revised rfcsp 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt...

10
IEG, LTD. 2015 Addendum No. 1 14-1047 04-MAR-15 Page -1 Image Engineering Group, Ltd. 635 Westport Parkway, Suite 300 Grapevine, TX 76051 Office (817) 410-2858 Fax (817) 251-8411 March 04, 2015 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS HVAC HVAC HVAC HVAC REPLACEMENT REPLACEMENT REPLACEMENT REPLACEMENT AT AT AT AT NORTH OAKS MIDDLE SCHOOL NORTH OAKS MIDDLE SCHOOL NORTH OAKS MIDDLE SCHOOL NORTH OAKS MIDDLE SCHOOL FOR BIRDVILLE FOR BIRDVILLE FOR BIRDVILLE FOR BIRDVILLE INDEPENDENT INDEPENDENT INDEPENDENT INDEPENDENT SCHOOL DISTRICT SCHOOL DISTRICT SCHOOL DISTRICT SCHOOL DISTRICT IEG JOB NO. IEG JOB NO. IEG JOB NO. IEG JOB NO. 14 14 14 14-1047 1047 1047 1047 1.01 1.01 1.01 1.01 GENERAL: GENERAL: GENERAL: GENERAL: A. This Addendum modifies the construction documents, dated February 23, 2015 as noted within and shall become part of the Contract Documents. B. Bidder shall acknowledge receipt of this addendum in the space provided on the bid form. Failure to do so may subject bidder to disqualification. C. Contractor to include all labor and material required, no additional funds will be approved for any work shown Contractor to include all labor and material required, no additional funds will be approved for any work shown Contractor to include all labor and material required, no additional funds will be approved for any work shown Contractor to include all labor and material required, no additional funds will be approved for any work shown to be included to be included to be included to be included 1.02 1.02 1.02 1.02 CLARIFICATIONS CLARIFICATIONS CLARIFICATIONS CLARIFICATIONS: Question #1: Is there asbestos in the campus(es)? Answer: BISD confirmed that there is no asbestos in these campuses. Answer: BISD confirmed that there is no asbestos in these campuses. Answer: BISD confirmed that there is no asbestos in these campuses. Answer: BISD confirmed that there is no asbestos in these campuses. Question #2: Will there be CO2 controls? Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements. Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements. Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements. Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements. Question #3: Does the contractor to perform the geothermal related work need to be an approved geothermal installer. Answer: Answer: Answer: Answer: Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional information. information. information. information. Question #4: Does the proposer have to bid both projects. Answe Answe Answe Answer: No, proposer can bid either project or both projects. Each project is separate. r: No, proposer can bid either project or both projects. Each project is separate. r: No, proposer can bid either project or both projects. Each project is separate. r: No, proposer can bid either project or both projects. Each project is separate. 14 14 14 14-1047 1047 1047 1047 – HVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOL HVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOL HVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOL HVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOL 14 14 14 14-1048 1048 1048 1048 – LIGHTING REPLACEMENT AT TWO CAMPUSES LIGHTING REPLACEMENT AT TWO CAMPUSES LIGHTING REPLACEMENT AT TWO CAMPUSES LIGHTING REPLACEMENT AT TWO CAMPUSES Question #5: What are the controls at each campus? Answer: All contr Answer: All contr Answer: All contr Answer: All controls for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. ols for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. ols for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. ols for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. Contractor shall expand existing controls to accommodate new HVAC systems. Contractor shall expand existing controls to accommodate new HVAC systems. Contractor shall expand existing controls to accommodate new HVAC systems. Contractor shall expand existing controls to accommodate new HVAC systems. Question #6: Is test and balance of each system required. Answer: Yes, test and balan Answer: Yes, test and balan Answer: Yes, test and balan Answer: Yes, test and balance of each system is required, CFM values are indicated on plans. Refer Specification ce of each system is required, CFM values are indicated on plans. Refer Specification ce of each system is required, CFM values are indicated on plans. Refer Specification ce of each system is required, CFM values are indicated on plans. Refer Specification Section 15990 for Test Section 15990 for Test Section 15990 for Test Section 15990 for Test-Adjust Adjust Adjust Adjust-Balance. Balance. Balance. Balance. Question #7: Does the contractor have to be manufactures certified to install VRF system. Answer: Yes. Refer to Specification Sect Answer: Yes. Refer to Specification Sect Answer: Yes. Refer to Specification Sect Answer: Yes. Refer to Specification Section 15700, 203, A. ion 15700, 203, A. ion 15700, 203, A. ion 15700, 203, A. and Addendum Item included in this Addendum for and Addendum Item included in this Addendum for and Addendum Item included in this Addendum for and Addendum Item included in this Addendum for additional information. additional information. additional information. additional information. Comment #1: Contractor shall coordinate work to be performed with each campus and its schedule. Comment #2: On site walk is scheduled for Friday March 6 th at 1:30 PM. Meet at the front office of North Oaks Middle School, then travel to Watauga Middle school and Watauga Elementary School. Additional site visits can be scheduled with Ricky RFCSP 027-15 REVISED

