NRM 2: Detailed measurement for building works

The RICS new rules of measurement (NRM) is a suite of documents issued by the RICS QuantitySurveying and Construction Professional Group.

The rules have been written to provide a standard set of measurement rules that are understandable byall those involved in a construction project. They provide advice and best practice guidance to RICSmembers involved in the cost management of construction projects worldwide.

This volume, NRM 2: Detailed measurement for building works, provides detailed rules for themeasurement and description of building works for the purpose of obtaining tender prices. The rulesaddress all aspects of bill of quantities production, including setting out the information required from theemployer and other construction consultants to enable a bill of quantities to be prepared, as well asdealing with the quantification of non-measurable work items, contractor designed works and risks.Guidance is also provided on the content, structure and format of bill of quantities, as well as the benefitsand uses of bill of quantities.

Moreover, the rules can be used for bill of quantities for both main contract works and for discrete workpackages – including separate preliminaries for both.

Although written primarily for the preparation of bill of quantities and quantified schedules of works, therules will be invaluable when designing and developing standard or bespoke schedules of rates, or otherquantity-based pricing document.

These rules provide essential guidance to all those involved in the preparation of bill of quantities,quantified schedules of works, schedules of rates and similar pricing documents, as well as those whowish to be better informed about the purpose, use and benefits of adopting detailed measurement oftheir cost control procedures.

The RICS new rules of measurement are based on UK practice but the requirements for a coordinatedset of rules and underlying philosophy behind each volume have worldwide application.

RICS new rules of measurement

RICS new rulesof measurementDetailed measurementfor building works

2D

etailed m

easurement fo

r build

ing w

orks

Page 2: RICS new rules of measurement 2

RICS NEW RULES OF MEASUREMENT

NRM 2: Detailed measurement forbuilding works

1st edition

Page 3: RICS new rules of measurement 2

Acknowledgments

The project stages from the RIBA Outline Plan of Work 2007 are reproduced with the permission of the Royal Institute ofBritish Architects.

Published by the Royal Institution of Chartered Surveyors (RICS)

Surveyor Court

Westwood Business Park

Coventry CV4 8JE

UK

www.ricsbooks.com

No responsibility for loss or damage caused to any person acting or refraining from action as a result of the materialincluded in this publication can be accepted by the authors or RICS.

Produced by the Quantity Surveying and Construction Professional Group of the Royal Institution of CharteredSurveyors.

ISBN 978 1 84219 716 5

Royal Institution of Chartered Surveyors (RICS) April 2012. Copyright in all or part of this publication rests with RICS.No part of this work may be reproduced or used in any form or by any means including graphic, electronic, ormechanical, including photocopying, recording, taping or web distribution, without the written permission of the RoyalInstitution of Chartered Surveyors or in line with the rules of an existing license.

Typeset in Great Britain by Columns Design XML Ltd, Reading, Berks

Printed by Page Bros, Norwich

Page 4: RICS new rules of measurement 2

ContentsForeword vAcknowledgments viIntroduction 1

Status of the RICS new rules of measurement 1The RICS new rules of measurement (NRM) suite of documents in context 2Identity 3Enquiries 3

Part 1: General 51.1 Introduction 71.2 Measurement in context with the RIBA Plan of Work and OGC Gateway Process 71.3 Purpose of NRM 2 91.4 Use of NRM 2 91.5 Structure of NRM 2 91.6 Symbols, abbreviations and definitions 10Part 2: Rules for detailed measurement of building works 152.1 Introduction 172.2 Purpose of bill of quantities 172.3 Benefits of bill of quantities 172.4 Types of bill of quantities 182.5 Preparation of bill of quantities 182.6 Composition of a bill of quantities 192.7 Preliminaries 222.8 Measurement rules for building works 242.9 Non-measurable works 242.10 Risks 272.11 Overheads and profit 282.12 Credits 282.13 Other considerations 282.14 Information requirements for measurement 302.15 Codification of bill of quantities 332.16 Cost management/control 382.17 Analysis, collection and storage of cost data 40Part 3:Tabulated rules of measurement for building works 413.1 Introduction 433.2 Use of tabulated rules of measurement for building works 433.3 Measurement rules for building works 46

Tabulated work sections:1 Preliminaries 502 Off-site manufactured materials, components and buildings 1203 Demolitions 1224 Alterations, repairs and conservation 1255 Excavating and filling 1316 Ground remediation and soil stabilisation 1397 Piling 1428 Underpinning 1459 Diaphragm walls and embedded retaining walls 14710 Crib walls, gabions and reinforced earth 149

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | iii

Page 5: RICS new rules of measurement 2

11 In-situ concrete works 15112 Precast/composite concrete 15913 Precast concrete 16114 Masonry 16415 Structural metalwork 16916 Carpentry 17317 Sheet roof coverings 17618 Tile and slate roof and wall coverings 18119 Waterproofing 18420 Proprietary linings and partitions 18721 Cladding and covering 19222 General joinery 19523 Windows, screens and lights 20024 Doors, shutters and hatches 20225 Stairs, walkways and balustrades 20526 Metalwork 20827 Glazing 21028 Floor, wall, ceiling and roof finishings 21229 Decoration 21830 Suspended ceilings 22031 Insulation, fire stopping and fire protection 22332 Furniture, fittings and equipment 22533 Drainage above ground 22734 Drainage below ground 23035 Site works 23436 Fencing 23837 Soft landscaping 24138 Mechanical services 24539 Electrical services 25040 Transportation 25441 Builder’s work in connection with mechanical, electrical and transportation

installations256

Appendices 261A Guidance on the preparation of bill of quantities 262B Template for preliminaries pricing schedule (condensed) 269C Template for preliminaries pricing schedule (expanded) 270D Template for pricing summary for elemental bill of quantities (condensed) 272E Template for pricing summary for elemental bill of quantities (expanded) 273F Templates for provisional sums, risks and credits 275G Example of a work package breakdown structure 276Bibliography 279Index 280

iv | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

Page 6: RICS new rules of measurement 2

Foreword

The measurement initiative steering group was set up by the RICS quantity surveying and constructionprofessional group to research the problems associated with the measurement of building works at all stagesof the design and construction process. The steering group quickly came to the conclusion that significantimprovements where required.

The development units on measurement set up by the measurement initiative steering group have produceda suite of documents covering all aspects of the measurement and description of a building project – from‘cradle to grave’.

This volume, RICS new rules of measurement: Detailed measurement for building works (‘NRM 2’), providesfundamental guidance on the quantification and description of building works for the purpose of preparingbill of quantities and quantified schedules of works; it also provides a sound basis for designing and developingstandard or bespoke schedules of rates. Direction on how to deal with items that are unquantifiable is alsoprovided – e.g. preliminaries, overheads and profit, contractor designed works, risk transfer and fluctuations.

The RICS new rules of measurement: Detailed measurement for building works provides a uniform basis formeasuring and describing building works and embodies the essentials of good practice.

NRM 2 replaces the Standard Method of Measurement for Building Works (‘SMM’), which was first published byRICS in 1922, with the latest edition being SMM7, published in 1988.

This first edition will become operative on 1 January 2013 and is post dated accordingly.

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | v

Page 7: RICS new rules of measurement 2

AcknowledgmentsThe development of the RICS new rules of measurement: Detailed measurement for building works wasfacilitated by the RICS Quantity Surveying and Construction Professional Group under thedirection of the steering group.

Lead authors:

+ David Benge, Gleeds Cost Management Limited

+ John Davidson, Consultant

Contributors:

+ Simon Cash,Appleyards

+ Graham Hadden,V B Johnson

+ Michael Jewell, MDA Consulting

+ Michael Rickard (Harvey Frost)

+ Justin Sullivan,Adair Associates

+ Keith Tweedy

Steering Group:

+ Chair: Stuart Earl, Gleeds Cost Management Limited

+ David Benge, Gleeds Cost Management Limited

+ Alan Cripps, RICS

+ John Davidson, Consultant

+ Adrian Green, Laing O’Rourke

+ Andy Green, Faithful and Gould

+ Joe Martin, BCIS

+ Alan Muse, RICS

+ Sean Smylie, Shepherd Construction; Contractors Legal Group; UK Contractors Group

+ Roy Stratton, Countryside Properties

The Steering Group express their thanks to the professional institutions and trade bodies, and tothe quantity surveyors and building contractors for their co-operation and advice in the detailedconsultations that have taken place. The steering group and development unit also express theirthanks to the surveyors who have assisted in testing the RICS new rules of measurement: Detailedmeasurement for building works, and to the editors who have had the task of bringing together thefinal document.

vi | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

Page 8: RICS new rules of measurement 2

Introduction

Status of the RICS new rules of measurementThese rules have the status of a guidance note. Where recommendations are made for specificprofessional tasks, these are intended to represent ‘best practice’, i.e. recommendations which inthe opinion of RICS meet a high standard of professional competence.

Although members are not required to follow the recommendations contained in the note, theyshould take into account the following points.

When an allegation of professional negligence is made against a surveyor, a court or tribunal maytake account of the contents of any relevant guidance notes published by RICS in deciding whetheror not the member had acted with reasonable competence.

In the opinion of RICS, a member conforming to the practices recommended in this note shouldhave at least a partial defence to an allegation of negligence if they have followed those practices.However, members have the responsibility of deciding when it is inappropriate to follow theguidance.

It is for each surveyor to decide on the appropriate procedure to follow in any professional task.However, where members do not comply with the practice recommended in this note, they shoulddo so only for a good reason. In the event of a legal dispute, a court or tribunal may require themto explain why they decided not to adopt the recommended practice. Also, if members have notfollowed this guidance, and their actions are questioned in an RICS disciplinary case, they will beasked to explain the actions they did take and this may be taken into account by the Panel.

In addition, guidance notes are relevant to professional competence in that each member should beup to date and should have knowledge of guidance notes within a reasonable time of their cominginto effect.

Document status defined

RICS produces a range of standards products. These have been defined in the table below. Thisdocument is a guidance note.

Type of document Definition Status

RICS practice statement Document that provides members withmandatory requirements under Rule 4 ofthe Rules of Conduct for members

Mandatory

RICS code of practice Standard approved by RICS, and endorsedby another professional body that providesusers with recommendations for acceptedgood practice as followed by conscientiouspractitioners

Mandatory or recommendedgood practice (will beconfirmed in the documentitself)

RICS guidance note Document that provides users withrecommendations for accepted goodpractice as followed by competent andconscientious practitioners

Recommended good practice

RICS information paper Practice based information that providesusers with the latest information and/orresearch

Information and/orexplanatory commentary

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 1

Page 9: RICS new rules of measurement 2

The RICS new rules of measurement (NRM) suite ofdocuments in contextThe RICS new rules of measurement (NRM) is a suite of documents issued by the RICS QuantitySurveying and Construction Professional Group.The rules have been written to provide a standardset of measurement rules that are understandable by anyone involved in a construction project.

The rules provide essential guidance to all those involved in, as well as those who wish to be betterinformed about, the cost management of construction projects. Although the RICS new rules ofmeasurement are principally based on UK practice, the requirements for a coordinated set of rulesand underlying philosophy behind each volume have worldwide application.

+ NRM 1: Order of cost estimating and cost planning for capital building works

+ NRM 2: Detailed measurement for building works

+ NRM 3: Order of cost estimating and cost planning for building maintenance works.

The NRM suite comprises the following three volumes:

NRM 1: Order of cost estimating and cost planning for capital buildingworks

This volume provides indispensable guidance on the quantification of building works for thepurpose of preparing cost estimates and cost plans. Direction on how to quantify other itemsforming part of the cost of a construction project, but which are not reflected in the measurablebuilding work items, is also provided – i.e. preliminaries, overheads and profit, project team anddesign team fees, risk allowances, inflation, and other development and project costs.

NRM 1 is the ‘cornerstone’ of good cost management of construction projects – enabling moreeffective and accurate cost advice to be given to clients and other project team members, as well asfacilitating better cost control.

Although written primarily for the preparation of order of cost estimates and cost plans, the ruleswill be invaluable when preparing approximate estimates.

In addition, the rules can be used as a basis for capturing historical cost data in the form requiredfor order of cost estimates and elemental cost plans, thereby completing the ‘cost managementcycle’.

NRM 2: Detailed measurement for building works

This volume provides fundamental guidance on the detailed measurement and description ofbuilding works for the purpose of obtaining a tender price.The rules address all aspects of bill ofquantities (BQ) production, including setting out the information required from the employer andother construction consultants to enable a BQ to be prepared, as well as dealing with thequantification of non-measurable work items, contractor designed works and risks. Guidance isalso provided on the content, structure and format of BQ, as well as the benefits and uses of BQ.

While written mainly for the preparation of bill of quantities, quantified schedules of works andquantified work schedules, the rules will be invaluable when designing and developing standard orbespoke schedules of rates.

These rules provide essential guidance to all those involved in the preparation of bill of quantities,as well as those who wish to be better informed about the purpose, use and benefits of bill ofquantities.

NRM 3: Order of cost estimating and cost planning for buildingmaintenance works

This volume provides essential guidance on the quantification and description of maintenanceworks for the purpose of preparing initial order of cost estimates during the preparation stages ofa building project, cost plans during the design development and pre-construction stages, anddetailed, asset-specific cost plans during the pre-construction phases of a building project. Theguidance provided by the rules also aids the procurement and cost control of maintenance works.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

2 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 10: RICS new rules of measurement 2

The rules follow the same framework and premise as NRM 1: Order of cost estimating and costplanning for capital building works. Consequently, they give direction on how to quantify and measureother items associated with maintenance works, but which are not reflected in the measurablemaintenance work items – i.e. maintenance contractor’s management and administration charges,overheads and profit, other maintenance-related costs, consultants’ fees and risks in connectionwith maintenance works.

Unlike capital building works projects, maintenance works are required to be carried out from theday a building or asset is put to use until the end of its life.Accordingly, while the costs of a capitalbuilding works project are usually incurred by the building owner/developer over a relativelyshort-term, costs in connection with maintenance works are incurred throughout the life of thebuilding – over the long-term. Consequently, the rules provide guidance on the measurement andcalculation of the time value of money, guidance on using the measured data to inform life cycle ofcost plans and forward maintenance plans, as well as VAT, and taxation.

NRM 3: Order of cost estimating and cost planning for building maintenance works, together with NRM1: Order of cost estimating and cost planning for capital building works, presents the basis of good costmanagement of capital building works and maintenance works – enabling more effective andaccurate cost advice to be given to clients and other project team members, as well as facilitatingbetter cost control.

IdentityThe rules are called NRM 2: Detailed measurement for building works.

EnquiriesEnquiries concerning the rules may be made in the first instance to the Quantity Surveying andConstruction Professional Group at RICS.

RICS QS & Construction Professional Group

The Royal Institution of Chartered Surveyors (RICS)

Parliament Square

London SW1P 3AD

United Kingdom

e: [email protected]

Any suggestions for future revisions are welcomed and may also be sent to the Quantity Surveyingand Construction Professional Group at RICS.

INTRODUCTION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 3

Page 11: RICS new rules of measurement 2
Page 12: RICS new rules of measurement 2

Part 1: General

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 5

Page 13: RICS new rules of measurement 2
Page 14: RICS new rules of measurement 2

Part 1: General1.1 Introduction

1.1.1 This part places detailed measurement for bill of quantities, schedules of works and work schedulesin context with the RIBA Outline Plan of Work and the OGC Gateway Process; and explains thesymbols, abbreviations and definitions used in the rules.

1.2 Measurement in context with the RIBA Plan ofWork and OGC Gateway Process

1.2.1 Throughout this document, references are made to both the RIBA Plan of Work and the OGCGateway Process and the RIBA Work Stages/OGC Gateways within.

1.2.2 The RIBA Plan of Work is a construction industry recognised framework that organises theprocess of managing and designing building projects and administering building contracts into anumber of key work stages.The RIBA Plan of Work has 11 sequential steps known as ‘RIBA WorkStages’. Despite its apparent linear nature, it should be recognised that the sequence or content ofthe RIBA Work Stages may need to be varied or overlapped to suit the proposed procurementmethod. Consequently, when two or more RIBA Work Stages are combined, it is not alwaystransparent when a building project is moving from one stage to another.As such, it is an ideal tool,provided that it is conceptualised as providing the basic outline of the building project process.

1.2.3 As an alternative to the RIBA Plan of Work, central civil government, the health sector, localgovernment and the defence sector have adopted the OGC Gateway Process as best practice formanaging and designing building projects. The process examines programmes and projects at keydecision-points in their lifecycle. It looks ahead to provide assurance that the employer canprogress to the next stage. Project reviews are carried out under OGC Gateway reviews 1 to 5.Typically, a project will undergo three reviews before commitment to invest, and two looking atservice implementation and confirmation of the operational benefits.

1.2.4 Both the RIBA Plan of Work and the OGC Gateway Process are recognised frameworks formanaging and designing building projects.

1.2.5 The point at which measurement is carried out by the quantity surveyor/cost manager for thepurpose of preparing bill of quantities, or quantified schedule of works, in the context of the RIBAWork Stages and OGC Gateways is shown in Figure 1.1.

1.2.6 Bill of quantities are prepared by the quantity surveyor/cost manager at RIBA Work Stage G(Tender Documentation).

1.2.7 The project stages from the RIBA Outline Plan of Work 2007 (overleaf) are reproduced with thepermission of the Royal Institute of British Architects.

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 7

Page 15: RICS new rules of measurement 2

Figure 1.1:The RICS formal cost estimating and cost planning stages in context withthe RIBA Plan of Work and OGC Gateways (adapted from the RIBA Outline Plan ofWork 2007).

Note: A prerequisite of OGC Gateway Review 3: Investment Decision, is that the design brief, concept designand detailed design have been approved and signed off by the Senior Responsible Owner (SRO). For thepurpose of comparing the OGC Gateway Process with the RIBA Work Stages, these two decision points arereferred to as OGC Gateway 3A (Design Brief and Concept Approval) and OGC Gateway 3B (DetailedDesign Approval); with OGC Gateway 3C representing the final OGC Gateway Review 3 (InvestmentDecision).

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

8 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 16: RICS new rules of measurement 2

1.3 Purpose of NRM 2

1.3.1 RICS new rules of measurement: Detailed measurement for building works has been written to providea standard set of measurement rules for the procurement of building works that areunderstandable by all those involved in a construction project, including the employer; therebyaiding communication between the project/design team and the employer.

1.3.2 The document provides rules of measurement for the preparation of bill of quantities andschedules of works (quantified).The rules also provide a framework, which can be used to developbespoke and standard schedules of rates.

1.3.3 The rules address all aspects of bill of quantities (BQ) production, including setting out theinformation required from the employer and other construction consultants to enable a BQ to beprepared, as well as dealing with the quantification of non-measurable work items, contractordesigned works and risks. Guidance is also provided on the content, structure and format of BQ

1.3.4 The RICS new rules of measurement suite of documents is based on UK practice but therequirements for a coordinated set of rules and underlying philosophy behind each section haveworldwide application.

1.4 Use of NRM 2

1.4.1 The RICS new rules of measurement: Detailed measurement for building works provides a structuredbasis for measuring building work and presents a consistent approach for dealing with other keycost components associated with a building project when preparing bill of quantities and quantifiedschedule of works.The rules represent the essentials of good practice.

1.4.2 The rules address both the production of bill of quantities (BQ) for entire building project and fordiscrete work packages. They can also be used to prepare quantified schedules of works andquantified work schedules.

1.4.3 In addition, the framework can be used to construct both bespoke and standard schedules of ratesfor the purpose of:

(1) Discrete contracts;

(2) Term contracts; and

(3) Framework arrangements.

1.4.4 Users of the rules are advised to adopt metric units as the standard system of measurement.Where the employer requires reference to imperial units these may be provided as supplementaryinformation (e.g. in parenthesis).

1.4.5 Although the British Standard BS 8888:2006 Technical Product Specification (for defining, specifyingand graphically representing products) recommends the inclusion of a comma rather than a pointas a decimal marker, and a space instead of a comma as a thousands separator, the traditional UKconvention has been adopted in these rules (i.e. a point as a decimal marker and a comma as athousands separator). Users should take care to ensure that this does not conflict with employerrequirements.

1.5 Structure of NRM 2

1.5.1 This document is divided into three parts with supporting appendices:

+ Part 1 places the places measurement for works procurement in context with the RIBA Planof Work and the OGC Gateway Process; and explains the symbols, abbreviations and definitionsused in the rules.

+ Part 2 outlines the benefits of detailed measurement, describes the purpose and uses ofRICS new rules of measurement: Detailed measurement for building works; explains the function of

PART 1: GENERAL

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 9

Page 17: RICS new rules of measurement 2

bill of quantities, provides work breakdown structures for bill of quantities, defines theinformation required to enable preparation of bill of quantities, describes the keyconstituents of bill of quantities, explains how to prepare bill of quantities; sets out the rulesof measurement for the preparation of bill of quantities; and provides the method for dealingwith contractors’ preliminaries, contractors’ overheads and profit, contractors’ design fees,other development/project costs, risks, inflation, and data-gathering for supporting claims fortax incentives.

+ Part 3 comprises the tabulated rules for the measurement and description of building worksfor the purpose of works procurement.

+ Appendices:

Appendix A: Guidance on the preparation of bill of quantities

Appendix B:Template for preliminaries (main contract) pricing schedule (condensed)

Appendix C:Template for preliminaries (main contract) pricing schedule (expanded)

Appendix D:Template for pricing summary for elemental bill of quantities (condensed)

Appendix E:Template for pricing summary for elemental bill of quantities (expanded)

Appendix F:Templates for provisional sums, risks and credits

Appendix G: Example of a work package breakdown structure

1.6 Symbols, abbreviations and definitionsSymbols, abbreviations and certain key words and phrases used in the rules are detailed below.

1.6.1 Symbols used for measurement

ha hectare

hr hour

kg kilogramme

kN kilonewton

kW Kilowatt

m linear metre

m2 square metre

m3 cubic metre

mm millimetre

mm2 square millimetre

mm3 cubic millimetre

nr number

t tonne

wk week

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

10 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 18: RICS new rules of measurement 2

1.6.2 Abbreviations

BQ bill of quantities

BQBS bill of quantities (or BQ) breakdown structure

CBS cost breakdown structure

OGC Office of Government Commerce

PC sum prime cost sum

PC price prime cost price

RIBA Royal Institute of British Architects

RICS Royal Institution of Chartered Surveyors

WBS work breakdown structure

Note: The names of UK government departments are frequently changed. This applies to theOffice of Government Commerce. Notwithstanding this, the acronym OGC has not been changedas it is a construction industry recognised phrase.

1.6.3 Definitions

Bill of quantities (BQ) – means a list of items giving detailed identifying descriptions and firmquantities of the work comprised in a contract.

Cost breakdown structure (CBS) – in the context of bill of quantities, represents the financialbreakdown of a building project into cost targets for elements or work packages.

Cost target – in the context of bill of quantities, means the total expenditure for an element orwork package.

Credit – means a refund offered by the contractor to the employer in return for the benefit oftaking ownership of materials, goods, items, mechanical and electrical plant and equipment, etc.arising from demolition or strip out works.

Daywork – means the method of valuing work on the basis of time spent by the contractor’sworkpeople, the materials used and the plant employed.

Defined provisional sum – means a sum provided for work which is not completely designedbut for which the following information shall be provided:

– the nature and construction of the work;

– a statement of how and where the work is fixed to the building and what other work is to befixed thereto;

– a quantity or quantities that indicate the scope and extent of the work; and

– any specific limitations and the like identified.

Design team – means architects, engineers and technology specialists responsible for theconceptual design aspects of a building, structure or facility and their development into drawings,specifications and instructions required for construction and associated processes.The design teamis a part of the project team.

Director’s adjustment – means a reduction or addition to the tender price, derived by thecontractor’s estimating team, offered by the director(s) of the contractor.

Employer – means the owner and/or the developer of the building; in some cases the ultimateuser. The terms Senior Responsible Owner (SRO) and project sponsor are used by central civilgovernment and the defence sector; being the representatives empowered to manage the buildingproject and make project-specific decisions. For the purpose of these measurement rules, the term‘employer’ will also be used interchangeably with Senior Responsible Owner (SRO) or projectsponsor.

Fixed charge – is for work, the cost of which is to be considered independent of duration.

PART 1: GENERAL

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 11

Page 19: RICS new rules of measurement 2

Main contractor (or prime contractor) – means the contractor responsible for the totalconstruction and completion process of the building project.The term ‘prime contractor’ is oftenused in central civil government and the defence sector to mean ‘main contractor’.

Main contract preliminaries – are items that cannot be allocated to a specific element,sub-element or component. Main contract preliminaries include the main contractor’s costsassociated with management and staff, site establishment, temporary services, security, safety andenvironmental protection, control and protection, common user mechanical plant, common usertemporary works, the maintenance of site records, completion and post-completion requirements,cleaning, fees and charges, sites services and insurances, bonds, guarantees and warranties. Maincontractors’ preliminaries exclude costs associated with subcontractors’ or work packagecontractors’ preliminaries.

OGC Gateway Process – is a process that examines programmes and projects at keydecision-points in their lifecycle. It looks ahead to provide assurance that the employer canprogress to the next stage. Project reviews are carried under OGC Gateway reviews 1 to 5.Typically, a project will undergo three reviews before a commitment to invest, and two looking atservice implementation and confirmation of the operational benefits.The process is best practice incentral civil government, the health sector, local government and the defence sector.The emphasisof the OGC Gateway Process is to examine the business case, which requires an assessment of thetotal development cost of the building project.

OGC Gateways (or OGC Gateway) – are key decision points within the OGC GatewayProcess.

Other development/project costs – means costs that are not necessarily directly associatedwith the cost of constructing the building, but form part of the total cost of the building project tothe employer (e.g. land acquisition costs, fees for letting agents, marketing costs and contributionsassociated with planning permissions).

Overheads and profit – means the contractor’s costs associated with head office administration,proportioned to each building contact, plus the main contractor’s return on capital investment.

Post tender estimate – means a cost estimate carried out after the evaluation of tenders tocorroborate the funds required by the employer to complete the building project.

Pre-tender estimate – means a cost estimate prepared immediately before calling tenders forconstruction.

Preliminaries – see main contract preliminaries and work package contract preliminaries.

Provisional quantity – means a quantity which cannot be accurately determined (i.e. an estimateof the quantity).

Provisional sum – means a sum of money set aside to carry out work that cannot be describedand given in quantified items in accordance with the tabulated rules of measurement.A provisionalsum will be identified as either ‘defined’ or ‘undefined’ (see definitions of ‘Defined provisional sums’and ‘Undefined’.

Prime cost sum (PC Sum) – means a sum of money included in a unit rate to be expended onmaterials or goods from suppliers (e.g. ceramic wall tiles at £36.00/m or door furniture at£75.00/door). It is a supply only rate for materials or goods where the precise quality of thosematerials and goods are unknown. PC Sums exclude all costs associated with fixing or installation,all ancillary and sundry materials and goods required for the fixing or installation of the materialsor goods, subcontractor’s design fees, subcontractor’s preliminaries, subcontractor’s overheads andprofit, Main Contractor’s design fees, preliminaries and overheads and profit.

Residual risk (or retained risk) – means the risks retained by the employer.

RIBA Outline Plan of Work summarises the deliverables required under each RIBA WorkStage.

RIBA Plan of Work – is a model procedure dealing with basic steps in decision making for amedium-sized building project. The RIBA Plan of Work sets out a logical structure for buildingprojects, starting with the brief and ending with post-occupancy evaluation.The procedures identifythe responsibilities of the design team at each stage of the design and contract administration

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

12 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 20: RICS new rules of measurement 2

process. Each step is referred to as a RIBA Work Stage.The full title of the RIBA Plan of Work isThe Architect’s Plan of Work, published by RIBA, but it is commonly known and referred to as theRIBA Plan of Work in the building construction industry.

RIBA Work Stage – means the stage into which the process of designing building projects andadministering building contracts may be divided. Some variations of the RIBA Work Stages apply fordesign and build procurement.

Statutory undertaker – means organisations, such as water, gas, electricity andtelecommunications companies, that are authorised by statute to construct and operate publicutility undertakings.

Subcontractor – means a contractor employed by the main contractor to undertake specificwork within the building project; also known as specialist, works, trade, work package, and labouronly contractors.

Time-related charge – is for work, the cost of which is to be considered dependent onduration.

Undefined provisional sum – means a sum provided for work that is not completely designed,but for which the information required for a defined provisional sum cannot be provided.

Work breakdown structure (WBS) – in the context of bill of quantities, is used to sub-dividea building project into meaningful elements or work packages.

Work package contractor – a specialist contractor who undertakes particular identifiableaspects of work within the building project; e.g. ground works, cladding, mechanical engineeringservices, electrical engineering services, lifts, soft landscape works or labour only. Depending on thecontract strategy, works contractors can be employed directly by the employer or by the maincontractor.

Work package contract preliminaries – are preliminaries that relate specifically to the workthat is to be carried out by a work package contractor.

PART 1: GENERAL

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 13

Page 21: RICS new rules of measurement 2
Page 22: RICS new rules of measurement 2

Part 2: Rules for detailedmeasurement of building works

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 15

Page 23: RICS new rules of measurement 2
Page 24: RICS new rules of measurement 2

Part 2: Rules for detailedmeasurement of building works2.1 Introduction

2.1.1 Part 2 of the rules describes the purpose and uses of NRM 2: Detailed measurement for buildingworks; describes the types of bill of quantities (BQ); gives guidance on the preparation andcomposition of BQ; and defines the information required to enable a BQ to be prepared. Part 2also sets out the rules of measurement of building items, and the rules for dealing withpreliminaries, non-measurable works, and contractor designed works, as well as risks, overheadsand profit, and credits.

2.1.2 In addition, Part 2 of the rules deals with other aspects of BQ production, including pricefluctuations, director’s adjustments, daywork and value added tax. Guidance is also provided on thecodification of BQ, the use of BQ for cost control and cost management, and the analysis of a BQto provide cost data.

2.2 Purpose of bill of quantities

2.2.1 The primary purposes of a bill of quantities (BQ), which becomes a contract document, are:

+ to provide a co-ordinated list of items, together with their identifying descriptions andquantities, that comprise the works to enable contractors to prepare tenders efficiently andaccurately; and

+ when a contract has been entered into, to:

– provide a basis for the valuation of work executed for the purpose of making interimpayments to the contractor; and.

– provide a basis for the valuation of varied work.

2.2.2 Essentially, a BQ is a list of the items with detailed identifying descriptions and quantities, whichmake up the component parts of a building.

2.3 Benefits of bill of quantities

2.3.1 Irrespective of what contract strategy is used, at some stage in the procurement process one partywill need to quantify the extent of works to be executed; whether it be the employer’s quantitysurveyor/cost manager, the main contractor or the work package contractors for the purpose ofobtaining a price for completing building works, valuing the extent of work complete for purposesof payment, valuing variations in the content or extent of building works, or to support applicationsfor tax or other financial incentives. Consequently, detailed measurement for the purpose of bill ofquantities (BQ) production is beneficial for a number of reasons:

+ it saves the cost and time of several contractors measuring the same design in order tocalculate their bids for competition;

+ it provides a consistent basis for obtaining competitive bids;

+ it provides an extensive and clear statement of the work to be executed;

+ it provides a very strong basis for budgetary control and accurate cost reporting of thecontract (i.e. post contract cost control), including:

– the preparation of cash flow forecasts,

– a basis for valuing variations, and

– a basis for the preparation of progress payments (i.e. interim payments);

+ it allows, when BQ items are codified, reconciliation and any necessary transfers andadjustments to be made to the cost plan;

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 17

Page 25: RICS new rules of measurement 2

+ when priced, it provides data to support claims for tax benefits (e.g. capital allowances andvalue added tax (VAT));

+ when priced, it provides data to support claims for grants; and

+ it provides one of the best sources of real-time cost data, which can be used for estimating thecost of future building projects (i.e. historic cost information (see 2.17)) as it provides a costmodel in a single document.

2.4 Types of bill of quantities

2.4.1 The use of bill of quantities in support of a contract is the traditional and proven means of securinga lump-sum price for undertaking building works. Bill of quantities (BQ) can be:

+ firm (to obtain a lump-sum price for a fully designed building project); or

+ approximate (subject to remeasurement as built).

2.4.2 Firm bill of quantities:

2.4.2.1 The reliability of the tender price will increase in relation to the accuracy of the quantitiesprovided (i.e. the more precisely the work is measured and described). In theory, were there nodesign changes, then a firm BQ would provide a price at tender stage, which would equal the finalcost. In practice there will be changes, and the BQ provides a good basis for cost control, since thedirect cost of change can be assessed with reference to the BQ rates.

2.4.2.2 The firmer the BQ the better it is as a means of financial control.

2.4.3 Approximate bill of quantities:

2.4.3.1 Approximate BQ are used when there is insufficient detail to prepare firm BQ or where it isdecided by the employer that the time or cost of a firm BQ is not warranted. Such contracts donot provide a lump-sum price, but rather tender price totals (i.e. a quantified schedule of rates),since the quantities are subject to re-measurement on completion by the quantity surveyor/costmanager. These contracts are usually subject to greater variation than lump sum contracts andtherefore should only be used where time is a limiting factor or where there is great uncertainty inrespect of certain elements, such as major excavation and earthworks.

2.4.3.2 The initial resource cost of an approximate BQ is likely to be lower than for a firm BQ, but theneed for re-measurement invariably results in an overall higher resource cost.

2.4.3.3 Although the quantities are approximate, the descriptions of work items should be correct.

2.5 Preparation of bill of quantities

2.5.1 Bill of quantities (BQ) are produced at ‘RIBA Work Stage G (Tender Documentation)’ or as anintrinsic part of ‘OGC Gateway 3C (Investment Decision)’.The requirements of RIBA Work StageG, as described in the RIBA Outline Plan of Work, are as follows:

Preparation and/or collation of tender documentation in sufficient detail to enable a tender ortenders to be obtained for the project.

2.5.2 To enable the preparation of BQ, the information resulting from RIBA Work Stages E (TechnicalDesign) and F (Production Information) will be required.The requirements of RIBA Work Stages Eand F, as described in the RIBA Outline Plan of Work, are as follows:

Preparation of technical design(s) and specifications, sufficient to co-ordinate components andelements of the project and information for statutory standards and construction safety.

F1 Preparation of production information in sufficient detail to enable a tender or tenders to beobtained.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

18 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 26: RICS new rules of measurement 2

F2 Application for statutory approvals. Preparation of further information for construction requiredunder the building contract.

Project stages from the RIBA Outline Plan of Work 2007 (Amended November 2008), copyrightRoyal Institute of British Architects, are reproduced here with the permission of the RIBA.

2.5.3 The processes defined by RIBA Work Stages E (Technical Design), F (Production Information) andG (Tender Documentation) are commensurate with the processes required to meet therequirements of OGC Gateway 3C (Investment Decision).

2.5.4 The information and documents required for the preparation of BQ are described in paragraph2.14 of these rules.

2.5.5 BQ required for a lump sum contract based on firm or approximate quantities will normally beprepared by the employer’s quantity surveyor/cost manager, whereas under a design and buildcontract, the employer’s project team will prepare the ‘employer’s requirements’ and the BQ orquantified schedules of work will be prepared by either the main contractor or, more likely, themain contractor’s work package contractors.The choice of who quantifies building works is solelydown to the employer’s preference of contract strategy (see Figure 2.1 below).

Figure 2.1: Responsibility for quantifying building works

Contract strategy Basis of ‘InvitationDocuments’

Preparation by

Traditional lump sum (a) Firm BQ- - - - - - - - - - - - - - - - - - -

Employer’s quantity surveyor/cost manager.

(b) Approximate BQ

Design and build Employer’sRequirements

Employer’s project team (with compilation normally by theemployer’s quantity surveyor/cost manager).Note:Quantification of the Employer’s Requirements will becarried out by either the main contractor or work packagecontractors; who will prepare firm or approximate BQ, orquantified schedules of work as appropriate.

Management (a) Firm BQ- - - - - - - - - - - - - - - - - - -

Employer’s quantity surveyor/cost manager (ormain contractor or work package contractors if‘Invitation Documents’ prepared by employer’squantity surveyor/cost manager or maincontractor, respectively, are based on either‘specification and drawings’ or ‘un-quantifiedschedule of works’ (i.e. un-quantified information).

(b) Approximate BQ

Management (design andmanage)

(a) Firm BQ- - - - - - - - - - - - - - - - - - -

(b) Approximate BQ

Construction management (a) Firm BQ- - - - - - - - - - - - - - - - - - -(b) Approximate BQ

2.5.6 Guidance on the preparation of a bill of quantities (BQ) is given in Appendix A of these rules.

2.6 Composition of a bill of quantities

2.6.1 Bill of quantities (BQ) usually comprise the following sections:

+ Form of Tender (including certificate of bona fide tender);

+ Summary (or Main Summary);

+ Preliminaries, comprising two sections as follows:

– Information and requirements; and

– Pricing schedule;

+ Measured work (incorporating contractor designed works);

+ Risks;

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 19

Page 27: RICS new rules of measurement 2

+ Provisional sums;

+ Credits (for materials arising from the works);

+ Dayworks (Provisional); and

+ Annexes.

2.6.2 Form of tender:

2.6.2.1 This is a document that is used to record the main contractor’s price for completing the buildingproject (i.e. his tender price). If accepted by the employer, the tender price will become the‘contract sum’.The form of tender can be a separate document.

2.6.2.2 A separate ‘certificate of bona fide tender’, which is completed by the main contractor to confirmthat he has not communicated his tender to other parties, is sometimes inserted after the form oftender. Alternatively, the employer’s requirements for confirming that bona fide tender has beensubmitted by the main contractor can be incorporated in the form of tender.

2.6.3 Summary (or main summary):

2.6.3.1 The summary, sometimes called the main summary, is made at either the front or end of the bill ofquantities and comprises a list of the bill that form the entire bill of quantities.The total price foreach section of the bill of quantities (BQ) is carried forwarded and inserted against the applicableitem listed in the summary. For example, a summary for an elemental bill will address all or someof the following:

+ Preliminaries;

+ Measured works (including ‘Contractor Designed Works’:

– Facilitating works

– Substructure

– Superstructure

– Internal finishes

– Fittings, furnishings and equipment

– Services

– Complete buildings

– Works to existing buildings

– External works

+ Risks;

+ Provisional sums:

– Defined

– Undefined

+ Works to be carried out by statutory undertakers;

+ Overheads and profit;

+ Credits (for materials arising from the works);

+ Fixed price adjustment;

+ Director’s adjustment;

+ Dayworks (Provisional);

+ Total price (to Form of Tender).

2.6.3.2 Where the measured work has been divided into work sections, the work sections will be listedinstead of elements.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

20 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 28: RICS new rules of measurement 2

2.6.3.3 At the end of the summary, provision is made to total the list to ascertain the total price andtransfer the total to the form of tender, which, subject to verification and any necessaryadjustments, will become the contract sum referred to by the conditions of contract.

2.6.4 Preliminaries:

2.6.4.1 Preliminaries address and communicate to the contractor items that are not directly related to anycomponent, element, or work section (i.e. measured works).The information provided will enablethe contractor to ascertain his or her price for, among other things, management of the buildingproject, site establishment, security, safety, environmental protection and common user mechanicalplant, as well as the employer’s completion and post-completion requirements. Preliminaries aredivided into two sections as follows:

2.6.4.2 Information and requirements:

The purpose of the information and requirements section is to describe the building projectparticulars; the drawings upon which the bill of quantities was based; the work in general; the siteand any adjoining properties; the form of contract and any amendments and/or supplementaryconditions to the form of contract; the employer’s specific requirements; and any specificlimitations or restrictions that might impact on the sequence and/or method of working. It alsocontains information on how to interpret the bill of quantities, including any special methods ofmeasurement (i.e. where the method of measurement has deviated from NRM 2: Detailedmeasurement for building works).

2.6.4.3 Pricing schedule:

The pricing schedule is simply a schedule in which the contractor inserts preliminary costs relatingto the employer’s requirements, and all contractor cost items (including management and staff, siteaccommodation, services and facilities, mechanical plant, and temporary works items). Thequantification of preliminaries is dealt with in paragraph 2.7.

2.6.5 Measured work:

2.6.5.1 This is the main part of the bill of quantities, which lists all the items of work to be undertaken.Thequantities and descriptions of items should be determined in accordance with the tabulated rulesof measurement in Part 3 (Tabulated rules for the measurement of building works) of these rules.Various methods can be used to present the measured work (i.e. bill breakdown structures – seeparagraph A.1 at Appendix A: Guidance on the preparation of bill of quantities).

2.6.5.2 The rules relating to the quantification and description of measured work are given inparagraph 2.8.

2.6.6 Risks:

2.6.6.1 This section comprises a list of residual risks (i.e. unexpected expenditure arising from risks thatmaterialise, for example, disposal of contaminated ground material), which the employer wishes totransfer to the contractor.The contractor is required to provide a lump-sum fixed price for taking,managing and dealing with the consequences of the identified risk should it materialise.

2.6.6.2 The rules relating to the quantification and description of risk are given in paragraph 2.10.

2.6.7 Provisional sums:

2.6.7.1 Provisional sums are sums included for any items of work that are anticipated, but for which nofirm design has been developed, including any sums listed for any items of work that are to beexecuted by a statutory undertaker.

2.6.7.2 This part of the BQ, therefore, lists items of work that cannot be entirely foreseen or detailedaccurately at the time tenders are invited (i.e. non-measurable items). Pre-determined sums ofmoney are set against each item, determined by the quantity surveyor/cost manager, to cover theircost.

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 21

Page 29: RICS new rules of measurement 2

2.6.7.3 The rules relating to provisional sums are given in paragraph 2.9.1.

2.6.8 Credits (for materials arising from the works):

2.6.8.1 This section of the BQ comprises a list of materials arising from the works for which the employerrequires the contractor to offer a credit.

2.6.8.2 The rules relating to the quantification and description of credits are given in paragraph 2.12.

2.6.9 Dayworks (Provisional):

2.6.9.1 This section of the BQ gives provision for the contractor to competitively tender rates and pricesfor works, which might be instructed to be carried out on a daywork basis.

2.6.9.2 The rules relating to time-charged work carried out on the basis of daywork rates are given inparagraph 2.13.3 below.

2.6.10 Annexes:

The annexes comprise information referred to in the BQ where it is not contained in, or to beissued as, a separate document. Examples are: performance specifications (if not included in projectspecification); copies of quotations; and copies of communications with statutory undertakers.

2.7 Preliminaries

2.7.1 For the most part, preliminaries are the cost of administering a project and providing plant, sitestaff, facilities site-based services, and other items not included in the rates for measured works.

2.7.2 Preliminaries are divided into two categories:

(1) preliminaries (main contract)

(2) preliminaries (works package contract).

2.7.3 Preliminaries (main contract) are divided into two discrete sections:

(1) information and requirements; and

(2) pricing schedule.

2.7.3.1 Information and requirements:

This is the descriptive part of the preliminaries (main contract), which:

(1) sets out the project particulars (e.g. the project title, the site address and the names andcontact details of the employer and the employer’s project team);

(2) identifies the drawings upon which the bill of quantities was based;

(3) depicts the boundary of the construction site;

(4) provides information about existing buildings and existing mains services on or adjacent tothe site, and about any existing records that will inform the main contractor of any known orpotential hazards that need to be considered;

(5) identifies known constraints and restrictions that might impact on the main contractor’smethodology for constructing the building or buildings;

(6) describes the building project in general;

(7) specifies the standard form of contract, together with the contract particulars and anyamendments and/or supplementary or special conditions to the standard form of contract,which is to be entered into by the contracting parties; as well as the employer’s requirementsin respect of insurances, parent company guarantees, performance bonds and collateralwarranties;

(8) explains the documents provided, their content and how they are to be used;

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

22 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 30: RICS new rules of measurement 2

(9) confirms the method of measurement (i.e. NRM 2: Detailed measurement for building works),how to interpret the bill of quantities, and any special methods of measurement (i.e. wherethe method of measurement has deviated from the specified rules);

(10) sets out the employer’s specific requirements in respect of:

(a) management of the works by the main contractor, including progress reporting,programme management and cost reporting requirements;

(b) quality standards to be achieved, and quality control requirements, by the maincontractor, including inspection, testing and commissioning requirements;

(c) security, safety and protection measures to be provided by the main contractor;

(d) facilities, temporary works and services required by the employer;

(e) specific requirements such as advertising, the provision of a marketing suite or atopping out event;

(f) specific limitations on method, sequence, timing of the ‘works’ imposed by theemployer, including out of normal hours working and phasing requirements;

(g) operation and maintenance of the finished building, including operation andmaintenance (O&M) manuals, familiarisation training, tools, and spare parts; and

(h) post-completion requirements such as maintenance services.

Instructions to tendering contractors and other information relating to the tender process (e.g.information required to be submitted with tender submission, site visits, confidentiality, etc) formpart of the invitation documents, but will not form part of the contract documents. Therefore,these should be addressed in a separate document (e.g. Conditions of Tender).

The items to be considered when drafting the main contractor’s preliminaries are included in PartA of Table 1 (Preliminaries (main contract)) at Part 3:Tabulated rules for measurement.

2.7.3.2 Pricing schedule (quantification of main contractor’s preliminaries):

It is not possible for the quantity surveyor/cost manager to quantify the main contractor’spreliminaries.This is because it is for the contractor to interpret the information provided as partof the tender invitation documentation. From the information provided, the main contractor willascertain his method of working and the resources required to complete the building project, aswell as identify any other cost items that are to be recovered.

The preliminaries bill is therefore to include a pricing schedule that simply lists the headings underwhich the main contractor is to price his or her preliminaries items. Templates for preliminariespricing schedules (condensed and expanded versions) are included in Appendices B and C,respectively, of these rules.

The pricing schedule is a simple a list of cost centres incorporated in the bill of quantities in whichthe main contractor will insert his charges relating to preliminaries.

The pricing schedule for main contractors’ preliminaries is divided into two main cost centres:

(1) employer’s requirements; and

(2) main contractor’s cost items.

The items that comprise these two cost centres are listed and defined in Part B of Table 1(Preliminaries (main contract)) at Part 3:Tabulated rules for measurement of these rules.

Notwithstanding this, as part of the priced bill of quantities submitted by the main contractor, it isessential that the quantity surveyor/cost manager obtains a full and detailed breakdown that clearlyidentifies the items, shows how the price for each item has been calculated, and how the total pricefor preliminaries has been calculated.

Accordingly, as part of the conditions of tender, the quantity surveyor/cost manager should instructthe main contractor to return along with his or her tender a full and detailed breakdown thatshows how the main contractor’s total price for preliminaries has been calculated. It should berequested that the main contractor append this information to his priced bill of quantities. Toensure that the main contractor’s detailed supporting calculations are presented in an easy-to-read

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 23

Page 31: RICS new rules of measurement 2

and logical format, the main contractor should be instructed to ascertain the price for preliminariesin accordance with the rules of measurement for main contractor’s preliminaries (refer to Part B(Pricing schedule) of Table 1 (Preliminaries (main contract)) at Part 3: Tabulated rules formeasurement of these rules).

It is also essential that the quantity surveyor/cost manager makes it clear to the main contractor inthe preliminaries bill and/or preliminaries pricing schedule that costs relating to items that are notspecifically identified by the main contractor in his or her full and detailed breakdown will bedeemed to have no cost implications or have been included elsewhere within his or her rates andprices.

2.7.4 Preliminaries (works package contract):

2.7.4.1 Information:

The descriptive part of the work package contract preliminaries is prepared in the same way as themain contract preliminaries.The items to be considered when drafting the work package contractsare included in Part A of Table 1 (Preliminaries (works package contract) at Part 3:Tabulated rulesfor measurement of these rules.

2.7.4.2 Pricing schedule:

For the same reasons as for main contractor’s preliminaries, the preliminaries bill for a workspackage shall comprise a pricing schedule that lists the headings under which the work packagecontractor will insert his charges relating to preliminaries items. It is a simple schedule comprisinga list of cost centres.

The pricing schedule for work package contract preliminaries is divided into two main costcentres:

(1) employer’s requirements; and

(2) work package contractor’s cost items.

The items that comprise these two cost centres are listed and defined in Part B of Table 1(Preliminaries (works package contract)) at Part 3:Tabulated rules for measurement of these rules.

Again, as part of the priced bill of quantities submitted by the work package contractor, it isessential that the work package contractor is instructed to provide a full and detailed breakdownthat clearly identifies the items, shows how the price for each item has been calculated, and howthe total price for preliminaries has been calculated.

2.8 Measurement rules for building worksThe rules for measuring and describing building items/components are set out in the tabulatedrules of measurement rules for building works at Part 3 (Tabulated rules of measurement forbuilding works) of these rules.

2.9 Non-measurable works

2.9.1 Provisional sums:

2.9.1.1 Where building components/items cannot be measured and described in accordance with thetabulated rules of measurement they shall be given as a ‘provisional sum’ and identified as either‘defined work’ or ‘undefined work’ as appropriate.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

24 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 32: RICS new rules of measurement 2

2.9.1.2 A provisional sum for defined work is a sum provided for work that is not completely designed butfor which the following information shall be provided:

(1) the nature and construction of the work;

(2) a statement of how and where the work is fixed to the building and what other work is to befixed thereto;

(3) a quantity or quantities which indicate the scope and extent of the work; and

(4) any specific limitations identified.

2.9.1.3 Where provisional sums are given for defined work, the contractor will be deemed to have madedue allowance in his or her programming, planning and pricing preliminaries.

2.9.1.4 Where any aspect of the information required by paragraph 2.9.1.2 above cannot be given, workshall be described as an ‘undefined’ provisional sum. Where provisional sums are given forundefined work, the contractor will be deemed not to have made any allowance in programming,planning and pricing preliminaries.

2.9.1.5 Any provisional sum given for defined work that does not comprise the information requiredunder 2.9.1.2 above shall be construed as a provisional sum for undefined work; irrespective that itwas given in the BQ as a provisional sum for defined work.

2.9.1.6 Provisional sums shall be exclusive of overheads and profit. Separate provision is to be made in theBQ for overheads and profit (refer to paragraph 2.11).

2.9.2 Contractor designed works:

2.9.2.1 Contractor designed works include any works that require the contractor to undertake its design,whether directly or via a subcontractor.The employer shall be deemed responsible for works notclearly identified as contractor designed works.

2.9.2.2 Contractor designed work is sometimes referred to as the ‘Contractor Designed Portion (CDP)’.

2.9.2.3 Where the contractor is required to take responsibility for the design of discrete parts of thebuilding, such as piled foundations, windows, pre-cast concrete components, roof trusses and/ormechanical and electrical engineering services, the work items shall be identified as ‘contractordesigned works’.

2.9.2.4 The method of quantifying contractor designed work is dependent on the nature of the work.

2.9.2.5 Where contractor designed works can be measured and described in accordance with thetabulated rules of measurement (e.g. windows and pre-cast concrete components), theperformance objectives or criteria that the contractor will be required to meet are to be clearlydefined by way of a preamble to the work items that comprise the contractor designed works.Detailed documents defining the performance objectives and/or criteria to be met are to beincorporated as an annex to the bill of quantities (BQ) and clearly cross-referenced in thepreamble.

2.9.2.6 Where contractor designed works comprise a complete element or works package (e.g. the entiremechanical and electrical engineering services for the building), the works are to be measured anddescribed as one or more item. The number of items is at the discretion of the quantitysurveyor/cost manager but must be sufficient to provide an analysis of the price of the contractordesigned works. In the case of elemental BQ, the basis of analysis will be the elements defined inNRM 1: Order of cost estimating and cost planning for capital building works (see Figure 2.2).Irrespective of the structure of the analysis, it is essential that the quantity surveyor/cost managerobtains a full and detailed breakdown that clearly shows how the contractor has calculated hisprice for each item in the analysis.

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 25

Page 33: RICS new rules of measurement 2

Figure 2.2: Price analysis for contractor designed works (based on group element 5(Services) of the RICS new rules of measurement: Order of cost estimating and costplanning for capital building works (NRM 1))

5.1 Sanitary installations £236,000.00

5.2 Services equipment £199,500.00

5.3 Disposal installations £99,000.00

5.4 Water installations £142,000.00

5.5 Heat source £88,000.00

5.6 Space heating and air conditioning £396,000.00

5.7 Ventilation £345,500.00

5.8 Electrical installations £458,000.00

5.9 Fuel installations £163,000.00

5.10 Lift and conveyor installations £689,000.00

5.11 Fire and lightning protection £222,300.00

5.12 Communication, security and control systems £181,500.00

5.13 Specialist installations £148,600.00

5.14 Builder’s work in connection with services £59,600.00

Total (carried to main summary): 3,428,000.00

2.9.2.7 The quantity surveyor/cost manager is to obtain details of performance objectives and/or criteriafrom the relevant design consultant (refer to paragraph 2.14.3.2(2) below).

2.9.2.8 In addition to all costs referred to in paragraph 3.3.3.13 (in Part 3:Tabulated rules of measurementfor building works) of these rules, contractor designed works shall be deemed to include all costsin connection with design, design management, and design and construction risks in connectionwith contractor designed works. Moreover, the contractor will be deemed to have made dueallowance in his programming and planning for all design works in connection with contractordesigned works.

2.9.3 Risks:

The method of dealing with the employer’s residual risks when preparing bill of quantities (BQ) isaddressed in paragraph 2.10.

2.9.4 Works to be carried out by statutory undertakers

2.9.4.1 Works that are required to be carried out by a statutory undertaker are to be given as a‘provisional sum’, with the scope of works to be executed by the statutory undertaker described.

2.9.4.2 The contractor is to be deemed to have made due allowance in his programming, planning andpricing preliminaries for all general attendance on statutory undertakers.

2.9.4.3 Provisional sums for work to be carried out by statutory undertakers are to be exclusive ofoverheads and profit. Separate provision shall be made in the BQ for overheads and profit (refer toparagraph 2.11 for further information).

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

26 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 34: RICS new rules of measurement 2

2.10 Risks

2.10.1 Risks generally:

2.10.1.1 Every building project involves risks and the proper management of risk saves time and money.Risks can occur at any point of a building project and it is essential that they are identified,assessed, monitored and controlled appropriately and effectively.

2.10.1.2 At the time of preparing a bill of quantities, a quantified schedule of works, or other quantity-baseddocuments, whether for a complete building project or discrete works package, there will still be anumber of risks remaining to be managed by the employer and his or her project team – this iscalled the employer’s residual risk exposure (or residual risks). A risk response should only bedecided after its possible causes and effects have been considered and fully understood. It will takethe form of one or more of the following:

+ risk transfer to the contractor;

+ risk sharing by both employer and contractor; or

+ risk retention by the employer.

2.10.1.3 Risks that can be designed out or avoided should have been addressed by this stage of the designdevelopment process. However, if time does not permit these risks to be designed out or properlydealt with, they will need to be dealt with using one of the above risk response strategies.

2.10.2 Risk transfer to the contractor:

2.10.2.1 The object of transferring risk is to pass the responsibility to another party able to control itbetter. If the risk materialises, the consequences are carried by the other party.

2.10.2.2 Whenever a risk is transferred there is usually a premium to be paid (effectively the contractor’svaluation of the cost of the risk). Risk transfer will usually give the employer price/cost certainty forthat aspect of the works. However, in return for price/cost certainty, the employer is required topay the risk premium to the contractor, irrespective of whether the risk transferred does or doesnot materialise.

2.10.2.3 Risks that the contractor is required to manage, should they materialise, are to be fully describedso that it is transparent what risk the contractor is required to manage, and what the extent ofservices and/or works the employer is paying for. Risks to be transferred to the contractor are tobe listed in the BQ under the heading ‘schedule of construction risks’.A template for a ‘schedule ofconstruction risks’ is in Appendix F of these rules.

2.10.2.4 The contractor will be deemed to have made due allowance in his risk allowances forprogramming, planning and pricing preliminaries.

2.10.2.5 Risk allowances inserted by the contractor shall be exclusive of overheads and profit. Separateprovision should be made in the BQ for overheads and profit (refer to paragraph 2.11 for furtherinformation).

2.10.3 Risk sharing by both employer and contractor:

2.10.3.1 Risk sharing occurs when a risk is not entirely transferred and some elements of it are retained bythe employer. It is important that both the employer and the contractor know the value of theportion of the risk for which they are responsible.The objective should be to improve control andto reduce or limit the cost of the risk to the employer, should it materialise.

2.10.3.2 The method of dealing with risks that are to be shared by both employer and contractor willnormally be dealt with using ‘provisional quantities’ with the pricing risk being taken by thecontractor and the quantification risk being taken by the employer.

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 27

Page 35: RICS new rules of measurement 2

2.10.4 Risk retention by the employer:

2.10.4.1 Where risks are to be retained by the employer, the applicable risk allowances included in the costplan will be retained and managed by the employer or, if empowered by the employer, the projectteam.

2.10.4.2 Before deciding to retain a particular risk, the employer might wish to find out what the premiumwill be if the contractor were to be paid for resolving the risk should it materialise. The employercan then decide whether or not to pay a premium for a defined scope of work. If the employer iscontent to pay a premium for transferring the risk, it is dealt with as a risk transfer in accordancewith paragraph 2.10.2 above.

2.10.4.3 Risks retained by an employer are not necessarily controllable.

2.11 Overheads and profit

2.11.1 Provision shall be made in the bill of quantities (BQ) for the contractor to apply their requiredpercentage addition for overheads and profit on the following:

(1) preliminaries;

(2) measured work, including contractor designed works;

(3) risk allowances;

(4) work resulting from the expenditure of provisional sums (i.e. defined provisional sums,undefined provisional sums and works to be undertaken by statutory undertakers).

2.11.2 When required, overheads and profit can be treated as two separate cost items; namely,‘overheads’and ‘profit’.

2.12 Credits

2.12.1 Credits are normally only applicable where the building project comprises the refurbishment orrehabilitation of an existing building, or demolition works. Provision for such provides the employeran opportunity to seek credits for old building materials; components and items; mechanical andelectrical plant; and fittings, furnishings and equipment which arise from the stripping out ordemolition works and for which the employer is content to pass ownership to the contractor forreuse.

2.12.2 Credits can be based on a pre-prepared list of items, which is incorporated in the BQ and thecontractor invited to insert the amount of credit he will give for each item. Alternatively, thecontractor can be invited to list items for which he is willing to offer a credit and the amount ofcredit he will give for each item.

2.12.3 A template for ‘credits’ is provided in Appendix F of these rules.

2.13 Other considerations

2.13.1 Price fluctuations:

2.13.1.1 The cost to the contractor of labour and materials etc. used in the works will alter during thecontract period (i.e. they will be subject to price fluctuations). It might fall but, more usually, it willrise.The risk of fluctuating prices can be dealt with as follows:

(1) contractor to price the risk (a fixed or firm price contract); or

(2) allow provision for contractor to recover full or limited fluctuations on certain prices (afluctuating price contract).

2.13.1.2 Most standard forms of contract conditions allow for either alternative to be used by providingclauses which may be included or deleted.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

28 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 36: RICS new rules of measurement 2

(1) Fixed price contracts:

These are contracts in which the price of labour, materials and plant is not subject tofluctuations. Fixed price contracts are sometimes referred to as ‘fixed price lump sumcontracts’, ‘firm price contracts’, or ‘firm price lump sum contracts’.

In the absence of any provision in the contract, or where the provision for recovering of pricefluctuations has been deleted, the contractor will be required to take the risk (i.e. price therisk) of price fluctuations during the contract period. In order to cover himself, thecontractor will make an estimate of the likely increase in costs and include this in his tenderprice.

Where there is no provision for recovering of price fluctuations, separate provision is to beincorporated in the bill of quantities for the contractor to tender his fixed price adjustmentfor pricing the risk. Such provision is to be referred to as either the ‘main contractor’s fixedprice adjustment’ or the ‘work package contractor’s fixed price adjustment’, whichever isapplicable.

When preparing bill of quantities, the quantity surveyor/cost manager shall ensure that nocontract conditions relating to the recovery of price fluctuations exist.

(2) Fluctuating price contracts:

These are contracts in which adjustment is allowed for fluctuations in the prices of labourand materials etc. Various degrees of fluctuations are allowed under the provisions ofstandard contract conditions. The extent to which fluctuations are allowed will have asignificant effect upon the contractor’s tender price.

Where fluctuations are to be allowed, no provision for ‘main contractor’s fixed price adjustment’ orthe ‘work package contractor’s fixed price adjustment’ is required.

2.13.2 Director’s adjustment:

2.13.2.1 Separate provision is to be incorporated in the bill of quantities for the contractor to insert a‘director’s adjustment’.

2.13.2.2 It is the responsibility of the contractor’s directors, or other senior managers, to secure work forthe company.Therefore, before submitting a tender price, the contractor’s directors will undertakea commercial review of the project and the estimated price. This review might result in thecontractor’s directors requiring adjustment to the estimated price, referred to as a ‘director’sadjustment’. The director’s adjustment will include adjustments for commercial matters such asfinancing charges, cash flow, opportunities and competition.This is a sum added to or omitted fromthe estimated price to arrive at a tender price.

2.13.3 Dayworks (provisional):

2.13.3.1 Daywork is a method of valuing work on the basis of time spent by the contractor’s employees, thematerials used and the plant employed.

2.13.3.2 If required, a schedule of dayworks is to be incorporated in the bill of quantities (BQ).The scheduleof dayworks is to comprise a list of the various classifications of labour, estimates of the number ofhours against each classification of labour, and estimated lump sums for materials and plant, forwhich daywork rates and percentage additions for overheads and profit are to be inserted by thecontractor. A statement of the conditions under which the contractor will be paid for workexecuted on a daywork basis is to be given in either the preliminaries bill or schedule of dayworks.

2.13.3.3 The method of calculating labour time charge rates for work carried out in normal working hours(i.e. productive time) and work carried out outside of normal working hours (i.e. non-productivetime) shall be defined in the schedule of dayworks.The definition of normal working hours shall begiven in either the preliminaries bill or schedule of dayworks.

2.13.3.4 The total amount included for daywork by the contractor shall be omitted from the contract sum.The rates and percentage additions included in the BQ shall be used to calculate the price of extraworks instructed, which are authorised to be valued on a daywork basis.

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 29

Page 37: RICS new rules of measurement 2

Note:The total price derived from the schedule of dayworks can be included within or excludedfrom the contract sum.When included, it is to be treated as a provisional sum.When excluded, itshall be clearly stated that the rates, prices and percentage adjustments tendered are included inthe contract.

2.13.4 Value Added Tax (VAT):

Value added tax (VAT) shall be excluded from bill of quantities (BQ). Notwithstanding this, ifrequired by the employer, provision for the contractor to provide a VAT assessment as part of histender return can be incorporated in the form of tender.

2.14 Information requirements for measurement

2.14.1 The accuracy of bill of quantities (BQ) is dependent on the quality of the information supplied tothe quantity surveyor/cost manager by the employer, designers and other project team members;the more information provided, the more reliable the outcome will be. Where little or noinformation is provided, the quantity surveyor/cost manager will need to seek decisions from theemployer as to how the uncertainty is to be managed and procured (refer to paragraph 2.11).

2.14.2 To enable the quantity surveyor/cost manager to prepare a BQ, the information in paragraphs2.14.3 to 2.14.6 inclusive (below) will be required.

2.14.3 Specification:

2.14.3.1 A specification defines what the employer wishes to buy and, consequently, what the contractor isexpected to supply.

2.14.3.2 The two main types of specification used are:

+ Prescriptive specifications

+ Performance specifications.

(1) Prescriptive specifications:

This form of specification is required to enable a firm bill of quantities to be prepared.Thefunction of a prescriptive specification is to prescribe the materials and workmanshiprequired for a building project in as much detail as possible. Specific products and materialswill be named, and the assembly of the building will be described and supported with drawninformation and schedules (see paragraphs 2.14.4 and 2.14.5 below).Where materials are notnamed, reference will be made to published standards governing their composition (e.g.British standards or other country specific standards).

Where a prescriptive specification is used, the contractor will not carry any designresponsibility.

(2) Performance specifications:

A performance specification describes the requirements of a product (e.g. windows),equipment (e.g. chiller plant), system or installation (e.g. mechanical and electricalinstallations) in terms of the performance objectives or criteria.

The main difference between a performance specification and a prescriptive specification isrelated to design responsibility. With a performance specification, the contractor isresponsible for design development of the specification to meet the performancerequirements.

The benefit to the employer is that design will not need to be advanced forperformance-specified work before inviting tenders from contractors.

It should be noted that some standard forms of contract conditions do not include provisionfor contractor designed work. Therefore, care should be taken to ensure that the contractconditions used for the building project clearly transfer design responsibility for contractordesigned work to the contractor (e.g. by incorporating supplementary contract conditions orother amendment to the standard forms of contract conditions used). Failure to do this willresult in design responsibility remaining with the employer, even though the employer did notundertake the design.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

30 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 38: RICS new rules of measurement 2

Usually, the quantity surveyor/cost manager will be faced with a combination of both types ofspecification, which needs to be organised in the BQ (i.e. separated into measured works andnon-measured works).

Insufficient or poorly described information can mislead contractors, resulting in contractvariations and potential time-related and/or cost-related claims.

2.14.4 Drawn information:

2.14.4.1 Drawn information is required to describe the assembly of the building, as well as any temporaryworks. Drawings shall be to a suitable scale.

2.14.4.2 Required drawn information shall include:

+ General arrangement (GA) drawings, comprising:

– a block plan: this shall identify the site and locates the outlines of the building works inrelation to the town plan or other wider context;

– a site plan: this shall locate the position of the building works in relation to the settingout points, the means of access and the general layout of the site; and

– plans, sections and elevations: these shall show the position occupied by the variousspaces in a building and the general construction and location of the principal elementsand components.The extent of elevations and sections shall be as appropriate to coverall major building zones.

General arrangement drawings are sometimes called ‘location’ drawings.

+ Component drawings: these shall show the information necessary for manufacture and assemblyof a component; including key details/interfaces (e.g. interface between curtain walling systemand structure, balconies and the like).

Component drawings are sometimes called ‘detail’ or ‘assembly’ drawings.

+ Schematic drawings: these show how something works and the relation between the parts (e.g.the wiring of an electrical system).

+ Record drawings: these are a set of drawings that depict the actual as-built conditions of anexisting building or structure, including mechanical and electrical engineering services installed.These are required for building projects involving the refurbishment or the demolition (partialor complete) of an existing building or structure.

Record drawings are sometimes called ‘existing’, ‘as-built’ or ‘as-installed’ drawings.

2.14.4.3 Specific requirements for drawn information are further defined in the tabulated rules ofmeasurement in Part 3 of these rules.

2.14.5 Schedules:

2.14.5.1 Schedules which provide the information required by the tabulated rules shall be deemed to bedrawings. Schedules include:

+ Room data sheets (including co-ordinated mechanical and electrical services engineering datasheets);

+ Door schedules, including ironmongery;

+ Window schedules, including ironmongery;

+ Reinforcement (bar bending) schedules

+ Landscaping and planting schedule (for internal and external works);

+ Drainage schedules;

+ Fittings, furnishings and equipment schedules;

+ Luminaires schedules;

+ Control schedules for mechanical and electrical engineering services;

+ Primary mechanical and electrical plant and equipment schedules;

+ Duties, outputs and sizes of primary mechanical and electrical plant and equipment;

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 31

Page 39: RICS new rules of measurement 2

+ Builder’s work in connection with mechanical and electrical engineering services;

+ Other scheduled information necessary to specify the works.

The above list is not meant to be definitive or exhaustive, but simply a guide.

2.14.6 Reports and other information:

Reports and/or other information required for the preparation of bill of quantities (BQ) will bedependent on the nature of the building project. However, such documents normally include someor all of the following:

+ drawings showing the site boundary and all known site constraints and restrictions, includingthe means of access, restrictive covenants, party walls, rights of light issues, and rights of access;

+ a statement of, and drawing(s) detailing, phasing requirements;

+ a statement of, and drawing(s) detailing, construction sequencing requirements;

+ details of residual design development and construction risks (i.e. risk register or risk log);

+ a schedule of gross external areas (GEA), gross internal floor areas (GIFA), net internal areas(NIA – i.e. usable area for shops, supermarkets and offices) and site area (SA).

+ site survey reports, including archaeological survey, ecological survey, invasive plant growthsurvey, etc.;

+ details of wildlife, including protected species, protection measures;

+ geotechnical and report(s) describing the intrusive ground and groundwater investigationscompleted, together with the results (e.g. the results of trial pits, auger holes, windowsamplers, boreholes, cone penetration tests (CPTs), and standard penetration tests (SPTs));

+ environmental report(s) describing the sampling and analysis of soils, together with the results,giving information about the soil, ground water, and gases;

+ details of any other facilitating works (e.g. soil stabilisation measures);

+ remediation plan describing the method of dealing with contaminated materials and/or invasiveplant growth (e.g. Japanese knotweed and giant hogweed), including requirements forpost-remediation validation sampling;

+ refurbishment and demolition survey reports, providing details of any asbestos containingmaterials (ACMs) and/or other hazardous materials, together with the scope of removal orencapsulation works required to be undertaken as part of the building works;

+ details of any other facilitating works (e.g. soil stabilisation measures);

+ details of any party wall awards or other agreements with adjoining owners and statutoryundertakers, specifically detailing any requirements of the award to which the contractorshould comply to ensure that the employer does not breach any agreement;

+ temporary works methodology, drawings and sketches;

+ details of which condition of contract is to be used for the building project;

+ details of any planning conditions or informatives that the contractor is required to complywith;

+ the employer’s requirements in respect of insurances;

+ the employer’s requirements for the contractor to collect and report cost data to supportclaims for capital allowances, grants, value added tax (VAT) recovery, and other tax incentives;

+ the employer’s policy documents, which the contractor will be required to comply with (e.g.site rules and regulations, environmental, corporate social responsibilities, and health and safetypolicies);

+ hoarding requirements, including design where this is an employer’s requirement;

+ details of the employer’s post completion requirements (e.g. operation and maintenance ofcompleted building (i.e. works and services)); and

+ all other information necessary to construct the preliminaries bill for the building project orwork package (refer to Work Section 1 (Preliminaries) at Part 3 (Tabulated rules ofmeasurement for building works) of these rules).

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

32 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 40: RICS new rules of measurement 2

The above list is not meant to be definitive or exhaustive, but merely a guide. It is intended to beused by the quantity surveyor/cost manager to assist in identifying the types of reports and otherinformation required to prepare a robust BQ.

2.15 Codification of bill of quantities

2.15.1 Planning the bill of quantities breakdown structures:

2.15.1.1 Before attempting to prepare a bill of quantities (BQ) for a building project, the composition of thebuilding project needs to be determined and the structure of the BQ planned.The composition ofa BQ can be viewed as a work breakdown structure (WBS).This is a tree structure which can beused to define and divide a building project into key facets. It is developed by starting with the endobjective (i.e. WBS Level 0 – the entire building project) and successively subdividing it into themain components and sub-components that make up the entire building project – providing ahierarchical breakdown. What is more, a WBS initiates the development of the cost breakdownstructure (CBS), which can be used to allocate costs to every facet of the building project at eachlevel of the WBS. Together, the WBS and CBS provide a frame of reference for the costmanagement of a building project during the construction phase (i.e. post contract). In the contextof BQ, the WBS is referred to as BQ breakdown structure (BQBS).

2.15.1.2 There are three principal breakdown structures for BQ.They are:

(1) Elemental:

Measurement and description is done by group elements; following the logic arrangement forelemental cost planning defined in NRM 1: Order of cost estimating and cost planning for capitalbuilding works. Each group element forms a separate section of the BQ, irrespective of theorder of work sections in NRM 2: Detailed measurement for building works. Group elements aresub-divided through the use of elements, which are further sub-divided by sub-elements.

(2) Work section:

Measurement and description is divided into the work sections defined in NRM 2: Detailedmeasurement for building works (refer to the tabulated rules in Part 3 of these rules).

(3) Work package:

Measurement and description is divided into employer or contractor defined work packages.Works packages can be based on either a specific-trade package or a single packagecomprising a number of different trades.

2.15.1.3 Amplification of these three principal BQ breakdown structures is given in paragraph A.1 (Bill ofquantities breakdown structures) at Appendix A (Guidance on the preparation of bill of quantities)of these rules.

2.15.2 Codification of bill of quantities:

2.15.2.1 The work breakdown structure (WBS) for the building project will have been initiated by thequantity surveyor/cost manager when preparing the initial order of cost estimates and developedduring the formal cost planning stages (i.e. the cost plan breakdown structure). As part of thisprocess, the cost breakdown structure (CBS) will have evolved. The key benefit of the cost planbreakdown structure is the ability to uniquely identify by a code all group elements, elements, sub-elements, and components (i.e. building components/items) in a numerical and logical manner –providing a codification framework for the cost management, control and reporting of costs.Witha unique code, all building components/items can be linked to components, components tosub-elements, sub-elements to elements, elements to group elements, and group elements to thecost limit (i.e. the total estimated cost of the building project). This makes it easier to retrieve,manage and restructure information (i.e. costs and building components/items). Details of thecodification framework, including the numbering logic, advocated for cost planning can be found inNRM 1: Order of cost estimating and cost planning for capital building works.

2.15.2.2 For the quantity surveyor/cost manager to manage the cost plan during the procurement andconstruction phases of the building project (i.e. by reconciling tender prices and project outturn

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 33

Page 41: RICS new rules of measurement 2

costs against the cost plan), the codification framework used for cost planning must be used as thebasis for the codification of building components/items and components in the bill of quantities(BQ).

2.15.3 The coding system:

2.15.3.1 The coding system used for a bill of quantities (BQ) will be dependant on the BQ breakdownstructure used.That is:

+ Elemental breakdown structure;

+ Work sectional breakdown structure; or

+ Work package breakdown structure.

(1) Elemental breakdown structure

When preparing elemental BQ, the BQ breakdown structure is based on the group elementsdefined by NRM 1: Order of cost estimating and cost planning for capital building works (i.e.facilitating works; substructure; superstructure; internal finishes; fittings, furnishings andequipment; services; prefabricated buildings and building units, work to existing buildings, andexternal works).

The identification numbers used to formulate codes for cost planning are described in NRM1: Order of cost estimating and cost planning for capital building works. The coding systemadvocated by NRM 1 is numeric. However, both alpha and numeric codes can be used(letters and numbers). It is recommended that the same approach be used in codifyingbuilding components/items (i.e. components and sub-components) in bill of quantities (BQ).

For practical purposes five to six levels of code are considered sufficient in cost planning toachieve the desired level of pre-contract cost control of a building project. The mainidentification numbers levels are as follows:

+ Level 0: Project number – most building projects will be given a project number, together witha project title or name, to distinguish them from all other projects the company might beworking on.

+ Level 1: Cost plan number – where a building project comprises more than one building orfacet, a discrete cost plan will most likely be prepared for each building and key facet;culminating in a ‘summary cost plan’. Therefore, an identification number will be required todistinguish cost plans.This code will not be required for a single cost plan.

The identification numbers for Level 2, Level 3 and Level 4 are pre-defined by NRM 1: Costestimating and cost planning for building works.

+ Level 2: Group element – identification number pre-defined.

+ Level 3: Element – identification number pre-defined.

+ Level 4: Sub-element – identification number pre-defined.

+ Level 5: Component – user defined (building components/items).

Because building components/items are described and quantified in greater detail in BQ thanthose for cost planning, a user defined level 6 identification numbers will need to beintroduced for each sub-component of a component that is to be measured in accordancewith NRM 2: Detailed measurement for building works. The way in which a code can beexpanded to include a level 6 identification number for sub-components is shown in thefollowing example.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

34 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 42: RICS new rules of measurement 2

Figure 2.3: Example of resultant codes used for codifying components andsub-components in elemental bill of quantities

Level Description Item Identificationnumbers

Resultant codes

0 Project number DPB27

1 Bill number Bill no. 3 3

2 Group element/BQnumber

Substructure 1

3 Element Foundations 1

4 Sub-element Piled foundations 2

5 Component Pile cap 1

6 Sub-component Excavation 1 DPB27-3.1.1.2.1.1

6 Sub-component Disposal 2 DPB27-3.1.1.2.1.2

6 Sub-component Concrete 3 DPB27-3.1.1.2.1.3

6 Sub-component Reinforcement 4 DPB27-3.1.1.2.1.4

6 Sub-component Formwork 5 DPB27-3.1.1.2.1.5

Note: It might not be necessary to prefix the code for components and sub-components with theproject number throughout the BQ.

The resultant codes can be inserted in the right-hand column of the bill paper or in bracketsafter the bill description.

(2) Work sectional breakdown structure

Where a work sectional breakdown structure is used to construct the bill of quantities(BQ), the work sections will be those defined in the work sections in NRM 2: Detailedmeasurement for building works (refer to the tabulated rules in Part 3 of this document).However, for the purposes of cost management and cost control, it is essential that the worksectional breakdown structure can be easily reconciled with the original cost planbreakdown structure.

The method recommended by the rules involves the provision of a secondary code whichacts as a suffix to the primary code used for BQ based on an elemental breakdown structuredescribed in sub-paragraph a) above. Examples of suffix codes are illustrated in Figure 2.4below.

Figure 2.4: Example of suffix codes used for codifying work sections in worksectional BQ breakdown structure

Serial no. Work Section Suffix

1 Preliminaries (main contract) /01

1 Preliminaries (works package contract) /01

2 Off-site manufactured materials, components and buildings /02

3 Demolitions /03

4 Alterations, repairs and conservation /04

5 Excavating and filling /05

6 Ground remediation and soil stabilisation /06

7 Piling /07

8 Underpinning /08

9 Diaphragm walls and embedded retaining walls /09

10 Crib walls, gabions and reinforced earth /10

11 ‘In-situ’ concrete works /11

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 35

Page 43: RICS new rules of measurement 2

Serial no. Work Section Suffix

12 Precast/composite concrete /12

13 Precast concrete /13

14 Masonry /14

15 Structural metalwork /15

16 Carpentry /16

17 Sheet roof coverings /17

18 Tile and slate roof and wall coverings /18

19 Waterproofing /19

20 Proprietary linings and partitions /20

21 Cladding and covering /21

22 General joinery /20

23 Windows, screens and lights /21

24 Doors, shutters and hatches /20

25 Stairs, walkways and balustrades /21

26 Metalwork /20

27 Glazing /21

28 Floor, wall, ceiling and roof finishings /20

29 Decoration /21

30 Suspended ceilings /30

31 Insulation, fire stopping and fire protection /31

32 Furniture, fittings and equipment /32

33 Drainage above ground /33

34 Drainage below ground /34

35 Site works /35

36 Fencing /36

37 Soft landscaping /37

38 Mechanical services /38

39 Electrical services /39

40 Transportation /40

41 Builder’s work in connection with mechanical, electrical and transportationinstallations

/41

Notes:1 Both alpha and numeric codes can be used (letters and numbers).2 As with elemental BQ, it is not be necessary to prefix the code for components and

sub-components with the project number throughout the BQ.

Using the examples of sub-components given in Figure 2.3 above, the resulting codes for awork sectional breakdown structure will be:

• Excavation DPB27-3.1.1.2.1.1/04

• Disposal DPB27-3.1.1.2.1.2/04

• Concrete DPB27-3.1.1.2.1.3/04

• Reinforcement DPB27-3.1.1.2.1.4/04

• Formwork DPB27-3.1.1.2.1.5/04

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

36 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 44: RICS new rules of measurement 2

(3) Work package breakdown structure

Both NRM 1: Order of cost estimating and cost planning for capital building works and NRM 2:Detailed measurement for building works recognise that cost plans will need to be restructuredfrom elements to works packages for the purposes procurement. However, they make noattempt at standardising works packages. This is because the content of work packages islikely to be different from one building project to another – with the content of workpackages often based on the perception of risk to those ultimately liable for the constructionworks. For example, for one building contract it might be deemed appropriate to have allconcrete work carried out under by a single subcontractor. Whereas for another buildingcontract, because of the perceived risks associated with the drainage passing through theground floor construction, it is considered more appropriate to include the construction ofpile caps, ground beams, base slab and below ground drainage in the works package forgroundworks.

For that reason, the number and content of work packages need to be carefully planned bythe cost manager/quantity surveyor before commencing the preparation of the bill ofquantities. Once the work package breakdown structure has been established, the provisionof a secondary code which acts as a suffix to the primary code (i.e. that used for BQ basedon an elemental breakdown structure described in sub-paragraph (a) above) can be applied.

