr
adin
g,tr
imm
ing
and
com
pact
ing
surfa
ces
expo
sed
byth
eex
cava
tions
.7
Cur
ved
wor
k.8
Mul
tiple
hand
ling
ofex
cava
ted
mat
eria
lson
site
unle
sssp
ecifi
ed.
1Th
egr
ound
wat
erle
velm
ust
bere
-est
ablis
hed
atth
etim
eea
chex
cava
tion
isca
rrie
dou
tan
dis
defin
edas
the
post
-con
trac
tgr
ound
wat
erle
vel.
2G
roun
dw
ater
leve
lssu
bjec
tto
perio
dic
chan
ges
due
totid
alor
simila
ref
fect
sar
eto
beso
desc
ribed
givi
ngth
em
ean
high
and
low
wat
erle
vels.
6 GROUND REMEDIATION AND SOIL STABILISATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 139
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Si
tede
wat
erin
gite
m1
Are
aof
site
tobe
dew
ater
ed.
2M
axim
umde
pth
ofbo
reho
les.
1M
etho
dof
disp
osal
ofw
ater
stat
edif
not
atdi
scre
tion
ofco
ntra
ctor
.
1Pr
e-co
ntra
ctw
ater
leve
l.2
Leve
lto
whi
chgr
ound
wat
erm
ust
belo
wer
edto
and
mai
ntai
ned
at.
1Ea
chty
peof
rem
edia
lwor
ksh
allb
eac
com
pani
edby
afu
llde
scrip
tion
ofth
epr
opos
edw
orks
incl
udin
glim
itson
the
exte
nt,t
hepr
oxim
ityof
adjo
inin
gbu
ildin
g,re
stric
tions
onm
etho
d,se
quen
cean
dtim
ing.
2St
erilis
atio
nm
31
Max
imum
dept
hof
grou
ndto
betr
eate
d.1
Met
hod
ofst
erilis
atio
nst
ated
.
3C
hem
ical
neut
ralis
ing
m3
1M
axim
umde
pth
ofgr
ound
tobe
trea
ted.
1M
etho
dof
neut
ralis
atio
nst
ated
.
4Fr
eezi
ngm
31
Max
imum
dept
hof
grou
ndto
betr
eate
d.1
Met
hod
offre
ezin
gst
ated
.2
Dur
atio
nof
freez
ing
stat
edif
not
left
todi
scre
tion
ofco
ntra
ctor
.
1D
urat
ion
may
best
ated
asa
perio
dof
time
orto
apo
int
with
inth
eco
ntra
ctpr
ogra
mm
esu
chas
‘com
plet
ion
offo
unda
tion
wor
k’.
5G
roun
dga
sve
ntin
gm
21
Type
ofga
sto
beve
nted
.1
Met
hod
ofco
llect
ion
stat
ed.
2M
etho
dof
disp
osal
stat
ed.
6So
ilna
iling
m2
1A
rea
ofsit
eto
betr
eate
d.1
Leng
than
ddi
amet
erof
nails
,de
tails
stat
ed.
2Sp
acin
gof
nails
.3
Met
hod
ofgr
outin
g.
7G
roun
dan
chor
snr
1D
iam
eter
and
leng
thof
bore
hole
.1
Det
ails
stat
ed.
TABULATED WORK SECTIONS
140 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
8Pr
essu
regr
outin
g/gr
ound
perm
eatio
nm
21
Are
aan
dde
pth
ofsit
eto
betr
eate
d.1
Det
ails
stat
ed.
9C
ompa
ctin
gm
21
Are
aof
site
tobe
trea
ted
2W
eigh
tof
com
pact
or1
Det
ails
stat
ed.
10St
abilis
ing
soil
insit
uby
inco
rpor
atin
gce
men
tw
itha
rota
vato
rm
21
Are
aof
site
tobe
trea
ted
2G
ram
s/m
2of
cem
ent.
1D
etai
lsst
ated
.
6 GROUND REMEDIATION AND SOIL STABILISATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 141
7P
iling
Bore
dpi
ling
Dri
ven
pilin
gIn
terl
ocki
ngpi
ling
Vib
ro-c
ompa
cted
ston
epi
ling
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
show
ing
site
boun
dary
and
any
adja
cent
build
ings
orfe
atur
esth
atm
ight
affe
ctor
beaf
fect
edby
the
pilin
g.2
Gen
eral
pilin
gla
yout
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ty
pes
ofpi
les.
2N
atur
eof
the
grou
nd.
3G
roun
dw
ater
leve
l(s)
and
date
(s)
esta
blish
ed.
4C
omm
enci
ngle
vels
from
whi
chw
ork
isex
pect
edto
begi
n.5
Lim
itatio
nson
head
room
.6
Kind
and
qual
ityof
mat
eria
ls.7
Type
sof
test
s.8
Type
ofgr
out.
9D
etai
lsof
com
pact
ion.
Not
es,c
omm
ents
and
glos
sary
1Irr
egul
argr
ound
leve
lsm
ust
best
ated
.2
Feat
ures
that
mig
htaf
fect
pilin
gin
clud
eriv
ers,
cana
ls,tid
alw
ater
s,flo
odar
eas
and
the
like
suffi
cien
tlycl
ose
toth
ew
orks
that
thei
rsit
uatio
nm
ayaf
fect
the
pilin
gpr
oces
s.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Po
sitio
nsof
pile
s.2
Posit
ions
ofex
istin
gbu
ildin
gsad
jace
ntto
the
site.
3Po
sitio
nof
exist
ing
serv
ices
.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1Te
mpo
rary
cont
ainm
ent
ofsp
oil.
2A
nyco
ncre
tepl
aced
inex
cess
ofth
ede
signe
dco
mpl
eted
leng
th.
3Ba
ckfil
ling
empt
ybo
res.
4A
llpr
e-bo
ring.
5Re
-pos
ition
ing
pilin
gpl
ant
durin
gth
ew
orks
6M
aint
aini
ngal
lpilin
gpl
ant.
TABULATED WORK SECTIONS
142 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1In
terlo
ckin
gsh
eet
pile
sm
21
Tota
ldriv
enar
ea,m
axim
umle
ngth
stat
ed.
1Se
ctio
nm
odul
usan
dcr
oss
sect
ion
size,
orse
ctio
nre
fere
nce
stat
ed.
1Re
mov
alto
best
ated
ifno
tle
ftto
disc
retio
nof
cont
ract
or.
1Th
eco
stof
extr
actio
nis
deem
edin
clud
ed.
2Bo
red
pile
s3
Driv
enpi
les
4O
ther
,typ
est
ated
m1
Type
stat
ed.
2N
omin
alsiz
eor
diam
eter
stat
ed.
3To
talb
ored
ordr
iven
leng
th:
max
imum
leng
thst
ated
.4
Tota
lcon
cret
edle
ngth
.5
Tota
lnum
ber.
1C
ontig
uous
/sec
ant
pilin
gsh
all
beso
desc
ribed
.2
Perm
anen
tca
sings
shal
lbe
stat
ed.
3Ra
king
,inc
linat
ion
stat
ed.
1Re
info
rcem
ent
topr
ecas
tco
ncre
tepi
les.
1Le
ngth
sar
em
easu
red
alon
gth
eax
esof
the
pile
sfro
mth
eco
mm
enci
ngle
velt
oth
ebo
ttom
ofth
epi
le.
5V
ibro
-com
pact
edpi
les
m1
Nom
inal
diam
eter
.2
Tota
lnum
ber.
6V
ibro
-com
pact
edtr
ench
fill
m1
Nom
inal
wid
than
dde
pth
stat
ed.
7Ex
tra
over
pilin
gnr
1En
larg
edba
ses.
2En
larg
edhe
ads.
1Ty
peof
pilin
gst
ated
.2
Dia
met
eror
size
ofen
larg
emen
tst
ated
.
1Th
isw
ork
isde
emed
toin
clud
eev
eryt
hing
nece
ssar
yto
form
the
enla
rgem
ent
incl
udin
gdi
spos
alof
addi
tiona
lspo
il.
m3
Pile
exte
nsio
ns.
1To
taln
umbe
rst
ated
.2
Tota
lcon
cret
edle
ngth
.1
Prep
arin
ghe
adof
pile
tore
ceiv
eex
tens
ion
isde
emed
incl
uded
.
8Re
info
rcem
ent
toin
-situ
conc
rete
pile
st
1N
omin
alsiz
ean
dty
peof
bars
stat
ed.
1Re
info
rcem
ent
isde
emed
toin
clud
ety
ing
wire
and
spac
ers
plus
links
and
bind
ers
that
are
inco
rpor
ated
atth
edi
scre
tion
ofth
eco
ntra
ctor
.2
Type
sof
bars
incl
ude
plai
n,de
form
edan
dhe
lical
.
9Br
eaki
ngth
roug
hob
stru
ctio
nshr
1Ri
gst
andi
ng.
1O
nly
mea
sure
dw
here
the
obst
ruct
ion
isen
coun
tere
dab
ove
the
foun
ding
stra
tum
ofth
epi
le.
7 PILING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 143
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
10D
ispos
alof
exca
vate
dm
ater
ials
m3
1O
ffsit
e.2
On
site.
1H
azar
dous
mat
eria
l.2
Non
-haz
ardo
usm
ater
ialw
here
itre
quire
sto
bedi
spos
edto
asp
ecifi
clo
catio
n.3
Des
tinat
ion
ofsp
oili
fno
tat
the
cont
ract
or’s
disc
retio
n.
1Th
evo
lum
eca
lcul
ated
isth
eno
min
alcr
oss
sect
ion
byth
epi
lele
ngth
s.2
The
volu
me
ofen
larg
edhe
ads
and
base
sis
tobe
incl
uded
.
11D
elay
shr
1Ri
gst
andi
ng.
1O
nly
mea
sure
dw
here
spec
ifica
llyin
stru
cted
.2
Dee
med
toin
clud
eal
lass
ocia
ted
labo
ur,p
lant
and
over
head
s.
12Te
sts
nr1
Det
ails
stat
ed.
1Ti
min
gst
ated
.
TABULATED WORK SECTIONS
144 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
8U
nder
pinn
ing
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Loca
tion
draw
ings
.2
Det
aile
dse
ctio
n(s)
.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Lim
itof
leng
thof
wor
kto
beca
rrie
dou
tin
one
oper
atio
n.2
Max
imum
num
ber
ofse
ctio
nsto
beca
rrie
dou
tat
any
one
time.
3G
roun
dco
nditi
ons
incl
udin
gan
ticip
ated
stab
ility
ofex
cava
tions
.4
Gro
und
wat
erle
vel(s
)an
dda
te(s
)es
tabl
ished
.5
Nat
ure
ofan
ykn
own
haza
rdou
sco
ntam
inat
ion
onth
esit
eor
inth
egr
ound
.6
Star
ting
leve
lof
each
type
ofex
cava
tion.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Ex
tent
and
met
hod
ofw
ork.
2D
etai
lsof
exist
ing
stru
ctur
eto
beun
derp
inne
d.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1Te
mpo
rary
supp
ort
ofex
istin
gst
ruct
ures
.2
Exca
vatio
nan
ddi
spos
al.
3Ea
rthw
ork
supp
ort.
4Pr
elim
inar
ytr
ench
ing.
5A
llw
orki
ngsp
ace.
6D
ispos
alof
grou
ndan
dsu
rface
wat
er.
7C
uttin
gaw
ayex
istin
gfo
unda
tions
and
foot
ings
and
disp
osal
.8
Prep
arin
gth
eun
ders
ide
ofex
istin
gw
ork.
9Ba
ckfil
ling.
10Su
rface
trea
tmen
ts.
11A
llne
ww
ork
asso
ciat
edw
ithth
epr
oces
sof
unde
rpin
ning
.12
All
mak
ing
good
ifsp
ecifi
ed.
1If
the
wor
kof
unde
rpin
ning
isex
tens
ive
the
vario
usel
emen
tsof
this
wor
km
aybe
mea
sure
dse
para
tely
inac
cord
ance
with
the
rule
sof
the
rele
vant
trad
esor
Wor
kSe
ctio
ns,
stat
ing
that
the
wor
kis
‘inun
derp
inni
ng’.
8 UNDERPINNING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 145
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1U
nder
pinn
ing
m m nr
1Fo
unda
tions
.2
Wal
ls.3
Base
s.
1Br
ief
desc
riptio
nof
wor
kst
atin
gde
pth,
max
imum
wid
than
dm
etho
dof
unde
rpin
ning
.2
Cur
ved
wor
k.
1M
etho
d,if
not
left
todi
scre
tion
ofco
ntra
ctor
,may
begi
ven
byre
fere
nce
todr
awin
g(s)
.
Inth
eev
ent
that
the
unde
rpin
ning
isof
such
anex
tent
that
itca
nno
tea
sily
bem
easu
red
inac
cord
ance
with
thes
eru
les
the
wor
kssh
allb
em
easu
red
inde
tail
inac
cord
ance
with
the
rule
sfo
rth
ere
leva
nttr
ades
requ
ired
.In
this
case
the
wor
ksh
allb
ede
scri
bed
as‘In
wor
ksof
unde
rpin
ning
’.
2C
oncr
ete
m3
1M
easu
red
inac
cord
ance
with
the
rule
sof
the
appr
opria
tetr
ade
orW
ork
Sect
ion
stat
ing
that
the
wor
kis
‘inun
derp
inni
ng’.
3Fo
rmw
ork
m2
4Re
info
rcem
ent
t
5Br
ickw
ork
orbl
ockw
ork
m2
6Ta
nkin
gm
2
TABULATED WORK SECTIONS
146 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
9D
iaph
ragm
wal
lsan
dem
bedd
edre
tain
ing
wal
ls
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Loca
tion
draw
ings
.2
Site
plan
ssh
owin
gsit
ebo
unda
ryan
dan
yad
jace
ntbu
ildin
gsor
feat
ures
that
mig
htaf
fect
orbe
affe
cted
byth
eco
nstr
uctio
nof
the
diap
hrag
mw
alls.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Li
mit
ofle
ngth
ofw
ork
tobe
carr
ied
out
inon
eop
erat
ion.
2M
axim
umnu
mbe
rof
sect
ions
tobe
carr
ied
out
atan
yon
etim
e.3
Gro
und
cond
ition
sin
clud
ing
antic
ipat
edst
abilit
yof
exca
vatio
ns4
Gro
und
wat
erle
vel(s
)an
dda
te(s
)es
tabl
ished
.5
Nat
ure
ofan
ykn
own
haza
rdou
sco
ntam
inat
ion
onth
esit
eor
inth
egr
ound
.6
Star
ting
leve
lof
each
exca
vatio
n.
Not
es,c
omm
ents
and
glos
sary
1Irr
egul
argr
ound
shal
lbe
sode
scrib
ed.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Ex
tent
ofw
ork.
1W
orks
and
mat
eria
lsde
emed
incl
uded
.1
Exca
vatio
nan
ddi
spos
al.
2Ea
rthw
ork
supp
ort.
3Pr
elim
inar
ytr
ench
ing.
4A
llw
orki
ngsp
ace.
5D
ispos
alof
grou
ndan
dsu
rface
wat
er.
6Ba
ckfil
ling.
7Su
rface
trea
tmen
ts.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1W
alls,
thic
knes
sst
ated
m2
1C
omm
enci
ngle
vels
ofex
cava
tion.
2M
axim
umde
pth
ofex
cava
tion.
3Fi
nish
edto
ple
velo
fco
ncre
teif
diffe
rent
from
com
men
cing
leve
lof
exca
vatio
n.
1D
etai
lsan
dm
etho
dof
cons
truc
tion
stat
ed.
2Ty
peof
conc
rete
.3
Det
ails
ofre
info
rcem
ent.
1D
etai
lsof
supp
ort
fluid
.
9 DIAPHRAGM WALLS AND EMBEDDED RETAINING WALLS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 147
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
2Ex
tra
over
exca
vatio
nan
ddi
spos
alm
31
Brea
king
out
hard
mat
eria
ls.2
Exca
vatin
gin
haza
rdou
sm
ater
ial.
m2
3Br
eaki
ngup
hard
surfa
cepa
ving
s,th
ickn
ess
stat
ed.
3Jo
ints
m1
Dim
ensio
ned
desc
riptio
n.1
Met
hod
offo
rmin
g.1
Vert
ical
.2
Hor
izont
al.
3Ra
king
.4
Cur
ved:
radi
usst
ated
.
4Tr
imm
ing
and
clea
ning
expo
sed
face
sm
21
Det
ails
stat
ed.
5D
elay
shr
1A
utho
rised
stan
ding
time.
1O
nly
mea
sure
dw
here
spec
ifica
llyin
stru
cted
.2
Dee
med
toin
clud
eal
lass
ocia
ted
labo
ur,p
lant
and
over
head
s.
6Te
sts
item
1D
etai
lsst
ated
.
TABULATED WORK SECTIONS
148 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
10C
rib
wal
ls,g
abio
nsan
dre
info
rced
eart
h
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
ssh
owin
gsc
ope
and
loca
tion
ofea
chty
peof
wor
k.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
and
qual
ityof
mat
eria
ls.N
otes
,com
men
tsan
dgl
ossa
ry
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1O
rigin
algr
ound
leve
ls.2
Fini
shed
grou
ndle
vels.
3C
ondi
tion
ofgr
ound
.
1W
orks
and
mat
eria
lsde
emed
incl
uded
.1
Fina
lexc
avat
ion
asso
ciat
edw
ithea
chin
stal
latio
n.2
Disp
osal
ofan
yex
cava
ted
mat
eria
linc
ludi
ngha
zard
ous
mat
eria
l.3
Eart
hwor
ksu
ppor
t.4
Prep
arin
gsu
rface
sto
rece
ive
each
inst
alla
tion.
5D
ispos
alof
surfa
cew
ater
.
1Fi
nale
xcav
atio
nm
eans
any
min
ortr
imm
ing
ofea
rth
surfa
ces
requ
ired
durin
gea
chin
stal
latio
n.A
llre
duce
dle
vela
ndfo
unda
tion
exca
vatio
ns,
foun
datio
nsan
dba
ckfil
lare
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofW
ork
Sect
ion
5:Ex
cava
ting
and
fillin
g.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
ribw
alls
m2
1Th
ickn
ess
stat
ed.
1Ve
rtic
al.
2Ba
tter
ing.
3C
urve
don
plan
:rad
ius
stat
ed.
1A
rea
ism
easu
red
onfro
ntfa
ce.
2N
ode
duct
ions
mad
efo
rvo
ids
≤1.
00m
2.
3D
owel
s,pi
ns,g
ranu
lar
infil
l,co
mpa
ctin
gfil
l,sp
ecia
luni
ts,p
rovi
ding
man
ufac
ture
rsce
rtifi
cate
s,bu
ildin
gin
pipe
san
dfo
rmin
gop
enin
gs≤
1.00
m2
deem
edin
clud
ed.
2Ex
tra
for
m1
Ends
.2
Cor
ners
irres
pect
ive
ofan
gle.
3G
abio
nba
sket
wal
lsm
21
Bask
etsiz
est
ated
.2
Gau
geof
bask
etw
irest
ated
.3
Wid
thof
the
base
ofth
ew
all.
1Ve
rtic
al.
2Ba
tter
ing:
rate
stat
ed.
3Sl
opin
g.4
Cur
ved
onpl
an:r
adiu
sst
ated
.5
Step
ped
onfa
ce.
1Ty
peof
fillt
oba
sket
sde
scrib
ed.
2Sp
ecifi
edtr
eatm
ent
ofba
sket
filld
escr
ibed
.3
Spec
ified
hand
ling
deta
ilsst
ated
.
1A
rea
ism
easu
red
onfro
ntfa
ce.
2G
abio
nba
sket
sar
ede
emed
toin
clud
eas
sem
blin
g,ty
ing,
fixin
g,br
acin
gan
dty
ing
lids.
3Fi
lling
isde
emed
toin
clud
eco
mpa
ctio
nan
dov
erfil
ling
offil
lm
ater
ial.
10 CRIB WALLS, GABIONS AND REINFORCED EARTH
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 149
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4Ea
rth
rein
forc
emen
tm
21
Mes
h.2
Fabr
ic.
1H
orizo
ntal
.2
Slop
ing.
3C
urve
don
plan
:rad
ius
stat
ed.
1M
etho
dof
anch
orin
gst
ated
.2
Min
imum
laps
stat
ed.
3Fi
nalf
acin
g,de
tails
stat
ed.
1A
rea
mea
sure
din
cont
act
with
base
and
excl
udes
laps
.2
Ass
embl
ing,
tyin
g,fix
ing,
stac
king
and
tens
ioni
ngde
emed
incl
uded
.3
No
dedu
ctio
nsm
ade
for
void
s≤
1.00
m2.
TABULATED WORK SECTIONS
150 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
11In
-sit
uco
ncre
tew
ork
sIn
-situ
conc
rete
Surf
ace
finis
hes
toin
-situ
conc
rete
Form
wor
kR
einf
orce
men
tD
esig
ned
join
tsin
in-s
ituco
ncre
teA
cces
sori
esca
stin
toin
-situ
conc
rete
In-s
ituco
ncre
tesu
ndri
es
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Gen
eral
arra
ngem
ent
draw
ings
.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
,qua
lity
and
size
ofm
ater
ials.
2D
etai
lsof
test
sof
mat
eria
ls.3
Det
ails
ofte
sts
offin
ished
wor
k.4
Lim
itatio
nson
met
hod,
sequ
ence
,sp
eed
orsiz
eof
pour
ing.
5M
etho
dof
com
pact
ion.
6M
etho
dof
curin
g.7
Det
ails
ofw
ater
tight
ness
.
Not
es,c
omm
ents
and
glos
sary
1W
ork
insu
bstr
uctu
res,
supe
rstr
uctu
res
orex
tern
alw
orks
tobe
stat
edin
head
ings
orde
scrip
tions
.2
Wat
ertig
htw
ork
shal
lbe
sode
scrib
ed.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Re
lativ
epo
sitio
nof
allm
embe
rs.
2Th
esiz
eof
mem
bers
.3
The
thic
knes
sof
slabs
.4
The
perm
issib
lelo
ads
inre
latio
nto
cast
ing
times
.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1C
oncr
ete
volu
me
ism
easu
red
net.
2N
oal
low
ance
invo
lum
eto
bem
ade
for
defle
ctio
nof
form
wor
k.3
Ded
uctio
nsar
eno
tm
ade
for
rein
forc
emen
t,st
eels
ectio
ns,c
ast-
inac
cess
orie
s,vo
ids
≤0.
05m
3ex
cept
void
sin
trou
ghed
and
coffe
red
slabs
.4
Con
cret
eis
deem
edca
stin
tofo
rmw
ork
unle
ssot
herw
isede
scrib
ed.
5C
oncr
ete
isde
emed
finish
edas
stru
ckfro
mba
sicfin
ishfo
rmw
ork.
6A
llto
psu
rface
san
dso
ffits
are
deem
edto
finish
horiz
onta
lunl
ess
othe
rwise
stat
ed.
7A
llto
psu
rface
sar
ede
emed
finish
edta
mpe
d.
1Th
isap
plie
sto
conc
rete
laid
onrib
bed
met
alde
ckin
gas
wel
las
othe
rty
pes
offo
rmw
ork.
11 IN-SITU CONCRETE WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 151
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Plai
nin
-situ
conc
rete
Rei
nfor
ced
in-s
ituco
ncre
teFi
bre
rein
forc
edin
-situ
conc
rete
Spra
yed
in-s
ituco
ncre
te
1M
ass
conc
rete
m3
1A
nyth
ickn
ess.
1In
fillin
gvo
ids.
2In
tren
chfil
ling.
3In
any
othe
rsit
uatio
n:de
tails
stat
ed.
1Po
ured
onor
agai
nst
eart
hor
unbl
inde
dha
rdco
re.
1M
ass
conc
rete
isan
yun
rein
forc
edbu
lkco
ncre
teno
tm
easu
red
else
whe
re.
2Th
evo
lum
esof
each
type
ofm
ass
conc
rete
wor
km
aybe
aggr
egat
edor
give
nse
para
tely.
2H
orizo
ntal
wor
km
31
≤30
0th
ick.
2>
300
thic
k.1
Inbl
indi
ng.
2In
stru
ctur
es.
1Po
ured
onor
agai
nst
eart
hor
unbl
inde
dha
rdco
re.
2Re
info
rced
>5%
.
1H
orizo
ntal
wor
kin
clud
esbl
indi
ng,
beds
,fou
ndat
ions
,pile
caps
,col
umn
base
s,gr
ound
beam
s,sla
bs,c
offe
red
and
trou
ghed
slabs
,lan
ding
s,be
ams,
atta
ched
beam
s,be
amca
sings
,she
arhe
ads,
upst
ands
who
sehe
ight
is≤
than
thre
etim
esth
eir
wid
th,k
erbs
,cop
ings
.2
The
volu
mes
ofea
chty
peof
horiz
onta
lwor
km
aybe
aggr
egat
edor
give
nse
para
tely.
3W
ork
laid
inba
yssh
allb
eso
desc
ribed
givi
ngav
erag
ear
eaof
bays
.
3Sl
opin
gw
ork
≤15
°4
Slop
ing
wor
k>
15°
m3
1≤
300
thic
k.2
>30
0th
ick.
1In
blin
ding
.2
Inst
ruct
ures
.3
Inst
airc
ases
.
1Po
ured
onor
agai
nst
eart
hor
unbl
inde
dha
rdco
re.
2Re
info
rced
>5%
.
1Sl
opin
gw
ork
incl
udes
blin
ding
,bed
s,sla
bs,s
teps
and
stai
rcas
es,k
erbs
,co
ping
s.2
Incl
udes
any
atta
ched
beam
s,up
stan
ds,
shea
rhe
ads
orsim
ilar.
3Th
evo
lum
esof
each
type
ofslo
ping
wor
km
aybe
aggr
egat
edor
give
nse
para
tely.
4W
ork
laid
inba
yssh
allb
eso
desc
ribed
givi
ngav
erag
ear
eaof
bays
.
TABULATED WORK SECTIONS
152 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5Ve
rtic
alw
ork
m3
1≤
300
thic
k.2
>30
0th
ick.
1In
stru
ctur
es.
2Re
info
rced
>5%
.1
Vert
ical
wor
kin
clud
esco
lum
ns,
atta
ched
colu
mns
,col
umn
casin
gs,
wal
ls,re
tain
ing
wal
ls,fil
ling
toho
llow
wal
ls,pa
rape
tsor
upst
and
beam
sw
here
heig
htis
grea
ter
than
thre
etim
esth
ew
idth
.2
The
volu
mes
ofea
chty
peof
vert
ical
wor
km
aybe
aggr
egat
edor
give
nse
para
tely.
6Su
ndry
in-s
ituco
ncre
tew
ork
m m3
1W
ork
≤30
0w
ide
orth
ick.
2W
ork
>30
0w
ide
orth
ick.
1H
orizo
ntal
.2
Slop
ing.
3Ve
rtic
al.
4Re
info
rced
>5%
.1
Incl
udes
wor
ksu
chas
back
sills,
mac
hine
and
plan
tba
ses
and
the
like.
7Sp
raye
din
-situ
conc
rete
m2
1Th
ickn
ess
stat
ed.
1Sl
abs.
1To
ps.
2So
ffits
.3
Cur
ved.
1Th
em
etho
dof
appl
icat
ion
and
finish
tobe
stat
edin
the
desc
riptio
n.
2W
alls.
3Be
ams.
4C
olum
ns.
1C
urve
d.
Surf
ace
finis
hes
toin
-situ
conc
rete
8Tr
owel
ling
9Po
wer
float
ing
10H
acki
ng11
Grin
ding
12A
nyot
her
surfa
cetr
eatm
ent
not
left
todi
scre
tion
ofth
eco
ntra
ctor
m2
1To
top
surfa
ces.
2To
face
s.3
Toso
ffits
.
1Sl
opin
g.2
Falls
.3
Cro
ssfa
lls.
1A
pplic
atio
nof
surfa
ceha
rden
ers,
seal
ers,
dust
proo
fers
,wat
erpr
oofe
rs,
carb
orun
dum
grai
nsor
the
like
shal
lbe
sode
scrib
ed.
11 IN-SITU CONCRETE WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 153
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Form
wor
k1
Plai
nfo
rmw
ork.
2Sp
ecia
lfin
ishfo
rmw
ork.
1Pl
ain
finish
shal
lbe
left
todi
scre
tion
ofth
eco
ntra
ctor
.2
Spec
ialf
inish
essh
allb
ede
scrib
ed.
3C
urve
dw
ork
shal
lbe
desc
ribed
stat
ing
the
radi
i.4
Perm
anen
tfo
rmw
ork
orfo
rmw
ork
left
insh
allb
eso
desc
ribed
.5
Void
form
ers
shal
lbe
sode
scrib
ed.
6N
ode
duct
ions
shal
lbe
mad
efo
rvo
ids
≤5.
00m
2
7A
llki
cker
sex
cept
tow
alls
shal
lbe
deem
edin
clud
ed.
8To
pfo
rmw
ork
ism
easu
red
for
slopi
ngsu
rface
sth
atar
e>
15°
orw
here
othe
rwise
spec
ifica
llyre
quire
d.9
All
squa
re,r
akin
gan
dcu
rved
cutt
ing
deem
edin
clud
ed.
10A
llho
les,
boxi
ngs,
rece
sses
,reb
ates
,ch
amfe
rs,n
ibs,
chan
nels
and
the
like
are
deem
edin
clud
ed.
13Si
des
offo
unda
tions
and
base
s14
Edge
sof
horiz
onta
lwor
km m
2
1≤
500
high
:wid
thst
ated
.2
>50
0hi
gh.
15So
ffits
ofho
rizon
talw
ork
16So
ffits
oftr
ough
edor
waf
fled
horiz
onta
lwor
k,de
tails
desc
ribed
m2
1Fo
rco
ncre
te≤
300
thic
k.2
For
conc
rete
300
to45
0th
ick.
3Fo
rco
ncre
te>
450
thic
k.
1Pr
oppi
ng≤
3mhi
gh.
2Pr
oppi
ngov
er3m
but
not
exce
edin
g4.
5mhi
gh.
3A
ndth
erea
fter
in1.
5mst
ages
.
1In
clud
essu
spen
ded
slabs
and
stai
rla
ndin
gs.
2Th
roug
hpr
oppi
ngto
bede
scrib
edif
not
left
todi
scre
tion
ofco
ntra
ctor
.
17Si
des
and
soffi
tsof
isola
ted
beam
s18
Side
san
dso
ffits
ofat
tach
edbe
ams
19Si
des
ofup
stan
dbe
ams
20Si
des
ofiso
late
dco
lum
ns,n
rst
ated
21Si
des
ofat
tach
edco
lum
ns
m2
1Re
gula
r:sh
ape
stat
ed.
2Irr
egul
arsh
aped
,dim
ensio
ned
desc
riptio
nor
diag
ram
.
1Sh
ape
isde
emed
regu
lar
unle
ssde
scrib
edas
othe
rwise
.2
Irreg
ular
shap
eis
any
shap
eot
her
than
squa
reor
rect
angu
lar.
3In
clud
esco
ncre
teca
sings
tost
eel
beam
san
dco
lum
ns.
TABULATED WORK SECTIONS
154 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
22Fa
ces
ofw
alls
and
othe
rve
rtic
alw
ork
m2
1Ve
rtic
al.
2Ba
tter
edon
efa
ce.
3Ba
tter
edbo
thfa
ces.
1Ra
teof
batt
erto
best
ated
.1
Wor
kto
singl
esid
essh
allb
eso
desc
ribed
.
23Ex
tra
over
nr1
Ope
ning
sfo
rdo
ors
orth
elik
e:th
ickn
ess
ofw
alls
tate
d.1
≤5.
00m
2.
25.
00m
2to
10.0
0m2.
3>
10.0
0m2.
1A
llad
ditio
nall
abou
ran
dm
ater
ial
need
edto
form
the
open
ing
isde
emed
incl
uded
.
24W
alle
nds,
soffi
tsan
dst
eps
inw
alls
m m2
1≤
500
wid
e,w
idth
stat
ed.
2>
500
wid
e.1
Excl
udes
ends
and
soffi
tsof
wal
lscr
eate
dby
the
form
atio
nof
anop
enin
g.Th
ese
are
deem
edin
clud
edin
the
item
for
form
ing
the
open
ing.
25So
ffits
ofslo
ping
wor
km
21
Slop
ing
one
way
.2
Slop
ing
two
way
s.1
This
incl
udes
wor
kto
soffi
tsof
slabs
,ra
mps
,ste
ps,s
tairc
ases
and
the
like.
26St
airc
ase
strin
gsan
dth
elik
em
1M
axim
umw
idth
stat
ed.
27St
airc
ase
riser
san
dth
elik
em
1Ve
rtic
al:w
idth
stat
ed.
2U
nder
cut:
wid
thst
ated
.
28Sl
opin
gto
psu
rface
sm
21
≤15
°.2
>15
°.
29St
eps
into
psu
rface
s30
Step
sin
soffi
tsm
1≤
500
high
:wid
thst
ated
.2
>50
0hi
gh.
31C
ompl
exsh
apes
nr1
Dim
ensio
ned
desc
riptio
nor
diag
ram
.1
Prop
ping
≤3m
high
.2
Prop
ping
over
3mbu
tno
tex
ceed
ing
4.5m
high
.3
And
ther
eafte
rin
1.5m
stag
es.
32W
allk
icke
rsm
1Pl
ain.
2Su
spen
ded.
1Le
ngth
ism
easu
red
alon
gce
ntre
line
and
isde
emed
toin
clud
ebo
thsid
es.
11 IN-SITU CONCRETE WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 155
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Rei
nfor
cem
ent
33M
ildst
eelb
ars
34H
igh
yiel
dst
eelb
ars
t1
Nom
inal
size
stat
ed.
1St
raig
ht.
2Be
nt.
3C
urve
d.4
Link
s.
1Ba
rsex
ceed
ing
12m
long
:le
ngth
stat
ed.
2D
efor
med
.3
Bend
ing
rest
rictio
ns
1Fo
rmin
gho
oks,
tyin
gw
ire,s
pace
rs,
cutt
ing,
and
bend
ing
isde
emed
incl
uded
.2
Cha
irsan
dco
nnec
tors
are
deem
edin
clud
edun
less
not
atdi
scre
tion
ofco
ntra
ctor
.
35A
cces
sorie
sno
tat
the
disc
retio
nof
the
cont
ract
ornr
1N
omin
alsiz
est
ated
.1
Cha
irsor
stoo
ls.2
Con
nect
ors.
36Pr
e/Po
st-t
ensio
ned
mem
bers
nr1
Dim
ensio
ned
desc
riptio
n.2
Nom
inal
size
stat
ed.
3M
etho
dof
tens
ioni
ngst
ated
.
1C
ompo
site
cons
truc
tion
desc
ribed
.1
Slee
ves,
tend
ons,
fittin
gsan
dgr
outin
gde
scrib
ed.
1Po
st-t
ensio
ning
ism
easu
red
byth
enu
mbe
rof
tend
ons
inid
entic
alm
embe
rs.
37M
esh
m2
1W
eigh
tpe
rm
2st
ated
.2
Fabr
icre
fere
nce
stat
ed3
Min
imum
laps
stat
ed.
1Be
nt.
2St
rips
inon
ew
idth
,wid
thst
ated
.
1La
ps,t
ying
wire
s,al
lcut
ting,
bend
ing,
spac
ers,
stoo
ls,ch
airs
and
othe
rsu
ppor
tsde
emed
incl
uded
.2
Void
s≤
1.00
m2
inar
eano
tde
duct
ed.
3Be
ntfa
bric
isde
emed
toin
clud
efa
bric
that
isw
rapp
edar
ound
stee
lm
embe
rs.
TABULATED WORK SECTIONS
156 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Des
igne
djo
ints
inin
-situ
conc
rete
1Jo
ints
loca
ted
atth
edi
scre
tion
ofth
eco
ntra
ctor
are
not
mea
sure
d.2
Det
ails
ofpr
imer
s,cl
eane
rs,f
illers
,w
ater
stop
s,ba
ckin
gst
rips,
rein
forc
emen
t,tie
s,se
alan
ts,t
hem
etho
dof
appl
icat
ion,
prep
arat
ion
and
the
like
shal
lbe
stat
edin
the
desc
riptio
n.
38Pl
ain
39Fo
rmed
40C
ut
m1
Dim
ensio
ned
desc
riptio
n.2
tota
ldep
thst
ated
.1
Hor
izont
al.
2Ve
rtic
al.
3C
urve
d,ra
dius
stat
ed.
1Pl
ain
join
tsar
eth
ose
that
dono
tre
quire
form
wor
k.2
Form
edjo
ints
are
deem
edto
incl
ude
form
wor
k.3
All
prep
arat
ion,
clea
ners
,prim
ers
and
seal
ers
are
deem
edin
clud
ed.
4A
llan
gles
,end
s,in
ters
ectio
nsar
ede
emed
incl
uded
whe
ther
they
are
form
ed,w
elde
dor
purp
ose
mad
e.
Acc
esso
ries
cast
into
in-s
ituco
ncre
te1
Kind
,qua
lity
ofm
ater
ials
and
size
orm
anuf
actu
rers
refe
renc
esh
allb
est
ated
.
41Ty
peor
prop
rieta
ryre
fere
nce
stat
edm
2
----
-m --
---
nr
1D
imen
sione
dde
scrip
tion.
1If
linea
ror
supe
rfici
alqu
antit
ies
are
used
the
desc
riptio
nm
ust
incl
ude
any
appr
opria
tesp
acin
gdi
men
sions
.
1C
ast-
inac
cess
orie
sin
clud
ean
chor
bolts
,anc
hor
boxe
s,fix
ing
bolts
,do
wel
s,co
lum
ngu
ards
,iso
late
dgl
ass
bloc
ksan
dan
yot
her
anci
llary
item
that
issp
ecifi
edto
beca
stin
asth
eco
ncre
tew
ork
proc
eeds
.2
Cas
t-in
acce
ssor
ies
excl
ude
rein
forc
emen
t,ty
ing
wire
,dist
ance
bloc
ks,s
pace
rs,c
hairs
,str
uctu
rals
teel
mem
bers
,hol
low
bloc
ks,f
iller
bloc
ks,
void
form
ers,
perm
anen
tfo
rmw
ork,
join
ts,a
llco
mpo
nent
sar
ound
whi
chco
ncre
teis
cast
but
whi
char
eno
tfix
edin
posit
ion
byth
eco
ntra
ctor
.
11 IN-SITU CONCRETE WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 157
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
In-s
ituco
ncre
tesu
ndri
es
42G
rout
ing
nr1
Dim
ensio
ned
desc
riptio
n.1
Stan
chio
nba
ses.
2G
rilla
ges.
1Fo
rmw
ork
orot
her
tem
pora
rym
eans
ofsu
ppor
tto
expo
sed
edge
san
dth
elik
eis
deem
edin
clud
ed.
43Fi
lling
mor
tices
orho
les
nr
44Fi
lling
chas
esm
TABULATED WORK SECTIONS
158 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
12P
reca
st/c
om
posi
teco
ncre
tePr
ecas
t/co
mpo
site
conc
rete
wal
ls,p
artit
ions
and
pane
lsPr
ecas
t/co
mpo
site
conc
rete
deck
ing
and
floor
ing
Oth
erpr
ecas
t/co
mpo
site
conc
rete
wor
k
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Gen
eral
arra
ngem
ent
draw
ings
.2
Spec
ific
draw
ings
orde
tails
rela
ting
topr
ecas
tw
orks
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials.
2Si
zes
and
spac
ing
ofpl
anks
and
bloc
ks.
3Ki
nd,q
ualit
yan
dm
ixof
conc
rete
.4
Met
hods
ofco
mpa
ctio
nan
dcu
ring.
5Be
ddin
gan
dfix
ing.
6Su
rface
finish
es.
7Ki
ndan
dqu
ality
ofre
info
rcem
ent
orpr
e/po
st-t
ensio
ning
,spa
cing
and
stre
sses
.8
Fini
shof
expo
sed
surfa
ces.
9D
etai
lsof
test
sof
mat
eria
ls.10
Det
ails
ofte
sts
offin
ished
wor
k.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Th
ere
lativ
epo
sitio
nof
conc
rete
mem
bers
.2
Size
ofm
embe
rs.
3Th
ickn
ess
ofsla
bsan
dpa
nels.
4Pe
rmiss
ible
load
s.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1M
ould
san
dfo
rmw
ork.
2Re
info
rcem
ent.
3Be
ddin
g.4
Fixi
ngs.
5Te
mpo
rary
supp
ort.
6C
ast-
inac
cess
orie
s.7
Pre-
tens
ioni
ngor
pre-
stre
ssin
g.8
Fille
den
ds.
9A
llgr
outin
g.10
Mar
gins
≤50
0mm
wid
e.
12 PRECAST/COMPOSITE CONCRETE
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 159
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
ompo
site
conc
rete
wor
km
21
Nat
ure
ofw
ork
desc
ribed
.2
Com
posit
ion
ofw
ork
desc
ribed
.3
Thic
knes
sst
ated
.
1H
orizo
ntal
.2
Slop
ing
≤15
°.3
Slop
ing
>15
°.4
Vert
ical
.
1Re
info
rcem
ent:
deta
ilsst
ated
.2
Post
-ten
sioni
ng:n
umbe
rof
tend
ons
and
deta
ilsst
ated
.3
Cas
t-in
acce
ssor
ies:
deta
ilsst
ated
.
1W
illap
ply
topa
nels,
slabs
,wal
ls,pa
rtiti
ons,
deck
ing.
2Th
eth
ickn
ess
stat
edis
the
com
bine
dth
ickn
ess
ofbo
thpr
ecas
tan
din
-situ
wor
k.3
Mar
gins
grea
ter
than
500m
mw
ide
are
mea
sure
das
ordi
nary
in-s
ituco
ncre
tesla
bs.
4N
ode
duct
ion
ism
ade
for
void
s≤
1.00
m2.
2D
esig
ned
join
tsm
1D
imen
sione
dde
scrip
tion.
1Ty
pean
dsiz
esof
fillin
gan
dse
alan
tst
ated
.1
Join
tsfo
rmed
atth
edi
scre
tion
ofth
eco
ntra
ctor
are
not
mea
sure
d.