Upload: others

Post on 11-Mar-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

IEG, LTD. 2015 Addendum No. 1 14-1047 04-MAR-15 Page -1

Image Engineering Group, Ltd. 635 Westport Parkway, Suite 300 Grapevine, TX 76051 Office (817) 410-2858 Fax (817) 251-8411

March 04, 2015

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS HVACHVACHVACHVAC REPLACEMENTREPLACEMENTREPLACEMENTREPLACEMENT AT AT AT AT NORTH OAKS MIDDLE SCHOOLNORTH OAKS MIDDLE SCHOOLNORTH OAKS MIDDLE SCHOOLNORTH OAKS MIDDLE SCHOOL FOR BIRDVILLEFOR BIRDVILLEFOR BIRDVILLEFOR BIRDVILLE INDEPENDENT INDEPENDENT INDEPENDENT INDEPENDENT SCHOOL DISTRICTSCHOOL DISTRICTSCHOOL DISTRICTSCHOOL DISTRICT IEG JOB NO. IEG JOB NO. IEG JOB NO. IEG JOB NO. 14141414----1047104710471047

1.011.011.011.01 GENERAL:GENERAL:GENERAL:GENERAL:

A. This Addendum modifies the construction documents, dated February 23, 2015 as noted within and shall become part of the Contract Documents.

B. Bidder shall acknowledge receipt of this addendum in the space provided on the bid form. Failure to do so may subject bidder to disqualification.

C. Contractor to include all labor and material required, no additional funds will be approved for any work shown Contractor to include all labor and material required, no additional funds will be approved for any work shown Contractor to include all labor and material required, no additional funds will be approved for any work shown Contractor to include all labor and material required, no additional funds will be approved for any work shown to be includedto be includedto be includedto be included

1.021.021.021.02 CLARIFICATIONSCLARIFICATIONSCLARIFICATIONSCLARIFICATIONS::::

Question #1: Is there asbestos in the campus(es)? Answer: BISD confirmed that there is no asbestos in these campuses.Answer: BISD confirmed that there is no asbestos in these campuses.Answer: BISD confirmed that there is no asbestos in these campuses.Answer: BISD confirmed that there is no asbestos in these campuses.

Question #2: Will there be CO2 controls? Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements.Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements.Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements.Answer: Yes. Refer to Specification Section 15975 for the CO2 requirements.

Question #3: Does the contractor to perform the geothermal related work need to be an approved geothermal installer. Answer: Answer: Answer: Answer: Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional Yes, refer to Specification Section 15880, and Addendum Item included in this Addendum for additional information. information. information. information.

Question #4: Does the proposer have to bid both projects. AnsweAnsweAnsweAnswer: No, proposer can bid either project or both projects. Each project is separate. r: No, proposer can bid either project or both projects. Each project is separate. r: No, proposer can bid either project or both projects. Each project is separate. r: No, proposer can bid either project or both projects. Each project is separate. 14141414----1047 1047 1047 1047 –––– HVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOLHVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOLHVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOLHVAC REPLACEMENT AT NORTH OAKS MIDDLE SCHOOL 14141414----1048 1048 1048 1048 –––– LIGHTING REPLACEMENT AT TWO CAMPUSESLIGHTING REPLACEMENT AT TWO CAMPUSESLIGHTING REPLACEMENT AT TWO CAMPUSESLIGHTING REPLACEMENT AT TWO CAMPUSES

Question #5: What are the controls at each campus? Answer: All contrAnswer: All contrAnswer: All contrAnswer: All controls for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. ols for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. ols for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. ols for these projects are Trance Tracer Summit. Refer to Specification Section 15975, 105, A. Contractor shall expand existing controls to accommodate new HVAC systems.Contractor shall expand existing controls to accommodate new HVAC systems.Contractor shall expand existing controls to accommodate new HVAC systems.Contractor shall expand existing controls to accommodate new HVAC systems.

Question #6: Is test and balance of each system required. Answer: Yes, test and balanAnswer: Yes, test and balanAnswer: Yes, test and balanAnswer: Yes, test and balance of each system is required, CFM values are indicated on plans. Refer Specification ce of each system is required, CFM values are indicated on plans. Refer Specification ce of each system is required, CFM values are indicated on plans. Refer Specification ce of each system is required, CFM values are indicated on plans. Refer Specification Section 15990 for TestSection 15990 for TestSection 15990 for TestSection 15990 for Test----AdjustAdjustAdjustAdjust----Balance.Balance.Balance.Balance.