Figure 2.5 provides typical example of part of a work package breakdown structure, to whichsuffix codes have been applied. An example of a full work package breakdown structure isgiven at Appendix G of these rules.The example is not meant to be definitive or exhaustive,but simply for guidance.

Figure 2.5:Typical example of suffix codes used for codifying work packages whena work package BQ breakdown structure is used

Serialno.

Work package title/content Suffix

1 Preliminaries /01

2 Intrusive investigations:Asbestos and other hazardous materialsGeotechnical and environmental investigationsAttendance on archaeological investigations

/02

Preliminaries (main contract) /01.2

3 Demolition works:Asbestos and other hazardous materials removal/treatment worksSoft strip of building components and sub-componentsSoft strip of mechanical and electrical engineering servicesDemolition

/03

Preliminaries (works package contract) /01.2

4 Groundworks:Contaminated ground material removalPreparatory earthworksExcavation and earthworks, including basement excavation, earthwork support anddisposalTemporary works – propping of existing basement retaining wallsBelow ground drainageGround beamsPile capsTemporary works – piling mats/platformsGround bearing base slab construction, including waterproofingBasement retaining wall structures, including waterproofing

/04

Preliminaries (works package contract) /01.2

5 Piling:Piling works

/05

Preliminaries (works package contract) /01.2

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 37

Page 45: RICS new rules of measurement 2

Serialno.

Work package title/content Suffix

6 Concrete works:FrameUpper floors, including roof structureCore and shear wallsStaircases

/06

Preliminaries (works package contract) /01.2

7 Roof coverings and roof drainage /07

8 External and internal structural walls /08

9 Cladding /09

10 Windows and external doors /10

11 Mastic /11

12 Non-structural walls and partitions /12

13 Joinery /13

14 Suspended ceilings /14

15 Architectural metalwork /15

16 Tiling /16

17 Painting and decorating /17

18 Floor coverings /18

19 Fittings, furnishings and equipment /19

20 Combined Mechanical and Electrical Engineering Services /20

21 External works /21

Notes:

1 Only work packages 1 to 6 inclusive have been expanded to illustrate the typical content of thework package.

2 As with elemental BQ, it is not be necessary to prefix the code for components andsub-components with the project number throughout the BQ.

Again, using the examples of sub-components given in Figure 2.3 above, the resulting codesfor a work package breakdown structure will be:

• Excavation DPB27-3.1.1.2.1.1/04

• Disposal DPB27-3.1.1.2.1.2/04

• Concrete DPB27-3.1.1.2.1.3/04

• Reinforcement DPB27-3.1.1.2.1.4/04

• Formwork DPB27-3.1.1.2.1.5/04

As all sub-components relate to the construction of pile caps, they will all be incorporated inthe work package for groundworks and, as a consequence, all be given the same suffix.

2.16 Cost management/control

2.16.1 The main purpose of a bill of quantities (BQ) is to present a co-ordinated list of components/items,together with their identifying descriptions and quantities that encompass the building works sothat the tendering contractors are able to prepare tenders efficiently and accurately. As well asassisting in ensuring parity of tendering. In addition, BQ provide a vital tool, which can be used bythe quantity surveyor/cost manager to manage and control the costs of the building project. Costmanagement and control uses include:

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

38 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 46: RICS new rules of measurement 2

+ Pre-tender estimates;

+ Post tender estimates;

+ Cost planning;

+ Pricing variations; and

+ Interim valuations and payment.

2.16.2 Pre-tender estimate:

Pre-tender estimates are prepared immediately before calling the first tenders for construction.This is the final cost-check undertaken by the cost manager before tender bids for the buildingproject, or any part of the building project, are obtained.When a bill of quantities (BQ) is the basisof obtaining a tender price, the pre-tender estimates will be based on the BQ.

2.16.3 Post-tender estimate:

A post-tender estimate is prepared at RIBA Work Stage H (tender action), or OGC Gateway 3C(investment decision), after all the construction tenders have been received and evaluated. It isbased on the outcome of any post-tender negotiations, including the resolution of any tenderqualifications and tender price adjustments.The post-tender estimate will include the actual knownconstruction costs and any residual risks. The aim of this estimate is to corroborate the fundinglevel required by the employer to complete the building project, including cost updates of projectand design team fees, as well as other development and project costs, where they form part of thecosts being managed by the cost manager.When reporting the outcome of the tendering processto the employer, the quantity surveyor/cost manager should include a summary of the post-tenderestimate(s).The post-tender estimate should be fairly accurate because the uncertainties of marketconditions have been removed. Post-tender estimates are used as the control estimate duringconstruction.

2.16.4 Cost planning:

2.16.4.1 Cost planning is an iterative process, which is performed in steps of increasing detail as moredesign information becomes available.A cost plan provides both a work breakdown structure anda cost breakdown structure which, by codifying, can be used to redistribute works in elements toworks packages for the purpose of procurement and cost control during the construction phase ofthe building project.

2.16.4.2 The third formal cost plan stage (completed at RIBA Work Stages E/F (Technical Design/ProductionInformation) is based on technical designs, specifications and detailed information for construction.Formal cost plan 3 will provide the frame of reference for appraising tenders. It also provides theframe of reference for reconciling ‘actual costs’ against ‘cost targets’. This is particularly beneficialwhere building works are being procured piecemeal (e.g. procuring discrete work packages as theirdesign is completed).The proper use of the cost plan will allow the re-profiling of cost targets asnecessary to ensure that the overall cost limit (i.e. the employer’s authorised budget) is maintainedby the project team.

2.16.5 Pricing variations:

The rates in a priced bill of quantities (BQ) provide a basis for the valuation of varied work.‘Pro-rata’ and ‘analogous’ rates can also be ascertained from the base rates tendered to calculatethe prices of other components not specifically described in the BQ.

2.16.6 Interim valuations and payment:

2.16.6.1 Many building projects require interim payments to be paid to the contractor.This is in order torelieve the contractor of the burden of financing the whole of the building works until completion;works which may take many months or years to complete. Within each contract there will beclauses which set out the administrative rules under which the quantity surveyor/cost manager,architect (or contract administrator or project manager, quantity surveyor/cost manager) employer

PART 2: RULES FOR DETAILED MEASUREMENT OF BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 39

Page 47: RICS new rules of measurement 2

and contractor must operate. In many contracts, while the completion and calculation of the valueis important, the method and procedure of the interim valuations and payment which thecontractor receives is equally important.

2.16.6.2 A priced bill of quantities (BQ) provides a comprehensive list of building components/items.Consequently, when a contract has been entered into, by assessing the building components/itemsin the BQ, the priced BQ can be used to ascertain periodic valuation of works properly executedin accordance with the provisions of the contract for the purpose of interim valuations andpayment.

2.17 Analysis, collection and storage of cost data

2.17.1 Priced bill of quantities (BQ) make available one of the best sources of real-time cost data, whichcan be used by quantity surveyors/cost managers to provide expert cost advice on the likely costof future building projects. Moreover, they afford a complete cost model in a single document.

2.17.2 The cost data provided in a BQ can be retrieved, analysed, stored and reprocessed in various ways(e.g. as distinct rates, detailed elemental cost analyses, element unit rates (EUR), cost/m2 of grossinternal floor area, and/or functional unit rates) for use in order of cost estimates and cost plans. Itcan also be used for benchmarking purposes.

2.17.3 NRM 1: Order of cost estimating and cost planning for capital building works can be used as a basis formeasuring element unit quantities (EUQ) for the purpose of preparing detailed cost analyses ofbuilding projects.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

40 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 48: RICS new rules of measurement 2

Part 3:Tabulated rules ofmeasurement for building works

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 41

Page 49: RICS new rules of measurement 2
Page 50: RICS new rules of measurement 2

Part 3:Tabulated rules ofmeasurement for building works3.1 Introduction

3.1.1 Part 3 of the rules comprise:

(1) the information and requirements for main contractor’s and work package contractors’preliminaries, together with the rules for preparing the preliminaries pricing schedule; and

(2) the rules of measurement for building components/items.

3.1.2 The use of the tabulated rules is also explained.

3.1.3 Bill of quantities (BQ) are to fully describe and accurately represent the quantity and quality of theworks to be carried out. More detail than is required by these rules should be given wherenecessary to define the precise nature and extent of the required work.

3.2 Use of tabulated rules of measurement for buildingworks

3.2.1 General

3.2.1.1 The rules of measurement for building works are set out in tables.The tables are divided into twocategories, namely those dealing with:

+ preliminaries; and

+ measurement of building components/items.

3.2.1.2 The rules are written in the present tense.

3.2.1.3 The symbol ‘/’ used between two or more units of measurement or within text, means ‘or’.

3.2.1.4 Horizontal lines divide the tables and rules into zones to which different rules apply.

3.2.1.5 Where units of measurement or rules are separated by a broken line ( - - - - - ) this denotes achoice of units or choice of ways of measuring the work.The method chosen shall be the best tosuit the particular situation.

3.2.1.6 The use of a hyphen (-) or the phrase ‘to’ between two dimensions in these tables or in a bill ofquantities means a range of dimensions exceeding the first dimension stated but not exceeding thesecond.

3.2.2 Tables: preliminaries

3.2.2.1 Work Section 1 comprises the rules for describing and quantifying preliminaries. It is divided intotwo sub-sections as follows:

+ preliminaries (main contract); and

+ preliminaries (work package contract).

3.2.2.2 Both sub-sections are sub-divided into parts as follows:

+ Part A: Information and requirements (i.e. dealing with the descriptive part of thepreliminaries); and

+ Part B: Pricing schedule (i.e. provides the basis of a pricing document for preliminaries).

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 43

Page 51: RICS new rules of measurement 2

3.2.2.3 The tables for information and requirements for both preliminaries (main contract) andpreliminaries (work package contract) are structured as follows:

(1) Information and requirements are specified under a number of headings, which are givenabove each table (i.e. project particulars; drawings and other documents; and the site andexisting buildings);

(2) The left hand column (sub-heading 1) lists the preliminaries items to be considered undereach main heading;

(3) The second column (sub-heading 2) lists the sub-items to be considered under eachsub-heading;

(4) The third column (information requirements) lists the information which shall be includedwithin the preliminaries descriptions; and

(5) The fourth column (supplementary information/notes) lists supplementary information thatmight need to be included within the preliminaries descriptions, as well as providingadditional guidance on the drafting of preliminaries statements.

3.2.2.4 The pricing schedule tables for both preliminaries (main contract) and preliminaries (work packagecontract) are structured as follows:

(1) The contractor’s pricing of preliminaries are captured under a number of headings, which aregiven above each table (i.e. project particulars; drawings and other documents; and the siteand existing buildings);

(2) The left hand column (component) lists the preliminaries items to be considered under eachmain heading;

(3) The second column (included/notes on pricing) lists the sub-items which form part of eachitem;

(4) The third column (unit) lists the unit of measurement for preliminaries items;

(5) The fourth column (pricing method) stipulates if the component is a ‘fixed charge’, a‘time-related charge’, or a combination of both; and

(6) The fifth column (excluded) describes the items excluded from a component. Whereexclusions are stated, cross references to the appropriate component is given.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

44 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 52: RICS new rules of measurement 2

3.2.3 Tables: building components/items

3.2.3.1 Work sections 2 to 41 comprise the rules of measurement for building components/items. Theyare as follows:

No. Work Section:

234567891011121314151617181920212223242526272829303132333435363738394041

Off-site manufactured materials, components and buildings:Demolitions;Alterations, repairs and conservation;Excavating and filling;Ground remediation and soil stabilisation;Piling;Underpinning;Diaphragm walls and embedded retaining walls;Crib walls, gabions and reinforced earth;In-situ concrete works;Precast/composite concrete;Precast concrete;Masonry;Structural metalwork;Carpentry;Sheet roof coverings;Tile and slate roof and wall coverings;Waterproofing;Proprietary linings and partitions;Cladding and covering;General joinery;Windows, screens and lights;Doors, shutters and hatches;Stairs, walkways and balustrades;Metalwork;Glazing;Floor, wall, ceiling and roof finishings;Decoration;Suspended ceilings;Insulation, fire stopping and fire protection;Furniture, fittings and equipment;Drainage above ground;Drainage below ground;Site works;Fencing;Soft landscaping;Mechanical services;Electrical services;Transportation; andBuilder’s work in connection with mechanical, electrical and transportation installations.

3.2.3.2 Each table is structured as follows:

(1) The title of the work section is given in the heading;

(2) The first two rows set out the:

(a) drawn information required in respect of each work section to enable measurementand shall accompany the bill of quantities when issued,

(b) mandatory information that is to be provided in each work section,

(c) minimum information that shall be shown on the drawings or any other document thataccompany each work section, and

PART 3:TABULATED RULES OF MEASUREMENT FOR BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 45

Page 53: RICS new rules of measurement 2

(d) works and materials that not measured, but are deemed to be included in the buildingcomponents/items measured in each work section;

(3) The left hand column (item) lists the building components/items commonly encountered inbuilding works;

(4) The second column (unit) lists the unit of measurement for building components/items;

(5) The third column (level 1) lists the information, including any dimension requirements, thatshall be included in the description of the building components/items;

(6) The fourth column (level 2) lists the supporting information, including any additionaldimension requirements, which shall be included in the description of the buildingcomponents/items;

(7) The fifth column (level 3) lists the further supporting information, including any additionaldimension requirements, which shall be included in the description of the buildingcomponents/items; and

(8) The sixth column (notes, comments and glossary) explains what work is deemed to beincluded in specific building components/items, clarifies the approach to quantification anddescription of building components/items, and contains definitions of specific terms andphrases used in connection with the building components/items.

The building components/items listed in the tables comprise those commonly encountered inbuilding works; the lists are not intended to be exhaustive.

3.3 Measurement rules for building works

3.3.1 BQ shall fully describe and accurately represent the quantity and quality of the works to be carriedout.Where necessary, more detail than is required by these rules shall be given in order to definethe precise nature and extent of the required work.

3.3.2 Quantities:

The rules for quantifying building components/items are as follows:

(1) Measurement and billing:

(a) Measure work net as fixed in position unless otherwise stated.

(b) Net quantity measured shall be deemed to include all additional material required forlaps, joints, seams and the like, as well as any waste material.

(c) Curved work shall be measured on the centre line of the material unless otherwisestated.

(d) Dimensions shall be measured to the nearest 10mm. 5mm and over shall be regardedas 10mm and less than 5mm shall be disregarded.

(e) Except for quantities measured in tonnes (t), quantities shall be given to the nearestwhole number. Quantities less than one unit shall be given as one unit. Quantitiesmeasured in tonnes (t) shall be given to two decimal places.

(2) Voids:

(a) Unless otherwise stated, minimum deductions for voids refer only to openings orwants within the boundaries of the measured work.

(b) Always deduct openings or wants at the boundaries of measured areas, irrespective ofsize.

(c) Do not measure separate items for widths not exceeding a stated limit where thesewidths are caused by voids.

3.3.3 Descriptions:

3.3.3.1 Each work section of a bill of quantities shall begin with a heading and a description stating thenature and location of the work.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

46 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 54: RICS new rules of measurement 2

3.3.3.2 Headings for groups of building components/items (i.e. components and sub-components) in a billof quantities shall be read as part of the descriptions of the items to which the headings apply.

3.3.3.3 Descriptions shall state the building components/items being measured (taken from the firstcolumn of the tabulated rules) and include all Level 1, 2 and 3 information (taken from the third,fourth and fifth columns respectively) applicable to that item. Where applicable, the relevantinformation from column five shall be included in the description.

3.3.3.4 Unless specifically stated otherwise in the bill of quantities or in these rules, descriptions forbuilding components/items shall include the:

(1) type and quality of the material;

(2) critical dimension(s) of the material(s);

(3) method of fixing, installing or incorporating the goods or materials into the work where notat the discretion of the contractor; and

(4) nature or type of background.

3.3.3.5 Where the nature or type of background is required to be identified, the buildingcomponents/items description shall state one of the following:

(1) timber (the term includes all types of hard and soft building boards);

(2) plastics;

(3) masonry (the term includes brick, concrete, block, natural and reconstituted stone);

(4) metal, of any type;

(5) metal-faced timber or plastics; and

(6) vulnerable materials (the term includes glass, marble, mosaic, ceramics, tiled finishes, materialfinishes and the like).

3.3.3.6 Dimensions given as part of the description shall be:

(1) stated in the sequence: length, width and height.Where ambiguity could arise, the dimensionsshall be identified in the description;

(2) the finished lengths, widths and heights specified or shown on the drawings with noallowance made for overlaps, scarcements and the like.

3.3.3.7 Thicknesses given as part of the description shall be the finished thickness of the material aftercompaction and shall exclude the thickness of adhesives and or bedding materials unless otherwisestated.

3.3.3.8 The use of a hyphen (-) or the phrase ‘to’ between two dimensions in a description shall mean arange of dimensions exceeding the first dimension stated but not exceeding the second.

3.3.3.9 Where the rules require work to be described as ‘curved’ with the radius stated, details shall begiven of the curved work, including if concave or convex, if conical or spherical, if to more than oneradius, and shall state the radius or radii. The radius shall be the mean radius measured to thecentre line of the material unless otherwise stated.

3.3.3.10 The information required by these rules may be given by a precise and unique cross-reference toanother document (e.g. to a specification or to a catalogue).

3.3.3.11 Where other components and sub-components are referred to in other documents (e.g. aspecification states that vinyl sheet flooring is to be laid on a plywood lining), each component andor sub-component shall be measured and described separately (i.e. both the vinyl sheet flooringand the plywood lining are to be measured as separate items).

3.3.3.12 Notwithstanding the requirements of paragraph 3.3.3.11 above, separate components orsub-components may be combined to form single composite building components/items. In suchcases, the description of the composite building components/items shall clearly state what isincluded and how each component and or sub-component is to be incorporated. Any component,

PART 3:TABULATED RULES OF MEASUREMENT FOR BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 47

Page 55: RICS new rules of measurement 2

sub-component or other element of the work not clearly included in the description shall bedeemed not to be included as part of the composite building components/items.

3.3.3.13 Unless specifically stated otherwise in the BQ or in these rules, each building component/item shallbe deemed to include the following:

(1) labour and all costs in connection therewith;

(2) materials and goods together with all costs in connection therewith;

(3) assembling, installing, erecting, fixing or fitting materials or goods in position;

(4) plant and all costs in connection therewith;

(5) waste of goods or materials;

(6) all rough and fair cutting unless specially stated otherwise;

(7) establishment charges; and

(8) cost of compliance with all legislation in connection with the work measured including healthand safety, disposal of waste and the like.

3.3.4 Work of special types:

3.3.4.1 Work of each of the following special types shall be separately identified. Work of special typesincludes:

(1) Work to existing buildings: such work is defined as work on, in or immediately under workexisting before the current building project. Specific details pertaining to work carried out toan existing building shall be given at the start of each applicable work section.

(2) Work carried out and subsequently removed: specific details pertaining to work that is to becarried out and subsequently removed shall be given at the start of each applicable worksection.

(3) Work outside the curtilage of the site: specific details pertaining to work to be executedoutside the curtilage of the site shall be given at the start of each applicable work section.

(4) Work carried out in extraordinary conditions, including:

(a) in, on or under water, stating whether river, canal, lake or sea and, where applicable,stating the mean spring levels of high and low water;

(b) in tidal conditions;

(c) underground, stating mean depth;

(d) in compressed air, stating the pressure and means of entry and exit; and

(e) in other types of extraordinary conditions.

3.3.4.2 Specific details pertaining to work carried out in each condition shall be given at the start of eachapplicable work section.

3.3.4.3 The additional rules for special types of work shall be read in conjunction with the rules in theappropriate work sections.

3.3.4.4 Details of the additional preliminaries that are pertinent to the special types of work shall be givenin the description, drawing attention to any specific requirements due to the nature of the work.

3.3.5 Measurable work not covered by the tabulated rules:

3.3.5.1 Building components/items not covered by the tabulated rules shall, if possible, be measured byrules for similar types of work. Rules of measurement adopted for such building components/itemsshall be clearly stated and fully defined in either the preliminaries or in the bill of quantities (againstthe building components/items or items to which the rule relates). Such rules shall, as far aspossible, conform to those given in the tabulated rules of measurement for similar buildingcomponents/items.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

48 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 56: RICS new rules of measurement 2

3.3.5.2 Where it is not possible to derive the method of measurement from the tabulated rules, the ruleschosen may be bespoke. In such cases, the rule or rules derived shall be reiterated in full in eitherthe preliminaries or in the bill of quantities (above the building components/items or items towhich the rule relates).

3.3.6 Procedure where work cannot be quantified:

For the rules relating to work which cannot be quantified, refer to paragraph 2.9 (Non-measurableworks) at Part 2 of these rules.

3.3.7 Procedure where exact type of product or component is not specified:

3.3.7.1 Where the exact type of product or component cannot be specified, an estimated price for theproduct or component shall be given in the description as a prime cost price (PC price). State, forexample, ‘Allow the PC price of £x per thousand delivered to site’, ‘Allow the PC price of £y perm2 delivered to site’, or ‘Allow £z each delivered to site’.

3.3.7.2 Unless specifically stated otherwise in the bill of quantities or in these rules, the contractor shall bedeemed to have allowed for all items listed in paragraph 3.3.3.13 in his or her priced rate for eachbuilding component/item incorporating a PC price.

3.3.7.3 PC prices shall exclude any allowance for the main contractor’s overheads and profit, which aredealt with separately.

3.3.8 Procedure where quantity of work cannot be accurately determined:

3.3.8.1 Where work can be described and given in items in accordance with the tabulated rules ofmeasurement but the quantity of work cannot be accurately determined, an estimate of thequantity shall be given and identified as a ‘provisional quantity’.

3.3.8.2 Work items identified as a ‘provisional quantity’ shall be subject to remeasurement when they havebeen completed. The ‘approximate quantity’ shall be substituted by the ‘firm quantity’ measured,and the total price for that item adjusted to reflect the change in quantity. Where the variancebetween the ‘provisional quantity’ and the ‘firm quantity’ measured is less than 20 per cent, the ratetendered by the contractor shall not be subject to review.Where the variance is significant (i.e. 20per cent or more), the rate can be reviewed to ensure that the rate is fair and reasonable to boththe employer and contractor.

PART 3:TABULATED RULES OF MEASUREMENT FOR BUILDING WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 49

Page 57: RICS new rules of measurement 2

Tabu

late

dw

ork

sect

ions

1P

relim

inar

ies

(mai

nco

ntra

ct)

Part

A:I

nfor

mat

ion

and

requ

irem

ents

1.1

Pro

ject

part

icul

ars

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Pr

ojec

tpa

rtic

ular

s1

Nam

eof

proj

ect.

Shor

tpr

ojec

ttit

leto

best

ated

.

2N

atur

eof

proj

ect.

Shor

tde

scrip

tion

tobe

stat

ed.

3Lo

catio

nof

proj

ect.

Full

post

alad

dres

sto

best

ated

.

4Le

ngth

ofco

ntra

ct.

Perio

d,in

wee

ks,t

obe

stat

ed.

Whe

reto

best

ated

byth

eco

ntra

ctor

,ins

ert‘

Tobe

conf

irmed

’.

5N

ames

,add

ress

esan

dpo

ints

ofco

ntac

tof

empl

oyer

and

cons

ulta

nts.

Func

tion

(e.g

.arc

hite

ct),

nam

eof

orga

nisa

tion,

addr

ess,

poin

tof

cont

act,

tele

phon

enu

mbe

ran

dem

aila

ddre

ssto

best

ated

Toin

clud

e:(1

)Em

ploy

er.

(2)

Proj

ect

spon

sor

(e.g

.em

ploy

er’s

inte

rnal

proj

ect

man

ager

).(3

)Pr

ojec

tm

anag

er(if

appl

icab

le).

(4)

Prin

cipa

lcon

trac

tor

(und

erC

DM

Regu

latio

ns).

(5)

Pers

onem

pow

ered

byth

eco

ntra

ctto

act

onbe

half

ofth

eem

ploy

er(p

erso

n’s

title

tobe

give

n(e

.g.

cont

ract

adm

inist

rato

r)).

(6)

CD

Mco

-ord

inat

or.

(7)

Qua

ntity

surv

eyor

.(8

)C

onsu

ltant

s(s

epar

atel

yid

entif

ied)

.(9

)C

lerk

ofw

orks

(ifre

quire

dby

the

empl

oyer

).

50 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 58: RICS new rules of measurement 2

1.2

Dra

win

gs

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1D

raw

ings

1Li

stof

draw

ings

from

whi

chth

ebi

llof

quan

titie

sw

aspr

epar

ed.

Dra

win

gnu

mbe

r,in

clud

ing

revi

sion

stat

us,d

raw

ing

title

,and

auth

orto

best

ated

.Ex

cept

ions

tobe

stat

ed.

2O

ther

docu

men

ts1

Pre-

cons

truc

tion

info

rmat

ion.

Expl

ain

how

pre-

cons

truc

tion

info

rmat

ion

isde

alt

with

(i.e.

with

inth

epr

elim

inar

ies

bill

oras

ase

para

tedo

cum

ent)

.Cro

ss-r

efer

ence

topr

e-co

nstr

uctio

nin

form

atio

ndo

cum

ent

ifse

para

tedo

cum

ent.

2Li

stof

draw

ings

and

othe

rdo

cum

ents

rela

ting

toth

eco

ntra

ctbu

tno

tin

clud

edin

the

tend

erdo

cum

ents

.

(1)

Prov

ide

alis

tof

draw

ings

and

othe

rdo

cum

ents

rela

ting

toth

eco

ntra

ctbu

tno

tin

clud

edin

the

tend

erdo

cum

ents

,whi

chm

aybe

seen

byth

eco

ntra

ctor

durin

gth

ete

nder

perio

d.(2

)D

ocum

ent

title

,ref

eren

ce,r

evisi

on,d

ate

ofiss

uean

dau

thor

tobe

stat

ed.

(3)

Det

ails

ofw

here

docu

men

tsca

nbe

seen

tobe

stat

ed.

1.3

The

site

and

exis

ting

build

ings

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Th

esit

e(1

)D

escr

iptio

nof

the

site.

(2)

Refe

renc

eto

draw

ing,

ordr

awin

gs,s

how

ing

the

site

boun

darie

san

dco

ntra

ctor

’sw

orki

ngar

ea(s

).

2Ex

istin

gbu

ildin

gson

orad

jace

ntto

the

site

Des

crip

tion

ofex

istin

gbu

ildin

gson

orad

jace

ntto

the

site.

3Su

rrou

ndin

gla

nd/b

uild

ing

uses

1A

ddre

ss.

(1)

Sub-

head

ing

2to

iden

tify

land

orbu

ildin

g.(2

)U

seor

activ

ities

carr

ied

out

onth

ela

ndor

inbu

ildin

g(s)

.

4Ex

istin

gm

ains

serv

ices

1O

nth

esit

e.Li

stdr

awin

gsan

dot

her

appl

icab

lein

form

atio

n.

2A

djac

ent

toth

esit

e.

5So

ilsan

dgr

ound

wat

erSt

ate

info

rmat

ion

prov

ided

and

whe

rein

clud

edin

docu

men

tatio

n(e

.g.‘A

nnex

Bof

the

BQ’o

r‘as

ase

para

tedo

cum

ent’)

.Cro

ss-r

efer

ence

asne

cess

ary.

6Si

tein

vest

igat

ion

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 51

Page 59: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

7H

ealth

and

safe

tyfil

e1

Hea

lthan

dsa

fety

file.

(1)

Ava

ilabi

lity

for

insp

ectio

n.(2

)A

rran

gem

ents

for

insp

ectio

n.2

Oth

erdo

cum

ents

.

8H

ealth

and

safe

tyha

zard

sD

etai

lsof

haza

rds

that

are

orm

aybe

pres

ent

onth

esit

e.W

here

info

rmat

ion

prov

ided

inth

epr

e-co

nstr

uctio

nin

form

atio

n,cr

oss-

refe

renc

eac

cord

ingl

y.

9A

cces

sto

the

site

(1)

Des

crip

tion.

(2)

Lim

itatio

ns.

10Pa

rkin

gD

etai

lsof

empl

oyer

’sre

quire

men

tsin

resp

ect

ofpa

rkin

gan

dpa

ymen

tsof

fees

and

char

ges

inco

nnec

tion

ofpa

rkin

g,in

clud

ing

park

ing

bay

and

park

ing

met

ersu

spen

sions

.

11U

seof

the

site

Det

ails

ofan

ylim

itatio

ns.

12Si

tevi

sits

(1)

Purp

ose.

(2)

Arr

ange

men

tsfo

rsit

evi

sit.

Incl

ude

whe

rein

form

atio

nno

tgi

ven

inth

e‘c

ondi

tions

ofte

nder

’.

1.4

Des

crip

tio

no

fth

eW

ork

s

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Th

eW

orks

Des

crip

tion

ofth

eW

orks

.

2Pr

epar

ator

yw

ork

byot

hers

Des

crip

tion

ofan

yw

ork

that

will

beca

rrie

dou

tby

othe

rsun

der

ase

para

teco

ntra

ctbe

fore

the

star

tof

wor

kon

site

for

this

cont

ract

.

3W

ork

byot

hers

conc

urre

ntw

ithth

eco

ntra

ctD

escr

iptio

nof

the

Wor

ks.

4C

ompl

etio

nw

ork

byot

hers

TABULATED WORK SECTIONS

52 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 60: RICS new rules of measurement 2

1.5

The

cont

ract

cond

itio

ns

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1C

ondi

tions

ofco

ntra

ct1

Form

ofco

ntra

cttit

leto

best

ated

.(1

)Fu

lltit

leof

the

stan

dard

orbe

spok

efo

rmof

cont

ract

,inc

ludi

nged

ition

,rev

ision

,and

stan

dard

amen

dmen

tsap

plic

able

.(2

)Sc

hedu

leof

clau

se/c

ondi

tion

head

ings

inth

est

anda

rdfo

rmof

cont

ract

(see

note

(1))

.(3

)Re

fere

nce

toan

yam

endm

ents

tocl

ause

s/co

nditi

ons

tost

anda

rdfo

rmof

cont

ract

(see

note

(1))

.(4

)Re

fere

nce

toan

ysu

pple

men

tary

orsp

ecia

lcl

ause

s/co

nditi

ons

tost

anda

rdfo

rmof

cont

ract

.(5

)In

sert

ions

rela

ting

toar

ticle

sof

agre

emen

t,ar

ticle

s,re

cita

lsan

dco

ntra

ctpa

rtic

ular

sor

abst

ract

ofpa

rtic

ular

s(s

eeno

te(1

)).

(6)

Empl

oyer

’sin

sura

nce

resp

onsib

ility.

(7)

Empl

oyer

’sre

quire

men

tsin

resp

ect

ofpe

rform

ance

bond

s.(8

)Em

ploy

er’s

requ

irem

ents

inre

spec

tof

pare

ntco

mpa

nygu

aran

tees

.(9

)Em

ploy

er’s

requ

irem

ents

inre

spec

tof

colla

tera

lw

arra

ntie

s.

(1)

Nei

ther

asc

hedu

leof

clau

se/c

ondi

tion

head

ings

inth

est

anda

rdfo

rmof

cont

ract

nor

refe

renc

eto

any

supp

lem

enta

ryor

spec

ialc

laus

es/c

ondi

tions

tost

anda

rdfo

rmof

cont

ract

orde

tails

ofin

sert

ions

rela

ting

toar

ticle

sof

agre

emen

t,ar

ticle

s,re

cita

lsan

dco

ntra

ctpa

rtic

ular

sor

abst

ract

ofpa

rtic

ular

sis

requ

ired

whe

read

dres

sed

thro

ugh

asc

hedu

leof

amen

dmen

tsto

the

stan

dard

cond

ition

sof

cont

ract

.N

otw

ithst

andi

ngth

is,re

fere

nce

toth

esc

hedu

leof

amen

dmen

tsis

tobe

mad

ein

this

sect

ion

ofth

epr

elim

inar

ies

bill.

(2)W

here

besp

oke,

orun

com

mon

,for

ms

ofco

ntra

ctar

eus

ed–

aco

pyis

tobe

appe

nded

toth

ebi

llof

quan

titie

sor

incl

uded

aspa

rtof

the

tend

er.

1.6

Em

ploy

er’s

requ

irem

ents

:Pro

visi

on,

cont

ent

and

use

of

docu

men

ts

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1D

efin

ition

san

din

terp

reta

tions

1D

efin

ition

s.Ex

plai

nho

wto

inte

rpre

tke

yw

ords

,ter

ms,

phra

ses

and

syno

nym

sus

edin

the

prel

imin

arie

san

dsp

ecifi

catio

n.

2C

omm

unic

atio

n.D

efin

ition

and

form

atof

com

mun

icat

ions

,and

timin

gof

resp

onse

.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 53

Page 61: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3Pr

oduc

ts.

Def

initi

onan

d/or

mea

ning

.

4Si

teeq

uipm

ent.

5D

raw

ings

.

6C

ontr

acto

r’sch

oice

.

7C

ontr

acto

r’sde

signe

dw

ork.

8Su

bmit

prop

osal

s.

9Te

rms

used

insp

ecifi

catio

n.D

efin

ition

san

d/or

mea

ning

ofke

yw

ords

,ter

ms,

phra

ses

and

syno

nym

sus

edin

the

spec

ifica

tion.

10M

anuf

actu

rer

and

prod

uct

refe

renc

es.

(1)

Def

initi

onof

term

s.(2

)Ver

sion

ofm

anuf

actu

rer’s

tech

nica

llite

ratu

reap

plic

able

tote

nder

and

cont

ract

(e.g

.cur

rent

onth

eda

teof

invi

tatio

nto

tend

er).

11Su

bstit

utio

nof

prod

ucts

.(1

)D

efin

ition

and/

orm

eani

ngof

subs

titut

e/al

tern

ativ

epr

oduc

ts.

(2)

Proc

ess

for

acce

ptan

cean

dre

ject

ion

ofsu

bstit

ute/

alte

rnat

ive

prod

ucts

.

12C

ross

-ref

eren

ces.

Expl

ain

met

hod

ofcr

oss

refe

renc

ing

used

.

13Re

fere

nced

docu

men

ts.

Ord

erof

prec

eden

ceof

refe

renc

eddo

cum

ents

.

14Eq

uiva

lent

prod

ucts

.D

efin

ition

and/

orm

eani

ng.

15Su

bstit

utio

nof

stan

dard

s.(1

)D

efin

ition

and/

orm

eani

ng.

(2)

Proc

ess

for

acce

ptan

cean

dre

ject

ion

ofsu

bstit

ute

stan

dard

s.

16C

urre

ncy

ofdo

cum

ents

.Ve

rsio

nof

publ

ished

docu

men

ts,i

nclu

ding

revi

sions

and

amen

dmen

ts,a

pplic

able

tote

nder

and

cont

ract

(e.g

.cur

rent

onth

eda

teof

invi

tatio

nto

tend

er).

17Pr

oduc

tsiz

es.

(1)

Gen

eral

defin

ition

ofpr

oduc

tsiz

es.

(2)

Exce

ptio

nsto

gene

rald

efin

ition

.Pr

oduc

tsto

besp

ecifi

edby

thei

rco

-ord

inat

ing

size.

Exce

ptio

nsto

this

rule

tobe

stat

ed.

TABULATED WORK SECTIONS

54 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 62: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

2D

ocum

ents

prov

ided

onbe

half

ofem

ploy

er1

Add

ition

alco

pies

ofdr

awin

gsan

ddo

cum

ents

.D

escr

ibe

proc

edur

e.

2D

imen

sions

.Ex

plai

now

ners

hip

ofsc

aled

dim

ensio

ns

3M

easu

red

quan

titie

s.Ex

plai

npr

eced

ence

ofm

easu

red

quan

titie

s.

4Th

esp

ecifi

catio

n.(1

)Re

fere

nce

the

spec

ifica

tion,

orsp

ecifi

catio

ns,t

hepr

elim

inar

ies.

(2)

Expl

ain

the

met

hod

used

tocr

oss

refe

renc

esp

ecifi

catio

ncl

ause

son

orin

othe

rte

nder

/con

trac

tdo

cum

ents

.

5D

iver

genc

efro

mth

est

atut

ory

requ

irem

ents

.M

etho

dfo

rde

alin

gw

ithdi

verg

ence

from

the

stat

utor

yre

quire

men

tssh

ould

they

occu

r.

6Em

ploy

er’s

polic

ydo

cum

ents

.Re

quire

men

tsin

resp

ect

ofco

mpl

ianc

ew

ithth

eem

ploy

er’s

polic

ies.

Exam

ples

incl

ude:

–en

viro

nmen

tal.

–su

stai

nabi

lity.

–co

rpor

ate

soci

alre

spon

sibilit

ies

(CSR

).–

heal

than

dsa

fety

.

3D

ocum

ents

prov

ided

byth

eco

ntra

ctor

,sub

cont

ract

ors

and

supp

liers

1D

esig

nin

form

atio

n.(1

)G

ener

alre

quire

men

ts,i

nclu

ding

desig

nm

anag

emen

tan

dpr

ogra

mm

ing

requ

irem

ents

.(2

)Sp

ecifi

cre

quire

men

tsin

resp

ect

ofde

sign

docu

men

tsan

din

form

atio

n.(3

)Fo

rmat

.(4

)N

umbe

rof

copi

es.

(5)

Subm

issio

nre

quire

men

ts.

2Pr

oduc

tion

info

rmat

ion.

(1)

Gen

eral

requ

irem

ents

inre

spec

tof

prod

uctio

nin

form

atio

n.(2

)Fo

rmat

.(3

)N

umbe

rof

copi

es.

(4)

Subm

issio

nre

quire

men

ts.

3A

s-bu

ilt/a

s-in

stal

led

draw

ings

and

info

rmat

ion.

(1)

Gen

eral

requ

irem

ents

.(2

)Su

bmiss

ion

requ

irem

ents

.(3

)N

umbe

rof

copi

es.

4Te

chni

call

itera

ture

.(1

)Li

tera

ture

tobe

mai

ntai

ned.

(2)

Requ

irem

ents

for

liter

atur

eto

beav

aila

ble

onsit

e.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 55

Page 63: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

5M

aint

enan

cein

stru

ctio

nsan

dgu

aran

tees

.(1

)In

form

atio

nre

quire

men

ts.

(2)

Form

at.

(3)

Num

ber

ofco

pies

.(4

)Su

bmiss

ion

requ

irem

ents

.(5

)St

orag

ean

din

form

atio

nm

anag

emen

t.(6

)Re

quire

men

tsin

resp

ect

ofem

erge

ncy

and/

orou

tof

norm

alw

orki

ngca

ll-ou

tse

rvic

es,i

nclu

ding

requ

irem

ents

for

cont

act

deta

ilsan

dex

tent

ofco

ver.

Requ

irem

ents

rela

ting

to‘m

anag

emen

tin

form

atio

nsy

stem

s’to

best

ated

unde

rst

orag

ean

din

form

atio

nm

anag

emen

tre

quire

men

ts.

6En

ergy

ratin

gca

lcul

atio

ns.

(1)

Info

rmat

ion

requ

irem

ents

.(2

)N

umbe

rof

copi

es.

(3)

Subm

issio

nre

quire

men

ts.

7En

viro

nmen

tala

sses

smen

tin

form

atio

n.(1

)Sc

hem

ety

pe.

(2)

Envi

ronm

enta

ltar

gets

(inre

spec

tof

site

activ

ities

and

the

wor

ks).

(3)

Info

rmat

ion

requ

irem

ents

.(4

)Fo

rmat

.(5

)N

umbe

rof

copi

es.

(6)

Subm

issio

nre

quire

men

ts.

8D

ocum

ents

requ

ired

befo

rePr

actic

alC

ompl

etio

n.Sp

ecifi

cre

quire

men

ts.

4D

ocum

ent

and

data

inte

rcha

nge

1El

ectr

onic

data

inte

rcha

nge

(ED

I).(1

)Typ

esan

dcl

asse

sof

com

mun

icat

ion.

(2)

Part

ies

com

mun

icat

ion

betw

een.

(3)

Requ

irem

ents

.

TABULATED WORK SECTIONS

56 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 64: RICS new rules of measurement 2

1.7

Em

ploy

er’s

requ

irem

ents

:Man

agem

ent

of

the

wo

rks

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Em

ploy

er’s

requ

irem

ents

–ge

nera

lly1

Supe

rvisi

on.

Spec

ific

requ

irem

ents

.

2C

onsid

erat

eco

nstr

ucto

rssc

hem

e.(1

)Re

gist

ratio

nre

quire

men

ts.

(2)

Con

tact

deta

ils.

(3)

Com

plia

nce

requ

irem

ents

.

3In

sura

nce.

(1)

Doc

umen

tary

evid

ence

requ

ired.

(2)W

hen

requ

ired.

4In

sura

nce

clai

ms.

(1)

Requ

irem

ents

for

notif

ying

even

ts.

(2)

Requ

irem

ents

for

inde

mni

fyin

gth

eem

ploy

er.

5C

limat

icco

nditi

ons.

Reco

rds

tobe

mai

ntai

ned

byco

ntra

ctor

.

6O

wne

rshi

pof

mat

eria

ls/pr

oduc

tsar

ising

from

the

wor

ks.

Requ

irem

ents

inre

spec

tof

owne

rshi

p,an

dre

mov

alfro

msit

e.W

here

tobe

com

eth

epr

oper

tyof

the

cont

ract

or;

cons

ider

seek

ing

cred

itfo

rm

ater

ials/

prod

ucts

arisi

ngfro

mth

ew

orks

.

2Pr

ogra

mm

e/pr

ogre

ss1

Prog

ram

me.

(1)

Form

atan

dco

nten

t.(2

)Ex

clus

ions

.(3

)D

ocum

ent

cont

rolr

equi

rem

ents

.(4

)Su

bmiss

ion

requ

irem

ents

.

2Re

vise

dpr

ogra

mm

e.Sp

ecifi

cre

quire

men

tsfo

rre

-pro

filin

gan

dre

issui

ngpr

ogra

mm

e.

4C

omm

ence

men

tof

wor

k.N

otic

epe

riod

tobe

give

nbe

fore

the

com

men

cem

ent

ofw

ork

onsit

e.

5M

onito

ring

prog

ress

.(1

)Em

ploy

er’s

spec

ific

requ

irem

ents

inre

spec

tof

repo

rtin

gan

dav

oidi

ngpo

tent

iald

elay

.(2

)Li

stan

dde

scrip

tion

ofke

ype

rform

ance

indi

cato

rs(K

PIs)

tobe

mai

ntai

ned

byco

ntra

ctor

.(3

)Re

quire

men

tsfo

rre

port

ing

agai

nst

KPIs.

(4)

Act

ions

ofco

ntra

ctor

ifKP

Isno

tac

hiev

ed.

6N

otifi

catio

nof

com

pens

atio

nev

ent(

s).

Empl

oyer

’ssp

ecifi

cre

quire

men

tsin

resp

ect

ofco

ntra

ctor

notif

ying

even

tsth

atco

mpe

nsat

epo

tent

ial

dela

y.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 57

Page 65: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

7Pr

ojec

tpr

ogre

ssm

eetin

gs.

(1)

Gen

eral

requ

irem

ents

.(2

)Pr

opos

edag

enda

.(3

)Fr

eque

ncy.

(4)

Loca

tion.

(5)

Acc

omm

odat

ion

avai

labi

lity.

(6)

Att

ende

es.

(7)

Cha

irper

son.

8C

ontr

acto

r’spr

ogre

ssre

port

.(1

)Fo

rman

dco

nten

tof

repo

rt.

(2)

Met

hod

ofpr

esen

tatio

n.(3

)Su

bmiss

ion

requ

irem

ents

.

9C

ontr

acto

r’ssit

em

eetin

gs.

Gen

eral

requ

irem

ents

.

10Ph

otog

raph

icre

cord

s.(1

)Im

age

form

at.

(2)

Freq

uenc

y.(3

)N

umbe

rof

loca

tions

.(4

)N

umbe

rof

imag

esfro

mea

chlo

catio

n.(5

)O

ther

requ

irem

ents

.

11Ea

rlypo

sses

sion.

Empl

oyer

’ssp

ecifi

cre

quire

men

tsfo

rea

rlypo

sses

sion

and

taki

ngov

erpa

rts

ofth

ew

orks

befo

repr

actic

alco

mpl

etio

n.

12N

otic

eof

com

plet

ion.

(1)

Gen

eral

requ

irem

ents

.(2

)M

inim

umpe

riod

ofno

tice

tobe

give

nby

cont

ract

orto

best

ated

.

13Ex

tens

ions

oftim

e.(1

)Re

quire

men

tsin

resp

ect

ofno

tific

atio

nby

the

cont

ract

or.

(2)

Subm

issio

nre

quire

men

ts.

3C

ost

cont

rol

1C

ash

flow

fore

cast

.(1

)Ba

sisof

cash

flow

fore

cast

.(2

)Fr

eque

ncy.

(3)

Subm

issio

nre

quire

men

ts.

2Re

mov

al/r

epla

cem

ent

ofex

istin

gw

ork.

(1)

Loca

tion.

(2)

Exte

nt.

(3)

Requ

irem

ents

inre

spec

tof

exec

utio

n.

TABULATED WORK SECTIONS

58 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 66: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3Pr

opos

edin

stru

ctio

ns.

(1)

Requ

irem

ents

inre

spec

tof

estim

ates

.(2

)C

onte

ntof

estim

ates

.(3

)O

ther

requ

irem

ents

.

4M

easu

rem

ent

ofco

vere

dw

ork.

(1)

Gen

eral

requ

irem

ents

.(2

)N

otic

epe

riod

tobe

give

nby

cont

ract

orbe

fore

cove

ring

wor

ksw

hich

are

tobe

mea

sure

d.

5D

ayw

ork

vouc

hers

.(1

)N

otic

epe

riod

tobe

give

nby

cont

ract

orbe

fore

com

men

cem

ent

ofw

ork

tobe

carr

ied

out

ona

dayw

ork

basis

.(2

)Su

bmiss

ion

requ

irem

ents

.

6In

terim

appl

icat

ions

,val

uatio

nsan

dpa

ymen

ts.

(1)

Proc

ess

for

agre

eing

inte

rimpa

ymen

tsan

dpa

ymen

tda

tes.

(2)

Con

tent

and

subm

issio

nre

quire

men

tsfo

rco

ntra

ctor

’sin

terim

appl

icat

ions

for

paym

ent.

(3)

Empl

oyer

’ssp

ecifi

cin

voic

ing

requ

irem

ents

.

7Pa

ymen

tfo

rpr

oduc

tsno

tin

corp

orat

edin

toth

ew

orks

.In

form

atio

n/ev

iden

ceof

freed

omfro

mtit

lere

quire

dfro

mco

ntra

ctor

inre

spec

tof

prod

ucts

stor

edon

-site

befo

repa

ymen

tis

tobe

cons

ider

edby

empl

oyer

.

8Pa

ymen

tfo

rpr

oduc

tsst

ored

off-s

ite.

Info

rmat

ion/

evid

ence

offre

edom

from

title

requ

ired

from

cont

ract

orin

resp

ect

ofpr

oduc

tsst

ored

off-s

itebe

fore

paym

ent

isto

beco

nsid

ered

byem

ploy

er.

9La

bour

and

equi

pmen

tre

turn

s.(1

)Re

cord

sto

bem

aint

aine

dby

the

cont

ract

or.

(2)

Con

tent

ofre

cord

s.(3

)Su

bmiss

ion

ofre

cord

s.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 59

Page 67: RICS new rules of measurement 2

1.8

Em

ploy

er’s

requ

irem

ents

:Qua

lity

stan

dard

san

dqu

alit

yco

ntro

l

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1St

anda

rds

ofpr

oduc

tsan

dex

ecut

ions

1In

com

plet

ein

form

atio

n.(1

)Re

quire

men

tsfo

rde

alin

gw

ithpr

oduc

ts/m

ater

ials

are

not

fully

spec

ified

.(2

)St

atus

ofw

orks

whe

reth

eex

tent

isno

tfu

llydo

cum

ente

d.(3

)St

atus

ofom

issio

nsor

erro

rsin

desc

riptio

nan

d/or

quan

tity.

2W

orkm

ansh

ipsk

ills.

Requ

irem

ents

inre

spec

tof

:(1

)A

ppro

pria

tene

ssof

cont

ract

or’s

oper

ativ

es.

(2)

Regi

stra

tion

sche

mes

tow

hich

cont

ract

or’s

oper

ativ

essh

ould

belo

ng.

(3)

Evid

ence

ofsc

hem

ere

gist

ratio

nre

quire

men

ts.

(4)

Oth

erre

quire

men

ts.

3Q

ualit

yof

prod

ucts

.Re

quire

men

tsin

resp

ect

of:

(1)

Usin

gne

wan

dre

cycl

edpr

oduc

ts.

(2)

Supp

lyof

prod

ucts

.(3

)Tol

eran

ces.

(4)

Det

erio

ratio

npr

even

tion.

(5)

Oth

erre

quire

men

ts.

4Q

ualit

yof

exec

utio

n.Re

quire

men

tsin

resp

ect

of:

(1)

Fixi

ng,a

pplic

atio

nan

din

stal

latio

nof

prod

ucts

,in

clud

ing

alig

nmen

t.(2

)C

olou

rba

tchi

ng.

(3)

Dim

ensio

ns.

(4)

Fini

shed

wor

k.(5

)Lo

catio

nan

dfix

ing

ofpr

oduc

ts.

(6)

Oth

erre

quire

men

ts.

5C

ompl

ianc

e.Re

quire

men

tsin

resp

ect

of:

(1)

Com

plia

nce

with

prop

rieta

rysp

ecifi

catio

ns.

(2)

Com

plia

nce

with

perfo

rman

cesp

ecifi

catio

ns.

(3)

Oth

erre

quire

men

ts.

TABULATED WORK SECTIONS

60 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 68: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

6In

spec

tions

.Re

quire

men

tsfo

rin

spec

ting

prod

ucts

and

wor

kex

ecut

ed.

7Re

late

dw

ork.

Requ

irem

ents

inre

spec

tof

co-o

rdin

atin

gw

orkm

ansh

ipof

trad

es.

8M

anuf

actu

rer’s

reco

mm

enda

tions

/inst

ruct

ions

.(1

)Re

quire

men

tsin

resp

ect

ofco

mpl

ianc

e.(2

)Ver

sion

ofm

anuf

actu

rer’s

reco

mm

enda

tions

/in

stru

ctio

nsap

plic

able

tote

nder

and

cont

ract

(e.g

.cu

rren

ton

the

date

ofin

vita

tion

tote

nder

).

9W

ater

for

the

wor

ks.

Gen

eral

requ

irem

ents

.

2Sa

mpl

es/A

ppro

vals

1Sa

mpl

es.

Requ

irem

ents

inre

spec

tof

sam

ples

ofpr

oduc

ts,w

ork

exec

uted

and

moc

k-up

s.

2A

ppro

valo

fpr

oduc

tsa

mpl

es.

(1)

Gen

eral

requ

irem

ents

(incl

udin

gpr

ogra

mm

ing

requ

irem

ents

)fo

rsu

bmiss

ion

of,i

nspe

ctio

nof

,and

test

son

sam

ples

.(2

)D

efin

ition

ofap

prov

alin

cont

ext

ofsa

mpl

es.

(3)

Rete

ntio

nof

com

plyi

ngsa

mpl

es,i

nclu

ding

stor

age

requ

irem

ents

.(4

)O

ther

requ

irem

ents

.

3A

ppro

valo

fw

ork

exec

uted

/moc

k-up

s.(1

)G

ener

alre

quire

men

ts(in

clud

ing

prog

ram

min

gre

quire

men

ts)

for

subm

issio

nof

,ins

pect

ion

of,t

ests

on,w

ork

exec

uted

and

moc

k-up

s.(2

)D

efin

ition

ofap

prov

alin

cont

ext

ofw

ork

exec

uted

and

moc

k-up

s.(3

)Re

tent

ion

ofco

mpl

ying

wor

kex

ecut

edan

dm

ock-

ups,

incl

udin

gst

orag

ere

quire

men

ts.

(4)

Oth

erre

quire

men

ts.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 61

Page 69: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3A

ccur

acy/

Sett

ing

out

1A

ccur

acy

ofin

stru

men

ts.

Gen

eral

requ

irem

ents

.

2Se

ttin

gou

t.

3A

ppea

ranc

ean

dfit

.Re

quire

men

tsin

resp

ect

ofto

lera

nces

and

dim

ensio

ns.

4C

ritic

aldi

men

sions

.D

etai

lsof

criti

cald

imen

sions

.

5Le

vels

ofst

ruct

ural

floor

s.M

axim

umto

lera

nces

for

desig

ned

leve

lsto

best

ated

.

6Re

cord

draw

ings

.(1

)Re

quire

men

tsin

resp

ect

ofre

cord

ing

deta

ilsof

grid

lines

,set

ting-

out

stat

ions

,ben

chm

arks

and

prof

iles.

(2)

Info

rmat

ion

rete

ntio

nre

quire

men

ts.

(3)

Subm

issio

nre

quire

men

ts.

(4)

Oth

erre

quire

men

ts.

4Se

rvic

es1

Serv

ices

regu

latio

ns.

Gen

eral

requ

irem

ents

.

2W

ater

regu

latio

ns/b

yela

ws

notif

icat

ion.

3W

ater

regu

latio

ns/b

yela

ws

cont

ract

or’s

cert

ifica

te.

(1)

Con

tent

ofce

rtifi

cate

.(2

)Su

bmiss

ion

requ

irem

ents

.(3

)O

ther

requ

irem

ents

.

4El

ectr

ical

inst

alla

tion

cert

ifica

te.

(1)

Subm

issio

nre

quire

men

ts.

(2)

Oth

erre

quire

men

ts.

5G

as,o

ilan

dso

lidfu

elap

plia

nce

inst

alla

tion

cert

ifica

te.

(1)

Con

tent

ofce

rtifi

cate

.(2

)Su

bmiss

ion

requ

irem

ents

.(3

)O

ther

requ

irem

ents

.

6M

echa

nica

land

elec

tric

alse

rvic

es.

(1)

Requ

irem

ents

inre

spec

tof

final

test

san

dco

mm

issio

ning

.(2

)Re

quire

men

tsin

resp

ect

ofBu

ildin

gRe

gula

tions

notic

e.(3

)O

ther

requ

irem

ents

.

5Su

perv

ision

/insp

ectio

n/de

fect

ive

wor

k1

Supe

rvisi

on.

(1)

Gen

eral

requ

irem

ents

.(2

)N

otic

epe

riod

for

repl

acem

ent

ofco

ntra

ctor

’spe

rson

inch

arge

byco

ntra

ctor

.

2C

o-or

dina

tion

ofm

echa

nica

land

elec

tric

alen

gine

erin

gse

rvic

es.

(1)

Gen

eral

requ

irem

ents

.(2

)Re

quire

men

tsfo

rdo

cum

enta

ryev

iden

ceof

cont

ract

or’s

staf

f.

TABULATED WORK SECTIONS

62 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 70: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3O

vert

ime

wor

king

.G

ener

alre

quire

men

ts.

4D

efec

tsin

exist

ing

wor

k.(1

)Pr

oces

sfo

rde

alin

gw

ithun

docu

men

ted

defe

cts.

(2)

Proc

ess

for

deal

ing

with

docu

men

ted

rem

edia

lw

ork.

5A

cces

sfo

rin

spec

tion.

Gen

eral

requ

irem

ents

.

6Te

sts

and

insp

ectio

ns.

(1)T

imin

gre

quire

men

ts.

(2)

Reco

rds

requ

ired.

(3)

Subm

issio

nre

quire

men

ts.

(4)

Oth

erre

quire

men

ts.

7A

irpe

rmea

bilit

y.(1

)M

etho

d.(2

)Pe

rform

ance

requ

irem

ents

.(3

)Su

bmiss

ion

requ

irem

ents

(res

ults

).(4

)O

ther

requ

irem

ents

.

8C

ontin

uity

ofth

erm

alin

sula

tion.

(1)

Gen

eral

requ

irem

ents

.(2

)C

onte

ntof

repo

rts.

(3)

Subm

issio

nre

quire

men

ts.

(4)

Num

ber

ofco

pies

.(5

)O

ther

requ

irem

ents

.

9Re

sista

nce

topa

ssag

eof

soun

d.(1

)M

etho

d.(2

)C

ompl

ianc

ere

quire

men

ts.

(3)

Subm

issio

nre

quire

men

ts.

(4)

Oth

erre

quire

men

ts.

10En

ergy

perfo

rman

cece

rtifi

cate

.(1

)G

ener

alre

quire

men

ts.

(2)

Form

atof

cert

ifica

tean

dre

port

.(3

)Su

bmiss

ion

requ

irem

ents

.(4

)O

ther

requ

irem

ents

.

11Pr

opos

als

for

rect

ifica

tion

ofde

fect

ive

prod

ucts

/exe

cutio

ns.

Gen

eral

requ

irem

ents

.

12M

easu

res

toes

tabl

ishac

cept

abilit

y.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 63

Page 71: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

13Q

ualit

yco

ntro

l.(1

)Pr

oced

ural

requ

irem

ents

.(2

)Re

cord

sre

quire

d.(3

)C

onte

ntof

reco

rds.

(4)

Oth

erre

quire

men

ts.

6W

ork

ator

afte

rco

mpl

etio

n1

Wor

kbe

fore

com

plet

ion.

(1)

Gen

eral

requ

irem

ents

.(2

)C

lean

ing

requ

irem

ents

,inc

ludi

ngcl

eani

ngm

ater

ials

and

met

hods

ofcl

eani

ng.

(3)

Requ

irem

ents

for

rect

ifyin

gm

inor

faul

ts.

(4)

Requ

irem

ents

inre

spec

tof

mov

ing

part

s.(5

)O

ther

requ

irem

ents

.

2Se

curit

yat

com

plet

ion.

(1)

Gen

eral

requ

irem

ents

.(2

)Re

quire

men

tsin

resp

ect

ofke

ys.

3M

akin

ggo

od/r

ectif

icat

ion

ofde

fect

s.(1

)A

cces

sar

rang

emen

ts.

(2)

Not

ice

perio

ds.

(3)

Com

plet

ion

requ

irem

ents

.

4H

ighw

ay/s

ewer

adop

tion.

(1)

Des

crip

tion

ofw

ork

tobe

adop

ted.

(2)

Requ

irem

ents

inre

spec

tof

wor

kfo

rad

optio

n.

1.9

Em

ploy

er’s

requ

irem

ents

:Sec

urit

y,sa

fety

and

pro

tect

ion

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Se

curit

y/he

alth

and

safe

ty1

Pre-

cons

truc

tion

info

rmat

ion.

Loca

tion

ofin

form

atio

n.

2Ex

ecut

ion

haza

rds.

(1)

Man

agem

ent

requ

irem

ents

for

com

mon

haza

rds.

(2)

Det

ails

ofsig

nific

ant

haza

rds

inco

rpor

ated

inth

ede

sign

ofth

epr

ojec

t.

3Pr

oduc

tha

zard

s.(1

)Re

quire

men

tsin

resp

ect

ofha

zard

ous

subs

tanc

es.

(2)

Man

agem

ent

requ

irem

ents

for

com

mon

haza

rds.

(3)

Det

ails

ofsig

nific

ant

haza

rds

insp

ecifi

edco

nstr

uctio

nm

ater

ials.

TABULATED WORK SECTIONS

64 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 72: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

4C

onst

ruct

ion

phas

ehe

alth

and

safe

typl

an.

(1)

Gen

eral

requ

irem

ents

.(2

)C

onte

nt.

(3)

Subm

issio

nre

quire

men

ts.

5Se

curit

y.(1

)Re

quire

men

tsfo

rpr

otec

ting

the

site,

the

wor

ks,

prod

ucts

,mat

eria

ls,an

dex

istin

gbu

ildin

gsaf

fect

edby

the

wor

ks,f

rom

dam

age

and

thef

t.(2

)Re

quire

men

tsfo

rpr

even

ting

unau

thor

ised

acce

ssto

the

site,

the

wor

ks,a

ndad

join

ing

prop

erty

.(3

)D

escr

iptio

nof

any

spec

ials

ecur

ityre

quire

men

ts.

6St

abilit

y.Re

quire

men

tsfo

rm

aint

aini

ngth

est

abilit

yan

dst

ruct

ural

inte

grity

ofth

ew

orks

and

adjo

inin

gpr

oper

tydu

ring

the

cont

ract

.

7O

ccup

ied

prem

ises.

(1)

Exte

ntex

istin

gbu

ildin

gsw

illbe

occu

pied

and/

orus

eddu

ring

the

cont

ract

.(2

)M

etho

dof

wor

king

.(3

)Re

quire

men

tsin

resp

ect

ofov

ertim

ew

orki

ng.

8Pa

sses

.(1

)D

etai

lsof

cont

rolle

dar

eas.

(2)

Proc

edur

esfo

rob

tain

ing

and

retu

rnin

gpa

sses

.

9O

ccup

ier’s

rule

san

dre

gula

tions

.(1

)G

ener

alre

quire

men

ts.

(2)

Loca

tion

ofru

les

and

regu

latio

ns.

(3)

Arr

ange

men

tsfo

rin

spec

tion.

10U

seof

mob

ilete

leph

ones

.Re

quire

men

tsre

latin

gto

use

ofm

obile

tele

phon

eson

-site

.

11Em

ploy

er’s

repr

esen

tativ

essit

evi

sits.

(1)

Safe

tyre

quire

men

ts.

(2)

Prot

ectiv

ecl

othi

ngan

d/or

equi

pmen

tre

quire

men

ts.

12W

orki

ngpr

ecau

tions

/res

tric

tions

.(1

)D

etai

lsof

haza

rdou

sar

eas.

(2)

Perm

itto

wor

kre

quire

men

ts.

2Pr

otec

tion

agai

nst

1Ex

plos

ives

.(1

)U

se.

(2)

Det

ails

ofre

stric

tions

.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 65

Page 73: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

2N

oise

cons

ent

bylo

cala

utho

rity.

(1)

Gen

eral

requ

irem

ents

.(2

)Sp

ecia

lreq

uire

men

ts.

3N

oise

cont

rol.

4Po

llutio

nco

ntro

l.

5Pe

stic

ides

.(1

)U

se.

(2)

Det

ails

ofre

stric

tions

.(3

)D

ispos

alre

quire

men

ts.

(4)

Ope

rativ

esco

mpe

tenc

yre

quire

men

ts.

6N

uisa

nce.

(1)

Gen

eral

requ

irem

ents

.(2

)Sp

ecia

lreq

uire

men

ts.

7A

sbes

tos

cont

aini

ngm

ater

ials

(AC

M)s

.

8A

ntiq

uitie

s.

9Fi

repr

even

tion.

(1)

Gen

eral

requ

irem

ents

.(2

)D

etai

lsof

stan

dard

sto

whi

chco

ntra

ctor

isto

com

ply.

10Sm

okin

gon

-site

.(1

)G

ener

alre

quire

men

ts.

(2)

Spec

ialr

equi

rem

ents

.11

Burn

ing

on-s

ite.

12M

oist

ure.

(1)

Requ

irem

ents

for

prev

entin

gw

etne

ssan

dda

mpn

ess.

(2)

Requ

irem

ents

for

dryi

ngou

t.

13In

fect

edtim

ber/

cont

amin

ated

mat

eria

ls.G

ener

alre

quire

men

ts.

14W

aste

.(1

)D

efin

ition

ofw

aste

.(2

)G

ener

alre

quire

men

ts,i

nclu

ding

min

imiz

ing

was

te,

rem

ovin

gw

aste

and

excl

udin

gw

aste

from

void

san

dca

vitie

sin

the

cons

truc

tion.

(3)

Requ

irem

ents

inre

spec

tof

‘site

was

tem

anag

emen

tpl

ans’

(SW

MP)

.(4

)D

ocum

enta

tion

requ

irem

ents

.(5

)D

etai

lsof

key

perfo

rman

cein

dica

tor

(KPI

)da

tato

bepr

ovid

ed.

(6)

Info

rmat

ion

and

docu

men

tatio

nsu

bmiss

ion

requ

irem

ents

.

TABULATED WORK SECTIONS

66 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 74: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

15El

ectr

omag

netic

inte

rfere

nce.

Gen

eral

requ

irem

ents

.

16La

ser

equi

pmen

t.

17Po

wer

actu

ated

fixin

gsy

stem

s.

18In

vasiv

esp

ecie

s.(1

)G

ener

alre

quire

men

tsfo

rth

epr

even

tion

ofin

vasiv

esp

ecie

s(e

.g.p

lant

san

dan

imal

s).

(2)

Det

ails

ofan

ysp

ecia

lpre

caut

ions

requ

ired.

(3)

Requ

irem

ents

inre

spec

tof

disc

over

yan

dre

port

ing.

3Pr

otec

tion

1Ex

istin

gse

rvic

es.

(1)

Requ

irem

ents

inre

spec

tof

notif

ying

serv

ices

auth

oriti

es,s

tatu

tory

unde

rtak

ers

and/

orad

join

ing

adja

cent

owne

rs.

(2)

Requ

irem

ents

for

iden

tific

atio

nof

exist

ing

serv

ices

.(3

)Re

quire

men

tssh

ould

dam

age

occu

rto

exist

ing

serv

ices

.(4

)O

ther

requ

irem

ents

.

2Ro

ads

and

foot

path

s.(1

)G

ener

alre

quire

men

ts.

(2)

Requ

irem

ents

shou

ldda

mag

eoc

cur

toex

istin

gro

ads

and/

orfo

otpa

ths.

(3)

Oth

erre

quire

men

ts.

3Ex

istin

gto

psoi

land

subs

oil.

(1)

Requ

irem

ents

for

prev

entin

gov

erco

mpa

ctio

nof

exist

ing

tops

oila

ndsu

bsoi

l.(2

)D

etai

lsof

prot

ectiv

em

easu

res.

4Re

tain

edtr

ees,

shru

bsan

dgr

asse

dar

eas.

(1)

Det

ails

ofpr

otec

tive

mea

sure

s.(2

)Re

quire

men

tssh

ould

dam

age

occu

rto

reta

ined

tree

s,sh

rubs

and

gras

sed

area

s.(3

)O

ther

requ

irem

ents

.

5A

reas

ofre

tain

edtr

ees.

Det

ails

ofpr

otec

tive

mea

sure

s.

6W

ildlif

esp

ecie

san

dha

bita

ts.

(1)

Gen

eral

requ

irem

ents

.(2

)D

etai

lsof

prot

ectiv

em

easu

res.

(3)

Oth

erre

quire

men

ts.

7Ex

istin

gfe

atur

es.

(1)

Det

ails

ofpr

otec

tive

mea

sure

s.(2

)Sp

ecia

lreq

uire

men

ts.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 67

Page 75: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

8Ex

istin

gw

ork.

(1)

Det

ails

ofpr

otec

tive

mea

sure

s.(2

)Re

quire

men

tsfo

rre

mov

ing

and

repl

acin

gex

istin

gw

ork.

9Bu

ildin

gin

terio

rs.

Det

ails

ofpr

otec

tive

mea

sure

s.

10Ex

istin

gfu

rnitu

re,f

ittin

gsan

deq

uipm

ent.

(1)

Det

ails

ofpr

otec

tive

mea

sure

s.(2

)Ex

tent

ofre

mov

alw

ork

tobe

carr

ied

out

byth

eem

ploy

er.

11Es

peci

ally

valu

able

and

vuln

erab

leite

ms.

(1)

Det

ails

ofpr

otec

tive

mea

sure

s.(2

)Ex

tent

ofre

mov

alw

ork

tobe

carr

ied

out

byth

eem

ploy

er.

12A

djoi

ning

prop

erty

.Pe

rmiss

ion

requ

irem

ents

.

13A

djoi

ning

prop

erty

rest

rictio

ns.

(1)

Prec

autio

nsto

beta

ken

byth

eco

ntra

ctor

.(2

)C

onse

quen

ceof

dam

age.

14Ex

istin

gst

ruct

ures

.G

ener

alre

quire

men

ts.

15M

ater

ials

for

recy

clin

gan

d/or

reus

e.(1

)So

rtin

gan

dda

mag

epr

even

tion

requ

irem

ents

.(2

)St

orag

ere

quire

men

ts.

1.10

Em

ploy

er’s

requ

irem

ents

:Spe

cific

limit

atio

nso

nm

etho

d,se

quen

cean

dti

min

g

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1G

ener

alSt

atem

ent

expl

aini

ngth

atlim

itatio

nsde

scrib

edin

this

sect

ion

ofth

epr

elim

inar

ies

bill

are

supp

lem

enta

ryto

limita

tions

desc

ribed

orim

plic

itin

info

rmat

ion

give

nin

othe

rse

ctio

nsor

onth

edr

awin

gs.

2D

esig

nco

nstr

aint

sD

etai

lsof

any

desig

nco

nstr

aint

s.

3M

etho

d/se

quen

ceof

wor

kSp

ecifi

clim

itatio

nsre

latin

gto

met

hod

and

sequ

ence

ofw

orki

ng,i

nclu

ding

phas

ing

requ

irem

ents

tobe

incl

uded

inth

epr

ogra

mm

e.

4U

seor

disp

osal

ofm

ater

ials

foun

dSp

ecifi

clim

itatio

ns.

TABULATED WORK SECTIONS

68 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 76: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

5U

seor

disp

osal

ofm

ater

ials

foun

dSp

ecifi

clim

itatio

ns.

6W

orki

ngho

urs

(1)

Def

initi

onof

wor

kho

urs.

(2)

Def

initi

onof

norm

alw

orki

ngho

urs.

7C

ompl

etio

nof

any

sect

ion

orpa

rtof

the

wor

ks1

Empl

oyer

requ

irem

ents

for

poss

essio

n.(1

)G

ener

alre

quire

men

ts.

(2)

Spec

ialr

equi

rem

ents

.

2Re

mai

nder

ofth

ew

orks

.Re

quire

men

tsin

resp

ect

of:

(1)

Prov

ision

ofse

rvic

es.

(2)

Fire

prec

autio

ns.

(3)

Mea

nsof

esca

pean

dsa

feac

cess

.(4

)O

ther

requ

irem

ents

.

1.11

Em

ploy

er’s

requ

irem

ents

:Sit

eac

com

mo

dati

on/

serv

ices

/faci

litie

s/te

mpo

rary

wo

rk

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1G

ener

ally

1Sp

oilh

eaps

,tem

pora

ryw

orks

and

serv

ices

.Re

quire

men

tsin

resp

ect

ofth

esit

ing

ofsp

oilh

eaps

and

the

mai

nten

ance

,alte

ratio

n,m

ovem

ent

and

rem

oval

ofte

mpo

rary

wor

ks.

2Si

teac

com

mod

atio

n1

Room

for

mee

tings

.(1

)Sp

ecifi

cre

quire

men

ts,i

nclu

ding

furn

iture

and

equi

pmen

t,to

best

ated

.(2

)C

lean

ing

and

mai

nten

ance

requ

irem

ents

.2

Site

offic

es.

3O

ff-sit

eof

fices

/roo

mfo

rm

eetin

gs.

(1)

Spec

ific

requ

irem

ents

,inc

ludi

ngfu

rnitu

rean

deq

uipm

ent.

(2)

Prep

arat

ory

wor

ks,i

nclu

ding

pain

ting,

deco

ratio

nan

dap

plie

dfin

ishin

gs(e

.g.c

arpe

t).

(3)

Cle

anin

gan

dm

aint

enan

cere

quire

men

ts.

4Sa

nita

ryac

com

mod

atio

n.Sp

ecifi

cre

quire

men

ts,i

nclu

ding

furn

iture

and

equi

pmen

t.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 69

Page 77: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

5U

seof

acco

mm

odat

ion/

land

not

incl

uded

inth

esit

e.(1

)Id

entif

icat

ion

ofac

com

mod

atio

nan

dor

land

that

may

beus

edby

the

cont

ract

orfo

rth

edu

ratio

nof

the

cont

ract

with

out

char

ge.

(2)

Lim

itatio

ns/r

estr

ictio

nson

use.

(3)

Requ

irem

ents

for

tem

pora

ryad

apta

tions

.(4

)C

lean

ing

and

mai

nten

ance

requ

irem

ents

.(5

)A

ccom

mod

atio

n/la

ndus

e.(6

)Lo

catio

nof

acco

mm

odat

ion/

land

.(7

)Re

inst

atem

ent

requ

irem

ents

onva

catio

nof

acco

mm

odat

ion/

land

.

6C

arpa

rkin

g.Sp

ecifi

cre

quire

men

tsfo

rth

epr

ovisi

onof

car

park

ing

for

repr

esen

tativ

esof

the

empl

oyer

.

3Se

rvic

esan

dfa

cilit

ies

1Li

ghtin

g.Sp

ecifi

cre

quire

men

tsfo

rth

epr

ovisi

onte

mpo

rary

light

ing

for

finish

ing

wor

kan

din

spec

tion.

2Li

ghtin

gan

dpo

wer

.(1

)Re

quire

men

tsin

resp

ect

of:

(a)

Use

ofem

ploy

er’s

mai

nssu

pply.

(b)

Resp

onsib

ility

for

cont

inui

tyof

supp

ly.(2

)M

eter

ing

requ

irem

ents

.(3

)Lo

catio

nof

supp

lypo

int.

(4)

Ava

ilabl

eca

paci

ty,f

requ

ency

,pha

sean

dcu

rren

tty

pe.

(5)

Con

ditio

ns/r

estr

ictio

nsim

pose

don

the

cont

ract

or.

3W

ater

.(1

)Re

quire

men

tsto

best

ated

inre

spec

tof

(a)

Use

ofem

ploy

er’s

mai

nssu

pply.

(b)

Resp

onsib

ility

for

cont

inui

tyof

supp

ly.(2

)M

eter

ing

requ

irem

ents

.(3

)So

urce

ofsu

pply.

(4)

Loca

tion

ofsu

pply

poin

t.(5

)C

ondi

tions

/res

tric

tions

impo

sed

onth

eco

ntra

ctor

.

4C

ontr

acto

r’son

-site

tele

phon

es.

(1)

Dat

eto

bein

stal

led.

(2)

Resp

onsib

ility

for

payi

ngin

stal

latio

nan

dal

lren

tal

char

ges,

incl

udin

gpa

ying

the

cost

ofca

lls.

(3)

Requ

irem

ents

for

diss

emin

atin

gte

leph

one

num

ber.

(4)

Oth

erre

quire

men

ts.

TABULATED WORK SECTIONS

70 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 78: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

5M

obile

tele

phon

es.

Requ

irem

ents

inre

spec

tof

:(1

)C

ontr

acto

r’sst

aff

requ

ired

tobe

prov

ided

with

mob

ilete

leph

ones

.(2

)Re

spon

sibilit

yfo

rpa

ying

inst

alla

tion

and

allr

enta

lch

arge

s,in

clud

ing

payi

ngth

eco

stof

calls

.(3

)Re

quire

men

tfo

rdi

ssem

inat

ing

tele

phon

enu

mbe

rs.

(4)

Oth

erre

quire

men

ts.

6Te

leph

ones

.(1

)Sy

stem

requ

irem

ents

.(2

)D

ate

tobe

inst

alle

d.(3

)Re

spon

sibilit

yfo

rpa

ying

inst

alla

tion

and

allr

enta

lch

arge

s,in

clud

ing

payi

ngth

eco

stof

calls

.(4

)O

ther

requ

irem

ents

.7

Fax

inst

alla

tion.

8C

ompu

ters

.(1

)Sy

stem

requ

irem

ents

,inc

ludi

ngco

mpu

ters

,so

ftwar

e,pr

inte

rs,c

able

san

dco

nsum

able

s.(2

)Re

spon

sibilit

yfo

rpa

ying

the

cost

ofco

nsum

able

s.(3

)D

ate

tobe

inst

alle

d.(4

)O

ther

requ

irem

ents

.

9Em

aila

ndin

tern

etfa

cilit

ies.

(1)

Syst

emre

quire

men

ts.

(2)

Dat

eto

bein

stal

led.

(3)

Resp

onsib

ility

for

payi

ngin

stal

latio

nan

dal

lren

tal

char

ges.

(4)

Oth

erre

quire

men

ts.

10Ph

otoc

opie

r.Em

ploy

er’s

requ

irem

ents

.

11Te

mpe

ratu

rean

dhu

mid

ity.

Leve

lsto

bem

aint

aine

dby

the

cont

ract

or.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 71

Page 79: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

12U

seof

perm

anen

the

atin

gsy

stem

s.(1

)C

onfir

mat

ion

orot

herw

iseth

atth

eco

ntra

ctor

ispe

rmitt

edto

use

perm

anen

the

atin

gsy

stem

sfo

rdr

ying

out

the

wor

ks,s

ervi

ces

and

cont

rollin

gte

mpe

ratu

rean

dhu

mid

ityle

vels.

(2)

Requ

irem

ents

for

oper

atio

n,m

aint

enan

cean

dre

med

ialw

ork.

(3)

Requ

irem

ents

for

cont

ract

orto

arra

nge

supe

rvisi

onof

use

bysu

bcon

trac

tor

and

inde

mni

ficat

ion

ofsu

bcon

trac

tor.

(4)

Oth

erre

quire

men

ts.

13Be

nefic

ialu

seof

perm

anen

tin

stal

led

syst

ems.

Det

ails

ofse

rvic

essy

stem

s,in

clud

ing

lifts

and

sani

tary

inst

alla

tions

,whi

chca

nbe

used

byth

eco

ntra

ctor

toco

mpl

ete

the

wor

ks.

14M

eter

read

ings

.Re

quire

men

tsfo

rob

tain

ing

met

erre

adin

gs.

15Th

erm

omet

ers.

Requ

irem

ents

for

prov

idin

gm

axim

uman

dm

inim

umth

erm

omet

ers

for

mea

surin

gat

mos

pher

icsh

ade

tem

pera

ture

.

16Su

rvey

ing

equi

pmen

t.Re

quire

men

tsfo

rpr

ovid

ing

surv

eyin

geq

uipm

ent.

17Pe

rson

alpr

otec

tive

equi

pmen

t.Sp

ecifi

cre

quire

men

tsfo

rth

ose

actin

gon

beha

lfof

the

empl

oyer

.

18O

ther

requ

irem

ents

.Sp

ecifi

cre

quire

men

ts.

4Te

mpo

rary

wor

ks1

Road

s,ha

rdst

andi

ngs

and

foot

path

s.Re

quire

men

tsin

resp

ect

ofpe

rman

ent

road

s,ha

rdst

andi

ngs

and

foot

path

son

the

site,

incl

udin

gre

stric

tions

onus

ean

dpr

otec

tive

and/

orre

med

ial

mea

sure

s.

2Te

mpo

rary

wor

ks.

Spec

ific

requ

irem

ents

(e.g

.fen

ces,

hoar

ding

s,sc

reen

san

dro

ofs)

.

TABULATED WORK SECTIONS

72 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 80: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3Te

mpo

rary

prot

ectio

nm

easu

res

toex

istin

gtr

ees/

vege

tatio

n.(1

)Lo

catio

nof

tem

pora

rypr

otec

tion

(by

refe

renc

eto

draw

ing)

(2)

Stan

dard

sof

prot

ectiv

eba

rrie

rsan

dan

yot

her

appl

icab

leph

ysic

alpr

otec

tion

mea

sure

s.(3

)D

esig

nde

tails

ofph

ysic

alpr

otec

tion

mea

sure

s(b

yre

fere

nce

todr

awin

g).

(4)

Are

asof

stru

ctur

alla

ndsc

apin

gto

bepr

otec

ted

from

cons

truc

tion

oper

atio

ns.

(5)

Requ

irem

ents

for

mai

ntai

ning

inte

grity

ofpr

otec

tion

for

the

dura

tion

ofth

ew

orks

.(6

)Re

quire

men

tsfo

rre

mov

ing

prot

ectio

non

com

plet

ion

ofth

ew

orks

.

4N

ame

boar

ds.

Spec

ific

requ

irem

ents

.

5A

dver

tisin

g.

6O

ther

requ

irem

ents

.

1.12

Em

ploy

er’s

requ

irem

ents

:Ope

rati

on/

mai

nten

ance

of

finis

hed

build

ing

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1O

pera

tion

and

mai

nten

ance

man

ual

1G

ener

ally.

(1)

Purp

ose.

(2)

Scop

e.(3

)Re

spon

sibilit

yfo

rpr

epar

atio

n.(4

)In

form

atio

nto

bepr

ovid

edby

othe

rs.

