revitalizing saint michael’s drive in santa fe, nm nghia hoang kristen leigher john mulhern xiying...
TRANSCRIPT
Revitalizing Saint Michael’s Drive in Santa Fe, NM
Nghia HoangKristen LeigherJohn MulhernXiying Zhang
Introduction• Founding of Santa Fe• Trade Routes• Statehood• Growth of Santa Fe• Transportation in Santa Fe• Urban Development• Recent Planning Trends• Redevelopment of Saint Michael’s Drive
Worcester Polytechnic Institute
Founding of Santa Fe
San Miguel MissionEst. 1610
Santa Fe,established in 1607 as a
mission city, entitled as New Mexico’s capital in 1610 by
Don Pedro de Peralta
Worcester Polytechnic Institute
www.legendsofamerica.com/HC-SantaFe.html
Trade Routes
Camino RealSanta Fe Trail
Worcester Polytechnic Institute
http://steamboattimes.com/artwork_1.html
www.las-cruces.org/.../alongCamCamino.html
http://simplymarvelous.wordpress.com/2007/08/04/the-great-santa-fe-trail-horse-race/
Conflict – Pueblo Revolt 1680
Worcester Polytechnic Institute 5
American Indians migration Spanish colonization of Americas
Spanish prohibition of Pueblo Indians’ traditions
Conflict became the great Pueblo Revolt
Statehood
After the War,New Mexico officially
became 47th stateJanuary 6, 1912
Worcester Polytechnic Institute
http://goldenstate.wordpress.com/2009/09/29/your-car-insurance/
Growth of Santa Fe
1610 1680 202020101848 1960Foundation Spanish
PeriodAmerican Period
Urban Renewal Period
Present Future Plan
Urban DevelopmentSprawl
Worcester Polytechnic Institute
Car Oriented
http://www.aaroads.com/west/us-085sa_co.html
http://www.coldwellbankersantafe.com/index.php?page_id=291
Commercial
Timeline
Transportation in Santa FeRailway
Worcester Polytechnic Institute
Vehicle
Walking
http://www.aaroads.com/west/us-085sa_co.html
http://www.coldwellbankersantafe.com/index.php?page_id=291
Worcester Polytechnic Institute 22
St. Michael’s Formation
Aqua Fria St.
Cerrillos Rd.
St. Francis Dr.
1.The city’s corridors
Interstate 25
Worcester Polytechnic Institute 23
St. Michael’s Formation
Aqua Fria St.
Cerrillos Rd.
St. Francis Dr.
1.The city’s corridors
Interstate 25
2. St. Michael’s Drive as a bridge
St. Michael’s Dr.
Recent Planning TrendsSanta Fe Railyard Redevelopment
Worcester Polytechnic Institute
http://www.lewallencontemporary.com/title.php?ititlenum=10002727&corderby=artist.clastname, artist.cfirstname, title.cmedium, title.ctitle &artistId=1094
2004
Recent Planning TrendsSanta Fe Railyard Redevelopment
Worcester Polytechnic Institute
http://econewmexico.com/system/files/images/new-santa-fe-farmers-market.jpg
2008
Redesign of Saint Michael’s Drive
Worcester Polytechnic Institute
http://www.santafenm.gov/index.aspx?NID=1766
Mission Statement
The ultimate goal of this project is to assist the City of
Santa Fe in establishing baselines and setting targets for
the redevelopment of St. Michael’s.
Worcester Polytechnic Institute
Project Objectives
1. Identify relevant issues
2. Organize and integrate existing data
3. Identify measurable indicators
4. Measure the implications of the charrette’s designs
Worcester Polytechnic Institute
Identify Relevant Issues
• Using existing literature
• Surveying the locals
• Interviewing city officials
Worcester Polytechnic Institute
Worcester Polytechnic Institute
Organize and integrate existing data• Select pertinent data from existing sources
• Construct accessible database of team’s data from field studies.
• Presenting data visually
Identify measurable indicators
• Identify most relevant variables to quantify.
• Create system of measurement for each
variable.
Worcester Polytechnic Institute
Measure the implications of the charrette’s designs
• Apply quantitative systems to the charrette
designs.
• Identify most effective redevelopment design.
• Identify gaps in selected charrette design.
Worcester Polytechnic Institute 34
Questions
Worcester Polytechnic Institute 35