3H
oldi
ngdo
wn
ortie
stra
psnr
1D
imen
sione
dde
scrip
tion
orpr
oprie
tary
refe
renc
enu
mbe
r.1
Mat
eria
ltyp
est
ated
.2
Prot
ectiv
eco
atin
gst
ated
.1
Met
hod
offix
ing.
TABULATED WORK SECTIONS
160 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
13P
reca
stco
ncre
te
Prec
ast
conc
rete
fram
est
ruct
ures
Prec
ast
conc
rete
sills
,lin
tels
,cop
ings
and
othe
run
itsPr
ecas
tco
ncre
tepa
nelc
ladd
ing
Prec
ast
conc
rete
slab
sPr
ecas
tco
ncre
tew
alls
and
part
ition
sPr
ecas
tco
ncre
tede
ckin
gPr
ecas
tco
ncre
tero
oflig
hts
and
pave
men
tlig
hts
Prec
ast
com
posi
teco
ncre
tew
ork
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Gen
eral
arra
ngem
ent
draw
ings
.2
Spec
ific
draw
ings
orde
tails
rela
ting
topr
ecas
tw
orks
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yan
dm
ixof
conc
rete
.2
Met
hods
ofco
mpa
ctio
nan
dcu
ring.
3Be
ddin
gan
dfix
ing.
4Su
rface
finish
es.
5Ki
ndan
dqu
ality
ofre
info
rcem
ent
orpr
e/po
st-t
ensio
ning
,spa
cing
and
stre
sses
.6
Fini
shof
expo
sed
surfa
ces.
7D
etai
lsof
test
sof
mat
eria
ls.8
Det
ails
ofte
sts
offin
ished
wor
k.
Not
es,c
omm
ents
and
glos
sary
13 PRECAST CONCRETE
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 161
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Th
ere
lativ
epo
sitio
nof
conc
rete
mem
bers
.2
The
thic
knes
sor
size
ofm
embe
rs.
3Th
ickn
ess
ofsla
bsan
dpa
nels.
4Pe
rmiss
ible
load
s.5
Full
deta
ilsof
anch
orag
es,
duct
s,sh
eath
ing
and
vent
s.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1M
ould
san
dfo
rmw
ork.
2Re
info
rcem
ent.
3Be
ddin
g.4
Fixi
ngs.
5Te
mpo
rary
supp
ort.
6C
ast-
inac
cess
orie
s.7
Pre-
tens
ioni
ngor
pre-
stre
ssin
g.8
Fille
den
ds.
9A
llgr
outin
g.10
Mar
gins
.11
Ang
les
and
fair
ends
.12
Gla
ssle
nses
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
ecas
tco
ncre
tego
ods
nr1
Dim
ensio
ned
desc
riptio
nor
dim
ensio
ned
diag
ram
.1
Rein
forc
emen
t:de
tails
stat
ed.
2Po
st-t
ensio
ning
:num
ber
ofte
ndon
san
dde
tails
stat
ed.
3C
ast-
inac
cess
orie
s:de
tails
stat
ed.
4Sl
opin
gno
tex
ceed
ing
15°.
5Sl
opin
gex
ceed
ing
15°.
1St
oolin
gs,n
umbe
rst
ated
.1
Will
appl
yto
sills,
linte
ls,pa
dsto
nes,
stai
rcas
es,l
andi
ngs,
pane
ls,pa
rtiti
ons,
colu
mns
,bea
ms,
stru
ctur
alfr
ames
and
othe
rpr
ecas
tfe
atur
es.
m2
Dim
ensio
ned
desc
riptio
nst
atin
gnu
mbe
rof
piec
es.
2W
illap
ply
tofr
ame
mem
bers
,cop
ings
and
the
like.
m2
3D
imen
sione
dde
scrip
tion
stat
ing
thic
knes
s.2
Span
whe
rere
leva
nt.
3W
illap
ply
topa
nels,
slabs
,wal
ls,pa
rtiti
ons,
deck
ing
and
the
like.
2Ro
oflig
hts
3Pa
vem
ent
light
s4
Vert
ical
pane
llig
hts
m2
----
-nr
1D
imen
sione
dde
scrip
tion,
Num
ber
stat
ed.
----
----
----
----
----
--2
Dim
ensio
ned
desc
riptio
n.
1Si
zes
and
exte
ntof
rein
forc
emen
tst
ated
.1
Isola
ted
glas
sle
nses
are
mea
sure
das
acce
ssor
ies
cast
into
insit
uco
ncre
te.
2Ro
of,p
avem
ent
and
pane
llig
hts
are
deem
edto
incl
ude
mou
lds,
form
wor
k,te
mpo
rary
prop
ping
,rei
nfor
cem
ent,
bedd
ing
and
glas
sle
nses
.
TABULATED WORK SECTIONS
162 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5D
esig
ned
join
tsm
1D
imen
sione
dde
scrip
tion.
1Ty
pean
dsiz
esof
fillin
gan
dse
alan
tst
ated
.1
Join
tsfo
rmed
atth
edi
scre
tion
ofth
eco
ntra
ctor
are
not
mea
sure
d.
6H
oldi
ngdo
wn
ortie
stra
psnr
1D
imen
sione
dde
scrip
tion
orpr
oprie
tary
refe
renc
enu
mbe
r.1
Mat
eria
ltyp
est
ated
.2
Prot
ectiv
eco
atin
gst
ated
.1
Met
hod
offix
ing.
13 PRECAST CONCRETE
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 163
14M
aso
nry
Bric
k/bl
ock
wal
ling
Gla
ssbl
ock
wal
ling
Nat
ural
ston
eru
bble
wal
ling
and
dres
sing
sN
atur
alst
one
ashl
arw
allin
gan
ddr
essi
ngs
Art
ifici
al/c
ast
ston
ew
allin
gan
ddr
essi
ngs
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
sof
each
floor
leve
l.2
Prin
cipa
lsec
tions
show
ing
floor
toflo
orhe
ight
s.3
Exte
rnal
elev
atio
ns.
4A
nyot
her
maj
orm
ason
ryw
ork.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yan
dsiz
eof
bric
k/bl
ock/
ston
eun
its.
2Ty
peof
finish
/faci
ngs
toea
chsid
e.3
Bond
.4
Com
posit
ion
and
mix
ofm
orta
r.5
Type
ofpo
intin
g.6
Bond
ing
toot
her
wor
k.7
Raki
ngor
curv
edw
ork
sode
scrib
ed.
8Ra
dius
ofcu
rved
wor
k.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1M
ajor
horiz
onta
land
vert
ical
dim
ensio
ns.
2Ty
pes
ofm
ater
ials
used
toco
nstr
uct
the
wal
lsan
dot
her
stru
ctur
es.
3Po
sitio
nof
mai
nst
ruct
ural
fram
em
embe
rs.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llro
ugh
and
fair
cutt
ing.
2A
llen
dsan
dan
gles
,eith
erfo
rmed
orpr
oprie
tary
.3
Extr
am
ater
ialf
orcu
rved
wor
k.4
Form
ing
allr
ough
and
fair
groo
ves,
thro
ats,
mor
tices
,ch
ases
,reb
ates
,hol
es,s
tops
,m
itres
and
the
like
labo
urs.
5Ra
king
out
join
tsto
form
ake
y.6
Raki
ngou
tjo
ints
toin
sert
flash
ings
.7
Cen
terin
gor
othe
rfo
rms
ofte
mpo
rary
supp
ort.
1A
llw
allin
gis
mea
sure
don
the
cent
relin
eirr
espe
ctiv
eof
cons
truc
tion.
2Th
ickn
esse
sst
ated
are
nom
inal
.3
Wor
kis
deem
edve
rtic
alun
less
othe
rwise
desc
ribed
.4
All
wal
ldim
ensio
nsex
clud
eap
plie
dfin
ishes
.5
No
dedu
ctio
nsw
illbe
mad
efo
rvo
ids
orbu
iltin
item
sw
hose
cros
sse
ctio
nal
area
isle
ssth
an0.
50m
2.
TABULATED WORK SECTIONS
164 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
8La
bour
inea
ves
fillin
g.9
Labo
urs
inre
turn
s,en
dsan
dan
gles
.10
Cen
terin
g.11
Ove
rhan
dw
ork.
12Bo
ndin
gen
dsof
wal
lsto
othe
rw
ork.
13A
llex
tra
mat
eria
lreq
uire
dfo
rbo
ndin
g.14
Add
ition
alm
ater
iali
nla
ps.
15Pr
epar
atio
nof
alls
urfa
ces
tore
ceiv
esu
bseq
uent
appl
icat
ions
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1W
alls;
over
allt
hick
ness
stat
ed2
Dia
phra
gmw
alls;
over
allt
hick
ness
stat
ed,s
paci
ngan
dth
ickn
ess
ofrib
sst
ated
.
m2
1Br
ickw
ork.
2Bl
ockw
ork.
3G
lass
bloc
kwor
k.4
Nat
ural
ston
e.5
Cas
tst
one.
6O
ther
:typ
est
ated
.
1Sk
ins
ofho
llow
wal
ls.2
Batt
ered
.3
Tape
red;
one
side
orbo
thsid
es.
4Bu
iltag
ains
tot
her
wor
k.5
Use
das
form
wor
k.
1M
etho
dof
form
ing.
1Th
ede
scrip
tion
shal
ldes
crib
eth
ety
peof
cons
truc
tion
ofth
em
ason
rysu
chas
rubb
leor
ashl
arw
ork
and
heig
htof
cour
sing.
2W
alls
are
mea
sure
don
the
cent
relin
eof
the
mat
eria
lunl
ess
othe
rwise
stat
ed.
3Th
era
dius
ofcu
rved
wor
kis
take
nfro
mth
ece
ntre
line.
4Ba
tter
ing
wal
lsar
eslo
ping
wal
lsw
ithpa
ralle
lsid
es.
5Th
ickn
ess
stat
edfo
rta
perin
gw
alls
isth
em
ean
thic
knes
s.6
No
dedu
ctio
nsto
bem
ade
for
void
sor
built
inite
ms
who
secr
oss
sect
iona
lar
eaeq
ualt
oor
less
than
0.50
m2.
7Th
ickn
ess
stat
edfo
rdi
aphr
agm
wal
lsis
tota
lthi
ckne
ssof
both
skin
san
dca
vity
void
.
3Va
ultin
g;th
ickn
ess
and
type
stat
edm
2
14 MASONRY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 165
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4Iso
late
dpi
ers;
isola
ted
casin
gs;c
him
ney
stac
ks;c
olum
nsm
1D
imen
sione
dde
scrip
tion
ordi
men
sione
ddi
agra
m.
1Ve
rtic
al.
2Ba
tter
ed.
3C
urve
d:ra
dius
stat
ed.
1Th
ese
are
such
whe
nth
eir
leng
thon
plan
iseq
ualt
oor
less
than
four
times
thei
rth
ickn
ess
exce
ptw
here
caus
edby
open
ings
.2
No
dedu
ctio
nsto
bem
ade
for
flues
and
the
like
equa
lto
orle
ssth
an0.
10m
2in
cros
sse
ctio
nala
rea.
5A
ttac
hed
proj
ectio
nsm
1Ve
rtic
al.
2Ra
king
.3
Hor
izont
al.
4C
urve
d:ra
dius
stat
ed.
1A
ttac
hed
proj
ectio
nsar
eat
tach
edpi
ers
who
sele
ngth
onpl
anis
equa
lto
orle
ssth
anfo
urtim
esth
eir
thic
knes
spl
uspl
inth
s,ov
ersa
iling
cour
ses
and
the
like.
6A
rche
s(n
umbe
rst
ated
)m
1H
eigh
tof
face
,wid
thof
soffi
tan
dsh
ape
ofar
chst
ated
.1
The
leng
this
the
mea
ngi
rth
orle
ngth
onfa
ce.
7Ba
nds;
dim
ensio
ned
desc
riptio
nm
1Fl
ush.
2Su
nk:d
epth
ofse
tba
ckst
ated
.3
Proj
ectin
g:de
pth
ofse
tfo
rwar
dst
ated
.
1Ve
rtic
al.
2Ra
king
.3
Hor
izont
al.
4C
urve
d:m
ean
radi
uson
face
stat
ed.
1En
tirel
yof
stre
tche
rs.
2En
tirel
yof
head
ers.
3A
ltern
ate
head
ers/
stre
tche
rs.
4O
ther
bond
.
1Ba
nds
are
bric
k-on
-edg
eba
nds,
bric
k-on
-end
band
s,ba
sket
patt
ern
band
s,m
ould
edor
spla
yed
capp
ings
,m
ould
edst
ring
cour
ses,
mou
lded
corn
ices
and
the
like.
8Fl
ues
9Fl
uelin
ings
10Fi
lling
arou
ndflu
es
m1
Dim
ensio
ned
desc
riptio
n.1
Met
hod
offo
rmin
g.
11Ex
tra
over
wal
lsfo
rpe
rimet
ers
and
abut
men
ts,d
etai
lsst
ated
m1
Dim
ensio
ned
desc
riptio
n.1
Met
hod
offo
rmin
g.2
Clo
sing
cavi
ties,
addi
tiona
ltie
s,in
sula
tion
and
allo
ther
asso
ciat
edw
ork
isde
emed
incl
uded
.
1Th
isw
illin
clud
ew
ork
form
ing
eave
s,co
ping
s,ke
rbs,
quoi
ns,e
nds
and
the
like.
12Ex
tra
over
wal
lsfo
rop
enin
gpe
rimet
ers,
deta
ilsst
ated
m1
This
will
incl
ude
wor
kfo
rmin
gsil
ls,ja
mbs
,rev
eals,
cavi
tycl
oser
s,ar
chitr
aves
,lin
tels,
mul
lions
,tra
nsom
s,th
resh
olds
,ste
psan
dth
elik
e.
TABULATED WORK SECTIONS
166 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
13Sp
ecia
lpur
pose
bloc
ksor
ston
esnr
1D
imen
sione
dde
scrip
tion.
1Fu
nctio
nst
ated
.1
Des
crip
tions
ofst
ones
are
give
nas
the
smal
lest
bloc
kfro
mw
hich
each
item
can
beob
tain
edha
ving
rega
rdin
the
case
ofna
tura
lsto
neto
the
plan
ein
whi
chth
est
one
isre
quire
dto
bela
idw
ithre
latio
nto
itsqu
arry
bed.
The
dim
ensio
nsar
eta
ken
over
one
mor
tar
bed
and
one
mor
tar
join
t.
14Fo
rmin
gca
vity
m2
1W
idth
and
met
hod
offo
rmin
g.1
Type
and
spac
ing
oftie
s.
15C
avity
insu
latio
nm
21
Type
and
thic
knes
s.2
Met
hod
ofin
stal
ling
orfix
ing.
16D
amp-
proo
fco
urse
s≤
300m
mw
ide
17D
amp-
proo
fco
urse
s>
300m
mw
ide
18Pr
e-fo
rmed
cavi
tytr
ays
m m2
m
1G
auge
orth
ickn
ess.
2N
umbe
rof
laye
rs.
3C
ompo
sitio
nan
dm
ixof
bedd
ing
mat
eria
ls.
1Ve
rtic
al.
2Ra
king
.3
Hor
izont
al.
4C
urve
d,m
ean
radi
uson
face
stat
ed.
5St
eppe
d.
1D
amp-
proo
fco
urse
sar
ede
emed
toin
clud
e:(a
)fo
rmin
gla
ps,e
nds
and
angl
es.
(b) p
oint
ing
expo
sed
edge
s.(c
)bo
ndin
gto
dam
p-pr
oof
mem
bran
esan
dth
elik
e.
19Jo
int
rein
forc
emen
tm
1W
idth
stat
ed.
20Fi
llets
m1
Wid
than
dth
ickn
ess
stat
ed.
1W
eath
er.
2A
ngle
.3
Oth
er.
21Po
intin
gm
1W
idth
and
dept
hof
join
tto
bepo
inte
d.1
Type
offin
ish.
1Th
isre
late
sto
the
poin
ting
ofjo
ints
,fla
shin
gs,f
ram
esan
dth
elik
e.
22Jo
ints
m1
Wid
than
dth
ickn
ess
stat
ed.
1Ty
peof
fille
r,se
alan
t,po
intin
g,m
etho
dof
appl
icat
ion
and
prep
arat
ion.
2Ti
es:c
entr
esst
ated
.3
Cha
nnel
s.
1Jo
ints
are
only
mea
sure
dw
here
thei
rco
mpo
sitio
nan
dpo
sitio
nis
desig
ned.
14 MASONRY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 167
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
23W
edgi
ngan
dpi
nnin
gm
1W
idth
and
thic
knes
sst
ated
.
24C
reas
ing
m1
Wid
thst
ated
.2
Num
ber
ofco
urse
s.
25Pr
oprie
tary
and
indi
vidu
alsp
otite
ms.
nr1
Dim
ensio
ned
desc
riptio
nor
dim
ensio
ned
diag
ram
.1
Prop
rieta
ryre
fere
nce
orca
talo
gue
num
ber
whe
reap
plic
able
.
1M
etho
dof
form
ing,
build
ing
inor
fixin
g.1
All
ofth
ese
item
sar
ede
emed
toin
clud
eal
lnec
essa
ryfo
rmin
gof
open
ings
orpo
cket
s,lin
ers,
cavi
tycl
oser
s,da
mp-
proo
fco
urse
s,fix
ings
and
fast
enin
gsan
dbu
ilder
’sw
ork
inco
nnec
tion
with
any
asso
ciat
edm
echa
nica
lor
elec
tric
alco
nnec
tions
.2
This
will
incl
ude
item
ssu
chas
win
dpos
ts,h
ead
rest
rain
tch
anne
ls,st
eell
inte
ls,w
alle
ndtie
s,w
alle
ndbo
ndin
gch
anne
ls,ca
ppin
gs,c
him
ney
pots
,fin
ials,
boile
rse
ats,
soot
door
s,pl
inth
s,st
eps,
win
ders
,lan
ding
s,ba
ses,
key
bloc
ks,a
irbr
icks
,ven
tilat
orgr
atin
gs,
flue
bloc
ks,f
ireba
cks
and
sides
,gra
tes,
carv
edbr
icks
,blo
cks
orst
ones
,quo
inst
ones
,jam
bst
ones
,hea
rths
,w
eep-
hole
form
ers
and
the
like.
3Th
elis
tis
not
exha
ustiv
e.A
nyty
peof
indi
vidu
alsh
aped
piec
esh
ould
been
umer
ated
and
desc
ribed
eith
erby
adi
men
sione
dde
scrip
tion
ora
dim
ensio
ned
diag
ram
orby
refe
renc
eto
the
spec
ifica
tion
ortr
ade
broc
hure
.
TABULATED WORK SECTIONS
168 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
15S
truc
tura
lm
etal
wo
rkSt
ruct
ural
Stee
lwor
kSt
ruct
ural
alum
iniu
mw
ork
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
All
Gen
eral
arra
ngem
ent
draw
ings
,Pla
ns,S
ectio
nsan
dEl
evat
ions
.2
Dra
win
gssp
ecifi
cto
the
wor
k.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ty
pes
and
grad
eof
mat
eria
lsin
clud
ing
stee
land
stee
lto
stee
lbol
ts.
2Sp
ecifi
catio
nde
scrib
ing
fabr
icat
ion,
wel
ding
,tes
ting,
erec
tion
and
ever
ythi
ngel
sene
cess
ary
toco
mpl
ete
the
inst
alla
tion.
3Su
rface
prep
arat
ion
prio
rto
appl
icat
ion
ofan
ysu
rface
trea
tmen
tor
finish
.
Not
es,c
omm
ents
and
glos
sary
.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Po
sitio
nof
the
wor
kin
rela
tion
toth
epr
opos
edst
ruct
ure
and
any
exist
ing
stru
ctur
eth
atth
ene
ww
ork
isbe
ing
conn
ecte
dto
.2
The
type
san
dsiz
esof
all
stru
ctur
alm
embe
rsan
dth
eir
posit
ions
inre
latio
nto
each
othe
r.3
Det
ails
ofco
nnec
tions
orof
the
reac
tions
,mom
ents
and
axia
lloa
dsat
conn
ectio
npo
ints
.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1Th
em
ass
offr
amin
gin
clud
esal
lcom
pone
nts.
2N
oal
low
ance
ism
ade
for
the
mas
sof
wel
ds,b
olts
,nut
s,w
ashe
rs,r
ivet
s,an
dpr
otec
tive
coat
ings
.3
Perm
anen
ter
ectio
nis
deem
edto
incl
ude
alls
peci
fied
oper
atio
nssu
bseq
uent
tofa
bric
atio
nin
clud
ing
deliv
ery
tosit
e.
15 STRUCTURAL METALWORK
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 169
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Fr
amed
mem
bers
,fra
min
gan
dfa
bric
atio
nt
1Le
ngth
sno
tex
ceed
ing
1.00
m2
Leng
ths
over
1.00
but
not
exce
edin
g9.
00m
3Le
ngth
sex
ceed
ing
9.00
m
1W
eigh
t≤
25kg
/m.
2W
eigh
t25
–50k
g/m
.3
Wei
ght
50–1
00kg
/m.
4A
ndso
onin
incr
emen
tsof
50kg
/m.
1C
olum
ns.
2Be
ams.
3Ra
fters
.4
Brac
ings
.5
Purli
nsan
dcl
addi
ngra
ils.
6G
rilla
ges.
7Tr
usse
s.8
Plat
egi
rder
s.9
Fram
ing
todo
ors
and
win
dow
s.10
Trim
mer
sto
roof
san
dw
alls.
11Ra
fter
and
colu
mn
stay
s,nu
mbe
rst
ated
.
1C
aste
llate
d.2
Tape
red.
3C
urve
d.4
Cam
bere
d.5
Hol
low
:sha
pest
ated
.6
Built
-up
wor
k:de
tails
ofco
nstr
uctio
nst
ated
.7
Com
poun
dfa
bric
atio
ns,d
etai
lsof
cons
truc
tion
stat
ed.
8C
ellu
lar.
9Se
cond
ary
stee
lwor
k.10
Tem
pora
rybr
acin
gor
supp
ort
wor
kno
tat
disc
retio
nof
the
cont
ract
or,
subs
eque
ntre
mov
alis
deem
edin
clud
edun
less
stat
edot
herw
ise.
2Fr
amed
mem
bers
,per
man
ent
erec
tion
onsit
e
1C
rane
rails
.1
Det
ails
and
cent
res
offix
ing
clip
san
dre
silie
ntpa
dsst
ated
.
1W
ires,
cabl
es,r
ods,
ties
and
bars
.
3Iso
late
dst
ruct
ural
mem
bers
,fa
bric
atio
nt
1Pl
ain
mem
ber:
use
stat
ed.
1D
imen
sione
dde
scrip
tion
and
wei
ght
per
linm
1A
niso
late
dst
ruct
ural
mem
ber
ison
eno
tin
tegr
ally
conn
ecte
dto
othe
rst
ruct
ural
mem
bers
.
4Iso
late
dst
ruct
ural
mem
bers
,pe
rman
ent
erec
tion
onsit
enr
2Bu
ilt-u
pm
embe
r,us
est
ated
.
5A
llow
ance
for
fittin
gst
1C
alcu
late
dw
eigh
t.2
Perc
enta
geal
low
ance
;pe
rcen
tage
stat
ed.
1To
fram
edm
embe
rs.
2To
isola
ted
mem
bers
.1
Fitt
ings
are
com
pone
nts
that
allo
wm
embe
rsto
bejo
ined
toge
ther
orar
eot
her
brac
kets
,sup
port
san
dth
elik
eth
atar
esu
pplie
dan
dat
tach
ed,e
ither
onor
off
site,
toth
em
ain
load
bear
ing
fram
eby
the
stru
ctur
alm
etal
cont
ract
or.
TABULATED WORK SECTIONS
170 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
6C
old
rolle
dpu
rlins
,cla
ddin
gra
ilsan
dth
elik
em
1Ty
pean
dm
etho
dof
fixin
gst
ated
.2
Size
orpr
oprie
tary
refe
renc
est
ated
.
1Pu
rlins
and
clad
ding
rails
.2
Sag
rods
.3
Stay
s.4
Oth
er.
1M
etho
dof
fixin
gst
ated
.
7Ex
tra
over
for
nr1
Form
ing
cran
ks.
Dim
ensio
nof
mem
ber
stat
ed.
8Pr
ofile
dm
etal
deck
ing,
type
and/
orpr
ofile
stat
edm
21
Hei
ght
not
exce
edin
g5.
00m
2H
eigh
tex
ceed
ing
5.00
mbu
tno
tex
ceed
ing
10.0
0m3
And
soon
in5.
00m
incr
emen
ts.
1Sh
ear
stud
s:siz
ean
dsp
acin
gst
ated
.1
Met
hod
offix
ing.
1Th
isw
ork
ison
lym
easu
red
here
whe
nit
form
spa
rtof
the
stru
ctur
alst
eel
pack
age
othe
rwise
itw
ould
bem
easu
red
inac
cord
ance
with
the
rule
sfo
rpe
rman
ent
form
wor
k.2
Hei
ghts
are
alw
ays
mea
sure
dfro
mfin
ished
floor
leve
lunl
ess
othe
rwise
stat
ed.
3Th
ear
eaof
met
alde
ckin
gis
calc
ulat
edas
the
finish
edar
eaof
conc
rete
cast
onto
the
deck
ing.
9Ex
tra
over
for
m1
Edge
trim
s;siz
e,gi
rth,
prof
ileor
prop
rieta
ryre
fere
nce
stat
ed.
1St
raig
ht.
2Ra
king
.3
Cur
ved,
radi
usst
ated
.
1En
ds,a
ngle
s,in
ters
ectio
nsar
eal
lde
emed
incl
uded
.
m2
Cur
ved
cutt
ing.
10H
oldi
ngdo
wn
bolts
oras
sem
blie
snr
1Ty
pean
ddi
amet
erst
ated
.1
Anc
hor
plat
es,f
ram
es,
mem
bers
,tub
es,c
ones
and
any
othe
ras
soci
ated
acce
ssor
yst
ated
1Su
pply
only.
11Sp
ecia
lbol
tsnr
1Ty
pean
ddi
amet
erst
ated
.1
Back
grou
ndif
othe
rth
anst
ruct
ural
stee
l.1
Spec
ialb
olts
are
allb
olts
and
fast
ener
sot
her
than
grad
e4.
6bl
ack
bolts
and
hold
ing
dow
nas
sem
blie
s.
15 STRUCTURAL METALWORK
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 171
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
12C
onne
ctio
nsto
exist
ing
stee
land
othe
rm
embe
rsor
stru
ctur
esnr
1D
etai
lsst
ated
.1
All
labo
urs
onne
wan
dex
istin
gst
eel
are
deem
edin
clud
ed.
2La
bour
son
non-
stee
lstr
uctu
res
are
mea
sure
del
sew
here
.
13Tr
iale
rect
ion
t1
Det
ails
and
loca
tion
stat
ed.
1O
nly
mea
sure
dw
hen
not
atdi
scre
tion
ofco
ntra
ctor
.2
The
info
rmat
ion
give
nin
the
desc
riptio
nm
ust
incl
ude
item
ssu
chas
the
num
ber
ofer
ecta
ble
piec
esan
dnu
mbe
rof
site
wel
ds.T
his
info
rmat
ion
may
begi
ven
byre
fere
nce
todr
awin
g(s)
.
14Fi
lling
hollo
wse
ctio
nsite
m1
Wat
er.
2C
oncr
ete.
3O
ther
mat
eria
ltyp
est
ated
1D
etai
lsst
ated
.
15Su
rface
trea
tmen
tsm
21
Gal
vani
sing.
2Sp
raye
dco
atin
g.3
Pain
ting.
4O
ther
trea
tmen
t:ty
pest
ated
.
1O
nsit
e.2
Off
site.
1Pr
epar
atio
nde
scrib
ed.
2N
umbe
rof
coat
sst
ated
.3
Thic
knes
sof
coat
(s)
stat
ed.
4Fi
rera
ting
stat
ed.
5Fi
nish
stat
ed.
1A
llpr
epar
atio
nis
deem
edin
clud
ed.
16Iso
late
dpr
otec
tive
coat
ings
nr1
App
roxi
mat
esiz
eor
area
stat
ed.
2Ty
peof
prot
ectiv
eco
ated
stat
ed.
3Pr
epar
atio
nde
scrib
ed.
1O
nsit
e.2
Off
site.
17Te
stin
gite
m1
Load
test
s.2
Fire
prot
ectio
nte
sts.
3O
ther
test
s.
1D
etai
lsst
ated
.
TABULATED WORK SECTIONS
172 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
16C
arpe
ntry
Tim
ber
fram
ing
Tim
ber
first
fixin
gsT
imbe
r,m
etal
and
plas
ticbo
ardi
ng,s
heet
ing,
deck
ing,
casi
ngs
and
linin
gsM
etal
and
plas
ticac
cess
orie
s
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
All
gene
rala
rran
gem
ent
plan
s,se
ctio
nsan
del
evat
ions
.2
Dra
win
gssp
ecifi
cto
the
wor
k.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yan
dsiz
eof
mat
eria
ls.2
Gra
deof
timbe
r.3
Type
ofpr
eser
vativ
etr
eatm
ent.
4Ty
peof
prot
ectiv
eco
atin
g5
Met
hod
offix
ing
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
6M
etho
dof
join
ting
orco
nstr
uctio
nw
here
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.7
Spac
ing
ofba
tten
san
dgr
ound
s.8
Nat
ure
ofba
se.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1La
yout
and
spac
ing
oftim
bers
.2
Type
sof
mat
eria
lsus
ed.
3Po
sitio
nof
timbe
rsin
rela
tion
adja
cent
stru
ctur
es.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llsiz
esno
min
alun
less
othe
rwise
stat
ed.
2A
lltim
bers
are
saw
nun
less
othe
rwise
stat
ed.
3A
llw
ork
fabr
icat
ed,a
ssem
bled
and
erec
ted
onsit
eun
less
othe
rwise
stat
ed.
4A
llw
ork
fixed
byna
ilsun
less
othe
rwise
stat
ed.
5H
oles
intim
ber
for
bolts
and
allo
ther
fixin
gs.
6A
llla
bour
son
timbe
r.7
All
web
s,gu
sset
san
dth
elik
eon
trus
ses
and
port
als.
16 CARPENTRY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 173
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
imar
yor
stru
ctur
altim
bers
m1
Nom
inal
size
stat
ed.
1Ra
fters
and
asso
ciat
edro
oftim
bers
.2
Purli
ns.
3W
allp
late
s.4
Roof
and
floor
joist
s.5
Beam
s.6
Post
sor
colu
mns
.7
Part
ition
and
wal
lmem
bers
.8
Stru
ttin
g.
1Se
lect
ion
and
prot
ectio
nfo
rsu
bseq
uent
trea
tmen
t.2
Mat
chin
ggr
ains
orco
lour
s.3
Lim
itson
plan
ing
mar
gins
.4
Fixi
ngce
ntre
sst
ated
whe
reno
tat
disc
retio
nof
the
cont
ract
or.
5Ty
pean
dsiz
eof
bolts
and
othe
rfix
ings
and
fast
enin
gs.
6Ba
ckgr
ound
orna
ture
ofba
se.
7Fi
thro
ugh
vuln
erab
lem
ater
ials.
8Su
rface
finish
ortr
eatm
ent
appl
ied
aspa
rtof
the
man
ufac
turin
gpr
oces
s.9
Leng
th>
6.00
inon
eco
ntin
uous
leng
th.
1St
rutt
ing
ism
easu
red
thro
ugh
the
stru
ctur
alm
embe
rsbe
ing
stiff
ened
.
2En
gine
ered
orpr
efab
ricat
edm
embe
rs/it
ems
nr1
Fini
shed
Dim
ensio
ned
desc
riptio
n.2
Roof
trus
ses.
3Po
rtal
fram
es.
4Tr
usse
s.5
Wal
lpan
els.
6Be
ams.
7Jo
ists.
8Po
sts
orco
lum
ns.
1M
anuf
actu
rers
’ref
eren
ce.
2Le
ngth
>6.
00in
one
cont
inuo
usle
ngth
.
3Ba
ckin
gan
dot
her
first
fixtim
bers
m1
Nom
inal
Dim
ensio
ned
desc
riptio
nof
each
mem
ber.
1G
roun
ds.
2Ba
tten
s.
m2
2N
omin
alD
imen
sione
dde
scrip
tion
ofea
chm
embe
r.1
Fram
edgr
ound
s,ba
tten
san
dbr
acke
ting.
1C
entr
es,e
ach
way
stat
ed.
4Bo
ardi
ng,f
loor
ing,
shee
ting,
deck
ing,
casin
gs,l
inin
gs,s
arki
ng,f
asci
as,
barg
eboa
rds,
soffi
tsan
dth
elik
e
m ----
-m
2
1N
otex
ceed
ing
600m
mw
ide;
finish
edw
idth
and
thic
knes
sst
ated
.2
Ove
r60
0mm
wid
e;fin
ished
thic
knes
sst
ated
.
1H
orizo
ntal
.2
Slop
ing.
3Ve
rtic
al.
4C
urve
d:ra
dius
stat
ed.
5So
ffit
orce
iling.
6O
ther
shap
ede
scrib
ed.
1Fi
nish
stat
edun
less
saw
n.2
Type
ofjo
ints
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
3Pr
ofile
.
1Th
elo
catio
nof
the
wor
ksh
allb
egi
ven
such
asex
tern
alw
alls,
inte
rnal
wal
lsan
dat
tach
edpi
ers,
isola
ted
colu
mns
,flo
ors,
ceilin
gsan
dat
tach
edbe
ams,
isola
ted
beam
s,ro
ofs,
eave
s,ve
rges
,top
san
dch
eeks
ofdo
rmer
san
dth
elik
e.
TABULATED WORK SECTIONS
174 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5O
rnam
enta
lend
sof
timbe
rm
embe
rsnr
1Si
zean
dde
tail
stat
ed.
6M
etal
fixin
gs,f
aste
ning
san
dfit
tings
nr1
Dim
ensio
ned
desc
riptio
n.2
Prop
rieta
ryre
fere
nce
orca
talo
gue
num
ber
whe
reap
plic
able
.
1Ti
es.
2Ro
ds.
3Br
acke
ts.
4St
raps
.5
Shoe
s.6
Bolts
.7
Joist
hang
ers.
8O
ther
:det
ails
stat
ed.
1M
etho
dof
fixin
gst
ated
.2
Back
grou
ndst
ated
ifno
ttim
ber
1Bo
ltsin
clud
ehe
ads,
nuts
and
was
hers
.2
The
leng
thof
abo
ltis
mea
sure
dov
erth
ehe
ad.
3W
ork
isde
emed
toin
clud
eal
llab
ours
infa
bric
atin
gan
dfix
ing
incl
udin
gdr
illing
hole
sin
the
fittin
g,th
etim
ber
and
the
back
grou
nd.
16 CARPENTRY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 175
17S
heet
roo
fco
veri
ngs
Bitu
min
ous
felts
Plas
ticsh
eets
Shee
tm
etal
sR
igid
boar
dsw
ithfa
ctor
yap
plie
dsh
eet
cove
ring
sA
nyot
her
type
ofsh
eet
roof
cove
ring
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
sof
each
roof
.2
Prin
cipa
lsec
tions
ofro
of.
3Ex
tern
alel
evat
ions
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yof
mat
eria
ls.2
Thic
knes
s,ga
uge,
wei
ght
and
tem
per.
3M
etho
dof
fixin
g.4
Det
ails
and
posit
ion
ofla
ps,
drip
s,w
elts
,bea
ds,r
olls,
join
ts,
upst
ands
and
dow
nsta
nds.
5Bo
ndin
gto
othe
rw
ork.
6Ra
dius
ofcu
rved
wor
k.7
Type
(s)
and
spac
ing
ofjo
ints
.8
Type
(s)
and
spac
ing
ofse
ams.
9Sp
ecia
lfin
ishes
.
Not
es,c
omm
ents
and
glos
sary
1Ex
ampl
esof
roof
cove
rings
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofth
isse
ctio
nar
e:sh
eet
lead
,alu
min
ium
,co
pper
,zin
c,st
ainl
ess
stee
l,fib
rebi
tum
en,b
utyl
rubb
er,t
herm
opla
stic
and
the
like
mem
bran
es.
2Th
islis
tis
not
exha
ustiv
e.
TABULATED WORK SECTIONS
176 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1M
ajor
horiz
onta
land
vert
ical
dim
ensio
ns.
2Ty
pes
ofm
ater
ials
used
toco
nstr
uct
the
roof
and
itsst
ruct
ures
.3
Posit
ion
ofm
ain
stru
ctur
alfr
ame
mem
bers
.4
Hei
ght
ofw
ork
abov
egr
ound
leve
lsta
ting
whe
ther
wor
king
plat
form
leve
lor
finish
edle
vel.
5A
llla
bour
san
ddr
essin
gs.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1U
nder
lay
inco
ntac
tw
ithth
eco
verin
g.2
All
roug
han
dfa
ircu
ttin
gan
dw
aste
.3
Extr
am
ater
ialr
equi
red
for
bond
ing.
4Ex
tra
mat
eria
lin
laps
and
dres
sings
.5
Extr
am
ater
ialf
orcu
rved
wor
k.6
All
ends
,ang
les
and
inte
rsec
tions
eith
erfo
rmed
orpr
oprie
tary
.7
Form
ing
allr
ough
and
fair
groo
ves,
thro
ats,
mor
tices
,ch
ases
,reb
ates
,hol
es,s
tops
,m
itres
and
the
like
labo
urs.
8Ra
king
out
join
tsto
inse
rtfla
shin
gs.
9La
bour
sin
retu
rns,
ends
and
angl
es.
10W
ork
iniso
late
dar
eas.
11W
ork
info
rmin
gvo
ids
and
hole
s≤
1.00
m2.
1Th
ear
eas
and
leng
ths
mea
sure
dar
ene
tin
cont
act
with
base
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
over
ings
>50
0mm
wid
em
21
Hor
izont
al.
2Sl
opin
g:pi
tch
stat
ed.
3Ve
rtic
al.
4C
urve
d:ra
diis
tate
d.
1U
nder
lays
.2
Insu
latio
n.3
Fini
shto
expo
sed
surfa
ce.
1N
atur
eof
base
.1
No
dedu
ctio
nis
mad
efo
rvo
ids
≤1.
00m
2.
2Fi
nish
esin
clud
eso
lar
refle
ctiv
epa
int,
chip
ping
san
dth
elik
e.Th
eyex
clud
etil
es,p
avin
gsla
bs,g
rass
roof
san
dth
elik
e.
2C
over
ings
≤50
0mm
wid
em
17 SHEET ROOF COVERINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 177
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
3Ex
tra
over
for
form
ing
m1
Drip
s.1
Hei
ght
stat
ed.
1Le
ngth
ssh
allb
ene
tle
ngth
ofea
chla
bour
.2
All
addi
tiona
lshe
etm
ater
ialr
equi
red
tofo
rmth
ela
bour
item
shal
lbe
deem
edin
clud
ed.
3A
llad
ditio
nalu
nder
lay,
insu
latio
nan
dsu
rface
finish
shal
lbe
deem
edin
clud
ed.
2W
elts
.1
Hei
ght
stat
ed.
1Ty
pest
ated
.
3Ro
lls.
1W
idth
and
heig
htst
ated
.1
Woo
dco
re.
2H
ollo
w.
4Se
ams.
1Le
ngth
stat
ed.
5La
ps.
1Le
ngth
stat
ed.
4Bo
unda
ryw
ork,
loca
tion
and
met
hod
offo
rmin
gde
scrib
edm
1N
etgi
rth
stat
ed.
2A
vera
gene
tgi
rth
stat
ed,
num
ber
ofle
ngth
sst
ated
.
1A
butm
ents
.2
Eave
s.3
Ridg
es.
4Ve
rges
.5
Valle
ys.
6H
ips.
7Ve
rtic
alan
gles
.8
Ups
tand
s≤
500m
mhi
gh.
9D
owns
tand
s≤
500m
mhi
gh.
1H
orizo
ntal
.2
Vert
ical
.3
Raki
ng.
4C
urve
d,ra
dius
stat
ed.
5St
eppe
d.6
Pref
orm
ed.
7Sl
opin
g.
1Bo
unda
ryw
ork
tovo
ids
ison
lym
easu
red
whe
reth
evo
idis
>1.
00m
2.
2Bo
unda
ryw
ork
isw
ork
asso
ciat
edw
ithcl
osin
gof
for
finish
ing
off
shee
tro
ofin
gat
the
exte
rnal
perim
eter
,at
the
abut
men
tw
ithdi
ffere
ntm
ater
ials
orth
epe
rimet
erof
open
ings
and
void
s.3
Boun
dary
wor
kis
deem
edto
incl
ude
unde
rclo
aks,
insu
latio
n,st
ripve
ntila
tors
,ro
ugh
and
fair
cutt
ing,
bedd
ing,
poin
ting,
laps
,sea
ms,
ends
,ang
les,
inte
rsec
tions
,rol
ls,up
stan
ds,
dow
nsta
nds,
wel
ted
edge
s,dr
essin
gsan
dw
edgi
ngs
and
addi
tiona
lcov
erin
gm
ater
ialn
eede
dto
form
the
deta
ilan
dal
lass
ocia
ted
labo
urs.
4W
here
seve
rali
tem
sof
the
sam
ety
peof
boun
dary
wor
kha
vesli
ghtly
diffe
ring
net
girt
hsth
ese
girt
hsm
aybe
aver
aged
and
the
leng
ths
aggr
egat
ed.
5Th
enu
mbe
rof
sepa
rate
leng
ths
aggr
egat
edm
ust
best
ated
6Va
lleys
incl
ude
ever
ythi
ngne
cess
ary
tofo
rman
dlin
eth
eva
lley.
7A
nup
stan
dor
dow
nsta
ndov
er50
0mm
high
ism
easu
red
asve
rtic
alw
ork.
TABULATED WORK SECTIONS
178 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5Fl
ashi
ngs
m1
Net
girt
hst
ated
.1
Flas
hing
s.2
Apr
ons.
3Si
lls.
4W
eath
erin
gs.
5C
appi
ngs.
6H
ips.
7Ke
rbs.
8Ri
dges
.9
Lini
ngs
toop
enin
gs.
1H
orizo
ntal
.2
Slop
ing
3Ve
rtic
al.
4Ra
king
.5
Cur
ved,
radi
usst
ated
.6
Step
ped.
7Pr
efor
med
.