(5)

Revi

ewpr

oces

s.(6

)N

umbe

rof

copi

es.

(7)

Late

stda

tefo

rsu

bmiss

ion

offin

alm

anua

l.(8

)A

s-bu

ilt/a

s-in

stal

led

draw

ings

:(a

)fo

rmat

and

stan

dard

(b)

num

ber

ofco

pies

.

The

oper

atio

nan

dm

aint

enan

cein

form

atio

n,th

ehe

alth

and

safe

tyfil

e,an

dal

loth

erin

form

atio

nca

nbe

com

bine

das

asin

gle

docu

men

t.In

this

case

,the

docu

men

tca

nbe

refe

rred

toas

the

‘bui

ldin

gm

anua

l’.

2C

onte

nt.

Spec

ific

requ

irem

ents

.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 73

Page 81: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

2H

ealth

and

safe

tyfil

e1

Gen

eral

ly.(1

)Pu

rpos

e.(2

)Sc

ope.

(3)

Resp

onsib

ility

for

prep

arat

ion.

(4)

Info

rmat

ion

tobe

prov

ided

byth

eco

ntra

ctor

,w

here

not

resp

onsib

lefo

rpr

epar

atio

n.(5

)Re

view

proc

ess.

(6)

Num

ber

ofco

pies

.(7

)La

test

date

for

subm

issio

nof

final

file.

2C

onte

nt.

Spec

ific

requ

irem

ents

.

3W

eb-b

ased

info

rmat

ion

man

agem

ent

syst

emSp

ecifi

cre

quire

men

ts.

4Pr

esen

tatio

nof

docu

men

ts1

Ope

ratio

nan

dm

aint

enan

cem

anua

l.Sp

ecifi

cre

quire

men

tsin

resp

ect

offo

rmat

and

pres

enta

tion.

2H

ealth

and

safe

tyfil

e.

3O

ther

docu

men

ts.

Spec

ific

requ

irem

ents

.

5O

ther

empl

oyer

spec

ific

requ

irem

ents

1M

aint

enan

cese

rvic

es.

Spec

ific

requ

irem

ents

for

post

com

plet

ion

mai

nten

ance

(pla

nned

and

reac

tive)

.

2In

form

atio

nfo

rco

mm

issio

ning

serv

ices

.Sp

ecifi

cre

quire

men

ts.

3Tr

aini

ng.

4Sp

are

part

s.

5To

ols.

6O

ther

info

rmat

ion

Spec

ific

requ

irem

ents

.

TABULATED WORK SECTIONS

74 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 82: RICS new rules of measurement 2

1P

relim

inar

ies

(mai

nco

ntra

ct)

Part

B:P

rici

ngsc

hedu

le

1.1

Em

ploy

er’s

requ

irem

ents

1.1.

1S

ite

acco

mm

oda

tio

n

Com

pone

ntIn

clud

ed/n

otes

onpr

icin

gU

nit

Pric

ing

met

hod

Excl

uded

1Si

teac

com

mod

atio

nSi

teac

com

mod

atio

nfo

rth

eem

ploy

eran

dth

eem

ploy

er’s

repr

esen

tativ

esw

here

sepa

rate

from

mai

nco

ntra

ctor

’ssit

eac

com

mod

atio

n,in

clud

ing:

–sit

eof

fices

.–

sani

tary

acco

mm

odat

ion.

–w

elfa

refa

cilit

ies.

–fo

unda

tions

tosit

eac

com

mod

atio

n.–

tem

pora

rydr

aina

geto

acco

mm

odat

ion.

–te

mpo

rary

serv

ices

.–

intr

uder

alar

ms.

Type

and

exte

ntof

acco

mm

odat

ion

tobe

prov

ided

tobe

stat

ed;

with

each

type

sepa

rate

lyqu

antif

ied.

Site

acco

mm

odat

ion,

furn

iture

and

equi

pmen

t,te

leco

mm

unic

atio

nan

dIT

syst

ems

for

the

empl

oyer

and

the

empl

oyer

repr

esen

tativ

esw

here

anin

tegr

alpa

rtof

the

mai

nco

ntra

ctor

’ssit

eac

com

mod

atio

n(in

clud

edin

sect

ion

1.2:

inco

ntra

ctor

’sco

stite

ms,

asap

prop

riate

).

1Br

ingi

ngto

site

and

inst

allin

g,in

clud

ing

allt

empo

rary

drai

nage

,se

rvic

esan

din

trud

eral

arm

s.ite

mFi

xed

char

ge.

2A

dapt

atio

ns/a

ltera

tions

durin

gw

orks

.

3D

isman

tling

and

rem

ovin

gfro

msit

e,in

clud

ing

rect

ifyin

gan

yda

mag

e.

4M

aint

aini

ng.

wee

ksTi

me-

rela

ted

char

ge.

5C

lean

ing.

6C

harg

es.

7O

ff-sit

ere

nted

tem

pora

ryac

com

mod

atio

n.

8Re

ctify

ing

dam

age

toof

f-site

rent

edte

mpo

rary

acco

mm

odat

ion.

item

Fixe

dch

arge

.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 75

Page 83: RICS new rules of measurement 2

Com

pone

ntIn

clud

ed/n

otes

onpr

icin

gU

nit

Pric

ing

met

hod

Excl

uded

2Fu

rnitu

rean

deq

uipm

ent

Furn

iture

and

equi

pmen

tfo

rth

eem

ploy

eran

dth

eem

ploy

er’s

repr

esen

tativ

esw

here

sepa

rate

from

mai

nco

ntra

ctor

’ssit

eac

com

mod

atio

n.Fo

rex

ampl

e,de

sks,

chai

rs,m

eetin

gta

ble

and

chai

rs,c

upbo

ards

,ket

tles,

coffe

em

aker

,pho

toco

pier

and

cons

umab

les.

1Br

ingi

ngto

site

and

inst

allin

g.ite

mFi

xed

char

ge.

2C

lean

ing.

wee

kTi

me-

rela

ted

char

ge.

3C

harg

es.

4D

isman

tling

and

rem

ovin

gfro

msit

e.ite

mFi

xed

char

ge.

3Te

leco

mm

unic

atio

nsan

dIT

syst

ems

Tele

com

mun

icat

ion

and

ITsy

stem

sfo

rth

eem

ploy

eran

dth

eem

ploy

er’s

repr

esen

tativ

esw

here

sepa

rate

from

mai

nco

ntra

ctor

’ssit

eac

com

mod

atio

n,in

clud

ing

tele

phon

es,f

axm

achi

nes,

phot

ocop

ier,

com

pute

rs,p

rinte

rsan

dco

nsum

able

s.

1Pu

rcha

sech

arge

s.nr

Fixe

dch

arge

.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3C

onsu

mab

les.

1.1.

2S

ite

reco

rds

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

tere

cord

s1

Ope

ratio

nan

dm

aint

enan

cem

anua

ls.ite

mFi

xed

char

ge.

2C

ompi

latio

nof

heal

than

dsa

fety

file.

2W

eb-b

ased

info

rmat

ion

man

agem

ent

syst

em1

Prov

ision

ofsy

stem

.

2U

ploa

ding

ofda

ta.

3Tr

aini

ngof

build

ing

user

’sst

aff

inth

eop

erat

ion

ofth

ew

eb-b

ased

man

agem

ent

syst

em.

TABULATED WORK SECTIONS

76 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 84: RICS new rules of measurement 2

1.1.

3C

om

plet

ion

and

post

-co

mpl

etio

nre

quir

emen

ts

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1H

ando

ver

requ

irem

ents

1Tr

aini

ngof

build

ing

user

’sst

aff

inth

eop

erat

ion

and

mai

nten

ance

ofth

ebu

ildin

gen

gine

erin

gse

rvic

essy

stem

s.ite

mFi

xed

char

ge.

2Pr

ovisi

onof

spar

epa

rts

for

mai

nten

ance

ofbu

ildin

gen

gine

erin

gse

rvic

es.

3Pr

ovisi

onof

tool

san

dpo

rtab

lein

dica

ting

inst

rum

ents

for

the

oper

atio

nan

dm

aint

enan

ceof

build

ing

engi

neer

ing

serv

ices

syst

ems.

2O

pera

tion

and

mai

nten

ance

serv

ices

1O

pera

tion

and

mai

nten

ance

ofbu

ildin

gen

gine

erin

gse

rvic

esin

stal

latio

ns,m

echa

nica

lpla

ntan

deq

uipm

ent

and

the

like

durin

gth

ede

fect

slia

bilit

ype

riod,

perio

dfo

rre

ctify

ing

defe

cts,

mai

nten

ance

perio

dor

othe

rsp

ecifi

edpe

riod

(i.e.

addi

tiona

lse

rvic

esth

atar

eno

rmal

lyre

quire

dby

the

cont

ract

).

wee

kTi

me-

rela

ted

char

ge.

3La

ndsc

ape

man

agem

ent

serv

ices

1M

aint

enan

ceof

inte

rnal

and

exte

rnal

plan

ting.

1.2

Mai

nC

ont

ract

or’

sco

stit

ems

1.2.

1M

anag

emen

tan

dst

aff

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Pr

ojec

t-sp

ecifi

cm

anag

emen

tan

dst

aff

Mai

nco

ntra

ctor

’spr

ojec

tsp

ecifi

cm

anag

emen

tan

dst

aff

such

as:

1Pr

ojec

tm

anag

er/d

irect

or.

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.1

Secu

rity

staf

f(in

clud

edin

sect

ion

1.2.

4:Se

curit

y).

2C

onst

ruct

ion

man

ager

.

3Su

perv

isors

,inc

ludi

ngw

orks

/tra

depa

ckag

em

anag

ers,

build

ing

serv

ices

engi

neer

ing

man

ager

s/co

-ord

inat

ors

and

off-s

itepr

oduc

tion

man

ager

s.

4H

ealth

and

safe

tym

anag

er/o

ffice

rs.

5C

omm

issio

ning

man

ager

(bui

ldin

gen

gine

erin

gse

rvic

es).

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 77

Page 85: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

6Pl

anni

ng/p

rogr

amm

ing

man

ager

and

staf

f.

7Se

nior

/man

agin

gqu

antit

ysu

rvey

or.

8Pr

ojec

t/pa

ckag

equ

antit

ysu

rvey

ors.

9Pr

ocur

emen

tm

anag

er.

10D

esig

nm

anag

er.

11Pr

ojec

ten

gine

ers.

12En

viro

nmen

talm

anag

er.

13Te

mpo

rary

wor

ksde

sign

engi

neer

s.

14M

ater

ials

man

agem

ent

staf

f(e

.g.s

tore

man

).

15A

dmin

istra

tive

staf

f,in

clud

ing

secr

etar

y,do

cum

ent

cont

rolle

rs,

finan

cecl

erks

and

the

like.

16O

ther

man

agem

ent

and

staf

f.

2V

isitin

gm

anag

emen

tan

dst

aff

1M

anag

ing

dire

ctor

,reg

iona

ldire

ctor

,ope

ratio

nsdi

rect

or,

com

mer

cial

dire

ctor

and

the

like.

1V

isitin

gm

anag

emen

tan

dst

aff

for

whi

chan

allo

wan

ceha

sbe

enm

ade

with

inth

em

ain

cont

ract

or’s

over

head

s.2

Qua

lity

man

ager

.

3C

ontr

acts

/com

mer

cial

man

ager

.

4H

ealth

and

safe

tym

anag

er.

5En

viro

nmen

talm

anag

er/c

onsu

ltant

.

6O

ther

visit

ing

man

agem

ent

and

staf

f.

3Ex

trao

rdin

ary

supp

ort

cost

s1

Lega

ladv

ice

cost

s(i.

e.so

licito

rs).

item

Fixe

dch

arge

.1

Extr

aord

inar

ysu

ppor

tco

sts

for

whi

chan

allo

wan

ceha

sbe

enm

ade

with

inth

em

ain

cont

ract

or’s

over

head

s.

2Re

crui

tmen

tco

sts.

3Te

ambu

ildin

gco

sts.

4O

ther

extr

aord

inar

ysu

ppor

tco

sts.

5D

aytr

ansp

ort.

wee

k(n

umbe

rof

days

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

6Pe

rson

nelt

rans

port

(i.e.

tran

spor

tatio

nof

wor

kop

erat

ives

tosit

e).

TABULATED WORK SECTIONS

78 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 86: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

7Te

mpo

rary

livin

gac

com

mod

atio

n(e

.g.l

ong/

med

ium

term

acco

mm

odat

ion

cost

s).

wee

k(n

umbe

rof

staf

fby

num

ber

ofda

yspe

rw

eek

bynu

mbe

rof

wee

ks)

8Su

bsist

ence

paym

ents

.

9O

utof

norm

alho

urs

wor

king

,inc

ludi

ngno

n-pr

oduc

tive

over

time

allo

wan

ces.

4St

aff

trav

elC

osts

asso

ciat

edw

ithof

f-site

visit

ssu

chas

:

1V

isits

toem

ploy

er’s

and

cons

ulta

nts’

offic

es.

nr(n

umbe

rof

occa

sions

)Fi

xed

char

ge.

2V

isits

tosu

bcon

trac

tors

’offi

ces/

wor

ks.

3O

vers

eas

visit

s.

4A

ccom

mod

atio

nch

arge

san

dov

erni

ght

expe

nses

.

1.2.

2S

ite

esta

blis

hmen

t

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

teac

com

mod

atio

nM

ain

cont

ract

or’s

and

com

mon

user

tem

pora

rysit

eac

com

mod

atio

nsu

chas

:–

offic

es.

–co

nfer

ence

/mee

ting

room

s.–

cant

eens

and

kitc

hens

.–

dryi

ngro

oms.

–to

ilets

and

was

hroo

ms.

–fir

stai

dro

om.

–la

bora

torie

s.–

wor

ksho

ps.

–se

cure

stor

es.

–co

mpo

unds

,inc

ludi

ngco

ntai

ners

for

mat

eria

lsto

rage

.–

secu

rity

cont

rolr

oom

.–

stai

rsan

dof

fice

stag

ing.

1Em

ploy

er’s

acco

mm

odat

ion,

whe

reno

tan

inte

gral

part

ofth

em

ain

cont

ract

or’s

site

acco

mm

odat

ion

(incl

uded

inse

ctio

n1.

1.1:

Site

acco

mm

odat

ion)

.2

Tem

pora

ryba

ses,

foun

datio

nsan

dpr

ovisi

onof

drai

nage

and

serv

ices

tote

mpo

rary

site

acco

mm

odat

ion

(incl

uded

inco

mpo

nent

1.2.

2.2:

Tem

pora

ryw

orks

inco

nnec

tion

with

site

esta

blish

men

t).

3Se

rvic

epr

ovid

er’s

char

ges

for

tem

pora

ryse

rvic

es(in

clud

edin

sect

ion

1.2.

12:F

ees

and

char

ges)

.4

Rate

sfo

rte

mpo

rary

serv

ices

(incl

uded

inse

ctio

n1.

2.12

:Fee

san

dch

arge

s).

Type

and

exte

ntof

acco

mm

odat

ion

tobe

prov

ided

tobe

stat

ed,

with

each

type

sepa

rate

lyqu

antif

ied.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 79

Page 87: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Pu

rcha

sech

arge

s.ite

mFi

xed

char

ge.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3Em

ploy

er’s

acco

mm

odat

ion,

whe

rean

inte

gral

part

ofth

em

ain

cont

ract

or’s

site

acco

mm

odat

ion.

4D

eliv

ery

ofte

mpo

rary

site

acco

mm

odat

ion

tosit

e,er

ectio

n,co

nstr

uctio

nan

dre

mov

al.

item

Fixe

dch

arge

.

5Te

mpo

rary

acco

mm

odat

ion

mad

eav

aila

ble

byth

eem

ploy

er.

wee

kTi

me-

rela

ted

char

ge.

6In

trud

eral

arm

s.ite

mFi

xed

char

ge.

7La

nd/p

rope

rty

rent

alw

here

site

acco

mm

odat

ion

loca

ted

off-s

ite.

wee

kTi

me-

rela

ted

char

ge.

8A

ltera

tions

and

adap

tatio

nsto

site

acco

mm

odat

ion,

incl

udin

gpa

rtiti

onin

g,do

ors,

pain

ting

and

deco

ratin

g,an

dth

elik

e.ite

mFi

xed

char

ge.

9Re

loca

tion

and

alte

ratio

nsof

tem

pora

ryac

com

mod

atio

ndu

ring

cons

truc

tion

stag

e.

10Re

inst

atin

gte

mpo

rary

site

acco

mm

odat

ion

toor

igin

alco

nditi

onpr

ior

tore

mov

alfro

msit

e.

11Re

mov

alof

site

acco

mm

odat

ion

and

tem

pora

ryw

orks

inco

nnec

tion

with

site

acco

mm

odat

ion.

2Te

mpo

rary

wor

ksin

conn

ectio

nw

ithsit

ees

tabl

ishm

ent

1Te

mpo

rary

base

san

dfo

unda

tions

for

site

acco

mm

odat

ion,

incl

udin

gm

aint

enan

cean

dre

inst

atem

ent

ofex

istin

gsu

rface

son

com

plet

ion

ofth

ew

orks

.

m2

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1Pr

ovisi

onof

tem

pora

ryse

rvic

esto

site

esta

blish

men

t(in

clud

edin

sect

ion

1.2.

3:Te

mpo

rary

serv

ices

).2

Prov

ision

ofte

mpo

rary

drai

nage

tosit

ees

tabl

ishm

ent

(incl

uded

inse

ctio

n1.

2.3:

Tem

pora

ryse

rvic

es).

3H

oard

ings

,fan

s,fe

ncin

gan

dth

elik

eto

site

boun

darie

san

dto

form

site

com

poun

ds(in

clud

edin

sect

ion

1.2.

4:Se

curit

y(H

oard

ings

,fen

ces

and

gate

s).

2C

onne

ctio

nsto

tem

pora

ryse

rvic

e,in

clud

ing

mai

nten

ance

and

rem

oval

onco

mpl

etio

nof

the

wor

ks.

nr

3C

onne

ctio

nsto

tem

pora

rydr

aina

ge,i

nin

clud

ing

mai

nten

ance

and

rem

oval

onco

mpl

etio

nof

the

wor

ks.

nr

4Te

mpo

rary

site

road

s,pa

ths

and

pavi

ngs

(incl

udin

gon

-site

car

park

ing)

,inc

ludi

ngre

inst

atem

ent

ofex

istin

gsu

rface

son

com

plet

ion

ofth

ew

orks

.

m

5Te

mpo

rary

surfa

cew

ater

drai

nage

tote

mpo

rary

site

road

s,pa

ths

and

pave

men

ts,i

nclu

ding

mai

nten

ance

and

rem

oval

onco

mpl

etio

nof

the

wor

ks.

m

TABULATED WORK SECTIONS

80 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 88: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

3Fu

rnitu

rean

deq

uipm

ent

1W

orks

tatio

nsfo

rst

aff,

incl

udin

gm

aint

enan

ce.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.1

Tele

phon

ean

dfa

xin

stal

latio

ns(in

clud

edin

sect

ion

1.2.

3:Te

mpo

rary

serv

ices

).2

Com

pute

rsan

dIT

asso

ciat

edeq

uipm

ent

(incl

uded

inco

mpo

nent

1.2.

2.4:

ITsy

stem

s).

2G

ener

alof

fice

furn

iture

,inc

ludi

ngm

aint

enan

ce.

item

3C

onfe

renc

e/m

eetin

gro

omfu

rnitu

re,i

nclu

ding

mai

nten

ance

.

4Ph

otoc

opie

rs,i

nclu

ding

purc

hase

/ren

tal,

mai

nten

ance

and

othe

rru

nnin

gco

sts.

5C

ante

enfu

rnitu

re,i

nclu

ding

mai

nten

ance

.

6C

ante

eneq

uipm

ent,

incl

udin

gpu

rcha

se/r

enta

l,m

aint

enan

cean

dot

her

runn

ing

cost

s.

7Fl

oor

cove

rings

,inc

ludi

ngm

aint

enan

ce.

8W

ater

disp

ense

rs,i

nclu

ding

purc

hase

/ren

tal,

mai

nten

ance

and

othe

rru

nnin

gco

sts.

9H

eate

rs,i

nclu

ding

mai

nten

ance

ofhe

ater

s.

10O

ther

offic

eeq

uipm

ent,

incl

udin

gm

aint

enan

ce.

11Re

mov

alof

furn

iture

and

equi

pmen

t.

12M

aint

enan

cefu

rnitu

rean

dflo

orco

verin

g.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 81

Page 89: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

4IT

syst

ems

1C

ompu

ter

hard

war

e,in

clud

ing

purc

hase

/ren

tal,

inst

alla

tion,

initi

alse

tup

,mai

nten

ance

and

runn

ing

cost

s,su

chas

:–

desk

top

com

pute

rsan

dla

ptop

com

pute

rs.

–C

AD

stat

ions

.–

serv

eran

dne

twor

keq

uipm

ent.

–pr

inte

rsan

dpl

otte

rs.

–ot

her

com

pute

rsy

stem

hard

war

e.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1C

ompu

ter

and

prin

ter

cons

umab

les

(incl

uded

inco

mpo

nent

1.1.

2.5:

Con

sum

able

san

dse

rvic

es).

2D

ocum

ent

man

agem

ent,

incl

udin

gel

ectr

onic

data

man

agem

ent

syst

ems

(ED

MS)

(incl

uded

inco

mpo

nent

1.1.

2.6:

Brou

ght

inse

rvic

es).

2So

ftwar

ean

dso

ftwar

elic

ence

s.

3M

odem

lines

,mod

ems

and

conn

ectio

ns(i.

e.em

aila

ndin

tern

etca

pabi

lity)

.

4W

AN

lines

and

conn

ectio

ns(if

onW

AN

).

5Li

nere

ntal

char

ges.

wee

kTi

me-

rela

ted

char

ge.

6In

tern

et/w

ebsit

ead

dres

ses.

nrFi

xed

char

ge.

7In

tern

etse

rvic

epr

ovid

er(IS

P)ch

arge

s.

8Li

neca

llsch

arge

s.w

eek

Tim

e-re

late

dch

arge

.

9IT

supp

ort

and

mai

nten

ance

.

5C

onsu

mab

les

and

serv

ices

1St

atio

nery

.w

eek

Tim

e-re

late

dch

arge

.

2C

ompu

ter

and

prin

ter

cons

umab

les

(e.g

.ink

cart

ridge

s).

3Po

stag

e.

4C

ourie

rch

arge

s.

5Te

a,co

ffee,

wat

erbo

ttle

san

dth

elik

e.

6Fi

rst

aid

cons

umab

les.

7Ph

otoc

opie

rco

nsum

able

s(e

.g.p

aper

and

tone

rs).

8Fa

xco

nsum

able

s(e

.g.p

aper

and

tone

rs).

9D

raw

ing

prin

ter

cons

umab

les

(e.g

.ink

cart

ridge

s).

TABULATED WORK SECTIONS

82 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 90: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

6Br

ough

t-in

serv

ices

Serv

ices

outs

ourc

edby

the

mai

nco

ntra

ctor

such

as:

1C

ater

ing.

wee

kTi

me-

rela

ted

char

ge.

2Eq

uipm

ent

mai

nten

ance

.

3D

ocum

ent

man

agem

ent,

incl

udin

gm

anag

emen

tin

form

atio

nsy

stem

san

del

ectr

onic

data

man

agem

ent

syst

ems

(ED

MS)

.

4Pr

intin

g(p

urch

asin

g),i

nclu

ding

repo

rts

and

draw

ings

.

5St

aff

tran

spor

t.

6O

ff-sit

epa

rkin

gch

arge

s.

7M

eetin

gro

omfa

cilit

ies.

8Ph

otog

raph

icse

rvic

es.

9O

ther

.

7Su

ndrie

s1

Mai

nco

ntra

ctor

’ssig

nboa

rds.

item

Fixe

dch

arge

.

2Sa

fety

and

info

rmat

ion

notic

ebo

ards

.

3Fi

repo

ints

.

4Sh

elte

rs.

5To

olst

ores

.

6C

rane

signa

ge.

7Em

ploy

er’s

com

posit

esig

nboa

rds.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 83

Page 91: RICS new rules of measurement 2

1.2.

3Te

mpo

rary

serv

ices

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Te

mpo

rary

wat

ersu

pply

1Te

mpo

rary

conn

ectio

ns.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Dist

ribut

ion

equi

pmen

t,in

stal

latio

nan

dad

apta

tions

.ite

m

3M

eter

char

ges.

wee

k

2Te

mpo

rary

gas

supp

ly1

Gas

conn

ectio

n.nr

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2D

istrib

utio

neq

uipm

ent,

inst

alla

tion

and

adap

tatio

ns.

item

3C

harg

es.

wee

k

4Bo

ttle

dga

s.

3Te

mpo

rary

elec

tric

itysu

pply

1Te

mpo

rary

conn

ectio

ns.

nrFi

xed

char

ge.

2Te

mpo

rary

elec

tric

alsu

pply

for

tow

ercr

anes

.ite

m

3C

harg

es–

pow

erco

nsum

ptio

nfo

rsit

ees

tabl

ishm

ent.

item

Tim

e-re

late

dch

arge

.

4C

harg

es–

pow

erco

nsum

ptio

nfo

rth

ew

orks

.

5D

istrib

utio

neq

uipm

ent,

inst

alla

tion

and

adap

tatio

ns.

item

Fixe

dch

arge

.

6A

tten

danc

e.nr

(num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

7U

nint

erru

pted

pow

ersu

pply

(UPS

).ite

mFi

xed

char

ge.

8Te

mpo

rary

subs

tatio

nm

odifi

catio

ns.

4Te

mpo

rary

tele

com

mun

icat

ion

syst

ems

1La

ndlin

es(in

clud

ing

conn

ectio

nan

dre

ntal

char

ges)

,inc

ludi

ng:

–te

leph

one

and

fax

lines

–IS

DN

lines

.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1Fa

xco

nsum

able

s(in

clud

edin

com

pone

nt1.

1.2.

5:C

onsu

mab

les

and

serv

ices

).

2Te

leph

one

and

facs

imile

equi

pmen

t(in

clud

ing

conn

ectio

nan

dre

ntal

char

ges)

,inc

ludi

ng:

–PA

BXeq

uipm

ent.

–ha

ndse

ts,i

nclu

ding

purc

hase

orre

ntal

.–

fax

mac

hine

s,in

clud

ing

purc

hase

orre

ntal

.–

inst

alla

tion

ofeq

uipm

ent.

–m

aint

enan

ceof

equi

pmen

t.

TABULATED WORK SECTIONS

84 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 92: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

3M

obile

(cel

lula

r)ph

ones

,inc

ludi

ng:

–m

obile

phon

es,i

nclu

ding

purc

hase

orre

ntal

and

conn

ectio

nch

arge

s.–

spar

eba

tter

ies.

–m

obile

phon

ech

arge

s.

4Te

leph

one

char

ges,

incl

udin

g:–

tele

phon

eca

llch

arge

s.–

fax

char

ges.

–fa

xan

dte

leph

one

cons

umab

les.

5Ra

dios

(incl

udin

gpu

rcha

seor

rent

alch

arge

s),i

nclu

ding

:–

base

set.

–ha

ndse

tsan

dch

arge

rs.

–re

pairs

and

mai

nten

ance

.–

licen

ces.

–sp

are

batt

erie

s.

5Te

mpo

rary

drai

nage

1Te

mpo

rary

mai

ns.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Se

ptic

tank

s.nr

3O

n-sit

etr

eatm

ent

plan

t.ite

m

4H

oldi

ngta

nks.

nr

5Se

wag

epu

mpi

ng.

6D

istrib

utio

npi

pew

ork,

etc.

item

7D

rain

age

inst

alla

tion

and

adap

tatio

ns.

8D

ispos

alch

arge

s(i.

e.ra

tes)

.w

eek

Tim

e-re

late

dch

arge

.

9D

ispos

alco

sts

(i.e.

tank

erch

arge

s).

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 85

Page 93: RICS new rules of measurement 2

1.2.

4S

ecur

ity

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Se

curit

yst

aff

1Se

curit

ygu

ards

(day

and

nigh

t).

nr(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

).

Tim

e-re

late

dch

arge

.1

Secu

rity

staf

fac

com

mod

atio

n(in

clud

edin

sect

ion

1.1.

2:Si

tees

tabl

ishm

ent)

.

2W

atch

men

(day

and

nigh

t).

2Se

curit

yeq

uipm

ent

1Si

tepa

ssiss

ueeq

uipm

ent,

incl

udin

gm

aint

enan

cean

dre

mov

al.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Si

tepa

ssco

nsum

able

s.

3C

CTV

surv

eilla

nce

inst

alla

tion,

incl

udin

gm

aint

enan

cean

dre

mov

al.

4Te

mpo

rary

vehi

cle

cont

rolb

arrie

rs,i

nclu

ding

mai

nten

ance

and

rem

oval

.nr

3H

oard

ings

,fen

ces

and

gate

s1

Perim

eter

hoar

ding

san

dfe

ncin

gan

dth

elik

eto

site

boun

darie

san

dto

form

site

com

poun

ds.

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

2A

cces

sga

tes,

incl

udin

gfr

ames

and

ironm

onge

ry.

nr

3Pa

intin

gof

hoar

ding

s,fe

ncin

g,ga

tes,

and

the

like.

m

4Te

mpo

rary

door

s.nr

5M

odifi

catio

nto

line

ofho

ardi

ngan

dfe

ncin

gdu

ring

cons

truc

tion.

6D

isman

tling

and

rem

oval

ofho

ardi

ng,f

enci

ng,g

ates

,and

the

like.

m

TABULATED WORK SECTIONS

86 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 94: RICS new rules of measurement 2

1.2.

5S

afet

yan

den

viro

nmen

tal

pro

tect

ion

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Sa

fety

prog

ram

me

Wor

ksre

quire

dto

satis

fyre

quire

men

tsof

CD

MRe

gula

tions

:1

Hea

lthan

dsa

fety

man

ager

/offi

cers

.nr

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

Tim

e-re

late

dch

arge

.1

Hea

lthan

dsa

fety

man

ager

/offi

cers

(incl

uded

inse

ctio

n1.

2.1:

Man

agem

ent

and

staf

f).2

Wel

fare

faci

litie

s(in

clud

edin

sect

ion

1.2.

2:Si

tees

tabl

ishm

ent)

.

2Sa

fety

audi

ts,i

nclu

ding

safe

tyau

dits

carr

ied

out

byex

tern

alco

nsul

tant

.nr

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

3St

aff

safe

tytr

aini

ng.

item

4Si

tesa

fety

ince

ntiv

esc

hem

e.

5N

otic

esan

din

form

atio

nto

neig

hbou

rs.

6Pe

rson

alpr

otec

tive

equi

pmen

t(P

PE),

incl

udin

gfo

rem

ploy

eran

dco

nsul

tant

s.nr

(set

s)

7PP

Efo

rm

ulti-

serv

ice

gang

s.

8Fi

repo

ints

.nr

9Te

mpo

rary

fire

alar

ms.

10Fi

reex

tingu

isher

s.

11St

atut

ory

safe

tysig

nage

.ite

m

12N

urse

.nr

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

Tim

e-re

late

dch

arge

.

13Tr

affic

mar

shal

s.

2Ba

rrie

rsan

dsa

fety

scaf

fold

ing

1G

uard

rails

and

edge

prot

ectio

n(e

.g.t

oed

ges

ofsu

spen

ded

slabs

and

roof

s).

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Te

mpo

rary

stai

rcas

eba

lust

rade

s(i.

e.to

new

stai

rcas

esdu

ring

cons

truc

tion)

.

3Li

ftsh

aft

prot

ectio

n.

4Pr

otec

tion

toho

les

and

open

ings

ingr

ound

floor

slabs

,su

spen

ded

slabs

and

the

like.

5D

ebris

nett

ing/

plas

ticsh

eetin

g.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 87

Page 95: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

6Fa

npr

otec

tion.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

7Sc

affo

ldin

spec

tions

.nr

8H

oist

run-

offs

.ite

m

9Pr

otec

tive

wal

kway

s.

10O

ther

safe

tym

easu

res.

3En

viro

nmen

talp

rote

ctio

nm

easu

res

1C

ontr

olof

pollu

tion.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Re

sidua

lcon

trol

ofno

ise.

3En

viro

nmen

talm

onito

ring.

4En

viro

nmen

talm

anag

er/c

onsu

ltant

.nr

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

Tim

e-re

late

dch

arge

.

5En

viro

nmen

tala

udits

,inc

ludi

ngsa

fety

audi

tsca

rrie

dou

tby

exte

rnal

cons

ulta

nt.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

1.2.

6C

ont

rol

and

pro

tect

ion

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Su

rvey

,ins

pect

ions

and

mon

itorin

g1

Surv

eys.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1En

viro

nmen

talm

onito

ring

(incl

uded

inse

ctio

n2.

2.5:

Safe

tyan

den

viro

nmen

tal

prot

ectio

n).

2To

pogr

aphi

cals

urve

y.

3N

on-e

mpl

oyer

dila

pida

tion

surv

ey.

4St

ruct

ural

/dila

pida

tions

surv

eyad

join

ing

build

ings

.

5En

viro

nmen

tals

urve

ys.

6M

ovem

ent

mon

itorin

g.

7M

aint

enan

cean

din

spec

tion

cost

s.

TABULATED WORK SECTIONS

88 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 96: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

2Se

ttin

gou

t1

Sett

ing

out

prim

ary

grid

s.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Grid

tran

sfer

san

dle

velc

heck

s.

3M

aint

enan

ceof

grid

s.

4Ta

keov

erco

ntro

land

inde

pend

ent

chec

ks(i.

e.on

chan

geof

subc

ontr

acto

rs).

5In

stru

men

tsfo

rse

ttin

gou

t.

3Pr

otec

tion

ofw

orks

1Pr

otec

tion

offin

ished

wor

ksto

proj

ect

hand

over

.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

2Pr

otec

tion

ofst

airs

,bal

ustr

ades

and

the

like

wor

ksto

proj

ect

hand

over

.

3Pr

otec

tion

offit

tings

and

furn

ishin

gsw

orks

topr

ojec

tha

ndov

er.

4Pr

otec

tion

ofen

tran

cedo

ors

and

fram

esw

orks

topr

ojec

tha

ndov

er.

5Pr

otec

tion

oflif

tca

rsan

ddo

ors

wor

ksto

proj

ect

hand

over

.

6Pr

otec

tion

ofsp

ecifi

cally

vuln

erab

lepr

oduc

tsto

proj

ect

hand

over

.

7Pr

otec

tion

ofal

lsun

dry

item

s.

4Sa

mpl

es1

Prov

ision

ofsa

mpl

es.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Pr

ovisi

onof

sam

ple

room

.

3M

ock-

ups

and

sam

ple

pane

ls.

4Te

stin

gof

sam

ples

/moc

k-up

s,in

clud

ing

test

ing

fees

.

5O

n-sit

ela

bora

tory

equi

pmen

t.

6M

ock-

ups

ofpr

efab

ricat

edun

its(e

.g.r

esid

entia

luni

ts,s

tude

ntac

com

mod

atio

nun

its,h

otel

acco

mm

odat

ion

and

the

like)

.

5En

viro

nmen

talc

ontr

olof

build

ing

1D

ryou

tbu

ildin

g.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Tem

pora

ryhe

atin

g/co

olin

g.

3Te

mpo

rary

wat

erpr

oofin

g,in

clud

ing

over

roof

s.

4Te

mpo

rary

encl

osur

es.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 89

Page 97: RICS new rules of measurement 2

1.2.

7M

echa

nica

lpl

ant

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1G

ener

ally

Com

mon

user

mec

hani

calp

lant

and

equi

pmen

tus

edin

cons

truc

tion

oper

atio

ns.

Plan

tan

deq

uipm

ent

used

for

spec

ific

cons

truc

tion

oper

atio

ns,s

uch

as:

1Ea

rthm

ovin

gpl

ant.

2Pi

ling

plan

t.3

Pavi

ngan

dsu

rfaci

ngpl

ant.

4W

heel

spin

ners

,and

road

swee

pers

(incl

uded

inse

ctio

n1.

2.11

:Cle

anin

g).

5A

cces

ssc

affo

ldin

g(in

clud

edin

sect

ion

1.2.

8:Te

mpo

rary

wor

ks).

2To

wer

cran

esTy

peof

cran

eage

tobe

prov

ided

shal

lbe

stat

ed;w

ithea

chty

pese

para

tely

quan

tifie

d.

1H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.1

Tem

pora

ryel

ectr

ical

supp

lyto

tow

ercr

ane

(incl

uded

inse

ctio

n1.

2.3:

Tem

pora

ryse

rvic

es).

2C

rane

oper

ator

.w

eek

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

3O

vert

ime

for

cran

ean

dop

erat

or.

4Pi

les

for

tow

ercr

ane

base

s,in

clud

ing

mai

nten

ance

rem

oval

.nr

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

5Te

mpo

rary

base

sfo

rto

wer

cran

es,i

nclu

ding

anch

ors,

mai

nten

ance

;rem

oval

and

rein

stat

emen

ton

com

plet

ion

(size

,in

m2,t

obe

stat

ed).

6Ti

es.

wee

kTi

me-

rela

ted

char

ge.

7C

onne

ctio

nsto

tem

pora

ryel

ectr

ical

supp

ly.nr

Fixe

dch

arge

.

8Br

ing

tosit

e,er

ectio

n,te

stan

dco

mm

issio

n.

9Pe

riodi

csa

fety

chec

ks/in

spec

tions

.w

eek

Tim

e-re

late

dch

arge

.

10D

isman

tling

and

rem

ovin

gfro

msit

e.nr

Fixe

dch

arge

.

TABULATED WORK SECTIONS

90 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 98: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

11O

ther

cost

ssp

ecifi

cto

tow

ercr

ane

such

as:

–ch

ain

pack

and

sund

ries

–re

lief

oper

ator

–ba

nksm

an–

man

cage

.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

12Te

mpo

rary

void

sin

build

ing

stru

ctur

efo

rcr

anea

ge,h

oist

san

dth

elik

ein

clud

ing

fillin

gvo

ids

afte

rre

mov

al.

nrFi

xed

char

ge.

3M

obile

cran

esTy

peof

cran

eage

tobe

prov

ided

shal

lbe

stat

ed;w

ithea

chty

pese

para

tely

quan

tifie

d.1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

1M

obile

cran

ehi

rech

arge

s,in

clud

ing

driv

er/o

pera

tor

char

ges.

wee

k

2A

tten

danc

e.nr

(num

ber

ofm

anho

urs

per

visit

bynu

mbe

rof

visit

s)

3O

ther

cost

ssp

ecifi

cto

mob

ilecr

ane

hire

.ite

m

4H

oist

sTy

peof

hoist

tobe

prov

ided

shal

lbe

stat

ed;w

ithea

chty

pese

para

tely

quan

tifie

d.

1G

oods

and

pass

enge

rho

ists,

incl

udin

gpr

otec

tion

cage

san

dem

bedm

ent

fram

es.

wee

kTi

me-

rela

ted

char

ge.

1Te

mpo

rary

serv

ices

toho

istin

stal

latio

ns(in

clud

edin

sect

ion

1.2.

3:Te

mpo

rary

serv

ices

).

2H

oist

base

s.nr

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

3Br

ingi

ngto

site,

erec

ting,

test

ing

and

com

miss

ioni

ng.

nrFi

xed

char

ge.

4D

isman

tling

and

rem

ovin

gfro

msit

e.

5Pr

otec

tion

syst

ems.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

6H

oist

oper

ator

,inc

ludi

ngov

ertim

e.w

eek

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

Tim

e-re

late

dch

arge

.

7Be

amho

ists.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 91

Page 99: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

8Pe

riodi

csa

fety

chec

ks/in

spec

tions

.m

onth

Tim

e-re

late

dch

arge

.

9O

ther

cost

ssp

ecifi

cto

tem

pora

ryho

istin

stal

latio

ns.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

5A

cces

spl

ant

1Fo

lklif

ts.

wee

k1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Sciss

orlif

ts.

3Lo

adin

gpl

atfo

rms.

4M

aint

enan

ceof

mec

hani

cala

cces

seq

uipm

ent.

5O

ther

cost

ssp

ecifi

cto

mec

hani

cala

cces

seq

uipm

ent.

item

6C

oncr

ete

plan

t1

Con

cret

epl

ant.

wee

k1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.1

Tem

pora

ryse

rvic

eto

conc

rete

plan

t(in

clud

edin

sect

ion

1.2.

3:Te

mpo

rary

serv

ices

).

2Pl

ant

oper

ator

.w

eek

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

Tim

e-re

late

dch

arge

.

3O

vert

ime

for

plan

tan

dop

erat

or.

4Ba

ses

for

conc

rete

plan

t.nr

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

5Po

wer

conn

ectio

ns,i

nclu

ding

cabl

ing

and

stat

utor

yun

dert

aker

’sch

arge

sfo

rte

mpo

rary

conn

ectio

nto

thei

rsu

pply.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

6Br

ing

tosit

e,er

ectio

n,te

stan

dco

mm

issio

n.nr

Fixe

dch

arge

.

7M

aint

enan

ceof

conc

rete

plan

t.w

eek

Tim

e-re

late

dch

arge

.

8D

isman

tling

and

rem

ovin

gfro

msit

e.nr

Fixe

dch

arge

.

TABULATED WORK SECTIONS

92 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 100: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

7O

ther

plan

t1

Smal

lpla

ntan

dto

ols.

wee

kTi

me-

rela

ted

char

ge.

1.2.

8Te

mpo

rary

wo

rks

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1A

cces

ssc

affo

ldin

gC

omm

onus

erac

cess

scaf

fold

ing

(typ

eof

acce

sssc

affo

ldin

gto

besp

ecifi

ed):

–ac

cess

scaf

fold

ing

toel

evat

ions

,lift

shaf

tsan

dth

elik

e,in

clud

ing:

fans

and

mes

hsc

reen

s.–

stru

ctur

alsc

affo

ldin

g(e

.g.t

opa

rty

wal

ls).

–bi

rdca

gesc

affo

ldin

g.–

cant

ileve

rac

cess

scaf

fold

ing.

–st

airc

ase

plat

form

s.–

prim

ary

load

ing

plat

form

s.–

trav

ellin

gac

cess

plat

form

s.

1Sc

affo

ldin

gsp

ecifi

cto

wor

kspa

ckag

es(in

clud

edin

appr

opria

teel

emen

tor

sub-

elem

ent)

.2

Scaf

fold

insp

ectio

ns(in

clud

edin

sub-

elem

ent

1.2.

5:Sa

fety

and

envi

ronm

enta

lpro

tect

ion)

.

1Br

ingi

ngto

site,

erec

ting

and

initi

alsa

fety

chec

ks.

nrFi

xed

char

ge.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3A

lterin

gan

dad

aptin

gdu

ring

cons

truc

tion.

nrFi

xed

char

ge.

4D

isman

tling

and

rem

ovin

gfro

msit

e.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 93

Page 101: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

2Te

mpo

rary

wor

ksC

omm

onus

erte

mpo

rary

wor

ks:

–su

ppor

tsc

affo

ldin

gan

dpr

oppi

ng.

–cr

ash

deck

s.–

tem

pora

rypr

otec

tion

toex

istin

gtr

ees

and/

orve

geta

tion.

–flo

odlig

hts.

1Te

mpo

rary

wor

ksde

sign

(incl

uded

inse

ctio

n1.

1.1:

Man

agem

ent

and

staf

f).2

Tem

pora

ryba

ses,

drai

nage

and

serv

ices

tosit

eac

com

mod

atio

n(in

clud

edin

sect

ion

1.2.

2:Si

tees

tabl

ishm

ent)

.3

Tem

pora

ryro

ads,

path

san

dpa

vem

ent,

incl

udin

gon

-site

car

park

ing

(incl

uded

inse

ctio

n1.

2.2:

Site

esta

blish

men

t(i.

e.Bu

ilder

’sw

ork

inco

nnec

tion

with

site

acco

mm

odat

ion)

).4

Hoa

rdin

gs,f

ans,

fenc

ing

and

the

like

tosit

ebo

unda

ries

and

tofo

rmsit

eco

mpo

unds

(incl

uded

inse

ctio

n1.

2.4:

Secu

rity

(hoa

rdin

gs,f

ence

san

dga

tes)

.5

Tem

pora

ryea

rthw

ork

supp

ort

base

men

tex

cava

tions

.6

Tem

pora

rypr

ops

and

wal

ings

tosu

ppor

tco

ntig

uous

bore

dpi

lew

allo

fba

sem

ent

exca

vatio

ns.

7Tr

affic

man

agem

ent,

incl

udin

gtr

affic

mar

shal

san

dte

mpo

rary

traf

ficlig

hts

(incl

uded

inse

ctio

n1.

2.5:

Safe

tyan

den

viro

nmen

talp

rote

ctio

n).

1Br

ingi

ngto

site,

erec

ting

and

initi

alsa

fety

chec

ks.

nrFi

xed

char

ge.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3A

lterin

gan

dad

aptin

gdu

ring

cons

truc

tion.

nrFi

xed

char

ge.

4D

isman

tling

and

rem

ovin

gfro

msit

e.

1.2.

9S

ite

reco

rds

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

tere

cord

sU

nles

sot

herw

isein

dica

ted,

cost

sas

soci

ated

with

the

follo

win

gsh

all

bede

emed

tobe

incl

uded

inm

anag

emen

tan

dst

aff

cost

s:

1Ph

otog

raph

y:–

cam

era

purc

hase

.–

cons

umab

les.

–pr

intin

gan

dpr

esen

tatio

n.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

TABULATED WORK SECTIONS

94 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 102: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

2W

orks

reco

rds:

–pr

ogre

ssre

port

ing.

–sit

ese

ttin

gou

tdr

awin

gs.

–co

nditi

onsu

rvey

san

dre

port

s.–

oper

atio

nan

dm

aint

enan

cem

anua

ls.–

as-b

uilt/

inst

alle

ddr

awin

gsan

dsc

hedu

les.

–co

-ord

inat

ing,

gath

erin

gan

dco

mpi

ling

heal

than

dsa

fety

info

rmat

ion

and

pres

enta

tion

toC

DM

co-o

rdin

ator

.–

com

pila

tion

ofhe

alth

and

safe

tyfil

e(if

requ

ired)

.

1.2.

10C

om

plet

ion

and

post

-co

mpl

etio

nre

quir

emen

ts

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Te

stin

gan

dco

mm

issio

ning

plan

Cos

tsas

soci

ated

with

the

follo

win

gsh

allb

ede

emed

tobe

incl

uded

inse

ctio

n1.

2.1:

Man

agem

ent

and

staf

fco

sts:

1Te

stin

gan

dco

mm

issio

ning

ofse

rvic

es.

1Pr

epar

atio

nof

Com

miss

ioni

ngPl

an.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2H

ando

ver

Unl

ess

othe

rwise

indi

cate

d,co

sts

asso

ciat

edw

ithth

efo

llow

ing

shal

lbe

deem

edto

bein

clud

edin

sect

ion

1.2.

1:M

anag

emen

tan

dst

aff

cost

s:

1Pr

epar

atio

nof

Han

dove

rPl

an.

2Tr

aini

ngof

build

ing

user

’sst

aff

inth

eop

erat

ion

and

mai

nten

ance

ofth

ebu

ildin

gen

gine

erin

gse

rvic

essy

stem

s.

3Pr

ovisi

onof

spar

epa

rts

for

mai

nten

ance

ofbu

ildin

gen

gine

erin

gse

rvic

es.

4Pr

ovisi

onof

tool

san

dpo

rtab

lein

dica

ting

inst

rum

ents

for

the

oper

atio

nan

dm

aint

enan

ceof

build

ing

engi

neer

ing

serv

ices

syst

ems.

5Pr

e-co

mpl

etio

nin

spec

tions

.

6Fi

nali

nspe

ctio

ns.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 95

Page 103: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

3Po

st-c

ompl

etio

nse

rvic

es1

Supe

rviso

ryst

aff

(em

ploy

er/t

enan

tca

re).

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

2H

andy

man

.

3M

inor

mat

eria

lsan

dsu

ndry

item

s.ite

mFi

xed

char

ge.

4In

sura

nces

.

5O

ther

post

-con

stru

ctio

nst

aff.

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

1.2.

11C

lean

ing

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

tetid

y1

Cle

anin

gsit

eac

com

mod

atio

n–

inte

rnal

,inc

ludi

ngcl

eani

ngte

leph

one

hand

sets

,oth

erof

fice

furn

iture

and

equi

pmen

tan

dw

indo

wcl

eani

ng.

wee

kTi

me-

rela

ted

char

ge.

2Pe

riodi

cm

aint

enan

ceof

site

acco

mm

odat

ion,

incl

udin

gre

deco

ratio

n(in

tern

alan

dex

tern

al).

3W

aste

man

agem

ent,

incl

udin

gru

bbish

disp

osal

(incl

udin

gco

mpa

ctor

visit

s;sk

ips

and

was

tebi

ns;r

oll-o

ff,ro

ll-on

was

tebi

ns)

and

othe

rdi

spos

al.

4Pe

stco

ntro

l.

2M

aint

enan

ceof

road

s,pa

ths

and

pavi

ngs

1M

aint

enan

ceof

tem

pora

rysit

ero

ads,

path

s,an

dpa

vem

ents

.w

eek

Tim

e-re

late

dch

arge

.

2M

aint

enan

ceof

publ

ican

dpr

ivat

ero

ads,

incl

udin

gw

heel

spin

ners

and

road

swee

pers

.

3Bu

ildin

gcl

ean

1Fi

nalb

uild

er’s

clea

n.ite

mFi

xed

char

ge.

TABULATED WORK SECTIONS

96 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 104: RICS new rules of measurement 2

1.2.

12Fe

esan

dch

arge

s

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Fe

es1

Build

ing

cont

rolf

ees,

whe

reno

tpa

idby

the

empl

oyer

.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.1

Build

ing

cont

rolf

ees,

whe

repa

idby

the

empl

oyer

.2

Ove

rsai

ling

fees

,whe

repa

idby

the

empl

oyer

.3

Sche

me

regi

stra

tion

fees

orsim

ilar

fees

,w

here

paid

byth

eem

ploy

er.

2O

vers

ailin

gfe

es,w

here

not

paid

byth

eem

ploy

er.

3C

onsid

erat

eC

onst

ruct

ors’

Sche

me

fees

(or

alte

rnat

ive

sche

me

oper

ated

bylo

cala

utho

rity)

.

4Sc

hem

ere

gist

ratio

nfe

esor

simila

rfe

es,w

here

not

paid

byth

eem

ploy

er.

2C

harg

es1

Rate

son

tem

pora

ryac

com

mod

atio

n.w

eek

Tim

e-re

late

dch

arge

.1

Stat

utor

yun

dert

aker

’sch

arge

sin

conn

ectio

nw

ithpe

rman

ent

serv

ices

toth

ebu

ildin

g.2

Stat

utor

yun

dert

aker

’sch

arge

sin

conn

ectio

nw

ithte

mpo

rary

serv

ices

.

2Li

cenc

esin

conn

ectio

nw

ithho

ardi

ngs,

scaf

fold

ing,

gant

ries

and

the

like.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

3Li

cenc

esin

conn

ectio

nw

ithcr

osso

vers

,par

king

perm

its,p

arki

ngba

ysu

spen

sions

and

the

like.

1.2.

13S

ite

serv

ices

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Te

mpo

rary

wor

ks1

Tem

pora

ryw

orks

that

are

not

spec

ific

toan

elem

ent.

item

/nr/

m/m

2/m

31

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.1

Tem

pora

rysc

reen

sin

conn

ectio

nw

ithm

inor

dem

oliti

onw

orks

and

alte

ratio

nw

orks

.2

Supp

orts

tosm

allo

peni

ngs

cut

into

exist

ing

wal

lsor

afte

rre

mov

alof

inte

rnal

wal

lsor

the

like

inco

nnec

tion

with

min

orde

mol

ition

wor

ksan

dal

tera

tion

wor

ks.

3Te

mpo

rary

orse

mi-p

erm

anen

tsu

ppor

tfo

run

stab

lest

ruct

ures

orfa

cade

s–

faca

dere

tent

ion

wor

ks(i.

e.st

ruct

ures

not

tobe

dem

olish

ed).

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 97

Page 105: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

2M

ulti-

serv

ice

gang

1G

ange

r.w

eek

(num

ber

ofst

aff

bynu

mbe

rof

man

hour

spe

rw

eek

bynu

mbe

rof

wee

ks)

Tim

e-re

late

dch

arge

.

2La

bour

.

3Fo

rklif

tdr

iver

.

4Se

rvic

ega

ngpl

ant

and

tran

spor

t.

1.2.

14In

sura

nce,

bond

s,gu

aran

tees

and

war

rant

ies

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1W

orks

insu

ranc

e1

Con

trac

tor’s

‘all

risks

’(C

AR)

insu

ranc

e.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Con

trac

tor’s

plan

tan

deq

uipm

ent

insu

ranc

e.

3Te

mpo

rary

build

ings

insu

ranc

e.

4Te

rror

ismin

sura

nce.

5O

ther

insu

ranc

esin

conn

ectio

nw

ithth

ew

orks

.

6In

sura

nce

prem

ium

tax

(IPT)

.

7A

llow

ance

for

reco

very

ofal

lor

part

ofin

sura

nce

prem

ium

exce

ss.

2Pu

blic

liabi

lity

insu

ranc

e1

Non

-neg

ligen

cein

sura

nce.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Pr

ofes

siona

lind

emni

tyin

sura

nce.

3In

sura

nce

prem

ium

tax

(IPT)

.

4A

llow

ance

for

reco

very

ofal

lor

part

ofin

sura

nce

prem

ium

exce

ss.

3Em

ploy

er’s

(mai

nco

ntra

ctor

’s)lia

bilit

yin

sura

nce

1M

anag

emen

tan

dst

aff,

incl

udin

gad

min

istra

tive

staf

f.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Wor

ksop

erat

ives

.

3In

sura

nce

prem

ium

tax

(IPT)

.

4A

llow

ance

for

reco

very

ofal

lor

part

ofin

sura

nce

prem

ium

exce

ss.

TABULATED WORK SECTIONS

98 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 106: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

4O

ther

insu

ranc

es1

Empl

oyer

’slo

ssof

liqui

date

dda

mag

es.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2La

tent

defe

cts

cove

r.

3M

otor

vehi

cles

.

4O

ther

insu

ranc

es.

5In

sura

nce

prem

ium

tax

(IPT)

.

6A

llow

ance

for

reco

very

ofal

lor

part

ofin

sura

nce

prem

ium

exce

ss.

5Bo

nds

1Te

nder

bond

s(if

appl

icab

le).

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Pe

rform

ance

bond

s.

6G

uara

ntee

s1

Pare

ntco

mpa

nygu

aran

tees

.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Prod

uct

guar

ante

es,i

nsur

ance

back

edgu

aran

tees

.

7W

arra

ntie

s1

Col

late

ralw

arra

ntie

s.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Fund

er’s

war

rant

ies.

3Pu

rcha

ser’s

and

tena

nt’s

war

rant

ies.

4O

ther

war

rant

ies.

1 PRELIMINARIES (MAIN CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 99

Page 107: RICS new rules of measurement 2

1P

relim

inar

ies

(wo

rks

pack

age

cont

ract

)

Part

A:I

nfor

mat

ion

and

requ

irem

ents

1.1

Pro

ject

part

icul

ars

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Pr

ojec

tpa

rtic

ular

s.1

The

proj

ect.

Shor

tpr

ojec

ttit

le.

2N

atur

eof

wor

kpa

ckag

ew

orks

.Sh

ort

desc

riptio

nto

best

ated

.

3Lo

catio

nof

proj

ect.

Full

post

alad

dres

sto

best

ated

.

4Le

ngth

ofw

ork

pack

age

cont

ract

/sub

-con

trac

t.Pe

riod,

inw

eeks

,to

best

ated

.W

here

tobe

stat

edby

the

cont

ract

or,i

nser

t‘to

beco

nfirm

ed’.

5N

ames

,add

ress

esan

dpo

ints

ofco

ntac

tof

cont

ract

or,e

mpl

oyer

and

cons

ulta

nts.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

1.2

Dra

win

gsan

do

ther

docu

men

ts

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1D

raw

ings

1Li

stof

draw

ings

from

whi

chth

ebi

llof

quan

titie

sw

aspr

epar

ed.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).Ex

cept

ions

tobe

stat

ed.

2O

ther

docu

men

ts1

Pre-

cons

truc

tion

info

rmat

ion.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

TABULATED WORK SECTIONS

100 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 108: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

2Li

stof

draw

ings

and

othe

rdo

cum

ents

rela

ting

toth

ew

ork

pack

age

orsu

b-co

ntra

ctbu

tno

tin

clud

edin

the

tend

erdo

cum

ents

.

(1)

Prov

ide

list

ofdr

awin

gsan

dot

her

docu

men

tsre

latin

gto

the

wor

kpa

ckag

eor

sub-

cont

ract

but

not

incl

uded

inth

ete

nder

docu

men

ts,w

hich

may

bese

enby

the

cont

ract

ordu

ring

the

tend

erpe

riod.

(2)

Doc

umen

ttit

le,r

efer

ence

,rev

ision

,dat

eof

issue

and

auth

orto

best

ated

.(3

)D

etai

lsof

whe

redo

cum

ents

can

bese

ento

best

ated

.

1.3

The

site

and

exis

ting

build

ings

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Th

esit

e(1

)A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

Cro

ssre

fere

nce

tom

ain

cont

ract

or’s

prel

imin

arie

s.

2Ex

istin

gbu

ildin

gson

orad

jace

ntto

the

site

(2)

Add

ition

alde

tails

rele

vant

toth

ew

ork

pack

age.

3Ex

istin

gm

ains

serv

ices

1O

nth

esit

e.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2A

djac

ent

toth

esit

e.

4H

ealth

and

safe

tyha

zard

sA

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

5Si

tevi

sits

Arr

ange

men

tsfo

rsit

evi

sits.

Incl

ude

whe

rein

form

atio

nno

tgi

ven

inth

e‘C

ondi

tions

ofTe

nder

’.

1.4

Des

crip

tio

no

fth

eW

ork

s

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Th

eW

orks

Des

crip

tion

ofth

eW

orks

(or

entir

ebu

ildin

gpr

ojec

t).

2Pr

epar

ator

yw

ork

byot

hers

Des

crip

tion

ofan

yw

ork

that

will

beca

rrie

dou

tby

othe

rsun

der

ase

para

teco

ntra

ctbe

fore

the

star

tof

wor

kon

site

for

this

cont

act.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 101

Page 109: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3Su

bcon

trac

tw

ork

Des

crip

tion

for

the

wor

ksco

mpr

ising

the

wor

kspa

ckag

e.4

Com

plet

ion

wor

kby

othe

rs

1.5

The

cont

ract

cond

itio

ns

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1C

ondi

tions

ofco

ntra

ct1

[For

mof

cont

ract

title

tobe

stat

ed]

(1)

Full

title

ofth

est

anda

rdor

besp

oke

form

ofco

ntra

ct/s

ub-c

ontr

act,

incl

udin

ged

ition

,rev

ision

,and

stan

dard

amen

dmen

tsap

plic

able

.(2

)Re

fere

nce

toan

yam

endm

ents

tocl

ause

s/co

nditi

ons

tost

anda

rdfo

rmof

cont

ract

/sub

-con

trac

t(s

eeno

te(1

)).

(3)

Refe

renc

eto

any

supp

lem

enta

ryor

spec

ial

clau

ses/

cond

ition

sto

stan

dard

form

ofco

ntra

ct/s

ub-c

ontr

act.

(1)W

here

besp

oke

orun

com

mon

form

sof

cont

ract

are

used

,aco

pyis

tobe

appe

nded

toth

ebi

llof

quan

titie

sor

incl

uded

aspa

rtof

the

tend

er.

1.6

Pro

visi

on,

cont

ent

and

use

of

docu

men

ts

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1D

efin

ition

san

din

terp

reta

tions

1D

efin

ition

s.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2C

omm

unic

atio

n.

3Pr

oduc

ts.

4Si

teeq

uipm

ent.

5D

raw

ings

.

6C

ontr

acto

r’sch

oice

.

7C

ontr

acto

r’sde

signe

d.w

orks

8Su

bmit

prop

osal

s.

9Te

rms

used

insp

ecifi

catio

n.

TABULATED WORK SECTIONS

102 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 110: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

10M

anuf

actu

rer

and

prod

uct

refe

renc

es.

11Su

bstit

utio

nof

prod

ucts

.

12C

ross

-ref

eren

ces.

13Re

fere

nced

docu

men

ts.

14Eq

uiva

lent

prod

ucts

.

15Su

bstit

utio

nof

stan

dard

s.

16C

urre

ncy

ofdo

cum

ents

.

17Pr

oduc

tsiz

es.

2D

ocum

ents

prov

ided

onbe

half

ofem

ploy

er1

Add

ition

alco

pies

ofdr

awin

gsan

ddo

cum

ents

.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2D

imen

sions

.

3M

easu

red

quan

titie

s

4Th

esp

ecifi

catio

n.

5D

iver

genc

efro

mth

est

atut

ory

requ

irem

ents

.

6Em

ploy

er’s

polic

ydo

cum

ents

.

3D

ocum

ents

prov

ided

byth

eco

ntra

ctor

,sub

cont

ract

ors

and

supp

liers

1D

esig

nan

dpr

oduc

tion

info

rmat

ion.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2D

raw

nan

dot

her

info

rmat

ion.

3A

s-bu

ilt/in

stal

led

draw

ings

and

info

rmat

ion.

4Te

chni

call

itera

ture

»

5M

aint

enan

cein

stru

ctio

nsan

dgu

aran

tees

.

6C

ode

for

Sust

aina

ble

Hom

es.

7En

viro

nmen

tala

sses

smen

tm

etho

d.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 103

Page 111: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

4D

ocum

ent

and

data

inte

rcha

nge

1El

ectr

onic

data

inte

rcha

nge

(ED

I).A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

1.7

Man

agem

ent

of

the

wo

rks

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Em

ploy

er’s

requ

irem

ents

–ge

nera

lly1

Insu

ranc

e.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2Pr

ofes

siona

lind

emni

ty.i

nsur

ance

Spec

ific

requ

irem

ents

.

3In

sura

nce

clai

ms.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Pr

ogra

mm

e/pr

ogre

ss1

Prog

ram

me.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Re

vise

dpr

ogra

mm

e.

3C

omm

ence

men

tof

wor

kon

site.

4W

ork

pack

age

cont

ract

or’s

prog

ress

repo

rt.

3C

ost

cont

rol

1Re

mov

al/r

epla

cem

ent

ofex

istin

gw

ork.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Pr

opos

edin

stru

ctio

ns.

3M

easu

rem

ent

ofco

vere

dw

ork.

4D

ayw

ork

vouc

hers

.

5In

terim

valu

atio

nsan

dpa

ymen

ts.

6Pa

ymen

tfo

rpr

oduc

tsno

tin

corp

orat

edin

toth

ew

orks

.

7Pa

ymen

tfo

rpr

oduc

tsst

ored

off-s

ite.

4A

tten

danc

es1

Gen

eral

atte

ndan

ces

Det

ails

ofge

nera

latt

enda

nces

prov

ided

byth

em

ain

cont

ract

or.

2Sp

ecia

latt

enda

nces

.m

etho

dof

deal

ing

with

wor

kpa

ckag

eco

ntra

ctor

’sad

ditio

nalr

equi

rem

ents

.

TABULATED WORK SECTIONS

104 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 112: RICS new rules of measurement 2

1.8

Qua

lity

stan

dard

san

dqu

alit

yco

ntro

l

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1St

anda

rds

ofpr

oduc

tsan

dex

ecut

ions

1In

com

plet

ein

form

atio

n.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2W

orkm

ansh

ipsk

ills.

3Q

ualit

yof

prod

ucts

.

4Q

ualit

yof

exec

utio

n.

5C

ompl

ianc

e.

6In

spec

tions

7M

anuf

actu

rer’s

reco

mm

enda

tions

/inst

ruct

ions

.

2Sa

mpl

es/a

ppro

vals

1Sa

mpl

es.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

3A

ccur

acy/

sett

ing

out

1A

ccur

acy

ofin

stru

men

ts.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Se

ttin

gou

t.

3A

ppea

ranc

ean

dfit

.

4C

ritic

aldi

men

sions

.

5Le

vels

ofst

ruct

ural

floor

s.

6Re

cord

draw

ings

.

4Se

rvic

es1

Serv

ices

regu

latio

ns.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2W

ater

regu

latio

ns/b

yela

ws

notif

icat

ion.

3W

ater

regu

latio

ns/b

yela

ws

cont

ract

or’s

cert

ifica

te.

4El

ectr

ical

inst

alla

tion

cert

ifica

te.

5G

as,o

ilan

dso

lidfu

elap

plia

nce

inst

alla

tion

cert

ifica

te.

6M

echa

nica

land

elec

tric

alse

rvic

es.

5Su

perv

ision

/insp

ectio

n/de

fect

ive

wor

k1

Supe

rvisi

on.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2D

efec

tsin

exist

ing

wor

k.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 105

Page 113: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

3Pr

opos

als

for

rect

ifica

tion

ofde

fect

ive

prod

ucts

/exe

cutio

ns.

4Pr

opos

als

for

rect

ifica

tion

ofde

fect

ive

prod

ucts

/exe

cutio

ns.

5Q

ualit

yco

ntro

l.

6W

ork

ator

afte

rco

mpl

etio

n1

Com

miss

ioni

ngan

dte

stin

g.Sp

ecifi

cre

quire

men

ts.

1.9

Sec

urit

y,sa

fety

and

pro

tect

ion

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Se

curit

y/he

alth

and

safe

ty1

Pre-

cons

truc

tion

info

rmat

ion.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Ex

ecut

ion

haza

rds.

3Pr

oduc

tha

zard

s.

4O

ccup

ied

prem

ises.

5Pa

sses

.

6O

ccup

ier’s

rule

san

dre

gula

tions

.

7U

seof

mob

ilete

leph

ones

.

8W

orki

ngpr

ecau

tions

/re

stric

tions

.

2Pr

otec

tion

agai

nst

1N

oise

cont

rol.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Po

llutio

nco

ntro

l.

3Fu

els,

lubr

ican

tsan

dhy

drau

licflu

ids.

4N

uisa

nce.

5A

sbes

tos

cont

aini

ngm

ater

ials

(AC

M)s

.

6A

ntiq

uitie

s.

7Fi

repr

even

tion.

8Sm

okin

gon

site.

9M

oist

ure.

TABULATED WORK SECTIONS

106 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 114: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

10In

fect

edtim

ber/

cont

amin

ated

mat

eria

ls.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

11W

aste

.

12El

ectr

omag

netic

inte

rfere

nce.

3Pr

otec

tion

1Ex

istin

gfe

atur

es.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2Ex

istin

gw

ork.

3Bu

ildin

gin

terio

rs.

4Ex

istin

gst

ruct

ures

5M

ater

ials

for

recy

clin

gan

d/or

reus

e.

6Pr

otec

tion

ofw

ork

pack

age

cont

ract

or’s

wor

k.Sp

ecifi

cre

quire

men

ts.

1.10

Spe

cific

limit

atio

nso

nm

etho

d,se

quen

cean

dti

min

g

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1G

ener

ally

As

for

Prel

imin

arie

s(m

ain

cont

ract

).

2U

seor

disp

osal

ofm

ater

ials

3W

orki

ngho

urs

Spec

ific

requ

irem

ents

.

1.11

Sit

eac

com

mo

dati

on/

serv

ices

/faci

litie

s/te

mpo

rary

wo

rks

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1Se

rvic

esan

dfa

cilit

ies

1Li

ghtin

gan

dpo

wer

.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2G

as.

3W

ater

.

4M

obile

tele

phon

es.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 107

Page 115: RICS new rules of measurement 2

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

5Te

mpe

ratu

rean

dhu

mid

ity.

6Be

nefic

ialu

seof

perm

anen

tin

stal

led

syst

ems.

7M

eter

read

ings

.

8O

ther

requ

irem

ents

.Sp

ecifi

cre

quire

men

ts.

2Te

mpo

rary

wor

ks1

Nam

ebo

ards

.Sp

ecifi

cre

quire

men

ts.

2A

dver

tisin

g.

3O

ther

requ

irem

ents

.

1.12

Ope

rati

on/

mai

nten

ance

of

finis

hed

build

ing

Sub-

head

ing

1Su

b-he

adin

g2

Info

rmat

ion

requ

irem

ents

Supp

lem

enta

ryin

form

atio

n/no

tes

1O

pera

tion

and

mai

nten

ance

man

ual

1G

ener

ally.

As

for

Prel

imin

arie

s(m

ain

cont

ract

).Th

eop

erat

ion

and

mai

nten

ance

info

rmat

ion,

the

heal

than

dsa

fety

file,

and

allo

ther

info

rmat

ion

can

beco

mbi

ned

asa

singl

edo

cum

ent.

Inth

isca

se,t

hedo

cum

ent

can

bere

ferr

edto

asth

e‘b

uild

ing

man

ual’.

2C

onte

nt.

2O

pera

tion

and

mai

nten

ance

man

uali

nfor

mat

ion

Spec

ifyin

form

atio

nan

ddo

cum

ents

tobe

prov

ided

.

3H

ealth

and

safe

tyfil

e1

Gen

eral

ly.A

sfo

rPr

elim

inar

ies

(mai

nco

ntra

ct).

2C

onte

nt.

4H

ealth

and

safe

tyin

form

atio

nSp

ecify

info

rmat

ion

and

docu

men

tsto

bepr

ovid

ed.

5O

ther

info

rmat

ion

Spec

ific

requ

irem

ents

.

TABULATED WORK SECTIONS

108 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 116: RICS new rules of measurement 2

1P

relim

inar

ies

(wo

rks

pack

age

cont

ract

)

Part

B:P

rici

ngsc

hedu

le

1.1

Man

agem

ent

and

staf

f

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Pr

ojec

tsp

ecifi

cm

anag

emen

tan

dst

aff

Wor

kpa

ckag

eco

ntra

ctor

’spr

ojec

t-sp

ecifi

cm

anag

emen

tan

dst

aff.

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

2St

aff

trav

elC

osts

asso

ciat

edw

ithof

f-site

visit

ssu

chas

:

1V

isits

toem

ploy

er’s

and

cons

ulta

nt’s

offic

es.

nr(n

umbe

rof

occa

sions

)Fi

xed

char

ge.

2V

isits

tom

ain

cont

ract

ors’

offic

es/w

orks

.

3O

vers

eas

visit

s.

4A

ccom

mod

atio

nch

arge

san

dov

erni

ght

expe

nses

.

1.2

Sit

ees

tabl

ishm

ent

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

teac

com

mod

atio

nW

ork

pack

age

cont

ract

or’s

proj

ect-

spec

ific

site

acco

mm

odat

ion.

Type

and

exte

ntof

acco

mm

odat

ion

tobe

prov

ided

tobe

stat

ed;w

ithea

chty

pese

para

tely

quan

tifie

d..

1Pu

rcha

sech

arge

s.ite

mFi

xed

char

ge.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3D

eliv

ery

ofte

mpo

rary

site

acco

mm

odat

ion

tosit

e,er

ectio

n,co

nstr

uctio

nan

dre

mov

al.

item

Fixe

dch

arge

.

4In

trud

eral

arm

s.

5La

nd/p

rope

rty

rent

alw

here

site

acco

mm

odat

ion

loca

ted

off-s

ite.

wee

kTi

me-

rela

ted

char

ge.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 109

Page 117: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

6A

ltera

tions

and

adap

tatio

nsto

site

acco

mm

odat

ion,

incl

udin

gpa

rtiti

onin

g,do

ors,

pain

ting

and

deco

ratin

g,an

dth

elik

e.

item

Fixe

dch

arge

.

7Re

loca

tion

and

alte

ratio

nsof

tem

pora

ryac

com

mod

atio

ndu

ring

cons

truc

tion

stag

e.

8Re

mov

alof

site

acco

mm

odat

ion

and

tem

pora

ryw

orks

inco

nnec

tion

with

site

acco

mm

odat

ion.

2Te

mpo

rary

wor

ksin

conn

ectio

nw

ithsit

ees

tabl

ishm

ent

1Te

mpo

rary

base

san

dfo

unda

tions

for

site

acco

mm

odat

ion,

incl

udin

gm

aint

enan

cean

dre

inst

atem

ent

ofex

istin

gsu

rface

son

com

plet

ion

ofth

ew

orks

.

m2

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2C

onne

ctio

nsto

tem

pora

ryse

rvic

e,in

clud

ing

mai

nten

ance

and

rem

oval

onco

mpl

etio

nof

the

wor

ksnr

3C

onne

ctio

nsto

tem

pora

rydr

aina

ge,i

nin

clud

ing

mai

nten

ance

and

rem

oval

onco

mpl

etio

nof

the

wor

ks.

3Fu

rnitu

rean

deq

uipm

ent

1W

orks

tatio

nsfo

rst

aff.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

2G

ener

alof

fice

furn

iture

.ite

m

3Fl

oor

cove

rings

.

4H

eate

rs,i

nclu

ding

mai

nten

ance

ofhe

ater

s.

5O

ther

offic

eeq

uipm

ent,

incl

udin

gm

aint

enan

ce.

6Re

mov

alof

furn

iture

and

equi

pmen

t.

7M

aint

enan

ceof

furn

iture

and

floor

cove

ring.

TABULATED WORK SECTIONS

110 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 118: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

4IT

syst

ems

1C

ompu

ter

hard

war

e,in

clud

ing

purc

hase

/ren

tal,

inst

alla

tion,

initi

alse

tup

,mai

nten

ance

and

runn

ing

cost

s,su

chas

:–

desk

top

com

pute

rsan

dla

ptop

com

pute

rs–

CA

Dst

atio

ns–

serv

eran

dne

twor

keq

uipm

ent

–pr

inte

rsan

dpl

otte

rs–

othe

rco

mpu

ter

syst

em/h

ardw

are.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2So

ftwar

ean

dso

ftwar

elic

ence

s.

3M

odem

lines

,mod

ems

and

conn

ectio

ns(i.

e.em

aila

ndin

tern

etca

pabi

lity)

.

4W

AN

lines

and

conn

ectio

ns(if

onW

AN

).

5Li

nere

ntal

char

ges.

wee

kTi

me-

rela

ted

char

ge.

6In

tern

et/w

ebsit

ead

dres

ses.

nrFi

xed

char

ge.

7In

tern

etse

rvic

epr

ovid

er(IS

P)ch

arge

s.

8Li

neca

llsch

arge

s.w

eek

Tim

e-re

late

dch

arge

.

9IT

supp

ort

and

mai

nten

ance

.

5C

onsu

mab

les

and

serv

ices

1St

atio

nery

.w

eek

Tim

e-re

late

dch

arge

.

2C

ompu

ter

and

prin

ter

cons

umab

les

(e.g

.ink

cart

ridge

s).

3Po

stag

e.

4co

urie

rch

arge

s.

5Te

a,co

ffee,

wat

erbo

ttle

s,et

c.

6Fi

rst

aid

cons

umab

les.

7Ph

otoc

opie

rco

nsum

able

s(e

.g.p

aper

and

tone

rs).

8Fa

xco

nsum

able

s(e

.g.p

aper

and

tone

rs).

9D

raw

ing

prin

ter

cons

umab

les

(e.g

.ink

cart

ridge

s).

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 111

Page 119: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

6Su

ndrie

s1

Wor

kpa

ckag

eco

ntra

ctor

’ssig

nboa

rds.

item

Fixe

dch

arge

.

1.3

Tem

pora

ryse

rvic

es

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Te

mpo

rary

wat

ersu

pply

1Te

mpo

rary

conn

ectio

ns.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Dist

ribut

ion

equi

pmen

t,in

stal

latio

nan

dad

apta

tions

.ite

m

3M

eter

char

ges.

wee

k

2Te

mpo

rary

gas

supp

ly1

Gas

conn

ectio

n.nr

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2D

istrib

utio

neq

uipm

ent,

inst

alla

tion

and

adap

tatio

ns.

item

3C

harg

es.

wee

k

4Bo

ttle

dga

s.

3Te

mpo

rary

elec

tric

itysu

pply

1Te

mpo

rary

conn

ectio

ns.

nrFi

xed

char

ge.

4Te

mpo

rary

tele

com

mun

icat

ion

syst

em1

Land

lines

(incl

udin

gco

nnec

tion

and

rent

alch

arge

s),

incl

udin

g:–

tele

phon

ean

dfa

xlin

es–

ISD

Nlin

es.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1Fa

xco

nsum

able

s(in

clud

edin

sect

ion

1.2.

5:C

onsu

mab

les

and

serv

ices

).

2Te

leph

one

and

facs

imile

equi

pmen

t(in

clud

ing

conn

ectio

nan

dre

ntal

char

ges)

,inc

ludi

ng:

–PA

BXeq

uipm

ent

–ha

ndse

ts,i

nclu

ding

purc

hase

orre

ntal

–fa

xm

achi

nes,

incl

udin

gpu

rcha

seor

rent

al–

inst

alla

tion

ofeq

uipm

ent

–m

aint

enan

ceof

equi

pmen

t.

3M

obile

(cel

lula

r)ph

ones

,inc

ludi

ng:

–m

obile

phon

es,i

nclu

ding

purc

hase

orre

ntal

and

conn

ectio

nch

arge

s–

spar

eba

tter

ies

–m

obile

phon

ech

arge

s.

TABULATED WORK SECTIONS

112 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 120: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

4Te

leph

one

char

ges,

incl

udin

g:–

tele

phon

eca

llch

arge

s–

fax

char

ges

–fa

xan

dte

leph

one

cons

umab

les.

5Ra

dios

(incl

udin

gpu

rcha

seor

rent

alch

arge

s),i

nclu

ding

:–

base

set

–ha

ndse

tsan

dch

arge

rs–

repa

irsan

dm

aint

enan

ce–

licen

ces

–sp

are

batt

erie

s.

1.4

Co

ntro

lan

dpr

ote

ctio

n

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Su

rvey

,ins

pect

ions

and

mon

itorin

g1

Surv

eys.

item

1Fi

xed

char

ge2

Tim

e-re

late

dch

arge

.1

Envi

ronm

enta

lmon

itorin

g(in

clud

edin

sect

ion

1.2.

5:Sa

fety

and

envi

ronm

enta

lpr

otec

tion)

2To

pogr

aphi

cals

urve

y.

3N

on-e

mpl

oyer

dila

pida

tion.

surv

ey

4St

ruct

ural

/dila

pida

tions

surv

eyad

join

ing

build

ings

.

5En

viro

nmen

tals

urve

ys.

6M

ovem

ent

mon

itorin

g.

7M

aint

enan

cean

din

spec

tion

cost

s.

2Se

ttin

gou

t1

Sett

ing

out

prim

ary

grid

s.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Grid

tran

sfer

san

dle

velc

heck

s.

3M

aint

enan

ceof

grid

s.

4Ta

keov

erco

ntro

land

inde

pend

ent

chec

ks(i.

e.on

chan

geof

subc

ontr

acto

rs).

5In

stru

men

tsfo

rse

ttin

gou

t.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 113

Page 121: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

3Pr

otec

tion

ofW

orks

1Pr

otec

tion

offin

ished

wor

ksto

proj

ect

hand

over

.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Prot

ectio

nof

stai

rs,b

alus

trad

esan

dth

elik

eto

proj

ect

hand

over

.

3Pr

otec

tion

offit

tings

and

furn

ishin

gsto

proj

ect

hand

over

.

4Pr

otec

tion

ofen

tran

cedo

ors

and

fram

esto

proj

ect

hand

over

.

5Pr

otec

tion

oflif

tca

rsan

ddo

ors

topr

ojec

tha

ndov

er.

6Pr

otec

tion

ofsp

ecifi

cally

vuln

erab

lepr

oduc

tsto

proj

ect

hand

over

.

7Pr

otec

tion

ofal

lsun

dry

item

s.

4Sa

mpl

es1

Prov

ision

ofsa

mpl

es.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Pr

ovisi

onof

sam

ple

room

.

3M

ock-

ups

and

sam

ple

pane

ls.

4Te

stin

gof

sam

ples

/moc

k-up

s,in

clud

ing

test

ing

fees

.

