rf optimisation - welcome to gtl ltd. :: · pdf filerf optimisation remains one of the key...
TRANSCRIPT
Safe harbor
Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action taken on the basis of information contained herein.
For a discussion of the risks and uncertainties that may cause results to differ, you should review GTLs filings with stock exchanges, including the annual report and quarterly disclosures.
RF RF OptimisationOptimisation
Network Planning, Design & OptimisationCore Offerings
2
Imperatives for Optimisation
3
RF optimisation remains one of the key challenges in any network.
Identifying potential faults in the network and resolving them before they affect network performance.
Rectifying causes of faults affecting network performance.
Leads to efficient use of the spectrum.
Optimisation Overview
4
Need for optimisation
Perceived reduction in network quality.
Maximising the use of existing infrastructure.
Introduction of new services.
Indications from network performance monitoring.
Subscriber's experience of using the network.
Operators wants to ensure the best returns on investment.
Maximise existing resources to accommodate new services such as GPRS.
Flawed original design in format.
Original design information has changed.
Change in original design parameters.
Network issues that may generate a requirement
5
Network Lifecycle
Network
Rollout
Network
Planning
Licence
Award
Continuous Optimisation
Pre Launch
Optimisation
Network Lifecycle
Swap Management
(If required)
6
RF Optimisation
7
SwapManagement
- BTS upgrade
- BTS re-homing
- BSC re-parenting
- Transmission Re-engineering
(If required)
Pre Launch Optimisation
Continuous Optimisation
Virtual Optimisation Centre
Virtual Optimisation Centre
Pre Launch Optimisation
8
Objectives
High rate of integrations
Low traffic (Pre-launch or launch)
Predominantly drive data dependant
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
Optimisation Process Single site verification
9
RF Site Audit
Coverage Verification
Parameter verification
Reconfiguration
Problem Analysis
Fail
PassSite
Acceptance
Site IdentificationPre Launch
Optimisation
Continuous Optimisation
Swap Management
Optimisation Process Drive Test Based
10
ClusterStimulation
Site Identification
ClusterPreparation
Drive Test
Data Analysis Reconfiguration
Problem Analysis
Site Acceptance
Fail
PassCluster Analysis
Cluster IdentificationPre Launch
Optimisation
Continuous Optimisation
Swap Management
Cluster Analysis
OMC Data
Drive Test Results
SimulationData
Determine clusters for acceptance
Characterise performance
Ensure correct site configuration
Drive tests
Process data
Analysis
Remodelling
Reconfiguration
Parameter Setting Neighbors Powered Stable
Call statistics Key measurement events Neighbor analysisKey measurement data
Parameters Neighbors Report Hardware Requirements
11
Cluster Reconfiguration
12
HardwareHardware
OptimisationOptimisation
Antenna Reorientation
Antenna Down tilt
Antenna Relocation
Antenna Height adjustment
Masthead Amplifiers
Cell parameter Cell parameter
optimisationoptimisation
Handover parameters
Power planning
Neighbour list reconfiguration
Frequency planning
Performance Monitoring
Pre Launch
Optimisation
Swap Management
Continuous Optimisation
Pre Launch Optimization
13
Parameter Analysis
Process Creation
KPI Definition
KPI Reporting
Training
Functionality
Asses
Config Management
Cluster
Preparation
Drive Testing
Drive Analysis
Modelling
Cluster Monitoring
Model Calibration
Cluster
Identification
Network Reconfigure
On SiteOff Site
What GTL can do for you
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
KPIs to be MonitoredBased on performance of a Network & Cell
Network KPI Target TypeKPI Deciding
Factor
Network / Town Level
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH
Blocking
93%
95%
5%
2%
3%
Performance
Performance
Performance
Performance
Performance
TBD upon checking trend to maintain the performance of the network
and to improve
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH Blocking
90%
92%
10%
4%
6%
Performance
Performance
Performance
Performance
Performance
TBD upon checking trend to maintain the performance of the network
and to improve
Cell Level
(TBD : To Be Decided)
14
KPIs to be MonitoredBased on performance of a Network & Cell
Network KPI Target TypeKPI Deciding
Factor
Network / Town Level
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data
Accessibility
TBA
TBA
TBA
TBA
TBA
Performance
Performance
Performance
Performance
Performance
TBD upon checking trend to maintain the performance of the network
and to improve
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data Accessibility
Performance
Performance
Performance
Performance
Performance
TBD upon checking trend to maintain the performance of the network
and to improve
Cell Level
(TBA : To Be Accepted)
15
TBA
TBA
TBA
TBA
TBA
Reports
Pre Launch Optimization
Cell / Cluster Drive Test and Analysis Report.
Quality issues identification and RX lev, RX Qual, TCH Blocking,SDCCH Drop,HO Issues, Call drop problems, and call set up issues analysis.
RF parameters audit and tuning : neighbour site list, power
parameters, HO parameters, etc.
Cell / Cluster Optimisation Report.
Antenna engineering tuning.
Deliverables
Cell / cluster Optimisation and tuning to reach acceptance criteria.
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
16
Reports
Network Analysis and Optimisation Report.
Cell, cluster, Network drive test reports from post processing tool.
RF coverage and quality assessment report.
Radio and system Parameters audit and tuning report.
Optimisation Report.
Acceptance Report.
Interference Measurement.
Updated network site database.
Traffic Statistics Analysis Report.
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
17
Continuous Optimisation
18
Objectives
Minimisation of integration Issues
Maintaining the traffic rate within medium to low
To achieve more stability in neighbour/ pilot
Reducing operational cost
Predominantly OMC R Stats and Counters
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
Continuous Optimisation
19
Network Performance
Targets
Performance
Customer Faults Trouble Tickets
CM Data Call Trace
Drive Test Results Alarms
Service Level OMC
Status
Fault Resolution
Cell
Prioritisation
ReportsFault
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
Optimisation Process Drive Test Based
20
Pre Launch
Optimisation
Continuous Optimisation
Swap Management
Characterise performance
Ensure correct site configuration
Drive tests
Process data
Analysis
Remodelling
Reconfiguration
Parameter Setting Neighbors Powered Stable
Call statistics Key measurement events Neighbor analysisKey measurement data
Determine clusters for acceptance
Parameters Neighbors Report Hardware Requirements
Cluster Reconfiguration
21
HardwareHardware
OptimisationOptimisation
Antenna Reorientation
Antenna Down tilt
Antenna Relocation
Antenna Height adjustment
Masthead Amplifiers
Cell parameter Cell parameter
optimisationoptimisation
Handover parameters
Power planning
Neighbour list reconfiguration