1Fl
ashi
ngs
are
deem
edto
incl
ude
unde
rclo
aks,
roug
han
dfa
ircu
ttin
g,be
ddin
g,po
intin
g,en
ds,a
ngle
s,in
ters
ectio
ns,w
elte
d,be
aded
orsh
aped
edge
san
dal
ldre
ssin
gs.
6G
utte
rs7
Valle
ysm
1N
etgi
rth
stat
ed.
1Sl
opin
g.2
Step
ped.
3C
urve
d,ra
dius
stat
ed.
4Se
cret
.5
Tape
red.
1N
atur
eof
base
.2
Spac
ing
ofst
ruct
ural
supp
orts
.3
Pref
orm
ed.
1Th
ele
ngth
isth
em
ean
leng
thm
easu
red
over
allf
ittin
gs.
2G
utte
ran
dva
lley
wor
kis
deem
edto
incl
ude
alld
ress
ings
requ
ired
tofo
rmth
epr
ofile
com
plet
ew
ithal
ljoi
nts,
laps
,sea
ms,
brac
kets
,und
ercl
oaks
and
othe
ras
soci
ated
linin
gs,o
utle
ts,
over
flow
s,en
ds,a
ngle
s,in
ters
ectio
ns,
bedd
ing,
poin
ting,
fixin
gsan
dth
elik
e.3
Max
imum
and
min
imum
girt
hof
tape
red
gutt
ers
orva
lleys
shal
lbe
give
n.
17 SHEET ROOF COVERINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 179
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
8Sp
otite
ms
nr1
Dim
ensio
ned
diag
ram
ordi
men
sione
dde
scrip
tion.
1C
atch
pits
.2
Sum
ps.
3O
utle
ts.
4H
atch
cove
rs.
5C
anop
yco
vers
.6
Col
lars
orsle
eves
arou
ndpi
pes
and
the
like.
7O
ther
:typ
est
ated
.
1N
atur
eof
base
.2
Spac
ing
ofst
ruct
ural
supp
orts
.3
Pref
orm
ed.
1Sp
otite
mw
ork
isde
emed
toin
clud
ejo
ints
,dre
ssin
gan
dbo
ndin
gto
surr
ound
ing
wor
k,un
derc
loak
san
dot
her
asso
ciat
edlin
ings
,end
s,an
gles
,be
ddin
g,po
intin
g,fix
ings
and
the
like.
9Fi
ttin
gsnr
1D
imen
sione
dde
scrip
tion.
1Ve
ntila
tors
.2
Fini
als.
3G
aste
rmin
als.
4H
ipiro
ns.
5So
aker
s.6
Sadd
les.
7Ro
oflig
hts.
8O
ther
:typ
est
ated
.
1N
atur
eof
base
.2
Met
hod
offix
ing
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
1Fi
ttin
gsar
ede
emed
toin
clud
ejo
ints
,dr
essin
gan
dbo
ndin
gto
surr
ound
ing
wor
k,un
derc
loak
san
dot
her
asso
ciat
edlin
ings
,end
s,an
gles
,bed
ding
,po
intin
g,fix
ings
and
the
like.
2Pr
oprie
tary
refe
renc
esm
aybe
give
nin
lieu
ofa
dim
ensio
ned
desc
riptio
n.
TABULATED WORK SECTIONS
180 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
18T
ilean
dsl
ate
roo
fan
dw
all
cove
ring
sPl
ain
tilin
gIn
terl
ocki
ngtil
ing
Fibr
ece
men
tsl
atin
gN
atur
alsl
atin
gN
atur
alor
artif
icia
lsto
nesl
atin
gT
imbe
ror
bitu
min
ous
felt
shin
gles
Any
othe
rty
peof
tile,
slat
e,sl
abor
bloc
kro
ofor
wal
lcov
erin
g
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
sof
each
roof
.2
Prin
cipa
lsec
tions
ofro
of.
3Ex
tern
alel
evat
ions
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yan
dsiz
eof
mat
eria
ls.2
Met
hod
offix
ing.
3M
inim
umla
ps.
4Sp
acin
gof
batt
ens
and
coun
ter
batt
ens.
5C
ompo
sitio
nan
dm
ixof
mor
tar.
6Ty
peof
poin
ting.
7Bo
ndin
gto
othe
rw
ork.
8Ra
dius
ofcu
rved
wor
k.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1M
ajor
horiz
onta
land
vert
ical
dim
ensio
ns.
2Ty
pes
ofm
ater
ials
used
toco
nstr
uct
the
roof
and
itsst
ruct
ures
.3
Posit
ion
ofm
ain
stru
ctur
alfr
ame
mem
bers
.4
Hei
ght
ofw
ork
abov
egr
ound
leve
l.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llro
ugh
and
fair
squa
re,r
akin
gan
dcu
rved
cutt
ing.
2A
llen
dsan
dan
gles
eith
erfo
rmed
orpr
oprie
tary
.3
Extr
am
ater
ialf
orcu
rved
wor
k.4
Form
ing
allr
ough
and
fair
groo
ves,
thro
ats,
mor
tices
,ch
ases
,reb
ates
,hol
es,s
tops
,m
itres
and
the
like
labo
urs.
5Ra
king
out
join
tsto
form
ake
y.
18 TILE AND SLATE ROOF AND WALL COVERINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 181
6Ra
king
out
join
tsto
inse
rtfla
shin
gs.
7La
bour
sin
retu
rns,
ends
and
angl
es.
8A
llex
tra
mat
eria
lreq
uire
dfo
rbo
ndin
g.9
Add
ition
alm
ater
iali
nla
ps.
10W
ork
info
rmin
gvo
ids
and
hole
s≤
1.00
m2.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Ro
ofco
verin
gs2
Wal
lcov
erin
gsm
21
Pitc
hst
ated
.2
Vert
ical
.1
Und
erla
ysan
dba
tten
s.1
Cur
ved:
radi
ista
ted.
2C
onic
al:m
axim
uman
dm
inim
umra
diis
tate
d.
1C
over
ings
are
deem
edto
incl
ude
unde
rlays
,bat
tens
and
wor
kin
form
ing
void
s≤
1.00
m2.
2N
ode
duct
ion
ism
ade
for
void
s≤
1.00
m2.
3Bo
unda
ryw
ork;
loca
tion
and
met
hod
offo
rmin
gde
scrib
edm
1D
imen
sione
dde
scrip
tion
stat
ing
net
girt
h.1
Abu
tmen
ts.
2Ea
ves.
3Ri
dges
.4
Verg
es.
5Va
lleys
.6
Hip
s.7
Vert
ical
angl
es.
1H
orizo
ntal
.2
Slop
ing.
3Ra
king
.4
Vert
ical
.5
Cur
ved:
radi
usst
ated
.6
Step
ped.
7Pr
efo
rmed
.
1Bo
unda
ryw
ork
isde
emed
toin
clud
eun
derc
loak
s,ro
ugh
and
fair
cutt
ing,
bedd
ing,
poin
ting,
ends
,ang
les
and
inte
rsec
tions
.2
Boun
dary
wor
kto
void
sis
only
mea
sure
dw
here
the
void
exce
eds
1.00
m2.
3Bo
unda
ryw
ork
isw
ork
asso
ciat
edw
ithcl
osin
gof
for
finish
ing
off
tile
orsla
tero
ofin
gat
the
exte
rnal
perim
eter
,at
the
abut
men
tw
ithdi
ffere
ntm
ater
ials
orth
epe
rimet
erof
open
ings
and
void
s.4
Valle
ysin
clud
eev
eryt
hing
nece
ssar
yto
form
and
line
the
valle
yex
clud
ing
any
shee
tm
etal
.She
etm
etal
linin
gssh
all
bem
easu
red
inW
ork
Sect
ion
17:
Shee
tRo
ofco
verin
gs.
TABULATED WORK SECTIONS
182 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4Fi
ttin
gsnr
1D
imen
sione
dde
scrip
tion.
1Ve
ntila
tors
.2
Fini
als.
3G
aste
rmin
als.
4H
ipiro
ns.
5So
aker
s.6
Sadd
les.
7Ro
oflig
hts.
8O
ther
:typ
est
ated
.
1N
atur
eof
base
.2
Met
hod
offix
ing
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
1Pr
oprie
tary
refe
renc
esm
aybe
give
nin
lieu
ofa
dim
ensio
ned
desc
riptio
n.
18 TILE AND SLATE ROOF AND WALL COVERINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 183
19W
ater
pro
ofin
gM
astic
asph
alt
roof
ing
App
lied
liqui
dro
ofin
gA
spha
ltta
nkin
gor
dam
ppr
oofin
gA
pplie
dliq
uid
tank
ing
orda
mp
proo
fing
Flex
ible
shee
tta
nkin
gor
dam
ppr
oofin
gO
ther
prop
riet
ary
syst
ems
ofta
nkin
gor
dam
ppr
oofin
g
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
sof
each
leve
lwhe
rew
ork
isto
beca
rrie
dou
t.2
Sect
ions
show
ing
exte
ntof
wor
k.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Re
stric
tions
onsit
ing
ofpl
ant
and
mat
eria
ls.2
Kind
and
qual
ityof
allm
ater
ials.
3Th
ickn
ess
and
num
ber
ofco
ats.
4Su
rface
finish
esor
trea
tmen
ts.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Ex
tent
ofw
ork.
2H
eigh
tof
wor
kab
ove
grou
ndle
vel.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1C
uttin
gto
line.
2A
llla
bour
and
mat
eria
las
soci
ated
with
cutt
ing,
notc
hing
,ben
ding
,lap
ping
and
rein
forc
emen
t.3
Wor
king
into
rece
sses
such
asdu
ctco
vers
,sha
ped
inse
ts,
man
hole
cove
rs,m
atw
ells,
outle
tpi
pes,
dish
edgu
llies
and
the
like.
4W
ork
tofa
llsan
dcr
oss
falls
.5
All
boun
dary
wor
kto
open
ings
≤1.
00m
2
6A
llpr
epar
atio
nto
back
grou
ndne
cess
ary
tofo
rma
key,
incl
udin
gra
king
out
join
ts,
scab
blin
gor
the
appl
icat
ion
ofa
bond
ing
agen
t.
TABULATED WORK SECTIONS
184 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
over
ings
>50
0mm
wid
em
21
Hor
izont
al.
2Sl
opin
g:pi
tch
stat
ed.
3Ve
rtic
al.
4C
urve
d:ra
diis
tate
d.
1U
nder
lays
.2
Insu
latio
n.3
Fini
shto
expo
sed
surfa
ce.
4Pr
otec
tion.
1N
atur
eof
base
.2
Num
ber
ofco
ats
orla
yers
.1
The
area
mea
sure
dis
that
inco
ntac
tw
ithba
se.
2N
ode
duct
ion
ism
ade
for
void
s≤
1.00
m2.
2C
over
ings
≤50
0mm
wid
em
3Sk
irtin
gs4
Fasc
ias
5A
pron
s
m1
Net
girt
hon
face
.1
Hor
izont
al.
2Sl
opin
g.3
Vert
ical
.4
Raki
ng.
5C
urve
d:ra
dius
stat
ed.
6St
eppe
d.
1Bo
unda
ryw
ork
tovo
ids
ison
lym
easu
red
whe
reth
evo
idis
>1.
00m
2.
2Bo
unda
ryw
ork
isw
ork
asso
ciat
edw
ithcl
osin
gof
for
finish
ing
off
the
wat
erpr
oofin
gat
the
exte
rnal
perim
eter
,at
the
abut
men
tw
ithdi
ffere
ntm
ater
ials
orth
epe
rimet
erof
open
ings
and
void
s.3
Boun
dary
wor
kis
deem
edto
incl
ude
unde
rclo
aks,
insu
latio
n,st
ripve
ntila
tors
,ro
ugh
and
fair
cutt
ing,
bedd
ing,
poin
ting,
laps
,sea
ms,
ends
,ang
les,
inte
rsec
tions
,rol
ls,up
stan
ds,
dow
nsta
nds,
dres
sings
and
wed
ging
s.
6G
utte
rs7
Cha
nnel
s8
Valle
ys9
Kerb
s
m1
Net
girt
hon
face
.1
Slop
ing.
2St
eppe
d.3
Cur
ved.
4Se
cret
.5
Tape
red.
1N
atur
eof
base
.2
Num
ber
ofco
ats
orla
yers
.3
Spac
ing
ofst
ruct
ural
supp
orts
.
1Th
ele
ngth
isth
em
ean
leng
thm
easu
red
over
allf
ittin
gs.
2Li
ning
and
cove
ring
wor
kis
deem
edto
incl
ude
alld
ress
ings
requ
ired
tofo
rmth
epr
ofile
,joi
nts,
brac
kets
,und
ercl
oaks
and
othe
ras
soci
ated
linin
gs,o
utle
ts,
over
flow
s,en
ds,a
ngle
s,in
ters
ectio
ns,
bedd
ing,
poin
ting,
fixin
gsan
dth
elik
e.3
Max
imum
and
min
imum
girt
hof
tape
red
gutt
ers
shal
lbe
give
n.
19 WATERPROOFING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 185
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
10Sp
otite
ms
nr1
Dim
ensio
ned
diag
ram
ordi
men
sione
dde
scrip
tion.
1C
atch
pits
.2
Sum
ps.
3O
utle
ts.
4H
atch
cove
rs.
5C
anop
yco
vers
.6
Col
lars
orsle
eves
arou
ndpi
pes
and
the
like.
7O
ther
:typ
est
ated
.
1Sp
otite
mw
ork
isde
emed
toin
clud
ejo
ints
,dre
ssin
gan
dbo
ndin
gto
surr
ound
ing
wor
k,un
derc
loak
san
dot
her
asso
ciat
edlin
ings
,end
s,an
gles
bedd
ing,
poin
ting,
fixin
gsan
dth
elik
e.
11Fi
ttin
gsnr
1D
imen
sione
dde
scrip
tion.
1Ve
ntila
tors
.2
Oth
er:t
ype
stat
ed.
1N
atur
eof
base
.2
Num
ber
ofco
ats
orla
yers
.3
Met
hod
offix
ing
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
1Fi
ttin
gsar
ede
emed
toin
clud
ejo
ints
,dr
essin
gan
dbo
ndin
gto
surr
ound
ing
wor
k,un
derc
loak
san
dot
her
asso
ciat
edlin
ings
,end
s,an
gles
bedd
ing,
poin
ting,
fixin
gsan
dth
elik
e.2
Prop
rieta
ryre
fere
nces
may
begi
ven
inlie
uof
adi
men
sione
dde
scrip
tion.
12Ed
getr
imm
TABULATED WORK SECTIONS
186 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
20P
ropr
ieta
rylin
ings
and
part
itio
nsM
etal
fram
edsy
stem
sto
wal
lsan
dce
iling
sD
rylin
ing
and
part
ition
ing
syst
ems
tow
alls
and
ceili
ngs
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.Pl
ans,
sect
ions
and
elev
atio
nsto
show
scop
ean
dlo
catio
nof
wor
k.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
,qua
lity
and
size
orth
ickn
ess
ofm
ater
ials
and
com
pone
nts.
2M
etho
dof
fixin
gfr
amin
gan
dlin
ings
.3
Layo
utan
dtr
eatm
ent
ofjo
ints
.4
Met
hod
ofjo
intin
g.5
Surfa
cepr
epar
atio
n.6
Fini
sh.
7Ra
diio
fcu
rved
wor
k.8
Nat
ure
ofba
se.
9Lo
catio
nof
wal
lor
ceilin
gm
ount
edfit
tings
requ
iring
addi
tiona
lsup
port
orfr
amin
g.10
Seal
ants
tojo
ints
and
perim
eter
s.
Not
es,c
omm
ents
and
glos
sary
1Th
efin
ishis
that
whi
chis
appl
ied
aspa
rtof
the
norm
alpr
oprie
tary
syst
em.
Any
finish
tobe
subs
eque
ntly
mad
eby
adi
ffere
nttr
ade
shal
lbe
mea
sure
dse
para
tely
unde
rth
ere
leva
ntru
les.
2Ex
ampl
esof
prop
rieta
ryfin
ishes
are
tape
djo
ints
,slu
rry
coat
s,an
dth
elik
e.3
Skim
coat
sor
othe
rw
ettr
ade
finish
esar
em
easu
red
inW
ork
Sect
ion
28:
Floo
r,w
all,
ceilin
gan
dro
ofco
verin
gs.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1St
ruct
ural
floor
toce
iling
heig
hts.
2Th
ese
rvic
eslo
cate
dw
ithin
the
ceilin
g,pa
rtiti
onor
linin
gw
here
the
wor
kin
clud
esco
mpl
exin
tegr
alse
rvic
es.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llw
ork
isde
emed
inte
rnal
unle
ssot
herw
isest
ated
.2
All
roug
han
dfa
ircu
ttin
g.3
Extr
am
ater
ialf
orcu
rved
wor
k.4
Add
ition
alfr
amin
gto
supp
ort
fittin
gs.
5En
ds,f
air
ends
and
abut
men
tsw
ithad
join
ing
wor
k.6
Wor
king
arou
ndco
lum
ns,
beam
san
dse
rvic
esw
here
the
oute
rfa
ceof
the
wor
kis
cont
inuo
us.
1Th
isre
fers
toth
efin
allo
catio
nof
the
wor
k.
20 PROPRIETARY LININGS AND PARTITIONS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 187
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
oprie
tary
met
alfr
amed
syst
emto
form
wal
lsm
21
Fini
shed
thic
knes
sst
ated
2H
eigh
tor
aver
age
heig
htst
ated
in1.
00m
incr
emen
ts.
3To
tall
engt
hst
ated
mea
sure
dal
ong
cent
relin
e.
1In
sula
tion.
2Va
pour
barr
iers
.3
Sub
linin
gs.
4Fi
nish
.5
Gla
zing
6C
urve
d:ra
dius
stat
ed.
1N
ode
duct
ions
for
void
s≤
1.00
m2.
2Th
eav
erag
ehe
ight
will
beca
lcul
ated
for
each
leng
thof
part
ition
with
aslo
ping
head
mea
sure
dbe
twee
nju
nctio
ns.
2Pr
oprie
tary
met
alfr
amed
syst
emto
form
ceilin
gsm
21
Ove
r30
0mm
wid
eon
face
1In
sula
tion.
2Va
pour
barr
iers
.3
Sub
linin
gs.
4Fi
nish
.5
Cur
ved:
radi
usst
ated
.6
Slop
ing
7C
onve
xor
conc
ave:
radi
usst
ated
.
1Fi
xed
dire
ctto
stru
ctur
also
ffit
2Su
ppor
ted
onad
jace
ntst
ruct
ure,
span
stat
edin
1.00
min
crem
ents
1Th
ead
jace
ntst
ruct
ure
such
asse
cond
ary
stee
lfra
min
gor
timbe
rfr
amin
gis
mea
sure
del
sew
here
.
m1
Not
exce
edin
g30
0mm
wid
eon
face
3Ex
tra
over
for
diffe
rent
m2
1Li
ning
:det
ails
stat
ed.
2Fi
nish
:det
ails
stat
ed.
1Th
isw
illap
ply
topa
rtiti
ons
that
have
area
sof
diffe
rent
linin
gsor
finish
esth
anth
atsp
ecifi
edin
the
gene
ral
desc
riptio
nhe
adin
g.It
will
not
appl
yto
diffe
rent
form
sof
cons
truc
tion
orco
mpo
nent
s.Th
ese
diffe
renc
esw
illre
quire
sepa
rate
item
sm
easu
red.
TABULATED WORK SECTIONS
188 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4Ex
tra
over
for
form
ing
open
ings
nr1
Not
exce
edin
g2.
50m
2.
22.
50–5
.00m
2.
3Ex
ceed
ing
5.00
m2
infu
rthe
rin
crem
ents
of2.
50m
2.
1Li
ned:
deta
ilsst
ated
.2
Unl
ined
.1
Non
-pro
prie
tary
mat
eria
lsar
eno
tde
emed
incl
uded
(e.g
.tim
ber
grou
nds
orin
sert
sw
ould
bem
easu
red
inW
ork
Sect
ion
16:C
arpe
ntry
).2
Line
dop
enin
gsar
eth
ose
lined
aspa
rtof
this
wor
k.
5Ex
tra
over
for
non-
stan
dard
perim
eter
deta
ilsm
1D
imen
sione
dde
scrip
tion
orpr
oprie
tary
refe
renc
e.1
Hea
ds:d
etai
lsst
ated
.2
Sole
s:de
tails
stat
ed.
3A
butm
ents
:det
ails
stat
ed.
1N
atur
eof
base
.1
Non
-sta
ndar
dde
tails
are
thos
eth
atin
volv
eth
eus
eof
com
pone
nts
that
are
not
used
with
inth
em
ain
body
ofw
ork
such
asde
flect
ion
head
s,ac
oust
icse
als,
fire
seal
san
dth
elik
e.6
Extr
aov
erfo
ran
gles
m
7Ex
tra
over
for
junc
tions
m1
Tee.
2C
ross
.
8Ex
tra
over
for
acce
sspa
nels
nr1
Dim
ensio
ned
desc
riptio
nor
prop
rieta
ryre
fere
nce.
1D
etai
lsst
ated
.1
Det
ails
incl
ude
type
offr
ame,
ironm
onge
ry,f
inish
,ins
ulat
ion,
fire
ratin
g,an
dpr
oprie
tary
refe
renc
enu
mbe
rw
here
appl
icab
le.
2Fa
iren
dsar
eon
lym
easu
red
whe
reth
eex
pose
den
dis
finish
edw
ithth
esa
me
finish
asth
efa
ce(s
)or
with
atr
imw
hich
isan
inte
gral
part
ofth
epa
rtiti
onsy
stem
.3
Fair
ends
are
deem
edto
incl
ude
all
extr
aw
ork
and
mat
eria
lsin
volv
ed.
9Fa
iren
dsto
part
ition
sm
1Th
ickn
ess
ofpa
rtiti
onst
ated
.1
Fini
shan
d/or
trim
s.
20 PROPRIETARY LININGS AND PARTITIONS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 189
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
10Pr
oprie
tary
linin
gsto
wal
lsm
21
Ove
r30
0mm
wid
eon
face
.2
Not
exce
edin
g30
0mm
wid
eon
face
.
1In
sula
tion.
2Va
pour
barr
iers
.3
Sub
linin
gs.
4Fi
nish
5C
urve
d,ra
dius
stat
ed6
Slop
ing
7C
onve
xor
conc
ave:
radi
usst
ated
.
1M
etho
dof
fixin
g2
Nat
ure
ofba
se
11Pr
oprie
tary
linin
gsto
ceilin
gsm
2
12Pr
oprie
tary
linin
gsto
colu
mns
m1
Gir
thn/
e30
0mm
,nr
offa
ces
stat
ed.
2G
irth
300–
600m
m,n
rof
face
sst
ated
.3
Gir
th60
0–90
0mm
,nr
offa
ces
stat
ed.
4Th
erea
fter
in30
0mm
stag
es,n
rof
face
sst
ated
.
13Pr
oprie
tary
linin
gsto
beam
sm
14Pr
oprie
tary
linin
gsto
bulk
head
sm
15Ex
tra
over
for
form
ing
open
ings
nr1
Not
exce
edin
g2.
50m
2.
22.
50–5
.00m
2.
3Ex
ceed
ing
5.00
m2
infu
rthe
rin
crem
ents
of2.
50m
2.
1Li
ned,
deta
ilsst
ated
.2
Unl
ined
.1
This
incl
udes
open
ings
for
door
s,w
indo
ws,
scre
ens
and
the
like.
16Ex
tra
over
for
non-
stan
dard
perim
eter
deta
ilsm
1D
imen
sione
dde
scrip
tion
orpr
oprie
tary
refe
renc
e.1
Hea
ds:d
etai
lsst
ated
.2
Sole
s:de
tails
stat
ed.
3A
butm
ents
:det
ails
stat
ed.
1N
atur
eof
base
.1
Non
-sta
ndar
dde
tails
are
thos
eth
atin
volv
eth
eus
eof
com
pone
nts
that
are
not
used
with
inth
em
ain
body
ofw
ork
such
asde
flect
ion
head
s,ac
oust
icse
als,
fire
seal
san
dth
elik
e.
17Ex
tra
over
for
angl
es.
m
18Ex
tra
over
for
junc
tions
.m
1Te
e.2
Cro
ss.
TABULATED WORK SECTIONS
190 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
19Ex
tra
over
for
acce
sspa
nels.
nr1
Dim
ensio
ned
desc
riptio
nor
prop
rieta
ryre
fere
nce.
1D
etai
lsst
ated
.1
Det
ails
incl
ude
type
offr
ame,
ironm
onge
ry,f
inish
,ins
ulat
ion,
fire
ratin
gan
dpr
oprie
tary
refe
renc
enu
mbe
rw
here
appl
icab
le.
20Be
ads,
func
tion
stat
edm
1M
etho
dof
fixin
g.1
Nat
ure
ofba
se.
1Fu
nctio
nof
bead
sin
clud
ean
gle
bead
s,st
opbe
ads,
shad
owga
pbe
ads,
casin
gbe
ads
and
the
like.
20 PROPRIETARY LININGS AND PARTITIONS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 191
21C
ladd
ing
and
cove
ring
Pate
ntgl
azin
g,cu
rtai
nw
allin
g,ra
insc
reen
clad
ding
,gla
zed
vaul
ting
and
stru
ctur
algl
ass
asse
mbl
ies
Rig
idsh
eet
clad
ding
Wea
ther
boar
ding
Prof
iled
shee
tcl
addi
ngor
roof
ing
Pane
lor
slab
clad
ding
orro
ofin
gSh
eet
clad
ding
sor
cove
ring
sA
nyot
her
type
ofcl
addi
ng,l
inin
gor
cove
ring
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
s,se
ctio
nsan
del
evat
ions
suffi
cien
tto
show
scop
ean
dlo
catio
nof
the
wor
ks.
2C
ompo
nent
draw
ings
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials.
2Ty
pe,f
inish
and
spac
ing
offr
amin
gm
embe
rs.
3N
atur
e,th
ickn
ess
and
spac
ing
ofst
ruct
ural
supp
orts
.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1C
onst
ruct
ion
ofea
chin
stal
latio
n.W
orks
and
mat
eria
lsde
emed
incl
uded
.1
Ironm
onge
ryw
here
supp
lied
with
the
com
pone
nt.
2G
lazi
ngw
here
part
ofth
ein
stal
latio
n.3
Inte
gral
insu
latio
n,m
embr
anes
and
the
like
whe
repa
rtof
the
syst
em.
4M
astic
san
dse
alan
ts.
5C
leat
san
dbr
acke
ts.
6Fi
san
dfa
sten
ings
.7
Mec
hani
cala
ndel
ectr
ical
oper
atin
geq
uipm
ent
whe
resu
pplie
dw
ithth
eco
mpo
nent
.
1Se
cond
ary
stee
lsup
port
wor
kis
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofW
ork
Sect
ion
15:S
truc
tura
lM
etal
wor
k.
TABULATED WORK SECTIONS
192 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1W
alls
2Fl
oors
3C
eilin
gs4
Roof
s5
Side
san
dto
psof
dorm
ers
6Si
des
and
soffi
tsof
beam
s7
Side
sof
colu
mns
m1
Not
exce
edin
g60
0w
ide.
1La
iddi
agon
ally.
2Sl
opin
g:pi
tch
stat
ed.
3Ve
rtic
al.
4C
urve
d:ra
dius
stat
ed.
5To
soffi
ts.
1In
tern
al.
2Ex
tern
al.
1W
alls
2Fl
oors
3C
eilin
gs4
Roof
s5
Side
san
dto
psof
dorm
ers
6Si
des
and
soffi
tsof
beam
s7
Side
sof
colu
mns
m2
1Ex
ceed
ing
600
wid
e.
nr1
Isola
ted
area
not
exce
edin
g1m
2,i
rres
pect
ive
ofw
idth
.
8Ite
ms
extr
aov
erth
ew
ork
inw
hich
they
occu
rnr
1D
imen
sione
dde
scrip
tion.
2Pr
oprie
tary
refe
renc
e.1
Ope
ning
light
s.2
Doo
rs.
3Ro
oflig
hts.
4Ve
ntila
tor
pane
ls.5
Form
ing
open
ings
for
othe
rtr
ades
.
1El
ectr
ical
requ
irem
ents
.1
Thes
eite
ms
are
only
for
com
pone
nts
that
are
part
ofth
esy
stem
tow
hich
they
are
inst
alle
d.
9Bo
unda
ryw
ork
m1
Hea
ds.
2Ri
dges
.3
Valle
ys.
4H
ips.
5Bo
ttom
edge
s.6
Eave
s.7
Verg
es.
8A
butm
ents
.9
Flas
hing
piec
es.
1H
orizo
ntal
.2
Vert
ical
.3
Slop
ing.
4Ra
king
.5
Cur
ved,
radi
usst
ated
.6
Step
ped.
7Pr
efor
med
.
1A
lled
gean
din
term
edia
tetr
ims,
cove
rpi
eces
,mas
tics
and
seal
ants
are
deem
edin
clud
edw
ithth
eas
soci
ated
boun
dary
orop
enin
gpe
rimet
erw
ork.
2Bo
unda
ryw
ork
isw
ork
asso
ciat
edw
ithcl
osin
gof
for
finish
ing
off
clad
ding
sor
cove
rings
atth
eex
tern
alpe
rimet
eror
atth
eab
utm
ent
with
diffe
rent
mat
eria
ls.
21 CLADDING AND COVERING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 193
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
10O
peni
ngpe
rimet
ers
m1
Dim
ensio
ned
desc
riptio
n.2
Prop
rieta
ryre
fere
nce.
1H
eads
.2
Jam
bs.
3Si
lls.
4Fl
ashi
ngpi
eces
.
1H
orizo
ntal
.2
Vert
ical
.3
Slop
ing.
4Ra
king
.5
Cur
ved,
radi
usst
ated
.6
Step
ped.
7Pr
efor
med
.
1op
enin
gw
ork
isas
soci
ated
with
clos
ing
off
orfin
ishin
gof
fcl
addi
ngs
and
cove
rings
atth
epe
rimet
erof
anop
enin
gor
avo
id.
11A
ngle
sm
1In
tern
al.
2Ex
tern
al.
1Re
gula
r.2
Irreg
ular
:ang
lest
ated
.1
Irreg
ular
angl
esar
ean
yth
atar
eno
t90
°.
12C
lose
rsm
1Fi
rest
ops.
2O
ther
:det
ails
stat
ed.
TABULATED WORK SECTIONS
194 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
22G
ener
aljo
iner
yU
nfra
med
isol
ated
trim
s,sk
irtin
gs,o
rsu
ndry
join
ery
item
sIn
-fill
pane
lsan
dsh
eets
Seal
ant
join
tsG
ener
alir
onm
onge
ryno
tas
soci
ated
with
win
dow
san
ddo
ors
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Gen
eral
arra
ngem
ent
plan
s.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
and
qual
ityof
mat
eria
ls.2
Fini
shof
timbe
rif
not
wro
t.3
Pres
erva
tion
trea
tmen
ts.
4Su
rface
trea
tmen
tsas
part
ofth
epr
oduc
tion
proc
ess.
5Se
lect
ion
and
prot
ectio
nfo
rsu
bseq
uent
trea
tmen
tor
clea
rfin
ish.
6M
atch
ing
grai
nor
colo
ur.
7Li
mits
onpl
anin
gm
argi
ns.
8M
etho
dof
join
ting
and
cons
truc
tion
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
9Fo
rmof
cons
truc
tion
and
join
ting
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
10M
etho
dof
fixin
gw
here
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sc
ope
and
loca
tion
ofw
ork.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
lltim
bers
are
deem
edto
bew
rot
finish
unle
ssde
scrib
edot
herw
ise.
2A
lltim
ber
sizes
are
nom
inal
unle
ssst
ated
asfin
ished
size.
3En
ds,a
ngle
s,m
itres
and
inte
rsec
tions
irres
pect
ive
ofcr
oss
sect
ion
area
oftim
ber.
4W
ork
isde
emed
inte
rnal
unle
ssde
scrib
edas
exte
rnal
.
22 GENERAL JOINERY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 195
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Unf
ram
edis
olat
edtr
ims,
skir
tings
and
sund
ryite
ms
1Sk
irtin
gs,p
ictu
rera
ils2
Arc
hitr
aves
and
the
like
3C
over
fille
ts,s
tops
,trim
s,be
ads,
nosin
gsan
dth
elik
e4
Isola
ted
shel
ves
and
wor
ktop
s5
Win
dow
boar
ds6
Isola
ted
hand
rails
and
grab
rails
m1
Dim
ensio
ned
over
allc
ross
sect
ion
stat
ed.
2N
umbe
ran
dty
peof
labo
urs
desc
ribed
.
1Bu
iltup
mem
bers
,size
ofco
mpo
nent
sst
ated
.2
Tim
ber
com
pone
nts
tong
ued
on.
3D
iffer
ent
cros
s-se
ctio
nsh
apes
(nr)
.
1Fi
thro
ugh
vuln
erab
lem
ater
ials.
2C
urve
dw
ork
tobe
desc
ribed
stat
ing
the
radi
us.
7D
uct
cove
rs8
Pipe
casin
gs9
Shel
ves
m1
Thic
knes
san
dw
idth
orgi
rth
stat
ed.
2Th
ickn
ess
and
wid
thor
girt
hno
tex
ceed
ing
300m
mst
ated
.3
Thic
knes
san
dw
idth
orgi
rth
over
300m
mbu
tno
tex
ceed
ing
600m
mst
ated
.4
Thic
knes
san
dw
idth
orgi
rth
ther
eafte
rin
300m
mst
ages
.
1N
atur
ean
dm
etho
dof
form
ing
join
ts.
1U
sual
lyth
eex
act
wid
thor
girt
hsh
all
begi
ven
for
thes
eite
ms
but
whe
reth
ere
are
man
ydi
fferin
gbu
tsim
ilar
wid
ths
thes
em
aybe
grou
ped
into
300m
mw
ide
orgi
rth
band
s.
10Pi
nboa
rds,
back
boar
ds,p
linth
bloc
ksan
dth
elik
enr
1D
imen
sione
dde
scrip
tion.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
se.
Floo
r,w
alla
ndce
iling
boar
ding
,she
etin
g,pa
nelli
ng,l
inin
gsan
dca
sing
s
11Bo
ardi
ng,s
heet
ing,
pane
lling
over
600m
mw
ide
m2
1Th
ickn
ess.
1Fl
oors
.2
Wal
ls.3
Cei
lings
.
1M
etho
dof
fixin
g.2
Met
hod
ofjo
intin
g.3
Nat
ure
ofba
se.
12Bo
ardi
ng,s
heet
ing,
pane
lling
not
exce
edin
g60
0mm
wid
em
1W
idth
and
thic
knes
s.
TABULATED WORK SECTIONS
196 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Prop
riet
ary
part
ition
s,pa
nels
and
cubi
cles
13Pa
rtiti
ons
m1
Hei
ght
and
thic
knes
sst
ated
.2
Prop
rieta
ryna
me
orre
fere
nce
stat
ed.
1O
ffsit
eap
plie
dfin
ish.
2O
nsit
eap
plie
dfin
ish.
1M
etho
dof
join
ting
and
fixin
g.2
Cur
ved:
radi
usst
ated
.3
Nat
ure
ofba
ckgr
ound
.4
Inte
gral
serv
ices
.
1Th
elin
ear
mea
sure
men
tis
the
mea
nle
ngth
mea
sure
dal
ong
the
cent
relin
eof
the
part
ition
.2
The
leng
this
mea
sure
dth
roug
han
dov
eral
lobs
truc
tions
and
open
ings
.3
Part
ition
sar
ede
emed
toin
clud
eal
lin
tegr
alco
mpo
nent
s,fix
ings
,joi
nts,
fact
ory
appl
ied
trim
s,ho
les
and
mor
tices
.
14Ite
ms
extr
aov
erth
epa
rtiti
onth
eyoc
cur
innr
1O
peni
ngs:
size
stat
ed.
1Bl
anks
.2
Doo
rs.
3W
indo
ws.
4G
laze
dpa
nels.
5A
cces
spa
nels.
1O
peni
ngs
are
deem
edto
incl
ude
ever
ythi
ngne
cess
ary
tofo
rmth
eop
enin
gto
geth
erw
ithth
eir
asso
ciat
edin
tegr
alco
mpo
nent
s,gl
ass,
door
s,iro
nmon
gery
,lin
ings
and
fact
ory-
appl
ied
trim
s.
m2
Trim
s:di
men
sione
dde
scrip
tion.
1Tr
ims
are
only
mea
sure
das
sepa
rate
item
sif
fixed
onsit
e.
15D
uct
pane
ls,Sa
nita
ryw
are
back
pane
lsan
dth
elik
enr
1O
vera
llsiz
est
ated
.2
Thic
knes
sst
ated
.Su
bfr
ames
,det
ails
stat
ed.
1M
etho
dof
fixin
g2
Nat
ure
ofba
ckgr
ound
.1
All
anci
llary
item
sne
eded
toco
nnec
tth
esa
nita
ryap
plia
nces
toth
eM
and
Ein
stal
latio
nsar
ede
emed
incl
uded
.2
Ass
ocia
ted
sani
tary
war
eite
ms
are
not
incl
uded
inth
ese
item
sbu
tsh
allb
em
easu
red
inac
cord
ance
with
the
rule
sof
Wor
kSe
ctio
n32
:Fur
nitu
re,f
ittin
gsan
deq
uipm
ent
16C
ubic
lepa
rtiti
onse
tsnr
1D
imen
sione
ddi
agra
mor
dim
ensio
ned
desc
riptio
n.1
Com
plet
ecu
bicl
es:n
umbe
rof
bays
stat
ed.
1N
atur
eof
back
grou
nd.
2M
etho
dof
fixin
gto
back
grou
nd.
1C
ubic
lese
tsar
ede
emed
toin
clud
eal
lin
tegr
alfr
ames
,pan
els,
door
s,fa
ctor
yap
plie
dtr
ims,
conn
ectio
ns,f
ixin
gsan
dfa
sten
ings
com
plet
ew
ithsu
ppor
tle
gs,
brac
kets
and
stan
dard
ironm
onge
ry.
22 GENERAL JOINERY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 197
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
17Ite
ms
extr
aov
erth
epa
rtiti
onth
eyoc
cur
inm
1Tr
ims:
dim
ensio
ned
desc
riptio
n.1
Trim
sar
eon
lym
easu
red
asse
para
teite
ms
iffix
edon
site.
Infil
lpan
els
1In
fillp
anel
sar
eno
n-gl
ass
and
non-
glas
spl
astic
srig
idsh
eet
span
drel
and
infil
lpa
nels
ofal
lkin
dsfix
edw
ithbe
ads,
gask
ets
and
the
like
tow
ood,
met
al,
plas
tican
dco
ncre
tesu
rrou
nds.
They
excl
ude
pane
lsor
shee
tsfo
rmin
gan
inte
gral
part
ofa
com
pone
ntor
prop
rieta
rycl
addi
ngsy
stem
.
18In
fillp
anel
san
dsh
eets
,num
ber
stat
edm
21
Thic
knes
sst
ated
.1
Cur
ved:
stat
ing
radi
us.
2Pa
nels
exce
edin
gsiz
eof
norm
alm
anuf
actu
red
unit.
3Pa
nels
requ
iring
spec
ial
trea
tmen
tto
edge
s.
1W
ork
isde
emed
inte
rnal
unle
ssde
scrib
edas
exte
rnal
.2
Infil
lpan
els
are
deem
edto
incl
ude
bedd
ing
com
poun
ds,s
eala
nts,
intu
mes
cent
com
poun
dsan
dst
rips,
dist
ance
piec
es,l
ocat
ion
and
sett
ing
bloc
ksan
dfix
ings
.
Seal
ant
join
ts1
Kind
and
qual
ityof
mat
eria
ls.2
Met
hod
ofap
plic
atio
n.3
Met
hod
ofpr
epar
ing
cont
act
surfa
ces.
19Jo
ints
:con
tact
surfa
ces
stat
edm
1Ty
pean
dsiz
eof
com
pone
nts
stat
ed.
1Ve
rtic
al.
2Sl
opin
g.3
Soffi
t.4
Hor
izont
al.
1Le
ngth
sar
em
easu
red
onfa
ce.
2W
ork
isde
emed
toin
clud
epr
epar
atio
n,cl
eane
rs,p
rimer
s,se
aler
s,ba
ckin
gst
rips
and
fille
rs.
20Po
intin
g:co
ntac
tsu
rface
sst
ated
m1
One
side.
2Bo
thsid
es.
TABULATED WORK SECTIONS
198 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
21Ra
king
out
exist
ing
join
tsm
1W
idth
,dep
than
dty
peof
mat
eria
lsta
ted.
1Ve
rtic
al.
2Sl
opin
g.3
Soffi
t.4
Hor
izont
al.
3D
eem
edto
incl
ude
disp
osal
ofal
lde
bris.
Iron
mon
gery
1Ki
ndan
dqu
ality
ofm
ater
ials
and
fixin
gs.
2Su
rface
finish
.3
Con
stitu
ent
part
sof
the
units
orse
ts.
4Fi
thro
ugh
vuln
erab
lem
ater
ials.
22Ty
peof
item
,uni
tor
set
stat
ednr
1M
etho
dof
fixin
g.2
Nat
ure
ofba
se.
1Iro
nmon
gery
isde
emed
toin
clud
efix
ing
with
scre
ws
tom
atch
and
prep
arin
gth
eba
seto
rece
ive
it.2
Shel
fbr
acke
tsan
das
soci
ated
fittin
gsw
illbe
mea
sure
dhe
re.
22 GENERAL JOINERY
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 199
23W
indo
ws,
scre
ens
and
light
sT
imbe
r,m
etal
,pla
stic
:W
indo
ws
and
shop
fron
tsR
oofli
ghts
Scre
ens
Louv
res,
shut
ters
,can
opie
san
dbl
inds
Ass
ocia
ted
glas
san
dgl
azin
gA
ssoc
iate
dir
onm
onge
ry
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Gen
eral
arra
ngem
ent
plan
s.2
Doo
ran
dw
indo
wsc
hedu
le.
3G
lazi
ngsc
hedu
le.
4Iro
nmon
gery
sche
dule
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials
and
iftim
ber
desc
ribin
gif
wro
tor
saw
n2
Pres
erva
tion
trea
tmen
ts.