5O

n-sit

ela

bora

tory

equi

pmen

t.

6M

ock-

ups

ofco

mpl

ete

units

(e.g

.res

iden

tialu

nits

,st

uden

tac

com

mod

atio

nun

its,h

otel

acco

mm

odat

ion

and

the

like)

.

5En

viro

nmen

talc

ontr

olof

build

ing

1D

ryou

tbu

ildin

g.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.2

Tem

pora

ryhe

atin

g/co

olin

g.

3Te

mpo

rary

wat

erpr

oofin

g,in

clud

ing

over

roof

s.

4Te

mpo

rary

encl

osur

es.

TABULATED WORK SECTIONS

114 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 122: RICS new rules of measurement 2

1.5

Mec

hani

cal

plan

t

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1M

echa

nica

lpla

ntTy

peof

plan

tto

bepr

ovid

edsh

allb

est

ated

;with

each

type

sepa

rate

lyqu

antif

ied.

1Ba

ses.

nr1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

2Br

ingi

ngto

site,

erec

ting,

test

ing

and

com

miss

ioni

ng.

nrFi

xed

char

ge.

3D

isman

tling

and

rem

ovin

gfro

msit

e.

4Pr

otec

tion

syst

ems.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

5O

pera

tor/

driv

er,i

nclu

ding

over

time.

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

6Pe

riodi

csa

fety

chec

ks/in

spec

tions

.m

onth

Tim

e-re

late

dch

arge

.

7O

ther

cost

s’sp

ecifi

cch

arge

s.ite

m1

Fixe

dch

arge

.2

Tim

e-re

late

dch

arge

.

1.6

Tem

pora

ryw

ork

s

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1A

cces

ssc

affo

ldin

gA

cces

ssc

affo

ldin

gsp

ecifi

cally

requ

ired

byw

ork

pack

age

cont

ract

or(t

ype

ofac

cess

scaf

fold

ing

tobe

spec

ified

):–

acce

sssc

affo

ldin

gto

elev

atio

ns,l

iftsh

afts

and

the

like,

incl

udin

g:fa

nsan

dm

esh

scre

ens.

–st

ruct

ural

scaf

fold

ing

(e.g

.to

part

yw

alls)

.–

bird

cage

scaf

fold

ing.

–ca

ntile

ver

acce

sssc

affo

ldin

g.–

stai

rcas

epl

atfo

rms.

–pr

imar

ylo

adin

gpl

atfo

rms.

–tr

avel

ling

acce

sspl

atfo

rms.

1Br

ingi

ngto

site,

erec

ting

and

initi

alsa

fety

chec

ks.

nrFi

xed

char

ge.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3A

lterin

gan

dad

aptin

gdu

ring

cons

truc

tion.

nrFi

xed

char

ge.

4D

isman

tling

and

rem

ovin

gfro

msit

e.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 115

Page 123: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

2Te

mpo

rary

wor

ksTe

mpo

rary

wor

kssp

ecifi

cally

requ

ired

byw

ork

pack

age

cont

ract

or:

–su

ppor

tsc

affo

ldin

gan

dpr

oppi

ng–

cras

hde

cks

–te

mpo

rary

prot

ectio

nto

exist

ing

tree

san

d/or

vege

tatio

n–

flood

light

s.

1Br

ingi

ngto

site,

erec

ting

and

initi

alsa

fety

chec

ks.

nrFi

xed

char

ge.

2H

irech

arge

s.w

eek

Tim

e-re

late

dch

arge

.

3A

lterin

gan

dad

aptin

gdu

ring

cons

truc

tion.

nrFi

xed

char

ge.

4D

isman

tling

and

rem

ovin

gfro

msit

e.

1.7

Sit

ere

cord

s

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

tere

cord

sU

nles

sot

herw

isein

dica

ted,

cost

sas

soci

ated

with

the

follo

win

gsh

allb

ede

emed

tobe

incl

uded

inm

anag

emen

tan

dst

aff

cost

s:

1Ph

otog

raph

y:–

Cam

era

purc

hase

–C

onsu

mab

les

–Pr

intin

gan

dpr

esen

tatio

n

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

TABULATED WORK SECTIONS

116 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 124: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

2W

orks

reco

rds:

–Pr

ogre

ssre

port

ing

–Si

tese

ttin

gou

tdr

awin

gs–

Con

ditio

nsu

rvey

san

dre

port

s–

Ope

ratio

nan

dm

aint

enan

cem

anua

ls–

as-b

uilt/

inst

alle

ddr

awin

gsan

dsc

hedu

les

–co

-ord

inat

ing,

gath

erin

gan

dco

mpi

ling

heal

than

dsa

fety

info

rmat

ion

and

pres

enta

tion

toC

DM

co-o

rdin

ator

–co

mpi

latio

nof

heal

than

dsa

fety

file

(ifre

quire

d).

1.8

Co

mpl

etio

nan

dpo

st-c

om

plet

ion

requ

irem

ents

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Te

stin

gan

dco

mm

issio

ning

plan

Cos

tsas

soci

ated

with

the

follo

win

gsh

allb

ede

emed

tobe

incl

uded

inse

ctio

n1.

1:M

anag

emen

tan

dst

aff

cost

s:

1Pr

epar

atio

nof

com

miss

ioni

ngpl

an.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1Te

stin

gan

dco

mm

issio

ning

ofse

rvic

es

1H

ando

ver

Unl

ess

othe

rwise

indi

cate

d,co

sts

asso

ciat

edw

ithth

efo

llow

ing

shal

lbe

deem

edto

bein

clud

edin

sect

ion

1.1:

Man

agem

ent

and

staf

fco

sts:

1Pr

epar

atio

nof

Han

dove

rPl

an.

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

2Tr

aini

ngof

build

ing

user

’sst

aff

inth

eop

erat

ion

and

mai

nten

ance

ofth

ebu

ildin

gen

gine

erin

gse

rvic

essy

stem

s.

3Pr

ovisi

onof

spar

epa

rts

for

mai

nten

ance

ofbu

ildin

gen

gine

erin

gse

rvic

es.

4Pr

ovisi

onof

tool

san

dpo

rtab

lein

dica

ting

inst

rum

ents

for

the

oper

atio

nan

dm

aint

enan

ceof

build

ing

engi

neer

ing

serv

ices

syst

ems.

5Pr

e-co

mpl

etio

nin

spec

tions

.

6Fi

nali

nspe

ctio

ns.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 117

Page 125: RICS new rules of measurement 2

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

3Po

st-c

ompl

etio

nse

rvic

es1

Supe

rviso

ryst

aff

(em

ploy

er/t

enan

tca

re).

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

2H

andy

man

.

3M

inor

mat

eria

lsan

dsu

ndry

item

s.ite

mFi

xed

char

ge.

4In

sura

nces

.

5O

ther

post

-con

stru

ctio

nst

aff.

wee

k(n

umbe

rof

staf

fby

num

ber

ofm

anho

urs

per

wee

kby

num

ber

ofw

eeks

)

Tim

e-re

late

dch

arge

.

1.9

Cle

anin

g

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1Si

tetid

y1

Cle

anin

gsit

eac

com

mod

atio

n–

inte

rnal

,inc

ludi

ngcl

eani

ngte

leph

one

hand

sets

,oth

erof

fice

furn

iture

and

equi

pmen

tan

dw

indo

wcl

eani

ng.

wee

kTi

me-

rela

ted

char

ge.

2Pe

riodi

cm

aint

enan

ceof

site

acco

mm

odat

ion,

incl

udin

gre

deco

ratio

n(in

tern

alan

dex

tern

al).

3W

aste

man

agem

ent,

incl

udin

gru

bbish

disp

osal

(incl

udin

gco

mpa

ctor

visit

s;sk

ips

and

was

tebi

ns;r

oll-o

ff,ro

ll-on

was

tebi

ns)

and

othe

rdi

spos

al.

4Pe

stco

ntro

l.

TABULATED WORK SECTIONS

118 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 126: RICS new rules of measurement 2

1.10

Fees

and

char

ges

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1C

harg

es1

Rate

son

tem

pora

ryac

com

mod

atio

n.w

eek

Tim

e-re

late

dch

arge

.

1.11

Insu

ranc

es,b

ond

s,gu

aran

tees

and

war

rant

ies

Com

pone

ntIn

clud

edU

nit

Pric

ing

met

hod

Excl

uded

1In

sura

nces

item

1Fi

xed

char

ge.

2Ti

me-

rela

ted

char

ge.

1 PRELIMINARIES (WORKS PACKAGE CONTRACT)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 119

Page 127: RICS new rules of measurement 2

2O

ff-s

ite

man

ufac

ture

dm

ater

ials

,co

mpo

nent

so

rbu

ildin

gs

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

s.2

Plan

s.3

Sect

ions

.4

Elev

atio

ns.

5In

stal

latio

nde

tails

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials.

2M

etho

dof

fixin

gor

inst

allin

g.3

Con

nect

ing

toot

her

wor

kan

dse

rvic

es.

4Sp

ecia

lfin

ishes

.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1M

ajor

dim

ensio

nsof

com

pone

nt,s

truc

ture

orun

it.2

Loca

tion

ofco

mpo

nent

,st

ruct

ure

orun

it.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llfa

ctor

yap

plie

dfin

ishes

.2

Tran

spor

tfro

mfa

ctor

yto

site.

3O

ffloa

ding

and

stor

ing

onsit

e.4

Sett

ing,

hoist

ing

and

plac

ing

infin

alpo

sitio

n.5

All

conn

ectio

nan

djo

int

mat

eria

ls.6

All

serv

ice

conn

ectio

ns.

7D

ispos

alof

allp

acka

ging

and

prot

ectiv

em

ater

ials.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

ompo

nent

nr1

Ove

rall

dim

ensio

ns.

1D

escr

iptio

nof

com

pone

nt.

1M

etho

dof

fixin

g/in

stal

ling.

2H

eigh

tab

ove

stru

ctur

algr

ound

floor

leve

l.3

Serv

ices

conn

ectio

ns.

1Th

ese

are

pref

abric

ated

prop

rieta

ryco

mpo

nent

sth

atar

eno

tad

equa

tely

cove

red

byth

eot

herW

ork

Sect

ions

inth

isdo

cum

ent.

TABULATED WORK SECTIONS

120 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 128: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

2Pr

efab

ricat

edst

ruct

ures

nr1

Ove

rall

dim

ensio

ns.

1Ro

ofs.

2Ex

tern

alw

alls.

3In

tern

alw

alls/

part

ition

s.4

Floo

rs.

5St

airs

.6

Brid

ges.

7M

asts

.8

Oth

er,t

ype

stat

ed.

1Th

ese

are

com

plet

eor

subs

tant

ially

com

plet

ebu

ildin

gel

emen

tsof

prop

rieta

ryco

nstr

uctio

n,la

rgel

ypr

efab

ricat

ed.T

hefix

ing

ofite

ms

supp

lied

only

aspa

rtof

the

prop

rieta

rypa

ckag

eis

incl

uded

here

.O

ther

wor

kno

tfo

rmin

gpa

rtof

the

prop

rieta

rypa

ckag

eis

mea

sure

dse

para

tely

inth

eap

prop

riate

Wor

kSe

ctio

n.

3Pr

efab

ricat

edbu

ildin

gun

itsnr

1To

ilet/

bath

room

units

.2

Soun

dpr

oof

room

s.3

Col

dro

oms.

4Sp

ray

boot

hs.

5Ki

osks

.6

Oth

er,t

ype

stat

ed.

1Th

ese

are

com

plet

eor

subs

tant

ially

com

plet

ero

omun

its,u

sual

lyof

prop

rieta

ryco

nstr

uctio

n,fo

rin

corp

orat

ion

into

build

ings

,str

uctu

res

orsit

ewor

ks.T

helis

tis

not

exha

ustiv

e.

4Pr

efab

ricat

edbu

ildin

gsnr

1D

escr

iptio

nof

build

ing.

1Th

ese

are

com

plet

eor

subs

tant

ially

com

plet

ebu

ildin

gsu

pers

truc

ture

sof

prop

rieta

ryco

nstr

uctio

n,la

rgel

ypr

efab

ricat

ed.T

hefix

ing

ofite

ms

supp

lied

only

aspa

rtof

the

prop

rieta

rypa

ckag

eis

incl

uded

here

.O

ther

wor

kno

tfo

rmin

gpa

rtof

the

prop

rieta

rypa

ckag

eis

mea

sure

dse

para

tely

inth

eap

prop

riate

Wor

kSe

ctio

n.

2 OFF-SITE MANUFACTURED MATERIALS, COMPONENTS OR BUILDINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 121

Page 129: RICS new rules of measurement 2

3D

emo

litio

nsD

emol

ition

sSh

orin

g,fa

cade

rete

ntio

nan

dte

mpo

rary

wor

ks

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Loca

tion

draw

ings

.2

Dra

win

gsof

exist

ing

stru

ctur

esto

show

full

exte

ntof

dem

oliti

on.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Br

ief

desc

riptio

nan

dsiz

eof

stru

ctur

eto

bede

mol

ished

.2

Any

limita

tions

due

topr

esen

ceof

toxi

cor

haza

rdou

sm

ater

ials.

3Ex

tent

ofpa

rts

ofst

ruct

ure

tobe

tem

pora

rily

reta

ined

.4

Asb

esto

ssu

rvey

s.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Lo

wes

tle

velo

fde

mol

ition

.2

Exte

ntof

any

tem

pora

ryw

orks

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.3

Posit

ion

and

exte

ntof

any

tem

pora

rysc

reen

s,ro

ofs

and

the

like.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llte

mpo

rary

wor

ksun

less

stat

edot

herw

ise.

2Te

mpo

raril

ydi

vert

ing,

mai

ntai

ning

orse

alin

gof

fex

istin

gse

rvic

es.

3D

ispos

alof

alld

ebris

unle

ssst

ated

othe

rwise

.4

Met

hod

ofde

mol

ition

unle

ssst

ated

othe

rwise

.5

All

tem

pora

rysu

ppor

tle

ftto

the

disc

retio

nof

the

cont

ract

or.

6C

lear

ing

away

allt

empo

rary

wor

ks.

7D

ispos

ing

ofra

inw

ater

.8

Mak

ing

good

allw

ork

dist

urbe

d.

1Th

elo

wes

tle

velw

illin

clud

eba

sem

ents

.2

Ifa

floor

slab

isto

bere

mov

edth

enth

elo

wes

tle

velm

ust

best

ated

asto

the

unde

rsid

eof

that

slab.

TABULATED WORK SECTIONS

122 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 130: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1D

emol

ition

site

m1

All

stru

ctur

es.

2In

divi

dual

stru

ctur

es.

3Pa

rts

ofst

ruct

ures

.

1D

escr

iptio

nof

build

ing(

s)or

part

sof

build

ing(

s).

2Lo

wes

tle

velt

ow

hich

stru

ctur

e(s)

tobe

dem

olish

ed.

1Li

mita

tions

ondi

spos

alof

mat

eria

ls.2

Any

mat

eria

lto

bere

tain

edfo

rre

-use

.3

Any

mat

eria

lto

rem

ain

the

prop

erty

ofth

eem

ploy

er.

1C

ontr

acto

rsh

ould

bead

vise

dto

insp

ect

the

stru

ctur

e(s)

tobe

dem

olish

ed.

2Te

mpo

rary

supp

ort

ofst

ruct

ures

,ro

ads

and

the

like

item

1Pa

rts

ofex

istin

gbu

ildin

gto

bere

tain

ed.

2A

djoi

ning

build

ings

not

form

ing

part

ofth

ew

orks

.3

Road

san

dot

her

surfa

ces

tobe

reta

ined

.4

Any

othe

rex

istin

gfe

atur

eto

bere

tain

ed.

1D

escr

iptio

nof

build

ing(

s)or

part

sof

build

ing(

s)or

road

orot

her

surfa

ceor

feat

ure

tobe

reta

ined

.2

Type

ofsh

orin

g.3

Leng

thof

expo

sed

edge

ofsu

rface

tobe

reta

ined

and

aver

age

heig

ht(s

).

1Su

ppor

tis

for

part

sof

the

stru

ctur

eth

atm

ust

bere

tain

ed.I

tdo

esno

tm

ean

any

type

ofsu

ppor

tre

quire

das

inci

dent

alto

the

dem

oliti

ons.

3Te

mpo

rary

wor

ksm

21

Roof

s.2

Scre

ens.

3Fl

oors

.4

Road

s.

1W

eath

erpr

oof.

2W

ater

tight

.3

Dus

tpro

of.

4Fi

repr

oof.

5A

nyot

her

requ

irem

ent:

type

stat

ed.

1M

etho

dof

cons

truc

tion

ifno

tat

the

disc

retio

nof

the

cont

ract

or.

2M

aint

aini

ng:d

urat

ion

stat

ed.

3A

dapt

ing

durin

gco

urse

ofw

orks

.4

Cle

arin

gaw

ay.

5D

ispos

ing

ofra

inw

ater

:det

ails

stat

ed.

6Pr

ovid

ing

open

ings

:det

ails

stat

ed.

1In

orde

rto

ensu

reth

efu

llex

tent

and

scop

eof

this

wor

kth

esu

rvey

orm

ayne

edto

prov

ide

addi

tiona

linf

orm

atio

nif

not

read

ilyas

cert

aine

dfro

mth

edr

awin

gs.

3 DEMOLITIONS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 123

Page 131: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4D

econ

tam

inat

ion

item

1Re

mov

alof

haza

rdou

sm

ater

ials.

2D

econ

tam

inat

ion

ofex

istin

gpr

emise

s.3

Infe

stat

ion

rem

oval

.

1Sc

ope

ofw

ork.

2Ty

peof

cont

amin

atio

n.3

Prio

rto

dem

oliti

on.

4D

urin

gde

mol

ition

orre

pair

proc

ess.

5Re

cycl

ing

item

1D

etai

led

desc

riptio

nof

type

ofm

ater

ialt

obe

recy

cled

and

any

limita

tions

impo

sed

byem

ploy

eror

loca

laut

horit

y.

1To

beco

llect

edby

loca

lau

thor

ity2

Tobe

tran

spor

ted

tore

cycl

ing

depo

t,de

tails

and

loca

tion

stat

ed.

TABULATED WORK SECTIONS

124 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 132: RICS new rules of measurement 2

4A

lter

atio

ns,r

epai

rsan

dco

nser

vati

on

Alte

ratio

nw

ork

toex

istin

gbu

ildin

gsR

epai

rs/c

lean

ing/

reno

vatin

gan

dco

nser

ving

Dec

onta

min

atio

nR

e-cy

clin

g

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Loca

tion

draw

ings

.2

Dra

win

gsof

exist

ing

stru

ctur

es.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1D

escr

iptio

nof

oper

atio

nsw

here

not

left

todi

scre

tion

ofth

eco

ntra

ctor

.2

Spec

ific

loca

tion

ofea

chite

mof

wor

kre

lativ

eto

the

exist

ing

build

ing.

3D

etai

lsof

allm

ater

ials

tobe

set

asid

efo

rsu

bseq

uent

re-u

sein

clud

ing

mea

nsof

stor

age.

4D

etai

lsof

allm

ater

ials

tore

mai

nth

epr

oper

tyof

the

empl

oyer

incl

udin

gm

eans

ofst

orag

e.5

Any

rest

rictio

nson

met

hod,

sequ

ence

and/

ortim

ing

ofth

ew

orks

.6

Any

rest

rictio

nson

met

hods

ofst

orag

eof

mat

eria

lsto

bere

-use

dor

tore

mai

npr

oper

tyof

the

empl

oyer

.7

Any

rest

rictio

nson

met

hod

orlo

catio

nof

disp

osal

ofw

aste

.8

Com

plia

nce

with

allr

egul

atio

nsre

latin

gto

the

hand

ling,

tran

spor

tan

ddi

spos

alof

haza

rdou

sw

aste

mat

eria

ls.9

Asb

esto

ssu

rvey

s.

Not

es,c

omm

ents

and

glos

sary

4 ALTERATIONS, REPAIRS AND CONSERVATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 125

Page 133: RICS new rules of measurement 2

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sc

ope

and

loca

tion

ofw

ork

rela

tive

toex

istin

gst

ruct

ures

.W

orks

and

mat

eria

lsde

emed

incl

uded

.1

All

tem

pora

ryw

orks

incl

udin

gsh

orin

gan

dsc

affo

ldin

gin

cide

ntal

toth

ew

ork

excl

udin

gth

ose

liste

dbe

low

.2

Mak

ing

good

allw

ork

dist

urbe

d.3

Exte

ndin

gan

dm

akin

ggo

odex

istin

gfin

ishes

.4

Disp

osal

ofal

lwas

tem

ater

ials.

5A

llw

ork

and

mat

eria

lsin

cide

ntal

toth

eite

ms

ofal

tera

tion.

6M

ater

ials

requ

ired

for

bond

ing

new

wor

kto

exist

ing.

1Th

eru

les

with

inth

isse

ctio

nap

ply

tow

orks

toex

istin

gbu

ildin

gsas

defin

edin

clau

se3.

3.4.

1of

the

Mea

sure

men

tRu

les

for

Build

ing

Wor

ks.

2In

sert

ing

new

wor

kin

clud

esre

-fixi

ngor

re-u

sing

rem

oved

mat

eria

ls.3

All

mat

eria

lsar

ising

from

thes

ew

orks

beco

me

the

prop

erty

ofth

eco

ntra

ctor

unle

ssot

herw

isest

ated

.4

The

rule

sw

ithin

this

sect

ion

dono

tap

ply

tote

mpo

rary

wor

ksex

cept

asth

ose

liste

din

Rule

24of

this

sect

ion.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1W

orks

ofal

tera

tion

item

1D

imen

sione

dde

scrip

tion

suffi

cien

tto

iden

tify

exte

ntan

dlo

catio

nof

wor

k.

1Ex

tent

,nat

ure

and

scop

eof

wor

kde

scrib

edin

clud

ing

type

and

thic

knes

sof

exist

ing

stru

ctur

e.

1D

etai

lsm

ust

begi

ven

ofal

lwor

kin

volv

edin

each

item

incl

udin

gm

etho

dof

oper

atio

nw

here

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.

2Re

mov

ing

item

----

-m

2

----

-m --

---

nr ——

1Fi

ttin

gsan

dfix

ture

s.2

Plum

bing

item

sor

inst

alla

tions

.3

Elec

tric

alite

ms

orin

stal

latio

ns.

4Fi

nish

es.

5C

over

ings

.6

Pavi

ngs.

1D

etai

lssu

ffici

ent

for

iden

tific

atio

nto

best

ated

.--

----

----

----

----

----

2A

ppro

xim

ate

area

orsiz

eof

area

ofea

chty

peof

finish

,co

verin

gor

pavi

ng.

1D

iscon

nect

ing

and,

ifre

quire

d,su

bseq

uent

re-c

onne

ctio

nof

plum

bing

and

elec

tric

alor

othe

rse

rvic

esin

stal

latio

nsis

deem

edin

clud

ed.

2Th

esu

rvey

orsh

allc

hoos

eth

eun

itm

ost

suita

ble

for

the

type

ofw

ork

bein

gre

mov

ed.

3C

uttin

gor

form

ing

open

ings

4C

uttin

gor

form

ing

rece

sses

5C

uttin

gba

ck6

Fillin

gin

open

ings

7Fi

lling

inre

cess

es

item

----

-m

2

----

-m --

---

nr ——

1D

imen

sione

dde

scrip

tion.

2Ty

pean

dth

ickn

ess

ofex

istin

gst

ruct

ure.

3M

etho

dof

perfo

rmin

gth

ew

ork

ifno

tle

ftto

disc

retio

nof

the

cont

ract

or.

1Re

-use

ofex

istin

gm

ater

ials

stat

ed.

2Ty

pean

dsiz

e(s)

ofne

wm

ater

ials

stat

ed.

1D

etai

lsgi

ven

ofne

ww

ork

are

tobe

the

equi

vale

ntof

thos

ede

tails

requ

ired

byth

eru

les

for

the

mea

sure

men

tof

the

sam

ein

othe

rW

ork

Sect

ions

.2

The

surv

eyor

shal

lcho

ose

the

unit

mos

tsu

itabl

efo

rth

ety

peof

wor

kbe

ing

cut

orfil

led.

TABULATED WORK SECTIONS

126 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 134: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

8Re

mov

ing

exist

ing

and

repl

acin

gite

m--

---

m2

----

-m --

---

nr ——

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Wid

than

dth

ickn

ess

stat

ed.

----

----

----

----

----

--3

Leng

th,w

idth

and

thic

knes

sst

ated

.--

----

----

----

----

----

4D

imen

sione

dde

scrip

tion.

1Br

ickw

ork.

2C

oncr

ete.

3St

onew

ork.

4Ti

mbe

r.5

Gla

ss.

6O

ther

,typ

est

ated

.

1Tr

eatm

ent

ofex

pose

dso

und

surfa

ce(s

)st

ated

.2

Trea

tmen

tof

expo

sed

rein

forc

emen

tor

othe

rm

ater

ial

stat

ed.

3M

akin

ggo

odw

ithne

wm

ater

ials

othe

rth

anto

mat

chex

istin

gto

bede

scrib

ed.

4Bo

ndin

gne

wto

exist

ing.

1Fo

rmw

ork

and

any

othe

rfo

rmof

tem

pora

rysu

ppor

tis

deem

edin

clud

ed.

2Th

eun

itof

mea

sure

men

tsh

allb

ele

ftto

the

disc

retio

nof

the

surv

eyor

but

shal

lref

lect

the

size

and

exte

ntof

the

wor

k.3

Mak

ing

good

isde

emed

tobe

tom

atch

exist

ing

unle

ssde

scrib

edot

herw

ise.

9Pr

epar

ing

exist

ing

stru

ctur

esfo

rco

nnec

tion

orat

tach

men

tof

new

wor

k

nr1

Dim

ensio

ned

desc

riptio

n.1

Des

crip

tion

suffi

cien

tto

dete

rmin

esc

ope

and

loca

tion.

1N

atur

eof

exist

ing

stru

ctur

eto

rece

ive

new

wor

k.1

This

will

incl

ude

prep

arin

gst

ruct

ural

stee

lsec

tions

for

atta

chm

ent

tone

wst

eelf

ram

ing

and

the

like.

10Re

pairi

ngm

2

----

-m --

---

nr ----

-ite

m

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Wid

than

dth

ickn

ess

stat

ed.

----

----

----

----

----

--3

Leng

th,w

idth

and

thic

knes

sst

ated

.--

----

----

----

----

----

4D

imen

sione

dde

scrip

tion.

1N

atur

eof

surfa

ceto

bere

paire

dst

ated

.1

Met

hod

ofre

pairi

ngst

ated

.1

The

unit

ofm

easu

rem

ent

shal

lbe

left

toth

edi

scre

tion

ofth

esu

rvey

orbu

tsh

allr

efle

ctth

esiz

ean

dex

tent

ofth

ew

ork.

11Re

poin

ting

join

tsm

1N

atur

eof

exist

ing

join

t.2

Type

ofpo

intin

g.1

Mat

eria

lsre

quire

dst

ated

.1

Wid

than

dde

pth

stat

ed.

1Re

mov

alof

exist

ing

join

tm

ater

iala

ndpr

epar

atio

nof

expo

sed

surfa

ces

deem

edin

clud

ed.

4 ALTERATIONS, REPAIRS AND CONSERVATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 127

Page 135: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

12Re

poin

ting

m2

----

-m --

---

nr

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Wid

than

dth

ickn

ess

stat

ed.

----

----

----

----

----

--3

Leng

th,w

idth

and

thic

knes

sst

ated

.

1N

atur

eof

exist

ing

surfa

ce.

2Si

zeof

exist

ing

com

pone

nts.

3Bo

ndof

exist

ing

join

ts.

4Ty

peof

new

poin

ting.

5W

idth

and

dept

hof

raki

ngou

tof

exist

ing

join

ts.

1C

ompo

sitio

nan

dm

ixof

mor

tar

and/

orot

her

join

tm

ater

ial(s

).

1Ty

pes

ofsu

rface

wou

ldin

clud

ebr

ickw

ork,

bloc

kwor

k,st

onew

ork

and

the

like.

2A

reas

each

less

than

1m2

tobe

enum

erat

ed.

3Li

near

item

sw

ould

incl

ude

reve

als,

wal

len

dsan

dth

elik

e.4

The

unit

ofm

easu

rem

ent

shal

lbe

left

toth

edi

scre

tion

ofth

esu

rvey

orbu

tsh

allr

efle

ctth

esiz

ean

dex

tent

ofth

ew

ork.

13Re

sinor

cem

ent

impr

egna

tion/

inje

ctio

nm

2

----

-m --

---

nr ----

-ite

m

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Wid

than

dth

ickn

ess

stat

ed.

----

----

----

----

----

--3

Leng

th,w

idth

and

thic

knes

sst

ated

.--

----

----

----

----

----

4D

imen

sione

dde

scrip

tion.

1M

etho

dof

impr

egna

tion

orin

ject

ion

stat

ed.

2N

atur

eof

exist

ing

mat

eria

l.3

Nat

ure

ofex

istin

gfin

ishw

here

appl

icab

le.

4Th

ickn

ess

orde

pth

oftr

eatm

ent.

1C

entr

esor

spac

ings

ofdr

illing

hole

s.2

Loca

lised

rem

oval

offin

ishes

.

1W

ork

isde

emed

toin

clud

em

akin

ggo

odho

les

and

finish

eson

com

plet

ion.

2O

vera

llre

mov

alof

finish

espr

ior

toth

isw

ork

wou

ldbe

mea

sure

del

sew

here

.3

The

unit

ofm

easu

rem

ent

shal

lbe

left

toth

edi

scre

tion

ofth

esu

rvey

orbu

tsh

allr

efle

ctth

esiz

ean

dex

tent

ofth

ew

ork.

14In

sert

ing

new

wal

lstie

sm

2

nr1

Size

and

type

ofne

wtie

s.1

Met

hod

ofin

sert

ion.

2N

atur

ean

dth

ickn

ess

ofou

ter

skin

.3

Nat

ure

ofex

istin

gfin

ishw

here

appl

icab

le.

1C

entr

esor

spac

ings

ofdr

illing

hole

s.2

Loca

lised

rem

oval

offin

ishes

.

1W

ork

isde

emed

toin

clud

em

akin

ggo

odho

les

and

finish

eson

com

plet

ion.

2O

vera

llre

mov

alof

finish

espr

ior

toth

isw

ork

wou

ldbe

mea

sure

del

sew

here

.

15Re

-dre

ssin

gex

istin

gfla

shin

gsan

dth

elik

em --

---

nr

1G

irth

and

thic

knes

sst

ated

.--

----

----

----

----

----

2Le

ngth

,wid

than

dth

ickn

ess

stat

ed.

1D

imen

sione

dde

scrip

tion

offla

shin

g.2

Des

crip

tion

ofne

wpr

ofile

.

1Ra

king

out

exist

ing

join

t.2

Repo

intin

gw

ithne

wm

ater

ial:

met

hod

and

type

ofpo

intin

gm

ater

ials

tate

d.

1Th

egi

rths

and

leng

ths

stat

edar

ene

t.N

oal

low

ance

tobe

mad

efo

rad

ditio

nalm

ater

ials

requ

ired

for

labo

urs.

2Re

mov

al,c

lean

ing,

re-s

hapi

ng,t

rimm

ing

and

re-fi

xing

exist

ing

flash

ing

isde

emed

incl

uded

.

TABULATED WORK SECTIONS

128 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 136: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

16D

amp-

proo

fco

urse

rene

wal

17D

amp-

proo

fco

urse

inse

rtio

nm

1M

etho

dof

rene

wal

orin

sert

ion

stat

ed.

2N

atur

ean

dth

ickn

ess

ofex

istin

gw

all.

3N

atur

eof

exist

ing

finish

esw

here

appl

icab

le.

4Th

ickn

ess

orde

pth

oftr

eatm

ent.

1C

entr

esor

spac

ings

ofdr

illing

hole

s.2

Loca

lised

rem

oval

offin

ishes

.

1C

hem

ical

.2

Inje

ctio

nm

orta

r.3

Elec

tro

osm

osis.

4O

ther

mec

hani

calm

etho

ds.

1W

ork

isde

emed

toin

clud

em

akin

ggo

odho

les

and

finish

eson

com

plet

ion.

2O

vera

llre

mov

alof

finish

espr

ior

toth

isw

ork

wou

ldbe

mea

sure

del

sew

here

.

18C

lean

ing

surfa

ces

19Re

mov

ing

stai

ns20

Art

ifici

alw

eath

erin

g

m2

----

-m --

---

nr ----

-ite

m

1O

ver

500m

mw

ide.

----

----

----

----

----

--2

Not

exce

edin

g50

0mm

wid

e:w

idth

stat

ed.

----

----

----

----

----

--3

Leng

than

dw

idth

stat

ed.

----

----

----

----

----

--4

Dim

ensio

ned

desc

riptio

n.

1N

atur

eof

surfa

ceto

betr

eate

dst

ated

.2

Requ

ired

finish

edap

pear

ance

.

1Tr

eatm

ent

mat

eria

lsta

ted.

2M

etho

dof

trea

ting

stat

ed.

1Th

eun

itof

mea

sure

men

tsh

allb

ele

ftto

the

disc

retio

nof

the

surv

eyor

.2

Any

repa

iran

dre

med

ialw

orks

requ

ired

toth

esu

rface

prio

rto

trea

tmen

tto

bem

easu

red

sepa

rate

ly.

21Re

nova

ting

m2

----

-m --

---

nr ----

-ite

m

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Wid

than

dth

ickn

ess

stat

ed.

----

----

----

----

----

--3

Leng

th,w

idth

and

thic

knes

sst

ated

.--

----

----

----

----

----

4D

imen

sione

dde

scrip

tion.

1Br

ickw

ork.

2C

oncr

ete.

3St

onew

ork.

4Ti

mbe

r.5

Oth

er:t

ype

stat

ed.

1D

etai

lsan

dna

ture

ofth

ere

nova

tion

stat

ed.

2M

ater

ials

requ

ired

stat

ed.

3M

etho

dof

reno

vatio

nst

ated

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

1Th

eun

itof

mea

sure

men

tsh

allb

ele

ftto

the

disc

retio

nof

the

surv

eyor

but

shal

lref

lect

the

size

and

exte

ntof

the

wor

k.

22C

onse

rvin

gm

2

----

-m --

---

nr ----

-ite

m

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Wid

than

dth

ickn

ess

stat

ed.

----

----

----

----

----

--3

Leng

th,w

idth

and

thic

knes

sst

ated

.--

----

----

----

----

----

4D

imen

sione

dde

scrip

tion.

1Br

ickw

ork.

2C

oncr

ete.

3St

onew

ork.

4Ti

mbe

r.5

Oth

er:t

ype

stat

ed.

1D

etai

lsan

dna

ture

ofth

eco

nser

vatio

nst

ated

.2

Mat

eria

lsre

quire

dst

ated

.3

Met

hod

ofco

nser

vatio

nst

ated

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

1Th

eun

itof

mea

sure

men

tsh

allb

ele

ftto

the

disc

retio

nof

the

surv

eyor

but

shal

lref

lect

the

size

and

exte

ntof

the

wor

k.

4 ALTERATIONS, REPAIRS AND CONSERVATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 129

Page 137: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

23D

econ

tam

inat

ion

item

1Re

mov

alof

toxi

c/ha

zard

ous

mat

eria

ls.2

Dec

onta

min

atio

nof

exist

ing

prem

ises.

3In

fest

atio

nre

mov

al/e

radi

catio

n.4

Fung

usre

mov

al/e

radi

catio

n.

1Sc

ope

and

loca

tion

ofw

ork.

2Ty

peof

cont

amin

atio

n/in

fest

atio

n/fu

ngus

tobe

trea

ted.

1Pr

epar

ator

yw

orks

.1

Suffi

cien

tin

form

atio

nm

ust

begi

ven

tofu

llyde

scrib

eth

eca

use

ofth

eco

ntam

inat

ion

orin

fest

atio

nto

geth

erw

ithsu

chin

form

atio

nas

isap

prop

riate

toal

low

the

cont

ract

orto

fully

trea

tth

eco

nditi

onde

scrib

ed.

2(E

xclu

ding

deco

ntam

inat

ion

ofex

istin

ggr

ound

:thi

sw

ork

ism

easu

red

inW

ork

Sect

ion

5:Ex

cava

ting

and

Fillin

g.)

24Te

mpo

rary

wor

ksRo

ads.

m2

1Ro

ofs.

2Sc

reen

s.3

Floo

rs.

1W

eath

erpr

oof.

2W

ater

tight

.3

Dus

tpro

of.

4Fi

repr

oof.

5A

nyot

her

requ

irem

ent:

type

stat

ed.

1M

etho

dof

cons

truc

tion

ifno

tat

the

disc

retio

nof

the

cont

ract

or.

2M

aint

aini

ng:d

urat

ion

stat

ed.

3A

dapt

ing

durin

gco

urse

ofw

orks

.4

Cle

arin

gaw

ay.

5D

ispos

ing

ofra

inw

ater

:det

ails

stat

ed.

6Pr

ovid

ing

open

ings

:det

ails

stat

ed.

1In

orde

rto

ensu

reth

efu

llex

tent

and

scop

eof

this

wor

kth

esu

rvey

orm

ayne

edto

prov

ide

addi

tiona

linf

orm

atio

nif

not

read

ilyas

cert

aine

dfro

mth

edr

awin

gs.

25Re

cycl

ing

item

1D

etai

led

desc

riptio

nof

type

ofm

ater

ialt

obe

recy

cled

and

any

limita

tions

impo

sed

byem

ploy

eror

loca

laut

horit

y.

1To

beco

llect

edby

loca

lau

thor

ity.

2To

betr

ansp

orte

dto

recy

clin

gde

pot,

deta

ilsan

dlo

catio

nst

ated

.

TABULATED WORK SECTIONS

130 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 138: RICS new rules of measurement 2

5E

xcav

atin

gan

dfil

ling

Site

clea

ranc

e/pr

epar

atio

nEx

cava

tions

Dis

posa

lFi

lling

sM

embr

anes

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

(s)

show

ing

allm

ajor

exca

vatio

ns.

2Lo

catio

nsof

spoi

lhea

psif

not

left

toth

edi

scre

tion

ofth

eco

ntra

ctor

.3

Exist

ing

site

surv

ey.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Lo

catio

nof

wor

ksin

acco

rdan

cew

ithcl

ause

3.3.

3.1

ofth

eM

easu

rem

ent

Rule

sfo

rBu

ildin

gW

orks

.2

Dat

eof

exist

ing

site

surv

ey.

3G

roun

dco

nditi

ons

incl

udin

gan

ticip

ated

stab

ility

ofex

cava

tions

.4

Gro

und

wat

erle

vel(s

)an

dda

te(s

)es

tabl

ished

.5

Nat

ure

ofan

ykn

own

haza

rdou

sco

ntam

inat

ion

onth

esit

eor

inth

egr

ound

incl

udin

gan

yre

stric

tions

ondi

spos

alof

surfa

ceor

grou

ndw

ater

.6

Star

ting

leve

lof

each

type

ofex

cava

tion.

7Le

vels

ofro

ckw

here

appl

icab

le.

Not

es,c

omm

ents

and

glos

sary

1Q

uant

ities

rela

teon

lyto

the

dept

hsan

ddi

men

sions

show

non

the

draw

ings

and

over

dig

isno

tin

clud

ed.

This

appl

ies

toas

soci

ated

Extr

aov

erite

ms

and

back

fillin

g.

5 EXCAVATING AND FILLING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 131

Page 139: RICS new rules of measurement 2

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

oran

yot

her

docu

men

tsth

atac

com

pany

this

sect

ion

ofm

easu

rem

ent.

1O

rigin

alan

dpr

opos

edgr

ound

leve

ls.2

Any

item

(s)

that

mus

tre

mai

non

site

durin

gth

ew

orks

and

bepr

otec

ted

from

dam

age.

3A

nyite

m(s

)ad

jace

ntto

site

that

may

impa

cton

the

wor

ks.

4D

etai

lsof

tria

lpits

orbo

reho

les

incl

udin

gth

eir

loca

tion.

5D

etai

lsof

live

over

orun

derg

roun

dse

rvic

esin

clud

ing

thei

rlo

catio

n.6

Pile

sizes

and

thei

rlo

catio

nsw

here

appl

icab

le.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1D

ispos

alof

alls

urfa

cew

ater

.2

Supp

ort

tofa

ces

ofex

cava

tion

unle

ssno

tat

the

disc

retio

nof

the

cont

ract

or.

3W

orki

ngsp

ace.

4Ex

cava

tion

and

fillin

gfo

rte

mpo

rary

wor

ksun

less

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.5

Leve

lling,

grad

ing,

trim

min

gan

dco

mpa

ctin

gsu

rface

sex

pose

dby

the

exca

vatio

ns.

6C

urve

dw

ork.

7M

ultip

leha

ndlin

gof

exca

vate

dm

ater

ials

onsit

eun

less

spec

ified

.8

All

exca

vate

dm

ater

iali

sde

emed

tobe

iner

tun

less

desc

ribed

othe

rwise

.

1Th

egr

ound

wat

erle

velm

ust

bere

-est

ablis

hed

atth

etim

eea

chex

cava

tion

isca

rrie

dou

tan

dis

defin

edas

the

post

-con

trac

tgr

ound

wat

erle

vel.

2G

roun

dw

ater

leve

lssu

bjec

tto

perio

dic

chan

ges

due

totid

alor

simila

ref

fect

sar

eto

beso

desc

ribed

givi

ngth

em

ean

high

and

low

wat

erle

vels.

3Th

equ

antit

ies

give

nfo

rex

cava

tion

and

fillin

gar

eth

ebu

lkbe

fore

exca

vatin

gor

the

net

void

tobe

fille

d.N

oal

low

ance

ism

ade

for

subs

eque

ntva

riatio

nsto

bulk

orfo

rth

eex

tra

spac

eta

ken

upby

wor

king

spac

eor

eart

hwor

ksu

ppor

tun

less

the

type

ofba

ckfil

lis

not

left

toth

edi

scre

tion

ofth

eco

ntra

ctor

.Thi

sal

soap

plie

sto

the

quan

titie

sgi

ven

for

any

subs

eque

ntEx

tra

over

item

slis

ted

inRu

le7.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

elim

inar

ysit

ewor

kite

mnr

1Lo

catin

gun

derg

roun

dse

rvic

es.

2Tr

ialp

itsto

loca

teex

istin

gse

rvic

esor

dete

rmin

egr

ound

cond

ition

s.

1M

axim

umde

pth

and

type

ofse

rvic

est

ated

.1

Spec

ified

loca

tion(

s)st

ated

.2

Mea

nsof

loca

ting

serv

ice

ifno

tle

ftto

disc

retio

nof

cont

ract

or.

nr3

Bore

hole

sto

dete

rmin

egr

ound

cond

ition

s.1

Dia

met

er.

2M

axim

umde

pth

stat

ed.

1D

estin

atio

nof

core

sam

ples

stat

ed.

2Ty

pean

dex

tent

ofre

port

requ

ired.

TABULATED WORK SECTIONS

132 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 140: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

2Re

mov

ing

tree

s3

Rem

ovin

gtr

eest

umps

nr1

Gir

th50

0mm

to1,

500m

m.

2G

irth

1,50

0to

3,00

0mm

.3

Gir

thov

er3,

000m

m,s

tate

din

1,50

0mm

stag

es.

1Fi

lling

mat

eria

lsta

ted.

1Re

mov

ing

tree

sis

deem

edto

incl

ude

rem

ovin

gth

est

ump

and

root

sun

less

othe

rwise

stat

ed.

2Tr

eegi

rths

are

mea

sure

dat

ahe

ight

of1.

00m

abov

eor

igin

algr

ound

leve

l.3

Stum

pgi

rths

are

mea

sure

dat

the

top.

4Th

isw

ork

isde

emed

toin

clud

e:gr

ubbi

ngup

root

s,di

spos

alof

fsit

eof

allm

ater

iala

risin

g,an

dfil

ling

void

s.

4Si

tecl

eara

nce

m2

1C

lear

site

ofal

lveg

etat

ion

and

othe

rgr

owth

and

disp

ose

off

site.

1D

escr

iptio

nsu

ffici

ent

toid

entif

ysc

ope

and

loca

tion

ofw

ork.

1A

llgr

owth

incl

udes

tree

san

dtr

eest

umps

less

than

500m

mgi

rth,

bush

es,

scru

b,he

dges

and

the

like

unle

sssp

ecifi

cally

desig

nate

dto

rem

ain.

2Th

ere

mov

alof

inva

sive

vege

tatio

nsu

chas

Japa

nese

knot

wee

dor

the

like

shou

ldbe

spec

ifica

llym

entio

ned

inth

ede

scrip

tion.

5Si

tepr

epar

atio

nm

21

Lifti

ngtu

rffo

rpr

eser

vatio

n:th

ickn

ess

stat

ed.

1M

etho

dan

dlo

catio

nof

pres

erva

tion

stat

ed.

m2

2Re

mov

eto

psoi

l:de

pth

stat

ed.

m2

3Re

mov

eha

rdsu

rface

pavi

ng:

thic

knes

sst

ated

.1

Des

tinat

ion

stat

ed.

2Ty

peof

pavi

ngst

ated

.1

Met

hod

ofbr

eaki

ngup

ifno

tle

ftto

disc

retio

nof

cont

ract

or.

1Ex

clud

esan

yha

rdco

rebe

dsbe

low

the

pavi

ngs.

2Re

mov

alof

the

hard

core

istr

eate

das

redu

ced

leve

lexc

avat

ion.

5 EXCAVATING AND FILLING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 133

Page 141: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5Si

tepr

epar

atio

n—co

nt.

nr4

Rem

ove

spec

ific

item

s.1

Dim

ensio

ned

desc

riptio

nsu

ffici

ent

toid

entif

ysiz

ean

dlo

catio

nof

each

item

.

1A

nyex

istin

gite

ms

onsit

eno

tsp

ecifi

cally

desig

nate

dto

rem

ain

incl

udin

gal

ltyp

esof

rubb

ishsu

chas

aban

done

dca

rs,f

ridge

san

dth

elik

e.2

This

excl

udes

allb

utth

esim

ples

tof

build

ing

stru

ctur

esw

hose

dem

oliti

onis

cove

red

inW

ork

Sect

ion

3:D

emol

ition

s.3

Rem

oval

ofan

yas

soci

ated

foun

datio

ns,

fixin

gs,s

uppo

rts,

fast

enin

gsan

dth

elik

eis

deem

edin

clud

ed.

6Ex

cava

tion,

com

men

cing

leve

lsta

ted

ifno

tor

igin

algr

ound

leve

lm

31

Bulk

exca

vatio

n.1

Not

exce

edin

g2m

deep

.2

Ove

r2m

not

exce

edin

g4m

deep

.3

And

ther

eafte

rin

stag

esof

2m.

1D

etai

lsof

obst

ruct

ions

ingr

ound

tobe

stat

ed.

1Bu

lkex

cava

tion

incl

udes

exca

vatin

gto

redu

cele

vels

orto

form

base

men

ts,

pool

s,po

nds

orth

elik

e.Fo

rcl

arity

each

type

ofex

cava

tion

may

bem

easu

red

and

desc

ribed

sepa

rate

ly.2

Obs

truc

tions

will

bepi

les,

man

hole

san

dth

elik

eth

atm

ust

rem

ain

undi

stur

bed.

m3

2Fo

unda

tion

exca

vatio

n.1

Foun

datio

nex

cava

tion

incl

udes

exca

vatin

gfo

rst

ripan

dpa

dfo

unda

tions

,pile

caps

and

allo

ther

type

sof

foun

datio

ns.

2Fo

rcl

arity

each

type

ofex

cava

tion

may

bem

easu

red

and

desc

ribed

sepa

rate

ly.

TABULATED WORK SECTIONS

134 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 142: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

7Ex

tra

over

allt

ypes

ofex

cava

tion

irres

pect

ive

ofde

pth

m3

1Ex

cava

ting

in.

1H

azar

dous

mat

eria

l,de

tails

stat

ed.

2N

on-h

azar

dous

mat

eria

l,de

tails

stat

ed.

3Be

low

grou

ndw

ater

leve

l.4

Inru

nnin

gw

ater

.5

Uns

tabl

egr

ound

.

1H

azar

dous

mat

eria

lsar

ean

ym

ater

ial

that

requ

iresp

ecia

lpre

caut

ions

take

nw

hen

hand

ling,

tran

spor

ting

ordi

spos

ing.

2G

roun

dw

ater

isan

yw

ater

enco

unte

red

belo

wth

ees

tabl

ished

wat

erta

ble

leve

l.It

does

not

incl

ude

wat

erfro

mun

derg

roun

dst

ream

s,br

oken

drai

nsor

culv

erts

orw

ater

arisi

ngfro

msu

rface

flood

ing.

3Ru

nnin

gw

ater

isa

sprin

g,st

ream

orriv

er.

4U

nsta

ble

grou

ndis

runn

ing

silt,

runn

ing

sand

,loo

segr

ound

and

the

like.

m3

2Br

eaki

ngup

.1

Rock

.2

Rein

forc

edco

ncre

te.

3C

oncr

ete.

4M

ason

ryor

ston

ewor

k.

1Ro

ckis

any

hard

mat

eria

lwhi

chis

ofsu

chsiz

eor

loca

tion

that

itca

non

lybe

rem

oved

byth

eus

eof

wed

ges,

rock

ham

mer

s,sp

ecia

lpla

ntor

expl

osiv

es.

2A

boul

der

≤5m

3in

volu

me

oron

eth

atca

nbe

lifte

dou

tin

the

buck

etof

anex

cava

tor

will

not

cons

titut

ero

ck.

3D

egra

ded

orfr

iabl

ero

ckth

atca

nbe

scra

ped

out

byth

eex

cava

tor

buck

etdo

esno

tco

nstit

ute

rock

.4

Trim

min

gex

pose

dfa

ces

ofro

ckis

deem

edin

clud

ed.

5Br

eaki

ngup

hard

surfa

cepa

ving

sis

mea

sure

din

acco

rdan

cew

ithru

le5.

3of

this

sect

ion.

5 EXCAVATING AND FILLING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 135

Page 143: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

7Ex

tra

over

allt

ypes

ofex

cava

tion

irres

pect

ive

ofde

pth—

cont

.m

3Ex

cava

ting

alon

gsid

eex

istin

gun

derg

roun

dse

rvic

es.

1Ty

pe,s

izean

dde

pth

ofse

rvic

est

ated

.1

Nat

ure

ofpr

ecau

tion

requ

ired.

1Th

ese

item

sar

em

easu

red

whe

reth

ere

isa

risk

ofth

eex

istin

gse

rvic

ebe

ing

affe

cted

byth

eex

cava

tion

proc

ess.

The

met

hod

ofpr

otec

tion

isle

ftto

the

disc

retio

nof

the

cont

ract

or.

2If

indo

ubt

the

surv

eyor

mus

tm

easu

rean

item

givi

ngth

ena

ture

ofth

eliv

ese

rvic

e.

nr4

Exca

vatin

gac

ross

exist

ing

unde

rgro

und

serv

ices

8Su

ppor

tto

face

(s)

ofex

cava

tion

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or

m2

1M

axim

umde

pth

stat

ed.

1Lo

catio

nst

ated

.1

Met

hod

offo

rmin

gsu

ppor

tw

here

not

left

todi

scre

tion

ofth

eco

ntra

ctor

.

1Th

isw

ork

shal

lonl

ybe

mea

sure

dw

here

itha

sbe

ensp

ecifi

cally

spec

ified

inth

eco

ntra

ctdo

cum

ents

orif

the

cont

ract

orha

sbe

enin

stru

cted

byth

eco

ntra

ctad

min

istra

tor

topr

ovid

eth

esu

ppor

tdu

ring

the

cour

seof

the

wor

ks.

9D

ispos

alite

m1

Gro

und

wat

er.

1D

epth

belo

wor

igin

algr

ound

leve

lsta

ted.

2Po

llute

dw

ater

desc

ribed

ifkn

own.

1If

the

post

-con

trac

tw

ater

leve

ldi

ffers

from

the

pre-

cont

ract

leve

lthe

mea

sure

men

tsm

ust

bere

vise

dac

cord

ingl

y.

1Th

em

etho

dan

dpl

ace

ofdi

scha

rge

left

toth

edi

scre

tion

ofth

eco

ntra

ctor

unle

ssst

ated

othe

rwise

.

2Ex

cava

ted

mat

eria

loff

site.

1D

estin

atio

nif

not

atth

eco

ntra

ctor

’sdi

scre

tion.

2H

azar

dous

mat

eria

l.3

Non

-haz

ardo

usm

ater

ialw

here

itre

quire

sto

bedi

spos

edto

asp

ecifi

clo

catio

n.

1Irr

espe

ctiv

eof

whe

reex

cava

ted

mat

eria

lorig

inat

es.

10Re

tain

ing

exca

vate

dm

ater

ialo

nsit

em

31

Top

soil.

2A

llot

her

exca

vate

dm

ater

ial.

1To

tem

pora

rysp

oilh

eaps

.2

Ave

rage

dist

ance

tosp

oilh

eap

stat

ed.

1Sp

ecifi

edha

ndlin

g:de

tails

stat

ed.

1If

the

dist

ance

tosp

oilh

eap

isno

tst

ated

the

loca

tion

isle

ftto

the

disc

retio

nof

the

cont

ract

or.

TABULATED WORK SECTIONS

136 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 144: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

11Fi

lling

obta

ined

from

exca

vate

dm

ater

ial

m2

1Fi

nalt

hick

ness

offil

ling

not

exce

edin

g50

0mm

deep

,fin

ished

thic

knes

sst

ated

.

1So

urce

,dist

ance

,des

tinat

ion

and

met

hod

stat

ed.

2M

axim

umor

aver

age

dept

hof

laye

rsst

ated

.

1Tr

eatm

ent

ofm

ater

ialp

rior

tode

posit

ing

infin

allo

catio

n.1

This

incl

udes

tops

oila

ndan

yot

her

mat

eria

laris

ing

from

the

exca

vatio

nsth

atha

vebe

ensp

ecifi

edto

rem

ain

onsit

e.2

The

thic

knes

sst

ated

will

beth

ataf

ter

com

pact

ion.

3D

estin

atio

nsw

illco

mpr

isege

nera

lar

eas

tom

ake

uple

vels,

back

fillin

gfo

unda

tions

,lan

dsca

ping

area

s,pl

ante

rbe

dsan

dth

elik

e.4

Com

pact

ing

laye

rsan

dsu

rface

sar

ede

emed

incl

uded

irres

pect

ive

ofde

pth

and

num

ber

ofla

yers

.5

Sour

cew

illbe

eith

erdi

rect

from

exca

vatio

nsor

from

tem

pora

rysp

oil

heap

s.

m3

2Fi

nalt

hick

ness

offil

ling

exce

edin

g50

0mm

deep

.

12Im

port

edfil

ling

m3

1Bl

indi

ngbe

dno

tex

ceed

ing

50m

mth

ick,

finish

edth

ickn

ess

stat

ed.

1Le

vel,

tofa

lls,c

ross

falls

orca

mbe

rs,s

tate

d.2

Slop

ing

not

exce

edin

g15

°fro

mho

rizon

tal.

3Sl

opin

gov

er15

°fro

mho

rizon

tal.

1D

estin

atio

nst

ated

.Max

imum

orav

erag

ede

pth

ofla

yers

stat

ed.

1A

llty

pes

ofsu

rface

trea

tmen

tsar

ede

emed

incl

uded

.2

The

thic

knes

sst

ated

will

beth

ataf

ter

com

pact

ion.

3C

ompa

ctin

gla

yers

and

surfa

ces

are

deem

edin

clud

edirr

espe

ctiv

eof

dept

han

dnu

mbe

rof

laye

rs.

m3

2Be

dsov

er50

mm

thic

kbu

tno

tex

ceed

ing

500m

mde

ep,

finish

edth

ickn

ess

stat

ed.

m3

3Be

dsex

ceed

ing

500m

mde

ep.

5 EXCAVATING AND FILLING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 137

Page 145: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

13G

eote

xtile

fabr

ic14

Rado

nba

rrie

r15

Met

hane

barr

ier

16D

amp

proo

fm

embr

ane

17G

roun

dm

ovem

ent

prot

ectio

nbo

ards

18A

nyot

her

fabr

ic,m

embr

ane

orbo

ard:

type

stat

ed19

Gro

und

stab

ilisat

ion

mes

hes

and

the

like,

type

stat

ed

m1

Not

exce

edin

g50

0mm

wid

e,th

ickn

ess

orga

uge

stat

ed.

----

----

----

----

----

--

1H

orizo

ntal

.2

Slop

ing.

3Ve

rtic

al.

1Pr

otec

tive

fleec

esor

boar

ds,

type

stat

ed.

2M

etho

dof

anch

orin

gst

ated

.

1A

lltu

rn-u

ps,t

urnd

owns

,lap

san

djo

ints

deem

edin

clud

ed.

2Fo

rmin

gho

les

deem

edin

clud

ed.

----

-

m2

2O

ver

500m

mw

ide,

thic

knes

sor

gaug

est

ated

.

20C

uttin

gof

fto

psof

pile

sirr

espe

ctiv

eof

leng

thnr

1Si

zest

ated

.1

Cut

ting

off

tops

ofpi

les

isde

emed

toin

clud

epr

epar

atio

nan

din

tegr

atio

nof

rein

forc

emen

tin

topi

leca

por

grou

ndbe

aman

ddi

spos

alof

alld

ebris

.

TABULATED WORK SECTIONS

138 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 146: RICS new rules of measurement 2

6G

roun

dre

med

iati

on

and

soil

stab

ilisa

tio

n

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

(s)

show

ing

loca

tion

ofw

ork(

s).

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1G

roun

dco

nditi

ons.

2G

roun

dw

ater

leve

l(s)

and

date

(s)

esta

blish

ed.

3N

atur

eof

any

know

nno

n-ha

zard

ous

orha

zard

ous

cont

amin

atio

non

the

site

orin

the

grou

nd.

4St

artin

gle

velo

fea

chty

peof

exca

vatio

n.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

oran

yot

her

docu

men

tsth

atac

com

pany

this

sect

ion

ofm

easu

rem

ent.

1O

rigin

alan

dpr

opos

edgr

ound

leve

ls.2

Any

item

(s)

that

mus

tre

mai

non

site

durin

gth

ew

orks

and

bepr

otec

ted

from

dam

age.

3A

nyite

m(s

)ad

jace

ntto

site

that

may

impa

cton

the

wor

ks.

4D

etai

lsof

tria

lpits

orbo

reho

les

incl

udin

gth

eir

loca

tion.

5D

etai

lsof

live

over

orun

derg

roun

dse

rvic

esin

clud

ing

thei

rlo

catio

n.6

Pile

sizes

and

thei

rlo

catio

nsw

here

appl

icab

le.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1D

ispos

alof

fsit

eof

alls

urpl

usex

cava

ted

mat

eria

l.2

Disp

osal

ofal

lsur

face

wat

er.

3Su

ppor

tto

face

sof

exca

vatio

nun

less

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.4

Wor

king

spac

e.5

Exca

vatio

nan

dfil

ling

for

tem

pora

ryw

orks

unle

ssno

tat

the

disc

retio

nof

the

cont

ract

or.

6Le

vellin

g,gr

adin

g,tr

imm

ing

and

com

pact

ing

surfa

ces

expo

sed

byth

eex

cava

tions

.7

Cur

ved

wor

k.8

Mul

tiple

hand

ling

ofex

cava

ted

mat

eria

lson

site

unle

sssp

ecifi

ed.

1Th

egr

ound

wat

erle

velm

ust

bere

-est

ablis

hed

atth

etim

eea

chex

cava

tion

isca

rrie

dou

tan

dis

defin

edas

the

post

-con

trac

tgr

ound

wat

erle

vel.

2G

roun

dw

ater

leve

lssu

bjec

tto

perio

dic

chan

ges

due

totid

alor

simila

ref

fect

sar

eto

beso

desc

ribed

givi

ngth

em

ean

high

and

low

wat

erle

vels.

6 GROUND REMEDIATION AND SOIL STABILISATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 139

Page 147: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Si

tede

wat

erin

gite

m1

Are

aof

site

tobe

dew

ater

ed.

2M

axim

umde

pth

ofbo

reho

les.

1M

etho

dof

disp

osal

ofw

ater

stat

edif

not

atdi

scre

tion

ofco

ntra

ctor

.

1Pr

e-co

ntra

ctw

ater

leve

l.2

Leve

lto

whi

chgr

ound

wat

erm

ust

belo

wer

edto

and

mai

ntai

ned

at.

1Ea

chty

peof

rem

edia

lwor

ksh

allb

eac

com

pani

edby

afu

llde

scrip

tion

ofth

epr

opos

edw

orks

incl

udin

glim

itson

the

exte

nt,t

hepr

oxim

ityof

adjo

inin

gbu

ildin

g,re

stric

tions

onm

etho

d,se

quen

cean

dtim

ing.

2St

erilis

atio

nm

31

Max

imum

dept

hof

grou

ndto

betr

eate

d.1

Met

hod

ofst

erilis

atio

nst

ated

.

3C

hem

ical

neut

ralis

ing

m3

1M

axim

umde

pth

ofgr

ound

tobe

trea

ted.

1M

etho

dof

neut

ralis

atio

nst

ated

.

4Fr

eezi

ngm

31

Max

imum

dept

hof

grou

ndto

betr

eate

d.1

Met

hod

offre

ezin

gst

ated

.2

Dur

atio

nof

freez

ing

stat

edif

not

left

todi

scre

tion

ofco

ntra

ctor

.

1D

urat

ion

may

best

ated

asa

perio

dof

time

orto

apo

int

with

inth

eco

ntra

ctpr

ogra

mm

esu

chas

‘com

plet

ion

offo

unda

tion

wor

k’.

5G

roun

dga

sve

ntin

gm

21

Type

ofga

sto

beve

nted

.1

Met

hod

ofco

llect

ion

stat

ed.

2M

etho

dof

disp

osal

stat

ed.

6So

ilna

iling

m2

1A

rea

ofsit

eto

betr

eate

d.1

Leng

than

ddi

amet

erof

nails

,de

tails

stat

ed.

2Sp

acin

gof

nails

.3

Met

hod

ofgr

outin

g.

7G

roun

dan

chor

snr

1D

iam

eter

and

leng

thof

bore

hole

.1

Det

ails

stat

ed.

TABULATED WORK SECTIONS

140 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 148: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

8Pr

essu

regr

outin

g/gr

ound

perm

eatio

nm

21

Are

aan

dde

pth

ofsit

eto

betr

eate

d.1

Det

ails

stat

ed.

9C

ompa

ctin

gm

21

Are

aof

site

tobe

trea

ted

2W

eigh

tof

com

pact

or1

Det

ails

stat

ed.

10St

abilis

ing

soil

insit

uby

inco

rpor

atin

gce

men

tw

itha

rota

vato

rm

21

Are

aof

site

tobe

trea

ted

2G

ram

s/m

2of

cem

ent.

1D

etai

lsst

ated

.

6 GROUND REMEDIATION AND SOIL STABILISATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 141

Page 149: RICS new rules of measurement 2

7P

iling

Bore

dpi

ling

Dri

ven

pilin

gIn

terl

ocki

ngpi

ling

Vib

ro-c

ompa

cted

ston

epi

ling

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

show

ing

site

boun

dary

and

any

adja

cent

build

ings

orfe

atur

esth

atm

ight

affe

ctor

beaf

fect

edby

the

pilin

g.2

Gen

eral

pilin

gla

yout

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ty

pes

ofpi

les.

2N

atur

eof

the

grou

nd.

3G

roun

dw

ater

leve

l(s)

and

date

(s)

esta

blish

ed.

4C

omm

enci

ngle

vels

from

whi

chw

ork

isex

pect

edto

begi

n.5

Lim

itatio

nson

head

room

.6

Kind

and

qual

ityof

mat

eria

ls.7

Type

sof

test

s.8

Type

ofgr

out.

9D

etai

lsof

com

pact

ion.

Not

es,c

omm

ents

and

glos

sary

1Irr

egul

argr

ound

leve

lsm

ust

best

ated

.2

Feat

ures

that

mig

htaf

fect

pilin

gin

clud

eriv

ers,

cana

ls,tid

alw

ater

s,flo

odar

eas

and

the

like

suffi

cien

tlycl

ose

toth

ew

orks

that

thei

rsit

uatio

nm

ayaf

fect

the

pilin

gpr

oces

s.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Po

sitio

nsof

pile

s.2

Posit

ions

ofex

istin

gbu

ildin

gsad

jace

ntto

the

site.

3Po

sitio

nof

exist

ing

serv

ices

.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1Te

mpo

rary

cont

ainm

ent

ofsp

oil.

2A

nyco

ncre

tepl

aced

inex

cess

ofth

ede

signe

dco

mpl

eted

leng

th.

3Ba

ckfil

ling

empt

ybo

res.

4A

llpr

e-bo

ring.

5Re

-pos

ition

ing

pilin

gpl

ant

durin

gth

ew

orks

6M

aint

aini

ngal

lpilin

gpl

ant.

TABULATED WORK SECTIONS

142 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 150: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1In

terlo

ckin

gsh

eet

pile

sm

21

Tota

ldriv

enar

ea,m

axim

umle

ngth

stat

ed.

1Se

ctio

nm

odul

usan

dcr

oss

sect

ion

size,

orse

ctio

nre

fere

nce

stat

ed.

1Re

mov

alto

best

ated

ifno

tle

ftto

disc

retio

nof

cont

ract

or.

1Th

eco

stof

extr

actio

nis

deem

edin

clud

ed.

2Bo

red

pile

s3

Driv

enpi

les

4O

ther

,typ

est

ated

m1

Type

stat

ed.

2N

omin

alsiz

eor

diam

eter

stat

ed.

3To

talb

ored

ordr

iven

leng

th:

max

imum

leng

thst

ated

.4

Tota

lcon

cret

edle

ngth

.5

Tota

lnum

ber.

1C

ontig

uous

/sec

ant

pilin

gsh

all

beso

desc

ribed

.2

Perm

anen

tca

sings

shal

lbe

stat

ed.

3Ra

king

,inc

linat

ion

stat

ed.

1Re

info

rcem

ent

topr

ecas

tco

ncre

tepi

les.

1Le

ngth

sar

em

easu

red

alon

gth

eax

esof

the

pile

sfro

mth

eco

mm

enci

ngle

velt

oth

ebo

ttom

ofth

epi

le.

5V

ibro

-com

pact

edpi

les

m1

Nom

inal

diam

eter

.2

Tota

lnum

ber.

6V

ibro

-com

pact

edtr

ench

fill

m1

Nom

inal

wid

than

dde

pth

stat

ed.

7Ex

tra

over

pilin

gnr

1En

larg

edba

ses.

2En

larg

edhe

ads.

1Ty

peof

pilin

gst

ated

.2

Dia

met

eror

size

ofen

larg

emen

tst

ated

.

1Th

isw

ork

isde

emed

toin

clud

eev

eryt

hing

nece

ssar

yto

form

the

enla

rgem

ent

incl

udin

gdi

spos

alof

addi

tiona

lspo

il.

m3

Pile

exte

nsio

ns.

1To

taln

umbe

rst

ated

.2

Tota

lcon

cret

edle

ngth

.1

Prep

arin

ghe

adof

pile

tore

ceiv

eex

tens

ion

isde

emed

incl

uded

.

8Re

info

rcem

ent

toin

-situ

conc

rete

pile

st

1N

omin

alsiz

ean

dty

peof

bars

stat

ed.

1Re

info

rcem

ent

isde

emed

toin

clud

ety

ing

wire

and

spac

ers

plus

links

and

bind

ers

that

are

inco

rpor

ated

atth

edi

scre

tion

ofth

eco

ntra

ctor

.2

Type

sof

bars

incl

ude

plai

n,de

form

edan

dhe

lical

.

9Br

eaki

ngth

roug

hob

stru

ctio

nshr

1Ri

gst

andi

ng.

1O

nly

mea

sure

dw

here

the

obst

ruct

ion

isen

coun

tere

dab

ove

the

foun

ding

stra

tum

ofth

epi

le.

7 PILING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 143

Page 151: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

10D

ispos

alof

exca

vate

dm

ater

ials

m3

1O

ffsit

e.2

On

site.

1H

azar

dous

mat

eria

l.2

Non

-haz

ardo

usm

ater

ialw

here

itre

quire

sto

bedi

spos

edto

asp

ecifi

clo

catio

n.3

Des

tinat

ion

ofsp

oili

fno

tat

the

cont

ract

or’s

disc

retio

n.

1Th

evo

lum

eca

lcul

ated

isth

eno

min

alcr

oss

sect

ion

byth

epi

lele

ngth

s.2

The

volu

me

ofen

larg

edhe

ads

and

base

sis

tobe

incl

uded

.

11D

elay

shr

1Ri

gst

andi

ng.

1O

nly

mea

sure

dw

here

spec

ifica

llyin

stru

cted

.2

Dee

med

toin

clud

eal

lass

ocia

ted

labo

ur,p

lant

and

over

head

s.

12Te

sts

nr1

Det

ails

stat

ed.

1Ti

min

gst

ated

.

TABULATED WORK SECTIONS

144 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 152: RICS new rules of measurement 2

8U

nder

pinn

ing

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Loca

tion

draw

ings

.2

Det

aile

dse

ctio

n(s)

.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Lim

itof

leng

thof

wor

kto

beca

rrie

dou

tin

one

oper

atio

n.2

Max

imum

num

ber

ofse

ctio

nsto

beca

rrie

dou

tat

any

one

time.

3G

roun

dco

nditi

ons

incl

udin

gan

ticip

ated

stab

ility

ofex

cava

tions

.4

Gro

und

wat

erle

vel(s

)an

dda

te(s

)es

tabl

ished

.5

Nat

ure

ofan

ykn

own

haza

rdou

sco

ntam

inat

ion

onth

esit

eor

inth

egr

ound

.6

Star

ting

leve

lof

each

type

ofex

cava

tion.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Ex

tent

and

met

hod

ofw

ork.

2D

etai

lsof

exist

ing

stru

ctur

eto

beun

derp

inne

d.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1Te

mpo

rary

supp

ort

ofex

istin

gst

ruct

ures

.2

Exca

vatio

nan

ddi

spos

al.

3Ea

rthw

ork

supp

ort.

4Pr

elim

inar

ytr

ench

ing.

5A

llw

orki

ngsp

ace.

6D

ispos

alof

grou

ndan

dsu

rface

wat

er.

7C

uttin

gaw

ayex

istin

gfo

unda

tions

and

foot

ings

and

disp

osal

.8

Prep

arin

gth

eun

ders

ide

ofex

istin

gw

ork.

9Ba

ckfil

ling.

10Su

rface

trea

tmen

ts.

11A

llne

ww

ork

asso

ciat

edw

ithth

epr

oces

sof

unde

rpin

ning

.12

All

mak

ing

good

ifsp

ecifi

ed.

1If

the

wor

kof

unde

rpin

ning

isex

tens

ive

the

vario

usel

emen

tsof

this

wor

km

aybe

mea

sure

dse

para

tely

inac

cord

ance

with

the

rule

sof

the

rele

vant

trad

esor

Wor

kSe

ctio

ns,

stat

ing

that

the

wor

kis

‘inun

derp

inni

ng’.

8 UNDERPINNING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 145

Page 153: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1U

nder

pinn

ing

m m nr

1Fo

unda

tions

.2

Wal

ls.3

Base

s.

1Br

ief

desc

riptio

nof

wor

kst

atin

gde

pth,

max

imum

wid

than

dm

etho

dof

unde

rpin

ning

.2

Cur

ved

wor

k.

1M

etho

d,if

not

left

todi

scre

tion

ofco

ntra

ctor

,may

begi

ven

byre

fere

nce

todr

awin

g(s)

.

Inth

eev

ent

that

the

unde

rpin

ning

isof

such

anex

tent

that

itca

nno

tea

sily

bem

easu

red

inac

cord

ance

with

thes

eru

les

the

wor

kssh

allb

em

easu

red

inde

tail

inac

cord

ance

with

the

rule

sfo

rth

ere

leva

nttr

ades

requ

ired

.In

this

case

the

wor

ksh

allb

ede

scri

bed

as‘In

wor

ksof

unde

rpin

ning

’.

2C

oncr

ete

m3

1M

easu

red

inac

cord

ance

with

the

rule

sof

the

appr

opria

tetr

ade

orW

ork

Sect

ion

stat

ing

that

the

wor

kis

‘inun

derp

inni

ng’.

3Fo

rmw

ork

m2

4Re

info

rcem

ent

t

5Br

ickw

ork

orbl

ockw

ork

m2

6Ta

nkin

gm

2

TABULATED WORK SECTIONS

146 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 154: RICS new rules of measurement 2

9D

iaph

ragm

wal

lsan

dem

bedd

edre

tain

ing

wal

ls

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Loca

tion

draw

ings

.2

Site

plan

ssh

owin

gsit

ebo

unda

ryan

dan

yad

jace

ntbu

ildin

gsor

feat

ures

that

mig

htaf

fect

orbe

affe

cted

byth

eco

nstr

uctio

nof

the

diap

hrag

mw

alls.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Li

mit

ofle

ngth

ofw

ork

tobe

carr

ied

out

inon

eop

erat

ion.

2M

axim

umnu

mbe

rof

sect

ions

tobe

carr

ied

out

atan

yon

etim

e.3

Gro

und

cond

ition

sin

clud

ing

antic

ipat

edst

abilit

yof

exca

vatio

ns4

Gro

und

wat

erle

vel(s

)an

dda

te(s

)es

tabl

ished

.5

Nat

ure

ofan

ykn

own

haza

rdou

sco

ntam

inat

ion

onth

esit

eor

inth

egr

ound

.6

Star

ting

leve

lof

each

exca

vatio

n.

Not

es,c

omm

ents

and

glos

sary

1Irr

egul

argr

ound

shal

lbe

sode

scrib

ed.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Ex

tent

ofw

ork.

1W

orks

and

mat

eria

lsde

emed

incl

uded

.1

Exca

vatio

nan

ddi

spos

al.

2Ea

rthw

ork

supp

ort.

3Pr

elim

inar

ytr

ench

ing.

4A

llw

orki

ngsp

ace.

5D

ispos

alof

grou

ndan

dsu

rface

wat

er.

6Ba

ckfil

ling.

7Su

rface

trea

tmen

ts.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1W

alls,

thic

knes

sst

ated

m2

1C

omm

enci

ngle

vels

ofex

cava

tion.

2M

axim

umde

pth

ofex

cava

tion.

3Fi

nish

edto

ple

velo

fco

ncre

teif

diffe

rent

from

com

men

cing

leve

lof

exca

vatio

n.

1D

etai

lsan

dm

etho

dof

cons

truc

tion

stat

ed.

2Ty

peof

conc

rete

.3

Det

ails

ofre

info

rcem

ent.

1D

etai

lsof

supp

ort

fluid

.

9 DIAPHRAGM WALLS AND EMBEDDED RETAINING WALLS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 147

Page 155: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

2Ex

tra

over

exca

vatio

nan

ddi

spos

alm

31

Brea

king

out

hard

mat

eria

ls.2

Exca

vatin

gin

haza

rdou

sm

ater

ial.

m2

3Br

eaki

ngup

hard

surfa

cepa

ving

s,th

ickn

ess

stat

ed.

3Jo

ints

m1

Dim

ensio

ned

desc

riptio

n.1

Met

hod

offo

rmin

g.1

Vert

ical

.2

Hor

izont

al.

3Ra

king

.4

Cur

ved:

radi

usst

ated

.

4Tr

imm

ing

and

clea

ning

expo

sed

face

sm

21

Det

ails

stat

ed.

5D

elay

shr

1A

utho

rised

stan

ding

time.

1O

nly

mea

sure

dw

here

spec

ifica

llyin

stru

cted

.2

Dee

med

toin

clud

eal

lass

ocia

ted

labo

ur,p

lant

and

over

head

s.

6Te

sts

item

1D

etai

lsst

ated

.

TABULATED WORK SECTIONS

148 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 156: RICS new rules of measurement 2

10C

rib

wal

ls,g

abio

nsan

dre

info

rced

eart

h

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

ssh

owin

gsc

ope

and

loca

tion

ofea

chty

peof

wor

k.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

and

qual

ityof

mat

eria

ls.N

otes

,com

men

tsan

dgl

ossa

ry

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1O

rigin

algr

ound

leve

ls.2

Fini

shed

grou

ndle

vels.

3C

ondi

tion

ofgr

ound

.

1W

orks

and

mat

eria

lsde

emed

incl

uded

.1

Fina

lexc

avat

ion

asso

ciat

edw

ithea

chin

stal

latio

n.2

Disp

osal

ofan

yex

cava

ted

mat

eria

linc

ludi

ngha

zard

ous

mat

eria

l.3

Eart

hwor

ksu

ppor

t.4

Prep

arin

gsu

rface

sto

rece

ive

each

inst

alla

tion.

5D

ispos

alof

surfa

cew

ater

.

1Fi

nale

xcav

atio

nm

eans

any

min

ortr

imm

ing

ofea

rth

surfa

ces

requ

ired

durin

gea

chin

stal

latio

n.A

llre

duce

dle

vela

ndfo

unda

tion

exca

vatio

ns,

foun

datio

nsan

dba

ckfil

lare

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofW

ork

Sect

ion

5:Ex

cava

ting

and

fillin

g.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

ribw

alls

m2

1Th

ickn

ess

stat

ed.

1Ve

rtic

al.

2Ba

tter

ing.

3C

urve

don

plan

:rad

ius

stat

ed.

1A

rea

ism

easu

red

onfro

ntfa

ce.

2N

ode

duct

ions

mad

efo

rvo

ids

≤1.

00m

2.

3D

owel

s,pi

ns,g

ranu

lar

infil

l,co

mpa

ctin

gfil

l,sp

ecia

luni

ts,p

rovi

ding

man

ufac

ture

rsce

rtifi

cate

s,bu

ildin

gin

pipe

san

dfo

rmin

gop

enin

gs≤

1.00

m2

deem

edin

clud

ed.

2Ex

tra

for

m1

Ends

.2

Cor

ners

irres

pect

ive

ofan

gle.

3G

abio

nba

sket

wal

lsm

21

Bask

etsiz

est

ated

.2

Gau

geof

bask

etw

irest

ated

.3

Wid

thof

the

base

ofth

ew

all.

1Ve

rtic

al.

2Ba

tter

ing:

rate

stat

ed.

3Sl

opin

g.4

Cur

ved

onpl

an:r

adiu

sst

ated

.5

Step

ped

onfa

ce.

1Ty

peof

fillt

oba

sket

sde

scrib

ed.

2Sp

ecifi

edtr

eatm

ent

ofba

sket

filld

escr

ibed

.3

Spec

ified

hand

ling

deta

ilsst

ated

.

1A

rea

ism

easu

red

onfro

ntfa

ce.

2G

abio

nba

sket

sar

ede

emed

toin

clud

eas

sem

blin

g,ty

ing,

fixin

g,br

acin

gan

dty

ing

lids.

3Fi

lling

isde

emed

toin

clud

eco

mpa

ctio

nan

dov

erfil

ling

offil

lm

ater

ial.

10 CRIB WALLS, GABIONS AND REINFORCED EARTH

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 149

Page 157: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4Ea

rth

rein

forc

emen

tm

21

Mes

h.2

Fabr

ic.

1H

orizo

ntal

.2

Slop

ing.

3C

urve

don

plan

:rad

ius

stat

ed.

1M

etho

dof

anch

orin

gst

ated

.2

Min

imum

laps

stat

ed.

3Fi

nalf

acin

g,de

tails

stat

ed.

1A

rea

mea

sure

din

cont

act

with

base

and

excl

udes

laps

.2

Ass

embl

ing,

tyin

g,fix

ing,

stac

king

and

tens

ioni

ngde

emed

incl

uded

.3

No

dedu

ctio

nsm

ade

for

void

s≤

1.00

m2.

TABULATED WORK SECTIONS

150 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 158: RICS new rules of measurement 2

11In

-sit

uco

ncre

tew

ork

sIn

-situ

conc

rete

Surf

ace

finis

hes

toin

-situ

conc

rete

Form

wor

kR

einf

orce

men

tD

esig

ned

join

tsin

in-s

ituco

ncre

teA

cces

sori

esca

stin

toin

-situ

conc

rete

In-s

ituco

ncre

tesu

ndri

es

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Gen

eral

arra

ngem

ent

draw

ings

.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

,qua

lity

and

size

ofm

ater

ials.