3Su
rface
trea
tmen
tsap
plie
das
part
ofth
epr
oduc
tion
proc
ess.
4Se
lect
ion
and
prot
ectio
nfo
rsu
bseq
uent
trea
tmen
tor
clea
rfin
ish.
5M
atch
ing
grai
nor
colo
ur.
6Li
mits
onpl
anin
gm
argi
ns.
7M
etho
dof
join
ting
and
cons
truc
tion
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
8Fo
rmof
cons
truc
tion
and
join
ting
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
9M
etho
dof
fixin
gw
here
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.10
Back
grou
ndw
here
vuln
erab
le.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sh
ape
and
size
ofun
its.
2M
etho
dsof
fixin
gun
its.
3G
lazi
ngre
quire
men
ts.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1Be
ddin
gan
dpo
intin
gfr
ames
.2
Gla
ssan
dth
elik
eis
deem
edto
bein
stal
led
onsit
eun
less
stat
edot
herw
ise.
TABULATED WORK SECTIONS
200 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1W
indo
ws
and
win
dow
fram
esnr
1D
imen
sione
dde
scrip
tion
ordi
agra
m.
1C
urve
dw
ork:
radi
usst
ated
.1
Met
hod
offix
ing
ifno
tle
ftto
disc
retio
nof
cont
ract
or.
2Fa
ctor
ygl
azed
.
1G
lass
may
bein
corp
orat
edin
toth
eas
soci
ated
wor
kfo
llow
ing
the
rule
sse
tou
tbe
low
.
2W
indo
wsh
utte
rs
3Su
nsh
ield
s
4Ro
oflig
hts,
skyl
ight
san
dla
nter
nlig
hts
5Sc
reen
s,bo
rrow
edlig
hts
and
fram
es
6Sh
opfro
nts
7Lo
uvre
san
dfr
ames
Gla
zing
8G
lass
,typ
est
ated
nr1
Thic
knes
sof
glas
sor
over
all
thic
knes
sof
seal
edun
itst
ated
.2
Pane
size.
1Sh
ape
ifot
her
than
squa
reor
rect
angu
lar.
2A
irspa
ce(s
)w
idth
(s)
ofdo
uble
/trip
legl
azed
units
.3
Gas
fillin
gof
airs
pace
s.
1Be
nt:d
irect
ion
stat
ed.
2M
etho
dof
glaz
ing
orse
curin
g.3
Edge
trea
tmen
t.
1G
lass
incl
udes
plas
tic,o
ran
yty
peof
mat
eria
lgla
zed
into
open
ings
exce
ptgl
ass
bloc
ks.
2Th
esiz
egi
ven
for
irreg
ular
pane
ssh
all
beth
esm
alle
stre
ctan
gula
rsiz
efro
mw
hich
the
pane
can
beob
tain
ed.
9Lo
uvre
blad
es
Iron
mon
gery
10Ty
peof
item
,uni
tor
set
stat
ednr
1M
etho
dof
fixin
g.2
Nat
ure
ofba
se.
1Ki
ndan
dqu
ality
ofm
ater
ials
and
fixin
gs.
2Su
rface
finish
.3
Con
stitu
ent
part
sof
the
units
orse
ts.
1Iro
nmon
gery
isde
emed
toin
clud
efix
ing
with
scre
ws
tom
atch
and
prep
arin
gth
eba
seto
rece
ive
it.
23 WINDOWS, SCREENS AND LIGHTS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 201
24D
oo
rs,s
hutt
ers
and
hatc
hes
Tim
ber,
met
al,p
last
ic:
Doo
rsan
dfr
ames
Shut
ters
and
Hat
ches
Slid
ing
orfo
ldin
gdo
ors
and
part
ition
sG
rille
sA
ssoc
iate
dgl
ass
and
glaz
ing
Ass
ocia
ted
iron
mon
gery
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Floo
rpl
ans.
2D
oor
sche
dule
.3
Ironm
onge
rysc
hedu
le.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials
and,
iftim
ber,
desc
ribin
gif
wro
tor
saw
n.2
Pres
erva
tion
trea
tmen
ts.
3Su
rface
trea
tmen
tsap
plie
das
part
ofth
epr
oduc
tion
proc
ess.
4Se
lect
ion
and
prot
ectio
nfo
rsu
bseq
uent
trea
tmen
tor
clea
rfin
ish.
5M
atch
ing
grai
nor
colo
ur.
6Li
mits
onpl
anin
gm
argi
ns.
7M
etho
dof
join
ting
and
cons
truc
tion
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
8Fo
rmof
cons
truc
tion
and
join
ting
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
9M
etho
dof
fixin
gw
here
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.10
Back
grou
ndw
here
vuln
erab
le.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Lo
catio
nof
alld
oors
.2
Doo
rre
fere
nce
num
ber.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1Be
ddin
gan
dpo
intin
gfr
ames
.2
Gla
ssan
dth
elik
eis
deem
edto
bein
stal
led
onsit
eun
less
stat
edot
herw
ise.
TABULATED WORK SECTIONS
202 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1D
oor
sets
nr1
Det
aile
dde
scrip
tion
ofse
t.2
Stru
ctur
alop
enin
gsiz
e.1
Back
grou
nd.
1Sm
oke
stop
s:de
tails
stat
ed.
2Fi
rest
ops:
deta
ilsst
ated
.1
Doo
rse
tsco
mpr
iseth
edo
oror
door
sco
mpl
ete
with
asso
ciat
edfr
ame,
stop
s,ar
chitr
aves
and
trim
s.2
Any
trim
san
dth
elik
efix
edto
the
set
afte
rin
stal
latio
nm
ust
bem
easu
red
inac
cord
ance
with
the
rule
sof
Wor
kSe
ctio
n22
:Gen
eral
join
ery.
3G
lass
may
bein
corp
orat
edin
toth
eas
soci
ated
wor
kfo
llow
ing
the
rule
sse
tou
tbe
low
,
2D
oors
nr1
Dim
ensio
ned
desc
riptio
nor
diag
ram
.1
Fire
resis
tanc
epe
rform
ance
.1
Met
hod
offix
ing
ifno
tle
ftto
disc
retio
nof
cont
ract
or2
Fact
ory
glaz
ed
1Ea
chle
afof
am
ulti-
leaf
eddo
oris
coun
ted
ason
edo
or.
2G
lass
may
bein
corp
orat
edin
toth
eas
soci
ated
wor
kfo
llow
ing
the
rule
sse
tou
tbe
low
.
3Ro
ller
shut
ters
4C
olla
psib
lega
tes
5Sl
idin
gfo
ldin
gpa
rtiti
ons
6H
atch
es
7St
rong
room
door
s
8G
rille
s
9D
oor
fram
esm
1D
imen
sione
dov
eral
lcro
ssse
ctio
nde
scrip
tion.
1La
bour
sde
scrib
ed.
1Fr
ames
and
linin
gsin
clud
esja
mbs
,he
ads,
sills,
mul
lions
and
tran
som
es.
10D
oor
linin
gs
11D
oor
stop
s
12A
ssoc
iate
dfir
est
ops
13A
ssoc
iate
dsm
oke
stop
s
24 DOORS, SHUTTERS AND HATCHES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 203
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Gla
zing
14G
lass
,typ
est
ated
nr1
Thic
knes
sof
glas
sor
over
all
thic
knes
sof
seal
edun
itst
ated
.2
Pane
size.
1Sh
ape
ifot
her
than
squa
reor
rect
angu
lar.
2A
irspa
ce(s
)w
idth
(s)
ofdo
uble
/trip
legl
azed
units
.3
Gas
fillin
gof
airs
pace
s.
1Be
nt:d
irect
ion
stat
ed.
2M
etho
dof
glaz
ing
orse
curin
g.3
Edge
trea
tmen
t.
1G
lass
incl
udes
plas
tic,o
ran
yty
peof
mat
eria
lgla
zed
into
open
ings
exce
ptgl
ass
bloc
ks.
2Th
esiz
egi
ven
for
irreg
ular
pane
ssh
all
beth
esm
alle
stre
ctan
gula
rsiz
efro
mw
hich
the
pane
can
beob
tain
ed.
15Lo
uvre
blad
es
Iron
mon
gery
16Ty
peof
item
,uni
tor
set
stat
ednr
1M
etho
dof
fixin
g.2
Nat
ure
ofba
se.
1Ki
ndan
dqu
ality
ofm
ater
ials
and
fixin
gs.
2Su
rface
finish
.3
Con
stitu
ent
part
sof
the
units
orse
ts.
1Iro
nmon
gery
isde
emed
toin
clud
efix
ing
with
scre
ws
tom
atch
and
prep
arin
gth
eba
seto
rece
ive
it.
TABULATED WORK SECTIONS
204 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
25S
tair
s,w
alkw
ays
and
balu
stra
des
Tim
ber,
met
al,p
last
ic:
Stai
rcas
esW
alkw
ays
and
Gan
trie
sBa
lust
rade
sBa
rrie
rsG
uard
rails
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
san
dse
ctio
nssh
owin
glo
catio
nan
dsc
ope
ofea
chun
it.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials
and
iftim
ber
desc
ribin
gif
wro
tor
saw
n.2
Pres
erva
tion
trea
tmen
ts.
3Su
rface
trea
tmen
tsap
plie
das
part
ofth
epr
oduc
tion
proc
ess.
4Se
lect
ion
and
prot
ectio
nfo
rsu
bseq
uent
trea
tmen
tor
clea
rfin
ish.
5M
atch
ing
grai
nor
colo
ur.
6Li
mits
onpl
anin
gm
argi
ns.
7M
etho
dof
join
ting
and
cons
truc
tion
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
8Fo
rmof
cons
truc
tion
and
join
ting
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
9M
etho
dof
fixin
gw
here
not
atth
edi
scre
tion
ofth
eco
ntra
ctor
.10
Back
grou
ndw
here
vuln
erab
le.
Not
es,c
omm
ents
and
glos
sary
25 STAIRS,WALKWAYS AND BALUSTRADES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 205
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Pr
inci
ple
dim
ensio
nsof
each
stai
rcas
eor
unit.
2H
eigh
tfro
mst
ruct
ural
floor
tost
ruct
ural
floor
leve
l.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llra
mps
,wre
aths
,ben
ds,p
lain
ends
,orn
amen
tale
nds
and
the
like
labo
urs.
2Li
ning
s,no
sings
,cov
erm
ould
s,tr
ims
and
the
like
whe
rein
tegr
alpa
rtof
the
unit.
3So
ffit
linin
gs,s
pand
relp
anel
san
dth
elik
ew
here
anin
tegr
alpa
rtof
the
unit.
4Iro
nmon
gery
whe
rean
inte
gral
part
ofth
eun
it.5
Fini
shes
appl
ied
off
site.
6Fi
s,fa
sten
ings
,blo
ckin
gs,
wed
ges,
bolts
,bra
cket
s,cl
eats
and
the
like.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1St
airc
ase:
type
stat
ednr
1D
imen
sione
dde
scrip
tion.
2C
ompo
nent
draw
ing
refe
renc
e.1
Hat
chdo
ors
whe
repa
rtof
the
loft
ladd
erco
mpo
nent
.1
Stai
rcas
esar
ede
emed
toin
clud
eat
tach
edba
lust
rade
san
dne
wel
post
s.2
Any
trim
san
dth
elik
efix
edto
the
unit
afte
rin
stal
latio
nm
ust
bem
easu
red
inac
cord
ance
with
the
rule
sof
Wor
kSe
ctio
n22
:Gen
eral
join
ery.
2Lo
ftla
dder
s
3La
dder
s
4Ex
tra
over
for:
nr1
Qua
rter
land
ing.
1D
imen
sione
dde
scrip
tion.
2H
alf
land
ing.
5C
atw
alks
m1
Dim
ensio
ned
desc
riptio
n.1
Cur
ved;
radi
usst
ated
.1
Met
hod
offix
ing
orsu
ppor
t.2
Back
grou
nd.
6W
alkw
ays
TABULATED WORK SECTIONS
206 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
7Ba
lust
rade
sm --
---
nr
1D
imen
sione
dde
scrip
tion.
----
----
----
----
----
--2
Com
pone
ntdr
awin
gre
fere
nce.
1C
urve
d:ra
dius
stat
ed.
1In
fillp
anel
s:de
tail
stat
ed.
2M
etho
dof
fixin
gor
supp
ort.
3Ba
ckgr
ound
.
1Th
ese
item
sar
em
easu
red
whe
nno
tfo
rmin
gan
inte
gral
part
ofa
stai
rcas
eun
it.2
Thes
eite
ms
incl
ude
alli
nteg
ralr
ails,
infil
lpan
els,
ironm
onge
ry,f
acto
ryap
plie
dfin
ishes
,fix
ings
and
fast
enin
gs.
8H
andr
ails
9Ba
rrie
rs
10G
uard
rails
11Ba
lcon
yun
its
12Ex
tra
over
for:
nr1
Ope
ning
port
ions
:size
and
deta
ilsst
ated
.
25 STAIRS,WALKWAYS AND BALUSTRADES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 207
26M
etal
wo
rkIs
olat
edm
etal
mem
bers
Gen
eral
met
alw
ork
Gen
eral
met
alw
ork
fittin
gsan
dfix
ture
s
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
s,se
ctio
ns,e
leva
tions
orde
tails
suffi
cien
tto
show
loca
tion,
scop
ean
dco
nstr
uctio
nof
each
item
mea
sure
d.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ty
pes
and
grad
esof
mat
eria
ls.2
Det
ails
ofco
nnec
tions
.3
Det
ails
ofw
eldi
ngte
sts
and
x-ra
ys.
4D
etai
lsof
perfo
rman
cete
sts.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Po
sitio
nof
the
wor
k.2
Type
san
dsiz
esof
stru
ctur
alm
embe
rsan
dth
eir
posit
ion
rela
tive
toea
chot
her.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llfa
bric
atio
nan
der
ectio
n.2
All
bolts
,nut
s,w
ashe
rs,f
ixin
gsan
dfa
sten
ings
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Iso
late
dm
etal
mem
bers
m1
Dim
ensio
ned
desc
riptio
n:cr
oss
sect
ion
prof
ilest
ated
.1
Built
up:d
etai
lsof
cons
truc
tion
stat
ed.
2Ta
pere
d.3
Cur
ved:
radi
usst
ated
.4
Hol
low
:sha
pest
ated
.
1M
etho
dof
fixin
gin
posit
ion.
2Fi
plat
es,b
rack
ets
and
the
like:
dim
ensio
ned
desc
riptio
nst
ated
.3
Prot
ectiv
eco
atin
gap
plie
dof
fsit
e.
1Fo
rmin
gho
les,
mor
tices
and
the
like
inth
eite
man
dba
ckgr
ound
for
fixin
gpu
rpos
esar
ede
emed
incl
uded
.
2G
ener
alm
etal
wor
km
embe
rsm --
---
nr
1D
imen
sione
dde
scrip
tion:
cros
sse
ctio
npr
ofile
stat
ed.
1Pr
otec
tive
coat
ing
appl
ied
off
site.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.3
Surfa
cepa
tter
nor
finish
.
3Sh
eet
met
alm
2
----
-nr
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Dim
ensio
ned
desc
riptio
n.
TABULATED WORK SECTIONS
208 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4W
irem
esh
m2
----
-nr
1M
esh
size
and
thic
knes
sst
ated
.--
----
----
----
----
----
2D
imen
sione
dde
scrip
tion.
1Pr
otec
tive
coat
ing
appl
ied
off
site.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.3
Surfa
cepa
tter
nor
finish
.
1Fo
rmin
gho
les,
mor
tices
and
the
like
inth
eite
man
dba
ckgr
ound
for
fixin
gpu
rpos
esar
ede
emed
incl
uded
.
5C
ompo
site
item
sm --
---
nr
1D
imen
sione
dde
scrip
tion.
2D
raw
ing
refe
renc
e.1
Full
desc
riptio
nof
all
com
pone
nts
incl
udin
gin
tegr
alno
n-m
etal
licite
ms.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.1
Non
-met
allic
inte
gral
item
sfo
rmin
gpa
rtof
the
com
posit
eite
mm
aybe
incl
uded
inth
eco
mpo
site
item
prov
ided
they
are
clea
rlyde
scrib
edas
such
.2
Any
non-
met
allic
item
appl
ied
afte
rth
eco
mpo
site
item
has
been
inst
alle
don
site
shal
lbe
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofth
ere
leva
ntse
ctio
n.
6Fi
lling
hollo
wse
ctio
nsite
m1
Wat
er.
2C
oncr
ete.
3O
ther
mat
eria
l:ty
pest
ated
.
1D
etai
lsst
ated
.
7Su
rface
trea
tmen
tsm
21
Gal
vani
sing.
2Sp
raye
dco
atin
g.3
Pain
ting.
4O
ther
trea
tmen
t:ty
pest
ated
.
1O
nsit
e.2
Off
site.
1Su
rface
prep
arat
ion
desc
ribed
.1
All
prep
arat
ion
isde
emed
incl
uded
.2
Any
finish
appl
ied
afte
rin
stal
latio
nis
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofth
e‘P
aint
ing
and
deco
ratin
g’se
ctio
n.
8Iso
late
dpr
otec
tive
coat
ings
nr1
App
roxi
mat
esiz
eor
area
stat
ed1
Type
ofpr
otec
tive
coat
edst
ated
.2
Prep
arat
ion
desc
ribed
.
1O
nsit
e.2
Off
site.
26 METALWORK
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 209
27G
lazi
ng
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Elev
atio
ns.
2C
ompo
nent
draw
ings
.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
qual
ityan
dth
ickn
ess
ofgl
ass.
2Ki
ndan
dqu
ality
ofgl
azin
gm
ater
ial.
3M
etho
dof
glaz
ing
incl
udin
gde
tails
ofga
sket
sw
here
requ
ired.
4N
atur
eof
fram
eor
back
grou
nd.
Not
es,c
omm
ents
and
glos
sary
1Th
isse
ctio
nco
vers
allt
ypes
ofgl
ass
and
glas
spl
astic
san
dgl
azin
gw
ithpu
tty,
bead
sor
gask
ets
into
prep
ared
open
ings
.2
Gla
zing
supp
lied
aspa
rtof
aw
indo
w,
door
orot
her
com
pone
ntis
mea
sure
del
sew
here
with
thos
eco
mpo
nent
s.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1G
ener
alsc
ope
and
loca
tion
ofw
ork.
1W
orks
and
mat
eria
lsde
emed
incl
uded
.1
All
raki
ngan
dcu
rved
cutt
ing.
2A
llpo
lishe
dan
dbe
velle
ded
ges
unle
ssgi
ven
inth
ede
scrip
tion.
3D
rillin
gho
les.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1G
lass
,typ
est
ated
2Se
aled
glaz
edun
its,t
ype
ofgl
ass
stat
ed3
Louv
rebl
ades
,typ
eof
glas
sst
ated
nr1
Thic
knes
sof
glas
sor
over
all
thic
knes
sof
seal
edun
it.2
Pane
size.
1Sh
ape
ifot
her
than
squa
reor
rect
angu
lar.
2A
irspa
ce(s
)w
idth
(s)
ofdo
uble
/trip
legl
azed
units
.3
Gas
fillin
gof
airs
pace
s.
1Be
nt:d
irect
ion
stat
ed.
2M
etho
dof
glaz
ing
orse
curin
g:de
tails
stat
ed.
3Ed
getr
eatm
ent.
1G
lass
incl
udes
lam
inat
ed,t
ough
ened
,do
uble
ortr
iple
glaz
ing
units
,lea
d,ac
rylic
,pol
ycar
bona
tean
dth
elik
e,or
any
othe
rty
peof
mat
eria
lgla
zed
into
open
ings
exce
ptgl
ass
bloc
ks.
2G
lass
bloc
ksar
em
easu
red
inac
cord
ance
with
the
rule
sof
Wor
kSe
ctio
n14
:Mas
onry
.3
The
size
give
nfo
rirr
egul
arpa
nes
shal
lbe
the
smal
lest
rect
angu
lar
size
from
whi
chth
epa
neca
nbe
obta
ined
.
4Ex
tra
for:
nr1
Grin
ding
.2
Sand
blas
ting.
3A
cid
etch
ing.
4Em
boss
ing.
5En
grav
ing.
1Pl
ain
wor
k;pa
nesiz
est
ated
.2
Des
ign
wor
k:pa
nesiz
est
ated
.1
Det
aile
dde
scrip
tion
ofw
ork
incl
udin
gex
tent
ofw
ork
over
the
pane
.
1Th
isin
form
atio
nm
aybe
give
nby
refe
renc
eto
deta
iled
draw
ings
.
TABULATED WORK SECTIONS
210 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5Le
adlig
htgl
azin
g,ty
peof
glas
sst
ated
nr1
Thic
knes
sof
glas
s.2
Ove
rall
win
dow
orlig
htsiz
e.1
Pane
sizes
whe
rere
gula
rsh
ape.
2Pa
tter
nof
lead
cam
es.
3Sp
acin
gsof
lead
cam
es.
1Be
nt:d
irect
ion
stat
ed.
2M
etho
dof
glaz
ing
orse
curin
g:de
tails
stat
ed.
3Ed
getr
eatm
ent.
1Th
epa
tter
nw
illbe
desc
ribed
asre
gula
r,di
amon
dor
irreg
ular
.2
Cam
esar
eth
eH
-sha
ped
lead
strip
sth
atar
eso
lder
edto
geth
erto
form
the
lead
glaz
edpa
nes.
6Sa
ddle
bars
m1
Dia
met
eran
dle
ngth
stat
ed.
1M
etho
dof
fixin
gto
win
dow
surr
ound
.1
Met
hod
ofat
tach
ing
tole
adlig
htgl
azin
g.1
Sadd
leba
rsar
em
etal
rods
used
tost
reng
then
and
prov
ide
supp
ort
tola
rge
lead
glaz
edpa
nes.
Thes
eba
rsar
eus
ually
built
into
the
win
dow
surr
ound
.
7M
irror
snr
1D
imen
sione
dde
scrip
tion.
1Ed
gede
scrip
tion.
2Pa
tter
n:m
etho
dof
form
ing
desc
ribed
.
1N
atur
eof
back
grou
nd.
2M
etho
dof
fixin
g:de
tails
stat
ed.
1Ed
ges
can
bepl
ain,
roun
ded,
beve
lled
and
the
like.
8Re
mov
ing
exist
ing
glas
san
dpr
epar
ing
fram
eor
surr
ound
tore
ceiv
ene
wgl
ass
nr1
Type
offr
ame
orsu
rrou
nd.
2Ty
peof
glas
sto
bere
mov
ed.
1Pa
nes
≤1.
00m
2.
2Pa
nes
1.00
–2.0
0m2.
3Pa
nes
2.00
–3.0
0m2.
4Pa
nes
3.00
–4.0
0m2.
5Pa
nes
≥4.
00m
2:s
izest
ated
.
1M
etho
dof
disp
osal
ofde
bris
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
2M
ater
ials
tobe
kept
for
re-u
se.
27 GLAZING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 211
28F
loo
r,w
all,
ceili
ngan
dro
of
finis
hing
s
In-s
itu,t
iled,
bloc
k,M
osai
c,sh
eet,
appl
ied
liqui
dor
plan
ted
finis
hes
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
sof
each
floor
.2
Prin
cipa
lsec
tions
thro
ugh
build
ing.
3Ex
tern
alel
evat
ions
.4
Fini
shes
sche
dule
s.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yan
dsiz
eof
mat
eria
ls.2
Num
ber
ofco
ats
ofin
-situ
wor
k.3
Type
sof
unde
rlays
orlin
ings
.4
Bedd
ing
orot
her
met
hod
offix
ing.
5Ty
peof
poin
ting.
6La
ps.
7La
yout
and
wid
thof
join
tsan
dba
ys.
8Pa
tter
ns.
9Sp
acin
gof
batt
ens
and
coun
ter
batt
ens.
10C
ompo
sitio
nan
dm
ixof
mor
tars
.11
Bond
ing
toot
her
wor
k.12
Radi
usof
curv
edw
ork.
13N
atur
eof
base
.14
Laid
inon
eop
erat
ion
with
base
.15
App
lied
finish
es/s
eale
rs/p
olish
es.
Not
es,c
omm
ents
and
glos
sary
1A
rea
mea
sure
dis
net
inco
ntac
tw
ithba
se.
2W
idth
sst
ated
are
the
wid
thof
each
finish
edfa
ce.
3N
ode
duct
ion
for
void
s≤
1.00
m2.
4N
oal
low
ance
tobe
mad
ein
net
area
for
laps
,dre
ssin
gsor
any
othe
rla
bour
.5
All
wor
kis
deem
edin
tern
alun
less
stat
edas
exte
rnal
.
TABULATED WORK SECTIONS
212 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1A
llflo
or-t
o-flo
oror
ceilin
ghe
ight
s.2
Layo
utof
patt
erne
dw
ork.
3D
etai
lsof
mou
lded
wor
k.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llro
ugh
and
fair
squa
re,r
akin
gan
dcu
rved
cutt
ing
and
was
te.
2A
llen
dsan
dan
gles
eith
erfo
rmed
orpr
oprie
tary
.3
Extr
am
ater
ialf
orcu
rved
wor
k.4
Form
ing
allr
ough
and
fair
groo
ves,
thro
ats,
mor
tices
,ch
ases
,edg
es,r
ebat
es,h
oles
,st
ops,
mitr
esan
dth
elik
ela
bour
s.5
Raki
ngou
tjo
ints
tofo
rma
key.
6Ra
king
out
join
tsto
inse
rtsk
irtin
gsor
the
like.
7A
llw
ork
info
rmin
gre
turn
s,en
ds,i
nter
nala
ndex
tern
alan
gles
.8
All
extr
am
ater
ialr
equi
red
for
bond
ing.
9A
dditi
onal
mat
eria
lin
laps
and
dres
sings
.10
All
wor
kon
atta
ched
colu
mns
and
beam
s11
Wor
kin
form
ing
void
san
dho
les
≤1.
00m
2.
12Fo
rmw
ork
oran
yot
her
form
ofte
mpo
rary
supp
ort.
13W
orki
ngfin
ishes
upto
and
arou
ndal
lacc
esso
ries.
28 FLOOR,WALL, CEILING AND ROOF FINISHINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 213
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Sc
reed
s,be
dsan
dto
ppin
gs,t
hick
ness
and
num
ber
ofco
ats
stat
edm --
---
m2
1≤
600m
mw
ide.
----
----
----
----
----
--2
>60
0mm
wid
e.
1Le
vela
ndto
falls
only
≤15
°fro
mho
rizon
tal.
2To
falls
,cro
ssfa
llsan
dslo
pes
≤15
°fro
mho
rizon
tal.
3To
falls
,cro
ssfa
llsan
dslo
pes
>15
°fro
mho
rizon
tal.
1Su
rface
finish
.2
Nat
ure
ofba
ckgr
ound
.3
Back
ings
and
bedd
ings
:th
ickn
ess
stat
ed.
4U
nder
lays
:typ
ean
dth
ickn
ess
stat
ed.
5In
sula
tion:
type
and
thic
knes
sst
ated
.6
Laid
inon
eop
erat
ion
with
itsba
se.
7Pa
tter
nof
join
ts.
8La
idin
one
oper
atio
nw
ithba
se(m
onol
ithic
ally
).
1Th
ickn
esse
sst
ated
are
the
thic
knes
sex
clus
ive
ofad
hesiv
es,k
eys,
groo
ves
and
the
like.
2U
nder
lays
incl
ude
plas
terb
oard
orot
her
rigid
shee
tla
thin
g.
2Fi
nish
toflo
ors,
type
offin
ishan
dov
eral
lthi
ckne
ssst
ated
m m2
1≤
600m
mw
ide.
2>
600m
mw
ide.
3Ti
les
are
deem
edto
bela
idw
ithth
eir
long
edge
sve
rtic
alor
para
llelt
oth
elo
ngax
isof
the
floor
orce
iling.
3Ra
ised
acce
ssflo
ors,
type
offin
ishan
dth
ickn
ess
ofpa
nels
stat
ed1
Hei
ght
ofca
vity
stat
ed.
4Ra
mps
tora
ised
acce
ssflo
ors
nr1
Leng
th,w
idth
and
heig
ht.
4Th
ehe
ight
stat
edis
the
heig
htat
the
top
end.
5Fi
reba
rrie
rsw
ithin
void
belo
wra
ised
floor
m2
----
-m
1Th
ickn
ess
stat
ed.
----
----
----
----
----
--2
Thic
knes
san
dhe
ight
stat
ed.
1Fi
rera
ting.
2M
etho
dof
fixin
gin
posit
ion.
3O
bstr
ucte
dby
serv
ices
.
1Fi
reba
rrie
rsar
ede
emed
toin
clud
eal
lsu
ppor
tw
ork,
scrib
ing
orfo
rmin
gto
fit,a
ngle
s,en
dsan
dw
orki
ngar
ound
stru
ctur
es,s
uppo
rtw
ork
and
serv
ices
.
TABULATED WORK SECTIONS
214 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
6Fi
nish
toro
ofs,
type
offin
ishan
dov
eral
lthi
ckne
ssst
ated
m m2
1≤
600m
mw
ide.
2>
600m
mw
ide.
1Le
vela
ndto
falls
only
≤15
°fro
mho
rizon
tal.
2To
falls
,cro
ssfa
llsan
dslo
pes
≤15
°fro
mho
rizon
tal.
3To
falls
,cro
ssfa
llsan
dslo
pes
>15
°fro
mho
rizon
tal.
1Ro
offin
ishes
incl
ude
gras
s,se
dum
and
the
like
live
finish
es.
2Th
eyex
clud
eso
lar
refle
ctiv
epa
int,
chip
ping
san
dth
elik
eth
atw
illbe
mea
sure
dw
ithth
eir
asso
ciat
edro
ofco
verin
g.3
Wid
this
the
wid
thof
each
face
.
7Fi
nish
tow
alls,
type
offin
ishan
dov
eral
lthi
ckne
ssst
ated
m m2
1≤
600m
mw
ide.
2>
600m
mw
ide.
1C
urve
d,ra
dius
stat
ed.
1H
eigh
tof
wal
lfin
ishes
ism
easu
red
tofin
ished
ceilin
ghe
ight
orsp
ecifi
edhe
ight
past
susp
ende
dce
ilings
.2
Wal
lfin
ishes
are
mea
sure
dbe
hind
skir
tings
unle
ssth
esk
irtin
gis
inst
alle
dpr
ior
toth
ew
allf
inish
.3
Wid
this
the
wid
thof
each
face
.
8Fi
nish
toiso
late
dco
lum
ns,t
ype
offin
ishan
dov
eral
lthi
ckne
ssst
ated
9Fi
nish
toce
ilings
,typ
eof
finish
and
over
allt
hick
ness
stat
edm m
2
1≤
600m
mw
ide.
2>
600m
mw
ide.
1O
ver
3.50
mab
ove
stru
ctur
alflo
orle
vel.
1H
eigh
tof
ceilin
gis
mea
sure
dfro
mst
ruct
ural
floor
leve
lto
soffi
tof
finish
edce
iling
oriso
late
dbe
am.
2W
idth
isth
ew
idth
ofea
chfa
ce.
10Fi
nish
toiso
late
dbe
ams,
type
offin
ishan
dov
eral
lthi
ckne
ssst
ated
11Fi
nish
totr
eads
m1
Net
wid
thst
ated
.1
Cur
ved:
radi
usst
ated
.1
Nat
ure
ofba
ckgr
ound
.2
Inse
tsde
scrib
ed.
1En
ds,a
ngle
san
dou
tlets
deem
edin
clud
ed.
12Fi
nish
toris
ers
m1
Net
wid
thst
ated
.1
Cur
ved:
radi
usst
ated
.2
Und
ercu
t.1
Nat
ure
ofba
ckgr
ound
.
13Fi
nish
tost
rings
and
apro
nsm
1N
etw
idth
orgi
rth
onfa
cest
ated
.1
Raki
ng.
2Sl
opin
g.3
Cur
ved:
radi
usst
ated
.
1N
atur
eof
back
grou
nd.
14Sk
irtin
gs,n
ethe
ight
stat
edm
1N
ethe
ight
stat
ed.
1Ra
king
.2
Slop
ing.
3C
urve
d:ra
dius
stat
ed.
1N
atur
eof
back
grou
nd.
2C
ove
form
ers.
28 FLOOR,WALL, CEILING AND ROOF FINISHINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 215
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
15Li
ning
sto
chan
nels
m1
Net
girt
hon
face
stat
ed.
1Ra
king
.2
Slop
ing.
3C
urve
d:ra
dius
stat
ed.
1N
atur
eof
back
grou
nd.
1En
ds,a
ngle
san
dou
tlets
deem
edin
clud
ed.
16Ke
rbs
and
capp
ings
m1
Net
girt
hon
face
stat
ed.
17C
oves
18M
ould
ings
19C
orni
ces
20A
rchi
trav
es21
Cei
ling
ribs
22Ba
nds
m1
Gir
than
dsh
ape
stat
ed.
----
----
----
----
----
--2
Dim
ensio
ned
desc
riptio
n.
1Pa
tter
ned:
deta
ilsst
ated
.2
Hor
izont
al.
3Ra
king
.4
Slop
ing.
5Ve
rtic
al.
6U
nder
cut.
7Fl
ush.
8Ra
ised.
9Su
nk.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.1
Mea
sure
the
leng
thin
cont
act
with
the
base
.2
All
ends
,ang
les,
inte
rsec
tions
are
deem
edin
clud
ed.
23Sp
ecia
ltile
s,sla
bsor
bloc
ksnr --
---
m2
1D
imen
sione
dde
scrip
tion.
2M
anuf
actu
rers
’ref
eren
ce.
1Sp
ecia
ltile
sar
eon
lym
easu
red
here
ifno
tal
read
ym
easu
red
unde
rpr
evio
usru
les
11–2
2in
clus
ive.
24Su
rface
dres
sings
,sea
lers
orpo
lishe
s.m
21
Type
stat
ed.
2Ra
teof
cove
rage
stat
ed.
1H
orizo
ntal
.2
Slop
ing.
3Ve
rtic
al.
4So
ffits
.
1N
atur
eof
finish
bein
gtr
eate
d.1
Dre
ssin
gsin
clud
eca
rbor
undu
mgr
ains
,st
one
chip
ping
san
dth
elik
e.2
Seal
ers
incl
ude
wat
erpr
oofe
rs,
hard
ener
s,du
stpr
oofe
rs,p
olish
esan
dth
elik
e.
25M
ovem
ent
join
ts26
Cov
erst
rips
27D
ivid
ing
strip
s28
Bead
s,fu
nctio
nst
ated
29N
osin
gs
m1
Dim
ensio
ned
desc
riptio
n.1
Met
hod
offix
ing.
2N
atur
eof
back
grou
nd.
1M
ovem
ent
join
tsin
clud
eex
pans
ion
join
ts.
2Fu
nctio
nof
bead
sin
clud
ean
gle
bead
s,st
opbe
ads,
shad
owga
pbe
ads,
casin
gbe
ads
and
the
like.
30Re
info
rcem
ent,
deta
ilsst
ated
31M
etal
mes
hla
thin
g,de
tails
stat
ed32
Boar
din
sula
tion,
thic
knes
sst
ated
33Q
uilt
insu
latio
n,th
ickn
ess
stat
ed34
Isola
tion
mem
bran
es,t
hick
ness
stat
ed
m ----
-m
2
1To
wal
ls.2
Toce
ilings
.3
Toflo
ors.
4To
roof
s.5
Toiso
late
dbe
ams.
6To
isola
ted
colu
mns
.
1D
epth
ofsu
spen
sion.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.
TABULATED WORK SECTIONS
216 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
35A
cces
sorie
snr
1D
imen
sione
dde
scrip
tion.
1M
etho
dof
fixin
g.1
Nat
ure
ofba
ckgr
ound
.1
Acc
esso
ries
incl
ude
acce
sspa
nels,
spec
ialp
anel
sin
raise
dac
cess
floor
s,ve
ntgr
illes,
orna
men
tsan
dth
elik
e.
36Pr
ecas
tpl
aste
rco
mpo
nent
sm
1D
imen
sione
dde
scrip
tion
orpr
oprie
tary
refe
renc
e.1
Met
hod
offix
ing.
1N
atur
eof
back
grou
nd.
1Th
edi
men
sione
dde
scrip
tion
shal
lful
lyde
scrib
eth
eco
mpo
nent
incl
udin
gst
atin
gth
een
dus
esu
chas
corn
ice,
mou
lded
band
,arc
hitr
ave
and
the
like.
28 FLOOR,WALL, CEILING AND ROOF FINISHINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 217
29D
eco
rati
on
Pain
ting
and
clea
rfin
ishe
sIn
tum
esce
ntco
atin
gsD
ecor
ativ
epa
pers
orfa
bric
sA
ntic
orro
sion
trea
tmen
ts
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
san
del
evat
ion
draw
ings
show
ing
scop
ean
dlo
catio
nof
the
wor
k.2
Pain
ting/
deco
ratin
gsc
hedu
le(s
).
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials.
2N
atur
eof
base
.3
Des
crip
tion
ofsu
rface
ifno
tsm
ooth
.4
Prep
arat
ory
wor
kto
base
.5
Type
and
num
ber
ofpr
imin
gor
seal
ing
coat
s.6
Type
and
num
ber
ofun
derc
oats
.7
Type
and
num
ber
offin
ishin
gco
ats.
8M
etho
dof
appl
icat
ion.
9Ty
peof
trea
tmen
tap
plie
dbe
twee
nco
ats.
10Pa
tter
nof
deco
rativ
epa
pers
.11
Met
hod
offix
ing
and
join
ting
pape
rsor
fabr
ics.
Not
es,c
omm
ents
and
glos
sary
1M
etho
dof
appl
icat
ion
left
toco
ntra
ctor
unle
ssst
ated
othe
rwise
.2
Nat
ure
ofno
n-sm
ooth
base
incl
udes
desc
riptio
nof
base
text
ure
and
prof
ilesu
chas
corr
ugat
ed,f
lute
d,m
ould
edor
carv
ed.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1C
eilin
gsov
er3.
5mab
ove
finish
edflo
orle
vel.
1W
orks
and
mat
eria
lsde
emed
incl
uded
.1
All
cutt
ing
tolin
e.2
Mul
ti-co
lour
edw
ork
ondi
fferin
gsu
rface
s.3
All
cutt
ing
topa
pers
and
fabr
ics.
TABULATED WORK SECTIONS
218 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pa
intin
gto
gene
rals
urfa
ces
2Pa
intin
gto
glaz
edsu
rface
sirr
espe
ctiv
eof
pane
sizes
3Pa
intin
gst
ruct
ural
met
alw
ork
4Pa
intin
gra
diat
ors,
type
stat
ed5
Pain
ting
gutt
ers
6Pa
intin
gpi
pes
7Pa
intin
gse
rvic
es,t
ype
stat
ed
m m2
nr
1≤
300m
mgi
rth.
2>
300m
mgi
rth.
3Iso
late
dar
eas
≤1.
00m
2
irres
pect
ive
oflo
catio
nor
girt
h.
1In
tern
al.
2Ex
tern
al.
1W
ork
toce
ilings
orbe
ams
over
3.5m
but
not
exce
edin
g5m
abov
efin
ished
floor
leve
lan
dth
erea
fter
in3.
00m
stag
es.
2Su
rface
sto
rem
ain
unpa
inte
d.3
Mul
ti-co
lour
edon
one
surfa
ce.
4Pa
tter
ned:
deta
ilsst
ated
.5
Fire
ratin
g.6
App
licat
ion
onsit
epr
ior
tofix
ing.
7A
pplic
atio
nof
fsit
epr
ior
tofix
ing.
1Th
ear
eaor
girt
hm
easu
red
isth
atco
vere
d.2
The
girt
hof
fram
esan
dth
elik
eis
calc
ulat
edfro
mon
eed
geto
the
othe
rov
eral
ltrim
s,ar
chitr
aves
,sto
psan
dth
elik
ean
das
sum
edo
ors
have
been
rem
oved
prio
rto
pain
ting.
3Th
egi
rth
desig
nate
das
exte
rnal
ondo
orfr
ames
and
the
like
isth
atpa
rtof
the
fram
evi
sible
whe
nth
edo
oris
clos
ed.
4Ex
ampl
esof
radi
ator
type
sar
efla
t,pa
nelle
d,co
lum
n,tu
bula
ror
the
like.
8Pa
intin
gra
ilings
,fen
ces
and
gate
sm m
2
nr
1≤
300m
mgi
rth.
2>
300m
mgi
rth.
3Iso
late
dar
eas
≤1.
00m
2
irres
pect
ive
oflo
catio
nor
girt
h.
1C
lose
d.2
Ope
n.3
Orn
amen
tal.
1C
lose
dm
eans
noga
psw
hats
oeve
r.
Dec
orat
ive
pape
rsor
fabr
ics
9W
alls
and
colu
mns
10C
eilin
gsan
dbe
ams
m m2
1A
reas
≤1.
00m
2.
2A
reas
>1.
00m
2.
1C
urve
dsu
rface
s.ra
diis
tate
d.1
Lini
ngpa
per.
2W
ork
toce
ilings
orbe
ams
over
3.5m
but
not
exce
edin
g5m
abov
efin
ished
floor
leve
lan
dth
erea
fter
in3.
00m
stag
es.
1N
ode
duct
ion
mad
efo
rvo
ids
≤1.
00m
2.
11Bo
rder
sm
1D
imen
sione
dde
scrip
tion.
1M
itres
,end
san
gles
,scr
ibin
gor
cutt
ing
deem
edin
clud
ed.
12M
otifs
nr1
Dim
ensio
ned
desc
riptio
nor
diag
ram
.
29 DECORATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 219
30S
uspe
nded
ceili
ngs
Dem
ount
able
susp
ende
dce
iling
sSo
lidsu
spen
ded
ceili
ngs
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
ssh
owin
glo
catio
nof
the
wor
k.
2Re
flect
edce
iling
plan
ssh
owin
gsc
ope
and
com
plex
ityof
the
wor
k.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials.
2Si
ze(s
)of
pane
lsan
dst
rips.
3C
onst
ruct
ion
ofsu
spen
sion
fram
ing
and
syst
ems.
4M
etho
dof
fixin
g.5
Nat
ure
ofba
ckgr
ound
.6
Nat
ure
ofse
rvic
eslo
cate
din
the
ceilin
gvo
id.
7N
atur
eof
inte
gral
serv
ices
and
fittin
gs.