2D

etai

lsof

test

sof

mat

eria

ls.3

Det

ails

ofte

sts

offin

ished

wor

k.4

Lim

itatio

nson

met

hod,

sequ

ence

,sp

eed

orsiz

eof

pour

ing.

5M

etho

dof

com

pact

ion.

6M

etho

dof

curin

g.7

Det

ails

ofw

ater

tight

ness

.

Not

es,c

omm

ents

and

glos

sary

1W

ork

insu

bstr

uctu

res,

supe

rstr

uctu

res

orex

tern

alw

orks

tobe

stat

edin

head

ings

orde

scrip

tions

.2

Wat

ertig

htw

ork

shal

lbe

sode

scrib

ed.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Re

lativ

epo

sitio

nof

allm

embe

rs.

2Th

esiz

eof

mem

bers

.3

The

thic

knes

sof

slabs

.4

The

perm

issib

lelo

ads

inre

latio

nto

cast

ing

times

.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1C

oncr

ete

volu

me

ism

easu

red

net.

2N

oal

low

ance

invo

lum

eto

bem

ade

for

defle

ctio

nof

form

wor

k.3

Ded

uctio

nsar

eno

tm

ade

for

rein

forc

emen

t,st

eels

ectio

ns,c

ast-

inac

cess

orie

s,vo

ids

≤0.

05m

3ex

cept

void

sin

trou

ghed

and

coffe

red

slabs

.4

Con

cret

eis

deem

edca

stin

tofo

rmw

ork

unle

ssot

herw

isede

scrib

ed.

5C

oncr

ete

isde

emed

finish

edas

stru

ckfro

mba

sicfin

ishfo

rmw

ork.

6A

llto

psu

rface

san

dso

ffits

are

deem

edto

finish

horiz

onta

lunl

ess

othe

rwise

stat

ed.

7A

llto

psu

rface

sar

ede

emed

finish

edta

mpe

d.

1Th

isap

plie

sto

conc

rete

laid

onrib

bed

met

alde

ckin

gas

wel

las

othe

rty

pes

offo

rmw

ork.

11 IN-SITU CONCRETE WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 151

Page 159: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Plai

nin

-situ

conc

rete

Rei

nfor

ced

in-s

ituco

ncre

teFi

bre

rein

forc

edin

-situ

conc

rete

Spra

yed

in-s

ituco

ncre

te

1M

ass

conc

rete

m3

1A

nyth

ickn

ess.

1In

fillin

gvo

ids.

2In

tren

chfil

ling.

3In

any

othe

rsit

uatio

n:de

tails

stat

ed.

1Po

ured

onor

agai

nst

eart

hor

unbl

inde

dha

rdco

re.

1M

ass

conc

rete

isan

yun

rein

forc

edbu

lkco

ncre

teno

tm

easu

red

else

whe

re.

2Th

evo

lum

esof

each

type

ofm

ass

conc

rete

wor

km

aybe

aggr

egat

edor

give

nse

para

tely.

2H

orizo

ntal

wor

km

31

≤30

0th

ick.

2>

300

thic

k.1

Inbl

indi

ng.

2In

stru

ctur

es.

1Po

ured

onor

agai

nst

eart

hor

unbl

inde

dha

rdco

re.

2Re

info

rced

>5%

.

1H

orizo

ntal

wor

kin

clud

esbl

indi

ng,

beds

,fou

ndat

ions

,pile

caps

,col

umn

base

s,gr

ound

beam

s,sla

bs,c

offe

red

and

trou

ghed

slabs

,lan

ding

s,be

ams,

atta

ched

beam

s,be

amca

sings

,she

arhe

ads,

upst

ands

who

sehe

ight

is≤

than

thre

etim

esth

eir

wid

th,k

erbs

,cop

ings

.2

The

volu

mes

ofea

chty

peof

horiz

onta

lwor

km

aybe

aggr

egat

edor

give

nse

para

tely.

3W

ork

laid

inba

yssh

allb

eso

desc

ribed

givi

ngav

erag

ear

eaof

bays

.

3Sl

opin

gw

ork

≤15

°4

Slop

ing

wor

k>

15°

m3

1≤

300

thic

k.2

>30

0th

ick.

1In

blin

ding

.2

Inst

ruct

ures

.3

Inst

airc

ases

.

1Po

ured

onor

agai

nst

eart

hor

unbl

inde

dha

rdco

re.

2Re

info

rced

>5%

.

1Sl

opin

gw

ork

incl

udes

blin

ding

,bed

s,sla

bs,s

teps

and

stai

rcas

es,k

erbs

,co

ping

s.2

Incl

udes

any

atta

ched

beam

s,up

stan

ds,

shea

rhe

ads

orsim

ilar.

3Th

evo

lum

esof

each

type

ofslo

ping

wor

km

aybe

aggr

egat

edor

give

nse

para

tely.

4W

ork

laid

inba

yssh

allb

eso

desc

ribed

givi

ngav

erag

ear

eaof

bays

.

TABULATED WORK SECTIONS

152 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 160: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5Ve

rtic

alw

ork

m3

1≤

300

thic

k.2

>30

0th

ick.

1In

stru

ctur

es.

2Re

info

rced

>5%

.1

Vert

ical

wor

kin

clud

esco

lum

ns,

atta

ched

colu

mns

,col

umn

casin

gs,

wal

ls,re

tain

ing

wal

ls,fil

ling

toho

llow

wal

ls,pa

rape

tsor

upst

and

beam

sw

here

heig

htis

grea

ter

than

thre

etim

esth

ew

idth

.2

The

volu

mes

ofea

chty

peof

vert

ical

wor

km

aybe

aggr

egat

edor

give

nse

para

tely.

6Su

ndry

in-s

ituco

ncre

tew

ork

m m3

1W

ork

≤30

0w

ide

orth

ick.

2W

ork

>30

0w

ide

orth

ick.

1H

orizo

ntal

.2

Slop

ing.

3Ve

rtic

al.

4Re

info

rced

>5%

.1

Incl

udes

wor

ksu

chas

back

sills,

mac

hine

and

plan

tba

ses

and

the

like.

7Sp

raye

din

-situ

conc

rete

m2

1Th

ickn

ess

stat

ed.

1Sl

abs.

1To

ps.

2So

ffits

.3

Cur

ved.

1Th

em

etho

dof

appl

icat

ion

and

finish

tobe

stat

edin

the

desc

riptio

n.

2W

alls.

3Be

ams.

4C

olum

ns.

1C

urve

d.

Surf

ace

finis

hes

toin

-situ

conc

rete

8Tr

owel

ling

9Po

wer

float

ing

10H

acki

ng11

Grin

ding

12A

nyot

her

surfa

cetr

eatm

ent

not

left

todi

scre

tion

ofth

eco

ntra

ctor

m2

1To

top

surfa

ces.

2To

face

s.3

Toso

ffits

.

1Sl

opin

g.2

Falls

.3

Cro

ssfa

lls.

1A

pplic

atio

nof

surfa

ceha

rden

ers,

seal

ers,

dust

proo

fers

,wat

erpr

oofe

rs,

carb

orun

dum

grai

nsor

the

like

shal

lbe

sode

scrib

ed.

11 IN-SITU CONCRETE WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 153

Page 161: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Form

wor

k1

Plai

nfo

rmw

ork.

2Sp

ecia

lfin

ishfo

rmw

ork.

1Pl

ain

finish

shal

lbe

left

todi

scre

tion

ofth

eco

ntra

ctor

.2

Spec

ialf

inish

essh

allb

ede

scrib

ed.

3C

urve

dw

ork

shal

lbe

desc

ribed

stat

ing

the

radi

i.4

Perm

anen

tfo

rmw

ork

orfo

rmw

ork

left

insh

allb

eso

desc

ribed

.5

Void

form

ers

shal

lbe

sode

scrib

ed.

6N

ode

duct

ions

shal

lbe

mad

efo

rvo

ids

≤5.

00m

2

7A

llki

cker

sex

cept

tow

alls

shal

lbe

deem

edin

clud

ed.

8To

pfo

rmw

ork

ism

easu

red

for

slopi

ngsu

rface

sth

atar

e>

15°

orw

here

othe

rwise

spec

ifica

llyre

quire

d.9

All

squa

re,r

akin

gan

dcu

rved

cutt

ing

deem

edin

clud

ed.

10A

llho

les,

boxi

ngs,

rece

sses

,reb

ates

,ch

amfe

rs,n

ibs,

chan

nels

and

the

like

are

deem

edin

clud

ed.

13Si

des

offo

unda

tions

and

base

s14

Edge

sof

horiz

onta

lwor

km m

2

1≤

500

high

:wid

thst

ated

.2

>50

0hi

gh.

15So

ffits

ofho

rizon

talw

ork

16So

ffits

oftr

ough

edor

waf

fled

horiz

onta

lwor

k,de

tails

desc

ribed

m2

1Fo

rco

ncre

te≤

300

thic

k.2

For

conc

rete

300

to45

0th

ick.

3Fo

rco

ncre

te>

450

thic

k.

1Pr

oppi

ng≤

3mhi

gh.

2Pr

oppi

ngov

er3m

but

not

exce

edin

g4.

5mhi

gh.

3A

ndth

erea

fter

in1.

5mst

ages

.

1In

clud

essu

spen

ded

slabs

and

stai

rla

ndin

gs.

2Th

roug

hpr

oppi

ngto

bede

scrib

edif

not

left

todi

scre

tion

ofco

ntra

ctor

.

17Si

des

and

soffi

tsof

isola

ted

beam

s18

Side

san

dso

ffits

ofat

tach

edbe

ams

19Si

des

ofup

stan

dbe

ams

20Si

des

ofiso

late

dco

lum

ns,n

rst

ated

21Si

des

ofat

tach

edco

lum

ns

m2

1Re

gula

r:sh

ape

stat

ed.

2Irr

egul

arsh

aped

,dim

ensio

ned

desc

riptio

nor

diag

ram

.

1Sh

ape

isde

emed

regu

lar

unle

ssde

scrib

edas

othe

rwise

.2

Irreg

ular

shap

eis

any

shap

eot

her

than

squa

reor

rect

angu

lar.

3In

clud

esco

ncre

teca

sings

tost

eel

beam

san

dco

lum

ns.

TABULATED WORK SECTIONS

154 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 162: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

22Fa

ces

ofw

alls

and

othe

rve

rtic

alw

ork

m2

1Ve

rtic

al.

2Ba

tter

edon

efa

ce.

3Ba

tter

edbo

thfa

ces.

1Ra

teof

batt

erto

best

ated

.1

Wor

kto

singl

esid

essh

allb

eso

desc

ribed

.

23Ex

tra

over

nr1

Ope

ning

sfo

rdo

ors

orth

elik

e:th

ickn

ess

ofw

alls

tate

d.1

≤5.

00m

2.

25.

00m

2to

10.0

0m2.

3>

10.0

0m2.

1A

llad

ditio

nall

abou

ran

dm

ater

ial

need

edto

form

the

open

ing

isde

emed

incl

uded

.

24W

alle

nds,

soffi

tsan

dst

eps

inw

alls

m m2

1≤

500

wid

e,w

idth

stat

ed.

2>

500

wid

e.1

Excl

udes

ends

and

soffi

tsof

wal

lscr

eate

dby

the

form

atio

nof

anop

enin

g.Th

ese

are

deem

edin

clud

edin

the

item

for

form

ing

the

open

ing.

25So

ffits

ofslo

ping

wor

km

21

Slop

ing

one

way

.2

Slop

ing

two

way

s.1

This

incl

udes

wor

kto

soffi

tsof

slabs

,ra

mps

,ste

ps,s

tairc

ases

and

the

like.

26St

airc

ase

strin

gsan

dth

elik

em

1M

axim

umw

idth

stat

ed.

27St

airc

ase

riser

san

dth

elik

em

1Ve

rtic

al:w

idth

stat

ed.

2U

nder

cut:

wid

thst

ated

.

28Sl

opin

gto

psu

rface

sm

21

≤15

°.2

>15

°.

29St

eps

into

psu

rface

s30

Step

sin

soffi

tsm

1≤

500

high

:wid

thst

ated

.2

>50

0hi

gh.

31C

ompl

exsh

apes

nr1

Dim

ensio

ned

desc

riptio

nor

diag

ram

.1

Prop

ping

≤3m

high

.2

Prop

ping

over

3mbu

tno

tex

ceed

ing

4.5m

high

.3

And

ther

eafte

rin

1.5m

stag

es.

32W

allk

icke

rsm

1Pl

ain.

2Su

spen

ded.

1Le

ngth

ism

easu

red

alon

gce

ntre

line

and

isde

emed

toin

clud

ebo

thsid

es.

11 IN-SITU CONCRETE WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 155

Page 163: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Rei

nfor

cem

ent

33M

ildst

eelb

ars

34H

igh

yiel

dst

eelb

ars

t1

Nom

inal

size

stat

ed.

1St

raig

ht.

2Be

nt.

3C

urve

d.4

Link

s.

1Ba

rsex

ceed

ing

12m

long

:le

ngth

stat

ed.

2D

efor

med

.3

Bend

ing

rest

rictio

ns

1Fo

rmin

gho

oks,

tyin

gw

ire,s

pace

rs,

cutt

ing,

and

bend

ing

isde

emed

incl

uded

.2

Cha

irsan

dco

nnec

tors

are

deem

edin

clud

edun

less

not

atdi

scre

tion

ofco

ntra

ctor

.

35A

cces

sorie

sno

tat

the

disc

retio

nof

the

cont

ract

ornr

1N

omin

alsiz

est

ated

.1

Cha

irsor

stoo

ls.2

Con

nect

ors.

36Pr

e/Po

st-t

ensio

ned

mem

bers

nr1

Dim

ensio

ned

desc

riptio

n.2

Nom

inal

size

stat

ed.

3M

etho

dof

tens

ioni

ngst

ated

.

1C

ompo

site

cons

truc

tion

desc

ribed

.1

Slee

ves,

tend

ons,

fittin

gsan

dgr

outin

gde

scrib

ed.

1Po

st-t

ensio

ning

ism

easu

red

byth

enu

mbe

rof

tend

ons

inid

entic

alm

embe

rs.

37M

esh

m2

1W

eigh

tpe

rm

2st

ated

.2

Fabr

icre

fere

nce

stat

ed3

Min

imum

laps

stat

ed.

1Be

nt.

2St

rips

inon

ew

idth

,wid

thst

ated

.

1La

ps,t

ying

wire

s,al

lcut

ting,

bend

ing,

spac

ers,

stoo

ls,ch

airs

and

othe

rsu

ppor

tsde

emed

incl

uded

.2

Void

s≤

1.00

m2

inar

eano

tde

duct

ed.

3Be

ntfa

bric

isde

emed

toin

clud

efa

bric

that

isw

rapp

edar

ound

stee

lm

embe

rs.

TABULATED WORK SECTIONS

156 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 164: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Des

igne

djo

ints

inin

-situ

conc

rete

1Jo

ints

loca

ted

atth

edi

scre

tion

ofth

eco

ntra

ctor

are

not

mea

sure

d.2

Det

ails

ofpr

imer

s,cl

eane

rs,f

illers

,w

ater

stop

s,ba

ckin

gst

rips,

rein

forc

emen

t,tie

s,se

alan

ts,t

hem

etho

dof

appl

icat

ion,

prep

arat

ion

and

the

like

shal

lbe

stat

edin

the

desc

riptio

n.

38Pl

ain

39Fo

rmed

40C

ut

m1

Dim

ensio

ned

desc

riptio

n.2

tota

ldep

thst

ated

.1

Hor

izont

al.

2Ve

rtic

al.

3C

urve

d,ra

dius

stat

ed.

1Pl

ain

join

tsar

eth

ose

that

dono

tre

quire

form

wor

k.2

Form

edjo

ints

are

deem

edto

incl

ude

form

wor

k.3

All

prep

arat

ion,

clea

ners

,prim

ers

and

seal

ers

are

deem

edin

clud

ed.

4A

llan

gles

,end

s,in

ters

ectio

nsar

ede

emed

incl

uded

whe

ther

they

are

form

ed,w

elde

dor

purp

ose

mad

e.

Acc

esso

ries

cast

into

in-s

ituco

ncre

te1

Kind

,qua

lity

ofm

ater

ials

and

size

orm

anuf

actu

rers

refe

renc

esh

allb

est

ated

.

41Ty

peor

prop

rieta

ryre

fere

nce

stat

edm

2

----

-m --

---

nr

1D

imen

sione

dde

scrip

tion.

1If

linea

ror

supe

rfici

alqu

antit

ies

are

used

the

desc

riptio

nm

ust

incl

ude

any

appr

opria

tesp

acin

gdi

men

sions

.

1C

ast-

inac

cess

orie

sin

clud

ean

chor

bolts

,anc

hor

boxe

s,fix

ing

bolts

,do

wel

s,co

lum

ngu

ards

,iso

late

dgl

ass

bloc

ksan

dan

yot

her

anci

llary

item

that

issp

ecifi

edto

beca

stin

asth

eco

ncre

tew

ork

proc

eeds

.2

Cas

t-in

acce

ssor

ies

excl

ude

rein

forc

emen

t,ty

ing

wire

,dist

ance

bloc

ks,s

pace

rs,c

hairs

,str

uctu

rals

teel

mem

bers

,hol

low

bloc

ks,f

iller

bloc

ks,

void

form

ers,

perm

anen

tfo

rmw

ork,

join

ts,a

llco

mpo

nent

sar

ound

whi

chco

ncre

teis

cast

but

whi

char

eno

tfix

edin

posit

ion

byth

eco

ntra

ctor

.

11 IN-SITU CONCRETE WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 157

Page 165: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

In-s

ituco

ncre

tesu

ndri

es

42G

rout

ing

nr1

Dim

ensio

ned

desc

riptio

n.1

Stan

chio

nba

ses.

2G

rilla

ges.

1Fo

rmw

ork

orot

her

tem

pora

rym

eans

ofsu

ppor

tto

expo

sed

edge

san

dth

elik

eis

deem

edin

clud

ed.

43Fi

lling

mor

tices

orho

les

nr

44Fi

lling

chas

esm

TABULATED WORK SECTIONS

158 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 166: RICS new rules of measurement 2

12P

reca

st/c

om

posi

teco

ncre

tePr

ecas

t/co

mpo

site

conc

rete

wal

ls,p

artit

ions

and

pane

lsPr

ecas

t/co

mpo

site

conc

rete

deck

ing

and

floor

ing

Oth

erpr

ecas

t/co

mpo

site

conc

rete

wor

k

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Gen

eral

arra

ngem

ent

draw

ings

.2

Spec

ific

draw

ings

orde

tails

rela

ting

topr

ecas

tw

orks

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials.

2Si

zes

and

spac

ing

ofpl

anks

and

bloc

ks.

3Ki

nd,q

ualit

yan

dm

ixof

conc

rete

.4

Met

hods

ofco

mpa

ctio

nan

dcu

ring.

5Be

ddin

gan

dfix

ing.

6Su

rface

finish

es.

7Ki

ndan

dqu

ality

ofre

info

rcem

ent

orpr

e/po

st-t

ensio

ning

,spa

cing

and

stre

sses

.8

Fini

shof

expo

sed

surfa

ces.

9D

etai

lsof

test

sof

mat

eria

ls.10

Det

ails

ofte

sts

offin

ished

wor

k.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Th

ere

lativ

epo

sitio

nof

conc

rete

mem

bers

.2

Size

ofm

embe

rs.

3Th

ickn

ess

ofsla

bsan

dpa

nels.

4Pe

rmiss

ible

load

s.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1M

ould

san

dfo

rmw

ork.

2Re

info

rcem

ent.

3Be

ddin

g.4

Fixi

ngs.

5Te

mpo

rary

supp

ort.

6C

ast-

inac

cess

orie

s.7

Pre-

tens

ioni

ngor

pre-

stre

ssin

g.8

Fille

den

ds.

9A

llgr

outin

g.10

Mar

gins

≤50

0mm

wid

e.

12 PRECAST/COMPOSITE CONCRETE

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 159

Page 167: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

ompo

site

conc

rete

wor

km

21

Nat

ure

ofw

ork

desc

ribed

.2

Com

posit

ion

ofw

ork

desc

ribed

.3

Thic

knes

sst

ated

.

1H

orizo

ntal

.2

Slop

ing

≤15

°.3

Slop

ing

>15

°.4

Vert

ical

.

1Re

info

rcem

ent:

deta

ilsst

ated

.2

Post

-ten

sioni

ng:n

umbe

rof

tend

ons

and

deta

ilsst

ated

.3

Cas

t-in

acce

ssor

ies:

deta

ilsst

ated

.

1W

illap

ply

topa

nels,

slabs

,wal

ls,pa

rtiti

ons,

deck

ing.

2Th

eth

ickn

ess

stat

edis

the

com

bine

dth

ickn

ess

ofbo

thpr

ecas

tan

din

-situ

wor

k.3

Mar

gins

grea

ter

than

500m

mw

ide

are

mea

sure

das

ordi

nary

in-s

ituco

ncre

tesla

bs.

4N

ode

duct

ion

ism

ade

for

void

s≤

1.00

m2.

2D

esig

ned

join

tsm

1D

imen

sione

dde

scrip

tion.

1Ty

pean

dsiz

esof

fillin

gan

dse

alan

tst

ated

.1

Join

tsfo

rmed

atth

edi

scre

tion

ofth

eco

ntra

ctor

are

not

mea

sure

d.

3H

oldi

ngdo

wn

ortie

stra

psnr

1D

imen

sione

dde

scrip

tion

orpr

oprie

tary

refe

renc

enu

mbe

r.1

Mat

eria

ltyp

est

ated

.2

Prot

ectiv

eco

atin

gst

ated

.1

Met

hod

offix

ing.

TABULATED WORK SECTIONS

160 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 168: RICS new rules of measurement 2

13P

reca

stco

ncre

te

Prec

ast

conc

rete

fram

est

ruct

ures

Prec

ast

conc

rete

sills

,lin

tels

,cop

ings

and

othe

run

itsPr

ecas

tco

ncre

tepa

nelc

ladd

ing

Prec

ast

conc

rete

slab

sPr

ecas

tco

ncre

tew

alls

and

part

ition

sPr

ecas

tco

ncre

tede

ckin

gPr

ecas

tco

ncre

tero

oflig

hts

and

pave

men

tlig

hts

Prec

ast

com

posi

teco

ncre

tew

ork

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Gen

eral

arra

ngem

ent

draw

ings

.2

Spec

ific

draw

ings

orde

tails

rela

ting

topr

ecas

tw

orks

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yan

dm

ixof

conc

rete

.2

Met

hods

ofco

mpa

ctio

nan

dcu

ring.

3Be

ddin

gan

dfix

ing.

4Su

rface

finish

es.

5Ki

ndan

dqu

ality

ofre

info

rcem

ent

orpr

e/po

st-t

ensio

ning

,spa

cing

and

stre

sses

.6

Fini

shof

expo

sed

surfa

ces.

7D

etai

lsof

test

sof

mat

eria

ls.8

Det

ails

ofte

sts

offin

ished

wor

k.

Not

es,c

omm

ents

and

glos

sary

13 PRECAST CONCRETE

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 161

Page 169: RICS new rules of measurement 2

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Th

ere

lativ

epo

sitio

nof

conc

rete

mem

bers

.2

The

thic

knes

sor

size

ofm

embe

rs.

3Th

ickn

ess

ofsla

bsan

dpa

nels.

4Pe

rmiss

ible

load

s.5

Full

deta

ilsof

anch

orag

es,

duct

s,sh

eath

ing

and

vent

s.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1M

ould

san

dfo

rmw

ork.

2Re

info

rcem

ent.

3Be

ddin

g.4

Fixi

ngs.

5Te

mpo

rary

supp

ort.

6C

ast-

inac

cess

orie

s.7

Pre-

tens

ioni

ngor

pre-

stre

ssin

g.8

Fille

den

ds.

9A

llgr

outin

g.10

Mar

gins

.11

Ang

les

and

fair

ends

.12

Gla

ssle

nses

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

ecas

tco

ncre

tego

ods

nr1

Dim

ensio

ned

desc

riptio

nor

dim

ensio

ned

diag

ram

.1

Rein

forc

emen

t:de

tails

stat

ed.

2Po

st-t

ensio

ning

:num

ber

ofte

ndon

san

dde

tails

stat

ed.

3C

ast-

inac

cess

orie

s:de

tails

stat

ed.

4Sl

opin

gno

tex

ceed

ing

15°.

5Sl

opin

gex

ceed

ing

15°.

1St

oolin

gs,n

umbe

rst

ated

.1

Will

appl

yto

sills,

linte

ls,pa

dsto

nes,

stai

rcas

es,l

andi

ngs,

pane

ls,pa

rtiti

ons,

colu

mns

,bea

ms,

stru

ctur

alfr

ames

and

othe

rpr

ecas

tfe

atur

es.

m2

Dim

ensio

ned

desc

riptio

nst

atin

gnu

mbe

rof

piec

es.

2W

illap

ply

tofr

ame

mem

bers

,cop

ings

and

the

like.

m2

3D

imen

sione

dde

scrip

tion

stat

ing

thic

knes

s.2

Span

whe

rere

leva

nt.

3W

illap

ply

topa

nels,

slabs

,wal

ls,pa

rtiti

ons,

deck

ing

and

the

like.

2Ro

oflig

hts

3Pa

vem

ent

light

s4

Vert

ical

pane

llig

hts

m2

----

-nr

1D

imen

sione

dde

scrip

tion,

Num

ber

stat

ed.

----

----

----

----

----

--2

Dim

ensio

ned

desc

riptio

n.

1Si

zes

and

exte

ntof

rein

forc

emen

tst

ated

.1

Isola

ted

glas

sle

nses

are

mea

sure

das

acce

ssor

ies

cast

into

insit

uco

ncre

te.

2Ro

of,p

avem

ent

and

pane

llig

hts

are

deem

edto

incl

ude

mou

lds,

form

wor

k,te

mpo

rary

prop

ping

,rei

nfor

cem

ent,

bedd

ing

and

glas

sle

nses

.

TABULATED WORK SECTIONS

162 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 170: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5D

esig

ned

join

tsm

1D

imen

sione

dde

scrip

tion.

1Ty

pean

dsiz

esof

fillin

gan

dse

alan

tst

ated

.1

Join

tsfo

rmed

atth

edi

scre

tion

ofth

eco

ntra

ctor

are

not

mea

sure

d.

6H

oldi

ngdo

wn

ortie

stra

psnr

1D

imen

sione

dde

scrip

tion

orpr

oprie

tary

refe

renc

enu

mbe

r.1

Mat

eria

ltyp

est

ated

.2

Prot

ectiv

eco

atin

gst

ated

.1

Met

hod

offix

ing.

13 PRECAST CONCRETE

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 163

Page 171: RICS new rules of measurement 2

14M

aso

nry

Bric

k/bl

ock

wal

ling

Gla

ssbl

ock

wal

ling

Nat

ural

ston

eru

bble

wal

ling

and

dres

sing

sN

atur

alst

one

ashl

arw

allin

gan

ddr

essi

ngs

Art

ifici

al/c

ast

ston

ew

allin

gan

ddr

essi

ngs

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

sof

each

floor

leve

l.2

Prin

cipa

lsec

tions

show

ing

floor

toflo

orhe

ight

s.3

Exte

rnal

elev

atio

ns.

4A

nyot

her

maj

orm

ason

ryw

ork.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yan

dsiz

eof

bric

k/bl

ock/

ston

eun

its.

2Ty

peof

finish

/faci

ngs

toea

chsid

e.3

Bond

.4

Com

posit

ion

and

mix

ofm

orta

r.5

Type

ofpo

intin

g.6

Bond

ing

toot

her

wor

k.7

Raki

ngor

curv

edw

ork

sode

scrib

ed.

8Ra

dius

ofcu

rved

wor

k.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1M

ajor

horiz

onta

land

vert

ical

dim

ensio

ns.

2Ty

pes

ofm

ater

ials

used

toco

nstr

uct

the

wal

lsan

dot

her

stru

ctur

es.

3Po

sitio

nof

mai

nst

ruct

ural

fram

em

embe

rs.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llro

ugh

and

fair

cutt

ing.

2A

llen

dsan

dan

gles

,eith

erfo

rmed

orpr

oprie

tary

.3

Extr

am

ater

ialf

orcu

rved

wor

k.4

Form

ing

allr

ough

and

fair

groo

ves,

thro

ats,

mor

tices

,ch

ases

,reb

ates

,hol

es,s

tops

,m

itres

and

the

like

labo

urs.

5Ra

king

out

join

tsto

form

ake

y.6

Raki

ngou

tjo

ints

toin

sert

flash

ings

.7

Cen

terin

gor

othe

rfo

rms

ofte

mpo

rary

supp

ort.

1A

llw

allin

gis

mea

sure

don

the

cent

relin

eirr

espe

ctiv

eof

cons

truc

tion.

2Th

ickn

esse

sst

ated

are

nom

inal

.3

Wor

kis

deem

edve

rtic

alun

less

othe

rwise

desc

ribed

.4

All

wal

ldim

ensio

nsex

clud

eap

plie

dfin

ishes

.5

No

dedu

ctio

nsw

illbe

mad

efo

rvo

ids

orbu

iltin

item

sw

hose

cros

sse

ctio

nal

area

isle

ssth

an0.

50m

2.

TABULATED WORK SECTIONS

164 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 172: RICS new rules of measurement 2

8La

bour

inea

ves

fillin

g.9

Labo

urs

inre

turn

s,en

dsan

dan

gles

.10

Cen

terin

g.11

Ove

rhan

dw

ork.

12Bo

ndin

gen

dsof

wal

lsto

othe

rw

ork.

13A

llex

tra

mat

eria

lreq

uire

dfo

rbo

ndin

g.14

Add

ition

alm

ater

iali

nla

ps.

15Pr

epar

atio

nof

alls

urfa

ces

tore

ceiv

esu

bseq

uent

appl

icat

ions

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1W

alls;

over

allt

hick

ness

stat

ed2

Dia

phra

gmw

alls;

over

allt

hick

ness

stat

ed,s

paci

ngan

dth

ickn

ess

ofrib

sst

ated

.

m2

1Br

ickw

ork.

2Bl

ockw

ork.

3G

lass

bloc

kwor

k.4

Nat

ural

ston

e.5

Cas

tst

one.

6O

ther

:typ

est

ated

.

1Sk

ins

ofho

llow

wal

ls.2

Batt

ered

.3

Tape

red;

one

side

orbo

thsid

es.

4Bu

iltag

ains

tot

her

wor

k.5

Use

das

form

wor

k.

1M

etho

dof

form

ing.

1Th

ede

scrip

tion

shal

ldes

crib

eth

ety

peof

cons

truc

tion

ofth

em

ason

rysu

chas

rubb

leor

ashl

arw

ork

and

heig

htof

cour

sing.

2W

alls

are

mea

sure

don

the

cent

relin

eof

the

mat

eria

lunl

ess

othe

rwise

stat

ed.

3Th

era

dius

ofcu

rved

wor

kis

take

nfro

mth

ece

ntre

line.

4Ba

tter

ing

wal

lsar

eslo

ping

wal

lsw

ithpa

ralle

lsid

es.

5Th

ickn

ess

stat

edfo

rta

perin

gw

alls

isth

em

ean

thic

knes

s.6

No

dedu

ctio

nsto

bem

ade

for

void

sor

built

inite

ms

who

secr

oss

sect

iona

lar

eaeq

ualt

oor

less

than

0.50

m2.

7Th

ickn

ess

stat

edfo

rdi

aphr

agm

wal

lsis

tota

lthi

ckne

ssof

both

skin

san

dca

vity

void

.

3Va

ultin

g;th

ickn

ess

and

type

stat

edm

2

14 MASONRY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 165

Page 173: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4Iso

late

dpi

ers;

isola

ted

casin

gs;c

him

ney

stac

ks;c

olum

nsm

1D

imen

sione

dde

scrip

tion

ordi

men

sione

ddi

agra

m.

1Ve

rtic

al.

2Ba

tter

ed.

3C

urve

d:ra

dius

stat

ed.

1Th

ese

are

such

whe

nth

eir

leng

thon

plan

iseq

ualt

oor

less

than

four

times

thei

rth

ickn

ess

exce

ptw

here

caus

edby

open

ings

.2

No

dedu

ctio

nsto

bem

ade

for

flues

and

the

like

equa

lto

orle

ssth

an0.

10m

2in

cros

sse

ctio

nala

rea.

5A

ttac

hed

proj

ectio

nsm

1Ve

rtic

al.

2Ra

king

.3

Hor

izont

al.

4C

urve

d:ra

dius

stat

ed.

1A

ttac

hed

proj

ectio

nsar

eat

tach

edpi

ers

who

sele

ngth

onpl

anis

equa

lto

orle

ssth

anfo

urtim

esth

eir

thic

knes

spl

uspl

inth

s,ov

ersa

iling

cour

ses

and

the

like.

6A

rche

s(n

umbe

rst

ated

)m

1H

eigh

tof

face

,wid

thof

soffi

tan

dsh

ape

ofar

chst

ated

.1

The

leng

this

the

mea

ngi

rth

orle

ngth

onfa

ce.

7Ba

nds;

dim

ensio

ned

desc

riptio

nm

1Fl

ush.

2Su

nk:d

epth

ofse

tba

ckst

ated

.3

Proj

ectin

g:de

pth

ofse

tfo

rwar

dst

ated

.

1Ve

rtic

al.

2Ra

king

.3

Hor

izont

al.

4C

urve

d:m

ean

radi

uson

face

stat

ed.

1En

tirel

yof

stre

tche

rs.

2En

tirel

yof

head

ers.

3A

ltern

ate

head

ers/

stre

tche

rs.

4O

ther

bond

.

1Ba

nds

are

bric

k-on

-edg

eba

nds,

bric

k-on

-end

band

s,ba

sket

patt

ern

band

s,m

ould

edor

spla

yed

capp

ings

,m

ould

edst

ring

cour

ses,

mou

lded

corn

ices

and

the

like.

8Fl

ues

9Fl

uelin

ings

10Fi

lling

arou

ndflu

es

m1

Dim

ensio

ned

desc

riptio

n.1

Met

hod

offo

rmin

g.

11Ex

tra

over

wal

lsfo

rpe

rimet

ers

and

abut

men

ts,d

etai

lsst

ated

m1

Dim

ensio

ned

desc

riptio

n.1

Met

hod

offo

rmin

g.2

Clo

sing

cavi

ties,

addi

tiona

ltie

s,in

sula

tion

and

allo

ther

asso

ciat

edw

ork

isde

emed

incl

uded

.

1Th

isw

illin

clud

ew

ork

form

ing

eave

s,co

ping

s,ke

rbs,

quoi

ns,e

nds

and

the

like.

12Ex

tra

over

wal

lsfo

rop

enin

gpe

rimet

ers,

deta

ilsst

ated

m1

This

will

incl

ude

wor

kfo

rmin

gsil

ls,ja

mbs

,rev

eals,

cavi

tycl

oser

s,ar

chitr

aves

,lin

tels,

mul

lions

,tra

nsom

s,th

resh

olds

,ste

psan

dth

elik

e.

TABULATED WORK SECTIONS

166 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 174: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

13Sp

ecia

lpur

pose

bloc

ksor

ston

esnr

1D

imen

sione

dde

scrip

tion.

1Fu

nctio

nst

ated

.1

Des

crip

tions

ofst

ones

are

give

nas

the

smal

lest

bloc

kfro

mw

hich

each

item

can

beob

tain

edha

ving

rega

rdin

the

case

ofna

tura

lsto

neto

the

plan

ein

whi

chth

est

one

isre

quire

dto

bela

idw

ithre

latio

nto

itsqu

arry

bed.

The

dim

ensio

nsar

eta

ken

over

one

mor

tar

bed

and

one

mor

tar

join

t.

14Fo

rmin

gca

vity

m2

1W

idth

and

met

hod

offo

rmin

g.1

Type

and

spac

ing

oftie

s.

15C

avity

insu

latio

nm

21

Type

and

thic

knes

s.2

Met

hod

ofin

stal

ling

orfix

ing.

16D

amp-

proo

fco

urse

s≤

300m

mw

ide

17D

amp-

proo

fco

urse

s>

300m

mw

ide

18Pr

e-fo

rmed

cavi

tytr

ays

m m2

m

1G

auge

orth

ickn

ess.

2N

umbe

rof

laye

rs.

3C

ompo

sitio

nan

dm

ixof

bedd

ing

mat

eria

ls.

1Ve

rtic

al.

2Ra

king

.3

Hor

izont

al.

4C

urve

d,m

ean

radi

uson

face

stat

ed.

5St

eppe

d.

1D

amp-

proo

fco

urse

sar

ede

emed

toin

clud

e:(a

)fo

rmin

gla

ps,e

nds

and

angl

es.

(b) p

oint

ing

expo

sed

edge

s.(c

)bo

ndin

gto

dam

p-pr

oof

mem

bran

esan

dth

elik

e.

19Jo

int

rein

forc

emen

tm

1W

idth

stat

ed.

20Fi

llets

m1

Wid

than

dth

ickn

ess

stat

ed.

1W

eath

er.

2A

ngle

.3

Oth

er.

21Po

intin

gm

1W

idth

and

dept

hof

join

tto

bepo

inte

d.1

Type

offin

ish.

1Th

isre

late

sto

the

poin

ting

ofjo

ints

,fla

shin

gs,f

ram

esan

dth

elik

e.

22Jo

ints

m1

Wid

than

dth

ickn

ess

stat

ed.

1Ty

peof

fille

r,se

alan

t,po

intin

g,m

etho

dof

appl

icat

ion

and

prep

arat

ion.

2Ti

es:c

entr

esst

ated

.3

Cha

nnel

s.

1Jo

ints

are

only

mea

sure

dw

here

thei

rco

mpo

sitio

nan

dpo

sitio

nis

desig

ned.

14 MASONRY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 167

Page 175: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

23W

edgi

ngan

dpi

nnin

gm

1W

idth

and

thic

knes

sst

ated

.

24C

reas

ing

m1

Wid

thst

ated

.2

Num

ber

ofco

urse

s.

25Pr

oprie

tary

and

indi

vidu

alsp

otite

ms.

nr1

Dim

ensio

ned

desc

riptio

nor

dim

ensio

ned

diag

ram

.1

Prop

rieta

ryre

fere

nce

orca

talo

gue

num

ber

whe

reap

plic

able

.

1M

etho

dof

form

ing,

build

ing

inor

fixin

g.1

All

ofth

ese

item

sar

ede

emed

toin

clud

eal

lnec

essa

ryfo

rmin

gof

open

ings

orpo

cket

s,lin

ers,

cavi

tycl

oser

s,da

mp-

proo

fco

urse

s,fix

ings

and

fast

enin

gsan

dbu

ilder

’sw

ork

inco

nnec

tion

with

any

asso

ciat

edm

echa

nica

lor

elec

tric

alco

nnec

tions

.2

This

will

incl

ude

item

ssu

chas

win

dpos

ts,h

ead

rest

rain

tch

anne

ls,st

eell

inte

ls,w

alle

ndtie

s,w

alle

ndbo

ndin

gch

anne

ls,ca

ppin

gs,c

him

ney

pots

,fin

ials,

boile

rse

ats,

soot

door

s,pl

inth

s,st

eps,

win

ders

,lan

ding

s,ba

ses,

key

bloc

ks,a

irbr

icks

,ven

tilat

orgr

atin

gs,

flue

bloc

ks,f

ireba

cks

and

sides

,gra

tes,

carv

edbr

icks

,blo

cks

orst

ones

,quo

inst

ones

,jam

bst

ones

,hea

rths

,w

eep-

hole

form

ers

and

the

like.

3Th

elis

tis

not

exha

ustiv

e.A

nyty

peof

indi

vidu

alsh

aped

piec

esh

ould

been

umer

ated

and

desc

ribed

eith

erby

adi

men

sione

dde

scrip

tion

ora

dim

ensio

ned

diag

ram

orby

refe

renc

eto

the

spec

ifica

tion

ortr

ade

broc

hure

.

TABULATED WORK SECTIONS

168 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 176: RICS new rules of measurement 2

15S

truc

tura

lm

etal

wo

rkSt

ruct

ural

Stee

lwor

kSt

ruct

ural

alum

iniu

mw

ork

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

All

Gen

eral

arra

ngem

ent

draw

ings

,Pla

ns,S

ectio

nsan

dEl

evat

ions

.2

Dra

win

gssp

ecifi

cto

the

wor

k.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ty

pes

and

grad

eof

mat

eria

lsin

clud

ing

stee

land

stee

lto

stee

lbol

ts.

2Sp

ecifi

catio

nde

scrib

ing

fabr

icat

ion,

wel

ding

,tes

ting,

erec

tion

and

ever

ythi

ngel

sene

cess

ary

toco

mpl

ete

the

inst

alla

tion.

3Su

rface

prep

arat

ion

prio

rto

appl

icat

ion

ofan

ysu

rface

trea

tmen

tor

finish

.

Not

es,c

omm

ents

and

glos

sary

.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Po

sitio

nof

the

wor

kin

rela

tion

toth

epr

opos

edst

ruct

ure

and

any

exist

ing

stru

ctur

eth

atth

ene

ww

ork

isbe

ing

conn

ecte

dto

.2

The

type

san

dsiz

esof

all

stru

ctur

alm

embe

rsan

dth

eir

posit

ions

inre

latio

nto

each

othe

r.3

Det

ails

ofco

nnec

tions

orof

the

reac

tions

,mom

ents

and

axia

lloa

dsat

conn

ectio

npo

ints

.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1Th

em

ass

offr

amin

gin

clud

esal

lcom

pone

nts.

2N

oal

low

ance

ism

ade

for

the

mas

sof

wel

ds,b

olts

,nut

s,w

ashe

rs,r

ivet

s,an

dpr

otec

tive

coat

ings

.3

Perm

anen

ter

ectio

nis

deem

edto

incl

ude

alls

peci

fied

oper

atio

nssu

bseq

uent

tofa

bric

atio

nin

clud

ing

deliv

ery

tosit

e.

15 STRUCTURAL METALWORK

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 169

Page 177: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Fr

amed

mem

bers

,fra

min

gan

dfa

bric

atio

nt

1Le

ngth

sno

tex

ceed

ing

1.00

m2

Leng

ths

over

1.00

but

not

exce

edin

g9.

00m

3Le

ngth

sex

ceed

ing

9.00

m

1W

eigh

t≤

25kg

/m.

2W

eigh

t25

–50k

g/m

.3

Wei

ght

50–1

00kg

/m.

4A

ndso

onin

incr

emen

tsof

50kg

/m.

1C

olum

ns.

2Be

ams.

3Ra

fters

.4

Brac

ings

.5

Purli

nsan

dcl

addi

ngra

ils.

6G

rilla

ges.

7Tr

usse

s.8

Plat

egi

rder

s.9

Fram

ing

todo

ors

and

win

dow

s.10

Trim

mer

sto

roof

san

dw

alls.

11Ra

fter

and

colu

mn

stay

s,nu

mbe

rst

ated

.

1C

aste

llate

d.2

Tape

red.

3C

urve

d.4

Cam

bere

d.5

Hol

low

:sha

pest

ated

.6

Built

-up

wor

k:de

tails

ofco

nstr

uctio

nst

ated

.7

Com

poun

dfa

bric

atio

ns,d

etai

lsof

cons

truc

tion

stat

ed.

8C

ellu

lar.

9Se

cond

ary

stee

lwor

k.10

Tem

pora

rybr

acin

gor

supp

ort

wor

kno

tat

disc

retio

nof

the

cont

ract

or,

subs

eque

ntre

mov

alis

deem

edin

clud

edun

less

stat

edot

herw

ise.

2Fr

amed

mem

bers

,per

man

ent

erec

tion

onsit

e

1C

rane

rails

.1

Det

ails

and

cent

res

offix

ing

clip

san

dre

silie

ntpa

dsst

ated

.

1W

ires,

cabl

es,r

ods,

ties

and

bars

.

3Iso

late

dst

ruct

ural

mem

bers

,fa

bric

atio

nt

1Pl

ain

mem

ber:

use

stat

ed.

1D

imen

sione

dde

scrip

tion

and

wei

ght

per

linm

1A

niso

late

dst

ruct

ural

mem

ber

ison

eno

tin

tegr

ally

conn

ecte

dto

othe

rst

ruct

ural

mem

bers

.

4Iso

late

dst

ruct

ural

mem

bers

,pe

rman

ent

erec

tion

onsit

enr

2Bu

ilt-u

pm

embe

r,us

est

ated

.

5A

llow

ance

for

fittin

gst

1C

alcu

late

dw

eigh

t.2

Perc

enta

geal

low

ance

;pe

rcen

tage

stat

ed.

1To

fram

edm

embe

rs.

2To

isola

ted

mem

bers

.1

Fitt

ings

are

com

pone

nts

that

allo

wm

embe

rsto

bejo

ined

toge

ther

orar

eot

her

brac

kets

,sup

port

san

dth

elik

eth

atar

esu

pplie

dan

dat

tach

ed,e

ither

onor

off

site,

toth

em

ain

load

bear

ing

fram

eby

the

stru

ctur

alm

etal

cont

ract

or.

TABULATED WORK SECTIONS

170 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 178: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

6C

old

rolle

dpu

rlins

,cla

ddin

gra

ilsan

dth

elik

em

1Ty

pean

dm

etho

dof

fixin

gst

ated

.2

Size

orpr

oprie

tary

refe

renc

est

ated

.

1Pu

rlins

and

clad

ding

rails

.2

Sag

rods

.3

Stay

s.4

Oth

er.

1M

etho

dof

fixin

gst

ated

.

7Ex

tra

over

for

nr1

Form

ing

cran

ks.

Dim

ensio

nof

mem

ber

stat

ed.

8Pr

ofile

dm

etal

deck

ing,

type

and/

orpr

ofile

stat

edm

21

Hei

ght

not

exce

edin

g5.

00m

2H

eigh

tex

ceed

ing

5.00

mbu

tno

tex

ceed

ing

10.0

0m3

And

soon

in5.

00m

incr

emen

ts.

1Sh

ear

stud

s:siz

ean

dsp

acin

gst

ated

.1

Met

hod

offix

ing.

1Th

isw

ork

ison

lym

easu

red

here

whe

nit

form

spa

rtof

the

stru

ctur

alst

eel

pack

age

othe

rwise

itw

ould

bem

easu

red

inac

cord

ance

with

the

rule

sfo

rpe

rman

ent

form

wor

k.2

Hei

ghts

are

alw

ays

mea

sure

dfro

mfin

ished

floor

leve

lunl

ess

othe

rwise

stat

ed.

3Th

ear

eaof

met

alde

ckin

gis

calc

ulat

edas

the

finish

edar

eaof

conc

rete

cast

onto

the

deck

ing.

9Ex

tra

over

for

m1

Edge

trim

s;siz

e,gi

rth,

prof

ileor

prop

rieta

ryre

fere

nce

stat

ed.

1St

raig

ht.

2Ra

king

.3

Cur

ved,

radi

usst

ated

.

1En

ds,a

ngle

s,in

ters

ectio

nsar

eal

lde

emed

incl

uded

.

m2

Cur

ved

cutt

ing.

10H

oldi

ngdo

wn

bolts

oras

sem

blie

snr

1Ty

pean

ddi

amet

erst

ated

.1

Anc

hor

plat

es,f

ram

es,

mem

bers

,tub

es,c

ones

and

any

othe

ras

soci

ated

acce

ssor

yst

ated

1Su

pply

only.

11Sp

ecia

lbol

tsnr

1Ty

pean

ddi

amet

erst

ated

.1

Back

grou

ndif

othe

rth

anst

ruct

ural

stee

l.1

Spec

ialb

olts

are

allb

olts

and

fast

ener

sot

her

than

grad

e4.

6bl

ack

bolts

and

hold

ing

dow

nas

sem

blie

s.

15 STRUCTURAL METALWORK

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 171

Page 179: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

12C

onne

ctio

nsto

exist

ing

stee

land

othe

rm

embe

rsor

stru

ctur

esnr

1D

etai

lsst

ated

.1

All

labo

urs

onne

wan

dex

istin

gst

eel

are

deem

edin

clud

ed.

2La

bour

son

non-

stee

lstr

uctu

res

are

mea

sure

del

sew

here

.

13Tr

iale

rect

ion

t1

Det

ails

and

loca

tion

stat

ed.

1O

nly

mea

sure

dw

hen

not

atdi

scre

tion

ofco

ntra

ctor

.2

The

info

rmat

ion

give

nin

the

desc

riptio

nm

ust

incl

ude

item

ssu

chas

the

num

ber

ofer

ecta

ble

piec

esan

dnu

mbe

rof

site

wel

ds.T

his

info

rmat

ion

may

begi

ven

byre

fere

nce

todr

awin

g(s)

.

14Fi

lling

hollo

wse

ctio

nsite

m1

Wat

er.

2C

oncr

ete.

3O

ther

mat

eria

ltyp

est

ated

1D

etai

lsst

ated

.

15Su

rface

trea

tmen

tsm

21

Gal

vani

sing.

2Sp

raye

dco

atin

g.3

Pain

ting.

4O

ther

trea

tmen

t:ty

pest

ated

.

1O

nsit

e.2

Off

site.

1Pr

epar

atio

nde

scrib

ed.

2N

umbe

rof

coat

sst

ated

.3

Thic

knes

sof

coat

(s)

stat

ed.

4Fi

rera

ting

stat

ed.

5Fi

nish

stat

ed.

1A

llpr

epar

atio

nis

deem

edin

clud

ed.

16Iso

late

dpr

otec

tive

coat

ings

nr1

App

roxi

mat

esiz

eor

area

stat

ed.

2Ty

peof

prot

ectiv

eco

ated

stat

ed.

3Pr

epar

atio

nde

scrib

ed.

1O

nsit

e.2

Off

site.

17Te

stin

gite

m1

Load

test

s.2

Fire

prot

ectio

nte

sts.

3O

ther

test

s.

1D

etai

lsst

ated

.

TABULATED WORK SECTIONS

172 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 180: RICS new rules of measurement 2

16C

arpe

ntry

Tim

ber

fram

ing

Tim

ber

first

fixin

gsT

imbe

r,m

etal

and

plas

ticbo

ardi

ng,s

heet

ing,

deck

ing,

casi

ngs

and

linin

gsM

etal

and

plas

ticac

cess

orie

s

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

All

gene

rala

rran

gem

ent

plan

s,se

ctio

nsan

del

evat

ions

.2

Dra

win

gssp

ecifi

cto

the

wor

k.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yan

dsiz

eof

mat

eria

ls.2

Gra

deof

timbe

r.3

Type

ofpr

eser

vativ

etr

eatm

ent.

4Ty

peof

prot

ectiv

eco

atin

g5

Met

hod

offix

ing

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

6M

etho

dof

join

ting

orco

nstr

uctio

nw

here

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.7

Spac

ing

ofba

tten

san

dgr

ound

s.8

Nat

ure

ofba

se.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1La

yout

and

spac

ing

oftim

bers

.2

Type

sof

mat

eria

lsus

ed.

3Po

sitio

nof

timbe

rsin

rela

tion

adja

cent

stru

ctur

es.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llsiz

esno

min

alun

less

othe

rwise

stat

ed.

2A

lltim

bers

are

saw

nun

less

othe

rwise

stat

ed.

3A

llw

ork

fabr

icat

ed,a

ssem

bled

and

erec

ted

onsit

eun

less

othe

rwise

stat

ed.

4A

llw

ork

fixed

byna

ilsun

less

othe

rwise

stat

ed.

5H

oles

intim

ber

for

bolts

and

allo

ther

fixin

gs.

6A

llla

bour

son

timbe

r.7

All

web

s,gu

sset

san

dth

elik

eon

trus

ses

and

port

als.

16 CARPENTRY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 173

Page 181: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

imar

yor

stru

ctur

altim

bers

m1

Nom

inal

size

stat

ed.

1Ra

fters

and

asso

ciat

edro

oftim

bers

.2

Purli

ns.

3W

allp

late

s.4

Roof

and

floor

joist

s.5

Beam

s.6

Post

sor

colu

mns

.7

Part

ition

and

wal

lmem

bers

.8

Stru

ttin

g.

1Se

lect

ion

and

prot

ectio

nfo

rsu

bseq

uent

trea

tmen

t.2

Mat

chin

ggr

ains

orco

lour

s.3

Lim

itson

plan

ing

mar

gins

.4

Fixi

ngce

ntre

sst

ated

whe

reno

tat

disc

retio

nof

the

cont

ract

or.

5Ty

pean

dsiz

eof

bolts

and

othe

rfix

ings

and

fast

enin

gs.

6Ba

ckgr

ound

orna

ture

ofba

se.

7Fi

xing

thro

ugh

vuln

erab

lem

ater

ials.

8Su

rface

finish

ortr

eatm

ent

appl

ied

aspa

rtof

the

man

ufac

turin

gpr

oces

s.9

Leng

th>

6.00

inon

eco

ntin

uous

leng

th.

1St

rutt

ing

ism

easu

red

thro

ugh

the

stru

ctur

alm

embe

rsbe

ing

stiff

ened

.

2En

gine

ered

orpr

efab

ricat

edm

embe

rs/it

ems

nr1

Fini

shed

Dim

ensio

ned

desc

riptio

n.2

Roof

trus

ses.

3Po

rtal

fram

es.

4Tr

usse

s.5

Wal

lpan

els.

6Be

ams.

7Jo

ists.

8Po

sts

orco

lum

ns.

1M

anuf

actu

rers

’ref

eren

ce.

2Le

ngth

>6.

00in

one

cont

inuo

usle

ngth

.

3Ba

ckin

gan

dot

her

first

fixtim

bers

m1

Nom

inal

Dim

ensio

ned

desc

riptio

nof

each

mem

ber.

1G

roun

ds.

2Ba

tten

s.

m2

2N

omin

alD

imen

sione

dde

scrip

tion

ofea

chm

embe

r.1

Fram

edgr

ound

s,ba

tten

san

dbr

acke

ting.

1C

entr

es,e

ach

way

stat

ed.

4Bo

ardi

ng,f

loor

ing,

shee

ting,

deck

ing,

casin

gs,l

inin

gs,s

arki

ng,f

asci

as,

barg

eboa

rds,

soffi

tsan

dth

elik

e

m ----

-m

2

1N

otex

ceed

ing

600m

mw

ide;

finish

edw

idth

and

thic

knes

sst

ated

.2

Ove

r60

0mm

wid

e;fin

ished

thic

knes

sst

ated

.

1H

orizo

ntal

.2

Slop

ing.

3Ve

rtic

al.

4C

urve

d:ra

dius

stat

ed.

5So

ffit

orce

iling.

6O

ther

shap

ede

scrib

ed.

1Fi

nish

stat

edun

less

saw

n.2

Type

ofjo

ints

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

3Pr

ofile

.

1Th

elo

catio

nof

the

wor

ksh

allb

egi

ven

such

asex

tern

alw

alls,

inte

rnal

wal

lsan

dat

tach

edpi

ers,

isola

ted

colu

mns

,flo

ors,

ceilin

gsan

dat

tach

edbe

ams,

isola

ted

beam

s,ro

ofs,

eave

s,ve

rges

,top

san

dch

eeks

ofdo

rmer

san

dth

elik

e.

TABULATED WORK SECTIONS

174 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 182: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5O

rnam

enta

lend

sof

timbe

rm

embe

rsnr

1Si

zean

dde

tail

stat

ed.

6M

etal

fixin

gs,f

aste

ning

san

dfit

tings

nr1

Dim

ensio

ned

desc

riptio

n.2

Prop

rieta

ryre

fere

nce

orca

talo

gue

num

ber

whe

reap

plic

able

.

1Ti

es.

2Ro

ds.

3Br

acke

ts.

4St

raps

.5

Shoe

s.6

Bolts

.7

Joist

hang

ers.

8O

ther

:det

ails

stat

ed.

1M

etho

dof

fixin

gst

ated

.2

Back

grou

ndst

ated

ifno

ttim

ber

1Bo

ltsin

clud

ehe

ads,

nuts

and

was

hers

.2

The

leng

thof

abo

ltis

mea

sure

dov

erth

ehe

ad.

3W

ork

isde

emed

toin

clud

eal

llab

ours

infa

bric

atin

gan

dfix

ing

incl

udin

gdr

illing

hole

sin

the

fittin

g,th

etim

ber

and

the

back

grou

nd.

16 CARPENTRY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 175

Page 183: RICS new rules of measurement 2

17S

heet

roo

fco

veri

ngs

Bitu

min

ous

felts

Plas

ticsh

eets

Shee

tm

etal

sR

igid

boar

dsw

ithfa

ctor

yap

plie

dsh

eet

cove

ring

sA

nyot

her

type

ofsh

eet

roof

cove

ring

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

sof

each

roof

.2

Prin

cipa

lsec

tions

ofro

of.

3Ex

tern

alel

evat

ions

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yof

mat

eria

ls.2

Thic

knes

s,ga

uge,

wei

ght

and

tem

per.

3M

etho

dof

fixin

g.4

Det

ails

and

posit

ion

ofla

ps,

drip

s,w

elts

,bea

ds,r

olls,

join

ts,

upst

ands

and

dow

nsta

nds.

5Bo

ndin

gto

othe

rw

ork.

6Ra

dius

ofcu

rved

wor

k.7

Type

(s)

and

spac

ing

ofjo

ints

.8

Type

(s)

and

spac

ing

ofse

ams.

9Sp

ecia

lfin

ishes

.

Not

es,c

omm

ents

and

glos

sary

1Ex

ampl

esof

roof

cove

rings

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofth

isse

ctio

nar

e:sh

eet

lead

,alu

min

ium

,co

pper

,zin

c,st

ainl

ess

stee

l,fib

rebi

tum

en,b

utyl

rubb

er,t

herm

opla

stic

and

the

like

mem

bran

es.

2Th

islis

tis

not

exha

ustiv

e.

TABULATED WORK SECTIONS

176 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 184: RICS new rules of measurement 2

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1M

ajor

horiz

onta

land

vert

ical

dim

ensio

ns.

2Ty

pes

ofm

ater

ials

used

toco

nstr

uct

the

roof

and

itsst

ruct

ures

.3

Posit

ion

ofm

ain

stru

ctur

alfr

ame

mem

bers

.4

Hei

ght

ofw

ork

abov

egr

ound

leve

lsta

ting

whe

ther

wor

king

plat

form

leve

lor

finish

edle

vel.

5A

llla

bour

san

ddr

essin

gs.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1U

nder

lay

inco

ntac

tw

ithth

eco

verin

g.2

All

roug

han

dfa

ircu

ttin

gan

dw

aste

.3

Extr

am

ater

ialr

equi

red

for

bond

ing.

4Ex

tra

mat

eria

lin

laps

and

dres

sings

.5

Extr

am

ater

ialf

orcu

rved

wor

k.6

All

ends

,ang

les

and

inte

rsec

tions

eith

erfo

rmed

orpr

oprie

tary

.7

Form

ing

allr

ough

and

fair

groo

ves,

thro

ats,

mor

tices

,ch

ases

,reb

ates

,hol

es,s

tops

,m

itres

and

the

like

labo

urs.

8Ra

king

out

join

tsto

inse

rtfla

shin

gs.

9La

bour

sin

retu

rns,

ends

and

angl

es.

10W

ork

iniso

late

dar

eas.

11W

ork

info

rmin

gvo

ids

and

hole

s≤

1.00

m2.

1Th

ear

eas

and

leng

ths

mea

sure

dar

ene

tin

cont

act

with

base

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

over

ings

>50

0mm

wid

em

21

Hor

izont

al.

2Sl

opin

g:pi

tch

stat

ed.

3Ve

rtic

al.

4C

urve

d:ra

diis

tate

d.

1U

nder

lays

.2

Insu

latio

n.3

Fini

shto

expo

sed

surfa

ce.

1N

atur

eof

base

.1

No

dedu

ctio

nis

mad

efo

rvo

ids

≤1.

00m

2.

2Fi

nish

esin

clud

eso

lar

refle

ctiv

epa

int,

chip

ping

san

dth

elik

e.Th

eyex

clud

etil

es,p

avin

gsla

bs,g

rass

roof

san

dth

elik

e.

2C

over

ings

≤50

0mm

wid

em

17 SHEET ROOF COVERINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 177

Page 185: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

3Ex

tra

over

for

form

ing

m1

Drip

s.1

Hei

ght

stat

ed.

1Le

ngth

ssh

allb

ene

tle

ngth

ofea

chla

bour

.2

All

addi

tiona

lshe

etm

ater

ialr

equi

red

tofo

rmth

ela

bour

item

shal

lbe

deem

edin

clud

ed.

3A

llad

ditio

nalu

nder

lay,

insu

latio

nan

dsu

rface

finish

shal

lbe

deem

edin

clud

ed.

2W

elts

.1

Hei

ght

stat

ed.

1Ty

pest

ated

.

3Ro

lls.

1W

idth

and

heig

htst

ated

.1

Woo

dco

re.

2H

ollo

w.

4Se

ams.

1Le

ngth

stat

ed.

5La

ps.

1Le

ngth

stat

ed.

4Bo

unda

ryw

ork,

loca

tion

and

met

hod

offo

rmin

gde

scrib

edm

1N

etgi

rth

stat

ed.

2A

vera

gene

tgi

rth

stat

ed,

num

ber

ofle

ngth

sst

ated

.

1A

butm

ents

.2

Eave

s.3

Ridg

es.

4Ve

rges

.5

Valle

ys.

6H

ips.

7Ve

rtic

alan

gles

.8

Ups

tand

s≤

500m

mhi

gh.

9D

owns

tand

s≤

500m

mhi

gh.

1H

orizo

ntal

.2

Vert

ical

.3

Raki

ng.

4C

urve

d,ra

dius

stat

ed.

5St

eppe

d.6

Pref

orm

ed.

7Sl

opin

g.

1Bo

unda

ryw

ork

tovo

ids

ison

lym

easu

red

whe

reth

evo

idis

>1.

00m

2.

2Bo

unda

ryw

ork

isw

ork

asso

ciat

edw

ithcl

osin

gof

for

finish

ing

off

shee

tro

ofin

gat

the

exte

rnal

perim

eter

,at

the

abut

men

tw

ithdi

ffere

ntm

ater

ials

orth

epe

rimet

erof

open

ings

and

void

s.3

Boun

dary

wor

kis

deem

edto

incl

ude

unde

rclo

aks,

insu

latio

n,st

ripve

ntila

tors

,ro

ugh

and

fair

cutt

ing,

bedd

ing,

poin

ting,

laps

,sea

ms,

ends

,ang

les,

inte

rsec

tions

,rol

ls,up

stan

ds,

dow

nsta

nds,

wel

ted

edge

s,dr

essin

gsan

dw

edgi

ngs

and

addi

tiona

lcov

erin

gm

ater

ialn

eede

dto

form

the

deta

ilan

dal

lass

ocia

ted

labo

urs.

4W

here

seve

rali

tem

sof

the

sam

ety

peof

boun

dary

wor

kha

vesli

ghtly

diffe

ring

net

girt

hsth

ese

girt

hsm

aybe

aver

aged

and

the

leng

ths

aggr

egat

ed.

5Th

enu

mbe

rof

sepa

rate

leng

ths

aggr

egat

edm

ust

best

ated

6Va

lleys

incl

ude

ever

ythi

ngne

cess

ary

tofo

rman

dlin

eth

eva

lley.

7A

nup

stan

dor

dow

nsta

ndov

er50

0mm

high

ism

easu

red

asve

rtic

alw

ork.

TABULATED WORK SECTIONS

178 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 186: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5Fl

ashi

ngs

m1

Net

girt

hst

ated

.1

Flas

hing

s.2

Apr

ons.

3Si

lls.

4W

eath

erin

gs.

5C

appi

ngs.

6H

ips.

7Ke

rbs.

8Ri

dges

.9

Lini

ngs

toop

enin

gs.

1H

orizo

ntal

.2

Slop

ing

3Ve

rtic

al.

4Ra

king

.5

Cur

ved,

radi

usst

ated

.6

Step

ped.

7Pr

efor

med

.

1Fl

ashi

ngs

are

deem

edto

incl

ude

unde

rclo

aks,

roug

han

dfa

ircu

ttin

g,be

ddin

g,po

intin

g,en

ds,a

ngle

s,in

ters

ectio

ns,w

elte

d,be

aded

orsh

aped

edge

san

dal

ldre

ssin

gs.

6G

utte

rs7

Valle

ysm

1N

etgi

rth

stat

ed.

1Sl

opin

g.2

Step

ped.

3C

urve

d,ra

dius

stat

ed.

4Se

cret

.5

Tape

red.

1N

atur

eof

base

.2

Spac

ing

ofst

ruct

ural

supp

orts

.3

Pref

orm

ed.

1Th

ele

ngth

isth

em

ean

leng

thm

easu

red

over

allf

ittin

gs.

2G

utte

ran

dva

lley

wor

kis

deem

edto

incl

ude

alld

ress

ings

requ

ired

tofo

rmth

epr

ofile

com

plet

ew

ithal

ljoi

nts,

laps

,sea

ms,

brac

kets

,und

ercl

oaks

and

othe

ras

soci

ated

linin

gs,o

utle

ts,

over

flow

s,en

ds,a

ngle

s,in

ters

ectio

ns,

bedd

ing,

poin

ting,

fixin

gsan

dth

elik

e.3

Max

imum

and

min

imum

girt

hof

tape

red

gutt

ers

orva

lleys

shal

lbe

give

n.

17 SHEET ROOF COVERINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 179

Page 187: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

8Sp

otite

ms

nr1

Dim

ensio

ned

diag

ram

ordi

men

sione

dde

scrip

tion.

1C

atch

pits

.2

Sum

ps.

3O

utle

ts.

4H

atch

cove

rs.

5C

anop

yco

vers

.6

Col

lars

orsle

eves

arou

ndpi

pes

and

the

like.

7O

ther

:typ

est

ated

.

1N

atur

eof

base

.2

Spac

ing

ofst

ruct

ural

supp

orts

.3

Pref

orm

ed.

1Sp

otite

mw

ork

isde

emed

toin

clud

ejo

ints

,dre

ssin

gan

dbo

ndin

gto

surr

ound

ing

wor

k,un

derc

loak

san

dot

her

asso

ciat

edlin

ings

,end

s,an

gles

,be

ddin

g,po

intin

g,fix

ings

and

the

like.

9Fi

ttin

gsnr

1D

imen

sione

dde

scrip

tion.

1Ve

ntila

tors

.2

Fini

als.

3G

aste

rmin

als.

4H

ipiro

ns.

5So

aker

s.6

Sadd

les.

7Ro

oflig

hts.

8O

ther

:typ

est

ated

.

1N

atur

eof

base

.2

Met

hod

offix

ing

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

1Fi

ttin

gsar

ede

emed

toin

clud

ejo

ints

,dr

essin

gan

dbo

ndin

gto

surr

ound

ing

wor

k,un

derc

loak

san

dot

her

asso

ciat

edlin

ings

,end

s,an

gles

,bed

ding

,po

intin

g,fix

ings

and

the

like.

2Pr

oprie

tary

refe

renc

esm

aybe

give

nin

lieu

ofa

dim

ensio

ned

desc

riptio

n.

TABULATED WORK SECTIONS

180 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 188: RICS new rules of measurement 2

18T

ilean

dsl

ate

roo

fan

dw

all

cove

ring

sPl

ain

tilin

gIn

terl

ocki

ngtil

ing

Fibr

ece

men

tsl

atin

gN

atur

alsl

atin

gN

atur

alor

artif

icia

lsto

nesl

atin

gT

imbe

ror

bitu

min

ous

felt

shin

gles

Any

othe

rty

peof

tile,

slat

e,sl

abor

bloc

kro

ofor

wal

lcov

erin

g

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

sof

each

roof

.2

Prin

cipa

lsec

tions

ofro

of.

3Ex

tern

alel

evat

ions

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yan

dsiz

eof

mat

eria

ls.2

Met

hod

offix

ing.

3M

inim

umla

ps.

4Sp

acin

gof

batt

ens

and

coun

ter

batt

ens.

5C

ompo

sitio

nan

dm

ixof

mor

tar.

6Ty

peof

poin

ting.

7Bo

ndin

gto

othe

rw

ork.

8Ra

dius

ofcu

rved

wor

k.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1M

ajor

horiz

onta

land

vert

ical

dim

ensio

ns.

2Ty

pes

ofm

ater

ials

used

toco

nstr

uct

the

roof

and

itsst

ruct

ures

.3

Posit

ion

ofm

ain

stru

ctur

alfr

ame

mem

bers

.4

Hei

ght

ofw

ork

abov

egr

ound

leve

l.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llro

ugh

and

fair

squa

re,r

akin

gan

dcu

rved

cutt

ing.

2A

llen

dsan

dan

gles

eith

erfo

rmed

orpr

oprie

tary

.3

Extr

am

ater

ialf

orcu

rved

wor

k.4

Form

ing

allr

ough

and

fair

groo

ves,

thro

ats,

mor

tices

,ch

ases

,reb

ates

,hol

es,s

tops

,m

itres

and

the

like

labo

urs.

5Ra

king

out

join

tsto

form

ake

y.

18 TILE AND SLATE ROOF AND WALL COVERINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 181

Page 189: RICS new rules of measurement 2

6Ra

king

out

join

tsto

inse

rtfla

shin

gs.

7La

bour

sin

retu

rns,

ends

and

angl

es.

8A

llex

tra

mat

eria

lreq

uire

dfo

rbo

ndin

g.9

Add

ition

alm

ater

iali

nla

ps.

10W

ork

info

rmin

gvo

ids

and

hole

s≤

1.00

m2.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Ro

ofco

verin

gs2

Wal

lcov

erin

gsm

21

Pitc

hst

ated

.2

Vert

ical

.1

Und

erla

ysan

dba

tten

s.1

Cur

ved:

radi

ista

ted.

2C

onic

al:m

axim

uman

dm

inim

umra

diis

tate

d.

1C

over

ings

are

deem

edto

incl

ude

unde

rlays

,bat

tens

and

wor

kin

form

ing

void

s≤

1.00

m2.

2N

ode

duct

ion

ism

ade

for

void

s≤

1.00

m2.

3Bo

unda

ryw

ork;

loca

tion

and

met

hod

offo

rmin

gde

scrib

edm

1D

imen

sione

dde

scrip

tion

stat

ing

net

girt

h.1

Abu

tmen

ts.

2Ea

ves.

3Ri

dges

.4

Verg

es.

5Va

lleys

.6

Hip

s.7

Vert

ical

angl

es.

1H

orizo

ntal

.2

Slop

ing.

3Ra

king

.4

Vert

ical

.5

Cur

ved:

radi

usst

ated

.6

Step

ped.

7Pr

efo

rmed

.

1Bo

unda

ryw

ork

isde

emed

toin

clud

eun

derc

loak

s,ro

ugh

and

fair

cutt

ing,

bedd

ing,

poin

ting,

ends

,ang

les

and

inte

rsec

tions

.2

Boun

dary

wor

kto

void

sis

only

mea

sure

dw

here

the

void

exce

eds

1.00

m2.

3Bo

unda

ryw

ork

isw

ork

asso

ciat

edw

ithcl

osin

gof

for

finish

ing

off

tile

orsla

tero

ofin

gat

the

exte

rnal

perim

eter

,at

the

abut

men

tw

ithdi

ffere

ntm

ater

ials

orth

epe

rimet

erof

open

ings

and

void

s.4

Valle

ysin

clud

eev

eryt

hing

nece

ssar

yto

form

and

line

the

valle

yex

clud

ing

any

shee

tm

etal

.She

etm

etal

linin

gssh

all

bem

easu

red

inW

ork

Sect

ion

17:

Shee

tRo

ofco

verin

gs.

TABULATED WORK SECTIONS

182 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 190: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4Fi

ttin

gsnr

1D

imen

sione

dde

scrip

tion.

1Ve

ntila

tors

.2

Fini

als.

3G

aste

rmin

als.

4H

ipiro

ns.

5So

aker

s.6

Sadd

les.

7Ro

oflig

hts.

8O

ther

:typ

est

ated

.

1N

atur

eof

base

.2

Met

hod

offix

ing

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

1Pr

oprie

tary

refe

renc

esm

aybe

give

nin

lieu

ofa

dim

ensio

ned

desc

riptio

n.

18 TILE AND SLATE ROOF AND WALL COVERINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 183

Page 191: RICS new rules of measurement 2

19W

ater

pro

ofin

gM

astic

asph

alt

roof

ing

App

lied

liqui

dro

ofin

gA

spha

ltta

nkin

gor

dam

ppr

oofin

gA

pplie

dliq

uid

tank

ing

orda

mp

proo

fing

Flex

ible

shee

tta

nkin

gor

dam

ppr

oofin

gO

ther

prop

riet

ary

syst

ems

ofta

nkin

gor

dam

ppr

oofin

g

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

sof

each

leve

lwhe

rew

ork

isto

beca

rrie

dou

t.2

Sect

ions

show

ing

exte

ntof

wor

k.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Re

stric

tions

onsit

ing

ofpl

ant

and

mat

eria

ls.2

Kind

and

qual

ityof

allm

ater

ials.

3Th

ickn

ess

and

num

ber

ofco

ats.

4Su

rface

finish

esor

trea

tmen

ts.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Ex

tent

ofw

ork.

2H

eigh

tof

wor

kab

ove

grou

ndle

vel.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1C

uttin

gto

line.

2A

llla

bour

and

mat

eria

las

soci

ated

with

cutt

ing,

notc

hing

,ben

ding

,lap

ping

and

rein

forc

emen

t.3

Wor

king

into

rece

sses

such

asdu

ctco

vers

,sha

ped

inse

ts,

man

hole

cove

rs,m

atw

ells,

outle

tpi

pes,

dish

edgu

llies

and

the

like.

4W

ork

tofa

llsan

dcr

oss

falls

.5

All

boun

dary

wor

kto

open

ings

≤1.

00m

2

6A

llpr

epar

atio

nto

back

grou

ndne

cess

ary

tofo

rma

key,

incl

udin

gra

king

out

join

ts,

scab

blin

gor

the

appl

icat

ion

ofa

bond

ing

agen

t.

TABULATED WORK SECTIONS

184 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 192: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

over

ings

>50

0mm

wid

em

21

Hor

izont

al.

2Sl

opin

g:pi

tch

stat

ed.

3Ve

rtic

al.

4C

urve

d:ra

diis

tate

d.

1U

nder

lays

.2

Insu

latio

n.3

Fini

shto

expo

sed

surfa

ce.

4Pr

otec

tion.

1N

atur

eof

base

.2

Num

ber

ofco

ats

orla

yers

.1

The

area

mea

sure

dis

that

inco

ntac

tw

ithba

se.

2N

ode

duct

ion

ism

ade

for

void

s≤

1.00

m2.

2C

over

ings

≤50

0mm

wid

em

3Sk

irtin

gs4

Fasc

ias

5A

pron

s

m1

Net

girt

hon

face

.1

Hor

izont

al.

2Sl

opin

g.3

Vert

ical

.4

Raki

ng.

5C

urve

d:ra

dius

stat

ed.

6St

eppe

d.

1Bo

unda

ryw

ork

tovo

ids

ison

lym

easu

red

whe

reth

evo

idis

>1.

00m

2.

2Bo

unda

ryw

ork

isw

ork

asso

ciat

edw

ithcl

osin

gof

for

finish

ing

off

the

wat

erpr

oofin

gat

the

exte

rnal

perim

eter

,at

the

abut

men

tw

ithdi

ffere

ntm

ater

ials

orth

epe

rimet

erof

open

ings

and

void

s.3

Boun

dary

wor

kis

deem

edto

incl

ude

unde

rclo

aks,

insu

latio

n,st

ripve

ntila

tors

,ro

ugh

and

fair

cutt

ing,

bedd

ing,

poin

ting,

laps

,sea

ms,

ends

,ang

les,

inte

rsec

tions

,rol

ls,up

stan

ds,

dow

nsta

nds,

dres

sings

and

wed

ging

s.

6G

utte

rs7

Cha

nnel

s8

Valle

ys9

Kerb

s

m1

Net

girt

hon

face

.1

Slop

ing.

2St

eppe

d.3

Cur

ved.

4Se

cret

.5

Tape

red.

1N

atur

eof

base

.2

Num

ber

ofco

ats

orla

yers

.3

Spac

ing

ofst

ruct

ural

supp

orts

.

1Th

ele

ngth

isth

em

ean

leng

thm

easu

red

over

allf

ittin

gs.

2Li

ning

and

cove

ring

wor

kis

deem

edto

incl

ude

alld

ress

ings

requ

ired

tofo

rmth

epr

ofile

,joi

nts,

brac

kets

,und

ercl

oaks

and

othe

ras

soci

ated

linin

gs,o

utle

ts,

over

flow

s,en

ds,a

ngle

s,in

ters

ectio

ns,

bedd

ing,

poin

ting,

fixin

gsan

dth

elik

e.3

Max

imum

and

min

imum

girt

hof

tape

red

gutt

ers

shal

lbe

give

n.

19 WATERPROOFING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 185

Page 193: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

10Sp

otite

ms

nr1

Dim

ensio

ned

diag

ram

ordi

men

sione

dde

scrip

tion.

1C

atch

pits

.2

Sum

ps.

3O

utle

ts.

4H

atch

cove

rs.

5C

anop

yco

vers

.6

Col

lars

orsle

eves

arou

ndpi

pes

and

the

like.

7O

ther

:typ

est

ated

.

1Sp

otite

mw

ork

isde

emed

toin

clud

ejo

ints

,dre

ssin

gan

dbo

ndin

gto

surr

ound

ing

wor

k,un

derc

loak

san

dot

her

asso

ciat

edlin

ings

,end

s,an

gles

bedd

ing,

poin

ting,

fixin

gsan

dth

elik

e.

11Fi

ttin

gsnr

1D

imen

sione

dde

scrip

tion.

1Ve

ntila

tors

.2

Oth

er:t

ype

stat

ed.

1N

atur

eof

base

.2

Num

ber

ofco

ats

orla

yers

.3

Met

hod

offix

ing

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

1Fi

ttin

gsar

ede

emed

toin

clud

ejo

ints

,dr

essin

gan

dbo

ndin

gto

surr

ound

ing

wor

k,un

derc

loak

san

dot

her

asso

ciat

edlin

ings

,end

s,an

gles

bedd

ing,

poin

ting,

fixin

gsan

dth

elik

e.2

Prop

rieta

ryre

fere

nces

may

begi

ven

inlie

uof

adi

men

sione

dde

scrip

tion.

12Ed

getr

imm

TABULATED WORK SECTIONS

186 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 194: RICS new rules of measurement 2

20P

ropr

ieta

rylin

ings

and

part

itio

nsM

etal

fram

edsy

stem

sto

wal

lsan

dce

iling

sD

rylin

ing

and

part

ition

ing

syst

ems

tow

alls

and

ceili

ngs

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.Pl

ans,

sect

ions

and

elev

atio

nsto

show

scop

ean

dlo

catio

nof

wor

k.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

,qua

lity

and

size

orth

ickn

ess

ofm

ater

ials

and

com

pone

nts.

2M

etho

dof

fixin

gfr

amin

gan

dlin

ings

.3

Layo

utan

dtr

eatm

ent

ofjo

ints

.4

Met

hod

ofjo

intin

g.5

Surfa

cepr

epar

atio

n.6

Fini

sh.

7Ra

diio

fcu

rved

wor

k.8

Nat

ure

ofba

se.

9Lo

catio

nof

wal

lor

ceilin

gm

ount

edfit

tings

requ

iring

addi

tiona

lsup

port

orfr

amin

g.10

Seal

ants

tojo

ints

and

perim

eter

s.

Not

es,c

omm

ents

and

glos

sary

1Th

efin

ishis

that

whi

chis

appl

ied

aspa

rtof

the

norm

alpr

oprie

tary

syst

em.

Any

finish

tobe

subs

eque

ntly

mad

eby

adi

ffere

nttr

ade

shal

lbe

mea

sure

dse

para

tely

unde

rth

ere

leva

ntru

les.