Not
es,c
omm
ents
and
glos
sary
1A
llw
ork
isde
emed
inte
rnal
unle
ssde
scrib
edas
exte
rnal
.2
Seco
ndar
yst
eelo
rtim
ber
supp
ort
wor
kis
mea
sure
del
sew
here
.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Se
rvic
eslo
cate
dw
ithin
the
ceilin
gvo
id.
2Lo
catio
nof
inte
gral
serv
ices
and
fittin
gs.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1W
orki
ngov
eran
dar
ound
obst
ruct
ions
.2
All
cutt
ing.
3Fo
rmin
gop
enin
gsan
dho
les.
4A
llad
ditio
nals
uppo
rtw
ork
incl
udin
gbr
idgi
ngfo
rfit
tings
.5
All
extr
aw
ork
requ
ired
for
wor
kde
scrib
edas
patt
erne
d.
1In
tegr
alfit
tings
are
thos
ede
signe
dto
bein
corp
orat
edin
toth
ece
iling
stru
ctur
e.
TABULATED WORK SECTIONS
220 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
eilin
gs2
Plen
umce
ilings
3Be
ams
4Bu
lkhe
ads
m2
1D
epth
ofsu
spen
sion
≤15
0mm
.2
Dep
thof
susp
ensio
n15
0–50
0mm
.3
Dep
thth
erea
fter
in50
0mm
stag
es.
1Ty
pean
dth
ickn
ess
oflin
ing.
2M
etho
dof
fixin
glin
ing
tosu
spen
sion.
3In
tegr
alin
sula
tion.
4In
tegr
alva
pour
barr
ier.
5H
eigh
tof
wor
kex
ceed
ing
3.50
mab
ove
finish
edflo
orle
vel
in1.
50m
stag
es.
1Pa
tter
ned:
deta
ilsst
ated
.2
Slop
ing.
3C
urve
d:ra
dius
and
plan
eof
curv
est
ated
.4
Susp
ensio
nob
stru
cted
byse
rvic
es.
5Tr
ims
atre
gula
rin
terv
als
with
inar
eaof
ceilin
g:de
tails
stat
ed.
1A
rea
mea
sure
dis
that
onth
eex
pose
dfa
ce.
2D
epth
ofsu
spen
sion
ism
easu
red
from
unde
rsid
eof
mai
nst
ruct
ural
soffi
tor
seco
ndar
ysu
ppor
tw
ork
toba
cksu
rface
oflin
ing.
3H
eigh
tof
wor
kis
mea
sure
dfro
mfin
ished
floor
leve
lto
face
ofce
iling.
4W
here
ceilin
gsar
esu
spen
ded
from
slopi
ng,c
urve
dor
irreg
ular
stru
ctur
esan
aver
age
dept
hof
susp
ensio
nsh
all
best
ated
.
5Iso
late
dst
rips
m1
Wid
th≤
600m
m.
2W
idth
ther
eafte
rin
300m
mst
ages
.
6U
psta
nds
m1
Hei
ght
≤60
0mm
.2
Hei
ght
ther
eafte
rin
300m
mst
ages
.
7A
cces
spa
nels
nr1
Dim
ensio
ned
desc
riptio
n.2
Prop
rieta
ryre
fere
nce.
1C
ompo
sitio
n.2
Met
hod
offix
ing.
1M
etho
dof
lock
ing.
1A
cces
spa
nels
are
deem
edto
incl
uded
alla
dditi
onal
supp
ort
wor
k,fr
amin
g,ed
getr
iman
dfix
ings
.
8Ed
getr
ims
9A
ngle
trim
sm
1D
imen
sione
dde
scrip
tion.
1Pl
ain.
2Fl
oatin
g.1
Cen
tres
offix
ing.
2N
atur
eof
back
grou
nd.
1Pl
ain
trim
sar
eth
ose
fixed
toth
est
ruct
ure.
2Fl
oatin
gtr
ims
are
thos
efix
edto
the
ceilin
gsy
stem
.3
Trim
sar
ede
emed
toin
clud
een
dsan
dan
gles
.
10Fi
reba
rrie
rsm --
---
m2
1D
imen
sione
dde
scrip
tion.
----
----
----
----
----
--2
Thic
knes
sst
ated
.
1Fi
rera
ting
whe
rere
quire
d.1
Met
hod
offix
ing
inpo
sitio
n.2
Obs
truc
ted
byse
rvic
esst
ated
.1
Fire
barr
iers
are
deem
edto
incl
ude
all
supp
ort
wor
k,sc
ribin
gor
form
ing
tofit
,ang
les,
ends
and
wor
king
arou
ndst
ruct
ures
,sup
port
wor
kan
dse
rvic
es.
30 SUSPENDED CEILINGS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 221
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
11C
olla
rsfo
rse
rvic
espa
ssin
gth
roug
hfir
eba
rrie
rsnr
1D
iam
eter
ofpi
pe.
2Si
zeof
trun
king
.1
Pipe
s.2
Trun
king
.1
Leng
thof
sleev
eea
chsid
eof
barr
ier
stat
ed.
2Fi
rera
ting
1C
olla
rsar
eon
lym
easu
red
here
whe
reth
eyar
ein
tegr
alw
ithth
efir
eba
rrie
r.If
they
are
not
inte
gral
they
shal
lbe
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofW
ork
Sect
ion
40:B
uild
er’s
wor
kin
conn
ectio
nw
ithm
echa
nica
l,el
ectr
ical
and
tran
spor
tatio
nin
stal
latio
ns.
12Fi
ttin
gsnr --
---
m
1D
imen
sione
dde
scrip
tion.
1N
atur
eof
back
grou
ndst
ated
.
13Sh
adow
gap
batt
ens
m1
Dim
ensio
ned
desc
riptio
n.1
Cen
tres
offix
ing.
2N
atur
eof
back
grou
nd.
1En
ds,a
ngle
san
dth
elik
ede
emed
incl
uded
.
TABULATED WORK SECTIONS
222 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
31In
sula
tio
n,fir
est
opp
ing
and
fire
pro
tect
ion
Boar
d,sh
eet,
quilt
,spr
ayed
,loo
sefil
lor
foam
edin
sula
tion
and
fire
prot
ectio
nin
stal
latio
ns
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Plan
s,se
ctio
nsan
dde
tails
suffi
cien
tto
show
the
scop
ean
dlo
catio
nof
the
vario
usw
orks
rela
ting
toth
isse
ctio
n.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ty
pe,q
ualit
yan
dth
ickn
ess
ofm
ater
ials.
2Fi
rera
ting
whe
rere
quire
d.3
Exte
ntof
laps
.4
Met
hod
offix
ing,
layi
ngor
appl
ying
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llcu
ttin
g.2
Wor
king
arou
ndor
over
all
mem
bers
and
serv
ices
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Bo
ards
2Sh
eets
3Q
uilts
4Lo
ose
m2
1Th
ickn
ess
stat
ed.
1Pl
ain
area
s.2
Laid
acro
ssjo
ists,
rafte
rs,
part
ition
fram
ing
orlik
em
embe
rs:c
entr
esof
mem
bers
stat
ed.
3La
idbe
twee
njo
ists,
rafte
rs,
part
ition
fram
ing
orlik
em
embe
rs:c
entr
esof
mem
bers
stat
ed.
1H
orizo
ntal
.2
Vert
ical
.3
Slop
ing.
4So
ffit.
1Th
ear
eam
easu
red
isth
atco
vere
d.2
No
dedu
ctio
nis
mad
efo
rvo
ids
≤1.
00m
2.
3Th
ear
eaof
joist
s,ra
fters
,par
titio
nfr
amin
gor
like
mem
bers
isde
duct
edw
hen
the
mat
eria
lis
laid
betw
een
such
mem
bers
.4
Slop
ing
isth
eup
per
surfa
ceno
tho
rizon
tal.
5So
ffits
are
the
unde
rsid
eof
any
horiz
onta
lor
slopi
ngst
ruct
ure.
m2
Purp
ose
and
dim
ensio
ned
desc
riptio
n.4
Loca
tion
stat
ed.
5Sp
raye
dm
21
Thic
knes
sst
ated
.1
Nat
ure
ofba
ckgr
ound
.
31 INSULATION, FIRE STOPPING AND FIRE PROTECTION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 223
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
6Fi
lling
cavi
ties
m2
1Th
ickn
ess
stat
ed.
1M
iner
alfib
re.
2Pl
astic
bead
s.3
Cel
lulo
sefib
re.
4Ex
pand
ing
foam
.5
Oth
erty
peof
blow
nor
inje
cted
mat
eria
l.
1In
tern
al.
2Ex
tern
al.
1D
rillin
gho
les
inst
ruct
ure
toal
low
inje
ctio
nof
mat
eria
land
subs
eque
ntm
akin
ggo
odis
deem
edin
clud
ed.
7Fi
rest
ops,
type
stat
edm
1D
imen
sione
dde
scrip
tion.
2Fi
rera
ting.
1H
orizo
ntal
.2
Vert
ical
.3
Raki
ng.
4St
eppe
d.5
Cur
ved,
radi
usst
ated
.
1M
etho
dof
fixin
g.2
Back
grou
ndw
hen
mec
hani
cally
fixed
.
8Fi
resle
eves
,col
lars
and
the
like
nr1
Dim
ensio
ned
desc
riptio
n.2
Fire
ratin
g.1
Met
hod
offix
ing.
2Ba
ckgr
ound
whe
nm
echa
nica
llyfix
ed.
TABULATED WORK SECTIONS
224 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
32F
urni
ture
,fit
ting
san
deq
uipm
ent
Gen
eral
fixtu
res,
furn
ishi
ngs
and
equi
pmen
tK
itche
nfit
tings
Cat
erin
geq
uipm
ent
Sani
tary
appl
ianc
esan
dfit
tings
Not
ices
and
sign
sSi
tean
dst
reet
furn
iture
Bird
/ver
min
cont
rol
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Loca
tion
draw
ings
.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Suffi
cien
tin
form
atio
nto
desig
n,pr
ocur
eor
man
ufac
ture
the
item
.2
Kind
and
qual
ityof
mat
eria
ls.3
Det
ails
ofal
lass
ocia
ted
build
ing
wor
k.4
Test
sw
ithw
hich
mat
eria
lsan
deq
uipm
ent
mus
tco
mpl
y.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1C
ompo
nent
s.1
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1M
arki
ngpo
sitio
ns.
2C
onne
ctin
gto
serv
ices
.3
Com
miss
ioni
ng.
4A
llas
soci
ated
exca
vatio
nsan
dco
ncre
tefo
unda
tions
orba
ses
unle
ssst
ated
asm
easu
red
else
whe
re.
32 FURNITURE, FITTINGS AND EQUIPMENT
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 225
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Fi
xtur
es,f
ittin
gsor
equi
pmen
tw
ithou
tse
rvic
es2
Fixt
ures
,fitt
ings
oreq
uipm
ent
with
serv
ices
nr1
Com
pone
ntdr
awin
gre
fere
nce.
2D
imen
sione
ddi
agra
m.
3M
anuf
actu
rers
refe
renc
e.
1A
ncilla
ryite
ms
prov
ided
with
the
equi
pmen
t.2
Inte
gral
cont
rols
and
indi
cato
rs.
3Re
mot
eco
ntro
lsan
din
dica
tors
.4
Supp
orts
,mou
ntin
gsan
dbr
acke
ts.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.
3A
ncilla
ryite
ms
not
prov
ided
with
the
item
ofeq
uipm
ent
nr1
Type
,size
and
met
hod
ofjo
intin
gst
ated
.
4Fi
xtur
es,f
ittin
gsor
equi
pmen
tsu
pplie
dby
the
empl
oyer
nr1
Type
and
size.
1C
olle
ctin
gfro
mlo
catio
nof
fsit
e:de
tails
stat
ed.
1A
ccep
ting
deliv
ery,
unlo
adin
g,tr
ansp
ortin
gab
out
site,
stor
ing
and
hand
ling
and
disp
osin
gof
allp
acki
ngm
ater
ials
isde
emed
incl
uded
.
5Si
gnw
ritin
gnr
1D
imen
sione
dde
scrip
tion.
1Fo
nt.
1N
atur
eof
back
grou
nd.
TABULATED WORK SECTIONS
226 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
33D
rain
age
abov
egr
oun
dR
ainw
ater
inst
alla
tions
Foul
drai
nage
inst
alla
tions
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Roof
plan
(s).
2Fl
oor
plan
sof
any
floor
sth
atha
vedr
aina
gein
stal
latio
ns.
3Pr
inci
pals
ectio
nsan
del
evat
ions
.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Lo
catio
nof
inst
alla
tion.
2N
atur
eof
back
grou
nd.
3M
etho
dan
dsp
acin
gof
fixin
g.4
Met
hod
and
spac
ing
ofjo
ints
.5
Des
crip
tion
ofm
ater
ial.
6Ty
peof
brac
kets
orsu
ppor
ts.
7Fi
nish
.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sc
ope
and
loca
tion
ofw
ork.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
lljo
ints
.2
All
brac
kets
and
supp
orts
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pi
pew
ork
m1
Nom
inal
diam
eter
.1
Stra
ight
,cur
ved,
flexi
ble.
2Ex
tend
able
.3
Met
hod
ofjo
intin
g.
1M
etho
dof
fixin
gto
back
grou
nd.
1M
easu
red
over
allf
ittin
gs.
2Pi
pew
ork
anci
llarie
snr
1D
imen
sione
dde
scrip
tion.
1A
ncilla
ries
incl
ude
valv
es,n
on-r
etur
nfla
ps,r
educ
ers,
tape
rs,b
ends
,hop
pers
,gu
llies,
tun
dish
es,r
oddi
ngey
es,t
raps
,ac
cess
door
s,an
gles
,offs
ets,
shoe
s,so
cket
s,ta
ppin
gs,b
osse
san
dth
elik
e.2
The
list
isno
tex
haus
tive.
3Ite
ms
extr
aov
erth
epi
pein
whi
chth
eyoc
cur
nr1
Fitt
ings
,pip
esiz
e≤
65m
m.
2Fi
ttin
gs,n
omin
alpo
pesiz
e>
65m
m.
1O
neen
d.2
Two
ends
.3
Thre
een
ds.
4O
ther
,det
ails
stat
ed.
1W
ithin
spec
tion
door
.2
Met
hod
ofjo
intin
gst
ated
whe
redi
ffere
ntfro
mpi
pein
whi
chth
efit
ting
occu
rs.
1C
uttin
gan
djo
intin
gpi
pes
tofit
tings
isde
emed
tobe
incl
uded
.2
Fitt
ings
whi
char
ere
duci
ngar
em
easu
red
extr
aov
erth
ela
rges
tpi
pein
whi
chth
eyoc
cur.
33 DRAINAGE ABOVE GROUND
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 227
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4Pi
pesle
eves
thro
ugh
wal
ls,flo
ors
and
ceilin
gsnr
1Ty
pean
dno
min
aldi
amet
erof
pipe
.2
Leng
thof
sleev
eor
thic
knes
sof
stru
ctur
ebe
ing
pass
edth
roug
h.3
Fire
ratin
g.
1Ty
peof
stru
ctur
ebe
ing
pass
edth
roug
hde
scrib
ed.
1M
etho
dof
fixin
gan
dpa
ckin
g.2
Han
ding
toot
hers
for
fixin
g.1
All
mak
ing
good
incl
udin
gfir
est
oppi
ngis
deem
edin
clud
ed.
5G
utte
rsm
1N
omin
alsiz
e.1
Stra
ight
,cur
ved,
flexi
ble.
2Ex
tend
able
.3
Met
hod
ofjo
intin
g.
1M
etho
dof
fixin
gto
back
grou
nd.
1M
easu
red
over
allf
ittin
gs.
6G
utte
ran
cilla
ries
nr1
Dim
ensio
ned
desc
riptio
n.1
Anc
illarie
sin
clud
est
open
ds,a
ngle
s,ou
tlets
,ove
rflow
s,ta
pers
,red
ucer
san
dth
elik
e.2
The
list
isno
tex
haus
tive
7Ite
ms
extr
aov
erth
egu
tter
inw
hich
they
occu
rnr
1D
imen
sione
dde
scrip
tion.
8M
arki
ng,p
ositi
onof
and
leav
ing
orfo
rmin
gal
lhol
es,m
ortic
es,c
hase
san
dth
elik
ere
quire
din
the
stru
ctur
e
item
1N
umbe
ran
dty
peof
inst
alla
tions
.
9Id
entif
icat
ion
nr1
Plat
es.
2D
iscs.
3La
bels.
4Ta
pes.
5Sy
mbo
lsor
num
bers
.6
Band
s.7
Cha
rts
ordi
agra
ms.
8O
ther
:typ
est
ated
.
1D
etai
lsst
ated
.1
Met
hod
offix
ing.
10Te
stin
gan
dco
mm
issio
ning
item
1In
stal
latio
nst
ated
.1
Att
enda
nce
requ
ired.
2In
sura
nces
requ
ired
byem
ploy
er.
1Pr
epar
ator
yop
erat
ions
stat
ed.
2St
age
test
s(n
r)lis
ted
and
purp
ose
stat
ed.
1A
llfu
elan
dpo
wer
used
isde
emed
incl
uded
.2
Prov
ision
ofte
stce
rtifi
cate
sis
deem
edin
clud
ed.
TABULATED WORK SECTIONS
228 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
11Pr
epar
ing
draw
ings
item
1N
umbe
rof
copi
esst
ated
.1
Met
hod
stat
ed.
2In
form
atio
nto
besh
own
stat
ed.
1W
orki
ngdr
awin
gs.
2A
sfit
ted
draw
ings
.
12O
pera
ting
man
uals
and
inst
ruct
ions
item
33 DRAINAGE ABOVE GROUND
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 229
34D
rain
age
belo
wgr
oun
dSt
orm
wat
erdr
ain
syst
ems
Foul
drai
nsy
stem
sPu
mpe
ddr
ain
syst
ems
Land
drai
nage
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Dra
inag
ela
yout
(s).
Man
dato
ryin
form
atio
nto
bepr
ovid
ed1
Kind
and
qual
ityof
mat
eria
ls.N
otes
,com
men
tsan
dgl
ossa
ry
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1La
yout
ofdr
aina
gesh
owin
gsc
ope
ofw
ork.
2In
vert
dept
hs.
3C
over
leve
ls.4
Pipe
sizes
.5
Det
ails
ofm
anho
les,
insp
ectio
nch
ambe
rsan
dot
her
pits
,tan
ks,
cham
bers
orth
elik
e.6
Wor
kou
tsid
esit
ebo
unda
ry.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1Ea
rthw
ork
supp
ort.
2C
ompa
ctin
gbo
ttom
sof
exca
vatio
ns.
3Tr
imm
ing
exca
vatio
ns.
4Ba
ckfil
ling
with
exca
vate
dm
ater
ials.
5C
ompa
ctin
gba
ckfil
l.6
Disp
osal
ofsu
rplu
sex
cava
ted
mat
eria
ls.7
Disp
osal
ofal
lwat
er.
8Th
ose
leng
ths
ofpi
pes
with
inm
anho
lew
alls.
9Bu
ildin
gin
ends
ofpi
pes.
10Be
ddin
gan
dpo
intin
g.
1W
ork
outs
ide
site
boun
dary
shal
lbe
mea
sure
dse
para
tely.
2W
ork
belo
wbu
ildin
gssh
allb
em
easu
red
sepa
rate
ly
TABULATED WORK SECTIONS
230 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1D
rain
runs
m1
Ave
rage
tren
chde
pth
in50
0mm
incr
emen
ts.
2Ty
pean
dno
min
aldi
amet
erof
pipe
.3
Mul
tiple
pipe
sst
atin
gnu
mbe
ran
dno
min
aldi
amet
erof
pipe
s.
1M
etho
dof
join
ting
pipe
s.2
Pipe
bedd
ing
and
orsu
rrou
nd:
deta
ilsst
ated
3Ty
peof
back
filli
fno
tob
tain
edfro
mth
eex
cava
tions
.
1Ve
rtic
al.
2C
urve
d.3
Belo
wgr
ound
wat
erle
vel.
4N
ext
toex
istin
gro
adw
ayor
path
.5
Nex
tto
exist
ing
build
ing.
6Sp
ecifi
edm
ultip
leha
ndlin
g:de
tails
stat
ed.
7D
ispos
alof
exca
vate
dm
ater
ial
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or:d
etai
lsst
ated
.
1D
rain
runs
are
mea
sure
dfro
mex
tern
alfa
ceof
man
hole
toex
tern
alfa
ceof
man
hole
orac
cess
ory.
2A
vera
gede
pth
isca
lcul
ated
for
each
run
irres
pect
ive
ofm
axim
umde
pth.
2Ite
ms
extr
aov
erdr
ain
runs
irres
pect
ive
ofde
pth
orpi
pesiz
em
21
Brea
king
upha
rdsu
rface
pavi
ngs:
thic
knes
sst
ated
.2
Lifti
ngan
dpr
eser
ving
turf:
thic
knes
sst
ated
.
1Re
inst
atin
gto
mat
chex
istin
g:de
tails
stat
ed.
2Re
layi
ngtu
rfpr
evio
usly
set
asid
e.
1Th
em
easu
rem
ent
ofth
ese
extr
aov
erite
ms
shal
lbe
base
don
the
desig
ned
wid
thof
beds
inth
etr
ench
.In
the
abse
nce
ofa
bed
the
wid
thsh
allb
eca
lcul
ated
asth
eno
min
alsiz
eof
the
serv
ice
plus
300m
msu
bjec
tto
am
inim
umw
idth
of50
0mm
.
m3
3Br
eaki
ngou
tha
rdm
ater
ials.
4Ex
cava
ting
inan
dre
mov
ing
haza
rdou
sm
ater
ial.
5Ex
cava
ting
inru
nnin
gsil
t,ru
nnin
gsa
ndor
othe
run
stab
legr
ound
.6
Exca
vatin
gbe
low
grou
ndw
ater
leve
l.
1D
etai
lsst
ated
.2
Har
dm
ater
iali
san
ym
ater
ialw
hich
isof
such
asiz
e,po
sitio
nor
cons
isten
cyth
atit
can
only
bere
mov
edby
spec
ial
plan
tor
expl
osiv
es.
m7
Nex
tto
exist
ing
live
serv
ices
.1
Tobe
mea
sure
dw
here
prec
autio
nsar
esp
ecifi
cally
requ
ired.
The
met
hod
ofpr
otec
tion
isle
ftto
the
disc
retio
nof
the
cont
ract
or.
2If
indo
ubt
the
surv
eyor
mus
tm
easu
rean
item
givi
ngth
ena
ture
ofth
ese
rvic
e.
nr8
Aro
und
exist
ing
live
serv
ices
cros
sing
tren
ch.
34 DRAINAGE BELOW GROUND
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 231
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
3Pi
pefit
tings
nr1
Dim
ensio
ned
desc
riptio
n.1
Type
stat
ed.
2M
etho
dof
join
ting
topi
pes.
1Pi
pefit
tings
incl
ude
bend
s,ju
nctio
ns,
insp
ectio
npi
pes,
rodd
ing
eyes
and
the
like.
4A
cces
sorie
snr
1A
cces
sorie
sin
clud
egu
llies,
trap
s,in
spec
tion
shoe
s,fre
shai
rin
lets
,no
n-re
turn
flaps
,val
ves,
rodd
ing
eyes
and
the
like
and
are
deem
edto
incl
ude
grat
ings
,cov
ers,
fram
es,b
aske
ts,
filte
rsan
dal
loth
erin
tegr
alan
dor
asso
ciat
edfit
tings
.2
The
list
isno
tex
haus
tive.
5Pu
mps
nr1
Size
and
capa
city
stat
ed.
1In
tegr
alco
ntro
ls.2
Rem
ote
cont
rols.
3In
dica
tors
.4
Supp
orts
.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
ckgr
ound
.
6M
anho
les
7In
spec
tion
cham
bers
8So
akaw
ays
9C
essp
its10
Sept
icta
nks,
11O
ther
tank
san
dpi
ts,t
ype
stat
ed
nr1
Det
aile
dde
scrip
tion
stat
ing
max
imum
inte
rnal
size
ofch
ambe
r.2
Dep
thfro
mto
psu
rface
ofco
ver
toin
vert
leve
lin
250
mm
stag
es.
3Pr
oprie
tary
syst
em,d
etai
lsst
ated
.
1Ba
sesla
bth
ickn
ess.
2W
allt
hick
ness
.3
Cov
ersla
bdi
men
sions
.4
Inte
rmed
iate
slab
dim
ensio
ns.
5Be
nchi
ngdi
men
sions
.6
Mai
nch
anne
ldia
met
eran
dco
nfig
urat
ion
7N
umbe
ran
ddi
amet
erof
bran
chch
anne
ls8
Inte
rnal
finish
.9
Exte
rnal
finish
.
1Si
zest
ated
isth
em
axim
umin
tern
alsiz
eof
the
cham
ber.
2Ro
cker
join
tsar
ede
emed
incl
uded
.3
Oth
erta
nks
and
pits
wou
ldin
clud
eca
tch
pits
,ser
vice
cham
bers
,sto
pcoc
kpi
tsan
dth
elik
e.
TABULATED WORK SECTIONS
232 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
12Ex
tra
over
the
exca
vatio
nfo
r:m
21
Brea
king
upha
rdsu
rface
pavi
ngs:
thic
knes
sst
ated
.2
Lifti
ngan
dpr
eser
ving
turf:
thic
knes
sst
ated
.
1M
akin
ggo
odar
ound
edge
sof
surfa
ces
isde
emed
incl
uded
.
m3
3Br
eaki
ngou
tha
rdm
ater
ials.
4Ex
cava
ting
inan
dre
mov
ing
haza
rdou
sm
ater
ial.
5Ex
cava
ting
inru
nnin
gsil
t,ru
nnin
gsa
ndor
othe
run
stab
legr
ound
.6
Exca
vatin
gbe
low
grou
ndw
ater
leve
l.
13Su
ndrie
snr
1D
etai
led
dim
ensio
ned
desc
riptio
n.1
Step
irons
.2
Inte
rcep
ting
trap
s.3
Back
drop
s.4
Any
othe
ras
soci
ated
item
:typ
est
ated
.
1Be
ddin
g,jo
intin
gan
dbu
ildin
gin
deem
edin
clud
ed.
2Th
ese
item
sm
aybe
incl
uded
with
thei
ras
soci
ated
man
hole
orch
ambe
rif
part
ofa
prop
rieta
rysy
stem
.
14C
over
san
dfr
ames
nr1
Dim
ensio
ned
desc
riptio
n.1
Man
ufac
ture
rsre
fere
nce.
1M
etho
dof
fixin
gfr
ame.
1Be
ddin
gco
vers
ingr
ease
isde
emed
incl
uded
.
15M
arke
rpo
sts
nr1
Dim
ensio
ned
desc
riptio
n.1
Iden
tific
atio
npl
ates
:det
ails
stat
ed.
1M
etho
dof
fixin
g:de
tails
stat
ed.
1Ex
cava
tion,
disp
osal
ofsp
oila
ndco
ncre
tefo
rba
sede
emed
incl
uded
.
16C
onne
ctio
nsite
m1
Det
ails
stat
ed.
17Te
stin
gan
dco
mm
issio
ning
item
1D
etai
led
desc
riptio
n.2
Type
ofte
stan
dst
anda
rdto
beac
hiev
ed.
1A
tten
danc
ere
quire
d.2
Inst
rum
ents
and
equi
pmen
tto
bepr
ovid
ed.
3Pr
epar
ator
yop
erat
ions
stat
ed.
4St
age
test
s(n
r)lis
ted.
1Pr
ovisi
onof
allf
uel,
pow
er,w
ater
and
othe
rsu
pplie
sis
deem
edin
clud
ed.
2Pr
ovisi
onof
test
cert
ifica
tes
isde
emed
incl
uded
.
34 DRAINAGE BELOW GROUND
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 233
35S
ite
wo
rks
Roa
dan
dpa
thpa
ving
sH
ard
land
scap
ing
Spor
tssu
rfac
ing
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
san
dse
ctio
ns.
2C
ompo
nent
deta
ils.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
y,sh
ape
and
size
ofm
ater
ials
and
com
pone
nts.
2Tr
eatm
ent
and
layo
utof
join
ts.
3N
atur
eof
base
.4
Prep
arat
ory
wor
k.5
Bedd
ing
and/
orm
etho
dsof
fixin
g.
Not
es,c
omm
ents
and
glos
sary
1U
nles
sst
ated
asde
emed
incl
uded
all
asso
ciat
edex
cava
tions
,disp
osal
san
dfil
lings
are
mea
sure
din
acco
rdan
cew
ithW
ork
Sect
ion
5:Ex
cava
ting
and
fillin
g.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sc
ope
and
loca
tion
ofth
ew
ork.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llw
ork
isde
emed
exte
rnal
unle
ssde
scrib
edas
inte
rnal
.2
Form
wor
kan
dal
loth
erte
mpo
rary
supp
ort.
3Fa
irjo
ints
.4
Fair
edge
s.5
Wor
king
over
and
arou
ndob
stru
ctio
nsan
din
tore
cess
esan
dsh
aped
inse
rts.
6Fo
rmin
gsh
allo
wch
anne
ls.7
Cut
ting.
8D
ispos
alof
surp
lus
exca
vate
dm
ater
ialo
ffsit
e.
1Th
ear
eas
mea
sure
dar
eth
ose
inco
ntac
tw
ithth
eba
se.
2N
ode
duct
ions
mad
ein
supe
rfici
alite
ms
for
void
s≤
1.00
m2.
3A
llth
ickn
ess
stat
edar
eno
min
alor
finish
edaf
ter
layi
ngan
dco
mpa
ctin
g.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Ke
rbs
2Ed
ging
s3
Cha
nnel
s4
Pavi
ngac
cess
orie
s
m1
Dim
ensio
ned
desc
riptio
n.1
Cur
ved:
radi
usst
ated
.1
Foun
datio
n:siz
ean
dde
tails
stat
ed.
2Re
info
rcem
ent:
deta
ilsst
ated
.3
Met
hod
offix
ing
orsu
ppor
t.
1Ex
cava
tion
and
disp
osal
isde
emed
incl
uded
.2
Ends
,ang
les,
outle
tsan
din
ters
ectio
nsde
emed
incl
uded
.3
Edgi
ngs
are
deem
edto
incl
ude
pegs
and
supp
orts
.
TABULATED WORK SECTIONS
234 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5Ex
tra
over
for:
nr1
Spec
ialu
nits
.2
Acc
esso
ries.
1D
imen
sione
dde
scrip
tion.
6In
-situ
conc
rete
7Fo
rmw
ork
8Re
info
rcem
ent
9Jo
ints
10W
orke
dfin
ishes
11A
cces
sorie
sca
stin
1A
llm
easu
red
inac
cord
ance
with
rule
sof
Wor
kSe
ctio
n11
:In
-situ
conc
rete
wor
ks.
12C
oate
dm
acad
aman
das
phal
tm
2
----
-m
1O
ver
300m
mw
ide:
thic
knes
sst
ated
.2
Not
exce
edin
g30
0mm
wid
e:th
ickn
ess
and
wid
thst
ated
.
1Ro
ads.
2Pa
ving
s.1
Leve
land
tofa
llson
ly.2
Tofa
llsan
dcr
ossf
alls
and
slope
s≤
15°
from
horiz
onta
l.3
Toslo
pes
>15
°fro
mho
rizon
tal.
4M
etho
dof
appl
icat
ion
5Su
rface
trea
tmen
tor
finish
.6
Spec
ialc
urin
gof
finish
edw
ork.
m3
Thic
knes
san
dgi
rth
onfa
cest
ated
.3
Lini
ngs
toch
anne
ls.7
Hor
izont
al.
8To
falls
.1
Arr
ises,
cove
s,en
ds,a
ngle
san
dou
tlets
deem
edin
clud
ed.
13G
rave
l,ho
ggin
and
woo
dchi
pm
2
----
-m
1O
ver
300m
mw
ide:
thic
knes
sst
ated
.2
Not
exce
edin
g30
0mm
wid
e:th
ickn
ess
and
wid
thst
ated
.
1Ro
ads.
2Pa
ving
s.1
Leve
land
tofa
llson
ly.2
Tofa
llsan
dcr
ossf
alls
and
slope
s≤
15°
from
horiz
onta
l.3
Toslo
pes
>15
°fro
mho
rizon
tal.
4M
etho
dof
appl
icat
ion.
5Su
rface
trea
tmen
tor
finish
.6
Spec
ialc
urin
gof
finish
edw
ork.
1Th
ear
eam
easu
red
isth
atin
cont
act
with
the
base
.
35 SITE WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 235
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
14In
terlo
ckin
gbr
ick
and
bloc
ks,s
labs
,br
icks
,blo
cks,
sett
san
dco
bble
sm
2
----
-m
1O
ver
300m
mw
ide.
2N
otex
ceed
ing
300m
mw
ide:
thic
knes
san
dw
idth
stat
ed.
1Ro
ads.
2Pa
ving
s.3
Trea
ds.
4Ri
sers
.5
Mar
gins
orba
nds.
6C
hann
els.
1Be
ddin
g:th
ickn
ess
stat
ed.
2Le
vela
ndto
falls
only.
3To
falls
,cro
ssfa
llsan
dslo
pes
≤15
°fro
mho
rizon
tal.
4To
slope
s>
15°
from
horiz
onta
l.5
Laid
inba
ys:a
vera
gesiz
eof
bays
stat
ed.
6Jo
int
patt
ern
stat
ed.
7C
urve
d:ra
dius
stat
ed.
8Fo
unda
tion
and
haun
chin
g.
1Se
ttin
gpa
ving
sin
tore
cess
edm
anho
leco
vers
isde
emed
incl
uded
.2
All
cutt
ing
and
fittin
gis
deem
edin
clud
ed.
3Ex
cava
tion
and
disp
osal
isde
emed
incl
uded
.4
Ends
,ang
les,
outle
tsan
din
ters
ectio
nsde
emed
incl
uded
.
m3
Thic
knes
san
dgi
rth
onfa
cest
ated
.7
Lini
ngs
toch
anne
ls.9
Hor
izont
al.
10To
falls
.5
Arr
ises,
cove
s,en
ds,a
ngle
san
dou
tlets
deem
edin
clud
ed.
15Ex
tra
over
for:
nr1
Spec
ialu
nits
.2
Acc
esso
ries.
1D
imen
sione
dde
scrip
tion.
1Sp
ecia
luni
tsin
clud
egu
lley
surr
ound
s,ho
pper
san
dth
elik
e.
16A
cces
sorie
sm
21
Thic
knes
sst
ated
.1
Mem
bran
es.
m2
Dim
ensio
ned
desc
riptio
n.2
Mov
emen
tjo
ints
.3
Expa
nsio
njo
ints
.1
Join
tslo
cate
dat
the
disc
retio
nof
the
cont
ract
orar
eno
tm
easu
rabl
e.
17Si
tefu
rnitu
renr
1D
imen
sione
dde
scrip
tion.
2M
anuf
actu
rers
refe
renc
e.1
Tree
grille
s.2
Bolla
rds.
3Li
tter
bins
.4
Seat
s.5
Oth
er:t
ype
stat
ed.
1M
etho
dof
fixin
g.
18Li
quid
appl
ied
surfa
cing
s19
Shee
tsu
rfaci
ngs
20Tu
fted
surfa
cing
s21
Prop
rieta
ryco
lour
edsp
orts
surfa
cing
s22
Surfa
cedr
essin
gs
m2
1Th
ickn
ess
stat
ed.
1N
umbe
rof
coat
sor
laye
rs.
1Le
vela
ndto
falls
only.
2To
falls
and
cros
sfal
lsan
dslo
pes
≤15
°fro
mho
rizon
tal.
3To
slope
s>
15°
from
horiz
onta
l.4
Met
hod
ofap
plic
atio
nor
fixin
g.5
Surfa
cetr
eatm
ent
orfin
ish.
6Sp
ecia
lcur
ing
offin
ished
wor
k.7
Exte
ntof
laps
.8
Type
ofse
ams.
TABULATED WORK SECTIONS
236 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
23Li
nem
arki
ngs,
wid
thst
ated
m1
Wid
th≤
300m
m.
2W
idth
>30
0mm
:wid
thst
ated
.1
Stra
ight
,con
tinuo
us.
2St
raig
ht,b
roke
n.3
Cur
ved,
cont
inuo
us:r
adiu
sst
ated
.4
Cur
ved,
brok
en:r
adiu
sst
ated
.
1N
umbe
rof
coat
s.2
Met
hod
ofap
plic
atio
n.3
Trea
tmen
tap
plie
dbe
twee
nco
ats.
4C
olou
r.
24Le
tter
s,fig
ures
and
sym
bols
nr1
Dim
ensio
ned
desc
riptio
n.
25Sh
eet
linin
gsto
pool
s,la
kes,
pond
s,w
ater
way
san
dth
elik
em m
2
1W
idth
≤50
0mm
2W
idth
>50
0mm
1H
orizo
ntal
.2
Slop
ing,
slope
stat
ed.
3C
urve
d,ra
dius
stat
ed.
4Ve
rtic
al.
1U
nder
lays
.1
The
area
mea
sure
dis
net
and
isth
atin
cont
act
with
base
.2
No
dedu
ctio
nis
mad
efo
rvo
ids
≤1.
00m
2.
3N
oal
low
ance
ism
ade
for
laps
and
the
like.
4A
llot
her
requ
irem
ents
ofW
ork
Sect
ion
19:W
ater
proo
fing
will
appl
yto
the
mea
sure
men
tof
this
wor
k.
26Sp
otite
ms
nr1
Dim
ensio
ned
diag
ram
.or
2D
imen
sione
dde
scrip
tion.
1Su
mps
.2
Out
lets
.3
Col
lars
orsle
eves
.4
Oth
er,t
ype
stat
ed.
1Sp
otite
mw
ork
isde
emed
toin
clud
ejo
ints
,dre
ssin
gan
dbo
ndin
gto
surr
ound
ing
wor
k,un
derc
loak
san
dot
her
asso
ciat
edlin
ings
,end
s,an
gles
,be
ddin
g,po
intin
g,fix
ings
and
the
like.
35 SITE WORKS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 237
36Fe
ncin
g
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
san
dse
ctio
ns.
2C
ompo
nent
deta
ils.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
ndan
dqu
ality
ofm
ater
ials.
2M
etho
dof
cons
truc
tion.
3Su
rface
trea
tmen
tsor
finish
esap
plie
das
part
ofth
em
anuf
actu
ring
proc
ess
orap
plie
dbe
fore
deliv
ery
tosit
e.4
Nat
ure
and
size
ofba
ckfil
ling.
Not
es,c
omm
ents
and
glos
sary
1U
nles
sst
ated
asde
emed
incl
uded
all
asso
ciat
edex
cava
tions
,disp
osal
san
dfil
lings
are
mea
sure
din
acco
rdan
cew
ithW
ork
Sect
ion
5:Ex
cava
ting
and
fillin
g.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sc
ope
and
loca
tion
ofth
ew
ork.
2Lo
catio
nof
fenc
ing
desig
ned
for
slopi
nggr
ound
.3
Pre-
cont
ract
grou
ndw
ater
leve
l(s)
and
date
(s)
esta
blish
ed.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llex
cava
tions
,bac
kfilli
ngan
ddi
spos
alof
fsit
eof
surp
lus
mat
eria
ls.2
Eart
hwor
ksu
ppor
t.3
Disp
osal
ofgr
ound
and
surfa
cew
ater
.4
in-s
ituco
ncre
tefo
rpo
stba
ses
and
the
like
5Te
mpo
rary
supp
orts
.6
Form
wor
k.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Fe
ncin
g,ty
pest
ated
m1
Hei
ght
offe
nce.
1Sp
acin
g,he
ight
and
dept
hof
supp
orts
.1
Set
tocu
rve
but
stra
ight
betw
een
post
s.2
Cur
ved:
radi
usst
ated
.3
Gro
und
slopi
ng>
15°
from
horiz
onta
l.4
Leng
ths
≤3m
.
1Fe
ncin
gis
mea
sure
dov
eral
lsup
port
s.2
The
heig
htof
fenc
ing
ism
easu
red
from
the
finish
edsu
rface
ofth
egr
ound
toth
eto
pof
the
infil
ling,
orw
here
ther
eis
noin
fillin
g,to
the
top
wire
orra
ilun
less
othe
rwise
stat
ed.
TABULATED WORK SECTIONS
238 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1[F
encin
g,ty
pest
ated
—co
nt.]
1Sp
acin
g,he
ight
and
dept
hof
supp
orts
.1
Set
tocu
rve
but
stra
ight
betw
een
post
s.2
Cur
ved:
radi
usst
ated
.3
Gro
und
slopi
ng>
15°
from
horiz
onta
l.4
Leng
ths
≤3m
.
3Su
ppor
tsar
epo
sts,
stru
tsor
the
like
occu
rrin
gat
regu
lar
inte
rval
s.4
Cur
ved
fenc
ing
isfe
ncin
gcu
rved
betw
een
supp
orts
.5
The
dept
hof
supp
orts
and
spec
ial
supp
orts
isth
ede
pth
belo
wth
egr
ound
surfa
ceor
othe
rst
ated
base
.6
The
heig
htof
supp
orts
and
spec
ial
supp
orts
isth
ehe
ight
abov
eth
egr
ound
surfa
ceor
othe
rst
ated
base
.
2Ex
tra
over
for
spec
ials
uppo
rts
nr1
Size
,hei
ght
and
dept
hst
ated
.1
End
post
.2
Ang
leor
corn
erpo
st.
3In
tegr
alga
tepo
st.
4St
rain
ing
post
.5
Oth
er:t
ype
stat
ed.
1M
etho
dof
fixin
g.2
Back
grou
ndst
ated
.3
Det
ails
ofba
ckst
ays
orst
ruts
stat
ed.
1In
tegr
alan
din
depe
nden
tga
tepo
sts
are
deem
edto
incl
ude
slam
min
gst
ops
and
hang
ing
pins
orfil
lets
.
3In
depe
nden
tga
tepo
sts
nr
4Ite
ms
extr
aov
erfe
ncin
g,su
ppor
tsan
dsp
ecia
lsup
port
san
din
depe
nden
tga
tepo
sts
irres
pect
ive
ofty
pe
m3
1Ex
cava
ting
belo
wgr
ound
wat
erle
vel.
2Ex
cava
ting
inha
zard
ous
mat
eria
l:de
tails
stat
ed.