2Ex

ampl

esof

prop

rieta

ryfin

ishes

are

tape

djo

ints

,slu

rry

coat

s,an

dth

elik

e.3

Skim

coat

sor

othe

rw

ettr

ade

finish

esar

em

easu

red

inW

ork

Sect

ion

28:

Floo

r,w

all,

ceilin

gan

dro

ofco

verin

gs.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1St

ruct

ural

floor

toce

iling

heig

hts.

2Th

ese

rvic

eslo

cate

dw

ithin

the

ceilin

g,pa

rtiti

onor

linin

gw

here

the

wor

kin

clud

esco

mpl

exin

tegr

alse

rvic

es.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llw

ork

isde

emed

inte

rnal

unle

ssot

herw

isest

ated

.2

All

roug

han

dfa

ircu

ttin

g.3

Extr

am

ater

ialf

orcu

rved

wor

k.4

Add

ition

alfr

amin

gto

supp

ort

fittin

gs.

5En

ds,f

air

ends

and

abut

men

tsw

ithad

join

ing

wor

k.6

Wor

king

arou

ndco

lum

ns,

beam

san

dse

rvic

esw

here

the

oute

rfa

ceof

the

wor

kis

cont

inuo

us.

1Th

isre

fers

toth

efin

allo

catio

nof

the

wor

k.

20 PROPRIETARY LININGS AND PARTITIONS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 187

Page 195: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

oprie

tary

met

alfr

amed

syst

emto

form

wal

lsm

21

Fini

shed

thic

knes

sst

ated

2H

eigh

tor

aver

age

heig

htst

ated

in1.

00m

incr

emen

ts.

3To

tall

engt

hst

ated

mea

sure

dal

ong

cent

relin

e.

1In

sula

tion.

2Va

pour

barr

iers

.3

Sub

linin

gs.

4Fi

nish

.5

Gla

zing

6C

urve

d:ra

dius

stat

ed.

1N

ode

duct

ions

for

void

s≤

1.00

m2.

2Th

eav

erag

ehe

ight

will

beca

lcul

ated

for

each

leng

thof

part

ition

with

aslo

ping

head

mea

sure

dbe

twee

nju

nctio

ns.

2Pr

oprie

tary

met

alfr

amed

syst

emto

form

ceilin

gsm

21

Ove

r30

0mm

wid

eon

face

1In

sula

tion.

2Va

pour

barr

iers

.3

Sub

linin

gs.

4Fi

nish

.5

Cur

ved:

radi

usst

ated

.6

Slop

ing

7C

onve

xor

conc

ave:

radi

usst

ated

.

1Fi

xed

dire

ctto

stru

ctur

also

ffit

2Su

ppor

ted

onad

jace

ntst

ruct

ure,

span

stat

edin

1.00

min

crem

ents

1Th

ead

jace

ntst

ruct

ure

such

asse

cond

ary

stee

lfra

min

gor

timbe

rfr

amin

gis

mea

sure

del

sew

here

.

m1

Not

exce

edin

g30

0mm

wid

eon

face

3Ex

tra

over

for

diffe

rent

m2

1Li

ning

:det

ails

stat

ed.

2Fi

nish

:det

ails

stat

ed.

1Th

isw

illap

ply

topa

rtiti

ons

that

have

area

sof

diffe

rent

linin

gsor

finish

esth

anth

atsp

ecifi

edin

the

gene

ral

desc

riptio

nhe

adin

g.It

will

not

appl

yto

diffe

rent

form

sof

cons

truc

tion

orco

mpo

nent

s.Th

ese

diffe

renc

esw

illre

quire

sepa

rate

item

sm

easu

red.

TABULATED WORK SECTIONS

188 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 196: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4Ex

tra

over

for

form

ing

open

ings

nr1

Not

exce

edin

g2.

50m

2.

22.

50–5

.00m

2.

3Ex

ceed

ing

5.00

m2

infu

rthe

rin

crem

ents

of2.

50m

2.

1Li

ned:

deta

ilsst

ated

.2

Unl

ined

.1

Non

-pro

prie

tary

mat

eria

lsar

eno

tde

emed

incl

uded

(e.g

.tim

ber

grou

nds

orin

sert

sw

ould

bem

easu

red

inW

ork

Sect

ion

16:C

arpe

ntry

).2

Line

dop

enin

gsar

eth

ose

lined

aspa

rtof

this

wor

k.

5Ex

tra

over

for

non-

stan

dard

perim

eter

deta

ilsm

1D

imen

sione

dde

scrip

tion

orpr

oprie

tary

refe

renc

e.1

Hea

ds:d

etai

lsst

ated

.2

Sole

s:de

tails

stat

ed.

3A

butm

ents

:det

ails

stat

ed.

1N

atur

eof

base

.1

Non

-sta

ndar

dde

tails

are

thos

eth

atin

volv

eth

eus

eof

com

pone

nts

that

are

not

used

with

inth

em

ain

body

ofw

ork

such

asde

flect

ion

head

s,ac

oust

icse

als,

fire

seal

san

dth

elik

e.6

Extr

aov

erfo

ran

gles

m

7Ex

tra

over

for

junc

tions

m1

Tee.

2C

ross

.

8Ex

tra

over

for

acce

sspa

nels

nr1

Dim

ensio

ned

desc

riptio

nor

prop

rieta

ryre

fere

nce.

1D

etai

lsst

ated

.1

Det

ails

incl

ude

type

offr

ame,

ironm

onge

ry,f

inish

,ins

ulat

ion,

fire

ratin

g,an

dpr

oprie

tary

refe

renc

enu

mbe

rw

here

appl

icab

le.

2Fa

iren

dsar

eon

lym

easu

red

whe

reth

eex

pose

den

dis

finish

edw

ithth

esa

me

finish

asth

efa

ce(s

)or

with

atr

imw

hich

isan

inte

gral

part

ofth

epa

rtiti

onsy

stem

.3

Fair

ends

are

deem

edto

incl

ude

all

extr

aw

ork

and

mat

eria

lsin

volv

ed.

9Fa

iren

dsto

part

ition

sm

1Th

ickn

ess

ofpa

rtiti

onst

ated

.1

Fini

shan

d/or

trim

s.

20 PROPRIETARY LININGS AND PARTITIONS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 189

Page 197: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

10Pr

oprie

tary

linin

gsto

wal

lsm

21

Ove

r30

0mm

wid

eon

face

.2

Not

exce

edin

g30

0mm

wid

eon

face

.

1In

sula

tion.

2Va

pour

barr

iers

.3

Sub

linin

gs.

4Fi

nish

5C

urve

d,ra

dius

stat

ed6

Slop

ing

7C

onve

xor

conc

ave:

radi

usst

ated

.

1M

etho

dof

fixin

g2

Nat

ure

ofba

se

11Pr

oprie

tary

linin

gsto

ceilin

gsm

2

12Pr

oprie

tary

linin

gsto

colu

mns

m1

Gir

thn/

e30

0mm

,nr

offa

ces

stat

ed.

2G

irth

300–

600m

m,n

rof

face

sst

ated

.3

Gir

th60

0–90

0mm

,nr

offa

ces

stat

ed.

4Th

erea

fter

in30

0mm

stag

es,n

rof

face

sst

ated

.

13Pr

oprie

tary

linin

gsto

beam

sm

14Pr

oprie

tary

linin

gsto

bulk

head

sm

15Ex

tra

over

for

form

ing

open

ings

nr1

Not

exce

edin

g2.

50m

2.

22.

50–5

.00m

2.

3Ex

ceed

ing

5.00

m2

infu

rthe

rin

crem

ents

of2.

50m

2.

1Li

ned,

deta

ilsst

ated

.2

Unl

ined

.1

This

incl

udes

open

ings

for

door

s,w

indo

ws,

scre

ens

and

the

like.

16Ex

tra

over

for

non-

stan

dard

perim

eter

deta

ilsm

1D

imen

sione

dde

scrip

tion

orpr

oprie

tary

refe

renc

e.1

Hea

ds:d

etai

lsst

ated

.2

Sole

s:de

tails

stat

ed.

3A

butm

ents

:det

ails

stat

ed.

1N

atur

eof

base

.1

Non

-sta

ndar

dde

tails

are

thos

eth

atin

volv

eth

eus

eof

com

pone

nts

that

are

not

used

with

inth

em

ain

body

ofw

ork

such

asde

flect

ion

head

s,ac

oust

icse

als,

fire

seal

san

dth

elik

e.

17Ex

tra

over

for

angl

es.

m

18Ex

tra

over

for

junc

tions

.m

1Te

e.2

Cro

ss.

TABULATED WORK SECTIONS

190 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 198: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

19Ex

tra

over

for

acce

sspa

nels.

nr1

Dim

ensio

ned

desc

riptio

nor

prop

rieta

ryre

fere

nce.

1D

etai

lsst

ated

.1

Det

ails

incl

ude

type

offr

ame,

ironm

onge

ry,f

inish

,ins

ulat

ion,

fire

ratin

gan

dpr

oprie

tary

refe

renc

enu

mbe

rw

here

appl

icab

le.

20Be

ads,

func

tion

stat

edm

1M

etho

dof

fixin

g.1

Nat

ure

ofba

se.

1Fu

nctio

nof

bead

sin

clud

ean

gle

bead

s,st

opbe

ads,

shad

owga

pbe

ads,

casin

gbe

ads

and

the

like.

20 PROPRIETARY LININGS AND PARTITIONS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 191

Page 199: RICS new rules of measurement 2

21C

ladd

ing

and

cove

ring

Pate

ntgl

azin

g,cu

rtai

nw

allin

g,ra

insc

reen

clad

ding

,gla

zed

vaul

ting

and

stru

ctur

algl

ass

asse

mbl

ies

Rig

idsh

eet

clad

ding

Wea

ther

boar

ding

Prof

iled

shee

tcl

addi

ngor

roof

ing

Pane

lor

slab

clad

ding

orro

ofin

gSh

eet

clad

ding

sor

cove

ring

sA

nyot

her

type

ofcl

addi

ng,l

inin

gor

cove

ring

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

s,se

ctio

nsan

del

evat

ions

suffi

cien

tto

show

scop

ean

dlo

catio

nof

the

wor

ks.

2C

ompo

nent

draw

ings

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials.

2Ty

pe,f

inish

and

spac

ing

offr

amin

gm

embe

rs.

3N

atur

e,th

ickn

ess

and

spac

ing

ofst

ruct

ural

supp

orts

.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1C

onst

ruct

ion

ofea

chin

stal

latio

n.W

orks

and

mat

eria

lsde

emed

incl

uded

.1

Ironm

onge

ryw

here

supp

lied

with

the

com

pone

nt.

2G

lazi

ngw

here

part

ofth

ein

stal

latio

n.3

Inte

gral

insu

latio

n,m

embr

anes

and

the

like

whe

repa

rtof

the

syst

em.

4M

astic

san

dse

alan

ts.

5C

leat

san

dbr

acke

ts.

6Fi

xing

san

dfa

sten

ings

.7

Mec

hani

cala

ndel

ectr

ical

oper

atin

geq

uipm

ent

whe

resu

pplie

dw

ithth

eco

mpo

nent

.

1Se

cond

ary

stee

lsup

port

wor

kis

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofW

ork

Sect

ion

15:S

truc

tura

lM

etal

wor

k.

TABULATED WORK SECTIONS

192 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 200: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1W

alls

2Fl

oors

3C

eilin

gs4

Roof

s5

Side

san

dto

psof

dorm

ers

6Si

des

and

soffi

tsof

beam

s7

Side

sof

colu

mns

m1

Not

exce

edin

g60

0w

ide.

1La

iddi

agon

ally.

2Sl

opin

g:pi

tch

stat

ed.

3Ve

rtic

al.

4C

urve

d:ra

dius

stat

ed.

5To

soffi

ts.

1In

tern

al.

2Ex

tern

al.

1W

alls

2Fl

oors

3C

eilin

gs4

Roof

s5

Side

san

dto

psof

dorm

ers

6Si

des

and

soffi

tsof

beam

s7

Side

sof

colu

mns

m2

1Ex

ceed

ing

600

wid

e.

nr1

Isola

ted

area

not

exce

edin

g1m

2,i

rres

pect

ive

ofw

idth

.

8Ite

ms

extr

aov

erth

ew

ork

inw

hich

they

occu

rnr

1D

imen

sione

dde

scrip

tion.

2Pr

oprie

tary

refe

renc

e.1

Ope

ning

light

s.2

Doo

rs.

3Ro

oflig

hts.

4Ve

ntila

tor

pane

ls.5

Form

ing

open

ings

for

othe

rtr

ades

.

1El

ectr

ical

requ

irem

ents

.1

Thes

eite

ms

are

only

for

com

pone

nts

that

are

part

ofth

esy

stem

tow

hich

they

are

inst

alle

d.

9Bo

unda

ryw

ork

m1

Hea

ds.

2Ri

dges

.3

Valle

ys.

4H

ips.

5Bo

ttom

edge

s.6

Eave

s.7

Verg

es.

8A

butm

ents

.9

Flas

hing

piec

es.

1H

orizo

ntal

.2

Vert

ical

.3

Slop

ing.

4Ra

king

.5

Cur

ved,

radi

usst

ated

.6

Step

ped.

7Pr

efor

med

.

1A

lled

gean

din

term

edia

tetr

ims,

cove

rpi

eces

,mas

tics

and

seal

ants

are

deem

edin

clud

edw

ithth

eas

soci

ated

boun

dary

orop

enin

gpe

rimet

erw

ork.

2Bo

unda

ryw

ork

isw

ork

asso

ciat

edw

ithcl

osin

gof

for

finish

ing

off

clad

ding

sor

cove

rings

atth

eex

tern

alpe

rimet

eror

atth

eab

utm

ent

with

diffe

rent

mat

eria

ls.

21 CLADDING AND COVERING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 193

Page 201: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

10O

peni

ngpe

rimet

ers

m1

Dim

ensio

ned

desc

riptio

n.2

Prop

rieta

ryre

fere

nce.

1H

eads

.2

Jam

bs.

3Si

lls.

4Fl

ashi

ngpi

eces

.

1H

orizo

ntal

.2

Vert

ical

.3

Slop

ing.

4Ra

king

.5

Cur

ved,

radi

usst

ated

.6

Step

ped.

7Pr

efor

med

.

1op

enin

gw

ork

isas

soci

ated

with

clos

ing

off

orfin

ishin

gof

fcl

addi

ngs

and

cove

rings

atth

epe

rimet

erof

anop

enin

gor

avo

id.

11A

ngle

sm

1In

tern

al.

2Ex

tern

al.

1Re

gula

r.2

Irreg

ular

:ang

lest

ated

.1

Irreg

ular

angl

esar

ean

yth

atar

eno

t90

°.

12C

lose

rsm

1Fi

rest

ops.

2O

ther

:det

ails

stat

ed.

TABULATED WORK SECTIONS

194 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 202: RICS new rules of measurement 2

22G

ener

aljo

iner

yU

nfra

med

isol

ated

trim

s,sk

irtin

gs,o

rsu

ndry

join

ery

item

sIn

-fill

pane

lsan

dsh

eets

Seal

ant

join

tsG

ener

alir

onm

onge

ryno

tas

soci

ated

with

win

dow

san

ddo

ors

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Gen

eral

arra

ngem

ent

plan

s.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

and

qual

ityof

mat

eria

ls.2

Fini

shof

timbe

rif

not

wro

t.3

Pres

erva

tion

trea

tmen

ts.

4Su

rface

trea

tmen

tsas

part

ofth

epr

oduc

tion

proc

ess.

5Se

lect

ion

and

prot

ectio

nfo

rsu

bseq

uent

trea

tmen

tor

clea

rfin

ish.

6M

atch

ing

grai

nor

colo

ur.

7Li

mits

onpl

anin

gm

argi

ns.

8M

etho

dof

join

ting

and

cons

truc

tion

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

9Fo

rmof

cons

truc

tion

and

join

ting

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

10M

etho

dof

fixin

gw

here

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sc

ope

and

loca

tion

ofw

ork.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

lltim

bers

are

deem

edto

bew

rot

finish

unle

ssde

scrib

edot

herw

ise.

2A

lltim

ber

sizes

are

nom

inal

unle

ssst

ated

asfin

ished

size.

3En

ds,a

ngle

s,m

itres

and

inte

rsec

tions

irres

pect

ive

ofcr

oss

sect

ion

area

oftim

ber.

4W

ork

isde

emed

inte

rnal

unle

ssde

scrib

edas

exte

rnal

.

22 GENERAL JOINERY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 195

Page 203: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Unf

ram

edis

olat

edtr

ims,

skir

tings

and

sund

ryite

ms

1Sk

irtin

gs,p

ictu

rera

ils2

Arc

hitr

aves

and

the

like

3C

over

fille

ts,s

tops

,trim

s,be

ads,

nosin

gsan

dth

elik

e4

Isola

ted

shel

ves

and

wor

ktop

s5

Win

dow

boar

ds6

Isola

ted

hand

rails

and

grab

rails

m1

Dim

ensio

ned

over

allc

ross

sect

ion

stat

ed.

2N

umbe

ran

dty

peof

labo

urs

desc

ribed

.

1Bu

iltup

mem

bers

,size

ofco

mpo

nent

sst

ated

.2

Tim

ber

com

pone

nts

tong

ued

on.

3D

iffer

ent

cros

s-se

ctio

nsh

apes

(nr)

.

1Fi

xing

thro

ugh

vuln

erab

lem

ater

ials.

2C

urve

dw

ork

tobe

desc

ribed

stat

ing

the

radi

us.

7D

uct

cove

rs8

Pipe

casin

gs9

Shel

ves

m1

Thic

knes

san

dw

idth

orgi

rth

stat

ed.

2Th

ickn

ess

and

wid

thor

girt

hno

tex

ceed

ing

300m

mst

ated

.3

Thic

knes

san

dw

idth

orgi

rth

over

300m

mbu

tno

tex

ceed

ing

600m

mst

ated

.4

Thic

knes

san

dw

idth

orgi

rth

ther

eafte

rin

300m

mst

ages

.

1N

atur

ean

dm

etho

dof

form

ing

join

ts.

1U

sual

lyth

eex

act

wid

thor

girt

hsh

all

begi

ven

for

thes

eite

ms

but

whe

reth

ere

are

man

ydi

fferin

gbu

tsim

ilar

wid

ths

thes

em

aybe

grou

ped

into

300m

mw

ide

orgi

rth

band

s.

10Pi

nboa

rds,

back

boar

ds,p

linth

bloc

ksan

dth

elik

enr

1D

imen

sione

dde

scrip

tion.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

se.

Floo

r,w

alla

ndce

iling

boar

ding

,she

etin

g,pa

nelli

ng,l

inin

gsan

dca

sing

s

11Bo

ardi

ng,s

heet

ing,

pane

lling

over

600m

mw

ide

m2

1Th

ickn

ess.

1Fl

oors

.2

Wal

ls.3

Cei

lings

.

1M

etho

dof

fixin

g.2

Met

hod

ofjo

intin

g.3

Nat

ure

ofba

se.

12Bo

ardi

ng,s

heet

ing,

pane

lling

not

exce

edin

g60

0mm

wid

em

1W

idth

and

thic

knes

s.

TABULATED WORK SECTIONS

196 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 204: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Prop

riet

ary

part

ition

s,pa

nels

and

cubi

cles

13Pa

rtiti

ons

m1

Hei

ght

and

thic

knes

sst

ated

.2

Prop

rieta

ryna

me

orre

fere

nce

stat

ed.

1O

ffsit

eap

plie

dfin

ish.

2O

nsit

eap

plie

dfin

ish.

1M

etho

dof

join

ting

and

fixin

g.2

Cur

ved:

radi

usst

ated

.3

Nat

ure

ofba

ckgr

ound

.4

Inte

gral

serv

ices

.

1Th

elin

ear

mea

sure

men

tis

the

mea

nle

ngth

mea

sure

dal

ong

the

cent

relin

eof

the

part

ition

.2

The

leng

this

mea

sure

dth

roug

han

dov

eral

lobs

truc

tions

and

open

ings

.3

Part

ition

sar

ede

emed

toin

clud

eal

lin

tegr

alco

mpo

nent

s,fix

ings

,joi

nts,

fact

ory

appl

ied

trim

s,ho

les

and

mor

tices

.

14Ite

ms

extr

aov

erth

epa

rtiti

onth

eyoc

cur

innr

1O

peni

ngs:

size

stat

ed.

1Bl

anks

.2

Doo

rs.

3W

indo

ws.

4G

laze

dpa

nels.

5A

cces

spa

nels.

1O

peni

ngs

are

deem

edto

incl

ude

ever

ythi

ngne

cess

ary

tofo

rmth

eop

enin

gto

geth

erw

ithth

eir

asso

ciat

edin

tegr

alco

mpo

nent

s,gl

ass,

door

s,iro

nmon

gery

,lin

ings

and

fact

ory-

appl

ied

trim

s.

m2

Trim

s:di

men

sione

dde

scrip

tion.

1Tr

ims

are

only

mea

sure

das

sepa

rate

item

sif

fixed

onsit

e.

15D

uct

pane

ls,Sa

nita

ryw

are

back

pane

lsan

dth

elik

enr

1O

vera

llsiz

est

ated

.2

Thic

knes

sst

ated

.Su

bfr

ames

,det

ails

stat

ed.

1M

etho

dof

fixin

g2

Nat

ure

ofba

ckgr

ound

.1

All

anci

llary

item

sne

eded

toco

nnec

tth

esa

nita

ryap

plia

nces

toth

eM

and

Ein

stal

latio

nsar

ede

emed

incl

uded

.2

Ass

ocia

ted

sani

tary

war

eite

ms

are

not

incl

uded

inth

ese

item

sbu

tsh

allb

em

easu

red

inac

cord

ance

with

the

rule

sof

Wor

kSe

ctio

n32

:Fur

nitu

re,f

ittin

gsan

deq

uipm

ent

16C

ubic

lepa

rtiti

onse

tsnr

1D

imen

sione

ddi

agra

mor

dim

ensio

ned

desc

riptio

n.1

Com

plet

ecu

bicl

es:n

umbe

rof

bays

stat

ed.

1N

atur

eof

back

grou

nd.

2M

etho

dof

fixin

gto

back

grou

nd.

1C

ubic

lese

tsar

ede

emed

toin

clud

eal

lin

tegr

alfr

ames

,pan

els,

door

s,fa

ctor

yap

plie

dtr

ims,

conn

ectio

ns,f

ixin

gsan

dfa

sten

ings

com

plet

ew

ithsu

ppor

tle

gs,

brac

kets

and

stan

dard

ironm

onge

ry.

22 GENERAL JOINERY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 197

Page 205: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

17Ite

ms

extr

aov

erth

epa

rtiti

onth

eyoc

cur

inm

1Tr

ims:

dim

ensio

ned

desc

riptio

n.1

Trim

sar

eon

lym

easu

red

asse

para

teite

ms

iffix

edon

site.

Infil

lpan

els

1In

fillp

anel

sar

eno

n-gl

ass

and

non-

glas

spl

astic

srig

idsh

eet

span

drel

and

infil

lpa

nels

ofal

lkin

dsfix

edw

ithbe

ads,

gask

ets

and

the

like

tow

ood,

met

al,

plas

tican

dco

ncre

tesu

rrou

nds.

They

excl

ude

pane

lsor

shee

tsfo

rmin

gan

inte

gral

part

ofa

com

pone

ntor

prop

rieta

rycl

addi

ngsy

stem

.

18In

fillp

anel

san

dsh

eets

,num

ber

stat

edm

21

Thic

knes

sst

ated

.1

Cur

ved:

stat

ing

radi

us.

2Pa

nels

exce

edin

gsiz

eof

norm

alm

anuf

actu

red

unit.

3Pa

nels

requ

iring

spec

ial

trea

tmen

tto

edge

s.

1W

ork

isde

emed

inte

rnal

unle

ssde

scrib

edas

exte

rnal

.2

Infil

lpan

els

are

deem

edto

incl

ude

bedd

ing

com

poun

ds,s

eala

nts,

intu

mes

cent

com

poun

dsan

dst

rips,

dist

ance

piec

es,l

ocat

ion

and

sett

ing

bloc

ksan

dfix

ings

.

Seal

ant

join

ts1

Kind

and

qual

ityof

mat

eria

ls.2

Met

hod

ofap

plic

atio

n.3

Met

hod

ofpr

epar

ing

cont

act

surfa

ces.

19Jo

ints

:con

tact

surfa

ces

stat

edm

1Ty

pean

dsiz

eof

com

pone

nts

stat

ed.

1Ve

rtic

al.

2Sl

opin

g.3

Soffi

t.4

Hor

izont

al.

1Le

ngth

sar

em

easu

red

onfa

ce.

2W

ork

isde

emed

toin

clud

epr

epar

atio

n,cl

eane

rs,p

rimer

s,se

aler

s,ba

ckin

gst

rips

and

fille

rs.

20Po

intin

g:co

ntac

tsu

rface

sst

ated

m1

One

side.

2Bo

thsid

es.

TABULATED WORK SECTIONS

198 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 206: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

21Ra

king

out

exist

ing

join

tsm

1W

idth

,dep

than

dty

peof

mat

eria

lsta

ted.

1Ve

rtic

al.

2Sl

opin

g.3

Soffi

t.4

Hor

izont

al.

3D

eem

edto

incl

ude

disp

osal

ofal

lde

bris.

Iron

mon

gery

1Ki

ndan

dqu

ality

ofm

ater

ials

and

fixin

gs.

2Su

rface

finish

.3

Con

stitu

ent

part

sof

the

units

orse

ts.

4Fi

xing

thro

ugh

vuln

erab

lem

ater

ials.

22Ty

peof

item

,uni

tor

set

stat

ednr

1M

etho

dof

fixin

g.2

Nat

ure

ofba

se.

1Iro

nmon

gery

isde

emed

toin

clud

efix

ing

with

scre

ws

tom

atch

and

prep

arin

gth

eba

seto

rece

ive

it.2

Shel

fbr

acke

tsan

das

soci

ated

fittin

gsw

illbe

mea

sure

dhe

re.

22 GENERAL JOINERY

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 199

Page 207: RICS new rules of measurement 2

23W

indo

ws,

scre

ens

and

light

sT

imbe

r,m

etal

,pla

stic

:W

indo

ws

and

shop

fron

tsR

oofli

ghts

Scre

ens

Louv

res,

shut

ters

,can

opie

san

dbl

inds

Ass

ocia

ted

glas

san

dgl

azin

gA

ssoc

iate

dir

onm

onge

ry

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Gen

eral

arra

ngem

ent

plan

s.2

Doo

ran

dw

indo

wsc

hedu

le.

3G

lazi

ngsc

hedu

le.

4Iro

nmon

gery

sche

dule

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials

and

iftim

ber

desc

ribin

gif

wro

tor

saw

n2

Pres

erva

tion

trea

tmen

ts.

3Su

rface

trea

tmen

tsap

plie

das

part

ofth

epr

oduc

tion

proc

ess.

4Se

lect

ion

and

prot

ectio

nfo

rsu

bseq

uent

trea

tmen

tor

clea

rfin

ish.

5M

atch

ing

grai

nor

colo

ur.

6Li

mits

onpl

anin

gm

argi

ns.

7M

etho

dof

join

ting

and

cons

truc

tion

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

8Fo

rmof

cons

truc

tion

and

join

ting

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

9M

etho

dof

fixin

gw

here

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.10

Back

grou

ndw

here

vuln

erab

le.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sh

ape

and

size

ofun

its.

2M

etho

dsof

fixin

gun

its.

3G

lazi

ngre

quire

men

ts.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1Be

ddin

gan

dpo

intin

gfr

ames

.2

Gla

ssan

dth

elik

eis

deem

edto

bein

stal

led

onsit

eun

less

stat

edot

herw

ise.

TABULATED WORK SECTIONS

200 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 208: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1W

indo

ws

and

win

dow

fram

esnr

1D

imen

sione

dde

scrip

tion

ordi

agra

m.

1C

urve

dw

ork:

radi

usst

ated

.1

Met

hod

offix

ing

ifno

tle

ftto

disc

retio

nof

cont

ract

or.

2Fa

ctor

ygl

azed

.

1G

lass

may

bein

corp

orat

edin

toth

eas

soci

ated

wor

kfo

llow

ing

the

rule

sse

tou

tbe

low

.

2W

indo

wsh

utte

rs

3Su

nsh

ield

s

4Ro

oflig

hts,

skyl

ight

san

dla

nter

nlig

hts

5Sc

reen

s,bo

rrow

edlig

hts

and

fram

es

6Sh

opfro

nts

7Lo

uvre

san

dfr

ames

Gla

zing

8G

lass

,typ

est

ated

nr1

Thic

knes

sof

glas

sor

over

all

thic

knes

sof

seal

edun

itst

ated

.2

Pane

size.

1Sh

ape

ifot

her

than

squa

reor

rect

angu

lar.

2A

irspa

ce(s

)w

idth

(s)

ofdo

uble

/trip

legl

azed

units

.3

Gas

fillin

gof

airs

pace

s.

1Be

nt:d

irect

ion

stat

ed.

2M

etho

dof

glaz

ing

orse

curin

g.3

Edge

trea

tmen

t.

1G

lass

incl

udes

plas

tic,o

ran

yty

peof

mat

eria

lgla

zed

into

open

ings

exce

ptgl

ass

bloc

ks.

2Th

esiz

egi

ven

for

irreg

ular

pane

ssh

all

beth

esm

alle

stre

ctan

gula

rsiz

efro

mw

hich

the

pane

can

beob

tain

ed.

9Lo

uvre

blad

es

Iron

mon

gery

10Ty

peof

item

,uni

tor

set

stat

ednr

1M

etho

dof

fixin

g.2

Nat

ure

ofba

se.

1Ki

ndan

dqu

ality

ofm

ater

ials

and

fixin

gs.

2Su

rface

finish

.3

Con

stitu

ent

part

sof

the

units

orse

ts.

1Iro

nmon

gery

isde

emed

toin

clud

efix

ing

with

scre

ws

tom

atch

and

prep

arin

gth

eba

seto

rece

ive

it.

23 WINDOWS, SCREENS AND LIGHTS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 201

Page 209: RICS new rules of measurement 2

24D

oo

rs,s

hutt

ers

and

hatc

hes

Tim

ber,

met

al,p

last

ic:

Doo

rsan

dfr

ames

Shut

ters

and

Hat

ches

Slid

ing

orfo

ldin

gdo

ors

and

part

ition

sG

rille

sA

ssoc

iate

dgl

ass

and

glaz

ing

Ass

ocia

ted

iron

mon

gery

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Floo

rpl

ans.

2D

oor

sche

dule

.3

Ironm

onge

rysc

hedu

le.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials

and,

iftim

ber,

desc

ribin

gif

wro

tor

saw

n.2

Pres

erva

tion

trea

tmen

ts.

3Su

rface

trea

tmen

tsap

plie

das

part

ofth

epr

oduc

tion

proc

ess.

4Se

lect

ion

and

prot

ectio

nfo

rsu

bseq

uent

trea

tmen

tor

clea

rfin

ish.

5M

atch

ing

grai

nor

colo

ur.

6Li

mits

onpl

anin

gm

argi

ns.

7M

etho

dof

join

ting

and

cons

truc

tion

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

8Fo

rmof

cons

truc

tion

and

join

ting

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

9M

etho

dof

fixin

gw

here

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.10

Back

grou

ndw

here

vuln

erab

le.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Lo

catio

nof

alld

oors

.2

Doo

rre

fere

nce

num

ber.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1Be

ddin

gan

dpo

intin

gfr

ames

.2

Gla

ssan

dth

elik

eis

deem

edto

bein

stal

led

onsit

eun

less

stat

edot

herw

ise.

TABULATED WORK SECTIONS

202 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 210: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1D

oor

sets

nr1

Det

aile

dde

scrip

tion

ofse

t.2

Stru

ctur

alop

enin

gsiz

e.1

Back

grou

nd.

1Sm

oke

stop

s:de

tails

stat

ed.

2Fi

rest

ops:

deta

ilsst

ated

.1

Doo

rse

tsco

mpr

iseth

edo

oror

door

sco

mpl

ete

with

asso

ciat

edfr

ame,

stop

s,ar

chitr

aves

and

trim

s.2

Any

trim

san

dth

elik

efix

edto

the

set

afte

rin

stal

latio

nm

ust

bem

easu

red

inac

cord

ance

with

the

rule

sof

Wor

kSe

ctio

n22

:Gen

eral

join

ery.

3G

lass

may

bein

corp

orat

edin

toth

eas

soci

ated

wor

kfo

llow

ing

the

rule

sse

tou

tbe

low

,

2D

oors

nr1

Dim

ensio

ned

desc

riptio

nor

diag

ram

.1

Fire

resis

tanc

epe

rform

ance

.1

Met

hod

offix

ing

ifno

tle

ftto

disc

retio

nof

cont

ract

or2

Fact

ory

glaz

ed

1Ea

chle

afof

am

ulti-

leaf

eddo

oris

coun

ted

ason

edo

or.

2G

lass

may

bein

corp

orat

edin

toth

eas

soci

ated

wor

kfo

llow

ing

the

rule

sse

tou

tbe

low

.

3Ro

ller

shut

ters

4C

olla

psib

lega

tes

5Sl

idin

gfo

ldin

gpa

rtiti

ons

6H

atch

es

7St

rong

room

door

s

8G

rille

s

9D

oor

fram

esm

1D

imen

sione

dov

eral

lcro

ssse

ctio

nde

scrip

tion.

1La

bour

sde

scrib

ed.

1Fr

ames

and

linin

gsin

clud

esja

mbs

,he

ads,

sills,

mul

lions

and

tran

som

es.

10D

oor

linin

gs

11D

oor

stop

s

12A

ssoc

iate

dfir

est

ops

13A

ssoc

iate

dsm

oke

stop

s

24 DOORS, SHUTTERS AND HATCHES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 203

Page 211: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Gla

zing

14G

lass

,typ

est

ated

nr1

Thic

knes

sof

glas

sor

over

all

thic

knes

sof

seal

edun

itst

ated

.2

Pane

size.

1Sh

ape

ifot

her

than

squa

reor

rect

angu

lar.

2A

irspa

ce(s

)w

idth

(s)

ofdo

uble

/trip

legl

azed

units

.3

Gas

fillin

gof

airs

pace

s.

1Be

nt:d

irect

ion

stat

ed.

2M

etho

dof

glaz

ing

orse

curin

g.3

Edge

trea

tmen

t.

1G

lass

incl

udes

plas

tic,o

ran

yty

peof

mat

eria

lgla

zed

into

open

ings

exce

ptgl

ass

bloc

ks.

2Th

esiz

egi

ven

for

irreg

ular

pane

ssh

all

beth

esm

alle

stre

ctan

gula

rsiz

efro

mw

hich

the

pane

can

beob

tain

ed.

15Lo

uvre

blad

es

Iron

mon

gery

16Ty

peof

item

,uni

tor

set

stat

ednr

1M

etho

dof

fixin

g.2

Nat

ure

ofba

se.

1Ki

ndan

dqu

ality

ofm

ater

ials

and

fixin

gs.

2Su

rface

finish

.3

Con

stitu

ent

part

sof

the

units

orse

ts.

1Iro

nmon

gery

isde

emed

toin

clud

efix

ing

with

scre

ws

tom

atch

and

prep

arin

gth

eba

seto

rece

ive

it.

TABULATED WORK SECTIONS

204 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 212: RICS new rules of measurement 2

25S

tair

s,w

alkw

ays

and

balu

stra

des

Tim

ber,

met

al,p

last

ic:

Stai

rcas

esW

alkw

ays

and

Gan

trie

sBa

lust

rade

sBa

rrie

rsG

uard

rails

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

san

dse

ctio

nssh

owin

glo

catio

nan

dsc

ope

ofea

chun

it.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials

and

iftim

ber

desc

ribin

gif

wro

tor

saw

n.2

Pres

erva

tion

trea

tmen

ts.

3Su

rface

trea

tmen

tsap

plie

das

part

ofth

epr

oduc

tion

proc

ess.

4Se

lect

ion

and

prot

ectio

nfo

rsu

bseq

uent

trea

tmen

tor

clea

rfin

ish.

5M

atch

ing

grai

nor

colo

ur.

6Li

mits

onpl

anin

gm

argi

ns.

7M

etho

dof

join

ting

and

cons

truc

tion

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

8Fo

rmof

cons

truc

tion

and

join

ting

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

9M

etho

dof

fixin

gw

here

not

atth

edi

scre

tion

ofth

eco

ntra

ctor

.10

Back

grou

ndw

here

vuln

erab

le.

Not

es,c

omm

ents

and

glos

sary

25 STAIRS,WALKWAYS AND BALUSTRADES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 205

Page 213: RICS new rules of measurement 2

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Pr

inci

ple

dim

ensio

nsof

each

stai

rcas

eor

unit.

2H

eigh

tfro

mst

ruct

ural

floor

tost

ruct

ural

floor

leve

l.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llra

mps

,wre

aths

,ben

ds,p

lain

ends

,orn

amen

tale

nds

and

the

like

labo

urs.

2Li

ning

s,no

sings

,cov

erm

ould

s,tr

ims

and

the

like

whe

rein

tegr

alpa

rtof

the

unit.

3So

ffit

linin

gs,s

pand

relp

anel

san

dth

elik

ew

here

anin

tegr

alpa

rtof

the

unit.

4Iro

nmon

gery

whe

rean

inte

gral

part

ofth

eun

it.5

Fini

shes

appl

ied

off

site.

6Fi

xing

s,fa

sten

ings

,blo

ckin

gs,

wed

ges,

bolts

,bra

cket

s,cl

eats

and

the

like.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1St

airc

ase:

type

stat

ednr

1D

imen

sione

dde

scrip

tion.

2C

ompo

nent

draw

ing

refe

renc

e.1

Hat

chdo

ors

whe

repa

rtof

the

loft

ladd

erco

mpo

nent

.1

Stai

rcas

esar

ede

emed

toin

clud

eat

tach

edba

lust

rade

san

dne

wel

post

s.2

Any

trim

san

dth

elik

efix

edto

the

unit

afte

rin

stal

latio

nm

ust

bem

easu

red

inac

cord

ance

with

the

rule

sof

Wor

kSe

ctio

n22

:Gen

eral

join

ery.

2Lo

ftla

dder

s

3La

dder

s

4Ex

tra

over

for:

nr1

Qua

rter

land

ing.

1D

imen

sione

dde

scrip

tion.

2H

alf

land

ing.

5C

atw

alks

m1

Dim

ensio

ned

desc

riptio

n.1

Cur

ved;

radi

usst

ated

.1

Met

hod

offix

ing

orsu

ppor

t.2

Back

grou

nd.

6W

alkw

ays

TABULATED WORK SECTIONS

206 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 214: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

7Ba

lust

rade

sm --

---

nr

1D

imen

sione

dde

scrip

tion.

----

----

----

----

----

--2

Com

pone

ntdr

awin

gre

fere

nce.

1C

urve

d:ra

dius

stat

ed.

1In

fillp

anel

s:de

tail

stat

ed.

2M

etho

dof

fixin

gor

supp

ort.

3Ba

ckgr

ound

.

1Th

ese

item

sar

em

easu

red

whe

nno

tfo

rmin

gan

inte

gral

part

ofa

stai

rcas

eun

it.2

Thes

eite

ms

incl

ude

alli

nteg

ralr

ails,

infil

lpan

els,

ironm

onge

ry,f

acto

ryap

plie

dfin

ishes

,fix

ings

and

fast

enin

gs.

8H

andr

ails

9Ba

rrie

rs

10G

uard

rails

11Ba

lcon

yun

its

12Ex

tra

over

for:

nr1

Ope

ning

port

ions

:size

and

deta

ilsst

ated

.

25 STAIRS,WALKWAYS AND BALUSTRADES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 207

Page 215: RICS new rules of measurement 2

26M

etal

wo

rkIs

olat

edm

etal

mem

bers

Gen

eral

met

alw

ork

Gen

eral

met

alw

ork

fittin

gsan

dfix

ture

s

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

s,se

ctio

ns,e

leva

tions

orde

tails

suffi

cien

tto

show

loca

tion,

scop

ean

dco

nstr

uctio

nof

each

item

mea

sure

d.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ty

pes

and

grad

esof

mat

eria

ls.2

Det

ails

ofco

nnec

tions

.3

Det

ails

ofw

eldi

ngte

sts

and

x-ra

ys.

4D

etai

lsof

perfo

rman

cete

sts.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Po

sitio

nof

the

wor

k.2

Type

san

dsiz

esof

stru

ctur

alm

embe

rsan

dth

eir

posit

ion

rela

tive

toea

chot

her.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llfa

bric

atio

nan

der

ectio

n.2

All

bolts

,nut

s,w

ashe

rs,f

ixin

gsan

dfa

sten

ings

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Iso

late

dm

etal

mem

bers

m1

Dim

ensio

ned

desc

riptio

n:cr

oss

sect

ion

prof

ilest

ated

.1

Built

up:d

etai

lsof

cons

truc

tion

stat

ed.

2Ta

pere

d.3

Cur

ved:

radi

usst

ated

.4

Hol

low

:sha

pest

ated

.

1M

etho

dof

fixin

gin

posit

ion.

2Fi

xing

plat

es,b

rack

ets

and

the

like:

dim

ensio

ned

desc

riptio

nst

ated

.3

Prot

ectiv

eco

atin

gap

plie

dof

fsit

e.

1Fo

rmin

gho

les,

mor

tices

and

the

like

inth

eite

man

dba

ckgr

ound

for

fixin

gpu

rpos

esar

ede

emed

incl

uded

.

2G

ener

alm

etal

wor

km

embe

rsm --

---

nr

1D

imen

sione

dde

scrip

tion:

cros

sse

ctio

npr

ofile

stat

ed.

1Pr

otec

tive

coat

ing

appl

ied

off

site.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.3

Surfa

cepa

tter

nor

finish

.

3Sh

eet

met

alm

2

----

-nr

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Dim

ensio

ned

desc

riptio

n.

TABULATED WORK SECTIONS

208 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 216: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4W

irem

esh

m2

----

-nr

1M

esh

size

and

thic

knes

sst

ated

.--

----

----

----

----

----

2D

imen

sione

dde

scrip

tion.

1Pr

otec

tive

coat

ing

appl

ied

off

site.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.3

Surfa

cepa

tter

nor

finish

.

1Fo

rmin

gho

les,

mor

tices

and

the

like

inth

eite

man

dba

ckgr

ound

for

fixin

gpu

rpos

esar

ede

emed

incl

uded

.

5C

ompo

site

item

sm --

---

nr

1D

imen

sione

dde

scrip

tion.

2D

raw

ing

refe

renc

e.1

Full

desc

riptio

nof

all

com

pone

nts

incl

udin

gin

tegr

alno

n-m

etal

licite

ms.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.1

Non

-met

allic

inte

gral

item

sfo

rmin

gpa

rtof

the

com

posit

eite

mm

aybe

incl

uded

inth

eco

mpo

site

item

prov

ided

they

are

clea

rlyde

scrib

edas

such

.2

Any

non-

met

allic

item

appl

ied

afte

rth

eco

mpo

site

item

has

been

inst

alle

don

site

shal

lbe

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofth

ere

leva

ntse

ctio

n.

6Fi

lling

hollo

wse

ctio

nsite

m1

Wat

er.

2C

oncr

ete.

3O

ther

mat

eria

l:ty

pest

ated

.

1D

etai

lsst

ated

.

7Su

rface

trea

tmen

tsm

21

Gal

vani

sing.

2Sp

raye

dco

atin

g.3

Pain

ting.

4O

ther

trea

tmen

t:ty

pest

ated

.

1O

nsit

e.2

Off

site.

1Su

rface

prep

arat

ion

desc

ribed

.1

All

prep

arat

ion

isde

emed

incl

uded

.2

Any

finish

appl

ied

afte

rin

stal

latio

nis

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofth

e‘P

aint

ing

and

deco

ratin

g’se

ctio

n.

8Iso

late

dpr

otec

tive

coat

ings

nr1

App

roxi

mat

esiz

eor

area

stat

ed1

Type

ofpr

otec

tive

coat

edst

ated

.2

Prep

arat

ion

desc

ribed

.

1O

nsit

e.2

Off

site.

26 METALWORK

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 209

Page 217: RICS new rules of measurement 2

27G

lazi

ng

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Elev

atio

ns.

2C

ompo

nent

draw

ings

.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

qual

ityan

dth

ickn

ess

ofgl

ass.

2Ki

ndan

dqu

ality

ofgl

azin

gm

ater

ial.

3M

etho

dof

glaz

ing

incl

udin

gde

tails

ofga

sket

sw

here

requ

ired.

4N

atur

eof

fram

eor

back

grou

nd.

Not

es,c

omm

ents

and

glos

sary

1Th

isse

ctio

nco

vers

allt

ypes

ofgl

ass

and

glas

spl

astic

san

dgl

azin

gw

ithpu

tty,

bead

sor

gask

ets

into

prep

ared

open

ings

.2

Gla

zing

supp

lied

aspa

rtof

aw

indo

w,

door

orot

her

com

pone

ntis

mea

sure

del

sew

here

with

thos

eco

mpo

nent

s.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1G

ener

alsc

ope

and

loca

tion

ofw

ork.

1W

orks

and

mat

eria

lsde

emed

incl

uded

.1

All

raki

ngan

dcu

rved

cutt

ing.

2A

llpo

lishe

dan

dbe

velle

ded

ges

unle

ssgi

ven

inth

ede

scrip

tion.

3D

rillin

gho

les.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1G

lass

,typ

est

ated

2Se

aled

glaz

edun

its,t

ype

ofgl

ass

stat

ed3

Louv

rebl

ades

,typ

eof

glas

sst

ated

nr1

Thic

knes

sof

glas

sor

over

all

thic

knes

sof

seal

edun

it.2

Pane

size.

1Sh

ape

ifot

her

than

squa

reor

rect

angu

lar.

2A

irspa

ce(s

)w

idth

(s)

ofdo

uble

/trip

legl

azed

units

.3

Gas

fillin

gof

airs

pace

s.

1Be

nt:d

irect

ion

stat

ed.

2M

etho

dof

glaz

ing

orse

curin

g:de

tails

stat

ed.

3Ed

getr

eatm

ent.

1G

lass

incl

udes

lam

inat

ed,t

ough

ened

,do

uble

ortr

iple

glaz

ing

units

,lea

d,ac

rylic

,pol

ycar

bona

tean

dth

elik

e,or

any

othe

rty

peof

mat

eria

lgla

zed

into

open

ings

exce

ptgl

ass

bloc

ks.

2G

lass

bloc

ksar

em

easu

red

inac

cord

ance

with

the

rule

sof

Wor

kSe

ctio

n14

:Mas

onry

.3

The

size

give

nfo

rirr

egul

arpa

nes

shal

lbe

the

smal

lest

rect

angu

lar

size

from

whi

chth

epa

neca

nbe

obta

ined

.

4Ex

tra

for:

nr1

Grin

ding

.2

Sand

blas

ting.

3A

cid

etch

ing.

4Em

boss

ing.

5En

grav

ing.

1Pl

ain

wor

k;pa

nesiz

est

ated

.2

Des

ign

wor

k:pa

nesiz

est

ated

.1

Det

aile

dde

scrip

tion

ofw

ork

incl

udin

gex

tent

ofw

ork

over

the

pane

.

1Th

isin

form

atio

nm

aybe

give

nby

refe

renc

eto

deta

iled

draw

ings

.

TABULATED WORK SECTIONS

210 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 218: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5Le

adlig

htgl

azin

g,ty

peof

glas

sst

ated

nr1

Thic

knes

sof

glas

s.2

Ove

rall

win

dow

orlig

htsiz

e.1

Pane

sizes

whe

rere

gula

rsh

ape.

2Pa

tter

nof

lead

cam

es.

3Sp

acin

gsof

lead

cam

es.

1Be

nt:d

irect

ion

stat

ed.

2M

etho

dof

glaz

ing

orse

curin

g:de

tails

stat

ed.

3Ed

getr

eatm

ent.

1Th

epa

tter

nw

illbe

desc

ribed

asre

gula

r,di

amon

dor

irreg

ular

.2

Cam

esar

eth

eH

-sha

ped

lead

strip

sth

atar

eso

lder

edto

geth

erto

form

the

lead

glaz

edpa

nes.

6Sa

ddle

bars

m1

Dia

met

eran

dle

ngth

stat

ed.

1M

etho

dof

fixin

gto

win

dow

surr

ound

.1

Met

hod

ofat

tach

ing

tole

adlig

htgl

azin

g.1

Sadd

leba

rsar

em

etal

rods

used

tost

reng

then

and

prov

ide

supp

ort

tola

rge

lead

glaz

edpa

nes.

Thes

eba

rsar

eus

ually

built

into

the

win

dow

surr

ound

.

7M

irror

snr

1D

imen

sione

dde

scrip

tion.

1Ed

gede

scrip

tion.

2Pa

tter

n:m

etho

dof

form

ing

desc

ribed

.

1N

atur

eof

back

grou

nd.

2M

etho

dof

fixin

g:de

tails

stat

ed.

1Ed

ges

can

bepl

ain,

roun

ded,

beve

lled

and

the

like.

8Re

mov

ing

exist

ing

glas

san

dpr

epar

ing

fram

eor

surr

ound

tore

ceiv

ene

wgl

ass

nr1

Type

offr

ame

orsu

rrou

nd.

2Ty

peof

glas

sto

bere

mov

ed.

1Pa

nes

≤1.

00m

2.

2Pa

nes

1.00

–2.0

0m2.

3Pa

nes

2.00

–3.0

0m2.

4Pa

nes

3.00

–4.0

0m2.

5Pa

nes

≥4.

00m

2:s

izest

ated

.

1M

etho

dof

disp

osal

ofde

bris

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

2M

ater

ials

tobe

kept

for

re-u

se.

27 GLAZING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 211

Page 219: RICS new rules of measurement 2

28F

loo

r,w

all,

ceili

ngan

dro

of

finis

hing

s

In-s

itu,t

iled,

bloc

k,M

osai

c,sh

eet,

appl

ied

liqui

dor

plan

ted

finis

hes

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

sof

each

floor

.2

Prin

cipa

lsec

tions

thro

ugh

build

ing.

3Ex

tern

alel

evat

ions

.4

Fini

shes

sche

dule

s.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yan

dsiz

eof

mat

eria

ls.2

Num

ber

ofco

ats

ofin

-situ

wor

k.3

Type

sof

unde

rlays

orlin

ings

.4

Bedd

ing

orot

her

met

hod

offix

ing.

5Ty

peof

poin

ting.

6La

ps.

7La

yout

and

wid

thof

join

tsan

dba

ys.

8Pa

tter

ns.

9Sp

acin

gof

batt

ens

and

coun

ter

batt

ens.

10C

ompo

sitio

nan

dm

ixof

mor

tars

.11

Bond

ing

toot

her

wor

k.12

Radi

usof

curv

edw

ork.

13N

atur

eof

base

.14

Laid

inon

eop

erat

ion

with

base

.15

App

lied

finish

es/s

eale

rs/p

olish

es.

Not

es,c

omm

ents

and

glos

sary

1A

rea

mea

sure

dis

net

inco

ntac

tw

ithba

se.

2W

idth

sst

ated

are

the

wid

thof

each

finish

edfa

ce.

3N

ode

duct

ion

for

void

s≤

1.00

m2.

4N

oal

low

ance

tobe

mad

ein

net

area

for

laps

,dre

ssin

gsor

any

othe

rla

bour

.5

All

wor

kis

deem

edin

tern

alun

less

stat

edas

exte

rnal

.

TABULATED WORK SECTIONS

212 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 220: RICS new rules of measurement 2

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1A

llflo

or-t

o-flo

oror

ceilin

ghe

ight

s.2

Layo

utof

patt

erne

dw

ork.

3D

etai

lsof

mou

lded

wor

k.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llro

ugh

and

fair

squa

re,r

akin

gan

dcu

rved

cutt

ing

and

was

te.

2A

llen

dsan

dan

gles

eith

erfo

rmed

orpr

oprie

tary

.3

Extr

am

ater

ialf

orcu

rved

wor

k.4

Form

ing

allr

ough

and

fair

groo

ves,

thro

ats,

mor

tices

,ch

ases

,edg

es,r

ebat

es,h

oles

,st

ops,

mitr

esan

dth

elik

ela

bour

s.5

Raki

ngou

tjo

ints

tofo

rma

key.

6Ra

king

out

join

tsto

inse

rtsk

irtin

gsor

the

like.

7A

llw

ork

info

rmin

gre

turn

s,en

ds,i

nter

nala

ndex

tern

alan

gles

.8

All

extr

am

ater

ialr

equi

red

for

bond

ing.

9A

dditi

onal

mat

eria

lin

laps

and

dres

sings

.10

All

wor

kon

atta

ched

colu

mns

and

beam

s11

Wor

kin

form

ing

void

san

dho

les

≤1.

00m

2.

12Fo

rmw

ork

oran

yot

her

form

ofte

mpo

rary

supp

ort.

13W

orki

ngfin

ishes

upto

and

arou

ndal

lacc

esso

ries.

28 FLOOR,WALL, CEILING AND ROOF FINISHINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 213

Page 221: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Sc

reed

s,be

dsan

dto

ppin

gs,t

hick

ness

and

num

ber

ofco

ats

stat

edm --

---

m2

1≤

600m

mw

ide.

----

----

----

----

----

--2

>60

0mm

wid

e.

1Le

vela

ndto

falls

only

≤15

°fro

mho

rizon

tal.

2To

falls

,cro

ssfa

llsan

dslo

pes

≤15

°fro

mho

rizon

tal.

3To

falls

,cro

ssfa

llsan

dslo

pes

>15

°fro

mho

rizon

tal.

1Su

rface

finish

.2

Nat

ure

ofba

ckgr

ound

.3

Back

ings

and

bedd

ings

:th

ickn

ess

stat

ed.

4U

nder

lays

:typ

ean

dth

ickn

ess

stat

ed.

5In

sula

tion:

type

and

thic

knes

sst

ated

.6

Laid

inon

eop

erat

ion

with

itsba

se.

7Pa

tter

nof

join

ts.

8La

idin

one

oper

atio

nw

ithba

se(m

onol

ithic

ally

).

1Th

ickn

esse

sst

ated

are

the

thic

knes

sex

clus

ive

ofad

hesiv

es,k

eys,

groo

ves

and

the

like.

2U

nder

lays

incl

ude

plas

terb

oard

orot

her

rigid

shee

tla

thin

g.

2Fi

nish

toflo

ors,

type

offin

ishan

dov

eral

lthi

ckne

ssst

ated

m m2

1≤

600m

mw

ide.

2>

600m

mw

ide.

3Ti

les

are

deem

edto

bela

idw

ithth

eir

long

edge

sve

rtic

alor

para

llelt

oth

elo

ngax

isof

the

floor

orce

iling.

3Ra

ised

acce

ssflo

ors,

type

offin

ishan

dth

ickn

ess

ofpa

nels

stat

ed1

Hei

ght

ofca

vity

stat

ed.

4Ra

mps

tora

ised

acce

ssflo

ors

nr1

Leng

th,w

idth

and

heig

ht.

4Th

ehe

ight

stat

edis

the

heig

htat

the

top

end.

5Fi

reba

rrie

rsw

ithin

void

belo

wra

ised

floor

m2

----

-m

1Th

ickn

ess

stat

ed.

----

----

----

----

----

--2

Thic

knes

san

dhe

ight

stat

ed.

1Fi

rera

ting.

2M

etho

dof

fixin

gin

posit

ion.

3O

bstr

ucte

dby

serv

ices

.

1Fi

reba

rrie

rsar

ede

emed

toin

clud

eal

lsu

ppor

tw

ork,

scrib

ing

orfo

rmin

gto

fit,a

ngle

s,en

dsan

dw

orki

ngar

ound

stru

ctur

es,s

uppo

rtw

ork

and

serv

ices

.

TABULATED WORK SECTIONS

214 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 222: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

6Fi

nish

toro

ofs,

type

offin

ishan

dov

eral

lthi

ckne

ssst

ated

m m2

1≤

600m

mw

ide.

2>

600m

mw

ide.

1Le

vela

ndto

falls

only

≤15

°fro

mho

rizon

tal.

2To

falls

,cro

ssfa

llsan

dslo

pes

≤15

°fro

mho

rizon

tal.

3To

falls

,cro

ssfa

llsan

dslo

pes

>15

°fro

mho

rizon

tal.

1Ro

offin

ishes

incl

ude

gras

s,se

dum

and

the

like

live

finish

es.

2Th

eyex

clud

eso

lar

refle

ctiv

epa

int,

chip

ping

san

dth

elik

eth

atw

illbe

mea

sure

dw

ithth

eir

asso

ciat

edro

ofco

verin

g.3

Wid

this

the

wid

thof

each

face

.

7Fi

nish

tow

alls,

type

offin

ishan

dov

eral

lthi

ckne

ssst

ated

m m2

1≤

600m

mw

ide.

2>

600m

mw

ide.

1C

urve

d,ra

dius

stat

ed.

1H

eigh

tof

wal

lfin

ishes

ism

easu

red

tofin

ished

ceilin

ghe

ight

orsp

ecifi

edhe

ight

past

susp

ende

dce

ilings

.2

Wal

lfin

ishes

are

mea

sure

dbe

hind

skir

tings

unle

ssth

esk

irtin

gis

inst

alle

dpr

ior

toth

ew

allf

inish

.3

Wid

this

the

wid

thof

each

face

.

8Fi

nish

toiso

late

dco

lum

ns,t

ype

offin

ishan

dov

eral

lthi

ckne

ssst

ated

9Fi

nish

toce

ilings

,typ

eof

finish

and

over

allt

hick

ness

stat

edm m

2

1≤

600m

mw

ide.

2>

600m

mw

ide.

1O

ver

3.50

mab

ove

stru

ctur

alflo

orle

vel.

1H

eigh

tof

ceilin

gis

mea

sure

dfro

mst

ruct

ural

floor

leve

lto

soffi

tof

finish

edce

iling

oriso

late

dbe

am.

2W

idth

isth

ew

idth

ofea

chfa

ce.

10Fi

nish

toiso

late

dbe

ams,

type

offin

ishan

dov

eral

lthi

ckne

ssst

ated

11Fi

nish

totr

eads

m1

Net

wid

thst

ated

.1

Cur

ved:

radi

usst

ated

.1

Nat

ure

ofba

ckgr

ound

.2

Inse

tsde

scrib

ed.

1En

ds,a

ngle

san

dou

tlets

deem

edin

clud

ed.

12Fi

nish

toris

ers

m1

Net

wid

thst

ated

.1

Cur

ved:

radi

usst

ated

.2

Und

ercu

t.1

Nat

ure

ofba

ckgr

ound

.

13Fi

nish

tost

rings

and

apro

nsm

1N

etw

idth

orgi

rth

onfa

cest

ated

.1

Raki

ng.

2Sl

opin

g.3

Cur

ved:

radi

usst

ated

.

1N

atur

eof

back

grou

nd.

14Sk

irtin

gs,n

ethe

ight

stat

edm

1N

ethe

ight

stat

ed.

1Ra

king

.2

Slop

ing.

3C

urve

d:ra

dius

stat

ed.

1N

atur

eof

back

grou

nd.

2C

ove

form

ers.

28 FLOOR,WALL, CEILING AND ROOF FINISHINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 215

Page 223: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

15Li

ning

sto

chan

nels

m1

Net

girt

hon

face

stat

ed.

1Ra

king

.2

Slop

ing.

3C

urve

d:ra

dius

stat

ed.

1N

atur

eof

back

grou

nd.

1En

ds,a

ngle

san

dou

tlets

deem

edin

clud

ed.

16Ke

rbs

and

capp

ings

m1

Net

girt

hon

face

stat

ed.

17C

oves

18M

ould

ings

19C

orni

ces

20A

rchi

trav

es21

Cei

ling

ribs

22Ba

nds

m1

Gir

than

dsh

ape

stat

ed.

----

----

----

----

----

--2

Dim

ensio

ned

desc

riptio

n.

1Pa

tter

ned:

deta

ilsst

ated

.2

Hor

izont

al.

3Ra

king

.4

Slop

ing.

5Ve

rtic

al.

6U

nder

cut.

7Fl

ush.

8Ra

ised.

9Su

nk.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.1

Mea

sure

the

leng

thin

cont

act

with

the

base

.2

All

ends

,ang

les,

inte

rsec

tions

are

deem

edin

clud

ed.

23Sp

ecia

ltile

s,sla

bsor

bloc

ksnr --

---

m2

1D

imen

sione

dde

scrip

tion.

2M

anuf

actu

rers

’ref

eren

ce.

1Sp

ecia

ltile

sar

eon

lym

easu

red

here

ifno

tal

read

ym

easu

red

unde

rpr

evio

usru

les

11–2

2in

clus

ive.

24Su

rface

dres

sings

,sea

lers

orpo

lishe

s.m

21

Type

stat

ed.

2Ra

teof

cove

rage

stat

ed.

1H

orizo

ntal

.2

Slop

ing.

3Ve

rtic

al.

4So

ffits

.

1N

atur

eof

finish

bein

gtr

eate

d.1

Dre

ssin

gsin

clud

eca

rbor

undu

mgr

ains

,st

one

chip

ping

san

dth

elik

e.2

Seal

ers

incl

ude

wat

erpr

oofe

rs,

hard

ener

s,du

stpr

oofe

rs,p

olish

esan

dth

elik

e.

25M

ovem

ent

join

ts26

Cov

erst

rips

27D

ivid

ing

strip

s28

Bead

s,fu

nctio

nst

ated

29N

osin

gs

m1

Dim

ensio

ned

desc

riptio

n.1

Met

hod

offix

ing.

2N

atur

eof

back

grou

nd.

1M

ovem

ent

join

tsin

clud

eex

pans

ion

join

ts.

2Fu

nctio

nof

bead

sin

clud

ean

gle

bead

s,st

opbe

ads,

shad

owga

pbe

ads,

casin

gbe

ads

and

the

like.

30Re

info

rcem

ent,

deta

ilsst

ated

31M

etal

mes

hla

thin

g,de

tails

stat

ed32

Boar

din

sula

tion,

thic

knes

sst

ated

33Q

uilt

insu

latio

n,th

ickn

ess

stat

ed34

Isola

tion

mem

bran

es,t

hick

ness

stat

ed

m ----

-m

2

1To

wal

ls.2

Toce

ilings

.3

Toflo

ors.

4To

roof

s.5

Toiso

late

dbe

ams.

6To

isola

ted

colu

mns

.

1D

epth

ofsu

spen

sion.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.

TABULATED WORK SECTIONS

216 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 224: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

35A

cces

sorie

snr

1D

imen

sione

dde

scrip

tion.

1M

etho

dof

fixin

g.1

Nat

ure

ofba

ckgr

ound

.1

Acc

esso

ries

incl

ude

acce

sspa

nels,

spec

ialp

anel

sin

raise

dac

cess

floor

s,ve

ntgr

illes,

orna

men

tsan

dth

elik

e.

36Pr

ecas

tpl

aste

rco

mpo

nent

sm

1D

imen

sione

dde

scrip

tion

orpr

oprie

tary

refe

renc

e.1

Met

hod

offix

ing.

1N

atur

eof

back

grou

nd.

1Th

edi

men

sione

dde

scrip

tion

shal

lful

lyde

scrib

eth

eco

mpo

nent

incl

udin

gst

atin

gth

een

dus

esu

chas

corn

ice,

mou

lded

band

,arc

hitr

ave

and

the

like.

28 FLOOR,WALL, CEILING AND ROOF FINISHINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 217

Page 225: RICS new rules of measurement 2

29D

eco

rati

on

Pain

ting

and

clea

rfin

ishe

sIn

tum

esce

ntco

atin

gsD

ecor

ativ

epa

pers

orfa

bric

sA

ntic

orro

sion

trea

tmen

ts

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

san

del

evat

ion

draw

ings

show

ing

scop

ean

dlo

catio

nof

the

wor

k.2

Pain

ting/

deco

ratin

gsc

hedu

le(s

).

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials.

2N

atur

eof

base

.3

Des

crip

tion

ofsu

rface

ifno

tsm

ooth

.4

Prep

arat

ory

wor

kto

base

.5

Type

and

num

ber

ofpr

imin

gor

seal

ing

coat

s.6

Type

and

num

ber

ofun

derc

oats

.7

Type

and

num

ber

offin

ishin

gco

ats.

8M

etho

dof

appl

icat

ion.

9Ty

peof

trea

tmen

tap

plie

dbe

twee

nco

ats.

10Pa

tter

nof

deco

rativ

epa

pers

.11

Met

hod

offix

ing

and

join

ting

pape

rsor

fabr

ics.

Not

es,c

omm

ents

and

glos

sary

1M

etho

dof

appl

icat

ion

left

toco

ntra

ctor

unle

ssst

ated

othe

rwise

.2

Nat

ure

ofno

n-sm

ooth

base

incl

udes

desc

riptio

nof

base

text

ure

and

prof

ilesu

chas

corr

ugat

ed,f

lute

d,m

ould

edor

carv

ed.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1C

eilin

gsov

er3.

5mab

ove

finish

edflo

orle

vel.

1W

orks

and

mat

eria

lsde

emed

incl

uded

.1

All

cutt

ing

tolin

e.2

Mul

ti-co

lour

edw

ork

ondi

fferin

gsu

rface

s.3

All

cutt

ing

topa

pers

and

fabr

ics.

TABULATED WORK SECTIONS

218 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 226: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pa

intin

gto

gene

rals

urfa

ces

2Pa

intin

gto

glaz

edsu

rface

sirr

espe

ctiv

eof

pane

sizes

3Pa

intin

gst

ruct

ural

met

alw

ork

4Pa

intin

gra

diat

ors,

type

stat

ed5

Pain

ting

gutt

ers

6Pa

intin

gpi

pes

7Pa

intin

gse

rvic

es,t

ype

stat

ed

m m2

nr

1≤

300m

mgi

rth.

2>

300m

mgi

rth.

3Iso

late

dar

eas

≤1.

00m

2

irres

pect

ive

oflo

catio

nor

girt

h.

1In

tern

al.

2Ex

tern

al.

1W

ork

toce

ilings

orbe

ams

over

3.5m

but

not

exce

edin

g5m

abov

efin

ished

floor

leve

lan

dth

erea

fter

in3.

00m

stag

es.

2Su

rface

sto

rem

ain

unpa

inte

d.3

Mul

ti-co

lour

edon

one

surfa

ce.

4Pa

tter

ned:

deta

ilsst

ated

.5

Fire

ratin

g.6

App

licat

ion

onsit

epr

ior

tofix

ing.

7A

pplic

atio

nof

fsit

epr

ior

tofix

ing.

1Th

ear

eaor

girt

hm

easu

red

isth

atco

vere

d.2

The

girt

hof

fram

esan

dth

elik

eis

calc

ulat

edfro

mon

eed

geto

the

othe

rov

eral

ltrim

s,ar

chitr

aves

,sto

psan

dth

elik

ean

das

sum

edo

ors

have

been

rem

oved

prio

rto

pain

ting.

3Th

egi

rth

desig

nate

das

exte

rnal

ondo

orfr

ames

and

the

like

isth

atpa

rtof

the

fram

evi

sible

whe

nth

edo

oris

clos

ed.

4Ex

ampl

esof

radi

ator

type

sar

efla

t,pa

nelle

d,co

lum

n,tu

bula

ror

the

like.

8Pa

intin

gra

ilings

,fen

ces

and

gate

sm m

2

nr

1≤

300m

mgi

rth.

2>

300m

mgi

rth.

3Iso

late

dar

eas

≤1.

00m

2

irres

pect

ive

oflo

catio

nor

girt

h.

1C

lose

d.2

Ope

n.3

Orn

amen

tal.

1C

lose

dm

eans

noga

psw

hats

oeve

r.

Dec

orat

ive

pape

rsor

fabr

ics

9W

alls

and

colu

mns

10C

eilin

gsan

dbe

ams

m m2

1A

reas

≤1.

00m

2.

2A

reas

>1.

00m

2.

1C

urve

dsu

rface

s.ra

diis

tate

d.1

Lini

ngpa

per.

2W

ork

toce

ilings

orbe

ams

over

3.5m

but

not

exce

edin

g5m

abov

efin

ished

floor

leve

lan

dth

erea

fter

in3.

00m

stag

es.

1N

ode

duct

ion

mad

efo

rvo

ids

≤1.

00m

2.

11Bo

rder

sm

1D

imen

sione

dde

scrip

tion.

1M

itres

,end

san

gles

,scr

ibin

gor

cutt

ing

deem

edin

clud

ed.

12M

otifs

nr1

Dim

ensio

ned

desc

riptio

nor

diag

ram

.

29 DECORATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 219

Page 227: RICS new rules of measurement 2

30S

uspe

nded

ceili

ngs

Dem

ount

able

susp

ende

dce

iling

sSo

lidsu

spen

ded

ceili

ngs

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

ssh

owin

glo

catio

nof

the

wor

k.

2Re

flect

edce

iling

plan

ssh

owin

gsc

ope

and

com

plex

ityof

the

wor

k.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials.

2Si

ze(s

)of

pane

lsan

dst

rips.

3C

onst

ruct

ion

ofsu

spen

sion

fram

ing

and

syst

ems.

4M

etho

dof

fixin

g.5

Nat

ure

ofba

ckgr

ound

.6

Nat

ure

ofse

rvic

eslo

cate

din

the

ceilin

gvo

id.

7N

atur

eof

inte

gral

serv

ices

and

fittin

gs.

Not

es,c

omm

ents

and

glos

sary

1A

llw

ork

isde

emed

inte

rnal

unle

ssde

scrib

edas

exte

rnal

.2

Seco

ndar

yst

eelo

rtim

ber

supp

ort

wor

kis

mea

sure

del

sew

here

.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Se

rvic

eslo

cate

dw

ithin

the

ceilin

gvo

id.

2Lo

catio

nof

inte

gral

serv

ices

and

fittin

gs.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1W

orki

ngov

eran

dar

ound

obst

ruct

ions

.2

All

cutt

ing.

3Fo

rmin

gop

enin

gsan

dho

les.

4A

llad

ditio

nals

uppo

rtw

ork

incl

udin

gbr

idgi

ngfo

rfit

tings

.5

All

extr

aw

ork

requ

ired

for

wor

kde

scrib

edas

patt

erne

d.

1In

tegr

alfit

tings

are

thos

ede

signe

dto

bein

corp

orat

edin

toth

ece

iling

stru

ctur

e.

TABULATED WORK SECTIONS

220 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 228: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

eilin

gs2

Plen

umce

ilings

3Be

ams

4Bu

lkhe

ads

m2

1D

epth

ofsu

spen

sion

≤15

0mm

.2

Dep

thof

susp

ensio

n15

0–50

0mm

.3

Dep

thth

erea

fter

in50

0mm

stag

es.

1Ty

pean

dth

ickn

ess

oflin

ing.

2M

etho

dof

fixin

glin

ing

tosu

spen

sion.

3In

tegr

alin

sula

tion.

4In

tegr

alva

pour

barr

ier.

5H

eigh

tof

wor

kex

ceed

ing

3.50

mab

ove

finish

edflo

orle

vel

in1.

50m

stag

es.

1Pa

tter

ned:

deta

ilsst

ated

.2

Slop

ing.

3C

urve

d:ra

dius

and

plan

eof

curv

est

ated

.4

Susp

ensio

nob

stru

cted

byse

rvic

es.

5Tr

ims

atre

gula

rin

terv

als

with

inar

eaof

ceilin

g:de

tails

stat

ed.

1A

rea

mea

sure

dis

that

onth

eex

pose

dfa

ce.

2D

epth

ofsu

spen

sion

ism

easu

red

from

unde

rsid

eof

mai

nst

ruct

ural

soffi

tor

seco

ndar

ysu

ppor

tw

ork

toba

cksu

rface

oflin

ing.

3H

eigh

tof

wor

kis

mea

sure

dfro

mfin

ished

floor

leve

lto

face

ofce

iling.

4W

here

ceilin

gsar

esu

spen

ded

from

slopi

ng,c

urve

dor

irreg

ular

stru

ctur

esan

aver

age

dept

hof

susp

ensio

nsh

all

best

ated

.

5Iso

late

dst

rips

m1

Wid

th≤

600m

m.

2W

idth

ther

eafte

rin

300m

mst

ages

.

6U

psta

nds

m1

Hei

ght

≤60

0mm

.2

Hei

ght

ther

eafte

rin

300m

mst

ages

.

7A

cces

spa

nels

nr1

Dim

ensio

ned

desc

riptio

n.2

Prop

rieta

ryre

fere

nce.

1C

ompo

sitio

n.2

Met

hod

offix

ing.

1M

etho

dof

lock

ing.

1A

cces

spa

nels

are

deem

edto

incl

uded

alla

dditi

onal

supp

ort

wor

k,fr

amin

g,ed

getr

iman

dfix

ings

.

8Ed

getr

ims

9A

ngle

trim

sm

1D

imen

sione

dde

scrip

tion.

1Pl

ain.

2Fl

oatin

g.1

Cen

tres

offix

ing.

2N

atur

eof

back

grou

nd.

1Pl

ain

trim

sar

eth

ose

fixed

toth

est

ruct

ure.

2Fl

oatin

gtr

ims

are

thos

efix

edto

the

ceilin

gsy

stem

.3

Trim

sar

ede

emed

toin

clud

een

dsan

dan

gles

.

10Fi

reba

rrie

rsm --

---

m2

1D

imen

sione

dde

scrip

tion.

----

----

----

----

----

--2

Thic

knes

sst

ated

.

1Fi

rera

ting

whe

rere

quire

d.1

Met

hod

offix

ing

inpo

sitio

n.2

Obs

truc

ted

byse

rvic

esst

ated

.1

Fire

barr

iers

are

deem

edto

incl

ude

all

supp

ort

wor

k,sc

ribin

gor

form

ing

tofit

,ang

les,

ends

and

wor

king

arou

ndst

ruct

ures

,sup

port

wor

kan

dse

rvic

es.

30 SUSPENDED CEILINGS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 221

Page 229: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

11C

olla

rsfo

rse

rvic

espa

ssin

gth

roug

hfir

eba

rrie

rsnr

1D

iam

eter

ofpi

pe.

2Si

zeof

trun

king

.1

Pipe

s.2

Trun

king

.1

Leng

thof

sleev

eea

chsid

eof

barr

ier

stat

ed.

2Fi

rera

ting

1C

olla

rsar

eon

lym

easu

red

here

whe

reth

eyar

ein

tegr

alw

ithth

efir

eba

rrie

r.If

they

are

not

inte

gral

they

shal

lbe

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofW

ork

Sect

ion

40:B

uild

er’s

wor

kin

conn

ectio

nw

ithm

echa

nica

l,el

ectr

ical

and

tran

spor

tatio

nin

stal

latio

ns.

12Fi

ttin

gsnr --

---

m

1D

imen

sione

dde

scrip

tion.

1N

atur

eof

back

grou

ndst

ated

.

13Sh

adow

gap

batt

ens

m1

Dim

ensio

ned

desc

riptio

n.1

Cen

tres

offix

ing.

2N

atur

eof

back

grou

nd.

1En

ds,a

ngle

san

dth

elik

ede

emed

incl

uded

.

TABULATED WORK SECTIONS

222 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 230: RICS new rules of measurement 2

31In

sula

tio

n,fir

est

opp

ing

and

fire

pro

tect

ion

Boar

d,sh

eet,

quilt

,spr

ayed

,loo

sefil

lor

foam

edin

sula

tion

and

fire

prot

ectio

nin

stal

latio

ns

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Plan

s,se

ctio

nsan

dde

tails

suffi

cien

tto

show

the

scop

ean

dlo

catio

nof

the

vario

usw

orks

rela

ting

toth

isse

ctio

n.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ty

pe,q

ualit

yan

dth

ickn

ess

ofm

ater

ials.

2Fi

rera

ting

whe

rere

quire

d.3

Exte

ntof

laps

.4

Met

hod

offix

ing,

layi

ngor

appl

ying

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llcu

ttin

g.2

Wor

king

arou

ndor

over

all

mem

bers

and

serv

ices

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Bo

ards

2Sh

eets

3Q

uilts

4Lo

ose

m2

1Th

ickn

ess

stat

ed.

1Pl

ain

area

s.2

Laid

acro

ssjo

ists,

rafte

rs,

part

ition

fram

ing

orlik

em

embe

rs:c

entr

esof

mem

bers

stat

ed.

3La

idbe

twee

njo

ists,

rafte

rs,

part

ition

fram

ing

orlik

em

embe

rs:c

entr

esof

mem

bers

stat

ed.

1H

orizo

ntal

.2

Vert

ical

.3

Slop

ing.

4So

ffit.

1Th

ear

eam

easu

red

isth

atco

vere

d.2

No

dedu

ctio

nis

mad

efo

rvo

ids

≤1.

00m

2.

3Th

ear

eaof

joist

s,ra

fters

,par

titio

nfr

amin

gor

like

mem

bers

isde

duct

edw

hen

the

mat

eria

lis

laid

betw

een

such

mem

bers

.4

Slop

ing

isth

eup

per

surfa

ceno

tho

rizon

tal.

5So

ffits

are

the

unde

rsid

eof

any

horiz

onta

lor

slopi

ngst

ruct

ure.

m2

Purp

ose

and

dim

ensio

ned

desc

riptio

n.4

Loca

tion

stat

ed.

5Sp

raye

dm

21

Thic

knes

sst

ated

.1

Nat

ure

ofba

ckgr

ound

.

31 INSULATION, FIRE STOPPING AND FIRE PROTECTION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 223

Page 231: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

6Fi

lling

cavi

ties

m2

1Th

ickn

ess

stat

ed.

1M

iner

alfib

re.

2Pl

astic

bead

s.3

Cel

lulo

sefib

re.

4Ex

pand

ing

foam

.5

Oth

erty

peof

blow

nor

inje

cted

mat

eria

l.

1In

tern

al.

2Ex

tern

al.

1D

rillin

gho

les

inst

ruct

ure

toal

low

inje

ctio

nof

mat

eria

land

subs

eque

ntm

akin

ggo

odis

deem

edin

clud

ed.

7Fi

rest

ops,

type

stat

edm

1D

imen

sione

dde

scrip

tion.

2Fi

rera

ting.

1H

orizo

ntal

.2

Vert

ical

.3

Raki

ng.

4St

eppe

d.5

Cur

ved,

radi

usst

ated

.

1M

etho

dof

fixin

g.2

Back

grou

ndw

hen

mec

hani

cally

fixed

.

8Fi

resle

eves

,col

lars

and

the

like

nr1

Dim

ensio

ned

desc

riptio

n.2

Fire

ratin

g.1

Met

hod

offix

ing.

2Ba

ckgr

ound

whe

nm

echa

nica

llyfix

ed.

TABULATED WORK SECTIONS

224 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 232: RICS new rules of measurement 2

32F

urni

ture

,fit

ting

san

deq

uipm

ent

Gen

eral

fixtu

res,

furn

ishi

ngs

and

equi

pmen

tK

itche

nfit

tings

Cat

erin

geq

uipm

ent

Sani

tary

appl

ianc

esan

dfit

tings

Not

ices

and

sign

sSi

tean

dst

reet

furn

iture

Bird

/ver

min

cont

rol

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Loca

tion

draw

ings

.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Suffi

cien

tin

form

atio

nto

desig

n,pr

ocur

eor

man

ufac

ture

the

item

.2

Kind

and

qual

ityof

mat

eria

ls.3

Det

ails

ofal

lass

ocia

ted

build

ing

wor

k.4

Test

sw

ithw

hich

mat

eria

lsan

deq

uipm

ent

mus

tco

mpl

y.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1C

ompo

nent

s.1

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1M

arki

ngpo

sitio

ns.

2C

onne

ctin

gto

serv

ices

.3

Com

miss

ioni

ng.

4A

llas

soci

ated

exca

vatio

nsan

dco

ncre

tefo

unda

tions

orba

ses

unle

ssst

ated

asm

easu

red

else

whe

re.

32 FURNITURE, FITTINGS AND EQUIPMENT

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 225

Page 233: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Fi

xtur

es,f

ittin

gsor

equi

pmen

tw

ithou

tse

rvic

es2

Fixt

ures

,fitt

ings

oreq

uipm

ent

with

serv

ices

nr1

Com

pone

ntdr

awin

gre

fere

nce.

2D

imen

sione

ddi

agra

m.

3M

anuf

actu

rers

refe

renc

e.