1If
the
post
-con
trac
tgr
ound
wat
erle
vel
diffe
rsfro
mth
epr
e-co
ntra
ctgr
ound
wat
erle
velt
hen
the
mea
sure
men
tsar
ead
just
edac
cord
ingl
y.
m3
m2
3Br
eaki
ngou
tex
istin
g.4
Brea
king
upex
istin
gha
rdpa
ving
s:th
ickn
ess
stat
ed.
1Ro
ck.
2C
oncr
ete.
3Re
info
rced
conc
rete
.4
Bric
kwor
k,bl
ockw
ork
orst
onew
ork.
5Ta
rmac
adam
oras
phal
t.
1Ro
ckis
any
hard
mat
eria
lwhi
chis
ofsu
chsiz
eor
loca
tion
that
itca
non
lybe
rem
oved
byth
eus
eof
wed
ges,
rock
ham
mer
s,sp
ecia
lpla
ntor
expl
osiv
es.
2A
boul
der
≤5m
3in
volu
me
oron
eth
atca
nbe
lifte
dou
tin
the
buck
etof
anex
cava
tor
will
not
cons
titut
ero
ck.
3D
egra
ded
orfr
iabl
ero
ckth
atca
nbe
scra
ped
out
byth
eex
cava
tor
buck
etdo
esno
tco
nstit
ute
rock
.4
Mak
ing
good
exist
ing
hard
pavi
ngs
isde
emed
incl
uded
.
36 FENCING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 239
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5G
ates
nr1
Hei
ght
and
wid
thst
ated
.1
Type
stat
ed.
1Po
wer
supp
ly1
Gat
esar
ede
emed
toin
clud
est
ops,
catc
hes,
inde
pend
ent
stay
s,so
unde
rs,
war
ning
light
san
dal
lass
ocia
ted
wor
k.
6Iro
nmon
gery
nr1
Type
ofite
m,u
nit
orse
tst
ated
.1
Kind
and
qual
ityof
mat
eria
lsan
dfix
ings
.2
Surfa
cefin
ish.
3C
onst
ituen
tpa
rts
ofth
eun
itsor
sets
.
1M
etho
dof
fixin
g.2
Nat
ure
ofba
se.
1Iro
nmon
gery
isde
emed
toin
clud
efix
ing
with
scre
ws
orbo
ltsto
mat
chan
dpr
epar
ing
the
base
tore
ceiv
eit.
TABULATED WORK SECTIONS
240 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
37S
oft
land
scap
ing
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Site
plan
san
dse
ctio
ns.
2C
ompo
nent
deta
ils.
3Pl
antin
gsc
hedu
le.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
y,siz
ean
dco
mpo
sitio
nof
mat
eria
ls.2
Prep
arat
ory
wor
k.3
Tim
ing
ofop
erat
ions
.4
Size
and
type
ofpi
ts,h
oles
and
tren
ches
,eith
erex
cava
ted
orfo
rmed
.5
Type
sof
supp
orts
and
ties.
6Sp
ecia
lfilli
ngm
ater
ials.
7M
etho
dof
labe
lling.
8W
ork
onro
ofs
and
the
like
stat
ed.
Not
es,c
omm
ents
and
glos
sary
1U
nles
sst
ated
asde
emed
incl
uded
all
asso
ciat
edex
cava
tions
,disp
osal
san
dfil
lings
are
mea
sure
din
acco
rdan
cew
ithW
ork
Sect
ion
5:Ex
cava
ting
and
fillin
g.
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1Sc
ope
and
loca
tion
ofth
ew
ork.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llw
ork
isde
emed
exte
rnal
unle
ssde
scrib
edas
inte
rnal
.2
All
exca
vatio
nsan
dba
ckfil
ling.
3A
llne
cess
ary
mul
tiple
hand
ling
ofex
cava
ted
mat
eria
l.4
Disp
osal
ofsu
rplu
sex
cava
ted
mat
eria
loff
site.
5Re
mov
alof
ston
esan
dru
bbish
.6
Wat
erin
g.7
Labe
lling.
1Th
ear
eas
mea
sure
dar
eth
ose
inco
ntac
tw
ithth
eba
se.
2N
ode
duct
ions
mad
ein
supe
rfici
alite
ms
for
void
s≤
1.00
m2.
3A
llth
ickn
ess
stat
edar
eno
min
alor
finish
edaf
ter
layi
ngan
dco
mpa
ctin
g.
37 SOFT LANDSCAPING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 241
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1C
ultiv
atin
gm
21
Dep
thst
ated
.1
Met
hod
and
degr
eeof
tilth
.
2Su
rface
appl
icat
ions
m2
1Ty
pean
dra
test
ated
.2
Met
hod
ofap
plic
atio
nst
ate.
1H
erbi
cide
s.2
Wee
dkille
rs.
3Pe
at.
4M
anur
e.5
Com
post
.6
Mul
ch.
7Fe
rtilis
er.
8Sa
nd.
9So
ilam
elio
rate
s.10
Oth
er:d
etai
lsst
ated
.
1Be
fore
sow
ing
orpl
antin
g.2
Afte
rpl
antin
g.3
Aro
und
indi
vidu
alpl
ants
.4
Toge
nera
lare
as.
5To
beds
.6
Topl
ante
rs.
7To
pots
.
1W
orki
ngin
isde
emed
incl
uded
.
3Se
edin
gm
21
Rate
stat
ed.
1G
rass
seed
.2
Cul
tivat
edpl
ant
seed
.3
Wild
flow
erse
ed.
4O
ther
:typ
est
ated
.
1Ra
king
in,h
arro
win
gan
dro
lling
isde
emed
incl
uded
.
4Tu
rfing
m2
----
-m
1Ty
pean
dth
ickn
ess
stat
ed.
----
----
----
----
----
--2
Type
,wid
than
dth
ickn
ess
stat
ed.
1C
uttin
gis
deem
edto
incl
ude
trim
min
ged
ges.
TABULATED WORK SECTIONS
242 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5Tr
ees
nr1
Bota
nica
lnam
e.1
BSsiz
ede
signa
tion
and
root
syst
emst
ated
.2
Gir
th,h
eigh
tan
dcl
ear
stem
and
root
syst
emst
ated
.
1Pl
antin
gin
culti
vate
dor
gras
sed
area
spr
epar
edby
othe
rsto
best
ated
incl
udin
gal
lnec
essa
ryre
inst
atem
ent.
2Pl
antin
gin
door
sto
best
ated
.3
Det
ails
ofin
itial
cut
back
stat
ed.
4D
etai
lsof
wat
erin
gst
ated
.5
Back
fillt
ype
stat
edif
not
the
mat
eria
laris
ing
from
exca
vatio
ns.
1Su
ppor
tsan
dtie
sde
emed
incl
uded
.2
BSsiz
ein
clud
est
anda
rd,a
dvan
ced
nurs
ery
stoc
kor
sem
i-mat
ure
type
s.3
Youn
gnu
rser
yst
ock
incl
udes
seed
lings
,tr
ansp
lant
san
dw
hips
.
6Yo
ung
nurs
ery
stoc
ktr
ees
nr3
Hei
ght
and
root
syst
emst
ated
.
7Sh
rubs
nr
8H
edge
plan
tsnr --
---
m
4H
eigh
tst
ated
.--
----
----
----
----
----
5H
eigh
t,sp
acin
g,nu
mbe
rof
row
san
dla
yout
stat
ed.
9Pl
ants
nr ----
-m
2
6Si
zest
ated
.--
----
----
----
----
----
7Si
zean
dnu
mbe
rpe
rm
2st
ated
.
10Bu
lbs,
corm
san
dtu
bers
nr ----
-m
2
8Si
zest
ated
.--
----
----
----
----
----
9Si
zean
dw
eigh
tpe
rm
2st
ated
.
11Pl
ant
cont
aine
rsnr
1D
imen
sione
dde
scrip
tion.
1Li
ning
s:ty
pest
ated
.1
Met
hod
offix
ing.
37 SOFT LANDSCAPING
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 243
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
12Pr
otec
tion
m1
Tem
pora
ryfe
ncin
g:ty
pean
ddu
ratio
nst
ated
.1
Ulti
mat
eow
ners
hip:
deta
ilsst
ated
.1
Perm
anen
tfe
ncin
gis
mea
sure
din
acco
rdan
cew
ithth
eru
les
ofW
ork
Sect
ion
36:F
enci
ng.
nr2
Tree
guar
ds,d
imen
sione
dde
scrip
tion.
2Ty
pest
ated
.1
Met
hod
offix
ing
stat
ed.
nr3
Wra
ppin
gs:h
eigh
tof
wra
ppin
gan
dgi
rth
oftr
eest
ated
.3
Che
mic
alap
plic
atio
nst
ated
.2
Met
hod
offix
ing
stat
ed.
nr4
Ant
i-des
icca
ntsp
rays
,hei
ght
and
girt
hof
tree
orsp
read
ofpl
ant
stat
ed.
4Ty
pest
ated
.3
Rate
ofsp
ray
stat
ed.
item
5G
ener
al:d
etai
lsst
ated
.5
Dur
atio
n.
13M
aint
enan
ceite
m1
Det
ails
stat
ed.
TABULATED WORK SECTIONS
244 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
38M
echa
nica
lse
rvic
es
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Floo
ran
dsit
epl
ans
deta
iling
layo
utof
syst
ems.
2Sy
stem
sche
mat
ics.
3C
ross
sect
ions
and
elev
atio
ns.
4D
etai
llay
outs
for
plan
troo
ms
and
prin
cipa
lser
vice
sin
stal
latio
nar
eas.
5Sp
ecifi
cin
stal
latio
nde
tails
for
equi
pmen
tan
dfit
tings
.6
Equi
pmen
tsc
hedu
les.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ty
pe,q
ualit
yan
dsiz
eor
thic
knes
sof
mat
eria
ls.2
Met
hod
offix
ing.
3Lo
catio
n.4
Whe
reth
em
anda
tory
info
rmat
ion
isav
aila
ble,
mea
sure
men
tof
pipe
wor
kan
d/or
duct
wor
kw
illbe
fully
deta
iled
with
the
mea
sure
men
tof
fittin
gsid
entif
ied
and
mea
sure
dse
para
tely,
inac
cord
ance
with
Alte
rnat
ive
1.H
owev
er,w
here
the
man
dato
ryin
form
atio
nis
not
avai
labl
eth
enpi
pew
ork/
duct
wor
kan
das
soci
ated
insu
latio
nan
dfir
epr
otec
tion
isto
bem
easu
red
incl
usiv
eof
fittin
gs.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llw
ork
isde
emed
inte
rnal
unle
ssst
ated
asex
tern
al.
2A
llw
aste
.3
Extr
am
ater
ialf
orla
bour
mad
efit
tings
.4
All
coup
lings
,bra
cket
s,su
ppor
ts,f
ixin
gsan
dca
stin
chan
nels.
5A
llla
bellin
g,ta
ggin
g,id
entif
icat
ion
and
char
ts.
6M
arki
ngof
allh
oles
chas
esan
dm
ortic
es.
7Ea
rth
conn
ecto
rs,s
trap
san
dlin
ks.
38 MECHANICAL SERVICES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 245
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
imar
yeq
uipm
ent
nr1
Syst
em1
Loca
tion
ofin
stal
latio
n–
Roof
s,hi
ghor
low
leve
lin
plan
troo
ms,
riser
sor
serv
ice
duct
s,hi
ghor
low
leve
lon
floor
s.
1Ty
pe,s
ize,c
apac
ity,l
oad,
ratin
g,sp
ecia
lfin
ishes
,cas
ings
,in-
fills,
asso
ciat
edin
tegr
ated
orre
mot
ean
cilla
ries,
cont
rols,
indi
cato
rsor
com
pone
nts,
anti-
vibr
atio
nm
ount
ings
,ac
oust
icpe
rform
ance
/tre
atm
ent
and
met
hod
offix
ing.
1Pr
imar
yeq
uipm
ent
isde
fined
aspl
ant
oreq
uipm
ent
from
whi
cha
syst
emor
igin
ates
,e.g
.boi
ler,
mai
nst
orag
eta
nk,
air
hand
ling
unit,
fan
and
the
like.
2C
ross
refe
renc
edto
draw
ings
and/
ora
full
spec
ifica
tion.
3H
igh
and
low
leve
lto
bein
acco
rdan
cew
ithN
atio
nalH
ealth
and
Safe
tyre
com
men
datio
nsan
dN
atio
nal
Wor
king
Rule
Agr
eem
ents
.
nr2
Off-
load
and
posit
ion
prim
ary
equi
pmen
t.
nr3
Ass
embl
yof
com
posit
eite
ms
ofpr
imar
yeq
uipm
ent.
2Te
rmin
aleq
uipm
ent
and
fittin
gsnr
1Sy
stem
.1
Loca
tion
ofin
stal
latio
n–
roof
s,hi
ghor
low
leve
lin
plan
troo
ms,
riser
sor
serv
ice
duct
s,hi
ghor
low
leve
lon
floor
s.
1Ty
pe,s
ize,c
apac
ity,l
oad,
ratin
g,sp
ecia
lfin
ishes
,cas
ings
,in-
fills,
asso
ciat
edin
tegr
ated
orre
mot
ean
cilla
ries,
cont
rols,
indi
cato
rsor
com
pone
nts,
anti-
vibr
atio
nm
ount
ings
,ac
oust
icpe
rform
ance
/tre
atm
ent
and
met
hod
offix
ing.
1Te
rmin
aleq
uipm
ent
and
fittin
gsar
ede
fined
asan
yite
mto
whi
cha
syst
emis
dist
ribut
edto
,e.g
.hea
tem
itter
s,gr
illes,
fan
coil
units
and
the
like.
3Pi
pew
ork
m1
Mat
eria
l,fin
ish,n
omin
aldi
amet
er,m
etho
dof
join
ting,
fixin
gsan
dba
ckgr
ound
for
fixin
g.
1Lo
catio
nof
inst
alla
tion
–Ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
1G
ener
ally
allp
ipew
ork
tobe
mea
sure
din
clus
ive
ofal
lfitt
ings
,i.e
.uni
ons,
conn
ecto
rs,f
lang
es,b
ends
,tee
s,ju
nctio
ns,r
educ
ers,
test
poin
ts,b
osse
s,so
cket
s,ta
ppin
gsan
dth
elik
e.
1U
nles
sm
easu
red
sepa
rate
ly,al
lfit
tings
are
deem
edto
bein
clud
ed.
TABULATED WORK SECTIONS
246 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
4A
ltern
ativ
e1
–pi
pefit
tings
nr1
Type
,mat
eria
l,fin
ish,n
omin
aldi
amet
er,m
etho
dof
join
ting.
1U
nion
s,co
nnec
tors
,fla
nges
,ben
ds,t
ees,
sets
,jun
ctio
ns,r
educ
ers,
test
poin
ts,
boss
es,s
ocke
ts,t
appi
ngs
and
the
like.
5Pi
pean
cilla
ries
nr1
Type
,mat
eria
l,fin
ish,n
omin
aldi
amet
er,m
etho
dof
join
ting.
1Va
lves
,str
aine
rs,e
xpan
sion
bello
ws,
anch
ors,
guid
esan
dro
llers
,gul
lies,
outle
ts,r
ainw
ater
head
s,tu
ndish
es,
trap
s,pi
pesle
eves
,wal
l,flo
oran
dce
iling
plat
esan
dth
elik
e.
6Ve
ntila
tion
duct
s1
Mat
eria
l,fin
ish,s
ectio
nsh
ape,
dim
ensio
ns,m
etho
dof
join
ting,
fixin
gsan
dba
ckgr
ound
for
fixin
g.
1Lo
catio
nof
inst
alla
tion
–ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors.
1G
ener
ally
alld
uctw
ork
tobe
mea
sure
din
clus
ive
ofal
lfitt
ings
,i.e
.con
nect
ors,
flang
es,b
ends
,tee
s,ju
nctio
ns,r
educ
ers,
spig
ots,
test
hole
san
dth
elik
e.
1U
nles
sm
easu
red
sepa
rate
ly,al
lfit
tings
are
deem
edto
bein
clud
ed.
7A
ltern
ativ
e1
–du
ctfit
tings
nr1
Type
,mat
eria
l,fin
ish,s
hape
,di
men
sions
,met
hod
ofjo
intin
g.1
Join
ts,f
lang
es,b
ends
,tee
s,se
ts,
junc
tions
,red
ucer
s,sp
igot
s,te
stho
les
and
the
like.
8D
uct
anci
llarie
snr
1Ty
pe,m
ater
ial,
finish
,sha
pe,
dim
ensio
ns,m
etho
dof
join
ting.
1D
ampe
rs,i
n-du
cthe
ater
/coo
ling
coils
.
9In
sula
tion
and
fire
prot
ectio
nnr
1Ty
pe,m
ater
ial,
finish
1Lo
catio
nof
inst
alla
tion
–ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
1To
equi
pmen
tan
dfit
tings
.
m2
Thic
knes
s,m
ater
ial,
finish
,no
min
aldi
amet
erof
pipe
.1
Topi
pew
ork.
1G
ener
ally
alli
nsul
atio
nto
pipe
wor
kto
bem
easu
red
incl
usiv
eof
allf
ittin
gs,i
.e.
unio
ns,c
onne
ctor
s,fla
nges
,ben
ds,t
ees,
sets
,jun
ctio
ns,r
educ
ers,
test
poin
ts,
boss
es,s
ocke
ts,t
appi
ngs
and
the
like.
38 MECHANICAL SERVICES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 247
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
9In
sula
tion
and
fire
prot
ectio
n—co
nt.
1U
nles
sm
easu
red
sepa
rate
ly,al
lfit
tings
are
deem
edto
bein
clud
ed.
10A
ltern
ativ
e1
–In
sula
tion
and
fire
prot
ectio
nto
pipe
fittin
gsnr
1Ty
pe,m
ater
ial,
finish
,nom
inal
diam
eter
,met
hod
ofjo
intin
g.1
Uni
ons,
conn
ecto
rs,f
lang
es,b
ends
,tee
s,se
ts,j
unct
ions
.red
ucer
s,te
stpo
ints
,bo
sses
,soc
kets
,tap
ping
san
dth
elik
e.
11In
sula
tion
and
fire
prot
ectio
nto
pipe
anci
llarie
snr
1Ty
pe,m
ater
ial,
finish
,nom
inal
diam
eter
,met
hod
ofjo
intin
g.1
Valv
es,s
trai
ners
,exp
ansio
nbe
llow
s,gu
llies,
outle
ts,t
undi
shes
,tra
ps,p
ipe
sleev
es,a
ndth
elik
e.
12In
sula
tion
and
fire
prot
ectio
nto
vent
ilatio
ndu
cts
m2
1Th
ickn
ess,
mat
eria
l,fin
ish,d
uct
dim
ensio
ns.
1Lo
catio
nof
inst
alla
tion
–Ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
1G
ener
ally
alli
nsul
atio
nto
duct
wor
kto
bem
easu
red
incl
usiv
eof
allf
ittin
gs,i
.e.
conn
ecto
rs,f
lang
es,b
ends
,tee
s,se
ts,
junc
tions
,red
ucer
s,sp
igot
s,te
stho
les
and
the
like,
onth
eex
tern
algi
rth
ofth
edu
ctto
bein
sula
ted.
1U
nles
sm
easu
red
sepa
rate
ly,in
sula
tion
and
fire
prot
ectio
nto
allf
ittin
gsis
deem
edto
bein
clud
ed.
13A
ltern
ativ
e1
–In
sula
tion
and
fire
prot
ectio
nto
duct
fittin
gs1
Type
,mat
eria
l,fin
ish,n
omin
aldi
amet
er,m
etho
dof
join
ting.
1Jo
ints
,fla
nges
,ben
ds,t
ees,
sets
,ju
nctio
ns,r
educ
ers,
spig
ots,
test
hole
san
dth
elik
e.
14In
sula
tion
and
fire
prot
ectio
nto
equi
pmen
tm
21
Thic
knes
s,m
ater
ial,
finish
,no
min
alar
ea,p
erfo
rman
cera
ting.
1In
sula
tion
toeq
uipm
ent
mea
sure
dse
para
tely
whe
reno
tgi
ven
inth
ede
scrip
tion
ofth
eite
ms
tow
hich
itre
late
s.
TABULATED WORK SECTIONS
248 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
15Fi
rest
oppi
ngnr
1M
ater
ial,
loca
tion,
size
ofop
enin
gto
best
oppe
d,siz
eof
serv
ice
stop
ping
tobe
inst
alle
dar
ound
,dep
than
dfir
era
ting.
16Id
entif
icat
ion
item
1Pl
ates
.2
Disc
s.3
Labe
ls.4
Tape
s.5
Sym
bols
ornu
mbe
rs.
6Ba
nds.
7C
hart
sor
diag
ram
s.8
Oth
er:t
ype
stat
ed.
17Te
stin
gite
m1
Toin
clud
ech
emic
altr
eatm
ent,
purg
ing,
ster
ilisat
ion,
pres
sure
test
ing.
18C
omm
issio
ning
item
1To
incl
ude
allf
inal
bala
ncin
g,ca
libra
tion
and
sett
ing
tow
ork.
19Sy
stem
valid
atio
nite
m
20O
pera
tion
and
mai
nten
ance
man
uals
item
21D
raw
ing
prep
arat
ion
item
1C
lass
ifica
tion
ofdr
awin
gs.
1In
stal
latio
n,co
-ord
inat
ion,
asin
stal
led,
and
reco
rddr
awin
gs.
22Tr
aini
ngite
m
23Lo
ose
anci
llarie
site
m1
Keys
,too
ls,sp
ares
,che
mic
als
and
the
like.
24Po
st-c
ompl
etio
nse
rvic
esite
m1
Mai
nten
ance
,adj
ustm
ents
,se
rvic
ing
and
the
like.
1Se
egl
ossa
ryof
term
sfo
rde
finiti
onof
com
plet
ion.
38 MECHANICAL SERVICES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 249
39E
lect
rica
lse
rvic
es
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Floo
ran
dsit
epl
ans
deta
iling
layo
utof
syst
ems.
2Sy
stem
sche
mat
ics.
3C
ross
sect
ions
and
elev
atio
ns.
4D
etai
llay
outs
for
plan
troo
ms
and
prin
cipa
lser
vice
sin
stal
latio
nar
eas.
5Sp
ecifi
cin
stal
latio
nde
tails
for
equi
pmen
tan
dfit
tings
.6
Equi
pmen
tsc
hedu
les.
Man
dato
ryin
form
atio
nto
bepr
ovid
ed.
1Ki
nd,q
ualit
yan
dsiz
eor
thic
knes
sof
mat
eria
ls.2
Met
hod
offix
ing.
3Lo
catio
n.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
Wor
ksan
dm
ater
ials
deem
edin
clud
ed.
1A
llw
ork
isde
emed
inte
rnal
unle
ssst
ated
asex
tern
al.
2A
llw
aste
.3
Extr
am
ater
ialf
orla
bour
mad
efit
tings
.4
All
brac
kets
,sup
port
s,fix
ings
and
cast
inch
anne
ls.5
All
labe
lling,
tagg
ing,
iden
tific
atio
nan
dch
arts
.6
Mar
king
ofal
lhol
esch
ases
and
mor
tices
.7
Eart
hco
nnec
tors
,str
aps
and
links
.
1W
here
the
man
dato
ryin
form
atio
nis
avai
labl
e,m
easu
rem
ent
ofca
ble
cont
ainm
ent
and
busb
ars
will
befu
llyde
taile
dw
ithth
em
easu
rem
ent
offit
tings
iden
tifie
dan
dm
easu
red
sepa
rate
ly,in
acco
rdan
cew
ithA
ltern
ativ
e1.
How
ever
,whe
reth
em
anda
tory
info
rmat
ion
isno
tav
aila
ble
then
cabl
eco
ntai
nmen
tan
dbu
sbar
sar
eto
bem
easu
red
incl
usiv
eof
fittin
gs.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
imar
yeq
uipm
ent
nr1
Syst
em.
1Lo
catio
nof
inst
alla
tion
–ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors.
1Ty
pe,s
ize,c
apac
ity,l
oad,
ratin
g,as
soci
ated
inte
grat
edor
rem
ote
anci
llarie
s,co
ntro
ls,in
dica
tors
orco
mpo
nent
san
dm
etho
dof
fixin
g.
1Pr
imar
yeq
uipm
ent
isde
fined
aspl
ant
oreq
uipm
ent
from
whi
cha
syst
emor
igin
ates
,e.g
.mai
nsw
itch
boar
d,m
ain
cont
rolb
oxan
dth
elik
e.2
Hig
han
dlo
wle
velt
obe
inac
cord
ance
with
Nat
iona
lHea
lthan
dSa
fety
reco
mm
enda
tions
and
Nat
iona
lW
orki
ngRu
leA
gree
men
ts.
TABULATED WORK SECTIONS
250 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Pr
imar
yeq
uipm
ent—
cont
.nr
2O
ff-lo
adan
dpo
sitio
npr
imar
yeq
uipm
ent.
nr3
Ass
embl
yof
com
posit
eite
ms
ofpr
imar
yeq
uipm
ent.
2Te
rmin
aleq
uipm
ent
and
Fitt
ings
nr1
Syst
em.
1Ty
pe,s
ize,c
apac
ity,l
oad,
ratin
g,sp
ecia
lfin
ishes
,cas
ings
,in-
fills,
asso
ciat
edin
tegr
ated
orre
mot
ean
cilla
ries,
cont
rols,
indi
cato
rsor
com
pone
nts
and
met
hod
offix
ing.
1Lo
catio
nof
inst
alla
tion
–Ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors.
1Te
rmin
aleq
uipm
ent
and
fittin
gsar
ede
fined
asan
yite
mto
whi
cha
syst
emis
dist
ribut
edto
,e.g
.lum
inai
res,
switc
hes,
actu
ator
san
dth
elik
e.
3C
able
cont
ainm
ent
m1
Type
,mat
eria
l,fin
ish,s
ectio
nsh
ape,
dim
ensio
ns,n
umbe
rof
com
part
men
ts,m
etho
dof
join
ting,
fixin
gsan
dba
ckgr
ound
for
fixin
g.
1Lo
catio
nof
inst
alla
tion
–ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
1G
ener
ally
allc
able
cont
ainm
ent
tobe
mea
sure
din
clus
ive
ofal
lfitt
ings
,i.e
.jo
int
boxe
s,co
nnec
tors
,fla
nges
,ben
ds,
tees
,jun
ctio
ns,r
educ
ers,
spig
ots,
fire
barr
iers
and
the
like.
Unl
ess
mea
sure
dse
para
tely,
all
fittin
gsar
ede
emed
tobe
incl
uded
.
4A
ltern
ativ
e1
–ca
ble
cont
ainm
ent
fittin
gsnr
1Ty
pe,m
ater
ial,
finish
,sha
pe,
dim
ensio
ns,m
etho
dof
join
ting.
1Jo
int
boxe
s,co
nnec
tors
,fla
nges
,ben
ds,
tees
,set
s,ju
nctio
ns,r
educ
ers,
spig
ots,
fire
barr
iers
and
the
like.
5C
able
sm
1Ty
pe,r
atin
g,siz
e,nu
mbe
rof
core
s,m
ater
ial,
arm
ourin
g,sh
eath
ing,
met
hod
ofjo
intin
g,fix
ings
and
back
grou
ndfo
rfix
ing.
1Lo
catio
nof
inst
alla
tion
–ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
39 ELECTRICAL SERVICES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 251
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
6C
able
term
inat
ions
and
join
tsnr
1Ty
pe,r
atin
g,siz
e,nu
mbe
rof
core
s,m
ater
ial,
arm
ourin
g,sh
eath
ing.
1In
clud
esal
lpot
s,se
als,
glan
ds,l
ugs,
conn
ecto
rbl
ocks
and
shro
uds.
7Fi
nalc
ircui
tsnr
1C
able
type
,rat
ing,
size,
mat
eria
l,sh
eath
ing,
num
ber
and
type
ofpo
ints
.
1Lo
catio
nof
inst
alla
tion
–ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors.
1In
clud
esal
lcon
tain
men
tno
tm
easu
red
sepa
rate
ly,ju
nctio
nbo
xes,
term
inat
ions
,po
ts,s
eals,
glan
ds,l
ugs,
conn
ecto
rbl
ocks
and
shro
uds.
2In
clud
esfix
ing
cont
ainm
ent
orca
bles
inch
ases
,sur
face
orsu
spen
ded
from
soffi
ts.
8M
odul
arw
iring
syst
ems
nr1
Cab
lety
pe,r
atin
g,siz
e,m
ater
ial,
shea
thin
g,nu
mbe
ran
dty
peof
poin
ts.
1In
clud
esal
lcon
tain
men
tno
tm
easu
red
sepa
rate
ly,ju
nctio
nbo
xes,
term
inat
ions
,po
ts,s
eals,
glan
ds,l
ugs,
conn
ecto
rbl
ocks
and
shro
uds.
2In
clud
esfix
ing
cont
ainm
ent
orca
bles
inch
ases
,sur
face
orsu
spen
ded
from
soffi
ts.
9Bu
sbar
m1
Type
,rat
ing,
mat
eria
l,nu
mbe
rof
bars
,met
hod
ofjo
intin
g,fix
ings
and
back
grou
ndfo
rfix
ing.
1Lo
catio
nof
inst
alla
tion
–Ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
1G
ener
ally
allb
usba
rto
bem
easu
red
incl
usiv
eof
allf
ittin
gs,i
.e.c
onne
ctor
s,fla
nges
,ben
ds,t
ees,
sets
,jun
ctio
ns,
feed
erun
its,t
ap-o
ffbo
xes
fire
barr
iers
and
the
like.
1U
nles
sm
easu
red
sepa
rate
ly,al
lfit
tings
are
deem
edto
bein
clud
ed.
10A
ltern
ativ
e1
–bu
sbar
fittin
gsnr
1Ty
pe,m
ater
ial,
finish
,sha
pe,
dim
ensio
ns,m
etho
dof
join
ting.
1C
onne
ctor
s,fla
nges
,ben
ds,t
ees,
sets
,ju
nctio
ns,f
eede
run
its,t
ap-o
ffbo
xes
fire
barr
iers
and
the
like.
2Jo
ints
,fla
nges
,ben
ds,t
ees,
sets
,ju
nctio
ns,r
educ
ers,
spig
ots,
test
hole
san
dth
elik
e.
11Ta
pes
m1
Type
,rat
ing,
size,
mat
eria
l,sh
eath
ing,
met
hod
ofjo
intin
g,fix
ings
and
back
grou
ndfo
rfix
ing.
1Lo
catio
nof
inst
alla
tion
–Ro
ofs,
high
orlo
wle
veli
npl
antr
oom
s,ris
ers
orse
rvic
edu
cts,
high
orlo
wle
velo
nflo
ors,
intr
ench
es.
1In
clud
esal
lcon
nect
ions
,joi
nts,
test
clam
ps.
TABULATED WORK SECTIONS
252 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
12El
ectr
odes
,ear
thro
ds,a
irte
rmin
atio
ns,t
erm
inat
ion
bars
nr1
Type
,rat
ing,
size,
mat
eria
l,m
etho
dof
join
ting,
fixin
gsan
dba
ckgr
ound
for
fixin
g.
13Fi
rest
oppi
ngan
dot
her
asso
ciat
edfir
epr
otec
tw
ork
nr1
Mat
eria
l,lo
catio
n,siz
eof
open
ing
tobe
stop
ped,
size
ofse
rvic
est
oppi
ngto
bein
stal
led
arou
nd,d
epth
and
fire
ratin
g.
14Id
entif
icat
ion
item
1Pl
ates
.2
Disc
s.3
Labe
ls.4
Tape
s.5
Sym
bols
ornu
mbe
rs.
6Ba
nds.
7C
hart
sor
diag
ram
s.8
Oth
er:t
ype
stat
ed.
15Te
stin
gite
m
16C
omm
issio
ning
item
17Sy
stem
valid
atio
nite
m
18O
pera
tion
and
mai
nten
ance
man
uals
item
19D
raw
ing
prep
arat
ion
item
1C
lass
ifica
tion
ofdr
awin
gs.
1In
stal
latio
n,co
-ord
inat
ion,
asin
stal
led
and
reco
rddr
awin
gs.
20Tr
aini
ngite
m
21Lo
ose
anci
llarie
site
m1
Keys
,too
ls,sp
ares
,che
mic
als.
22Po
stpr
actic
alco
mpl
etio
nSe
rvic
esite
m1
Mai
nten
ance
,adj
ustm
ents
and
serv
icin
g.
39 ELECTRICAL SERVICES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 253
40T
rans
port
atio
n
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Loca
tion
plan
sM
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
,qua
lity
and
size
orth
ickn
ess
ofm
ater
ials.
2Lo
catio
n.3
Eart
hco
nnec
tors
,str
aps
and
links
.
Not
es,c
omm
ents
and
glos
sary
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1O
vera
lldi
men
sions
ofite
ms
orsy
stem
sW
orks
and
mat
eria
lsde
emed
incl
uded
.1
All
wor
kis
deem
edin
tern
alun
less
stat
edas
exte
rnal
.2
All
was
te.
3Ex
tra
mat
eria
lfor
labo
urm
ade
fittin
gs.
4A
llbr
acke
ts,s
uppo
rts,
fixin
gsan
dca
stin
chan
nels.
5A
llla
bellin
g,ta
ggin
g,id
entif
icat
ion
and
char
ts.
6M
arki
ngof
allh
oles
chas
esan
dm
ortic
es.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
1Sy
stem
nr1
Type
,size
,cap
acity
,loa
d,ra
ting,
leng
th,n
umbe
rof
stop
s,st
orey
heig
ht,a
ssoc
iate
din
tegr
ated
orre
mot
ean
cilla
ries,
cont
rols,
indi
cato
rsor
com
pone
nts.
1C
ross
refe
renc
edto
draw
ings
and/
ora
full
spec
ifica
tion
deta
iling
finish
es.
nr2
Off-
load
and
posit
ion
prim
ary
equi
pmen
t.
nr3
Ass
embl
yof
com
posit
eite
ms
ofpr
imar
yeq
uipm
ent.
item
4Fr
eeiss
uefix
ing
stee
lwor
kan
dot
her
com
pone
nts
for
inst
alla
tion
byot
hers
.
1Ty
peof
free
issue
mat
eria
ls.
item
5In
terfa
cew
ithan
dco
nnec
tion
tosy
stem
ssu
pplie
dan
din
stal
led
byot
hers
.
1Ty
peof
syst
em.
1N
atur
eof
inte
rface
.1
Syst
ems
supp
lied
and
inst
alle
dby
othe
rsw
illin
clud
ete
leph
ones
,in
terc
oms,
fire
alar
man
dth
elik
e.
TABULATED WORK SECTIONS
254 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
2Fi
rest
oppi
ngan
dot
her
asso
ciat
edfir
epr
otec
tw
ork
nr1
Mat
eria
l,lo
catio
n,siz
eof
open
ing
tobe
stop
ped,
size
ofse
rvic
est
oppi
ngto
bein
stal
led
arou
nd,d
epth
and
fire
ratin
g.
3Id
entif
icat
ion
item
1Pl
ates
.2
Disc
s.3
Labe
ls.4
Tape
s.5
Sym
bols
ornu
mbe
rs.
6Ba
nds.
7C
hart
sor
diag
ram
s.8
Oth
er:t
ype
stat
ed.
4Te
stin
gan
dco
mm
issio
ning
item
5Sy
stem
valid
atio
nite
m
6O
pera
tion
and
mai
nten
ance
man
uals
item
7D
raw
ing
prep
arat
ion
item
1C
lass
ifica
tion
ofdr
awin
gs.
1In
stal
latio
n,co
-ord
inat
ion,
asin
stal
led
and
reco
rddr
awin
gs.
8Tr
aini
ngite
m
9Lo
ose
anci
llarie
site
m1
Keys
,too
ls,sp
ares
,che
mic
als.
10Po
stpr
actic
alco
mpl
etio
nse
rvic
esite
m1
Mai
nten
ance
,adj
ustm
ents
and
serv
icin
g.
40 TRANSPORTATION
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 255
41B
uild
er’s
wo
rkin
conn
ecti
on
wit
hm
echa
nica
l,el
ectr
ical
and
tran
spo
rtat
ion
inst
alla
tio
ns
Dra
win
gsth
atm
ust
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.1
Layo
utof
each
type
ofse
rvic
ein
stal
latio
n.M
anda
tory
info
rmat
ion
tobe
prov
ided
.1
Kind
and
qual
ityof
mat
eria
ls.N
otes
,com
men
tsan
dgl
ossa
ry
Min
imum
info
rmat
ion
that
mus
tbe
show
non
the
draw
ings
that
acco
mpa
nyth
isse
ctio
nof
mea
sure
men
t.
1C
onst
ruct
ion
ofst
ruct
ure.
2Fi
reco
mpa
rtm
enta
tion.
3Se
rvic
eru
ns.
1W
orks
and
mat
eria
lsde
emed
incl
uded
.
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
Wor
kfo
rse
rvic
esin
stal
latio
nsin
new
build
ings
1G
ener
albu
ilder
’sw
ork
inco
nnec
tion
with
:ite
m1
Type
ofIn
stal
latio
nst
ated
.1
An
item
shal
lbe
give
nfo
rea
chan
dev
ery
serv
ices
inst
alla
tion.
2Ex
ampl
esof
inst
alla
tions
are
cold
wat
erse
rvic
es,h
otw
ater
serv
ices
,lig
htin
gin
stal
latio
ns,p
ower
inst
alla
tions
,lif
tin
stal
latio
ns.I
nth
eca
seof
larg
epr
ojec
tsit
may
bene
cess
ary
tosu
b-di
vide
each
inst
alla
tion
into
loca
tions
.3
This
item
mea
nsev
ery
type
ofge
nera
lbu
ilder
’sw
ork
nece
ssar
yin
conn
ectio
nw
ithth
ese
rvic
ein
stal
latio
nex
cept
thos
eite
ms
incl
uded
inth
efo
llow
ing
rule
s.
2M
arki
ngpo
sitio
nof
hole
s,m
ortic
esan
dch
ases
inth
est
ruct
ure
item
3Pi
pean
ddu
ctsle
eves
nr1
Size
and
type
stat
ed.
1Fi
rera
ting
stat
ed.
1N
atur
ean
dth
ickn
ess
ofst
ruct
ure
stat
ed.
2M
etho
dof
fixin
gst
ated
.3
Slee
ves
supp
lied
byot
hers
stat
ed.
1M
akin
ggo
odar
ound
sleev
eis
deem
edin
clud
ed.
4Ba
ses,
plin
ths
and
the
like
nr1
Size
stat
ed.
1M
etho
dof
form
ing
orco
nstr
uctio
nst
ated
.1
Ant
i-vib
ratio
npa
ds.
2A
cous
ticpa
ds.
TABULATED WORK SECTIONS
256 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
5D
uct
cove
rsan
dfr
ames
m ----
-nr
1W
idth
and
type
stat
ed.
----
----
----
----
----
--2
Size
and
type
stat
ed.
1Li
mita
tions
tole
ngth
sof
cove
rsst
ated
.2
Fini
shst
ated
.
1M
etho
dof
fixin
gst
ated
.2
Nat
ure
ofba
ckgr
ound
stat
ed.
6Su
ppor
tsfo
rse
rvic
esno
tpr
ovid
edby
serv
ices
cont
ract
orm --
---
nr
1Si
zean
dty
pest
ated
.--
----
----
----
----
-2
Size
,len
gth
and
type
stat
ed.
1Py
lons
.2
Pole
s.3
Wal
lbra
cket
s.4
Soffi
tha
nger
s.5
Stay
s.6
Prop
rieta
rysu
ppor
ts.
Man
ufac
ture
rsre
fere
nce
stat
ed.
7C
aten
ary
cabl
esm
1Si
zean
dty
pest
ated
.1
Eye
bolts
:det
ails
stat
ed.
2Sh
ackl
es:d
etai
lsst
ated
.3
Stra
inin
gsc
rew
s:de
tails
stat
ed.
1Th
ele
ngth
isne
tw
ithno
allo
wan
cem
ade
for
sag.
Wor
kfo
rse
rvic
esin
stal
latio
nsin
exis
ting
build
ings
8C
uttin
gho
les
thro
ugh
exist
ing
stru
ctur
esnr
1Si
zest
ated
.1
Nat
ure
and
thic
knes
sof
stru
ctur
est
ated
.1
Mak
ing
good
tom
atch
exist
ing
orpr
epar
ing
for
new
wor
kis
deem
edin
clud
ed.
9C
uttin
gm
ortic
esan
dsin
king
sin
exist
ing
stru
ctur
enr
1Si
zest
ated
.1
Nat
ure
ofst
ruct
ure
stat
ed.
41 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATIONINSTALLATIONS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 257
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
10C
uttin
gch
ases
thro
ugh
exist
ing
stru
ctur
esm
1Si
zean
dnu
mbe
rof
serv
ices
stat
ed.
11Li
fting
and
repl
acin
gflo
orbo
ards
m1
Size
and
num
ber
ofse
rvic
esst
ated
.1
No
dist
inct
ion
ism
ade
betw
een
rout
espa
ralle
lor
atan
angl
eto
the
floor
boar
ds.
2C
uttin
gbo
ards
and
notc
hing
orho
ling
joist
sis
deem
edin
clud
ed.
12Li
fting
and
repl
acin
gdu
ctco
vers
orch
eque
rpl
ates
m1
Wid
than
dty
pest
ated
.
Wor
kfo
rex
tern
alse
rvic
esin
stal
latio
ns
13U
nder
grou
ndse
rvic
eru
nsm
1A
vera
getr
ench
dept
hin
500m
min
crem
ents
.2
Type
and
nom
inal
diam
eter
ofpi
pedu
ct.
3M
ultip
lepi
pedu
cts
stat
ing
num
ber
and
nom
inal
diam
eter
ofpi
pedu
cts.
4Pi
pedu
ct(s
)su
pplie
dby
othe
rs;
type
and
nom
inal
diam
eter
.5
Type
and
size
ofco
ver
tile(
s)or
iden
tific
atio
nta
pe(s
).
1M
etho
dof
join
ting
pipe
duct
s.2
Pipe
duct
bedd
ing
and
orsu
rrou
nd:d
etai
lsst
ated
.3
Type
ofba
ckfil
lif
not
obta
ined
from
the
exca
vatio
ns.
1Ve
rtic
al.
2C
urve
d.3
Belo
wgr
ound
wat
erle
vel.
4N
ext
toex
istin
gro
adw
ayor
path
.5
Nex
tto
exist
ing
build
ing.
6Sp
ecifi
edm
ultip
leha
ndlin
g:de
tails
stat
ed.
7D
ispos
alof
exca
vate
dm
ater
ial
whe
reno
tat
the
disc
retio
nof
the
cont
ract
or:d
etai
lsst
ated
.
1Pi
pedu
ctru
nsar
ede
emed
toru
nst
raig
htun
less
stat
edot
herw
ise.
2Pi
pedu
ctru
nsar
em
easu
red
from
exte
rnal
face
ofm
anho
leto
exte
rnal
face
ofm
anho
leor
acce
ssor
y.3
Ave
rage
dept
his
calc
ulat
edfo
rea
chru
nirr
espe
ctiv
eof
max
imum
dept
h.
14Ite
ms
extr
aov
erse
rvic
eru
nsirr
espe
ctiv
eof
dept
hor
pipe
size
m2
1Br
eaki
ngup
hard
surfa
cepa
ving
s:th
ickn
ess
stat
ed.
2Li
fting
and
pres
ervi
ngtu
rf:th
ickn
ess
stat
ed.
1Re
inst
atin
gto
mat
chex
istin
g:de
tails
stat
ed.
2Re
layi
ngtu
rfpr
evio
usly
set
asid
e.
1Th
em
easu
rem
ent
ofth
ese
extr
aov
erite
ms
shal
lbe
base
don
the
desig
ned
wid
thof
beds
inth
etr
ench
.In
the
abse
nce
ofa
bed
the
wid
thsh
allb
eca
lcul
ated
asth
eno
min
alsiz
eof
the
serv
ice
plus
300m
msu
bjec
tto
am
inim
umw
idth
of50
0mm
.
TABULATED WORK SECTIONS
258 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
14[It
ems
extr
aov
erse
rvic
eru
nsirr
espe
ctiv
eof
dept
hor
pipe
size–
cont
.]
m3
3Br
eaki
ngou
tha
rdm
ater
ials.
4Ex
cava
ting
inan
dre
mov
ing
haza
rdou
sm
ater
ial.
5Ex
cava
ting
inru
nnin
gsil
t,ru
nnin
gsa
ndor
othe
run
stab
legr
ound
.6
Exca
vatin
gbe
low
grou
ndw
ater
leve
l.
3D
etai
lsst
ated
.1
Har
dm
ater
iali
san
ym
ater
ialw
hich
isof
such
asiz
e,po
sitio
nor
cons
isten
cyth
atit
can
only
bere
mov
edby
spec
ial
plan
tor
expl
osiv
es.
m7
Nex
tto
exist
ing
live
serv
ices
.1
Tobe
mea
sure
dw
here
prec
autio
nsar
esp
ecifi
cally
requ
ired.
2Th
em
etho
dof
prot
ectio
nis
left
toth
edi
scre
tion
ofth
eco
ntra
ctor
.
nr8
Aro
und
exist
ing
live
serv
ices
cros
sing
tren
ch.
15Pi
pedu
ctfit
tings
nr1
Dim
ensio
ned
desc
riptio
n.1
Type
stat
ed.
1M
etho
dof
join
ting
topi
pedu
cts.
1Pi
pedu
ctfit
tings
incl
ude
bend
s,ju
nctio
ns,i
nspe
ctio
npi
pes,
stop
ends
and
the
like
and
conn
ectio
nsto
pipe
s.
16A
cces
sorie
snr
1D
imen
sione
dde
scrip
tion.
1A
cces
sorie
sin
clud
eal
lint
egra
land
oras
soci
ated
fittin
gsan
dco
nnec
tions
topi
pes.
17M
anho
les
18A
cces
sch
ambe
rs19
Valv
ech
ambe
rs20
Insp
ectio
nch
ambe
rs21
Surfa
cebo
xes
22St
opco
ckpi
ts
nr1
Det
aile
dde
scrip
tion
stat
ing
max
imum
inte
rnal
size
ofch
ambe
r.2
Dep
thfro
mto
psu
rface
ofco
ver
toto
psu
rface
ofba
seor
inve
rtle
veli
n25
0mm
stag
es.
3Pr
oprie
tary
cham
bers
boxe
san
dth
elik
e:de
tails
stat
ed.
1Ba
sesla
bth
ickn
ess.
2W
allt
hick
ness
.3
Cov
ersla
bdi
men
sions
.4
Inte
rmed
iate
slab
dim
ensio
ns.
5In
tern
alfin
ish.
6Ex
tern
alfin
ish.
7C
over
and
fram
e:ty
pest
ated
.
1Si
zest
ated
isth
em
axim
umin
tern
alsiz
eof
the
cham
ber.
2Ro
cker
join
tsar
ede
emed
incl
uded
.
41 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATIONINSTALLATIONS
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 259
Item
orw
ork
tobe
mea
sure
dU
nit
Leve
lone
Leve
ltw
oLe
velt
hree
Not
es,c
omm
ents
and
glos
sary
23Ex
tra
over
the
exca
vatio
nfo
r:m
21
Brea
king
upha
rdsu
rface
pavi
ngs:
thic
knes
sst
ated
.2
Lifti
ngan
dpr
eser
ving
turf:
thic
knes
sst
ated
.
1M
akin
ggo
odar
ound
edge
sof
surfa
ces
isde
emed
incl
uded
.
m3
3Br
eaki
ngou
tha
rdm
ater
ials.
4Ex
cava
ting
inan
dre
mov
ing
haza
rdou
sm
ater
ial.
5Ex
cava
ting
inru
nnin
gsil
t,ru
nnin
gsa
ndor
othe
run
stab
legr
ound
.6
Exca
vatin
gbe
low
grou
ndw
ater
leve
l.
24M
arke
rpo
sts
25M
arke
rpl
ates
nr1
Dim
ensio
ned
desc
riptio
n.1
Iden
tific
atio
npl
ates
:det
ails
stat
ed.
2Le
tter
ing
requ
ired.
1M
etho
dof
fixin
g:de
tails
stat
ed.
1Ex
cava
tion,
disp
osal
ofsp
oila
ndco
ncre
tefo
rba
sede
emed
incl
uded
.
26C
onne
ctio
nsite
m1
Det
ails
stat
ed.
27Te
stin
gan
dco
mm
issio
ning
item
1D
etai
led
desc
riptio
n.2
Type
ofte
stan
dst
anda
rdto
beac
hiev
ed.
1A
tten
danc
ere
quire
d.2
Inst
rum
ents
and
equi
pmen
tto
bepr
ovid
ed.
1Pr
ovisi
onof
wat
eran
dot
her
supp
lies
isde
emed
incl
uded
.2
Prov
ision
ofte
stce
rtifi
cate
sis
deem
edin
clud
ed.
TABULATED WORK SECTIONS
260 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
AppendicesAppendix A: Guidance on the preparation of bill of quantities
Appendix B: Template for preliminaries (main contract) pricing schedule (condensed)
Appendix C: Template for preliminaries (main contract) pricing schedule (expanded)
Appendix D: Template for pricing summary for elemental bill of quantities (condensed)
Appendix E: Template for pricing summary for elemental bill of quantities (expanded)
Appendix F: Templates for provisional sums, risks and credits
Appendix G: Example of a work package breakdown structure
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 261
Appendix A: Guidance on thepreparation of bill of quantitiesA.1 Bill of quantities breakdown structure
A.1.1 There a number of different breakdown structures for bill of quantities (BQ).They each have theirown advantages and disadvantages. However, computerised BQ production systems with multiplesort facilities can be used to generate different BQ formats and make it easy to trace items – aslong as items have been properly codified (refer to 2.15 (Codification of bill of quantities).
A.1.2 NRM 2: Detailed measurement for building works can be adopted as the rules of measurement forbuilding works irrespective of what BQ breakdown structure is chosen.
A.1.3 The main BQ breakdown structures are:
(a) Elemental: Measurement and description is done by group elements and each groupelement forms a separate section of the BQ, irrespective of the order of work sections inNRM 2: Detailed measurement for building works. Group elements are sub-divided through theuse of elements, which are further sub-divided by sub-elements. The group elements,elements and sub-elements used are those defined by NRM 1: Order of cost estimating and costplanning for capital building works.
Figure A.1: Elemental BQ breakdown structures for a simple building project
Elemental breakdown structure
Bill No. 1: Preliminaries (main contract)
Bill No. 2: Facilitating Works
Bill No. 3: Substructure
Bill No. 4: Superstructure
Bill No. 5: Internal Finishes
Bill No. 6: Fittings, Furnishings and Equipment
Bill No. 7: Services
Bill No. 8: External Works
Bill No. 9: Risks
Bill No. 10: Provisional Sums
Bill No. 11: Credits
Bill No. 12: Daywork (provisional)
An elemental breakdown structure supports a logical and structured approach to the quantificationof a building project. Moreover, this type of breakdown structure makes it easier for the quantitysurveyor/cost manager to analysis a contractor’s tender price and collects real-time cost data forfuture use.
(b) Work section: Measurement and description is divided into the work sections listed inNRM 2: Detailed measurement for building works (refer to the tabulated rules in Part 3 of theserules).
262 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Figure A.2:Work section BQ breakdown structures for a simple building project
Work section breakdown structure
Bill No. 1: Main contractor’s preliminaries
Bill No. 2: Off-site manufactured materials, components and buildings
Bill No. 3: Demolitions
Bill No. 4: Alterations, repairs and conservation
Bill No. 5: Excavating and filling
Bill No. 6: Ground remediation and soil stabilisation
Bill No. 7: Piling
Bill No. 8: Underpinning
Bill No. 9: Diaphragm walls and embedded retaining walls
Bill No. 10: Crib walls, gabions and reinforced earth
Bill No. 11: In-situ concrete works
Bill No. 12: Precast/composite concrete
Bill No. 13: Precast concrete
Bill No. 14: Masonry
Bill No. 15: Structural metalwork
Bill No. 16: Carpentry
Bill No. 17: Sheet roof coverings
Bill No. 18: Tile and slate roof and wall coverings
Bill No. 19: Waterproofing
Bill No. 20: Proprietary linings and partitions
Bill No. 21: Cladding and covering
Bill No. 22: General joinery
Bill No. 23: Windows, screens and lights
Bill No. 24: Doors, shutters and hatches
Bill No. 25: Stairs, walkways and balustrades
Bill No. 26: Metalwork
Bill No. 27: Glazing
Bill No. 28: Floor, wall, ceiling and roof finishings
Bill No. 29: Decoration
Bill No. 30: Suspended ceilings
Bill No. 31: Insulation, fire stopping and fire protection
Bill No. 32: Furniture, fittings and equipment
Bill No. 33: Drainage above ground
Bill No. 34: Drainage below ground
Bill No. 35: Site works
Bill No. 36: Fencing
Bill No. 37: Soft landscaping
Bill No. 38: Mechanical services
Bill No. 39: Electrical services
Bill No. 40: Transport
Bill No. 41: Builder’s work in connection with mechanical, electrical and transportation installations
Bill No. 42: Risks
Bill No. 43: Provisional sums
Bill No. 44: Credits
Bill No. 45: Daywork (Provisional)
This breakdown structure is often preferred by contractors for the purpose of pricing as all likeproducts and components are grouped together (e.g. the reinforced concrete columns, beams,floors, roofs and staircases), whereas they can be spread among a number of different elements
APPENDIX A: GUIDANCE ON THE PREPARATION OF BILL OF QUANTITIES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 263
when an elemental breakdown structure is used. Codification of BQ items using computerised BQsystems will solve the problem of preferences (refer to 2.15 (Codification of bill of quantities) ofthe rules).
(c) Work package: Measurement and description is divided into employer, quantity surveyor orcontractor defined work packages – whichever is applicable.Works packages can be based oneither a specific-trade (e.g. concrete work, brickwork and blockwork, roof coverings, paintingand decorating, and wall tiling) or a single package comprising a number of different trades(e.g. a groundworks package might include all excavation and earthworks, below grounddrainage and the ground-bearing concrete floor-slab – so as to make a single workscontractor responsible for the interface between the drainage and the ground-bearingconcrete floor-slab).
Figure A.3:Typical BQ breakdown structure for discrete work package
Work section breakdown structure
Bill No. 1: Main contractor’s preliminaries
Bill No. 2: Intrusive investigations
Bill No. 3: Demolition works
Bill No. 4: Groundworks
Bill No. 5: Piling
Bill No. 6: Concrete works
Bill No. 7: Roof coverings and roof drainage
Bill No. 8: External and internal structural walls
Bill No. 9: Cladding
Bill No. 10: Windows and external doors
Bill No. 11: Mastic
Bill No. 12: Non-structural walls and partitions
Bill No. 13: Joinery
Bill No. 14: Suspended ceilings
Bill No. 15: Architectural metalwork
Bill No. 16: Tiling
Bill No. 17: Painting and decorating
Bill No. 18: Floor coverings
Bill No. 19: Fittings, furnishings and equipment
Bill No. 20: Combined mechanical and electrical engineering services
Bill No. 21: Lifts and escalators
Bill No. 22: Facade access equipment
Bill No. 23: External works and drainage
Bill No. 24: Risks
Bill No. 25: Provisional sums
Bill No. 26: Credits
Bill No. 27: Daywork (Provisional)
Again, codification of BQ items using computerised BQ systems will allow the re-sorting of itemsfrom elements to works packages for the purposes of tendering, and vice versa for the purpose ofoverall cost control (refer to 2.15 (Codification of bill of quantities) at Part 2 of these rules).
This breakdown structure is usually used by contractors to procure packages of work from theirsupply chain.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
264 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
A.2 Bill of quantities breakdown structure for projects comprising morethan one building
Where a building project comprises more than one type of building, it is recommended that aseparate bill of quantities be prepared for each building; culminating in a ‘summary bill’ for theentire building project.
A.3 Order of items in bill of quantities
The order of items in a bill of quantities (BQ) is:
(1) For elemental BQ:
(a) Elements as contained in NRM 1: Order of cost estimating and cost planning for capital buildingworks.
(b) Within each element the order of measured items is cubic, square, linear, enumerated itemsand itemised items.
(c) Labour-only items are to precede labour and material items within the subdivisions in (b).
(d) Items within each subdivision in (b) and (c) above are to be placed in order of value, leastexpensive first.
(e) Preambles are to be incorporated in each element as appropriate.
(f) PC sums are to be incorporated in item descriptions.
(g) Contractor designed works are to be incorporated under the applicable element orsub-element, after measured work, under a heading of ‘Contractor designed work’. A priceanalysis for contractor designed work is to be incorporated (see paragraph 2.9.2 (Contractordesigned work) in Part 2 (Rules for detailed measurement of building works) of these rules).
(h) Provisional sums are to be listed and described in a separate bill.
(i) Construction risks to be transferred to the contractor are to be identified and described ina ‘schedule of construction risks’ (see paragraph 2.10.2 (Risk transfer to the contractor) inPart 2 (Rules for detailed measurement of building works) of these rules).
(j) Where applicable, provision for the contractor to offer credits against items and componentsarising from demolition works and/or soft strip works is to be provided (see paragraph 2.12(Credits) in Part 2 (Rules for detailed measurement of building works) of these rules).
(2) For work section BQ:
(a) Work sections as contained in NRM 2: Detailed measurement for building works, althoughseparate locational BQ sections such as facilitating works, substructure, superstructure andor external works might be required.
(b) Subdivisions:
(i) of work sections as contained in NRM 2: Detailed measurement for building works;
(ii) as required by NRM 2: Detailed measurement for building works, such as externalpaintwork;
(iii) of different types of materials; such as different mixes of concrete, different types ofbrick.
(c) Within each subdivision in (b), the order of cubic, square, linear, enumerated items anditemised items.
(d) Labour-only items are to precede labour and material items within the subdivisions in (c).
(e) Items within each subdivision in (c) and (d) above are to be placed in order of value, leastexpensive first.
(f) Preambles are to be incorporated in the appropriate work section.
(g) PC sums are to be incorporated in item descriptions.
(h) Contractor designed works are to be incorporated under the applicable element orsub-element, after measured work, under a heading of ‘Contractor designed work’. A priceanalysis for contractor designed work is to be incorporated (see paragraph 2.9.2 (Contractordesigned work) in Part 2 (Rules for detailed measurement of building works) of these rules).
APPENDIX A: GUIDANCE ON THE PREPARATION OF BILL OF QUANTITIES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 265
(i) Provisional sums are to be listed and described in a separate bill.
(j) Construction risks to be transferred to the contractor are to be identified and described ina ‘schedule of construction risks’ (see paragraph 2.10.2 (Risk transfer to the contractor) inPart 2 (Rules for detailed measurement of building works) of these rules).
(k) Where applicable, provision for the contractor to offer credits against items and componentsarising from demolition works and/or soft strip works is to be provided (see paragraph 2.12(Credits) in Part 2 (Rules for detailed measurement of building works) of these rules).
(3) For work package BQ:
(a) Work packages as defined by the employer, quantity surveyor or contractor, whichever isapplicable.
(b) Within each work package the order of measured items is cubic, square, linear, enumerateditems and itemised items.
(c) Labour-only items are to precede labour and material items within the subdivisions in (b).
(d) Items within each subdivision in (b) and (c) above are to be placed in order of value, leastexpensive first.
(e) Preambles are to be incorporated in the appropriate work package.
(f) PC sums are to be incorporated in item descriptions.
(g) Contractor designed works are to be incorporated into the applicable work package bill,after measured work, under a heading of ‘Contractor designed work’, under a heading of‘Contractor designed work’.A price analysis for contractor designed work is to be included(see paragraph 2.9.2 (Contractor designed work) in Part 2 (Rules for detailed measurementof building works) of these rules).
(h) Provisional sums are to be listed and described in a separate bill.
(i) Construction risks to be transferred to the contractor are to be identified and described ina ‘schedule of construction risks’ (see paragraph 2.10.2 (Risk transfer to the contractor) inPart 2 (Rules for detailed measurement of building works) of these rules).
(j) Where applicable, provision for the contractor to offer credits against items and componentsarising from demolition works and/or soft strip works is to be provided (see paragraph 2.12(Credits) in Part 2 (Rules for detailed measurement of building works) of these rules).
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
266 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
A.4 Format of billThe bill for each element or work section is to be commenced on a new sheet.The ruling of thepaper and typical headings for each type of bill are shown in Figures A.4 and A.5.
Figure A.4:Typical BQ format for an elemental bill of quantities
Bill No. 3 Superstructure
3.2.5 External walls
3.2.5.1 EXTERNAL WALLS ABOVE GROUND FLOORLEVEL
3.2.5.1.1 Common brickwork in cement: lime mortar (1:1:6)
3.2.5.1.1.1 Walls 102.5mm thick, brickwork; built against otherwork
196 m2
3.2.5.1.1.2 Walls 215mm thick, brickwork 302 m2
Figure A.5:Typical BQ format for a work section bill of quantities
Bill No. 2 Superstructure
2.14 Masonry
2.14.1 BRICK/BLOCK WALLING
2.14.1.1 Common brickwork in cement: lime mortar (1:1:6)
2.14.1.1.1 Walls 102.5mm thick, brickwork; built against otherwork
196 m2
2.14.1.1.2 Walls 215mm thick, brickwork 302 m2
Figure A.6:Typical BQ format for a work package bill of quantities
Bill No. 8 EXTERNAL AND INTERNAL STRUCTURAL WALLS
8.1 Masonry
8.1.1 BRICK/BLOCK WALLING
8.1.1.1 Common brickwork in cement: lime mortar (1:1:6)
8.1.1.1.1 Walls 102.5mm thick, brickwork; built against otherwork
196 m2
8.1.1.1.2 Walls 215mm thick, brickwork 302 m2
A.5 Codifying itemsAs well as for the purpose of making it easy to search, it is essential that every item in the bill ofquantities (BQ) can be referenced back to the cost plan.
A.6 Unit of measurementThe units of measurement for items are stipulated by the tabulated rules of measurement. For thepurpose of clarity, the unit of measurement is to be entered against each item in the bill ofquantities, irrespective of whether it is the same unit as the previous item.
A.7 Order of sizesSizes or dimensions in descriptions are to be in the order: length, width, height. Sometimes thewidth of a component (e.g. a base unit) is referred to as its ‘depth’. If there is likely to be any doubt,for the purpose of clarity, the dimensions are to be stated.
APPENDIX A: GUIDANCE ON THE PREPARATION OF BILL OF QUANTITIES
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 267
For example:
Base unit: 1000mm long x 600mm wide x 900mm high; …
A.8 Use of headings
Headings usually fall into one of four categories:
1 Elemental or work section headings
2 Element or sub-section headings
3 Headings that partly describe a group of items
4 Subdivisions required by NRM 2: Detailed measurement for building works.
A.9 Unit of billing
Other than enumerated and itemised items, the unit of measurement is the metre.The exceptionto this rule is steel bar reinforcement and structural steelwork, which are billed in tonnes to twodecimal places.
A.10 Framing of descriptions
The bill of quantities is a legal document. Therefore, care should be taken when framingdescriptions so that there is no doubt as to their meaning.
A.11 Totalling pages
There are a number of ways in which the quantity surveyor/cost manager might indicate how thecash totals on each page of the bill are to be dealt with.The preferred method is for the total to becarried over to be added to the next page and so on until the end of the bill or sub-section of thebill. Unless the bill section comprises only one page, the foot of the first and intermediate bill pagesshould be completed as follows:
Figure A.7: Examples of how to total pages
Carried forward £
The top of the following bill page is completed as follows:
BILL 3: SUPERSTRUCTURE
2.5 EXTERNAL WALLS
Brought forward £
To end each bill section, the section is completed as follows:
TOTAL carried to main summary £
A.12 Price summary
Templates for the pricing summary for elemental bill of quantities (condensed and expandedversions) are included at Appendices D and E, respectively, of these rules.The structure of pricingsummaries for other bill of quantities formats should follow the same principles.
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
268 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Appendix B:Template forpreliminaries (main contract) pricingschedule (condensed)CostCentre
Component Time-RelatedCharges
Fixed Charges TotalCharges
£ p £ p £ p
1 PRELIMINARIES
1.1 EMPLOYER’S REQUIREMENTS
1.1.1 Site accommodation
1.1.2 Site records
1.1.3 Completion and post-completion requirements
1.2 MAIN CONTRACTOR’S COST ITEMS
1.2.1 Management and staff
1.2.2 Site establishment
1.2.3 Temporary services
1.2.5 Safety and environmental protection
1.2.6 Control and protection
1.2.7 Mechanical plant
1.2.8 Temporary works
1.2.9 Site records
1.2.10 Completion and post-completion requirements
1.2.11 Cleaning
1.2.12 Fees and charges
1.2.13 Site services
1.2.14 Insurance, bonds, guarantees and warranties
Totals £
TOTAL CARRIED TO MAIN SUMMARY £
Note: Costs relating to main contractor’s preliminaries items that are not specifically identified inthe contractor’s full and detailed breakdown shall be deemed to have no cost implications or havebeen included elsewhere within the contractor’s rates and prices.
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 269
Appendix C:Template forpreliminaries (main contract) pricingschedule (expanded)Costcentre
Component Time-relatedcharges
Fixed charges Total charges
£ p £ p £ p
1.1 EMPLOYER’S REQUIREMENTS
1.1.1 Site accommodation
1.1.1.1 Site accommodation
1.1.1.2 Furniture and equipment
1.1.1.3 Telecommunications and IT systems
1.1.2 Site records
1.1.2.1 Site records
1.1.3 Completion and post-completion requirements
1.1.3.1 Handover requirements
1.1.3.2 Operation and maintenance services
1.2 MAIN CONTRACTOR’S COST ITEMS
1.2.1 Management and staff
1.2.1.1 Project specific management and staff
1.2.1.2 Visiting management and staff
1.2.1.3 Extraordinary support costs
1.2.1.4 Staff travel
1.2.2 Site establishment
1.2.2.1 Site accommodation
1.2.2.2 Temporary works in connection with site establishment
1.2.2.3 Furniture and equipment
1.2.2.4 IT systems
1.2.2.5 Consumables and services
1.2.2.6 Brought-in services
1.2.2.7 Sundries
1.2.3 Temporary services
1.2.3.1 Temporary water supply
1.2.3.2 Temporary gas supply
1.2.3.3 Temporary electricity supply
1.2.3.4 Temporary telecommunication systems
1.2.3.5 Temporary drainage
1.2.4 Security
1.2.4.1 Security staff
1.2.4.2 Security equipment
1.2.4.3 Hoardings, fences and gates
1.2.5 Safety and environmental protection
1.2.5.1 Safety programme
1.2.5.2 Barriers and safety scaffolding
1.2.5.3 Environmental protection measures
270 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
1.2.6 Control and protection
1.2.6.1 Survey, inspections and monitoring
1.2.6.2 Setting out
1.2.6.3 Protection of works
1.2.6.4 Samples
1.2.6.5 Environmental control of building
1.2.7 Mechanical plant
1.2.7.1 Generally
1.2.7.2 Tower cranes
1.2.7.3 Mobile cranes
1.2.7.4 Hoists
1.2.7.5 Access plant
1.2.7.6 Concrete plant
1.2.7.7 Other plant
1.2.8 Temporary works
1.2.8.1 Access scaffolding
1.2.8.2 Temporary works
1.2.9 Site records
1.2.9.1 Site records
1.2.10 Completion and post-completion requirements
1.2.10.1 Testing and commissioning plan
1.2.10.2 Handover
1.2.10.3 Post-completion services
1.2.11 Cleaning
1.2.11.1 Site tidy
1.2.11.2 Maintenance of roads, paths and pavings
1.2.11.3 Building clean
1.2.12 Fees and charges
1.2.12.1 Fees
1.2.12.2 Charges
1.2.13 Site services
1.2.13.1 Temporary works
1.2.13.2 Multi-service gang
1.2.14 Insurance, bonds, guarantees and warranties
1.2.14.1 Works insurance
1.2.14.2 Public liability insurance
1.2.14.3 Employer’s (main contractor’s) liability insurance
1.2.14.4 Other insurances
1.2.14.5 Bonds
1.2.14.6 Guarantees
1.2.14.7 Warranties
Totals £
TOTAL CARRIED TO MAIN SUMMARY £
Note: Costs relating to preliminaries items that are not specifically identified in the contractor’sfull and detailed breakdown shall be deemed to have no cost implications or have been includedelsewhere within the contractor’s rates and prices.
APPENDIX C:TEMPLATE FOR PRELIMINARIES (MAIN CONTRACT) PRICING SCHEDULE (EXPANDED)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 271
Appendix D:Template for pricingsummary for elemental bill ofquantities (condensed)Costcentre
Element £/p £/p
0.0 Facilitating works £0.00
1.0 Substructure £0.00
2.0 Superstructure £0.00
3.0 Internal finishes £0.00
4.0 Fittings, furnishings and equipment £0.00
5.0 Services £0.00
6.0 Prefabricated buildings and building units £0.00
7.0 Work to existing building £0.00
8.0 External works £0.00
TOTAL (Building works, including M&E engineering services) £0.00
9.0 Main contractor’s preliminaries £0.00
Sub-total £0.00
10.0 Provisional sums: £0.00
10.1 Defined provisional sums £0.00
10.2 Undefined provisional sums £0.00
10.3 Works to be carried out by statutory undertakers £0.00
Sub-total £0.00
11.0 Risks £0.00
11.1 Sub-total £0.00
12.0 Main contractor’s overheads and profit (insert required %adjustment) 0.00% £0.00
Sub-total £0.00
13.0 Credit (for retained arisings) £(0.00)
Sub-total £0.00
14.0 Main contractor’s fixed price adjustment (insert required %adjustment) 0.00%
£0.00
Sub-total £0.00
15.0Director’s adjustment (insert required adjustment (+/-))
£0.00 or£(0.00)
Sub-total £0.00
16.0 Dayworks (Provisional) £0.00
TOTAL TENDER PRICE, exclusive of VAT (Carried to Form of Tender) £0.00
272 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Appendix E:Template for pricingsummary for elemental bill ofquantities (expanded)Costcentre
Element £/p £/p
0.0 Facilitating works £0.00
0.1 Toxic/hazardous/contaminated material treatment £0.00
0.2 Major demolition works £0.00
0.3 Specialist ground works £0.00
0.4 Temporary diversion works £0.00
0.5 Extraordinary site investigation works £0.00
1.0 Substructure £0.00
1.1 Substructure £0.00
2.0 Superstructure £0.00
2.1 Frame £0.00
2.2 Upper floors £0.00
2.3 Roof £0.00
2.4 Stairs and ramps £0.00
2.5 External walls £0.00
2.6 Windows and external doors £0.00
2.7 Internal walls and partitions £0.00
2.8 Internal doors £0.00
3.0 Internal finishes £0.00
3.1 Wall finishes £0.00
3.2 Floor finishes £0.00
3.3 Ceiling finishes £0.00
4.0 Fittings, furnishings and equipment £0.00
4.1 Fittings, furnishings and equipment £0.00
5.0 Services £0.00
5.1 Sanitary installations £0.00
5.2 Services equipment £0.00
5.3 Disposal installations £0.00
5.4 Water installations £0.00
5.5 Heat source £0.00
5.6 Space heating and air conditioning £0.00
5.7 Ventilation £0.00
5.8 Electrical installations £0.00
5.9 Fuel installations/systems £0.00
5.10 Lift and conveyor installations/systems £0.00
5.11 Fire and lightning protection £0.00
5.12 Communication, security and control systems £0.00
5.13 Special installations/systems £0.00
5.14 Builder’s work in connection with services £0.00
6.0 Complete buildings £0.00
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 273
6.1 Pre-fabricated buildings £0.00
7.0 Work to existing building £0.00
7.1 Minor demolition works and alteration works £0.00
7.2 Repairs to existing services £0.00
7.3 Damp proof courses/fungus and beetle eradication £0.00
7.4 Facade retention £0.00
7.5 Cleaning existing surfaces £0.00
7.6 Renovation works £0.00
8.0 External works £0.00
8.1 Site preparation works £0.00
8.2 Roads, paths and pavings £0.00
8.3 Soft landscaping, planting and irrigation systems £0.00
8.4 Fencing, railings and walls £0.00
8.5 Site/street furniture and equipment £0.00
8.6 External drainage £0.00
8.7 External services £0.00
8.8 Minor building works and ancillary buildings £0.00
TOTAL (Building works, including M&E engineering services) £0.00
9.0 Main contractor’s preliminaries £0.00
Sub-total £0.00
10.0 Risks £0.00
Sub-total £0.00
11.0 Provisional sums: £0.00
11.1 Defined provisional sums £0.00
11.2 Undefined provisional sums £0.00
11.3 Works to be carried out by statutory undertakers £0.00
Sub-total £0.00
12.0 Main contractor’s overheads and profit (insert required %adjustment) 0.00% £0.00
Sub-total £0.00
13.0 Credit (for retained arisings) £(0.00)
Sub-total £0.00
14.0 Main contractor’s fixed price adjustment (insert required %adjustment) 0.00%
£0.00
Sub-total £0.00
15.0 Director’s adjustment (insert required adjustment (+/-)) £0.00 or £(0.00)
Sub-total £0.00
16.0 Dayworks (Provisional) £0.00
TOTAL TENDER PRICE, exclusive of VAT (Carried to Form of Tender) £0.00
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
274 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Appendix F:Templates for provisionalsums, risks and credits
Schedule of provisional sums
Costcentre
Provisional sum £/p
DEFINED PROVISIONAL SUMS
UNDEFINED PROVISIONAL SUMS
TOTAL PROVISIONAL SUMS, exclusive of VAT (Carried to MainSummary)
Schedule of construction risks
Costcentre
Risk description £/p
R001
R002
R003
R004
R005
R006
TOTAL RISK ALLOWANCE, exclusive of VAT (Carried to Main Summary)
Credits
Costcentre
Description £/p
C001
C002
C003
C004
C005
TOTAL CREDITS, exclusive of VAT (Carried to Main Summary)
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 275
Appendix G: Example of a workpackage breakdown structure
Figure 2.5:Typical example of suffix codes used for codifying work packages when a work packageBQ breakdown structure is used
Serial no. Work package title/content Suffix
1. Main contractor’s preliminaries /01.1
2. Intrusive investigations:Asbestos and other hazardous materialsGeotechnical and environmental investigationsAttendance on archaeological investigationsWork package contractor’s preliminaries
/02/01.2
3. Demolition works:Asbestos and other hazardous materials removal/treatment worksSoft strip of building components and sub-componentsSoft strip of mechanical and electrical engineering services.Demolition.Work package contractor’s preliminaries
/03/01.2
4. Groundworks:Contaminated ground material removal;Preparatory earthworks;Excavation and earthworks, including basement excavation, earthwork support and disposal;Temporary works – propping of existing basement retaining walls;Below ground drainage;Ground beams;Pile caps;Temporary works – piling mats/platforms;Ground bearing base slab construction, including waterproofing; andBasement retaining wall structures, including waterproofing.Work package contractor’s preliminaries
/04/01.2
5. Piling:Piling worksWork package contractor’s preliminaries
/05/01.2
6. Concrete works:FrameUpper floors, including roof structureCore and shear wallsStaircasesWork package contractor’s preliminaries
/06/01.2
7. Roof coverings and roof drainage:Roof cladding/coverings;Flashings; andRoof drainage.Work package contractor’s preliminaries
/07/01.2
276 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Serial no. Work package title/content Suffix
8. External and internal structural walls:Structural steelworkMasonry (brickwork and blockwork)Roof systems and rainwater goodsCladdingCurtain wallingCarpentryGeneral joineryBespoke joineryWindows and external doorsDry linings and partitionsArchitectural metal workWork package contractor’s preliminaries
/08/01.2
9. Cladding:Cladding systems, including integral windows and external doors.Work package contractor’s preliminaries
/09/01.2
10. Windows and external doors:(Non-integral to cladding system)Windows;Louvers;External doors; andShop fronts.Work package contractor’s preliminaries
/10/01.2
11. Mastic:Mastic to windows, louvers and external door frames; andMastic to wet areas.Work package contractor’s preliminaries
/11/01.2
12. Non-structural walls and partitions:Tiling (floor and wall)Internal stone finishesPainting and decoratingSoft floor coveringsSuspended ceilingsWork package contractor’s preliminaries
/12/01.2
13. Joinery:Reception deskInternal door sets;Screens;Toilet cubicles;Timber wall linings to toilet cubicles;Skirtings; andAll other second fix joinery items.Work package contractor’s preliminaries
/13/01.2
14. Suspended ceilings:Suspended ceilingsWork package contractor’s preliminaries
/14/01.2
15. Architectural metal work:All architectural metal work itemsWork package contractor’s preliminaries
/15/01.2
16. Tiling:Internal stone finishesWall tiling; andFloor tilingWork package contractor’s preliminaries
/16/01.2
APPENDIX G: EXAMPLE OF A WORK PACKAGE BREAKDOWN STRUCTURE
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 277
Serial no. Work package title/content Suffix
17. Painting and decorating:Painting and decoratingWork package contractor’s preliminaries
/17/01.2
18. Floor coverings:Carpet; andVinyl tiles.Work package contractor’s preliminaries
/18/01.2
19. Fittings, furnishings and equipment:Cupboards and shelves to storeroomsLoose fittings, furnishings and equipment; andSignageWork package contractor’s preliminaries
/19/01.2
20. Combined Mechanical and Electrical Engineering Services:Sanitary appliances, including kitchette sinks;Mechanical engineering services installations;Electrical engineering services installations;Public health engineering services installations (above ground); andLifts (by named subcontractor).Work package contractor’s preliminaries
/20/01.2
21. Lifts and escalators:Passenger lifts;Fire fighting lift;Platforms; andEscalators
/21/01.2
22. Facade access equipment:Building maintenance units (BMUs), including proprietary storage units.Work package contractor’s preliminaries
/22/01.2
23. External works and drainage:External drainageSoft landscape worksHard landscape worksWork package contractor’s preliminaries.