1A

ncilla

ryite

ms

prov

ided

with

the

equi

pmen

t.2

Inte

gral

cont

rols

and

indi

cato

rs.

3Re

mot

eco

ntro

lsan

din

dica

tors

.4

Supp

orts

,mou

ntin

gsan

dbr

acke

ts.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.

3A

ncilla

ryite

ms

not

prov

ided

with

the

item

ofeq

uipm

ent

nr1

Type

,size

and

met

hod

ofjo

intin

gst

ated

.

4Fi

xtur

es,f

ittin

gsor

equi

pmen

tsu

pplie

dby

the

empl

oyer

nr1

Type

and

size.

1C

olle

ctin

gfro

mlo

catio

nof

fsit

e:de

tails

stat

ed.

1A

ccep

ting

deliv

ery,

unlo

adin

g,tr

ansp

ortin

gab

out

site,

stor

ing

and

hand

ling

and

disp

osin

gof

allp

acki

ngm

ater

ials

isde

emed

incl

uded

.

5Si

gnw

ritin

gnr

1D

imen

sione

dde

scrip

tion.

1Fo

nt.

1N

atur

eof

back

grou

nd.

TABULATED WORK SECTIONS

226 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 234: RICS new rules of measurement 2

33D

rain

age

abov

egr

oun

dR

ainw

ater

inst

alla

tions

Foul

drai

nage

inst

alla

tions

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Roof

plan

(s).

2Fl

oor

plan

sof

any

floor

sth

atha

vedr

aina

gein

stal

latio

ns.

3Pr

inci

pals

ectio

nsan

del

evat

ions

.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Lo

catio

nof

inst

alla

tion.

2N

atur

eof

back

grou

nd.

3M

etho

dan

dsp

acin

gof

fixin

g.4

Met

hod

and

spac

ing

ofjo

ints

.5

Des

crip

tion

ofm

ater

ial.

6Ty

peof

brac

kets

orsu

ppor

ts.

7Fi

nish

.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sc

ope

and

loca

tion

ofw

ork.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

lljo

ints

.2

All

brac

kets

and

supp

orts

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pi

pew

ork

m1

Nom

inal

diam

eter

.1

Stra

ight

,cur

ved,

flexi

ble.

2Ex

tend

able

.3

Met

hod

ofjo

intin

g.

1M

etho

dof

fixin

gto

back

grou

nd.

1M

easu

red

over

allf

ittin

gs.

2Pi

pew

ork

anci

llarie

snr

1D

imen

sione

dde

scrip

tion.

1A

ncilla

ries

incl

ude

valv

es,n

on-r

etur

nfla

ps,r

educ

ers,

tape

rs,b

ends

,hop

pers

,gu

llies,

tun

dish

es,r

oddi

ngey

es,t

raps

,ac

cess

door

s,an

gles

,offs

ets,

shoe

s,so

cket

s,ta

ppin

gs,b

osse

san

dth

elik

e.2

The

list

isno

tex

haus

tive.

3Ite

ms

extr

aov

erth

epi

pein

whi

chth

eyoc

cur

nr1

Fitt

ings

,pip

esiz

e≤

65m

m.

2Fi

ttin

gs,n

omin

alpo

pesiz

e>

65m

m.

1O

neen

d.2

Two

ends

.3

Thre

een

ds.

4O

ther

,det

ails

stat

ed.

1W

ithin

spec

tion

door

.2

Met

hod

ofjo

intin

gst

ated

whe

redi

ffere

ntfro

mpi

pein

whi

chth

efit

ting

occu

rs.

1C

uttin

gan

djo

intin

gpi

pes

tofit

tings

isde

emed

tobe

incl

uded

.2

Fitt

ings

whi

char

ere

duci

ngar

em

easu

red

extr

aov

erth

ela

rges

tpi

pein

whi

chth

eyoc

cur.

33 DRAINAGE ABOVE GROUND

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 227

Page 235: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4Pi

pesle

eves

thro

ugh

wal

ls,flo

ors

and

ceilin

gsnr

1Ty

pean

dno

min

aldi

amet

erof

pipe

.2

Leng

thof

sleev

eor

thic

knes

sof

stru

ctur

ebe

ing

pass

edth

roug

h.3

Fire

ratin

g.

1Ty

peof

stru

ctur

ebe

ing

pass

edth

roug

hde

scrib

ed.

1M

etho

dof

fixin

gan

dpa

ckin

g.2

Han

ding

toot

hers

for

fixin

g.1

All

mak

ing

good

incl

udin

gfir

est

oppi

ngis

deem

edin

clud

ed.

5G

utte

rsm

1N

omin

alsiz

e.1

Stra

ight

,cur

ved,

flexi

ble.

2Ex

tend

able

.3

Met

hod

ofjo

intin

g.

1M

etho

dof

fixin

gto

back

grou

nd.

1M

easu

red

over

allf

ittin

gs.

6G

utte

ran

cilla

ries

nr1

Dim

ensio

ned

desc

riptio

n.1

Anc

illarie

sin

clud

est

open

ds,a

ngle

s,ou

tlets

,ove

rflow

s,ta

pers

,red

ucer

san

dth

elik

e.2

The

list

isno

tex

haus

tive

7Ite

ms

extr

aov

erth

egu

tter

inw

hich

they

occu

rnr

1D

imen

sione

dde

scrip

tion.

8M

arki

ng,p

ositi

onof

and

leav

ing

orfo

rmin

gal

lhol

es,m

ortic

es,c

hase

san

dth

elik

ere

quire

din

the

stru

ctur

e

item

1N

umbe

ran

dty

peof

inst

alla

tions

.

9Id

entif

icat

ion

nr1

Plat

es.

2D

iscs.

3La

bels.

4Ta

pes.

5Sy

mbo

lsor

num

bers

.6

Band

s.7

Cha

rts

ordi

agra

ms.

8O

ther

:typ

est

ated

.

1D

etai

lsst

ated

.1

Met

hod

offix

ing.

10Te

stin

gan

dco

mm

issio

ning

item

1In

stal

latio

nst

ated

.1

Att

enda

nce

requ

ired.

2In

sura

nces

requ

ired

byem

ploy

er.

1Pr

epar

ator

yop

erat

ions

stat

ed.

2St

age

test

s(n

r)lis

ted

and

purp

ose

stat

ed.

1A

llfu

elan

dpo

wer

used

isde

emed

incl

uded

.2

Prov

ision

ofte

stce

rtifi

cate

sis

deem

edin

clud

ed.

TABULATED WORK SECTIONS

228 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 236: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

11Pr

epar

ing

draw

ings

item

1N

umbe

rof

copi

esst

ated

.1

Met

hod

stat

ed.

2In

form

atio

nto

besh

own

stat

ed.

1W

orki

ngdr

awin

gs.

2A

sfit

ted

draw

ings

.

12O

pera

ting

man

uals

and

inst

ruct

ions

item

33 DRAINAGE ABOVE GROUND

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 229

Page 237: RICS new rules of measurement 2

34D

rain

age

belo

wgr

oun

dSt

orm

wat

erdr

ain

syst

ems

Foul

drai

nsy

stem

sPu

mpe

ddr

ain

syst

ems

Land

drai

nage

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Dra

inag

ela

yout

(s).

Man

dato

ryin

form

atio

nto

bepr

ovid

ed1

Kind

and

qual

ityof

mat

eria

ls.N

otes

,com

men

tsan

dgl

ossa

ry

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1La

yout

ofdr

aina

gesh

owin

gsc

ope

ofw

ork.

2In

vert

dept

hs.

3C

over

leve

ls.4

Pipe

sizes

.5

Det

ails

ofm

anho

les,

insp

ectio

nch

ambe

rsan

dot

her

pits

,tan

ks,

cham

bers

orth

elik

e.6

Wor

kou

tsid

esit

ebo

unda

ry.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1Ea

rthw

ork

supp

ort.

2C

ompa

ctin

gbo

ttom

sof

exca

vatio

ns.

3Tr

imm

ing

exca

vatio

ns.

4Ba

ckfil

ling

with

exca

vate

dm

ater

ials.

5C

ompa

ctin

gba

ckfil

l.6

Disp

osal

ofsu

rplu

sex

cava

ted

mat

eria

ls.7

Disp

osal

ofal

lwat

er.

8Th

ose

leng

ths

ofpi

pes

with

inm

anho

lew

alls.

9Bu

ildin

gin

ends

ofpi

pes.

10Be

ddin

gan

dpo

intin

g.

1W

ork

outs

ide

site

boun

dary

shal

lbe

mea

sure

dse

para

tely.

2W

ork

belo

wbu

ildin

gssh

allb

em

easu

red

sepa

rate

ly

TABULATED WORK SECTIONS

230 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 238: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1D

rain

runs

m1

Ave

rage

tren

chde

pth

in50

0mm

incr

emen

ts.

2Ty

pean

dno

min

aldi

amet

erof

pipe

.3

Mul

tiple

pipe

sst

atin

gnu

mbe

ran

dno

min

aldi

amet

erof

pipe

s.

1M

etho

dof

join

ting

pipe

s.2

Pipe

bedd

ing

and

orsu

rrou

nd:

deta

ilsst

ated

3Ty

peof

back

filli

fno

tob

tain

edfro

mth

eex

cava

tions

.

1Ve

rtic

al.

2C

urve

d.3

Belo

wgr

ound

wat

erle

vel.

4N

ext

toex

istin

gro

adw

ayor

path

.5

Nex

tto

exist

ing

build

ing.

6Sp

ecifi

edm

ultip

leha

ndlin

g:de

tails

stat

ed.

7D

ispos

alof

exca

vate

dm

ater

ial

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or:d

etai

lsst

ated

.

1D

rain

runs

are

mea

sure

dfro

mex

tern

alfa

ceof

man

hole

toex

tern

alfa

ceof

man

hole

orac

cess

ory.

2A

vera

gede

pth

isca

lcul

ated

for

each

run

irres

pect

ive

ofm

axim

umde

pth.

2Ite

ms

extr

aov

erdr

ain

runs

irres

pect

ive

ofde

pth

orpi

pesiz

em

21

Brea

king

upha

rdsu

rface

pavi

ngs:

thic

knes

sst

ated

.2

Lifti

ngan

dpr

eser

ving

turf:

thic

knes

sst

ated

.

1Re

inst

atin

gto

mat

chex

istin

g:de

tails

stat

ed.

2Re

layi

ngtu

rfpr

evio

usly

set

asid

e.

1Th

em

easu

rem

ent

ofth

ese

extr

aov

erite

ms

shal

lbe

base

don

the

desig

ned

wid

thof

beds

inth

etr

ench

.In

the

abse

nce

ofa

bed

the

wid

thsh

allb

eca

lcul

ated

asth

eno

min

alsiz

eof

the

serv

ice

plus

300m

msu

bjec

tto

am

inim

umw

idth

of50

0mm

.

m3

3Br

eaki

ngou

tha

rdm

ater

ials.

4Ex

cava

ting

inan

dre

mov

ing

haza

rdou

sm

ater

ial.

5Ex

cava

ting

inru

nnin

gsil

t,ru

nnin

gsa

ndor

othe

run

stab

legr

ound

.6

Exca

vatin

gbe

low

grou

ndw

ater

leve

l.

1D

etai

lsst

ated

.2

Har

dm

ater

iali

san

ym

ater

ialw

hich

isof

such

asiz

e,po

sitio

nor

cons

isten

cyth

atit

can

only

bere

mov

edby

spec

ial

plan

tor

expl

osiv

es.

m7

Nex

tto

exist

ing

live

serv

ices

.1

Tobe

mea

sure

dw

here

prec

autio

nsar

esp

ecifi

cally

requ

ired.

The

met

hod

ofpr

otec

tion

isle

ftto

the

disc

retio

nof

the

cont

ract

or.

2If

indo

ubt

the

surv

eyor

mus

tm

easu

rean

item

givi

ngth

ena

ture

ofth

ese

rvic

e.

nr8

Aro

und

exist

ing

live

serv

ices

cros

sing

tren

ch.

34 DRAINAGE BELOW GROUND

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 231

Page 239: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

3Pi

pefit

tings

nr1

Dim

ensio

ned

desc

riptio

n.1

Type

stat

ed.

2M

etho

dof

join

ting

topi

pes.

1Pi

pefit

tings

incl

ude

bend

s,ju

nctio

ns,

insp

ectio

npi

pes,

rodd

ing

eyes

and

the

like.

4A

cces

sorie

snr

1A

cces

sorie

sin

clud

egu

llies,

trap

s,in

spec

tion

shoe

s,fre

shai

rin

lets

,no

n-re

turn

flaps

,val

ves,

rodd

ing

eyes

and

the

like

and

are

deem

edto

incl

ude

grat

ings

,cov

ers,

fram

es,b

aske

ts,

filte

rsan

dal

loth

erin

tegr

alan

dor

asso

ciat

edfit

tings

.2

The

list

isno

tex

haus

tive.

5Pu

mps

nr1

Size

and

capa

city

stat

ed.

1In

tegr

alco

ntro

ls.2

Rem

ote

cont

rols.

3In

dica

tors

.4

Supp

orts

.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

ckgr

ound

.

6M

anho

les

7In

spec

tion

cham

bers

8So

akaw

ays

9C

essp

its10

Sept

icta

nks,

11O

ther

tank

san

dpi

ts,t

ype

stat

ed

nr1

Det

aile

dde

scrip

tion

stat

ing

max

imum

inte

rnal

size

ofch

ambe

r.2

Dep

thfro

mto

psu

rface

ofco

ver

toin

vert

leve

lin

250

mm

stag

es.

3Pr

oprie

tary

syst

em,d

etai

lsst

ated

.

1Ba

sesla

bth

ickn

ess.

2W

allt

hick

ness

.3

Cov

ersla

bdi

men

sions

.4

Inte

rmed

iate

slab

dim

ensio

ns.

5Be

nchi

ngdi

men

sions

.6

Mai

nch

anne

ldia

met

eran

dco

nfig

urat

ion

7N

umbe

ran

ddi

amet

erof

bran

chch

anne

ls8

Inte

rnal

finish

.9

Exte

rnal

finish

.

1Si

zest

ated

isth

em

axim

umin

tern

alsiz

eof

the

cham

ber.

2Ro

cker

join

tsar

ede

emed

incl

uded

.3

Oth

erta

nks

and

pits

wou

ldin

clud

eca

tch

pits

,ser

vice

cham

bers

,sto

pcoc

kpi

tsan

dth

elik

e.

TABULATED WORK SECTIONS

232 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 240: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

12Ex

tra

over

the

exca

vatio

nfo

r:m

21

Brea

king

upha

rdsu

rface

pavi

ngs:

thic

knes

sst

ated

.2

Lifti

ngan

dpr

eser

ving

turf:

thic

knes

sst

ated

.

1M

akin

ggo

odar

ound

edge

sof

surfa

ces

isde

emed

incl

uded

.

m3

3Br

eaki

ngou

tha

rdm

ater

ials.

4Ex

cava

ting

inan

dre

mov

ing

haza

rdou

sm

ater

ial.

5Ex

cava

ting

inru

nnin

gsil

t,ru

nnin

gsa

ndor

othe

run

stab

legr

ound

.6

Exca

vatin

gbe

low

grou

ndw

ater

leve

l.

13Su

ndrie

snr

1D

etai

led

dim

ensio

ned

desc

riptio

n.1

Step

irons

.2

Inte

rcep

ting

trap

s.3

Back

drop

s.4

Any

othe

ras

soci

ated

item

:typ

est

ated

.

1Be

ddin

g,jo

intin

gan

dbu

ildin

gin

deem

edin

clud

ed.

2Th

ese

item

sm

aybe

incl

uded

with

thei

ras

soci

ated

man

hole

orch

ambe

rif

part

ofa

prop

rieta

rysy

stem

.

14C

over

san

dfr

ames

nr1

Dim

ensio

ned

desc

riptio

n.1

Man

ufac

ture

rsre

fere

nce.

1M

etho

dof

fixin

gfr

ame.

1Be

ddin

gco

vers

ingr

ease

isde

emed

incl

uded

.

15M

arke

rpo

sts

nr1

Dim

ensio

ned

desc

riptio

n.1

Iden

tific

atio

npl

ates

:det

ails

stat

ed.

1M

etho

dof

fixin

g:de

tails

stat

ed.

1Ex

cava

tion,

disp

osal

ofsp

oila

ndco

ncre

tefo

rba

sede

emed

incl

uded

.

16C

onne

ctio

nsite

m1

Det

ails

stat

ed.

17Te

stin

gan

dco

mm

issio

ning

item

1D

etai

led

desc

riptio

n.2

Type

ofte

stan

dst

anda

rdto

beac

hiev

ed.

1A

tten

danc

ere

quire

d.2

Inst

rum

ents

and

equi

pmen

tto

bepr

ovid

ed.

3Pr

epar

ator

yop

erat

ions

stat

ed.

4St

age

test

s(n

r)lis

ted.

1Pr

ovisi

onof

allf

uel,

pow

er,w

ater

and

othe

rsu

pplie

sis

deem

edin

clud

ed.

2Pr

ovisi

onof

test

cert

ifica

tes

isde

emed

incl

uded

.

34 DRAINAGE BELOW GROUND

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 233

Page 241: RICS new rules of measurement 2

35S

ite

wo

rks

Roa

dan

dpa

thpa

ving

sH

ard

land

scap

ing

Spor

tssu

rfac

ing

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

san

dse

ctio

ns.

2C

ompo

nent

deta

ils.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

y,sh

ape

and

size

ofm

ater

ials

and

com

pone

nts.

2Tr

eatm

ent

and

layo

utof

join

ts.

3N

atur

eof

base

.4

Prep

arat

ory

wor

k.5

Bedd

ing

and/

orm

etho

dsof

fixin

g.

Not

es,c

omm

ents

and

glos

sary

1U

nles

sst

ated

asde

emed

incl

uded

all

asso

ciat

edex

cava

tions

,disp

osal

san

dfil

lings

are

mea

sure

din

acco

rdan

cew

ithW

ork

Sect

ion

5:Ex

cava

ting

and

fillin

g.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sc

ope

and

loca

tion

ofth

ew

ork.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llw

ork

isde

emed

exte

rnal

unle

ssde

scrib

edas

inte

rnal

.2

Form

wor

kan

dal

loth

erte

mpo

rary

supp

ort.

3Fa

irjo

ints

.4

Fair

edge

s.5

Wor

king

over

and

arou

ndob

stru

ctio

nsan

din

tore

cess

esan

dsh

aped

inse

rts.

6Fo

rmin

gsh

allo

wch

anne

ls.7

Cut

ting.

8D

ispos

alof

surp

lus

exca

vate

dm

ater

ialo

ffsit

e.

1Th

ear

eas

mea

sure

dar

eth

ose

inco

ntac

tw

ithth

eba

se.

2N

ode

duct

ions

mad

ein

supe

rfici

alite

ms

for

void

s≤

1.00

m2.

3A

llth

ickn

ess

stat

edar

eno

min

alor

finish

edaf

ter

layi

ngan

dco

mpa

ctin

g.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Ke

rbs

2Ed

ging

s3

Cha

nnel

s4

Pavi

ngac

cess

orie

s

m1

Dim

ensio

ned

desc

riptio

n.1

Cur

ved:

radi

usst

ated

.1

Foun

datio

n:siz

ean

dde

tails

stat

ed.

2Re

info

rcem

ent:

deta

ilsst

ated

.3

Met

hod

offix

ing

orsu

ppor

t.

1Ex

cava

tion

and

disp

osal

isde

emed

incl

uded

.2

Ends

,ang

les,

outle

tsan

din

ters

ectio

nsde

emed

incl

uded

.3

Edgi

ngs

are

deem

edto

incl

ude

pegs

and

supp

orts

.

TABULATED WORK SECTIONS

234 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 242: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5Ex

tra

over

for:

nr1

Spec

ialu

nits

.2

Acc

esso

ries.

1D

imen

sione

dde

scrip

tion.

6In

-situ

conc

rete

7Fo

rmw

ork

8Re

info

rcem

ent

9Jo

ints

10W

orke

dfin

ishes

11A

cces

sorie

sca

stin

1A

llm

easu

red

inac

cord

ance

with

rule

sof

Wor

kSe

ctio

n11

:In

-situ

conc

rete

wor

ks.

12C

oate

dm

acad

aman

das

phal

tm

2

----

-m

1O

ver

300m

mw

ide:

thic

knes

sst

ated

.2

Not

exce

edin

g30

0mm

wid

e:th

ickn

ess

and

wid

thst

ated

.

1Ro

ads.

2Pa

ving

s.1

Leve

land

tofa

llson

ly.2

Tofa

llsan

dcr

ossf

alls

and

slope

s≤

15°

from

horiz

onta

l.3

Toslo

pes

>15

°fro

mho

rizon

tal.

4M

etho

dof

appl

icat

ion

5Su

rface

trea

tmen

tor

finish

.6

Spec

ialc

urin

gof

finish

edw

ork.

m3

Thic

knes

san

dgi

rth

onfa

cest

ated

.3

Lini

ngs

toch

anne

ls.7

Hor

izont

al.

8To

falls

.1

Arr

ises,

cove

s,en

ds,a

ngle

san

dou

tlets

deem

edin

clud

ed.

13G

rave

l,ho

ggin

and

woo

dchi

pm

2

----

-m

1O

ver

300m

mw

ide:

thic

knes

sst

ated

.2

Not

exce

edin

g30

0mm

wid

e:th

ickn

ess

and

wid

thst

ated

.

1Ro

ads.

2Pa

ving

s.1

Leve

land

tofa

llson

ly.2

Tofa

llsan

dcr

ossf

alls

and

slope

s≤

15°

from

horiz

onta

l.3

Toslo

pes

>15

°fro

mho

rizon

tal.

4M

etho

dof

appl

icat

ion.

5Su

rface

trea

tmen

tor

finish

.6

Spec

ialc

urin

gof

finish

edw

ork.

1Th

ear

eam

easu

red

isth

atin

cont

act

with

the

base

.

35 SITE WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 235

Page 243: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

14In

terlo

ckin

gbr

ick

and

bloc

ks,s

labs

,br

icks

,blo

cks,

sett

san

dco

bble

sm

2

----

-m

1O

ver

300m

mw

ide.

2N

otex

ceed

ing

300m

mw

ide:

thic

knes

san

dw

idth

stat

ed.

1Ro

ads.

2Pa

ving

s.3

Trea

ds.

4Ri

sers

.5

Mar

gins

orba

nds.

6C

hann

els.

1Be

ddin

g:th

ickn

ess

stat

ed.

2Le

vela

ndto

falls

only.

3To

falls

,cro

ssfa

llsan

dslo

pes

≤15

°fro

mho

rizon

tal.

4To

slope

s>

15°

from

horiz

onta

l.5

Laid

inba

ys:a

vera

gesiz

eof

bays

stat

ed.

6Jo

int

patt

ern

stat

ed.

7C

urve

d:ra

dius

stat

ed.

8Fo

unda

tion

and

haun

chin

g.

1Se

ttin

gpa

ving

sin

tore

cess

edm

anho

leco

vers

isde

emed

incl

uded

.2

All

cutt

ing

and

fittin

gis

deem

edin

clud

ed.

3Ex

cava

tion

and

disp

osal

isde

emed

incl

uded

.4

Ends

,ang

les,

outle

tsan

din

ters

ectio

nsde

emed

incl

uded

.

m3

Thic

knes

san

dgi

rth

onfa

cest

ated

.7

Lini

ngs

toch

anne

ls.9

Hor

izont

al.

10To

falls

.5

Arr

ises,

cove

s,en

ds,a

ngle

san

dou

tlets

deem

edin

clud

ed.

15Ex

tra

over

for:

nr1

Spec

ialu

nits

.2

Acc

esso

ries.

1D

imen

sione

dde

scrip

tion.

1Sp

ecia

luni

tsin

clud

egu

lley

surr

ound

s,ho

pper

san

dth

elik

e.

16A

cces

sorie

sm

21

Thic

knes

sst

ated

.1

Mem

bran

es.

m2

Dim

ensio

ned

desc

riptio

n.2

Mov

emen

tjo

ints

.3

Expa

nsio

njo

ints

.1

Join

tslo

cate

dat

the

disc

retio

nof

the

cont

ract

orar

eno

tm

easu

rabl

e.

17Si

tefu

rnitu

renr

1D

imen

sione

dde

scrip

tion.

2M

anuf

actu

rers

refe

renc

e.1

Tree

grille

s.2

Bolla

rds.

3Li

tter

bins

.4

Seat

s.5

Oth

er:t

ype

stat

ed.

1M

etho

dof

fixin

g.

18Li

quid

appl

ied

surfa

cing

s19

Shee

tsu

rfaci

ngs

20Tu

fted

surfa

cing

s21

Prop

rieta

ryco

lour

edsp

orts

surfa

cing

s22

Surfa

cedr

essin

gs

m2

1Th

ickn

ess

stat

ed.

1N

umbe

rof

coat

sor

laye

rs.

1Le

vela

ndto

falls

only.

2To

falls

and

cros

sfal

lsan

dslo

pes

≤15

°fro

mho

rizon

tal.

3To

slope

s>

15°

from

horiz

onta

l.4

Met

hod

ofap

plic

atio

nor

fixin

g.5

Surfa

cetr

eatm

ent

orfin

ish.

6Sp

ecia

lcur

ing

offin

ished

wor

k.7

Exte

ntof

laps

.8

Type

ofse

ams.

TABULATED WORK SECTIONS

236 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 244: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

23Li

nem

arki

ngs,

wid

thst

ated

m1

Wid

th≤

300m

m.

2W

idth

>30

0mm

:wid

thst

ated

.1

Stra

ight

,con

tinuo

us.

2St

raig

ht,b

roke

n.3

Cur

ved,

cont

inuo

us:r

adiu

sst

ated

.4

Cur

ved,

brok

en:r

adiu

sst

ated

.

1N

umbe

rof

coat

s.2

Met

hod

ofap

plic

atio

n.3

Trea

tmen

tap

plie

dbe

twee

nco

ats.

4C

olou

r.

24Le

tter

s,fig

ures

and

sym

bols

nr1

Dim

ensio

ned

desc

riptio

n.

25Sh

eet

linin

gsto

pool

s,la

kes,

pond

s,w

ater

way

san

dth

elik

em m

2

1W

idth

≤50

0mm

2W

idth

>50

0mm

1H

orizo

ntal

.2

Slop

ing,

slope

stat

ed.

3C

urve

d,ra

dius

stat

ed.

4Ve

rtic

al.

1U

nder

lays

.1

The

area

mea

sure

dis

net

and

isth

atin

cont

act

with

base

.2

No

dedu

ctio

nis

mad

efo

rvo

ids

≤1.

00m

2.

3N

oal

low

ance

ism

ade

for

laps

and

the

like.

4A

llot

her

requ

irem

ents

ofW

ork

Sect

ion

19:W

ater

proo

fing

will

appl

yto

the

mea

sure

men

tof

this

wor

k.

26Sp

otite

ms

nr1

Dim

ensio

ned

diag

ram

.or

2D

imen

sione

dde

scrip

tion.

1Su

mps

.2

Out

lets

.3

Col

lars

orsle

eves

.4

Oth

er,t

ype

stat

ed.

1Sp

otite

mw

ork

isde

emed

toin

clud

ejo

ints

,dre

ssin

gan

dbo

ndin

gto

surr

ound

ing

wor

k,un

derc

loak

san

dot

her

asso

ciat

edlin

ings

,end

s,an

gles

,be

ddin

g,po

intin

g,fix

ings

and

the

like.

35 SITE WORKS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 237

Page 245: RICS new rules of measurement 2

36Fe

ncin

g

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

san

dse

ctio

ns.

2C

ompo

nent

deta

ils.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

ndan

dqu

ality

ofm

ater

ials.

2M

etho

dof

cons

truc

tion.

3Su

rface

trea

tmen

tsor

finish

esap

plie

das

part

ofth

em

anuf

actu

ring

proc

ess

orap

plie

dbe

fore

deliv

ery

tosit

e.4

Nat

ure

and

size

ofba

ckfil

ling.

Not

es,c

omm

ents

and

glos

sary

1U

nles

sst

ated

asde

emed

incl

uded

all

asso

ciat

edex

cava

tions

,disp

osal

san

dfil

lings

are

mea

sure

din

acco

rdan

cew

ithW

ork

Sect

ion

5:Ex

cava

ting

and

fillin

g.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sc

ope

and

loca

tion

ofth

ew

ork.

2Lo

catio

nof

fenc

ing

desig

ned

for

slopi

nggr

ound

.3

Pre-

cont

ract

grou

ndw

ater

leve

l(s)

and

date

(s)

esta

blish

ed.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llex

cava

tions

,bac

kfilli

ngan

ddi

spos

alof

fsit

eof

surp

lus

mat

eria

ls.2

Eart

hwor

ksu

ppor

t.3

Disp

osal

ofgr

ound

and

surfa

cew

ater

.4

in-s

ituco

ncre

tefo

rpo

stba

ses

and

the

like

5Te

mpo

rary

supp

orts

.6

Form

wor

k.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Fe

ncin

g,ty

pest

ated

m1

Hei

ght

offe

nce.

1Sp

acin

g,he

ight

and

dept

hof

supp

orts

.1

Set

tocu

rve

but

stra

ight

betw

een

post

s.2

Cur

ved:

radi

usst

ated

.3

Gro

und

slopi

ng>

15°

from

horiz

onta

l.4

Leng

ths

≤3m

.

1Fe

ncin

gis

mea

sure

dov

eral

lsup

port

s.2

The

heig

htof

fenc

ing

ism

easu

red

from

the

finish

edsu

rface

ofth

egr

ound

toth

eto

pof

the

infil

ling,

orw

here

ther

eis

noin

fillin

g,to

the

top

wire

orra

ilun

less

othe

rwise

stat

ed.

TABULATED WORK SECTIONS

238 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 246: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1[F

encin

g,ty

pest

ated

—co

nt.]

1Sp

acin

g,he

ight

and

dept

hof

supp

orts

.1

Set

tocu

rve

but

stra

ight

betw

een

post

s.2

Cur

ved:

radi

usst

ated

.3

Gro

und

slopi

ng>

15°

from

horiz

onta

l.4

Leng

ths

≤3m

.

3Su

ppor

tsar

epo

sts,

stru

tsor

the

like

occu

rrin

gat

regu

lar

inte

rval

s.4

Cur

ved

fenc

ing

isfe

ncin

gcu

rved

betw

een

supp

orts

.5

The

dept

hof

supp

orts

and

spec

ial

supp

orts

isth

ede

pth

belo

wth

egr

ound

surfa

ceor

othe

rst

ated

base

.6

The

heig

htof

supp

orts

and

spec

ial

supp

orts

isth

ehe

ight

abov

eth

egr

ound

surfa

ceor

othe

rst

ated

base

.

2Ex

tra

over

for

spec

ials

uppo

rts

nr1

Size

,hei

ght

and

dept

hst

ated

.1

End

post

.2

Ang

leor

corn

erpo

st.

3In

tegr

alga

tepo

st.

4St

rain

ing

post

.5

Oth

er:t

ype

stat

ed.

1M

etho

dof

fixin

g.2

Back

grou

ndst

ated

.3

Det

ails

ofba

ckst

ays

orst

ruts

stat

ed.

1In

tegr

alan

din

depe

nden

tga

tepo

sts

are

deem

edto

incl

ude

slam

min

gst

ops

and

hang

ing

pins

orfil

lets

.

3In

depe

nden

tga

tepo

sts

nr

4Ite

ms

extr

aov

erfe

ncin

g,su

ppor

tsan

dsp

ecia

lsup

port

san

din

depe

nden

tga

tepo

sts

irres

pect

ive

ofty

pe

m3

1Ex

cava

ting

belo

wgr

ound

wat

erle

vel.

2Ex

cava

ting

inha

zard

ous

mat

eria

l:de

tails

stat

ed.

1If

the

post

-con

trac

tgr

ound

wat

erle

vel

diffe

rsfro

mth

epr

e-co

ntra

ctgr

ound

wat

erle

velt

hen

the

mea

sure

men

tsar

ead

just

edac

cord

ingl

y.

m3

m2

3Br

eaki

ngou

tex

istin

g.4

Brea

king

upex

istin

gha

rdpa

ving

s:th

ickn

ess

stat

ed.

1Ro

ck.

2C

oncr

ete.

3Re

info

rced

conc

rete

.4

Bric

kwor

k,bl

ockw

ork

orst

onew

ork.

5Ta

rmac

adam

oras

phal

t.

1Ro

ckis

any

hard

mat

eria

lwhi

chis

ofsu

chsiz

eor

loca

tion

that

itca

non

lybe

rem

oved

byth

eus

eof

wed

ges,

rock

ham

mer

s,sp

ecia

lpla

ntor

expl

osiv

es.

2A

boul

der

≤5m

3in

volu

me

oron

eth

atca

nbe

lifte

dou

tin

the

buck

etof

anex

cava

tor

will

not

cons

titut

ero

ck.

3D

egra

ded

orfr

iabl

ero

ckth

atca

nbe

scra

ped

out

byth

eex

cava

tor

buck

etdo

esno

tco

nstit

ute

rock

.4

Mak

ing

good

exist

ing

hard

pavi

ngs

isde

emed

incl

uded

.

36 FENCING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 239

Page 247: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5G

ates

nr1

Hei

ght

and

wid

thst

ated

.1

Type

stat

ed.

1Po

wer

supp

ly1

Gat

esar

ede

emed

toin

clud

est

ops,

catc

hes,

inde

pend

ent

stay

s,so

unde

rs,

war

ning

light

san

dal

lass

ocia

ted

wor

k.

6Iro

nmon

gery

nr1

Type

ofite

m,u

nit

orse

tst

ated

.1

Kind

and

qual

ityof

mat

eria

lsan

dfix

ings

.2

Surfa

cefin

ish.

3C

onst

ituen

tpa

rts

ofth

eun

itsor

sets

.

1M

etho

dof

fixin

g.2

Nat

ure

ofba

se.

1Iro

nmon

gery

isde

emed

toin

clud

efix

ing

with

scre

ws

orbo

ltsto

mat

chan

dpr

epar

ing

the

base

tore

ceiv

eit.

TABULATED WORK SECTIONS

240 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 248: RICS new rules of measurement 2

37S

oft

land

scap

ing

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Site

plan

san

dse

ctio

ns.

2C

ompo

nent

deta

ils.

3Pl

antin

gsc

hedu

le.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

y,siz

ean

dco

mpo

sitio

nof

mat

eria

ls.2

Prep

arat

ory

wor

k.3

Tim

ing

ofop

erat

ions

.4

Size

and

type

ofpi

ts,h

oles

and

tren

ches

,eith

erex

cava

ted

orfo

rmed

.5

Type

sof

supp

orts

and

ties.

6Sp

ecia

lfilli

ngm

ater

ials.

7M

etho

dof

labe

lling.

8W

ork

onro

ofs

and

the

like

stat

ed.

Not

es,c

omm

ents

and

glos

sary

1U

nles

sst

ated

asde

emed

incl

uded

all

asso

ciat

edex

cava

tions

,disp

osal

san

dfil

lings

are

mea

sure

din

acco

rdan

cew

ithW

ork

Sect

ion

5:Ex

cava

ting

and

fillin

g.

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1Sc

ope

and

loca

tion

ofth

ew

ork.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llw

ork

isde

emed

exte

rnal

unle

ssde

scrib

edas

inte

rnal

.2

All

exca

vatio

nsan

dba

ckfil

ling.

3A

llne

cess

ary

mul

tiple

hand

ling

ofex

cava

ted

mat

eria

l.4

Disp

osal

ofsu

rplu

sex

cava

ted

mat

eria

loff

site.

5Re

mov

alof

ston

esan

dru

bbish

.6

Wat

erin

g.7

Labe

lling.

1Th

ear

eas

mea

sure

dar

eth

ose

inco

ntac

tw

ithth

eba

se.

2N

ode

duct

ions

mad

ein

supe

rfici

alite

ms

for

void

s≤

1.00

m2.

3A

llth

ickn

ess

stat

edar

eno

min

alor

finish

edaf

ter

layi

ngan

dco

mpa

ctin

g.

37 SOFT LANDSCAPING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 241

Page 249: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1C

ultiv

atin

gm

21

Dep

thst

ated

.1

Met

hod

and

degr

eeof

tilth

.

2Su

rface

appl

icat

ions

m2

1Ty

pean

dra

test

ated

.2

Met

hod

ofap

plic

atio

nst

ate.

1H

erbi

cide

s.2

Wee

dkille

rs.

3Pe

at.

4M

anur

e.5

Com

post

.6

Mul

ch.

7Fe

rtilis

er.

8Sa

nd.

9So

ilam

elio

rate

s.10

Oth

er:d

etai

lsst

ated

.

1Be

fore

sow

ing

orpl

antin

g.2

Afte

rpl

antin

g.3

Aro

und

indi

vidu

alpl

ants

.4

Toge

nera

lare

as.

5To

beds

.6

Topl

ante

rs.

7To

pots

.

1W

orki

ngin

isde

emed

incl

uded

.

3Se

edin

gm

21

Rate

stat

ed.

1G

rass

seed

.2

Cul

tivat

edpl

ant

seed

.3

Wild

flow

erse

ed.

4O

ther

:typ

est

ated

.

1Ra

king

in,h

arro

win

gan

dro

lling

isde

emed

incl

uded

.

4Tu

rfing

m2

----

-m

1Ty

pean

dth

ickn

ess

stat

ed.

----

----

----

----

----

--2

Type

,wid

than

dth

ickn

ess

stat

ed.

1C

uttin

gis

deem

edto

incl

ude

trim

min

ged

ges.

TABULATED WORK SECTIONS

242 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 250: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5Tr

ees

nr1

Bota

nica

lnam

e.1

BSsiz

ede

signa

tion

and

root

syst

emst

ated

.2

Gir

th,h

eigh

tan

dcl

ear

stem

and

root

syst

emst

ated

.

1Pl

antin

gin

culti

vate

dor

gras

sed

area

spr

epar

edby

othe

rsto

best

ated

incl

udin

gal

lnec

essa

ryre

inst

atem

ent.

2Pl

antin

gin

door

sto

best

ated

.3

Det

ails

ofin

itial

cut

back

stat

ed.

4D

etai

lsof

wat

erin

gst

ated

.5

Back

fillt

ype

stat

edif

not

the

mat

eria

laris

ing

from

exca

vatio

ns.

1Su

ppor

tsan

dtie

sde

emed

incl

uded

.2

BSsiz

ein

clud

est

anda

rd,a

dvan

ced

nurs

ery

stoc

kor

sem

i-mat

ure

type

s.3

Youn

gnu

rser

yst

ock

incl

udes

seed

lings

,tr

ansp

lant

san

dw

hips

.

6Yo

ung

nurs

ery

stoc

ktr

ees

nr3

Hei

ght

and

root

syst

emst

ated

.

7Sh

rubs

nr

8H

edge

plan

tsnr --

---

m

4H

eigh

tst

ated

.--

----

----

----

----

----

5H

eigh

t,sp

acin

g,nu

mbe

rof

row

san

dla

yout

stat

ed.

9Pl

ants

nr ----

-m

2

6Si

zest

ated

.--

----

----

----

----

----

7Si

zean

dnu

mbe

rpe

rm

2st

ated

.

10Bu

lbs,

corm

san

dtu

bers

nr ----

-m

2

8Si

zest

ated

.--

----

----

----

----

----

9Si

zean

dw

eigh

tpe

rm

2st

ated

.

11Pl

ant

cont

aine

rsnr

1D

imen

sione

dde

scrip

tion.

1Li

ning

s:ty

pest

ated

.1

Met

hod

offix

ing.

37 SOFT LANDSCAPING

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 243

Page 251: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

12Pr

otec

tion

m1

Tem

pora

ryfe

ncin

g:ty

pean

ddu

ratio

nst

ated

.1

Ulti

mat

eow

ners

hip:

deta

ilsst

ated

.1

Perm

anen

tfe

ncin

gis

mea

sure

din

acco

rdan

cew

ithth

eru

les

ofW

ork

Sect

ion

36:F

enci

ng.

nr2

Tree

guar

ds,d

imen

sione

dde

scrip

tion.

2Ty

pest

ated

.1

Met

hod

offix

ing

stat

ed.

nr3

Wra

ppin

gs:h

eigh

tof

wra

ppin

gan

dgi

rth

oftr

eest

ated

.3

Che

mic

alap

plic

atio

nst

ated

.2

Met

hod

offix

ing

stat

ed.

nr4

Ant

i-des

icca

ntsp

rays

,hei

ght

and

girt

hof

tree

orsp

read

ofpl

ant

stat

ed.

4Ty

pest

ated

.3

Rate

ofsp

ray

stat

ed.

item

5G

ener

al:d

etai

lsst

ated

.5

Dur

atio

n.

13M

aint

enan

ceite

m1

Det

ails

stat

ed.

TABULATED WORK SECTIONS

244 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 252: RICS new rules of measurement 2

38M

echa

nica

lse

rvic

es

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Floo

ran

dsit

epl

ans

deta

iling

layo

utof

syst

ems.

2Sy

stem

sche

mat

ics.

3C

ross

sect

ions

and

elev

atio

ns.

4D

etai

llay

outs

for

plan

troo

ms

and

prin

cipa

lser

vice

sin

stal

latio

nar

eas.

5Sp

ecifi

cin

stal

latio

nde

tails

for

equi

pmen

tan

dfit

tings

.6

Equi

pmen

tsc

hedu

les.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ty

pe,q

ualit

yan

dsiz

eor

thic

knes

sof

mat

eria

ls.2

Met

hod

offix

ing.

3Lo

catio

n.4

Whe

reth

em

anda

tory

info

rmat

ion

isav

aila

ble,

mea

sure

men

tof

pipe

wor

kan

d/or

duct

wor

kw

illbe

fully

deta

iled

with

the

mea

sure

men

tof

fittin

gsid

entif

ied

and

mea

sure

dse

para

tely,

inac

cord

ance

with

Alte

rnat

ive

1.H

owev

er,w

here

the

man

dato

ryin

form

atio

nis

not

avai

labl

eth

enpi

pew

ork/

duct

wor

kan

das

soci

ated

insu

latio

nan

dfir

epr

otec

tion

isto

bem

easu

red

incl

usiv

eof

fittin

gs.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llw

ork

isde

emed

inte

rnal

unle

ssst

ated

asex

tern

al.

2A

llw

aste

.3

Extr

am

ater

ialf

orla

bour

mad

efit

tings

.4

All

coup

lings

,bra

cket

s,su

ppor

ts,f

ixin

gsan

dca

stin

chan

nels.

5A

llla

bellin

g,ta

ggin

g,id

entif

icat

ion

and

char

ts.

6M

arki

ngof

allh

oles

chas

esan

dm

ortic

es.

7Ea

rth

conn

ecto

rs,s

trap

san

dlin

ks.

38 MECHANICAL SERVICES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 245

Page 253: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

imar

yeq

uipm

ent

nr1

Syst

em1

Loca

tion

ofin

stal

latio

n–

Roof

s,hi

ghor

low

leve

lin

plan

troo

ms,

riser

sor

serv

ice

duct

s,hi

ghor

low

leve

lon

floor

s.

1Ty

pe,s

ize,c

apac

ity,l

oad,

ratin

g,sp

ecia

lfin

ishes

,cas

ings

,in-

fills,

asso

ciat

edin

tegr

ated

orre

mot

ean

cilla

ries,

cont

rols,

indi

cato

rsor

com

pone

nts,

anti-

vibr

atio

nm

ount

ings

,ac

oust

icpe

rform

ance

/tre

atm

ent

and

met

hod

offix

ing.

1Pr

imar

yeq

uipm

ent

isde

fined

aspl

ant

oreq

uipm

ent

from

whi

cha

syst

emor

igin

ates

,e.g

.boi

ler,

mai

nst

orag

eta

nk,

air

hand

ling

unit,

fan

and

the

like.

2C

ross

refe

renc

edto

draw

ings

and/

ora

full

spec

ifica

tion.

3H

igh

and

low

leve

lto

bein

acco

rdan

cew

ithN

atio

nalH

ealth

and

Safe

tyre

com

men

datio

nsan

dN

atio

nal

Wor

king

Rule

Agr

eem

ents

.

nr2

Off-

load

and

posit

ion

prim

ary

equi

pmen

t.

nr3

Ass

embl

yof

com

posit

eite

ms

ofpr

imar

yeq

uipm

ent.

2Te

rmin

aleq

uipm

ent

and

fittin

gsnr

1Sy

stem

.1

Loca

tion

ofin

stal

latio

n–

roof

s,hi

ghor

low

leve

lin

plan

troo

ms,

riser

sor

serv

ice

duct

s,hi

ghor

low

leve

lon

floor

s.

1Ty

pe,s

ize,c

apac

ity,l

oad,

ratin

g,sp

ecia

lfin

ishes

,cas

ings

,in-

fills,

asso

ciat

edin

tegr

ated

orre

mot

ean

cilla

ries,

cont

rols,

indi

cato

rsor

com

pone

nts,

anti-

vibr

atio

nm

ount

ings

,ac

oust

icpe

rform

ance

/tre

atm

ent

and

met

hod

offix

ing.

1Te

rmin

aleq

uipm

ent

and

fittin

gsar

ede

fined

asan

yite

mto

whi

cha

syst

emis

dist

ribut

edto

,e.g

.hea

tem

itter

s,gr

illes,

fan

coil

units

and

the

like.

3Pi

pew

ork

m1

Mat

eria

l,fin

ish,n

omin

aldi

amet

er,m

etho

dof

join

ting,

fixin

gsan

dba

ckgr

ound

for

fixin

g.

1Lo

catio

nof

inst

alla

tion

–Ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

1G

ener

ally

allp

ipew

ork

tobe

mea

sure

din

clus

ive

ofal

lfitt

ings

,i.e

.uni

ons,

conn

ecto

rs,f

lang

es,b

ends

,tee

s,ju

nctio

ns,r

educ

ers,

test

poin

ts,b

osse

s,so

cket

s,ta

ppin

gsan

dth

elik

e.

1U

nles

sm

easu

red

sepa

rate

ly,al

lfit

tings

are

deem

edto

bein

clud

ed.

TABULATED WORK SECTIONS

246 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 254: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

4A

ltern

ativ

e1

–pi

pefit

tings

nr1

Type

,mat

eria

l,fin

ish,n

omin

aldi

amet

er,m

etho

dof

join

ting.

1U

nion

s,co

nnec

tors

,fla

nges

,ben

ds,t

ees,

sets

,jun

ctio

ns,r

educ

ers,

test

poin

ts,

boss

es,s

ocke

ts,t

appi

ngs

and

the

like.

5Pi

pean

cilla

ries

nr1

Type

,mat

eria

l,fin

ish,n

omin

aldi

amet

er,m

etho

dof

join

ting.

1Va

lves

,str

aine

rs,e

xpan

sion

bello

ws,

anch

ors,

guid

esan

dro

llers

,gul

lies,

outle

ts,r

ainw

ater

head

s,tu

ndish

es,

trap

s,pi

pesle

eves

,wal

l,flo

oran

dce

iling

plat

esan

dth

elik

e.

6Ve

ntila

tion

duct

s1

Mat

eria

l,fin

ish,s

ectio

nsh

ape,

dim

ensio

ns,m

etho

dof

join

ting,

fixin

gsan

dba

ckgr

ound

for

fixin

g.

1Lo

catio

nof

inst

alla

tion

–ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors.

1G

ener

ally

alld

uctw

ork

tobe

mea

sure

din

clus

ive

ofal

lfitt

ings

,i.e

.con

nect

ors,

flang

es,b

ends

,tee

s,ju

nctio

ns,r

educ

ers,

spig

ots,

test

hole

san

dth

elik

e.

1U

nles

sm

easu

red

sepa

rate

ly,al

lfit

tings

are

deem

edto

bein

clud

ed.

7A

ltern

ativ

e1

–du

ctfit

tings

nr1

Type

,mat

eria

l,fin

ish,s

hape

,di

men

sions

,met

hod

ofjo

intin

g.1

Join

ts,f

lang

es,b

ends

,tee

s,se

ts,

junc

tions

,red

ucer

s,sp

igot

s,te

stho

les

and

the

like.

8D

uct

anci

llarie

snr

1Ty

pe,m

ater

ial,

finish

,sha

pe,

dim

ensio

ns,m

etho

dof

join

ting.

1D

ampe

rs,i

n-du

cthe

ater

/coo

ling

coils

.

9In

sula

tion

and

fire

prot

ectio

nnr

1Ty

pe,m

ater

ial,

finish

1Lo

catio

nof

inst

alla

tion

–ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

1To

equi

pmen

tan

dfit

tings

.

m2

Thic

knes

s,m

ater

ial,

finish

,no

min

aldi

amet

erof

pipe

.1

Topi

pew

ork.

1G

ener

ally

alli

nsul

atio

nto

pipe

wor

kto

bem

easu

red

incl

usiv

eof

allf

ittin

gs,i

.e.

unio

ns,c

onne

ctor

s,fla

nges

,ben

ds,t

ees,

sets

,jun

ctio

ns,r

educ

ers,

test

poin

ts,

boss

es,s

ocke

ts,t

appi

ngs

and

the

like.

38 MECHANICAL SERVICES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 247

Page 255: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

9In

sula

tion

and

fire

prot

ectio

n—co

nt.

1U

nles

sm

easu

red

sepa

rate

ly,al

lfit

tings

are

deem

edto

bein

clud

ed.

10A

ltern

ativ

e1

–In

sula

tion

and

fire

prot

ectio

nto

pipe

fittin

gsnr

1Ty

pe,m

ater

ial,

finish

,nom

inal

diam

eter

,met

hod

ofjo

intin

g.1

Uni

ons,

conn

ecto

rs,f

lang

es,b

ends

,tee

s,se

ts,j

unct

ions

.red

ucer

s,te

stpo

ints

,bo

sses

,soc

kets

,tap

ping

san

dth

elik

e.

11In

sula

tion

and

fire

prot

ectio

nto

pipe

anci

llarie

snr

1Ty

pe,m

ater

ial,

finish

,nom

inal

diam

eter

,met

hod

ofjo

intin

g.1

Valv

es,s

trai

ners

,exp

ansio

nbe

llow

s,gu

llies,

outle

ts,t

undi

shes

,tra

ps,p

ipe

sleev

es,a

ndth

elik

e.

12In

sula

tion

and

fire

prot

ectio

nto

vent

ilatio

ndu

cts

m2

1Th

ickn

ess,

mat

eria

l,fin

ish,d

uct

dim

ensio

ns.

1Lo

catio

nof

inst

alla

tion

–Ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

1G

ener

ally

alli

nsul

atio

nto

duct

wor

kto

bem

easu

red

incl

usiv

eof

allf

ittin

gs,i

.e.

conn

ecto

rs,f

lang

es,b

ends

,tee

s,se

ts,

junc

tions

,red

ucer

s,sp

igot

s,te

stho

les

and

the

like,

onth

eex

tern

algi

rth

ofth

edu

ctto

bein

sula

ted.

1U

nles

sm

easu

red

sepa

rate

ly,in

sula

tion

and

fire

prot

ectio

nto

allf

ittin

gsis

deem

edto

bein

clud

ed.

13A

ltern

ativ

e1

–In

sula

tion

and

fire

prot

ectio

nto

duct

fittin

gs1

Type

,mat

eria

l,fin

ish,n

omin

aldi

amet

er,m

etho

dof

join

ting.

1Jo

ints

,fla

nges

,ben

ds,t

ees,

sets

,ju

nctio

ns,r

educ

ers,

spig

ots,

test

hole

san

dth

elik

e.

14In

sula

tion

and

fire

prot

ectio

nto

equi

pmen

tm

21

Thic

knes

s,m

ater

ial,

finish

,no

min

alar

ea,p

erfo

rman

cera

ting.

1In

sula

tion

toeq

uipm

ent

mea

sure

dse

para

tely

whe

reno

tgi

ven

inth

ede

scrip

tion

ofth

eite

ms

tow

hich

itre

late

s.

TABULATED WORK SECTIONS

248 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 256: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

15Fi

rest

oppi

ngnr

1M

ater

ial,

loca

tion,

size

ofop

enin

gto

best

oppe

d,siz

eof

serv

ice

stop

ping

tobe

inst

alle

dar

ound

,dep

than

dfir

era

ting.

16Id

entif

icat

ion

item

1Pl

ates

.2

Disc

s.3

Labe

ls.4

Tape

s.5

Sym

bols

ornu

mbe

rs.

6Ba

nds.

7C

hart

sor

diag

ram

s.8

Oth

er:t

ype

stat

ed.

17Te

stin

gite

m1

Toin

clud

ech

emic

altr

eatm

ent,

purg

ing,

ster

ilisat

ion,

pres

sure

test

ing.

18C

omm

issio

ning

item

1To

incl

ude

allf

inal

bala

ncin

g,ca

libra

tion

and

sett

ing

tow

ork.

19Sy

stem

valid

atio

nite

m

20O

pera

tion

and

mai

nten

ance

man

uals

item

21D

raw

ing

prep

arat

ion

item

1C

lass

ifica

tion

ofdr

awin

gs.

1In

stal

latio

n,co

-ord

inat

ion,

asin

stal

led,

and

reco

rddr

awin

gs.

22Tr

aini

ngite

m

23Lo

ose

anci

llarie

site

m1

Keys

,too

ls,sp

ares

,che

mic

als

and

the

like.

24Po

st-c

ompl

etio

nse

rvic

esite

m1

Mai

nten

ance

,adj

ustm

ents

,se

rvic

ing

and

the

like.

1Se

egl

ossa

ryof

term

sfo

rde

finiti

onof

com

plet

ion.

38 MECHANICAL SERVICES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 249

Page 257: RICS new rules of measurement 2

39E

lect

rica

lse

rvic

es

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Floo

ran

dsit

epl

ans

deta

iling

layo

utof

syst

ems.

2Sy

stem

sche

mat

ics.

3C

ross

sect

ions

and

elev

atio

ns.

4D

etai

llay

outs

for

plan

troo

ms

and

prin

cipa

lser

vice

sin

stal

latio

nar

eas.

5Sp

ecifi

cin

stal

latio

nde

tails

for

equi

pmen

tan

dfit

tings

.6

Equi

pmen

tsc

hedu

les.

Man

dato

ryin

form

atio

nto

bepr

ovid

ed.

1Ki

nd,q

ualit

yan

dsiz

eor

thic

knes

sof

mat

eria

ls.2

Met

hod

offix

ing.

3Lo

catio

n.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

Wor

ksan

dm

ater

ials

deem

edin

clud

ed.

1A

llw

ork

isde

emed

inte

rnal

unle

ssst

ated

asex

tern

al.

2A

llw

aste

.3

Extr

am

ater

ialf

orla

bour

mad

efit

tings

.4

All

brac

kets

,sup

port

s,fix

ings

and

cast

inch

anne

ls.5

All

labe

lling,

tagg

ing,

iden

tific

atio

nan

dch

arts

.6

Mar

king

ofal

lhol

esch

ases

and

mor

tices

.7

Eart

hco

nnec

tors

,str

aps

and

links

.

1W

here

the

man

dato

ryin

form

atio

nis

avai

labl

e,m

easu

rem

ent

ofca

ble

cont

ainm

ent

and

busb

ars

will

befu

llyde

taile

dw

ithth

em

easu

rem

ent

offit

tings

iden

tifie

dan

dm

easu

red

sepa

rate

ly,in

acco

rdan

cew

ithA

ltern

ativ

e1.

How

ever

,whe

reth

em

anda

tory

info

rmat

ion

isno

tav

aila

ble

then

cabl

eco

ntai

nmen

tan

dbu

sbar

sar

eto

bem

easu

red

incl

usiv

eof

fittin

gs.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

imar

yeq

uipm

ent

nr1

Syst

em.

1Lo

catio

nof

inst

alla

tion

–ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors.

1Ty

pe,s

ize,c

apac

ity,l

oad,

ratin

g,as

soci

ated

inte

grat

edor

rem

ote

anci

llarie

s,co

ntro

ls,in

dica

tors

orco

mpo

nent

san

dm

etho

dof

fixin

g.

1Pr

imar

yeq

uipm

ent

isde

fined

aspl

ant

oreq

uipm

ent

from

whi

cha

syst

emor

igin

ates

,e.g

.mai

nsw

itch

boar

d,m

ain

cont

rolb

oxan

dth

elik

e.2

Hig

han

dlo

wle

velt

obe

inac

cord

ance

with

Nat

iona

lHea

lthan

dSa

fety

reco

mm

enda

tions

and

Nat

iona

lW

orki

ngRu

leA

gree

men

ts.

TABULATED WORK SECTIONS

250 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 258: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Pr

imar

yeq

uipm

ent—

cont

.nr

2O

ff-lo

adan

dpo

sitio

npr

imar

yeq

uipm

ent.

nr3

Ass

embl

yof

com

posit

eite

ms

ofpr

imar

yeq

uipm

ent.

2Te

rmin

aleq

uipm

ent

and

Fitt

ings

nr1

Syst

em.

1Ty

pe,s

ize,c

apac

ity,l

oad,

ratin

g,sp

ecia

lfin

ishes

,cas

ings

,in-

fills,

asso

ciat

edin

tegr

ated

orre

mot

ean

cilla

ries,

cont

rols,

indi

cato

rsor

com

pone

nts

and

met

hod

offix

ing.

1Lo

catio

nof

inst

alla

tion

–Ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors.

1Te

rmin

aleq

uipm

ent

and

fittin

gsar

ede

fined

asan

yite

mto

whi

cha

syst

emis

dist

ribut

edto

,e.g

.lum

inai

res,

switc

hes,

actu

ator

san

dth

elik

e.

3C

able

cont

ainm

ent

m1

Type

,mat

eria

l,fin

ish,s

ectio

nsh

ape,

dim

ensio

ns,n

umbe

rof

com

part

men

ts,m

etho

dof

join

ting,

fixin

gsan

dba

ckgr

ound

for

fixin

g.

1Lo

catio

nof

inst

alla

tion

–ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

1G

ener

ally

allc

able

cont

ainm

ent

tobe

mea

sure

din

clus

ive

ofal

lfitt

ings

,i.e

.jo

int

boxe

s,co

nnec

tors

,fla

nges

,ben

ds,

tees

,jun

ctio

ns,r

educ

ers,

spig

ots,

fire

barr

iers

and

the

like.

Unl

ess

mea

sure

dse

para

tely,

all

fittin

gsar

ede

emed

tobe

incl

uded

.

4A

ltern

ativ

e1

–ca

ble

cont

ainm

ent

fittin

gsnr

1Ty

pe,m

ater

ial,

finish

,sha

pe,

dim

ensio

ns,m

etho

dof

join

ting.

1Jo

int

boxe

s,co

nnec

tors

,fla

nges

,ben

ds,

tees

,set

s,ju

nctio

ns,r

educ

ers,

spig

ots,

fire

barr

iers

and

the

like.

5C

able

sm

1Ty

pe,r

atin

g,siz

e,nu

mbe

rof

core

s,m

ater

ial,

arm

ourin

g,sh

eath

ing,

met

hod

ofjo

intin

g,fix

ings

and

back

grou

ndfo

rfix

ing.

1Lo

catio

nof

inst

alla

tion

–ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

39 ELECTRICAL SERVICES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 251

Page 259: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

6C

able

term

inat

ions

and

join

tsnr

1Ty

pe,r

atin

g,siz

e,nu

mbe

rof

core

s,m

ater

ial,

arm

ourin

g,sh

eath

ing.

1In

clud

esal

lpot

s,se

als,

glan

ds,l

ugs,

conn

ecto

rbl

ocks

and

shro

uds.

7Fi

nalc

ircui

tsnr

1C

able

type

,rat

ing,

size,

mat

eria

l,sh

eath

ing,

num

ber

and

type

ofpo

ints

.

1Lo

catio

nof

inst

alla

tion

–ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors.

1In

clud

esal

lcon

tain

men

tno

tm

easu

red

sepa

rate

ly,ju

nctio

nbo

xes,

term

inat

ions

,po

ts,s

eals,

glan

ds,l

ugs,

conn

ecto

rbl

ocks

and

shro

uds.

2In

clud

esfix

ing

cont

ainm

ent

orca

bles

inch

ases

,sur

face

orsu

spen

ded

from

soffi

ts.

8M

odul

arw

iring

syst

ems

nr1

Cab

lety

pe,r

atin

g,siz

e,m

ater

ial,

shea

thin

g,nu

mbe

ran

dty

peof

poin

ts.

1In

clud

esal

lcon

tain

men

tno

tm

easu

red

sepa

rate

ly,ju

nctio

nbo

xes,

term

inat

ions

,po

ts,s

eals,

glan

ds,l

ugs,

conn

ecto

rbl

ocks

and

shro

uds.

2In

clud

esfix

ing

cont

ainm

ent

orca

bles

inch

ases

,sur

face

orsu

spen

ded

from

soffi

ts.

9Bu

sbar

m1

Type

,rat

ing,

mat

eria

l,nu

mbe

rof

bars

,met

hod

ofjo

intin

g,fix

ings

and

back

grou

ndfo

rfix

ing.

1Lo

catio

nof

inst

alla

tion

–Ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

1G

ener

ally

allb

usba

rto

bem

easu

red

incl

usiv

eof

allf

ittin

gs,i

.e.c

onne

ctor

s,fla

nges

,ben

ds,t

ees,

sets

,jun

ctio

ns,

feed

erun

its,t

ap-o

ffbo

xes

fire

barr

iers

and

the

like.

1U

nles

sm

easu

red

sepa

rate

ly,al

lfit

tings

are

deem

edto

bein

clud

ed.

10A

ltern

ativ

e1

–bu

sbar

fittin

gsnr

1Ty

pe,m

ater

ial,

finish

,sha

pe,

dim

ensio

ns,m

etho

dof

join

ting.

1C

onne

ctor

s,fla

nges

,ben

ds,t

ees,

sets

,ju

nctio

ns,f

eede

run

its,t

ap-o

ffbo

xes

fire

barr

iers

and

the

like.

2Jo

ints

,fla

nges

,ben

ds,t

ees,

sets

,ju

nctio

ns,r

educ

ers,

spig

ots,

test

hole

san

dth

elik

e.

11Ta

pes

m1

Type

,rat

ing,

size,

mat

eria

l,sh

eath

ing,

met

hod

ofjo

intin

g,fix

ings

and

back

grou

ndfo

rfix

ing.

1Lo

catio

nof

inst

alla

tion

–Ro

ofs,

high

orlo

wle

veli

npl

antr

oom

s,ris

ers

orse

rvic

edu

cts,

high

orlo

wle

velo

nflo

ors,

intr

ench

es.

1In

clud

esal

lcon

nect

ions

,joi

nts,

test

clam

ps.

TABULATED WORK SECTIONS

252 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 260: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

12El

ectr

odes

,ear

thro

ds,a

irte

rmin

atio

ns,t

erm

inat

ion

bars

nr1

Type

,rat

ing,

size,

mat

eria

l,m

etho

dof

join

ting,

fixin

gsan

dba

ckgr

ound

for

fixin

g.

13Fi

rest

oppi

ngan

dot

her

asso

ciat

edfir

epr

otec

tw

ork

nr1

Mat

eria

l,lo

catio

n,siz

eof

open

ing

tobe

stop

ped,

size

ofse

rvic

est

oppi

ngto

bein

stal

led

arou

nd,d

epth

and

fire

ratin

g.

14Id

entif

icat

ion

item

1Pl

ates

.2

Disc

s.3

Labe

ls.4

Tape

s.5

Sym

bols

ornu

mbe

rs.

6Ba

nds.

7C

hart

sor

diag

ram

s.8

Oth

er:t

ype

stat

ed.

15Te

stin

gite

m

16C

omm

issio

ning

item

17Sy

stem

valid

atio

nite

m

18O

pera

tion

and

mai

nten

ance

man

uals

item

19D

raw

ing

prep

arat

ion

item

1C

lass

ifica

tion

ofdr

awin

gs.

1In

stal

latio

n,co

-ord

inat

ion,

asin

stal

led

and

reco

rddr

awin

gs.

20Tr

aini

ngite

m

21Lo

ose

anci

llarie

site

m1

Keys

,too

ls,sp

ares

,che

mic

als.

22Po

stpr

actic

alco

mpl

etio

nSe

rvic

esite

m1

Mai

nten

ance

,adj

ustm

ents

and

serv

icin

g.

39 ELECTRICAL SERVICES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 253

Page 261: RICS new rules of measurement 2

40T

rans

port

atio

n

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Loca

tion

plan

sM

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

,qua

lity

and

size

orth

ickn

ess

ofm

ater

ials.

2Lo

catio

n.3

Eart

hco

nnec

tors

,str

aps

and

links

.

Not

es,c

omm

ents

and

glos

sary

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1O

vera

lldi

men

sions

ofite

ms

orsy

stem

sW

orks

and

mat

eria

lsde

emed

incl

uded

.1

All

wor

kis

deem

edin

tern

alun

less

stat

edas

exte

rnal

.2

All

was

te.

3Ex

tra

mat

eria

lfor

labo

urm

ade

fittin

gs.

4A

llbr

acke

ts,s

uppo

rts,

fixin

gsan

dca

stin

chan

nels.

5A

llla

bellin

g,ta

ggin

g,id

entif

icat

ion

and

char

ts.

6M

arki

ngof

allh

oles

chas

esan

dm

ortic

es.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

1Sy

stem

nr1

Type

,size

,cap

acity

,loa

d,ra

ting,

leng

th,n

umbe

rof

stop

s,st

orey

heig

ht,a

ssoc

iate

din

tegr

ated

orre

mot

ean

cilla

ries,

cont

rols,

indi

cato

rsor

com

pone

nts.

1C

ross

refe

renc

edto

draw

ings

and/

ora

full

spec

ifica

tion

deta

iling

finish

es.

nr2

Off-

load

and

posit

ion

prim

ary

equi

pmen

t.

nr3

Ass

embl

yof

com

posit

eite

ms

ofpr

imar

yeq

uipm

ent.

item

4Fr

eeiss

uefix

ing

stee

lwor

kan

dot

her

com

pone

nts

for

inst

alla

tion

byot

hers

.

1Ty

peof

free

issue

mat

eria

ls.

item

5In

terfa

cew

ithan

dco

nnec

tion

tosy

stem

ssu

pplie

dan

din

stal

led

byot

hers

.

1Ty

peof

syst

em.

1N

atur

eof

inte

rface

.1

Syst

ems

supp

lied

and

inst

alle

dby

othe

rsw

illin

clud

ete

leph

ones

,in

terc

oms,

fire

alar

man

dth

elik

e.

TABULATED WORK SECTIONS

254 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 262: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

2Fi

rest

oppi

ngan

dot

her

asso

ciat

edfir

epr

otec

tw

ork

nr1

Mat

eria

l,lo

catio

n,siz

eof

open

ing

tobe

stop

ped,

size

ofse

rvic

est

oppi

ngto

bein

stal

led

arou

nd,d

epth

and

fire

ratin

g.

3Id

entif

icat

ion

item

1Pl

ates

.2

Disc

s.3

Labe

ls.4

Tape

s.5

Sym

bols

ornu

mbe

rs.

6Ba

nds.

7C

hart

sor

diag

ram

s.8

Oth

er:t

ype

stat

ed.

4Te

stin

gan

dco

mm

issio

ning

item

5Sy

stem

valid

atio

nite

m

6O

pera

tion

and

mai

nten

ance

man

uals

item

7D

raw

ing

prep

arat

ion

item

1C

lass

ifica

tion

ofdr

awin

gs.

1In

stal

latio

n,co

-ord

inat

ion,

asin

stal

led

and

reco

rddr

awin

gs.

8Tr

aini

ngite

m

9Lo

ose

anci

llarie

site

m1

Keys

,too

ls,sp

ares

,che

mic

als.

10Po

stpr

actic

alco

mpl

etio

nse

rvic

esite

m1

Mai

nten

ance

,adj

ustm

ents

and

serv

icin

g.

40 TRANSPORTATION

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 255

Page 263: RICS new rules of measurement 2

41B

uild

er’s

wo

rkin

conn

ecti

on

wit

hm

echa

nica

l,el

ectr

ical

and

tran

spo

rtat

ion

inst

alla

tio

ns

Dra

win

gsth

atm

ust

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.1

Layo

utof

each

type

ofse

rvic

ein

stal

latio

n.M

anda

tory

info

rmat

ion

tobe

prov

ided

.1

Kind

and

qual

ityof

mat

eria

ls.N

otes

,com

men

tsan

dgl

ossa

ry

Min

imum

info

rmat

ion

that

mus

tbe

show

non

the

draw

ings

that

acco

mpa

nyth

isse

ctio

nof

mea

sure

men

t.

1C

onst

ruct

ion

ofst

ruct

ure.

2Fi

reco

mpa

rtm

enta

tion.

3Se

rvic

eru

ns.

1W

orks

and

mat

eria

lsde

emed

incl

uded

.

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

Wor

kfo

rse

rvic

esin

stal

latio

nsin

new

build

ings

1G

ener

albu

ilder

’sw

ork

inco

nnec

tion

with

:ite

m1

Type

ofIn

stal

latio

nst

ated

.1

An

item

shal

lbe

give

nfo

rea

chan

dev

ery

serv

ices

inst

alla

tion.

2Ex

ampl

esof

inst

alla

tions

are

cold

wat

erse

rvic

es,h

otw

ater

serv

ices

,lig

htin

gin

stal

latio

ns,p

ower

inst

alla

tions

,lif

tin

stal

latio

ns.I

nth

eca

seof

larg

epr

ojec

tsit

may

bene

cess

ary

tosu

b-di

vide

each

inst

alla

tion

into

loca

tions

.3

This

item

mea

nsev

ery

type

ofge

nera

lbu

ilder

’sw

ork

nece

ssar

yin

conn

ectio

nw

ithth

ese

rvic

ein

stal

latio

nex

cept

thos

eite

ms

incl

uded

inth

efo

llow

ing

rule

s.

2M

arki

ngpo

sitio

nof

hole

s,m

ortic

esan

dch

ases

inth

est

ruct

ure

item

3Pi

pean

ddu

ctsle

eves

nr1

Size

and

type

stat

ed.

1Fi

rera

ting

stat

ed.

1N

atur

ean

dth

ickn

ess

ofst

ruct

ure

stat

ed.

2M

etho

dof

fixin

gst

ated

.3

Slee

ves

supp

lied

byot

hers

stat

ed.

1M

akin

ggo

odar

ound

sleev

eis

deem

edin

clud

ed.

4Ba

ses,

plin

ths

and

the

like

nr1

Size

stat

ed.

1M

etho

dof

form

ing

orco

nstr

uctio

nst

ated

.1

Ant

i-vib

ratio

npa

ds.

2A

cous

ticpa

ds.

TABULATED WORK SECTIONS

256 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 264: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

5D

uct

cove

rsan

dfr

ames

m ----

-nr

1W

idth

and

type

stat

ed.

----

----

----

----

----

--2

Size

and

type

stat

ed.

1Li

mita

tions

tole

ngth

sof

cove

rsst

ated

.2

Fini

shst

ated

.

1M

etho

dof

fixin

gst

ated

.2

Nat

ure

ofba

ckgr

ound

stat

ed.

6Su

ppor

tsfo

rse

rvic

esno

tpr

ovid

edby

serv

ices

cont

ract

orm --

---

nr

1Si

zean

dty

pest

ated

.--

----

----

----

----

-2

Size

,len

gth

and

type

stat

ed.

1Py

lons

.2

Pole

s.3

Wal

lbra

cket

s.4

Soffi

tha

nger

s.5

Stay

s.6

Prop

rieta

rysu

ppor

ts.

Man

ufac

ture

rsre

fere

nce

stat

ed.

7C

aten

ary

cabl

esm

1Si

zean

dty

pest

ated

.1

Eye

bolts

:det

ails

stat

ed.

2Sh

ackl

es:d

etai

lsst

ated

.3

Stra

inin

gsc

rew

s:de

tails

stat

ed.

1Th

ele

ngth

isne

tw

ithno

allo

wan

cem

ade

for

sag.

Wor

kfo

rse

rvic

esin

stal

latio

nsin

exis

ting

build

ings

8C

uttin

gho

les

thro

ugh

exist

ing

stru

ctur

esnr

1Si

zest

ated

.1

Nat

ure

and

thic

knes

sof

stru

ctur

est

ated

.1

Mak

ing

good

tom

atch

exist

ing

orpr

epar

ing

for

new

wor

kis

deem

edin

clud

ed.

9C

uttin

gm

ortic

esan

dsin

king

sin

exist

ing

stru

ctur

enr

1Si

zest

ated

.1

Nat

ure

ofst

ruct

ure

stat

ed.

41 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATIONINSTALLATIONS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 257

Page 265: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

10C

uttin

gch

ases

thro

ugh

exist

ing

stru

ctur

esm

1Si

zean

dnu

mbe

rof

serv

ices

stat

ed.

11Li

fting

and

repl

acin

gflo

orbo

ards

m1

Size

and

num

ber

ofse

rvic

esst

ated

.1

No

dist

inct

ion

ism

ade

betw

een

rout

espa

ralle

lor

atan

angl

eto

the

floor

boar

ds.

2C

uttin

gbo

ards

and

notc

hing

orho

ling

joist

sis

deem

edin

clud

ed.

12Li

fting

and

repl

acin

gdu

ctco

vers

orch

eque

rpl

ates

m1

Wid

than

dty

pest

ated

.

Wor

kfo

rex

tern

alse

rvic

esin

stal

latio

ns

13U

nder

grou

ndse

rvic

eru

nsm

1A

vera

getr

ench

dept

hin

500m

min

crem

ents

.2

Type

and

nom

inal

diam

eter

ofpi

pedu

ct.

3M

ultip

lepi

pedu

cts

stat

ing

num

ber

and

nom

inal

diam

eter

ofpi

pedu

cts.

4Pi

pedu

ct(s

)su

pplie

dby

othe

rs;

type

and

nom

inal

diam

eter

.5

Type

and

size

ofco

ver

tile(

s)or

iden

tific

atio

nta

pe(s

).

1M

etho

dof

join

ting

pipe

duct

s.2

Pipe

duct

bedd

ing

and

orsu

rrou

nd:d

etai

lsst

ated

.3

Type

ofba

ckfil

lif

not

obta

ined

from

the

exca

vatio

ns.

1Ve

rtic

al.

2C

urve

d.3

Belo

wgr

ound

wat

erle

vel.

4N

ext

toex

istin

gro

adw

ayor

path

.5

Nex

tto

exist

ing

build

ing.

6Sp

ecifi

edm

ultip

leha

ndlin

g:de

tails

stat

ed.

7D

ispos

alof

exca

vate

dm

ater

ial

whe

reno

tat

the

disc

retio

nof

the

cont

ract

or:d

etai

lsst

ated

.

1Pi

pedu

ctru

nsar

ede

emed

toru

nst

raig

htun

less

stat

edot

herw

ise.

2Pi

pedu

ctru

nsar

em

easu

red

from

exte

rnal

face

ofm

anho

leto

exte

rnal

face

ofm

anho

leor

acce

ssor

y.3

Ave

rage

dept

his

calc

ulat

edfo

rea

chru

nirr

espe

ctiv

eof

max

imum

dept

h.

14Ite

ms

extr

aov

erse

rvic

eru

nsirr

espe

ctiv

eof

dept

hor

pipe

size

m2

1Br

eaki

ngup

hard

surfa

cepa

ving

s:th

ickn

ess

stat

ed.

2Li

fting

and

pres

ervi

ngtu

rf:th

ickn

ess

stat

ed.

1Re

inst

atin

gto

mat

chex

istin

g:de

tails

stat

ed.

2Re

layi

ngtu

rfpr

evio

usly

set

asid

e.

1Th

em

easu

rem

ent

ofth

ese

extr

aov

erite

ms

shal

lbe

base

don

the

desig

ned

wid

thof

beds

inth

etr

ench

.In

the

abse

nce

ofa

bed

the

wid

thsh

allb

eca

lcul

ated

asth

eno

min

alsiz

eof

the

serv

ice

plus

300m

msu

bjec

tto

am

inim

umw

idth

of50

0mm

.

TABULATED WORK SECTIONS

258 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 266: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

14[It

ems

extr

aov

erse

rvic

eru

nsirr

espe

ctiv

eof

dept

hor

pipe

size–

cont

.]

m3

3Br

eaki

ngou

tha

rdm

ater

ials.

4Ex

cava

ting

inan

dre

mov

ing

haza

rdou

sm

ater

ial.

5Ex

cava

ting

inru

nnin

gsil

t,ru

nnin

gsa

ndor

othe

run

stab

legr

ound

.6

Exca

vatin

gbe

low

grou

ndw

ater

leve

l.

3D

etai

lsst

ated

.1

Har

dm

ater

iali

san

ym

ater

ialw

hich

isof

such

asiz

e,po

sitio

nor

cons

isten

cyth

atit

can

only

bere

mov

edby

spec

ial

plan

tor

expl

osiv

es.

m7

Nex

tto

exist

ing

live

serv

ices

.1

Tobe

mea

sure

dw

here

prec

autio

nsar

esp

ecifi

cally

requ

ired.

2Th

em

etho

dof

prot

ectio

nis

left

toth

edi

scre

tion

ofth

eco

ntra

ctor

.

nr8

Aro

und

exist

ing

live

serv

ices

cros

sing

tren

ch.

15Pi

pedu

ctfit

tings

nr1

Dim

ensio

ned

desc

riptio

n.1

Type

stat

ed.

1M

etho

dof

join

ting

topi

pedu

cts.

1Pi

pedu

ctfit

tings

incl

ude

bend

s,ju

nctio

ns,i

nspe

ctio

npi

pes,

stop

ends

and

the

like

and

conn

ectio

nsto

pipe

s.

16A

cces

sorie

snr

1D

imen

sione

dde

scrip

tion.

1A

cces

sorie

sin

clud

eal

lint

egra

land

oras

soci

ated

fittin

gsan

dco

nnec

tions

topi

pes.

17M

anho

les

18A

cces

sch

ambe

rs19

Valv

ech

ambe

rs20

Insp

ectio

nch

ambe

rs21

Surfa

cebo

xes

22St

opco

ckpi

ts

nr1

Det

aile

dde

scrip

tion

stat

ing

max

imum

inte

rnal

size

ofch

ambe

r.2

Dep

thfro

mto

psu

rface

ofco

ver

toto

psu

rface

ofba

seor

inve

rtle

veli

n25

0mm

stag

es.

3Pr

oprie

tary

cham

bers

boxe

san

dth

elik

e:de

tails

stat

ed.

1Ba

sesla

bth

ickn

ess.

2W

allt

hick

ness

.3

Cov

ersla

bdi

men

sions

.4

Inte

rmed

iate

slab

dim

ensio

ns.

5In

tern

alfin

ish.

6Ex

tern

alfin

ish.

7C

over

and

fram

e:ty

pest

ated

.

1Si

zest

ated

isth

em

axim

umin

tern

alsiz

eof

the

cham

ber.

2Ro

cker

join

tsar

ede

emed

incl

uded

.

41 BUILDER’S WORK IN CONNECTION WITH MECHANICAL, ELECTRICAL AND TRANSPORTATIONINSTALLATIONS

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 259

Page 267: RICS new rules of measurement 2

Item

orw

ork

tobe

mea

sure

dU

nit

Leve

lone

Leve

ltw

oLe

velt

hree

Not

es,c

omm

ents

and

glos

sary

23Ex

tra

over

the

exca

vatio

nfo

r:m

21

Brea

king

upha

rdsu

rface

pavi

ngs:

thic

knes

sst

ated

.2

Lifti

ngan

dpr

eser

ving

turf:

thic

knes

sst

ated

.

1M

akin

ggo

odar

ound

edge

sof

surfa

ces

isde

emed

incl

uded

.

m3

3Br

eaki

ngou

tha

rdm

ater

ials.

4Ex

cava

ting

inan

dre

mov

ing

haza

rdou

sm

ater

ial.

5Ex

cava

ting

inru

nnin

gsil

t,ru

nnin

gsa

ndor

othe

run

stab

legr

ound

.6

Exca

vatin

gbe

low

grou

ndw

ater

leve

l.

24M

arke

rpo

sts

25M

arke

rpl

ates

nr1

Dim

ensio

ned

desc

riptio

n.1

Iden

tific

atio

npl

ates

:det

ails

stat

ed.

2Le

tter

ing

requ

ired.

1M

etho

dof

fixin

g:de

tails

stat

ed.

1Ex

cava

tion,

disp

osal

ofsp

oila

ndco

ncre

tefo

rba

sede

emed

incl

uded

.

26C

onne

ctio

nsite

m1

Det

ails

stat

ed.

27Te

stin

gan

dco

mm

issio

ning

item

1D

etai

led

desc

riptio

n.2

Type

ofte

stan

dst

anda

rdto

beac

hiev

ed.

1A

tten

danc

ere

quire

d.2

Inst

rum

ents

and

equi

pmen

tto

bepr

ovid

ed.

1Pr

ovisi

onof

wat

eran

dot

her

supp

lies

isde

emed

incl

uded

.2

Prov

ision

ofte

stce

rtifi

cate

sis

deem

edin

clud

ed.

TABULATED WORK SECTIONS

260 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 268: RICS new rules of measurement 2

AppendicesAppendix A: Guidance on the preparation of bill of quantities

Appendix B: Template for preliminaries (main contract) pricing schedule (condensed)

Appendix C: Template for preliminaries (main contract) pricing schedule (expanded)

Appendix D: Template for pricing summary for elemental bill of quantities (condensed)

Appendix E: Template for pricing summary for elemental bill of quantities (expanded)

Appendix F: Templates for provisional sums, risks and credits

Appendix G: Example of a work package breakdown structure

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 261

Page 269: RICS new rules of measurement 2

Appendix A: Guidance on thepreparation of bill of quantitiesA.1 Bill of quantities breakdown structure

A.1.1 There a number of different breakdown structures for bill of quantities (BQ).They each have theirown advantages and disadvantages. However, computerised BQ production systems with multiplesort facilities can be used to generate different BQ formats and make it easy to trace items – aslong as items have been properly codified (refer to 2.15 (Codification of bill of quantities).

A.1.2 NRM 2: Detailed measurement for building works can be adopted as the rules of measurement forbuilding works irrespective of what BQ breakdown structure is chosen.

A.1.3 The main BQ breakdown structures are:

(a) Elemental: Measurement and description is done by group elements and each groupelement forms a separate section of the BQ, irrespective of the order of work sections inNRM 2: Detailed measurement for building works. Group elements are sub-divided through theuse of elements, which are further sub-divided by sub-elements. The group elements,elements and sub-elements used are those defined by NRM 1: Order of cost estimating and costplanning for capital building works.

Figure A.1: Elemental BQ breakdown structures for a simple building project

Elemental breakdown structure

Bill No. 1: Preliminaries (main contract)

Bill No. 2: Facilitating Works

Bill No. 3: Substructure

Bill No. 4: Superstructure

Bill No. 5: Internal Finishes

Bill No. 6: Fittings, Furnishings and Equipment

Bill No. 7: Services

Bill No. 8: External Works

Bill No. 9: Risks

Bill No. 10: Provisional Sums

Bill No. 11: Credits

Bill No. 12: Daywork (provisional)

An elemental breakdown structure supports a logical and structured approach to the quantificationof a building project. Moreover, this type of breakdown structure makes it easier for the quantitysurveyor/cost manager to analysis a contractor’s tender price and collects real-time cost data forfuture use.

(b) Work section: Measurement and description is divided into the work sections listed inNRM 2: Detailed measurement for building works (refer to the tabulated rules in Part 3 of theserules).

262 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 270: RICS new rules of measurement 2

Figure A.2:Work section BQ breakdown structures for a simple building project

Work section breakdown structure

Bill No. 1: Main contractor’s preliminaries

Bill No. 2: Off-site manufactured materials, components and buildings

Bill No. 3: Demolitions

Bill No. 4: Alterations, repairs and conservation

Bill No. 5: Excavating and filling

Bill No. 6: Ground remediation and soil stabilisation

Bill No. 7: Piling

Bill No. 8: Underpinning

Bill No. 9: Diaphragm walls and embedded retaining walls

Bill No. 10: Crib walls, gabions and reinforced earth

Bill No. 11: In-situ concrete works

Bill No. 12: Precast/composite concrete

Bill No. 13: Precast concrete

Bill No. 14: Masonry

Bill No. 15: Structural metalwork

Bill No. 16: Carpentry

Bill No. 17: Sheet roof coverings

Bill No. 18: Tile and slate roof and wall coverings

Bill No. 19: Waterproofing

Bill No. 20: Proprietary linings and partitions

Bill No. 21: Cladding and covering

Bill No. 22: General joinery

Bill No. 23: Windows, screens and lights

Bill No. 24: Doors, shutters and hatches

Bill No. 25: Stairs, walkways and balustrades

Bill No. 26: Metalwork

Bill No. 27: Glazing

Bill No. 28: Floor, wall, ceiling and roof finishings

Bill No. 29: Decoration

Bill No. 30: Suspended ceilings

Bill No. 31: Insulation, fire stopping and fire protection

Bill No. 32: Furniture, fittings and equipment

Bill No. 33: Drainage above ground

Bill No. 34: Drainage below ground

Bill No. 35: Site works

Bill No. 36: Fencing

Bill No. 37: Soft landscaping

Bill No. 38: Mechanical services

Bill No. 39: Electrical services

Bill No. 40: Transport

Bill No. 41: Builder’s work in connection with mechanical, electrical and transportation installations

Bill No. 42: Risks

Bill No. 43: Provisional sums

Bill No. 44: Credits

Bill No. 45: Daywork (Provisional)

This breakdown structure is often preferred by contractors for the purpose of pricing as all likeproducts and components are grouped together (e.g. the reinforced concrete columns, beams,floors, roofs and staircases), whereas they can be spread among a number of different elements

APPENDIX A: GUIDANCE ON THE PREPARATION OF BILL OF QUANTITIES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 263

Page 271: RICS new rules of measurement 2

when an elemental breakdown structure is used. Codification of BQ items using computerised BQsystems will solve the problem of preferences (refer to 2.15 (Codification of bill of quantities) ofthe rules).

(c) Work package: Measurement and description is divided into employer, quantity surveyor orcontractor defined work packages – whichever is applicable.Works packages can be based oneither a specific-trade (e.g. concrete work, brickwork and blockwork, roof coverings, paintingand decorating, and wall tiling) or a single package comprising a number of different trades(e.g. a groundworks package might include all excavation and earthworks, below grounddrainage and the ground-bearing concrete floor-slab – so as to make a single workscontractor responsible for the interface between the drainage and the ground-bearingconcrete floor-slab).

Figure A.3:Typical BQ breakdown structure for discrete work package

Work section breakdown structure

Bill No. 1: Main contractor’s preliminaries

Bill No. 2: Intrusive investigations

Bill No. 3: Demolition works

Bill No. 4: Groundworks

Bill No. 5: Piling

Bill No. 6: Concrete works

Bill No. 7: Roof coverings and roof drainage

Bill No. 8: External and internal structural walls

Bill No. 9: Cladding

Bill No. 10: Windows and external doors

Bill No. 11: Mastic

Bill No. 12: Non-structural walls and partitions

Bill No. 13: Joinery

Bill No. 14: Suspended ceilings

Bill No. 15: Architectural metalwork

Bill No. 16: Tiling

Bill No. 17: Painting and decorating

Bill No. 18: Floor coverings

Bill No. 19: Fittings, furnishings and equipment

Bill No. 20: Combined mechanical and electrical engineering services

Bill No. 21: Lifts and escalators

Bill No. 22: Facade access equipment

Bill No. 23: External works and drainage

Bill No. 24: Risks

Bill No. 25: Provisional sums

Bill No. 26: Credits

Bill No. 27: Daywork (Provisional)

Again, codification of BQ items using computerised BQ systems will allow the re-sorting of itemsfrom elements to works packages for the purposes of tendering, and vice versa for the purpose ofoverall cost control (refer to 2.15 (Codification of bill of quantities) at Part 2 of these rules).

This breakdown structure is usually used by contractors to procure packages of work from theirsupply chain.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

264 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 272: RICS new rules of measurement 2

A.2 Bill of quantities breakdown structure for projects comprising morethan one building

Where a building project comprises more than one type of building, it is recommended that aseparate bill of quantities be prepared for each building; culminating in a ‘summary bill’ for theentire building project.

A.3 Order of items in bill of quantities

The order of items in a bill of quantities (BQ) is:

(1) For elemental BQ:

(a) Elements as contained in NRM 1: Order of cost estimating and cost planning for capital buildingworks.

(b) Within each element the order of measured items is cubic, square, linear, enumerated itemsand itemised items.

(c) Labour-only items are to precede labour and material items within the subdivisions in (b).

(d) Items within each subdivision in (b) and (c) above are to be placed in order of value, leastexpensive first.

(e) Preambles are to be incorporated in each element as appropriate.

(f) PC sums are to be incorporated in item descriptions.

(g) Contractor designed works are to be incorporated under the applicable element orsub-element, after measured work, under a heading of ‘Contractor designed work’. A priceanalysis for contractor designed work is to be incorporated (see paragraph 2.9.2 (Contractordesigned work) in Part 2 (Rules for detailed measurement of building works) of these rules).

(h) Provisional sums are to be listed and described in a separate bill.

(i) Construction risks to be transferred to the contractor are to be identified and described ina ‘schedule of construction risks’ (see paragraph 2.10.2 (Risk transfer to the contractor) inPart 2 (Rules for detailed measurement of building works) of these rules).

(j) Where applicable, provision for the contractor to offer credits against items and componentsarising from demolition works and/or soft strip works is to be provided (see paragraph 2.12(Credits) in Part 2 (Rules for detailed measurement of building works) of these rules).

(2) For work section BQ:

(a) Work sections as contained in NRM 2: Detailed measurement for building works, althoughseparate locational BQ sections such as facilitating works, substructure, superstructure andor external works might be required.

(b) Subdivisions:

(i) of work sections as contained in NRM 2: Detailed measurement for building works;

(ii) as required by NRM 2: Detailed measurement for building works, such as externalpaintwork;

(iii) of different types of materials; such as different mixes of concrete, different types ofbrick.

(c) Within each subdivision in (b), the order of cubic, square, linear, enumerated items anditemised items.

(d) Labour-only items are to precede labour and material items within the subdivisions in (c).

(e) Items within each subdivision in (c) and (d) above are to be placed in order of value, leastexpensive first.

(f) Preambles are to be incorporated in the appropriate work section.

(g) PC sums are to be incorporated in item descriptions.

(h) Contractor designed works are to be incorporated under the applicable element orsub-element, after measured work, under a heading of ‘Contractor designed work’. A priceanalysis for contractor designed work is to be incorporated (see paragraph 2.9.2 (Contractordesigned work) in Part 2 (Rules for detailed measurement of building works) of these rules).

APPENDIX A: GUIDANCE ON THE PREPARATION OF BILL OF QUANTITIES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 265

Page 273: RICS new rules of measurement 2

(i) Provisional sums are to be listed and described in a separate bill.

(j) Construction risks to be transferred to the contractor are to be identified and described ina ‘schedule of construction risks’ (see paragraph 2.10.2 (Risk transfer to the contractor) inPart 2 (Rules for detailed measurement of building works) of these rules).

(k) Where applicable, provision for the contractor to offer credits against items and componentsarising from demolition works and/or soft strip works is to be provided (see paragraph 2.12(Credits) in Part 2 (Rules for detailed measurement of building works) of these rules).

(3) For work package BQ:

(a) Work packages as defined by the employer, quantity surveyor or contractor, whichever isapplicable.

(b) Within each work package the order of measured items is cubic, square, linear, enumerateditems and itemised items.

(c) Labour-only items are to precede labour and material items within the subdivisions in (b).

(d) Items within each subdivision in (b) and (c) above are to be placed in order of value, leastexpensive first.

(e) Preambles are to be incorporated in the appropriate work package.

(f) PC sums are to be incorporated in item descriptions.

(g) Contractor designed works are to be incorporated into the applicable work package bill,after measured work, under a heading of ‘Contractor designed work’, under a heading of‘Contractor designed work’.A price analysis for contractor designed work is to be included(see paragraph 2.9.2 (Contractor designed work) in Part 2 (Rules for detailed measurementof building works) of these rules).

(h) Provisional sums are to be listed and described in a separate bill.

(i) Construction risks to be transferred to the contractor are to be identified and described ina ‘schedule of construction risks’ (see paragraph 2.10.2 (Risk transfer to the contractor) inPart 2 (Rules for detailed measurement of building works) of these rules).

(j) Where applicable, provision for the contractor to offer credits against items and componentsarising from demolition works and/or soft strip works is to be provided (see paragraph 2.12(Credits) in Part 2 (Rules for detailed measurement of building works) of these rules).

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

266 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 274: RICS new rules of measurement 2

A.4 Format of billThe bill for each element or work section is to be commenced on a new sheet.The ruling of thepaper and typical headings for each type of bill are shown in Figures A.4 and A.5.

Figure A.4:Typical BQ format for an elemental bill of quantities

Bill No. 3 Superstructure

3.2.5 External walls

3.2.5.1 EXTERNAL WALLS ABOVE GROUND FLOORLEVEL

3.2.5.1.1 Common brickwork in cement: lime mortar (1:1:6)

3.2.5.1.1.1 Walls 102.5mm thick, brickwork; built against otherwork

196 m2

3.2.5.1.1.2 Walls 215mm thick, brickwork 302 m2

Figure A.5:Typical BQ format for a work section bill of quantities

Bill No. 2 Superstructure

2.14 Masonry

2.14.1 BRICK/BLOCK WALLING

2.14.1.1 Common brickwork in cement: lime mortar (1:1:6)

2.14.1.1.1 Walls 102.5mm thick, brickwork; built against otherwork

196 m2

2.14.1.1.2 Walls 215mm thick, brickwork 302 m2

Figure A.6:Typical BQ format for a work package bill of quantities

Bill No. 8 EXTERNAL AND INTERNAL STRUCTURAL WALLS

8.1 Masonry

8.1.1 BRICK/BLOCK WALLING

8.1.1.1 Common brickwork in cement: lime mortar (1:1:6)

8.1.1.1.1 Walls 102.5mm thick, brickwork; built against otherwork

196 m2

8.1.1.1.2 Walls 215mm thick, brickwork 302 m2

A.5 Codifying itemsAs well as for the purpose of making it easy to search, it is essential that every item in the bill ofquantities (BQ) can be referenced back to the cost plan.

A.6 Unit of measurementThe units of measurement for items are stipulated by the tabulated rules of measurement. For thepurpose of clarity, the unit of measurement is to be entered against each item in the bill ofquantities, irrespective of whether it is the same unit as the previous item.

A.7 Order of sizesSizes or dimensions in descriptions are to be in the order: length, width, height. Sometimes thewidth of a component (e.g. a base unit) is referred to as its ‘depth’. If there is likely to be any doubt,for the purpose of clarity, the dimensions are to be stated.

APPENDIX A: GUIDANCE ON THE PREPARATION OF BILL OF QUANTITIES

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 267

Page 275: RICS new rules of measurement 2

For example:

Base unit: 1000mm long x 600mm wide x 900mm high; …

A.8 Use of headings

Headings usually fall into one of four categories:

1 Elemental or work section headings

2 Element or sub-section headings

3 Headings that partly describe a group of items

4 Subdivisions required by NRM 2: Detailed measurement for building works.

A.9 Unit of billing

Other than enumerated and itemised items, the unit of measurement is the metre.The exceptionto this rule is steel bar reinforcement and structural steelwork, which are billed in tonnes to twodecimal places.

A.10 Framing of descriptions

The bill of quantities is a legal document. Therefore, care should be taken when framingdescriptions so that there is no doubt as to their meaning.

A.11 Totalling pages

There are a number of ways in which the quantity surveyor/cost manager might indicate how thecash totals on each page of the bill are to be dealt with.The preferred method is for the total to becarried over to be added to the next page and so on until the end of the bill or sub-section of thebill. Unless the bill section comprises only one page, the foot of the first and intermediate bill pagesshould be completed as follows:

Figure A.7: Examples of how to total pages

Carried forward £

The top of the following bill page is completed as follows:

BILL 3: SUPERSTRUCTURE

2.5 EXTERNAL WALLS

Brought forward £

To end each bill section, the section is completed as follows:

TOTAL carried to main summary £

A.12 Price summary

Templates for the pricing summary for elemental bill of quantities (condensed and expandedversions) are included at Appendices D and E, respectively, of these rules.The structure of pricingsummaries for other bill of quantities formats should follow the same principles.

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

268 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 276: RICS new rules of measurement 2

Appendix B:Template forpreliminaries (main contract) pricingschedule (condensed)CostCentre

Component Time-RelatedCharges

Fixed Charges TotalCharges

£ p £ p £ p

1 PRELIMINARIES

1.1 EMPLOYER’S REQUIREMENTS

1.1.1 Site accommodation

1.1.2 Site records

1.1.3 Completion and post-completion requirements

1.2 MAIN CONTRACTOR’S COST ITEMS

1.2.1 Management and staff

1.2.2 Site establishment

1.2.3 Temporary services

1.2.5 Safety and environmental protection

1.2.6 Control and protection

1.2.7 Mechanical plant

1.2.8 Temporary works

1.2.9 Site records

1.2.10 Completion and post-completion requirements

1.2.11 Cleaning

1.2.12 Fees and charges

1.2.13 Site services

1.2.14 Insurance, bonds, guarantees and warranties

Totals £

TOTAL CARRIED TO MAIN SUMMARY £

Note: Costs relating to main contractor’s preliminaries items that are not specifically identified inthe contractor’s full and detailed breakdown shall be deemed to have no cost implications or havebeen included elsewhere within the contractor’s rates and prices.

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 269

Page 277: RICS new rules of measurement 2

Appendix C:Template forpreliminaries (main contract) pricingschedule (expanded)Costcentre

Component Time-relatedcharges

Fixed charges Total charges

£ p £ p £ p

1.1 EMPLOYER’S REQUIREMENTS

1.1.1 Site accommodation

1.1.1.1 Site accommodation

1.1.1.2 Furniture and equipment

1.1.1.3 Telecommunications and IT systems

1.1.2 Site records

1.1.2.1 Site records

1.1.3 Completion and post-completion requirements

1.1.3.1 Handover requirements

1.1.3.2 Operation and maintenance services

1.2 MAIN CONTRACTOR’S COST ITEMS

1.2.1 Management and staff

1.2.1.1 Project specific management and staff

1.2.1.2 Visiting management and staff

1.2.1.3 Extraordinary support costs

1.2.1.4 Staff travel

1.2.2 Site establishment

1.2.2.1 Site accommodation

1.2.2.2 Temporary works in connection with site establishment

1.2.2.3 Furniture and equipment

1.2.2.4 IT systems

1.2.2.5 Consumables and services

1.2.2.6 Brought-in services

1.2.2.7 Sundries

1.2.3 Temporary services

1.2.3.1 Temporary water supply

1.2.3.2 Temporary gas supply

1.2.3.3 Temporary electricity supply

1.2.3.4 Temporary telecommunication systems

1.2.3.5 Temporary drainage

1.2.4 Security

1.2.4.1 Security staff

1.2.4.2 Security equipment

1.2.4.3 Hoardings, fences and gates

1.2.5 Safety and environmental protection

1.2.5.1 Safety programme

1.2.5.2 Barriers and safety scaffolding

1.2.5.3 Environmental protection measures

270 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 278: RICS new rules of measurement 2

1.2.6 Control and protection

1.2.6.1 Survey, inspections and monitoring

1.2.6.2 Setting out

1.2.6.3 Protection of works

1.2.6.4 Samples

1.2.6.5 Environmental control of building

1.2.7 Mechanical plant

1.2.7.1 Generally

1.2.7.2 Tower cranes

1.2.7.3 Mobile cranes

1.2.7.4 Hoists

1.2.7.5 Access plant

1.2.7.6 Concrete plant

1.2.7.7 Other plant

1.2.8 Temporary works

1.2.8.1 Access scaffolding

1.2.8.2 Temporary works

1.2.9 Site records

1.2.9.1 Site records

1.2.10 Completion and post-completion requirements

1.2.10.1 Testing and commissioning plan

1.2.10.2 Handover

1.2.10.3 Post-completion services

1.2.11 Cleaning

1.2.11.1 Site tidy

1.2.11.2 Maintenance of roads, paths and pavings

1.2.11.3 Building clean

1.2.12 Fees and charges

1.2.12.1 Fees

1.2.12.2 Charges

1.2.13 Site services

1.2.13.1 Temporary works

1.2.13.2 Multi-service gang

1.2.14 Insurance, bonds, guarantees and warranties

1.2.14.1 Works insurance

1.2.14.2 Public liability insurance

1.2.14.3 Employer’s (main contractor’s) liability insurance

1.2.14.4 Other insurances

1.2.14.5 Bonds

1.2.14.6 Guarantees

1.2.14.7 Warranties

Totals £

TOTAL CARRIED TO MAIN SUMMARY £

Note: Costs relating to preliminaries items that are not specifically identified in the contractor’sfull and detailed breakdown shall be deemed to have no cost implications or have been includedelsewhere within the contractor’s rates and prices.

APPENDIX C:TEMPLATE FOR PRELIMINARIES (MAIN CONTRACT) PRICING SCHEDULE (EXPANDED)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 271

Page 279: RICS new rules of measurement 2

Appendix D:Template for pricingsummary for elemental bill ofquantities (condensed)Costcentre

Element £/p £/p

0.0 Facilitating works £0.00

1.0 Substructure £0.00

2.0 Superstructure £0.00

3.0 Internal finishes £0.00

4.0 Fittings, furnishings and equipment £0.00

5.0 Services £0.00

6.0 Prefabricated buildings and building units £0.00

7.0 Work to existing building £0.00

8.0 External works £0.00

TOTAL (Building works, including M&E engineering services) £0.00

9.0 Main contractor’s preliminaries £0.00

Sub-total £0.00

10.0 Provisional sums: £0.00

10.1 Defined provisional sums £0.00

10.2 Undefined provisional sums £0.00

10.3 Works to be carried out by statutory undertakers £0.00

Sub-total £0.00

11.0 Risks £0.00

11.1 Sub-total £0.00

12.0 Main contractor’s overheads and profit (insert required %adjustment) 0.00% £0.00

Sub-total £0.00

13.0 Credit (for retained arisings) £(0.00)

Sub-total £0.00

14.0 Main contractor’s fixed price adjustment (insert required %adjustment) 0.00%

£0.00

Sub-total £0.00

15.0Director’s adjustment (insert required adjustment (+/-))

£0.00 or£(0.00)

Sub-total £0.00

16.0 Dayworks (Provisional) £0.00

TOTAL TENDER PRICE, exclusive of VAT (Carried to Form of Tender) £0.00

272 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 280: RICS new rules of measurement 2

Appendix E:Template for pricingsummary for elemental bill ofquantities (expanded)Costcentre

Element £/p £/p

0.0 Facilitating works £0.00

0.1 Toxic/hazardous/contaminated material treatment £0.00

0.2 Major demolition works £0.00

0.3 Specialist ground works £0.00

0.4 Temporary diversion works £0.00

0.5 Extraordinary site investigation works £0.00

1.0 Substructure £0.00

1.1 Substructure £0.00

2.0 Superstructure £0.00

2.1 Frame £0.00

2.2 Upper floors £0.00

2.3 Roof £0.00

2.4 Stairs and ramps £0.00

2.5 External walls £0.00

2.6 Windows and external doors £0.00

2.7 Internal walls and partitions £0.00

2.8 Internal doors £0.00

3.0 Internal finishes £0.00

3.1 Wall finishes £0.00

3.2 Floor finishes £0.00

3.3 Ceiling finishes £0.00

4.0 Fittings, furnishings and equipment £0.00

4.1 Fittings, furnishings and equipment £0.00

5.0 Services £0.00

5.1 Sanitary installations £0.00

5.2 Services equipment £0.00

5.3 Disposal installations £0.00

5.4 Water installations £0.00

5.5 Heat source £0.00

5.6 Space heating and air conditioning £0.00

5.7 Ventilation £0.00

5.8 Electrical installations £0.00

5.9 Fuel installations/systems £0.00

5.10 Lift and conveyor installations/systems £0.00

5.11 Fire and lightning protection £0.00

5.12 Communication, security and control systems £0.00

5.13 Special installations/systems £0.00

5.14 Builder’s work in connection with services £0.00

6.0 Complete buildings £0.00

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 273

Page 281: RICS new rules of measurement 2

6.1 Pre-fabricated buildings £0.00

7.0 Work to existing building £0.00

7.1 Minor demolition works and alteration works £0.00

7.2 Repairs to existing services £0.00

7.3 Damp proof courses/fungus and beetle eradication £0.00

7.4 Facade retention £0.00

7.5 Cleaning existing surfaces £0.00

7.6 Renovation works £0.00

8.0 External works £0.00

8.1 Site preparation works £0.00

8.2 Roads, paths and pavings £0.00

8.3 Soft landscaping, planting and irrigation systems £0.00

8.4 Fencing, railings and walls £0.00

8.5 Site/street furniture and equipment £0.00

8.6 External drainage £0.00

8.7 External services £0.00

8.8 Minor building works and ancillary buildings £0.00

TOTAL (Building works, including M&E engineering services) £0.00

9.0 Main contractor’s preliminaries £0.00

Sub-total £0.00

10.0 Risks £0.00

Sub-total £0.00

11.0 Provisional sums: £0.00

11.1 Defined provisional sums £0.00

11.2 Undefined provisional sums £0.00

11.3 Works to be carried out by statutory undertakers £0.00

Sub-total £0.00

12.0 Main contractor’s overheads and profit (insert required %adjustment) 0.00% £0.00

Sub-total £0.00

13.0 Credit (for retained arisings) £(0.00)

Sub-total £0.00

14.0 Main contractor’s fixed price adjustment (insert required %adjustment) 0.00%

£0.00

Sub-total £0.00

15.0 Director’s adjustment (insert required adjustment (+/-)) £0.00 or £(0.00)

Sub-total £0.00

16.0 Dayworks (Provisional) £0.00

TOTAL TENDER PRICE, exclusive of VAT (Carried to Form of Tender) £0.00

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

274 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 282: RICS new rules of measurement 2

Appendix F:Templates for provisionalsums, risks and credits

Schedule of provisional sums

Costcentre

Provisional sum £/p

DEFINED PROVISIONAL SUMS

UNDEFINED PROVISIONAL SUMS

TOTAL PROVISIONAL SUMS, exclusive of VAT (Carried to MainSummary)

Schedule of construction risks

Costcentre

Risk description £/p

R001

R002

R003

R004

R005

R006

TOTAL RISK ALLOWANCE, exclusive of VAT (Carried to Main Summary)

Credits

Costcentre

Description £/p

C001

C002

C003

C004

C005

TOTAL CREDITS, exclusive of VAT (Carried to Main Summary)

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 275

Page 283: RICS new rules of measurement 2

Appendix G: Example of a workpackage breakdown structure

Figure 2.5:Typical example of suffix codes used for codifying work packages when a work packageBQ breakdown structure is used

Serial no. Work package title/content Suffix

1. Main contractor’s preliminaries /01.1

2. Intrusive investigations:Asbestos and other hazardous materialsGeotechnical and environmental investigationsAttendance on archaeological investigationsWork package contractor’s preliminaries

/02/01.2

3. Demolition works:Asbestos and other hazardous materials removal/treatment worksSoft strip of building components and sub-componentsSoft strip of mechanical and electrical engineering services.Demolition.Work package contractor’s preliminaries

/03/01.2

4. Groundworks:Contaminated ground material removal;Preparatory earthworks;Excavation and earthworks, including basement excavation, earthwork support and disposal;Temporary works – propping of existing basement retaining walls;Below ground drainage;Ground beams;Pile caps;Temporary works – piling mats/platforms;Ground bearing base slab construction, including waterproofing; andBasement retaining wall structures, including waterproofing.Work package contractor’s preliminaries

/04/01.2

5. Piling:Piling worksWork package contractor’s preliminaries

/05/01.2

6. Concrete works:FrameUpper floors, including roof structureCore and shear wallsStaircasesWork package contractor’s preliminaries

/06/01.2

7. Roof coverings and roof drainage:Roof cladding/coverings;Flashings; andRoof drainage.Work package contractor’s preliminaries

/07/01.2

276 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 284: RICS new rules of measurement 2

Serial no. Work package title/content Suffix

8. External and internal structural walls:Structural steelworkMasonry (brickwork and blockwork)Roof systems and rainwater goodsCladdingCurtain wallingCarpentryGeneral joineryBespoke joineryWindows and external doorsDry linings and partitionsArchitectural metal workWork package contractor’s preliminaries

/08/01.2

9. Cladding:Cladding systems, including integral windows and external doors.Work package contractor’s preliminaries

/09/01.2

10. Windows and external doors:(Non-integral to cladding system)Windows;Louvers;External doors; andShop fronts.Work package contractor’s preliminaries

/10/01.2

11. Mastic:Mastic to windows, louvers and external door frames; andMastic to wet areas.Work package contractor’s preliminaries

/11/01.2

12. Non-structural walls and partitions:Tiling (floor and wall)Internal stone finishesPainting and decoratingSoft floor coveringsSuspended ceilingsWork package contractor’s preliminaries

/12/01.2

13. Joinery:Reception deskInternal door sets;Screens;Toilet cubicles;Timber wall linings to toilet cubicles;Skirtings; andAll other second fix joinery items.Work package contractor’s preliminaries

/13/01.2

14. Suspended ceilings:Suspended ceilingsWork package contractor’s preliminaries

/14/01.2

15. Architectural metal work:All architectural metal work itemsWork package contractor’s preliminaries

/15/01.2

16. Tiling:Internal stone finishesWall tiling; andFloor tilingWork package contractor’s preliminaries

/16/01.2

APPENDIX G: EXAMPLE OF A WORK PACKAGE BREAKDOWN STRUCTURE

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 277

Page 285: RICS new rules of measurement 2

Serial no. Work package title/content Suffix

17. Painting and decorating:Painting and decoratingWork package contractor’s preliminaries

/17/01.2

18. Floor coverings:Carpet; andVinyl tiles.Work package contractor’s preliminaries

/18/01.2

19. Fittings, furnishings and equipment:Cupboards and shelves to storeroomsLoose fittings, furnishings and equipment; andSignageWork package contractor’s preliminaries

/19/01.2

20. Combined Mechanical and Electrical Engineering Services:Sanitary appliances, including kitchette sinks;Mechanical engineering services installations;Electrical engineering services installations;Public health engineering services installations (above ground); andLifts (by named subcontractor).Work package contractor’s preliminaries

/20/01.2

21. Lifts and escalators:Passenger lifts;Fire fighting lift;Platforms; andEscalators

/21/01.2

22. Facade access equipment:Building maintenance units (BMUs), including proprietary storage units.Work package contractor’s preliminaries

/22/01.2

23. External works and drainage:External drainageSoft landscape worksHard landscape worksWork package contractor’s preliminaries.

/231/01.2

NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS

278 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 286: RICS new rules of measurement 2

Bibliography

Building Costs Information Service: Standard Form of Cost analysis (4th edition), BCIS, 2012

Published by the Office of Government Commerce, ITIL, 2007:

+ OGC GatewayTM Process Review 0: Strategic assessment

+ OGC GatewayTM Process Review 1: Business justification

+ OGC GatewayTM Process Review 2: Delivery strategy

+ OGC GatewayTM Process Review 3: Investment decision

+ OGC GatewayTM Process Review 4: Readiness for service

+ OGC GatewayTM Process Review 5: Operational review and benefits realisation

Royal Institute of British Architects, RIBA Outline Plan of Work 2007 (amended November 2008),RIBA, 2008

Royal Institution of Chartered Surveyors, Cost Management in Engineering Construction Projects, RICS,Surveyors Holdings Limited, London, 1992

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 279

Page 287: RICS new rules of measurement 2

IndexA

Access floorsfinishes 214

Access plantmain contractor’s costs 92

Access scaffoldingmain contractor’s costs 93

Access to sitecontractors’ preliminaries 52

Accommodation costs 79; 80Accuracy of instruments 62Adjoining property

protection 68Advertising and marketing

contractor’s preliminaries 23temporary works 73; 108

Air permeabilityemployer’s requirements 63

Alteration works 125–130Archaeological survey 32Architraves 196; 216Asbestos

contamination reports 32health and safety 66

Asphaltroofing 184–186surfacing, site works 234–237

Antiquitieshealth and safety 66

Ashlar walling see Masonry

B

Balustrades see Stairs/walkways and balustradesBargeboards 174Barriers and safety scaffolding

main contractor’s costs 87; 88Bill of quantities (BQ)

approximate 18benefits of 17, 18breakdown structure see Codification of bill of

quantitiesbudgetary control and accurate cost reporting,

basis for 17cash flow forecast preparation, basis for 17codification see Codification of bill of quantitiescompetitive bids, basis for 17composition see Composition of bill of quantitiescontract document, becoming 17cost breakdown structure, meaning 12cost data, analysis/collection and storage 40cost management/control see Cost management

and controlcost target, meaning 11firm 18format 267

grants, claims for 18information and documents required see

Documents; Drawings; Information andrequirements; Reports

meaning 11non-measurable works see Non-measurable

workspost contract cost control 17preparation see Preparation of bill of quantitiesproduction stage 18purpose of 17quantifying building works, responsibility for 19quantity and quality of works 43real-time cost data, source of 18tax benefit claims 18types of 18

approximate 18firm 18

valuing variations, basis for 17work breakdown structures 33

Bird/vermin controlfittings and equipment 225; 226

Bituminous felts 176–180; 180–182Block plan 31Block walling see MasonryBoarding see Carpentry; JoineryBonds

main contractor’s costs 99Boundary of construction site

contractor’s preliminaries 22; 51; 52Brickwork see MasonryBrought-in services 83Building components/items

deemed inclusions 48description 46–48not covered by tabulated rules 48; 49quantities 46structure of tables 45; 46type and quality of material 47

Bulkheads 221Burning on-site 66

C

Capital allowancesclaims, data to support 32

Car parkingsite accommodation 70

Carpentry see also Joinerybacking and other first fix timbers 174bargeboards 174boarding/flooring/sheeting and decking 173–175casings and linings 173–175drawings and information 173engineered or prefabricated members/items 174fascias 174metal and plastic accessories 173–175

280 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 288: RICS new rules of measurement 2

metal fixings, fastenings and fittings 175ornamental ends of timber members 175primary or structural timbers 174sarking 174soffits and the like 174timber first fixings 173–175timber framing 173–175

Cash flow forecast 58Catering equipment 225; 226Catwalks 206Cavity insulation 167Ceilings

decorative papers or fabrics 219finishes see Finishings to floors/walls and ceilingsproprietary linings and partitions 187–191suspended see Suspended ceilings

Cement impregnation/injection 128Certificate of bona fide tender 20Cess pits 232Cladding and covering

angles 194beams, sides and soffits of 193boundary work 193ceilings 193closers 194columns, sides of 193curtain walling 192–194dormers, sides and tops of 192drawings and information 192extra over 193floors 193glazed vaulting 192–194opening perimeters 193panel or slab cladding or roofing 192–194patent glazing 192–194profiled sheet cladding or roofing 192–194rainscreen cladding 192–194rigid sheet cladding 192–194roofs 193sheet claddings or coverings 192–194structural glass assemblies 192–194walls 193weatherboarding 192–194

Cleaningexisting buildings 125–130site, main contractor’s costs 96

Climatic conditionsmanagement of the works 57

Cobbles 236Code for Sustainable Homes 56; 114Codification of bill of quantities

coding system 34–38cost breakdown structure 33; 34elemental breakdown structure 33–35; 262

example of resultant codes 35identification numbers 34order of items 265

planning breakdown structures 33work breakdown structures 33; 34

work package breakdown structure 33; 34; 255example of suffix codes 37; 38; 276–278order of items 266

work sectional breakdown structure 33–36; 262;263

example of suffix codes 35; 36order of items 265; 266

Collapsible gates 203Commencement of work

notice period 57Compensation events

notification 57Completion of works

employer’s requirements 69main contractor’s costs 95; 96notice of 58post-completion requirements

contractor’s preliminaries 23details of 32employer’s requirements 32main contractor’s costs 95; 96

pricing schedule 77Compliance

quality standards 60Component drawings 31Composite concrete see Concrete worksComposition of bill of quantities

annexes 20; 22codification see Codification of bill of quantitiescredits see Creditsdayworks 20; 22determination 33format 267form of tender 19; 20measured work 19; 21order of items 265; 266preliminaries 19; 21provisional sums see Provisional sumsrisks see Riskssummary see Summary for bill of quantitieswork breakdown structure 33

Compressed airwork in 48

Computers see Telecommunications and IT systemsConcrete plant

main contractor’s costs 92Concrete works

in-situaccessories cast into 157designed joints 157drawings and information 151filling mortices/holes/chases 158formwork 154; 155grinding 153grouting 158hacking 153horizontal work 152mass concrete 152power floating 153reinforcement 156

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 281

Page 289: RICS new rules of measurement 2

site works 235sloping work 152sprayed work 153sundries 158sundry work 153surface finishes 153trowelling 153vertical work 153

pre-cast concretecomposite concrete work 161–163decking 161–163designed joints 163drawings and information 161; 162frame structures 161–163holding down or tie straps 163panel cladding 161–163pavement lights 162rooflights 162sills/lintels/copings and other units 161–163slabs 161–163vertical panel lights 162walls and partitions 161–163

pre-cast/composite concretedecking and flooring 159; 160designed joints 160drawings and information 159holding down or tie straps 160walls/partitions and panels 159; 160

Conservation 125–130Considerate constructors scheme 57Constraints and restrictions

contractor’s preliminaries 22Construction sequencing requirements

statement 32Consumables and services

main contractor’s costs 82Contaminated materials 66Contract see also Standard form of contract

conditionsmain contractors’ preliminaries 53works package contractor’s preliminaries 113

details of condition to be used 32length of 50

Contractor designed worksnon-measurable works 25; 26price analysis 26

Contractor’s preliminaries see PreliminariesCopings

precast concrete 161–163Cornices 216Cost breakdown structure (CBS)

meaning 11Cost estimates and cost plans

formal stages 8; 9Cost management and control

cash flow forecast 58cost planning 39employer’s requirements 57–59interim valuations and payments 39; 40main contractor’s preliminaries 57–59

post-tender estimate 39pre-tender estimate 39pricing variations 39use of bill of quantities 38work package contractor’s preliminaries 115

Cost manager see Quantity surveyor/cost managerCost plan 39Cost target

meaning 11Coves 216Cranes

main contractor’s costs 90; 91Credits

application 28composition of bill of quantities 22meaning of credit 11pre-prepared list of terms 28templates 275

Crib walls 149Cubicles 197Curtain walling 192–194Curved work

description 47quantifying 46radius 47

D

Damp-proofingapplied liquid 184–186asphalt 184–186damp-proof courses, insertion/renewal 129; 167damp-proof membrane, excavation and filling

138flexible sheet 184–186other proprietary systems 184–186

Dayworkscalculation of labour time charge rates 29composition of bill of quantities 22meaning of daywork 11schedule of 29total amount included 29valuation method 29vouchers 59working hours 23; 29

Decking see Carpentry; Concrete worksDecontamination 124; 130Decoration

anti-corrosion treatments 218; 219decorative papers or fabrics

borders 219ceilings and beams 219motifs 219walls and columns 219

drawings and information 218intumescent coatings 218; 219painting

general surfaces 219glazed surfaces 219

INDEX

282 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 290: RICS new rules of measurement 2

gutters 219pipes 219radiators 219railings/fences and gates 219services 219structural metalwork 219

Defective products/executionsemployer’s requirements 63

Defined provisional summeaning 11

Definitions 11–13Demolitions

decontamination 124drawings and information 122facade retention 122; 123recycling 124shoring 122; 123survey reports 32temporary works 122; 123

Descriptionbuilding components/items 46–48components and sub-components 47dimensions 47fixing/installing/incorporating goods or materials

47main contractor’s preliminaries 22; 52nature and location of work 46nature or type of background 47site 51sub-components 47type and quality of material 47works package contractor’s preliminaries 112;

113Design constraints 68Design team

meaning 11Diaphragm walls see WallsDimensions

description 47quality standards and control 62quantities 46use of hyphen or phrase to 43; 47

Director’s adjustmentcommercial review of project 29meaning 11provision in bill of quantities 29

Documents see also Drawings; Information andrequirements

data interchange 56; 115definitions and interpretations 53; 54electronic data interchange 56; 115employer’s requirements 53–56form of tender 20main contractor’s preliminaries 22; 23; 51; 53–56produced on behalf of employer

additional copies of drawings/documents 55; 114dimensions 55; 114divergence from statutory requirements 55; 114employer’s policy document 55

measured quantities 55; 114specification 55; 114

provided by contractor/subcontractors andsuppliers

as built/as-installed drawings and information 55;114

Code for Sustainable Homes 56; 114design information 55; 114electronic data interchange 56; 114energy rating calculations 56environmental assessment information 56; 114maintenance instructions and guarantees 56production information 55; 114technical literature 55; 114

works package contractor’s preliminaries 111;112; 113

Door schedules 31Doors/shutters and hatches

collapsible gates 203door frames 203door linings 203door sets 203door stops 203drawings and information 202fire stops 203glazing

louvre blades 204type of glass 204

grilles 203ironmongery 204roller shutters 203sliding folding partitions 203smoke stops 203strong room doors 203timber/metal and plastic 202–204

Drainageabove ground

drawings and information 227foul drainage installations 227–229gutters 228holes/mortices/chases and the like 228identification 228operating manuals and instructions 229pipe sleeves through walls/floors and ceilings 228pipework 227preparing drawings 227rainwater installations 227–229testing and commissioning 228

below groundaccessories 232cesspits 232connections 233covers and frames 233drain runs 231drawings and information 230extra over 231; 233foul drain systems 230–233inspection chambers 232land drainage 230–233manholes 232marker posts 233

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 283

Page 291: RICS new rules of measurement 2

other tanks and pits 232pipe fittings 232pumped drain systems 230–233pumps 232septic tanks 232soakaways 232storm water drain systems 230–233sundries 233testing and commissioning 233

schedules 31temporary, main contractor’s costs 85

Drawingsalterations to existing buildings 125; 126balustrades 205block plan 31carpentry 173cladding and covering 192component drawings 31conservation 125; 126crib walls/gabions and reinforced earth 149decoration 218demolitions 122detail or assembly drawings 31diaphragm walls and embedded retaining walls

147doors 202drainage

above ground 227below ground 230

electrical installations, builder’s work on 256electrical services 250excavations and filling 131; 133existing, as-built or as-installed drawings 31fencing 238finishings to floors/walls and ceilings 212; 213furniture/fittings and equipment 225general arrangement (GA) drawings 31glazing 210ground remediation and soil stabilisation 139hatches 202in-situ concrete works 151insulation 223joinery 195; 196landscaping 241linings and partitions (proprietary) 187location drawings 31main contractor’s preliminaries 22; 51masonry 164; 165mechanical installations, builder’s work on 256mechanical services 245metalwork 208off-site manufactured materials/components or

buildings 120; 121piling 142plans, sections and elevations 31pre-cast/composite concrete works 159pre-cast concrete works 161; 162record drawings 31; 62repairs to existing buildings 115; 116

requirements 31roof coverings 176; 177; 181; 182schedules 31schematic drawings 31shutters 202site plan 31site works 234stairs 205structural metalwork 169suspended ceilings 220tile and slate roof/wall coverings 181; 182transportation 254transportation installations, builder’s work on

256underpinning 145walkways 205waterproofing 184–186windows/screens and lights 200works package contractor’s preliminaries 111;

112Drylining 187–191

E

Early possessionemployer’s requirements 58

Earth reinforcement walls 150Earth rods 253Ecological survey 32Electrical engineering services

schedules 31Electrical installations

builder’s workaccess chambers 259accessories 259bases/plinths and the like 256catenary cables 257connections 260drawings and information 256duct covers and frames 257existing buildings 257; 258external services installations 258–260extra over, excavation/service runs 258; 259; 260holes/mortices and chases 256inspection chambers 259manholes 259marker posts/plates 260new buildings 256; 257pipe and duct sleeves 256pipe duct fittings 259stopcock pits 259surface boxes 259testing and commissioning 260underground service runs 258valve chambers 259

Electrical installations certificate 62Electrical services

air terminations 253busbar 252cables 251

INDEX

284 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 292: RICS new rules of measurement 2

containment 251termination and joints 252

commissioning 253drawings and information 250; 253earth rods 253electrodes 252employer’s requirements 62final circuits 252fire stopping and other associated fire protection

work 253identification 253loose ancillaries 253modular wiring systems 252operation and maintenance manuals 253post practical completion services 253primary equipment 250; 251system validation 253tapes 252terminal equipment and fittings 251termination bars 253testing 254training 253

Electricitysite services and facilities 70temporary supply, main contractor’s costs 84

Electromagnetic interference 67Electronic data interchange 56; 114E-mail

site services and facilities 71Employers

meaning 11names/addresses and contact points 50policy documents

compliance with 32main contractor’s preliminaries 55works package contractor’s preliminaries 55

project sponsor 11quantifying building works, responsibility for 19risks see RisksSenior Responsible Owner 11

Employer’s requirementsmain contractor’s preliminaries

documents, provision/content and use of seeDocuments

health and safety see Health and safetyinsurance 32management of the works see Management of

worksmethod/sequence and timing of work 68; 69operation/maintenance of finished building 73; 74post completion 32quality standards and quality control see Quality

standards and quality controlservices and facilities 69–72site accommodation 69; 70specific requirements 23temporary works 72; 73

works package contractor’s preliminariescompletion and post-completion 77pricing schedule see Pricing schedule

site accommodation 75; 76site records 76

Energy performance certificate 63Energy rating calculations 56Environmental assessment information 56; 114Environmental control of building

main contractor’s costs 89Environmental protection measures

main contractor’s costs 88Environmental reports 32Estimated prices

product/component not specified 49Excavation and filling

commencing level 134cutting off tops of piles 138damp proof membrane 138disposals 136; 144drawings and information 131; 132extra over all types of excavation 135; 136filling using excavated material 137geotextile fabric 138ground movement protection boards 138ground stabilisation meshes 138imported filling 137methane barrier 138preliminary sitework 132radon barrier 138retaining material on site 136site clearance 133site preparation 133; 134support to faces 136tree and tree stump removal 133

Existing buildingsalterations/repairs and conservation 125–130health and safety 68main contractors’ preliminaries 51work carried out to 48work package contractor’s preliminaries 112

Existing featureshealth and safety 67

Existing workprotection 68

Explosiveshealth and safety 65

Extensions of time 58

F

Facilitiescontractor’s preliminaries 23site services and facilities 69–73

Fascias 174; 185Fax installation

site services and facilities 71Fees and charges

main contractors 97Fencing and gates

drawings and information 238extra over for supports 239; 240

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 285

Page 293: RICS new rules of measurement 2

independent gate posts 239ironmongery 240painting 219security/protection, main contractor’s costs 86temporary works 72type/height 238; 239

Filling see Excavation and fillingFinishings to floors/walls and ceilings

accessories 217applied liquid or planted finishes 212–217architraves 216bands 216beads 216board insulation 216ceiling ribs 216ceilings 215channels 216cornices 216cover strips 216coves 216dividing strips 216drawings and information 212; 213fire barriers within void under raised floor 214floors

raised access floors 214screeds/beds and toppings 214type and thickness 214

in situ 212–217isolated beams 215isolated columns 215isolation membranes 216kerbs and cappings 216metal mesh lathings 216mosaic 212–217mouldings 216movement joints 216nosings 216precast plaster components 217quilt insulation 216ramps to raised access floors 214reinforcement 216risers 215roofs 215sheet 212–217skirtings 215strings and aprons 215surface dressings/sealers or polishers 216tiles/slabs or blocks 216treads 215walls 215

Firebarriers

suspended ceilings 221; 222within void below raised floors 214

insulationmechanical services 247; 248sleeves, collars and the like 224stops 224; 249

prevention 66

stops 203; 224; 248First fix timbers 174Fittings and equipment see Furniture, fittings and

equipmentFixed charge

meaning 11Fixed price contracts 28; 29Flashings 128; 179Flooring see Carpentry; Concrete works; Finishings

to floors/walls and ceilingsFluctuating price contracts 29Flues 166Form of tender

bill of quantities composition 20certificate of bona fide tender 20

Foul drainage installationsbelow ground 230–233above ground 227–229

Frame structuresprecast concrete see Concrete works

Furniture, fittings and equipmentancillary items 226bird/vermin control 225; 226catering equipment 225; 226drawings and information 225employer-provided 226kitchen fittings 225; 226main contractor’s costs 81; 82pricing schedule 76protection 68sanitary appliance and fittings 225; 226schedules 31signwriting 226site and street furniture 225; 226with/without services 226

G

Gambion basket walls 149Gas installation certificate 62Gas supplies

temporarymain contractor’s costs 84work package contractor’s preliminaries 107

Gates see Fencing and gatesGeneral arrangement (GA) drawings 31Geotechnical reports 32Geotextile fabric

excavation and filling 138Giant hogweed remediation plan 32Glass block walling 164–168Glazing

doors/shutters and hatches 204drawings and information 210extra work 210glazed vaulting 192–194lead lights 211louvre blades 201; 204; 210mirrors 211

INDEX

286 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 294: RICS new rules of measurement 2

removal of existing glass/preparation of frame fornew 211

saddle bars 211sealed units 210type of glass 201; 210

Grantsclaims, data to support 32

Grassed areashealth and safety 67landscaping 242

Gravelsite works 235

Grilles 203Ground remediation and soil stabilisation

chemical neutralising 140compacting 141drawings and information 139freezing 140ground anchors 140ground gas venting 140incorporating cement into soil in situ 141information required 32; 139pressure grouting/ground permeation 141site dewatering 140soil nailing 140sterilisation 140

Groundwatercontractors’ preliminaries 51excavation and filling 136investigation reports 32

Guaranteesmain contractor’s costs 99

Gutters 179; 185; 219

H

Handover see Completion of worksHandrails and grab rails 196; 207Hard landscaping see Site worksHatches see Doors/shutters and hatchesHazards see Health and safetyHealth and safety

adjoining property 68asbestos 66antiquities 66building interiors 68burning on-site 66construction phase plan 65electromagnetic interference 67execution hazards 64existing services/features/structures and work

67; 68explosives 65fire prevention 66furniture/fittings and equipment 68infected timber/contaminated materials 66invasive species 67laser equipment 67main contractor’s costs

barriers and safety scaffolding 87; 88environmental protection measures 88safety programme 87

main contractor’s preliminaries 23; 52; 64–68mobile telephone use 65moisture 66noise 66occupied premises 65occupier’s rules and regulations 65operation and maintenance of building 73; 119passes 65pesticides 66pollution control 66power actuated fixing systems 67pre-construction information 64product hazards 64protection 65–68recycling material/reuse 68roads and footpaths 67site visits 65smoking on-site 66stability and structural integrity of works 65topsoil and subsoil 67trees/shrubs and grassed areas 67valuable and vulnerable items 68waste 66wildlife species and habitats 67working precautions/restrictions 65work package contractor’s preliminaries 117;

118Heating systems

site services and facilities 71Hedges see Landscaping;Trees/shrubs and

vegetationHoarding requirements 32; 72; 86Hoggin

site works 235Hoists

main contractor’s costs 91Hyphen

use of 43; 47

I

Infected timbers 66Infestation removal 124Information and requirements see also Documents;

Drawings; Reports; Schedulescomposition of bill of quantities 21descriptions 47drawings see Drawingshealth and safety see Health and safetymain contractor’s preliminaries 22; 23; 44; 50–74

contract conditions 53description of work 52employer’s requirements see Employer’s

requirementsproject particulars 50site and existing buildings 51; 52

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 287

Page 295: RICS new rules of measurement 2

management of the works see Management ofworks

preparation of bill of quantities 18; 19; 30quality standards and control see Quality

standards and quality controlsecurity, safety and protection see Health and

safety; Security, safety and protectionmeasures

specificationperformance 30prescriptive 30

work package contractor’s preliminaries 24; 44;100–108

contract conditions 102description of work 101; 102project particulars 100site and existing buildings 101specific limitations on method/sequence and

timing 107In-situ concrete works see Concrete worksInspection chambers 232Inspections

access for 63employer’s requirements 63; 115main contractor’s costs 88products and work executed 61

Insulationboards 223cavity 167drawings and information 223filling cavities 224finishings to floors/walls/seilings 216fire sleeves/collars and the like 224fire stops 224; 249loose 223mechanical services 245–249quilts 223sheets 223sprayed 223thermal, employer’s requirements 63

Insurancesemployer’s requirements 32; 57main contractor’s costs 98; 99

Interim valuations and payments 39; 40; 59Interiors of buildings

protection 68Internet

site services and facilities 71Invasive species

employer’s requirements 67invasive plant growth survey 32

Ironmongery 199; 201; 240IT systems see Telecommunications and IT systems

J

Japanese knotweed remediation plan 32Joinery

architraves 196

beads 196blackboards 196casings 196ceiling boarding/sheeting/panelling 196cover fillets 185cubicle partition sets 196drawings and information 195duct covers/panels 196; 197floor boarding/sheeting/panelling 196handrails and grab rails 196infill panels and sheets 195–199ironmongery not associated with windows and

doors 184–188linings 196nosings 196panelling 196partitions/panels and cubicles (proprietary)

197–199picture rails 196pinboards 196pipe casings 196plinth blocks 196sealant joints 195–199shelves 196skirtings 196stops 196trims 196unframed isolated trims/skirtings and sundry

items 195–199wall boarding/sheeting/panelling 196window boards 196worktops 196

K

Kitchen fittings 225; 226

L

Labourprice fluctuations 28; 29records, employer’s requirements 60

Ladders 206Lakes

site works 237Land drainage 230–233Landscaping

hard landscaping see Site workslandscape management services, pricing schedule

77schedules 31site works see Site workssoft landscaping

bulbs/corms and tubers 243cultivating 242drawings and information 241hedge plants 243maintenance 244plant containers 243

INDEX

288 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 296: RICS new rules of measurement 2

plants 243protection 244seeding 242shrubs 243surface applications 242trees 243turfing 242young nursery stock trees 243

Lantern lights 201Laser equipment 67Lead lights 211Legal advice costs 78Lifts

site services and facilities 72Lighting and power

site services and facilities 70; 118Line markings

site works 237Lining paper see DecorationLinings, partitions and panels see also Finishings to

floors/walls and ceilingsbeads 191concrete work see Concrete worksdrawings and information 20drylining and partitioning systems to walls and

ceilings 187–191extra over

access panels 189; 191angles 189; 190different 188forming openings 189; 190junctions 189; 190non-standard perimeter details 190

fair ends to partitions 189metal framed systems to walls and ceilings

187–191proprietary linings

beams 190bulkheads 190ceilings 190columns 190walls 190

Lintelsprecast concrete see Concrete works

Location of work 46Loft ladders 206Louvres 201Luminaries schedules 31Lump sum price

firm bill of quantities 18

M

Macadamsite works 224

Machinery and plantmain contractor’s costs

access plant 92common usage 90concrete plant 92

hoists 91mobile cranes 91small plant and tools 93tower cranes 90; 91

Main contractorcosts see Main contractor’s cost itemsmeaning 12overheads and profit, meaning 13preliminaries see Preliminariespricing schedule see Pricing schedule

Main contractor’s cost itemscleaning 96completion/post-completion requirements 95; 96control and protection 88; 89fees and charges 97insurance/bonds/guarantees and warranties 98;

99management and staff 77–79mechanical plant 90–93safety and environmental protection 87; 88security 86site establishment 80–83site records 94; 95site services 97; 98temporary services 84; 85temporary works 93; 94

Mains servicescontractors’ preliminaries 51

Main summary see Summary for bill of quantitiesMaintenance and operation manual 73Maintenance instructions and guarantees

contractor’s preliminaries 56Maintenance services

contractor’s preliminaries 23employer’s requirements 74

Management and staffmain contractor’s cost items

extraordinary support costs 79project specific 77; 78travel 79visiting 78

Management of worksattendances 104; 105climatic conditions 57compensation events 57considerate constructors scheme 57cost control 58–60; 105early possession 58employer’s requirements 57–60; 104extensions of time 58insurance 57main contractor’s preliminaries 23; 57–60notice of completion 58ownership of materials/products 57photographic records 58programme 57; 105progress 57; 58; 105site meetings 58supervision 57

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 289

Page 297: RICS new rules of measurement 2

works package contractor’s preliminaries 104;105

Manholes 232; 259Manufacturer’s recommendations/instructions

compliance 60Masonry

arches 166artificial/cast stone walling and dressings

164–168attached projections 166bands, dimensional description 166brick/block walling 164–168cavity insulation 167creasing 168damp-proof courses 167diaphragm walls, overall thickness/spacing and

thickness of ribs stated 165drawings and information 164; 165extra over walls

opening perimeters 166perimeters/abutments 166

fillets 167flues and flue linings/filling around flues 166forming cavity 167glass block walling 164–168isolated piers/casings, chimney stacks and columns

166joint reinforcement 167joints 167natural stone rubble/ashlar walling and dressings

164–168pointing 167pre-formed cavity trays 167proprietary and individual spot items 168special purpose blocks or stones 167vaulting, thickness and type stated 165walls, overall thickness stated 165wedging and pinning 168

Materialsdescription 47dimensions 47price fluctuations 28; 29thicknesses 47type and quality 47

Mechanical and electrical engineering servicesco-ordination 62schedules 31

Mechanical installationsbuilder’s work

access chambers 259accessories 259bases/plinths and the like 256catenary cables 257connections 260drawings and information 256duct covers and frames 257existing buildings 257; 258external services installations 258–260extra over, excavation/service runs 258; 259; 260holes/mortices and chases 256

inspection chambers 259manholes 259marker posts/plates 260new buildings 256; 257pipe and duct sleeves 256pipe duct fittings 259stopcock pits 259surface boxes 259testing and commissioning 260underground service runs 258valve chambers 259

Mechanical servicescommissioning 249drawings and information 245; 249duct fittings 247employer’s requirements 62fire stopping 249identification 249insulation and fire protection 247; 248loose ancillaries 249operation and maintenance manuals 249pipe ancillaries 247pipe fittings 246pipework 246post-completion services 249primary equipment 246system validation 249terminal equipment and services 246testing 249training 249ventilation ducts 247

Method of measurementcontractor’s preliminaries 23

Method/sequence of workspecific limitations 68; 107

Measured workcomposition of bill of quantities 21

Meeting roomsemployer’s requirements 69

Metalwork see also Structural metalworkcomposite items 209drawings and information 208filling hollow sections 209general metalwork members 208isolated metal members 208isolated protective coatings 209sheet metal 208surface treatments 209wire mesh 209

Meter readings 72Methane barrier 138Mirrors 211Mobile telephones

main contractor’s costs 85on-site use 65site services and facilities 71; 107

Mock-upsemployer’s requirements 61

Moisture see Water

INDEX

290 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 298: RICS new rules of measurement 2

Monitoringmain contractor’s costs 88

Mosaic see Finishings to floors/walls and ceilingsMouldings 216Multi-service gang

main contractor’s costs 98

N

Name boardstemporary works 73; 108

Nature of work 46Noise

health and safety 66Non-measurable works

contractor designed works 25provisional sums 24; 25; 26risks 26works carried out by statutory undertakers 26

Notice of completion 58Notices and signs 225; 226

O

Occupied premiseshealth and safety 65

Office of Government Commerce Gateway seeOGC Gateway

Off-site manufactured materials/components orbuildings 120; 121

OGC Gatewaymeaning 13

OGC Gateway Processalternative to RIBA Plan of Work 8investment decision (3C) 18; 19meaning 13measurement in context with 8; 9

Oil installation appliance certificate 62Operation and maintenance of finished building

employer’s requirements 73; 74health and safety file 74; 108information for commissioning services 74main contractor’s preliminaries 23maintenance services 74operation and maintenance manual 73; 108pricing schedule 77spare parts 74tools 74training 74works package contractor’s preliminaries 108

Other development/project costsmeaning 13

Overheads and profitmeaning 13provision in bill of quantities 28

Overtime working 63Ownership of materials and products

management of works 57

P

Paintinggeneral surfaces 219glazed surfaces 219gutters 219pipes 219radiators 219railings/fences and gates 219services 219structural metalwork 219

Panelling see JoineryParking

contractors’ preliminaries 52Partitions and panels see Linings, partitions and

panelsParty wall agreements 32Passes

health and safety 65Pavement lights

precast concrete 162Payments

employer’s requirements 59Personal protective equipment

employer’s requirements 72Pesticides

health and safety 66Phasing requirements

statement of 32Photocopier

site services and facilities 71Photographic records

management of works 58Picture rails 196Piling

bored piles 143breaking through obstructions 143delays 144disposal of excavated materials 144drawings and information 142driven piles 143extra over 143interlocking sheet piles 143reinforcement to concrete piles 143tests 144vibro-compacted piles/trench fill 143

Pipework see DrainagePlanning conditions or information 32Plans see DrawingsPlants see LandscapingPleum ceilings 221Pollution control 66; 88Pool/pond linings 237Post-completion requirements

contractor’s preliminaries 23details of 32employer’s requirements 32main contractor’s costs 95; 96

Post tender estimate

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 291

Page 299: RICS new rules of measurement 2

meaning 13preparation 39

Power actuated fixing systems 67Precast concrete see Concrete worksPrefabricated buildings 121Preliminaries

categories 22main contractors

advertising and marketing 23boundary of construction site 22constraints and restrictions 22description of building project 22drawings 22employer’s requirements see Employer’s

requirementsfacilities 23information and requirements 22; 23; 44; 50–74maintenance services 23management of the works 23method of measurement 23operation and maintenance of finished building

23post-completion requirements 23pricing schedule 23; 24; 44project particulars 50quality standards and quality control see Quality

standards and quality controlsecurity, safety and protection measures 23standard form of contract 22temporary works and services 23timing of works 23

meaning 12rules for describing and quantifying 43summary for bill of quantities

information and requirements 20; 21; 22pricing schedule 20; 21; 23

work package contractorsemployer’s requirements see Employer’s

requirementsinformation and requirements see Information and

requirementspricing schedule see Pricing schedule

Preparation of bill of quantitiesbreakdown structure 262–264codification see Codification of bill of quantitiescredits 275format of bill 267framing descriptions 268information requirements 18; 19OGC Gateway 3C (investment decision) 18; 19order of items 265; 266order of sizes 267pricing schedule

condensed 269expanded 270; 271

pricing summary 268condensed 272expanded 273; 274provisional sums 275

production information requirements 18

RIBA Work Stage E (technical design) 18; 19RIBA Work Stage F (production information) 18;

19RIBA Work Stage G (tender documentation) 18;

19risks 275technical designs and specifications 18totalling pages 268unit of billing 268unit of measurement 267use of headings 268

Pre-tender estimatemeaning 12preparation 39

Price fluctuationsfixed price contracts 28fluctuating price contracts 29

Pricing scheduledescription 21employer’s requirements 24

completion and post-completion requirements77

furniture and equipment 76site accommodation 75; 76site records 76telecommunications and IT systems 76

main contractor’s cost itemsbonds 99cleaning 96completion and post-completion requirements

95; 96control and protection 88; 89fees and charges 97guarantees 99insurance 98; 99management and staff 77–79mechanical plant 90–93safety and environmental protection 87; 88security 86site establishment 80–83site records 94; 95site services 97; 98temporary services 84; 85temporary works 93; 94warranties 99

main contractor’s preliminaries 23; 24; 44; 260;270; 271

templatescondensed 269expanded 270; 271

work package contractors’ preliminaries 24; 44Pricing summary

elemental bill of quantitiescondensed 263expanded 273; 274

Pricing variations 39Prime contractor see Main contractorPrime cost price (PC price)

type of product/component not specified 49Prime cost sum (PC sum)

INDEX

292 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 300: RICS new rules of measurement 2

meaning 12Production information

bill of quantities preparation 18; 19Progress monitoring 57; 58Project particulars

contractors’ preliminaries 22; 50Project sponsor see EmployersProject team

quantifying building works, responsibility for 19Proprietary linings and partitions see Linings,

partitions and panelsProtected species information 32Protection of works

main contractor’s costs 89Provisional sums

composition of bill of quantities 21; 22defined work 24; 25meaning 12non-measurable works 24; 25; 26overheads and profit 25templates 275undefined work 24; 25

Public liability insurancemain contractor’s costs 98

Pumps 232

Q

Quality standards and quality controlaccuracy/setting out 62; 105compliance 60execution 60incomplete information 60inspections 61main contractor’s preliminaries 23; 60–64manufacturer’s recommendations/instructions 61products 60related work 61samples/approvals 61; 105services 62; 105standards of products and executions 60; 61;

106supervision/inspection/defective work 62–64;

106water for the works 61work at or after completion 64; 106workmanship skills 60works package contractor’s preliminaries 105;

106Quantifying building works

responsibility for 19Quantities

approximate quantity 49estimates 49measurement and billing 46provisional quantity 49voids 46

Quantity surveyor/cost managerresponsibility for quantifying building works 19

R

Radiatorspainting 219

Radon barrier 138Rainwater installations 227–229Records

drawings 31; 62employer’s requirements 60main contractor’s costs 94; 95pricing schedule 76

Recruitment costs 78Recycling/reuse of materials 68; 124; 130Reinforcement schedules 31Removals and replacements 126; 127Renovations 125–130Repairs to buildings 125–130Repointing 127; 128Reports

environmental 32geotechnical 32refurbishment and demolition 32requirements for preparation of bill of quantities

32site survey 32

Residual or retained risk see RisksResin impregnation/injection 128RIBA Outline Plan of Work

meaning 12project stages 9

RIBA Plan of Workalternative to see OGC Gateway Processmeaning 7; 12measurement in context with 7; 8

RIBA Work Stagesbill of quantities production stage 18meaning 13production information (F) 18; 19project stages 9technical design (E) 18; 19tender documentation (G) 18

Riskscomposition of bill of quantities 21designed out or avoided 27generally 26; 27non-measurable works 26register/log 32residual or retained risk, meaning 12response, form of 27retention by the employer 27; 28sharing by both employer and contractor 27templates 275transfer to contractor 27

Roads and footpathshealth and safety 67main contractor’s costs 96site works see Site workstemporary works 72

Roller shutters 203

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 293

Page 301: RICS new rules of measurement 2

Roof coveringsasphalt 184–186bituminous felts 176–180boundary work, location/method of forming 167drawings and information 176; 177extra over for forming 178finishings 215fittings 180flashings 179gutters 179liquid 184–186mastic asphalt roofing 184–186more than/less than 500mm wide 177panel or slab 192–194plastic sheets 176–180profile sheet 192–194rigid boards with factory applied sheet metal

covering 176–180sheet metals 176–180sheet roof coverings 176–180spot items 180tile and slate

artificial stone slating 181–183boundary work, location/method of forming

described 182drawings and information 181; 182fibre cement slating 181–183fittings 183interlocking tiling 181–183natural slating 181–183plain tiling 81–183

valleys 179waterproofing

applied liquid roofing 184–186mastic asphalt 184–186

Rooflightsframes 201glass 201precast concrete 162

Room data sheets 31Royal Institute of British Architects

Plan of Work see RIBA Plan of Work

S

Safety see Health and safety; Security, safety andprotection measures

Samplesemployer’s requirements 61main contractor’s costs 89

Sanitary appliance and fittingsdrawings and information 225; 226site accommodation 69; 71

Sarking 176Scaffolding

main contractor’s costs 93Schedules

builder’s work mechanical and electricalengineering services 31

control schedules for mechanical/engineeringservices 31

dayworks see Dayworksdeemed to be drawings 31door schedules 31drainage schedules 31duties/outputs and sizes of primary mechanical

and electrical plant and equipment 31fitting/furnishings and equipment schedules 31gross external areas 32gross internal floor areas 32landscaping and planting schedules 31luminaries schedules 31net internal areas 32pricing see Pricing scheduleprimary mechanical and electrical plant and

equipment schedules 31reinforcement (bar bending) schedules 31room data sheets 31site area 32window schedules 31

Schematic drawings 31Screeds 214Screens see Windows/screens and lightsSecurity, safety and protection measures see also

Health and safetymain contractor’s costs

hoardings, fences and gates 86security equipment 86security staff 86

main contractor’s preliminaries 23; 65work package contractor’s preliminaries 86; 106;

107Seeding 242Senior Responsible Owner (SRO) see EmployersSeptic tanks 232Sequence of work see Method/sequence of workServices

brought-in 83electrical see Electrical serviceselectrical installation certificate 62gas/oil/solid fuel appliance installation certificate

62maintenance 23; 74mechanical services see Mechanical servicessite see Site services and facilitiestemporary work see Temporary works and

serviceswater regulation/byelaws 62

Setting outmain contractor’s costs 89

Setts and cobbles 236Sheeting see Carpentry; Roof coveringsSheet metal 208Shelves 196Shingles 181–183Shop fronts 201Shutters see Doors/shutters and hatchesSignwriting 226

INDEX

294 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 302: RICS new rules of measurement 2

Sillsprecast concrete see Concrete works

Siteaccommodation see Site accommodationdescription 51excavation and filling see Excavation and fillinghard landscaping see Site worksmain contractors’ preliminaries 51meetings 58plan 31; 32services see Site services and facilitiessurvey reports 32visits 52; 63work package contractor’s preliminaries 101

Site accommodationmain contractor’s costs 80

brought-in services 83consumables and services 83furniture and equipment 81; 82IT systems 82sundries 83temporary works in connection with 81

main contractor’s preliminariescar parking 70cleaning 96meeting rooms 69off-site offices/meeting rooms 69sanitary requirements 69site offices 69tidying 96use of accommodation/land not included in site

69work package contractor’s preliminaries 75

furniture and equipment 76telecommunications and IT systems 76

Site meetingsemployer’s requirements 58

Site planconstraints and restrictions 32general arrangement drawings 31

Site services and facilitiesbeneficial use of permanent installed services 71;

108computers 71e-mail and internet facilities 71fax installation 71heating systems 72lifts 71lighting and power 70; 107main contractor’s costs 97meter readings 71; 108mobile telephones 70; 107personal protective equipment 72photocopier 71sanitary installations 71surveying equipment 72telephones 70; 71temperature and humidity levels 71; 107thermometers 72water 70; 107

Site survey reports 32Site visits

contractors’ preliminaries 52health and safety 65

Site worksaccessories 2235; 236bricks/blocks and slabs 236channels 234coated macadam and asphalt 235cobbles 236drawings and information 234edgings 234extra over 235; 236formwork 235gravel 235hard landscaping 234–237hoggin 235in-situ concrete 235interlocking bricks/blocks and slabs 236joints 235kerbs 234letters/figures and symbols 237line markings 237liquid applied surfacings 238paving accessories 234pools/lakes ponds/waterways and the like, linings

for 235proprietary coloured sports surfacings 236reinforcement 235road and path pavings 234–237setts and cobbles 236sheet surfacings 236site furniture 236slabs 236sports surfacing 234spot items 237surface dressings 236tufted surfacings 236woodchip 235worked finishes 235

Skirtings 196; 215Skylights 201Slate roof coverings see Roof coveringsSliding folding partitions 203Smoke stops 203; 224; 248Smoking on-site 66Soffits 174Soil

analysis and soil stabilisation information 32contractors’ preliminaries 51stabilisation see Ground remediation and soil

stabilisationtopsoil and subsoil, health and safety 67

Solid fuel appliance installation certificate 62Sound passage

resistance to, employer’s requirements 63Spoil heaps

employer’s requirements 69excavations and filling 136

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 295

Page 303: RICS new rules of measurement 2

Special types of work 48Sports surfacing 234Staff see Management and staffStain removal 129Stairs/walkways and balustrades

balcony units 207balustrades 207barriers 207catwalks 206drawings and information 205; 206extra over

landings 206opening partitions 207

guard rails 208handrails 207ladders and loft ladders 206staircases 206timber/metal and plastic 205–207walkways 206

Standard form of contractcontractor’s preliminaries 22

Statutory undertakermeaning 13

Stone walling see MasonryStorm water drain systems 230–233Strong room doors 203Structural metalwork

allowance for fittings 170aluminium work 169–172cold rolled purlins, cladding rails and the like 171connections to existing steel etc. 172drawings and information 169extra over for 171filling hollow sections 172framed members

framing and fabrication 170permanent erection on site 170

holding down bolts/assemblies 171isolated protective coatings 172isolated structural members

fabrication 170permanent erection on site 170

painting 219profiled metal decking, type/profile stated 171special bolts 171steelwork 169–172surface treatments 172testing 172trial erection 172

Subcontractormeaning 13

Subsistence payments 79Summary for bill of quantities

annexes 22credits for materials arising from works 22dayworks (provisional) 22example 20measured work 21preliminaries

information and requirements 20pricing schedule 20

provisional sums 21; 22risks 21

Sundriesmain contractor’s costs 83

Sun shields 201Supervision

general requirements 62Surveying equipment

employer’s requirements 72Surveys

main contractor’s costs 88Suspended ceilings

access panels 221angle trims 221beams 221bulkheads 221depth of suspension 221drawings and information 220edge trims 221fire barriers 221

collars for services passing through 222fittings 222isolated strips 222plenum ceilings 222shadow gap battens 222upstands 222

Symbols used for measurement 10

T

Tankingapplied liquid tanking 184–186asphalt tanking 184–186flexible sheet tanking 184–186other proprietary systems 184–186underpinning 146

Technical designs and specificationsbill of quantities preparation 18; 19

Technical literaturecontractors’ preliminaries 55

Telecommunications and IT systemsemployer’s requirements 70; 71main contractor’s costs 82; 84pricing schedule 76

Telephones see Mobile telephones;Telecommunications and IT systems

Temperature and humiditysite services and facilities 71; 107

Temporary works and servicesadvertising 73; 108alterations, repairs and conservation 130demolitions 122; 123employer’s requirements 69; 72; 73fences/hoardings/screens and roofs 72main contractor’s costs 81; 94; 97

access scaffolding 93; 94drainage 85

INDEX

296 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 304: RICS new rules of measurement 2

electricity supplies 84gas supplies 84pricing schedule 93; 94telecommunication systems 84water supplies 84

main contractor’s preliminaries 23methodology/drawings and sketches 32name boards 73; 108protection for trees/vegetation 73roads/hard standings and footpaths 72main contractor’s costs

site accommodation 81work package contractor’s preliminaries 108

Tender documentationRIBA Work Stage G 18

Tender priceapproximate bill of quantities 18firm bill of quantities 18

Testsemployer’s requirements 63

Thermal insulationcontinuity, employer’s requirements 63

Thermometerssite facilities and services 71

Thicknessesdescription 47

Tidal conditions 48Tiling see Finishings to floors/walls and ceilings;

Roof coveringsTimber work see CarpentryTime-related charge

meaning 13Timing of works

contractor’s preliminaries 23; 107extensions of time 58

Tower cranesmain contractor’s costs 90

Transportationdrawings and information 254; 155fire stopping and other associated fire protection

work 255identification 255loose ancillaries 255operation and maintenance manuals 255post practical completion services 255system 254

validation 255testing and commissioning 255training 255

Transportation installationsbuilder’s work

access chambers 259accessories 259bases/plinths and the like 256catenary cables 257connections 260drawings and information 256duct covers and frames 257existing buildings 257; 258external services installations 258–260

extra over, excavation/service runs 258; 259; 260holes/mortices and chases 256inspection chambers 259manholes 259marker posts/plates 260new buildings 256; 257pipe and duct sleeves 256pipe duct fittings 259stopcock pits 259surface boxes 259testing and commissioning 260underground service runs 258valve chambers 259

Trees/shrubs and vegetationexcavation and filling 133health and safety 67soft landscaping see Landscapingtemporary protection measures 73

Turfing 242

U

Undefined provisional summeaning 13

Underground work 48Underpinning

brickwork/blockwork 146concrete 146drawings and information 145formwork 146in works underpinning 146reinforcement 146tanking 146

Use of land/buildingscontractors’ preliminaries 51

Use of sitecontractors’ preliminaries 52

V

Valleys 179; 185Valuable and vulnerable items

protection 68Valuation of works

interim 39; 40; 59Value added tax

assessment as part of tender return 30exclusion from bill of quantities 30recovery, data to support 32

Vermin controlequipment and fittings 225; 226

Visiting management and staffmain contractor’s costs 78

Visits to sitecontractors’ preliminaries 52; 65

Voidsdeductions for 46

INDEX

EFFECTIVE FROM 1 JANUARY 2013 RICS NEW RULES OF MEASUREMENT | 297

Page 305: RICS new rules of measurement 2

W

Walkways see Stairs/walkways and balustradesWall paper see DecorationWalls

brick/block see Masonrycrib walls 149diaphragm walls and embedded retaining walls

delays 148drawings and information 147extra over excavation and disposal 148joints 148tests 148thickness stated 147trimming and cleaning exposed faces 148

drylining 187–191earth reinforcement 150finishes see Finishings to floors/walls and ceilingsgambion basket walls 149lining and partitions (proprietary) 187–191metal framed systems 187–191partitionary 187–191precast concrete see Concrete worksstone see Masonrytile and slate coverings 181–183

Wall tiesinserting new 128

Warrantiesmain contractor’s costs 99

Wasteemployer’s requirements 66

Water see also Groundwaterfor the works, quality control 61prevention of wetness/dampness 66regulations/byelaws

contractor’s certificate 62notification 62

site services and facilities 70; 107temporary supplies, main contractor’s costs 84working in or under 48

Waterproofingapplied liquid roofing 184–186aprons 185asphalt tanking or damp proofing 184–186channels 185coverings more than/less than 500mm wide 185drawings and information 184edge trim 186fascias 185fittings 186gutters 185kerbs 185mastic asphalt roofing 184–186

skirtings 186spot items 186tanking or damp proofing 184–186valleys 185

Weatherboarding 192–194Wildlife species and habitat

information 32protection 67

Windows/screens and lightsdrawings and information 200frames 201glazing

glass type 201louvre blades 201

ironmongery 201louvres 201rooflights/sky lights and lanternlights 201screens/borrowed lights and frames 201shop fronts 200; 201shutters 201sun shields 201timber/metal and plastic 200; 201

Window schedules 31Wiring see Electrical servicesWire mesh 209Woodchip

site works 235Work at or after completion

quality standards and control 64Work breakdown structures (WBS)

meaning 13planning 33; 34work package breakdown structure 33; 34

example of suffix codes 37; 38; 276–278work sectional breakdown structure 33–36

example of suffix codes 35; 36Working hours

contractor’s preliminaries 23definitions 68overtime 63schedule of dayworks 29

Workmanship skillsquality standards and control 60

Work of special types 48Work package contractor

employer’s requirements see Employer’srequirements

information see Information and requirementsmeaning 13preliminaries see Preliminariespricing schedule see Pricing schedule

Worktops 196

INDEX

298 | RICS NEW RULES OF MEASUREMENT EFFECTIVE FROM 1 JANUARY 2013

Page 306: RICS new rules of measurement 2

NRM 2: Detailed measurement for building works

The RICS new rules of measurement (NRM) is a suite of documents issued by the RICS QuantitySurveying and Construction Professional Group.

The rules have been written to provide a standard set of measurement rules that are understandable byall those involved in a construction project. They provide advice and best practice guidance to RICSmembers involved in the cost management of construction projects worldwide.

This volume, NRM 2: Detailed measurement for building works, provides detailed rules for themeasurement and description of building works for the purpose of obtaining tender prices. The rulesaddress all aspects of bill of quantities production, including setting out the information required from theemployer and other construction consultants to enable a bill of quantities to be prepared, as well asdealing with the quantification of non-measurable work items, contractor designed works and risks.Guidance is also provided on the content, structure and format of bill of quantities, as well as the benefitsand uses of bill of quantities.

Moreover, the rules can be used for bill of quantities for both main contract works and for discrete workpackages – including separate preliminaries for both.

Although written primarily for the preparation of bill of quantities and quantified schedules of works, therules will be invaluable when designing and developing standard or bespoke schedules of rates, or otherquantity-based pricing document.

These rules provide essential guidance to all those involved in the preparation of bill of quantities,quantified schedules of works, schedules of rates and similar pricing documents, as well as those whowish to be better informed about the purpose, use and benefits of adopting detailed measurement oftheir cost control procedures.

The RICS new rules of measurement are based on UK practice but the requirements for a coordinatedset of rules and underlying philosophy behind each volume have worldwide application.

RICS new rules of measurement

RICS new rulesof measurementDetailed measurementfor building works

2

Detailed

measurem

ent for b

uilding

wo

rks