/231/01.2
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
278 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Bibliography
Building Costs Information Service: Standard Form of Cost analysis (4th edition), BCIS, 2012
Published by the Office of Government Commerce, ITIL, 2007:
+ OGC GatewayTM Process Review 0: Strategic assessment
+ OGC GatewayTM Process Review 1: Business justification
+ OGC GatewayTM Process Review 2: Delivery strategy
+ OGC GatewayTM Process Review 3: Investment decision
+ OGC GatewayTM Process Review 4: Readiness for service
+ OGC GatewayTM Process Review 5: Operational review and benefits realisation
Royal Institute of British Architects, RIBA Outline Plan of Work 2007 (amended November 2008),RIBA, 2008
Royal Institution of Chartered Surveyors, Cost Management in Engineering Construction Projects, RICS,Surveyors Holdings Limited, London, 1992
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 279
IndexA
Access floorsfinishes 214
Access plantmain contractor’s costs 92
Access scaffoldingmain contractor’s costs 93
Access to sitecontractors’ preliminaries 52
Accommodation costs 79; 80Accuracy of instruments 62Adjoining property
protection 68Advertising and marketing
contractor’s preliminaries 23temporary works 73; 108
Air permeabilityemployer’s requirements 63
Alteration works 125–130Archaeological survey 32Architraves 196; 216Asbestos
contamination reports 32health and safety 66
Asphaltroofing 184–186surfacing, site works 234–237
Antiquitieshealth and safety 66
Ashlar walling see Masonry
B
Balustrades see Stairs/walkways and balustradesBargeboards 174Barriers and safety scaffolding
main contractor’s costs 87; 88Bill of quantities (BQ)
approximate 18benefits of 17, 18breakdown structure see Codification of bill of
quantitiesbudgetary control and accurate cost reporting,
basis for 17cash flow forecast preparation, basis for 17codification see Codification of bill of quantitiescompetitive bids, basis for 17composition see Composition of bill of quantitiescontract document, becoming 17cost breakdown structure, meaning 12cost data, analysis/collection and storage 40cost management/control see Cost management
and controlcost target, meaning 11firm 18format 267
grants, claims for 18information and documents required see
Documents; Drawings; Information andrequirements; Reports
meaning 11non-measurable works see Non-measurable
workspost contract cost control 17preparation see Preparation of bill of quantitiesproduction stage 18purpose of 17quantifying building works, responsibility for 19quantity and quality of works 43real-time cost data, source of 18tax benefit claims 18types of 18
approximate 18firm 18
valuing variations, basis for 17work breakdown structures 33
Bird/vermin controlfittings and equipment 225; 226
Bituminous felts 176–180; 180–182Block plan 31Block walling see MasonryBoarding see Carpentry; JoineryBonds
main contractor’s costs 99Boundary of construction site
contractor’s preliminaries 22; 51; 52Brickwork see MasonryBrought-in services 83Building components/items
deemed inclusions 48description 46–48not covered by tabulated rules 48; 49quantities 46structure of tables 45; 46type and quality of material 47
Bulkheads 221Burning on-site 66
C
Capital allowancesclaims, data to support 32
Car parkingsite accommodation 70
Carpentry see also Joinerybacking and other first fix timbers 174bargeboards 174boarding/flooring/sheeting and decking 173–175casings and linings 173–175drawings and information 173engineered or prefabricated members/items 174fascias 174metal and plastic accessories 173–175
280 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
metal fixings, fastenings and fittings 175ornamental ends of timber members 175primary or structural timbers 174sarking 174soffits and the like 174timber first fixings 173–175timber framing 173–175
Cash flow forecast 58Catering equipment 225; 226Catwalks 206Cavity insulation 167Ceilings
decorative papers or fabrics 219finishes see Finishings to floors/walls and ceilingsproprietary linings and partitions 187–191suspended see Suspended ceilings
Cement impregnation/injection 128Certificate of bona fide tender 20Cess pits 232Cladding and covering
angles 194beams, sides and soffits of 193boundary work 193ceilings 193closers 194columns, sides of 193curtain walling 192–194dormers, sides and tops of 192drawings and information 192extra over 193floors 193glazed vaulting 192–194opening perimeters 193panel or slab cladding or roofing 192–194patent glazing 192–194profiled sheet cladding or roofing 192–194rainscreen cladding 192–194rigid sheet cladding 192–194roofs 193sheet claddings or coverings 192–194structural glass assemblies 192–194walls 193weatherboarding 192–194
Cleaningexisting buildings 125–130site, main contractor’s costs 96
Climatic conditionsmanagement of the works 57
Cobbles 236Code for Sustainable Homes 56; 114Codification of bill of quantities
coding system 34–38cost breakdown structure 33; 34elemental breakdown structure 33–35; 262
example of resultant codes 35identification numbers 34order of items 265
planning breakdown structures 33work breakdown structures 33; 34
work package breakdown structure 33; 34; 255example of suffix codes 37; 38; 276–278order of items 266
work sectional breakdown structure 33–36; 262;263
example of suffix codes 35; 36order of items 265; 266
Collapsible gates 203Commencement of work
notice period 57Compensation events
notification 57Completion of works
employer’s requirements 69main contractor’s costs 95; 96notice of 58post-completion requirements
contractor’s preliminaries 23details of 32employer’s requirements 32main contractor’s costs 95; 96
pricing schedule 77Compliance
quality standards 60Component drawings 31Composite concrete see Concrete worksComposition of bill of quantities
annexes 20; 22codification see Codification of bill of quantitiescredits see Creditsdayworks 20; 22determination 33format 267form of tender 19; 20measured work 19; 21order of items 265; 266preliminaries 19; 21provisional sums see Provisional sumsrisks see Riskssummary see Summary for bill of quantitieswork breakdown structure 33
Compressed airwork in 48
Computers see Telecommunications and IT systemsConcrete plant
main contractor’s costs 92Concrete works
in-situaccessories cast into 157designed joints 157drawings and information 151filling mortices/holes/chases 158formwork 154; 155grinding 153grouting 158hacking 153horizontal work 152mass concrete 152power floating 153reinforcement 156
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 281
site works 235sloping work 152sprayed work 153sundries 158sundry work 153surface finishes 153trowelling 153vertical work 153
pre-cast concretecomposite concrete work 161–163decking 161–163designed joints 163drawings and information 161; 162frame structures 161–163holding down or tie straps 163panel cladding 161–163pavement lights 162rooflights 162sills/lintels/copings and other units 161–163slabs 161–163vertical panel lights 162walls and partitions 161–163
pre-cast/composite concretedecking and flooring 159; 160designed joints 160drawings and information 159holding down or tie straps 160walls/partitions and panels 159; 160
Conservation 125–130Considerate constructors scheme 57Constraints and restrictions
contractor’s preliminaries 22Construction sequencing requirements
statement 32Consumables and services
main contractor’s costs 82Contaminated materials 66Contract see also Standard form of contract
conditionsmain contractors’ preliminaries 53works package contractor’s preliminaries 113
details of condition to be used 32length of 50
Contractor designed worksnon-measurable works 25; 26price analysis 26
Contractor’s preliminaries see PreliminariesCopings
precast concrete 161–163Cornices 216Cost breakdown structure (CBS)
meaning 11Cost estimates and cost plans
formal stages 8; 9Cost management and control
cash flow forecast 58cost planning 39employer’s requirements 57–59interim valuations and payments 39; 40main contractor’s preliminaries 57–59
post-tender estimate 39pre-tender estimate 39pricing variations 39use of bill of quantities 38work package contractor’s preliminaries 115
Cost manager see Quantity surveyor/cost managerCost plan 39Cost target
meaning 11Coves 216Cranes
main contractor’s costs 90; 91Credits
application 28composition of bill of quantities 22meaning of credit 11pre-prepared list of terms 28templates 275
Crib walls 149Cubicles 197Curtain walling 192–194Curved work
description 47quantifying 46radius 47
D
Damp-proofingapplied liquid 184–186asphalt 184–186damp-proof courses, insertion/renewal 129; 167damp-proof membrane, excavation and filling
138flexible sheet 184–186other proprietary systems 184–186
Dayworkscalculation of labour time charge rates 29composition of bill of quantities 22meaning of daywork 11schedule of 29total amount included 29valuation method 29vouchers 59working hours 23; 29
Decking see Carpentry; Concrete worksDecontamination 124; 130Decoration
anti-corrosion treatments 218; 219decorative papers or fabrics
borders 219ceilings and beams 219motifs 219walls and columns 219
drawings and information 218intumescent coatings 218; 219painting
general surfaces 219glazed surfaces 219
INDEX
282 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
gutters 219pipes 219radiators 219railings/fences and gates 219services 219structural metalwork 219
Defective products/executionsemployer’s requirements 63
Defined provisional summeaning 11
Definitions 11–13Demolitions
decontamination 124drawings and information 122facade retention 122; 123recycling 124shoring 122; 123survey reports 32temporary works 122; 123
Descriptionbuilding components/items 46–48components and sub-components 47dimensions 47fixing/installing/incorporating goods or materials
47main contractor’s preliminaries 22; 52nature and location of work 46nature or type of background 47site 51sub-components 47type and quality of material 47works package contractor’s preliminaries 112;
113Design constraints 68Design team
meaning 11Diaphragm walls see WallsDimensions
description 47quality standards and control 62quantities 46use of hyphen or phrase to 43; 47
Director’s adjustmentcommercial review of project 29meaning 11provision in bill of quantities 29
Documents see also Drawings; Information andrequirements
data interchange 56; 115definitions and interpretations 53; 54electronic data interchange 56; 115employer’s requirements 53–56form of tender 20main contractor’s preliminaries 22; 23; 51; 53–56produced on behalf of employer
additional copies of drawings/documents 55; 114dimensions 55; 114divergence from statutory requirements 55; 114employer’s policy document 55
measured quantities 55; 114specification 55; 114
provided by contractor/subcontractors andsuppliers
as built/as-installed drawings and information 55;114
Code for Sustainable Homes 56; 114design information 55; 114electronic data interchange 56; 114energy rating calculations 56environmental assessment information 56; 114maintenance instructions and guarantees 56production information 55; 114technical literature 55; 114
works package contractor’s preliminaries 111;112; 113
Door schedules 31Doors/shutters and hatches
collapsible gates 203door frames 203door linings 203door sets 203door stops 203drawings and information 202fire stops 203glazing
louvre blades 204type of glass 204
grilles 203ironmongery 204roller shutters 203sliding folding partitions 203smoke stops 203strong room doors 203timber/metal and plastic 202–204
Drainageabove ground
drawings and information 227foul drainage installations 227–229gutters 228holes/mortices/chases and the like 228identification 228operating manuals and instructions 229pipe sleeves through walls/floors and ceilings 228pipework 227preparing drawings 227rainwater installations 227–229testing and commissioning 228
below groundaccessories 232cesspits 232connections 233covers and frames 233drain runs 231drawings and information 230extra over 231; 233foul drain systems 230–233inspection chambers 232land drainage 230–233manholes 232marker posts 233
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 283
other tanks and pits 232pipe fittings 232pumped drain systems 230–233pumps 232septic tanks 232soakaways 232storm water drain systems 230–233sundries 233testing and commissioning 233
schedules 31temporary, main contractor’s costs 85
Drawingsalterations to existing buildings 125; 126balustrades 205block plan 31carpentry 173cladding and covering 192component drawings 31conservation 125; 126crib walls/gabions and reinforced earth 149decoration 218demolitions 122detail or assembly drawings 31diaphragm walls and embedded retaining walls
147doors 202drainage
above ground 227below ground 230
electrical installations, builder’s work on 256electrical services 250excavations and filling 131; 133existing, as-built or as-installed drawings 31fencing 238finishings to floors/walls and ceilings 212; 213furniture/fittings and equipment 225general arrangement (GA) drawings 31glazing 210ground remediation and soil stabilisation 139hatches 202in-situ concrete works 151insulation 223joinery 195; 196landscaping 241linings and partitions (proprietary) 187location drawings 31main contractor’s preliminaries 22; 51masonry 164; 165mechanical installations, builder’s work on 256mechanical services 245metalwork 208off-site manufactured materials/components or
buildings 120; 121piling 142plans, sections and elevations 31pre-cast/composite concrete works 159pre-cast concrete works 161; 162record drawings 31; 62repairs to existing buildings 115; 116
requirements 31roof coverings 176; 177; 181; 182schedules 31schematic drawings 31shutters 202site plan 31site works 234stairs 205structural metalwork 169suspended ceilings 220tile and slate roof/wall coverings 181; 182transportation 254transportation installations, builder’s work on
256underpinning 145walkways 205waterproofing 184–186windows/screens and lights 200works package contractor’s preliminaries 111;
112Drylining 187–191
E
Early possessionemployer’s requirements 58
Earth reinforcement walls 150Earth rods 253Ecological survey 32Electrical engineering services
schedules 31Electrical installations
builder’s workaccess chambers 259accessories 259bases/plinths and the like 256catenary cables 257connections 260drawings and information 256duct covers and frames 257existing buildings 257; 258external services installations 258–260extra over, excavation/service runs 258; 259; 260holes/mortices and chases 256inspection chambers 259manholes 259marker posts/plates 260new buildings 256; 257pipe and duct sleeves 256pipe duct fittings 259stopcock pits 259surface boxes 259testing and commissioning 260underground service runs 258valve chambers 259
Electrical installations certificate 62Electrical services
air terminations 253busbar 252cables 251
INDEX
284 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
containment 251termination and joints 252
commissioning 253drawings and information 250; 253earth rods 253electrodes 252employer’s requirements 62final circuits 252fire stopping and other associated fire protection
work 253identification 253loose ancillaries 253modular wiring systems 252operation and maintenance manuals 253post practical completion services 253primary equipment 250; 251system validation 253tapes 252terminal equipment and fittings 251termination bars 253testing 254training 253
Electricitysite services and facilities 70temporary supply, main contractor’s costs 84
Electromagnetic interference 67Electronic data interchange 56; 114E-mail
site services and facilities 71Employers
meaning 11names/addresses and contact points 50policy documents
compliance with 32main contractor’s preliminaries 55works package contractor’s preliminaries 55
project sponsor 11quantifying building works, responsibility for 19risks see RisksSenior Responsible Owner 11
Employer’s requirementsmain contractor’s preliminaries
documents, provision/content and use of seeDocuments
health and safety see Health and safetyinsurance 32management of the works see Management of
worksmethod/sequence and timing of work 68; 69operation/maintenance of finished building 73; 74post completion 32quality standards and quality control see Quality
standards and quality controlservices and facilities 69–72site accommodation 69; 70specific requirements 23temporary works 72; 73
works package contractor’s preliminariescompletion and post-completion 77pricing schedule see Pricing schedule
site accommodation 75; 76site records 76
Energy performance certificate 63Energy rating calculations 56Environmental assessment information 56; 114Environmental control of building
main contractor’s costs 89Environmental protection measures
main contractor’s costs 88Environmental reports 32Estimated prices
product/component not specified 49Excavation and filling
commencing level 134cutting off tops of piles 138damp proof membrane 138disposals 136; 144drawings and information 131; 132extra over all types of excavation 135; 136filling using excavated material 137geotextile fabric 138ground movement protection boards 138ground stabilisation meshes 138imported filling 137methane barrier 138preliminary sitework 132radon barrier 138retaining material on site 136site clearance 133site preparation 133; 134support to faces 136tree and tree stump removal 133
Existing buildingsalterations/repairs and conservation 125–130health and safety 68main contractors’ preliminaries 51work carried out to 48work package contractor’s preliminaries 112
Existing featureshealth and safety 67
Existing workprotection 68
Explosiveshealth and safety 65
Extensions of time 58
F
Facilitiescontractor’s preliminaries 23site services and facilities 69–73
Fascias 174; 185Fax installation
site services and facilities 71Fees and charges
main contractors 97Fencing and gates
drawings and information 238extra over for supports 239; 240
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 285
independent gate posts 239ironmongery 240painting 219security/protection, main contractor’s costs 86temporary works 72type/height 238; 239
Filling see Excavation and fillingFinishings to floors/walls and ceilings
accessories 217applied liquid or planted finishes 212–217architraves 216bands 216beads 216board insulation 216ceiling ribs 216ceilings 215channels 216cornices 216cover strips 216coves 216dividing strips 216drawings and information 212; 213fire barriers within void under raised floor 214floors
raised access floors 214screeds/beds and toppings 214type and thickness 214
in situ 212–217isolated beams 215isolated columns 215isolation membranes 216kerbs and cappings 216metal mesh lathings 216mosaic 212–217mouldings 216movement joints 216nosings 216precast plaster components 217quilt insulation 216ramps to raised access floors 214reinforcement 216risers 215roofs 215sheet 212–217skirtings 215strings and aprons 215surface dressings/sealers or polishers 216tiles/slabs or blocks 216treads 215walls 215
Firebarriers
suspended ceilings 221; 222within void below raised floors 214
insulationmechanical services 247; 248sleeves, collars and the like 224stops 224; 249
prevention 66
stops 203; 224; 248First fix timbers 174Fittings and equipment see Furniture, fittings and
equipmentFixed charge
meaning 11Fixed price contracts 28; 29Flashings 128; 179Flooring see Carpentry; Concrete works; Finishings
to floors/walls and ceilingsFluctuating price contracts 29Flues 166Form of tender
bill of quantities composition 20certificate of bona fide tender 20
Foul drainage installationsbelow ground 230–233above ground 227–229
Frame structuresprecast concrete see Concrete works
Furniture, fittings and equipmentancillary items 226bird/vermin control 225; 226catering equipment 225; 226drawings and information 225employer-provided 226kitchen fittings 225; 226main contractor’s costs 81; 82pricing schedule 76protection 68sanitary appliance and fittings 225; 226schedules 31signwriting 226site and street furniture 225; 226with/without services 226
G
Gambion basket walls 149Gas installation certificate 62Gas supplies
temporarymain contractor’s costs 84work package contractor’s preliminaries 107
Gates see Fencing and gatesGeneral arrangement (GA) drawings 31Geotechnical reports 32Geotextile fabric
excavation and filling 138Giant hogweed remediation plan 32Glass block walling 164–168Glazing
doors/shutters and hatches 204drawings and information 210extra work 210glazed vaulting 192–194lead lights 211louvre blades 201; 204; 210mirrors 211
INDEX
286 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
removal of existing glass/preparation of frame fornew 211
saddle bars 211sealed units 210type of glass 201; 210
Grantsclaims, data to support 32
Grassed areashealth and safety 67landscaping 242
Gravelsite works 235
Grilles 203Ground remediation and soil stabilisation
chemical neutralising 140compacting 141drawings and information 139freezing 140ground anchors 140ground gas venting 140incorporating cement into soil in situ 141information required 32; 139pressure grouting/ground permeation 141site dewatering 140soil nailing 140sterilisation 140
Groundwatercontractors’ preliminaries 51excavation and filling 136investigation reports 32
Guaranteesmain contractor’s costs 99
Gutters 179; 185; 219
H
Handover see Completion of worksHandrails and grab rails 196; 207Hard landscaping see Site worksHatches see Doors/shutters and hatchesHazards see Health and safetyHealth and safety
adjoining property 68asbestos 66antiquities 66building interiors 68burning on-site 66construction phase plan 65electromagnetic interference 67execution hazards 64existing services/features/structures and work
67; 68explosives 65fire prevention 66furniture/fittings and equipment 68infected timber/contaminated materials 66invasive species 67laser equipment 67main contractor’s costs
barriers and safety scaffolding 87; 88environmental protection measures 88safety programme 87
main contractor’s preliminaries 23; 52; 64–68mobile telephone use 65moisture 66noise 66occupied premises 65occupier’s rules and regulations 65operation and maintenance of building 73; 119passes 65pesticides 66pollution control 66power actuated fixing systems 67pre-construction information 64product hazards 64protection 65–68recycling material/reuse 68roads and footpaths 67site visits 65smoking on-site 66stability and structural integrity of works 65topsoil and subsoil 67trees/shrubs and grassed areas 67valuable and vulnerable items 68waste 66wildlife species and habitats 67working precautions/restrictions 65work package contractor’s preliminaries 117;
118Heating systems
site services and facilities 71Hedges see Landscaping;Trees/shrubs and
vegetationHoarding requirements 32; 72; 86Hoggin
site works 235Hoists
main contractor’s costs 91Hyphen
use of 43; 47
I
Infected timbers 66Infestation removal 124Information and requirements see also Documents;
Drawings; Reports; Schedulescomposition of bill of quantities 21descriptions 47drawings see Drawingshealth and safety see Health and safetymain contractor’s preliminaries 22; 23; 44; 50–74
contract conditions 53description of work 52employer’s requirements see Employer’s
requirementsproject particulars 50site and existing buildings 51; 52
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 287
management of the works see Management ofworks
preparation of bill of quantities 18; 19; 30quality standards and control see Quality
standards and quality controlsecurity, safety and protection see Health and
safety; Security, safety and protectionmeasures
specificationperformance 30prescriptive 30
work package contractor’s preliminaries 24; 44;100–108
contract conditions 102description of work 101; 102project particulars 100site and existing buildings 101specific limitations on method/sequence and
timing 107In-situ concrete works see Concrete worksInspection chambers 232Inspections
access for 63employer’s requirements 63; 115main contractor’s costs 88products and work executed 61
Insulationboards 223cavity 167drawings and information 223filling cavities 224finishings to floors/walls/seilings 216fire sleeves/collars and the like 224fire stops 224; 249loose 223mechanical services 245–249quilts 223sheets 223sprayed 223thermal, employer’s requirements 63
Insurancesemployer’s requirements 32; 57main contractor’s costs 98; 99
Interim valuations and payments 39; 40; 59Interiors of buildings
protection 68Internet
site services and facilities 71Invasive species
employer’s requirements 67invasive plant growth survey 32
Ironmongery 199; 201; 240IT systems see Telecommunications and IT systems
J
Japanese knotweed remediation plan 32Joinery
architraves 196
beads 196blackboards 196casings 196ceiling boarding/sheeting/panelling 196cover fillets 185cubicle partition sets 196drawings and information 195duct covers/panels 196; 197floor boarding/sheeting/panelling 196handrails and grab rails 196infill panels and sheets 195–199ironmongery not associated with windows and
doors 184–188linings 196nosings 196panelling 196partitions/panels and cubicles (proprietary)
197–199picture rails 196pinboards 196pipe casings 196plinth blocks 196sealant joints 195–199shelves 196skirtings 196stops 196trims 196unframed isolated trims/skirtings and sundry
items 195–199wall boarding/sheeting/panelling 196window boards 196worktops 196
K
Kitchen fittings 225; 226
L
Labourprice fluctuations 28; 29records, employer’s requirements 60
Ladders 206Lakes
site works 237Land drainage 230–233Landscaping
hard landscaping see Site workslandscape management services, pricing schedule
77schedules 31site works see Site workssoft landscaping
bulbs/corms and tubers 243cultivating 242drawings and information 241hedge plants 243maintenance 244plant containers 243
INDEX
288 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
plants 243protection 244seeding 242shrubs 243surface applications 242trees 243turfing 242young nursery stock trees 243
Lantern lights 201Laser equipment 67Lead lights 211Legal advice costs 78Lifts
site services and facilities 72Lighting and power
site services and facilities 70; 118Line markings
site works 237Lining paper see DecorationLinings, partitions and panels see also Finishings to
floors/walls and ceilingsbeads 191concrete work see Concrete worksdrawings and information 20drylining and partitioning systems to walls and
ceilings 187–191extra over
access panels 189; 191angles 189; 190different 188forming openings 189; 190junctions 189; 190non-standard perimeter details 190
fair ends to partitions 189metal framed systems to walls and ceilings
187–191proprietary linings
beams 190bulkheads 190ceilings 190columns 190walls 190
Lintelsprecast concrete see Concrete works
Location of work 46Loft ladders 206Louvres 201Luminaries schedules 31Lump sum price
firm bill of quantities 18
M
Macadamsite works 224
Machinery and plantmain contractor’s costs
access plant 92common usage 90concrete plant 92
hoists 91mobile cranes 91small plant and tools 93tower cranes 90; 91
Main contractorcosts see Main contractor’s cost itemsmeaning 12overheads and profit, meaning 13preliminaries see Preliminariespricing schedule see Pricing schedule
Main contractor’s cost itemscleaning 96completion/post-completion requirements 95; 96control and protection 88; 89fees and charges 97insurance/bonds/guarantees and warranties 98;
99management and staff 77–79mechanical plant 90–93safety and environmental protection 87; 88security 86site establishment 80–83site records 94; 95site services 97; 98temporary services 84; 85temporary works 93; 94
Mains servicescontractors’ preliminaries 51
Main summary see Summary for bill of quantitiesMaintenance and operation manual 73Maintenance instructions and guarantees
contractor’s preliminaries 56Maintenance services
contractor’s preliminaries 23employer’s requirements 74
Management and staffmain contractor’s cost items
extraordinary support costs 79project specific 77; 78travel 79visiting 78
Management of worksattendances 104; 105climatic conditions 57compensation events 57considerate constructors scheme 57cost control 58–60; 105early possession 58employer’s requirements 57–60; 104extensions of time 58insurance 57main contractor’s preliminaries 23; 57–60notice of completion 58ownership of materials/products 57photographic records 58programme 57; 105progress 57; 58; 105site meetings 58supervision 57
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 289
works package contractor’s preliminaries 104;105
Manholes 232; 259Manufacturer’s recommendations/instructions
compliance 60Masonry
arches 166artificial/cast stone walling and dressings
164–168attached projections 166bands, dimensional description 166brick/block walling 164–168cavity insulation 167creasing 168damp-proof courses 167diaphragm walls, overall thickness/spacing and
thickness of ribs stated 165drawings and information 164; 165extra over walls
opening perimeters 166perimeters/abutments 166
fillets 167flues and flue linings/filling around flues 166forming cavity 167glass block walling 164–168isolated piers/casings, chimney stacks and columns
166joint reinforcement 167joints 167natural stone rubble/ashlar walling and dressings
164–168pointing 167pre-formed cavity trays 167proprietary and individual spot items 168special purpose blocks or stones 167vaulting, thickness and type stated 165walls, overall thickness stated 165wedging and pinning 168
Materialsdescription 47dimensions 47price fluctuations 28; 29thicknesses 47type and quality 47
Mechanical and electrical engineering servicesco-ordination 62schedules 31
Mechanical installationsbuilder’s work
access chambers 259accessories 259bases/plinths and the like 256catenary cables 257connections 260drawings and information 256duct covers and frames 257existing buildings 257; 258external services installations 258–260extra over, excavation/service runs 258; 259; 260holes/mortices and chases 256
inspection chambers 259manholes 259marker posts/plates 260new buildings 256; 257pipe and duct sleeves 256pipe duct fittings 259stopcock pits 259surface boxes 259testing and commissioning 260underground service runs 258valve chambers 259
Mechanical servicescommissioning 249drawings and information 245; 249duct fittings 247employer’s requirements 62fire stopping 249identification 249insulation and fire protection 247; 248loose ancillaries 249operation and maintenance manuals 249pipe ancillaries 247pipe fittings 246pipework 246post-completion services 249primary equipment 246system validation 249terminal equipment and services 246testing 249training 249ventilation ducts 247
Method of measurementcontractor’s preliminaries 23
Method/sequence of workspecific limitations 68; 107
Measured workcomposition of bill of quantities 21
Meeting roomsemployer’s requirements 69
Metalwork see also Structural metalworkcomposite items 209drawings and information 208filling hollow sections 209general metalwork members 208isolated metal members 208isolated protective coatings 209sheet metal 208surface treatments 209wire mesh 209
Meter readings 72Methane barrier 138Mirrors 211Mobile telephones
main contractor’s costs 85on-site use 65site services and facilities 71; 107
Mock-upsemployer’s requirements 61
Moisture see Water
INDEX
290 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Monitoringmain contractor’s costs 88
Mosaic see Finishings to floors/walls and ceilingsMouldings 216Multi-service gang
main contractor’s costs 98
N
Name boardstemporary works 73; 108
Nature of work 46Noise
health and safety 66Non-measurable works
contractor designed works 25provisional sums 24; 25; 26risks 26works carried out by statutory undertakers 26
Notice of completion 58Notices and signs 225; 226
O
Occupied premiseshealth and safety 65
Office of Government Commerce Gateway seeOGC Gateway
Off-site manufactured materials/components orbuildings 120; 121
OGC Gatewaymeaning 13
OGC Gateway Processalternative to RIBA Plan of Work 8investment decision (3C) 18; 19meaning 13measurement in context with 8; 9
Oil installation appliance certificate 62Operation and maintenance of finished building
employer’s requirements 73; 74health and safety file 74; 108information for commissioning services 74main contractor’s preliminaries 23maintenance services 74operation and maintenance manual 73; 108pricing schedule 77spare parts 74tools 74training 74works package contractor’s preliminaries 108
Other development/project costsmeaning 13
Overheads and profitmeaning 13provision in bill of quantities 28
Overtime working 63Ownership of materials and products
management of works 57
P
Paintinggeneral surfaces 219glazed surfaces 219gutters 219pipes 219radiators 219railings/fences and gates 219services 219structural metalwork 219
Panelling see JoineryParking
contractors’ preliminaries 52Partitions and panels see Linings, partitions and
panelsParty wall agreements 32Passes
health and safety 65Pavement lights
precast concrete 162Payments
employer’s requirements 59Personal protective equipment
employer’s requirements 72Pesticides
health and safety 66Phasing requirements
statement of 32Photocopier
site services and facilities 71Photographic records
management of works 58Picture rails 196Piling
bored piles 143breaking through obstructions 143delays 144disposal of excavated materials 144drawings and information 142driven piles 143extra over 143interlocking sheet piles 143reinforcement to concrete piles 143tests 144vibro-compacted piles/trench fill 143
Pipework see DrainagePlanning conditions or information 32Plans see DrawingsPlants see LandscapingPleum ceilings 221Pollution control 66; 88Pool/pond linings 237Post-completion requirements
contractor’s preliminaries 23details of 32employer’s requirements 32main contractor’s costs 95; 96
Post tender estimate
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 291
meaning 13preparation 39
Power actuated fixing systems 67Precast concrete see Concrete worksPrefabricated buildings 121Preliminaries
categories 22main contractors
advertising and marketing 23boundary of construction site 22constraints and restrictions 22description of building project 22drawings 22employer’s requirements see Employer’s
requirementsfacilities 23information and requirements 22; 23; 44; 50–74maintenance services 23management of the works 23method of measurement 23operation and maintenance of finished building
23post-completion requirements 23pricing schedule 23; 24; 44project particulars 50quality standards and quality control see Quality
standards and quality controlsecurity, safety and protection measures 23standard form of contract 22temporary works and services 23timing of works 23
meaning 12rules for describing and quantifying 43summary for bill of quantities
information and requirements 20; 21; 22pricing schedule 20; 21; 23
work package contractorsemployer’s requirements see Employer’s
requirementsinformation and requirements see Information and
requirementspricing schedule see Pricing schedule
Preparation of bill of quantitiesbreakdown structure 262–264codification see Codification of bill of quantitiescredits 275format of bill 267framing descriptions 268information requirements 18; 19OGC Gateway 3C (investment decision) 18; 19order of items 265; 266order of sizes 267pricing schedule
condensed 269expanded 270; 271
pricing summary 268condensed 272expanded 273; 274provisional sums 275
production information requirements 18
RIBA Work Stage E (technical design) 18; 19RIBA Work Stage F (production information) 18;
19RIBA Work Stage G (tender documentation) 18;
19risks 275technical designs and specifications 18totalling pages 268unit of billing 268unit of measurement 267use of headings 268
Pre-tender estimatemeaning 12preparation 39
Price fluctuationsfixed price contracts 28fluctuating price contracts 29
Pricing scheduledescription 21employer’s requirements 24
completion and post-completion requirements77
furniture and equipment 76site accommodation 75; 76site records 76telecommunications and IT systems 76
main contractor’s cost itemsbonds 99cleaning 96completion and post-completion requirements
95; 96control and protection 88; 89fees and charges 97guarantees 99insurance 98; 99management and staff 77–79mechanical plant 90–93safety and environmental protection 87; 88security 86site establishment 80–83site records 94; 95site services 97; 98temporary services 84; 85temporary works 93; 94warranties 99
main contractor’s preliminaries 23; 24; 44; 260;270; 271
templatescondensed 269expanded 270; 271
work package contractors’ preliminaries 24; 44Pricing summary
elemental bill of quantitiescondensed 263expanded 273; 274
Pricing variations 39Prime contractor see Main contractorPrime cost price (PC price)
type of product/component not specified 49Prime cost sum (PC sum)
INDEX
292 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
meaning 12Production information
bill of quantities preparation 18; 19Progress monitoring 57; 58Project particulars
contractors’ preliminaries 22; 50Project sponsor see EmployersProject team
quantifying building works, responsibility for 19Proprietary linings and partitions see Linings,
partitions and panelsProtected species information 32Protection of works
main contractor’s costs 89Provisional sums
composition of bill of quantities 21; 22defined work 24; 25meaning 12non-measurable works 24; 25; 26overheads and profit 25templates 275undefined work 24; 25
Public liability insurancemain contractor’s costs 98
Pumps 232
Q
Quality standards and quality controlaccuracy/setting out 62; 105compliance 60execution 60incomplete information 60inspections 61main contractor’s preliminaries 23; 60–64manufacturer’s recommendations/instructions 61products 60related work 61samples/approvals 61; 105services 62; 105standards of products and executions 60; 61;
106supervision/inspection/defective work 62–64;
106water for the works 61work at or after completion 64; 106workmanship skills 60works package contractor’s preliminaries 105;
106Quantifying building works
responsibility for 19Quantities
approximate quantity 49estimates 49measurement and billing 46provisional quantity 49voids 46
Quantity surveyor/cost managerresponsibility for quantifying building works 19
R
Radiatorspainting 219
Radon barrier 138Rainwater installations 227–229Records
drawings 31; 62employer’s requirements 60main contractor’s costs 94; 95pricing schedule 76
Recruitment costs 78Recycling/reuse of materials 68; 124; 130Reinforcement schedules 31Removals and replacements 126; 127Renovations 125–130Repairs to buildings 125–130Repointing 127; 128Reports
environmental 32geotechnical 32refurbishment and demolition 32requirements for preparation of bill of quantities
32site survey 32
Residual or retained risk see RisksResin impregnation/injection 128RIBA Outline Plan of Work
meaning 12project stages 9
RIBA Plan of Workalternative to see OGC Gateway Processmeaning 7; 12measurement in context with 7; 8
RIBA Work Stagesbill of quantities production stage 18meaning 13production information (F) 18; 19project stages 9technical design (E) 18; 19tender documentation (G) 18
Riskscomposition of bill of quantities 21designed out or avoided 27generally 26; 27non-measurable works 26register/log 32residual or retained risk, meaning 12response, form of 27retention by the employer 27; 28sharing by both employer and contractor 27templates 275transfer to contractor 27
Roads and footpathshealth and safety 67main contractor’s costs 96site works see Site workstemporary works 72
Roller shutters 203
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 293
Roof coveringsasphalt 184–186bituminous felts 176–180boundary work, location/method of forming 167drawings and information 176; 177extra over for forming 178finishings 215fittings 180flashings 179gutters 179liquid 184–186mastic asphalt roofing 184–186more than/less than 500mm wide 177panel or slab 192–194plastic sheets 176–180profile sheet 192–194rigid boards with factory applied sheet metal
covering 176–180sheet metals 176–180sheet roof coverings 176–180spot items 180tile and slate
artificial stone slating 181–183boundary work, location/method of forming
described 182drawings and information 181; 182fibre cement slating 181–183fittings 183interlocking tiling 181–183natural slating 181–183plain tiling 81–183
valleys 179waterproofing
applied liquid roofing 184–186mastic asphalt 184–186
Rooflightsframes 201glass 201precast concrete 162
Room data sheets 31Royal Institute of British Architects
Plan of Work see RIBA Plan of Work
S
Safety see Health and safety; Security, safety andprotection measures
Samplesemployer’s requirements 61main contractor’s costs 89
Sanitary appliance and fittingsdrawings and information 225; 226site accommodation 69; 71
Sarking 176Scaffolding
main contractor’s costs 93Schedules
builder’s work mechanical and electricalengineering services 31
control schedules for mechanical/engineeringservices 31
dayworks see Dayworksdeemed to be drawings 31door schedules 31drainage schedules 31duties/outputs and sizes of primary mechanical
and electrical plant and equipment 31fitting/furnishings and equipment schedules 31gross external areas 32gross internal floor areas 32landscaping and planting schedules 31luminaries schedules 31net internal areas 32pricing see Pricing scheduleprimary mechanical and electrical plant and
equipment schedules 31reinforcement (bar bending) schedules 31room data sheets 31site area 32window schedules 31
Schematic drawings 31Screeds 214Screens see Windows/screens and lightsSecurity, safety and protection measures see also
Health and safetymain contractor’s costs
hoardings, fences and gates 86security equipment 86security staff 86
main contractor’s preliminaries 23; 65work package contractor’s preliminaries 86; 106;
107Seeding 242Senior Responsible Owner (SRO) see EmployersSeptic tanks 232Sequence of work see Method/sequence of workServices
brought-in 83electrical see Electrical serviceselectrical installation certificate 62gas/oil/solid fuel appliance installation certificate
62maintenance 23; 74mechanical services see Mechanical servicessite see Site services and facilitiestemporary work see Temporary works and
serviceswater regulation/byelaws 62
Setting outmain contractor’s costs 89
Setts and cobbles 236Sheeting see Carpentry; Roof coveringsSheet metal 208Shelves 196Shingles 181–183Shop fronts 201Shutters see Doors/shutters and hatchesSignwriting 226
INDEX
294 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
Sillsprecast concrete see Concrete works
Siteaccommodation see Site accommodationdescription 51excavation and filling see Excavation and fillinghard landscaping see Site worksmain contractors’ preliminaries 51meetings 58plan 31; 32services see Site services and facilitiessurvey reports 32visits 52; 63work package contractor’s preliminaries 101
Site accommodationmain contractor’s costs 80
brought-in services 83consumables and services 83furniture and equipment 81; 82IT systems 82sundries 83temporary works in connection with 81
main contractor’s preliminariescar parking 70cleaning 96meeting rooms 69off-site offices/meeting rooms 69sanitary requirements 69site offices 69tidying 96use of accommodation/land not included in site
69work package contractor’s preliminaries 75
furniture and equipment 76telecommunications and IT systems 76
Site meetingsemployer’s requirements 58
Site planconstraints and restrictions 32general arrangement drawings 31
Site services and facilitiesbeneficial use of permanent installed services 71;
108computers 71e-mail and internet facilities 71fax installation 71heating systems 72lifts 71lighting and power 70; 107main contractor’s costs 97meter readings 71; 108mobile telephones 70; 107personal protective equipment 72photocopier 71sanitary installations 71surveying equipment 72telephones 70; 71temperature and humidity levels 71; 107thermometers 72water 70; 107
Site survey reports 32Site visits
contractors’ preliminaries 52health and safety 65
Site worksaccessories 2235; 236bricks/blocks and slabs 236channels 234coated macadam and asphalt 235cobbles 236drawings and information 234edgings 234extra over 235; 236formwork 235gravel 235hard landscaping 234–237hoggin 235in-situ concrete 235interlocking bricks/blocks and slabs 236joints 235kerbs 234letters/figures and symbols 237line markings 237liquid applied surfacings 238paving accessories 234pools/lakes ponds/waterways and the like, linings
for 235proprietary coloured sports surfacings 236reinforcement 235road and path pavings 234–237setts and cobbles 236sheet surfacings 236site furniture 236slabs 236sports surfacing 234spot items 237surface dressings 236tufted surfacings 236woodchip 235worked finishes 235
Skirtings 196; 215Skylights 201Slate roof coverings see Roof coveringsSliding folding partitions 203Smoke stops 203; 224; 248Smoking on-site 66Soffits 174Soil
analysis and soil stabilisation information 32contractors’ preliminaries 51stabilisation see Ground remediation and soil
stabilisationtopsoil and subsoil, health and safety 67
Solid fuel appliance installation certificate 62Sound passage
resistance to, employer’s requirements 63Spoil heaps
employer’s requirements 69excavations and filling 136
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 295
Special types of work 48Sports surfacing 234Staff see Management and staffStain removal 129Stairs/walkways and balustrades
balcony units 207balustrades 207barriers 207catwalks 206drawings and information 205; 206extra over
landings 206opening partitions 207
guard rails 208handrails 207ladders and loft ladders 206staircases 206timber/metal and plastic 205–207walkways 206
Standard form of contractcontractor’s preliminaries 22
Statutory undertakermeaning 13
Stone walling see MasonryStorm water drain systems 230–233Strong room doors 203Structural metalwork
allowance for fittings 170aluminium work 169–172cold rolled purlins, cladding rails and the like 171connections to existing steel etc. 172drawings and information 169extra over for 171filling hollow sections 172framed members
framing and fabrication 170permanent erection on site 170
holding down bolts/assemblies 171isolated protective coatings 172isolated structural members
fabrication 170permanent erection on site 170
painting 219profiled metal decking, type/profile stated 171special bolts 171steelwork 169–172surface treatments 172testing 172trial erection 172
Subcontractormeaning 13
Subsistence payments 79Summary for bill of quantities
annexes 22credits for materials arising from works 22dayworks (provisional) 22example 20measured work 21preliminaries
information and requirements 20pricing schedule 20
provisional sums 21; 22risks 21
Sundriesmain contractor’s costs 83
Sun shields 201Supervision
general requirements 62Surveying equipment
employer’s requirements 72Surveys
main contractor’s costs 88Suspended ceilings
access panels 221angle trims 221beams 221bulkheads 221depth of suspension 221drawings and information 220edge trims 221fire barriers 221
collars for services passing through 222fittings 222isolated strips 222plenum ceilings 222shadow gap battens 222upstands 222
Symbols used for measurement 10
T
Tankingapplied liquid tanking 184–186asphalt tanking 184–186flexible sheet tanking 184–186other proprietary systems 184–186underpinning 146
Technical designs and specificationsbill of quantities preparation 18; 19
Technical literaturecontractors’ preliminaries 55
Telecommunications and IT systemsemployer’s requirements 70; 71main contractor’s costs 82; 84pricing schedule 76
Telephones see Mobile telephones;Telecommunications and IT systems
Temperature and humiditysite services and facilities 71; 107
Temporary works and servicesadvertising 73; 108alterations, repairs and conservation 130demolitions 122; 123employer’s requirements 69; 72; 73fences/hoardings/screens and roofs 72main contractor’s costs 81; 94; 97
access scaffolding 93; 94drainage 85
INDEX
296 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
electricity supplies 84gas supplies 84pricing schedule 93; 94telecommunication systems 84water supplies 84
main contractor’s preliminaries 23methodology/drawings and sketches 32name boards 73; 108protection for trees/vegetation 73roads/hard standings and footpaths 72main contractor’s costs
site accommodation 81work package contractor’s preliminaries 108
Tender documentationRIBA Work Stage G 18
Tender priceapproximate bill of quantities 18firm bill of quantities 18
Testsemployer’s requirements 63
Thermal insulationcontinuity, employer’s requirements 63
Thermometerssite facilities and services 71
Thicknessesdescription 47
Tidal conditions 48Tiling see Finishings to floors/walls and ceilings;
Roof coveringsTimber work see CarpentryTime-related charge
meaning 13Timing of works
contractor’s preliminaries 23; 107extensions of time 58
Tower cranesmain contractor’s costs 90
Transportationdrawings and information 254; 155fire stopping and other associated fire protection
work 255identification 255loose ancillaries 255operation and maintenance manuals 255post practical completion services 255system 254
validation 255testing and commissioning 255training 255
Transportation installationsbuilder’s work
access chambers 259accessories 259bases/plinths and the like 256catenary cables 257connections 260drawings and information 256duct covers and frames 257existing buildings 257; 258external services installations 258–260
extra over, excavation/service runs 258; 259; 260holes/mortices and chases 256inspection chambers 259manholes 259marker posts/plates 260new buildings 256; 257pipe and duct sleeves 256pipe duct fittings 259stopcock pits 259surface boxes 259testing and commissioning 260underground service runs 258valve chambers 259
Trees/shrubs and vegetationexcavation and filling 133health and safety 67soft landscaping see Landscapingtemporary protection measures 73
Turfing 242
U
Undefined provisional summeaning 13
Underground work 48Underpinning
brickwork/blockwork 146concrete 146drawings and information 145formwork 146in works underpinning 146reinforcement 146tanking 146
Use of land/buildingscontractors’ preliminaries 51
Use of sitecontractors’ preliminaries 52
V
Valleys 179; 185Valuable and vulnerable items
protection 68Valuation of works
interim 39; 40; 59Value added tax
assessment as part of tender return 30exclusion from bill of quantities 30recovery, data to support 32
Vermin controlequipment and fittings 225; 226
Visiting management and staffmain contractor’s costs 78
Visits to sitecontractors’ preliminaries 52; 65
Voidsdeductions for 46
INDEX
EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 297
W
Walkways see Stairs/walkways and balustradesWall paper see DecorationWalls
brick/block see Masonrycrib walls 149diaphragm walls and embedded retaining walls
delays 148drawings and information 147extra over excavation and disposal 148joints 148tests 148thickness stated 147trimming and cleaning exposed faces 148
drylining 187–191earth reinforcement 150finishes see Finishings to floors/walls and ceilingsgambion basket walls 149lining and partitions (proprietary) 187–191metal framed systems 187–191partitionary 187–191precast concrete see Concrete worksstone see Masonrytile and slate coverings 181–183
Wall tiesinserting new 128
Warrantiesmain contractor’s costs 99
Wasteemployer’s requirements 66
Water see also Groundwaterfor the works, quality control 61prevention of wetness/dampness 66regulations/byelaws
contractor’s certificate 62notification 62
site services and facilities 70; 107temporary supplies, main contractor’s costs 84working in or under 48
Waterproofingapplied liquid roofing 184–186aprons 185asphalt tanking or damp proofing 184–186channels 185coverings more than/less than 500mm wide 185drawings and information 184edge trim 186fascias 185fittings 186gutters 185kerbs 185mastic asphalt roofing 184–186
skirtings 186spot items 186tanking or damp proofing 184–186valleys 185
Weatherboarding 192–194Wildlife species and habitat
information 32protection 67
Windows/screens and lightsdrawings and information 200frames 201glazing
glass type 201louvre blades 201
ironmongery 201louvres 201rooflights/sky lights and lanternlights 201screens/borrowed lights and frames 201shop fronts 200; 201shutters 201sun shields 201timber/metal and plastic 200; 201
Window schedules 31Wiring see Electrical servicesWire mesh 209Woodchip
site works 235Work at or after completion
quality standards and control 64Work breakdown structures (WBS)
meaning 13planning 33; 34work package breakdown structure 33; 34
example of suffix codes 37; 38; 276–278work sectional breakdown structure 33–36
example of suffix codes 35; 36Working hours
contractor’s preliminaries 23definitions 68overtime 63schedule of dayworks 29
Workmanship skillsquality standards and control 60
Work of special types 48Work package contractor
employer’s requirements see Employer’srequirements
information see Information and requirementsmeaning 13preliminaries see Preliminariespricing schedule see Pricing schedule
Worktops 196
INDEX
298 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013
NRM 2: Detailed measurement for building works
The RICS new rules of measurement (NRM) is a suite of documents issued by the RICS QuantitySurveying and Construction Professional Group.
The rules have been written to provide a standard set of measurement rules that are understandable byall those involved in a construction project. They provide advice and best practice guidance to RICSmembers involved in the cost management of construction projects worldwide.
This volume, NRM 2: Detailed measurement for building works, provides detailed rules for themeasurement and description of building works for the purpose of obtaining tender prices. The rulesaddress all aspects of bill of quantities production, including setting out the information required from theemployer and other construction consultants to enable a bill of quantities to be prepared, as well asdealing with the quantification of non-measurable work items, contractor designed works and risks.Guidance is also provided on the content, structure and format of bill of quantities, as well as the benefitsand uses of bill of quantities.
Moreover, the rules can be used for bill of quantities for both main contract works and for discrete workpackages – including separate preliminaries for both.
Although written primarily for the preparation of bill of quantities and quantified schedules of works, therules will be invaluable when designing and developing standard or bespoke schedules of rates, or otherquantity-based pricing document.
These rules provide essential guidance to all those involved in the preparation of bill of quantities,quantified schedules of works, schedules of rates and similar pricing documents, as well as those whowish to be better informed about the purpose, use and benefits of adopting detailed measurement oftheir cost control procedures.
The RICS new rules of measurement are based on UK practice but the requirements for a coordinatedset of rules and underlying philosophy behind each volume have worldwide application.
RICS new rules of measurement
RICS new rulesof measurementDetailed measurementfor building works
2
Detailed
measurem
ent for b
uilding
wo
rks