Question #7: Does the contractor have to be manufactures certified to install VRF system. Answer: Yes. Refer to Specification SectAnswer: Yes. Refer to Specification SectAnswer: Yes. Refer to Specification SectAnswer: Yes. Refer to Specification Section 15700, 203, A.ion 15700, 203, A.ion 15700, 203, A.ion 15700, 203, A. and Addendum Item included in this Addendum for and Addendum Item included in this Addendum for and Addendum Item included in this Addendum for and Addendum Item included in this Addendum for additional information.additional information.additional information.additional information.

Comment #1: Contractor shall coordinate work to be performed with each campus and its schedule.

Comment #2: On site walk is scheduled for Friday March 6th at 1:30 PM. Meet at the front office of North Oaks Middle School, then travel to Watauga Middle school and Watauga Elementary School. Additional site visits can be scheduled with Ricky

RFCSP 027-15

REVISED

Page 2: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

IEG, LTD. 2015 Addendum No. 1 14-1047 04-MAR-15 Page -2

Grant Monday March 9th through Wednesday March 11th from 8:00AM to 2:00PM. Ricky Grant - 817.547.5856 – [email protected]

1.031.031.031.03 PROJECT MANUALPROJECT MANUALPROJECT MANUALPROJECT MANUAL

A. Refer to Vendor Return Packet:

1. Delete PROPOSAL FORM in its entirety. Replace with new PROPOSAL FORM.

B. Section 02100 School Operations Parameters Statement, Part 1.01, Paragraph C, delete in its entirety. Replace with new Paragraph C as follows.

Weekend and Holiday Access. All work in this bid package may be performed at any time during a normal work week. Any requirement by the Contractor to enter areas of the school on weekends or holidays shall be approved in advance by BISD and shall be coordinated through the school principal’s office since it will require BISD school staff to be present to unlock doors, provide access to mechanical and equipment rooms, etc. The Contractor will incur and will need to budget for overtime costs ($35/hr) for BISD Staff presence at the school site on weekends and holidays. This cost shall be included in the proposal price. The contractor submit a written request for weekend or holiday access to the Owner at least two (2) working days prior to the needed access date. Contractor shall submit copies of a detailed log that will track all hours worked during this period and will submit the log to the Owner on a weekly basis for review and approval. BISD will recover from the Contractor any and all overtime costs based on the actual wage rates involving District personnel. BISD shall seek reimbursement from the Contractor via a deductive change order to the contract at a point during the project to be determined by the Owner.

C. Section 15700 Direct Expansion (DX), Air Cooled, Variable Capacity, Split System, Part 2.03, Add the following

Paragraph B. as follows.

1. All field personnel installing any components of the Direct Expansion (DX), Air Cooled, Variable Capacity, Split System to be factory trained by Daikin. Contractor to submit Daikin Factory Training Certificates of installing personnel prior to starting installation. Systems that are installed by non-certified personnel will be subject to removal and replacement at the contractor’s expense.

D. Section 15880 Piping Closed Loop Geothermal Heat Pump System, Part 1.02, Paragraph B, delete in it’s entirety.

Replace with new Paragraph B. as follows.

1. Century Mechanical – Contact Rod Campbell or Mike Beebe (817-293-3803)

2. Johnson Drilling Company – Contact Mark Johnson (972-924-3411)

3. Geothermal Drilling, Inc. - William C. McPike (936) 293-8787

4. John Cook & Associates – Kevin Cook (972) 286-7266

5. Earth Tech - Jimmy Gaffney (972) 335-5814

6. Berger Engineering Company – Contact Don Lenoir (214) 358-4451

7. SkiHi Mechanical - Richard Skipper (817) 923-0292

8. Others must be approved in writing prior submitting proposal.

1.041.041.041.04 CONTRACT DOCUMENTSCONTRACT DOCUMENTSCONTRACT DOCUMENTSCONTRACT DOCUMENTS A. Sheet ME2.01

1. Provide (1) CO2 sensor for each of the following pieces of equipment. RTU-02, RTU-03, and AHU-BAND 1. Locate adjacent to each of these units space temperature sensor.

B. Sheet ME2.02 1. Refer to detail A2 NORTH OAKS MS – KITCHEN AND CAFETERIA DEMO PLAN.

a. Delete Kitchen outside air duct and louver note in its entirety. Replace with the following note:

REMOVE EXISTING OUTSIDE AIR DUCT AND LOUVER IN THEIR ENTIRETY. REWORK EXISTING WINDOW FRAMING AND REPLACE EXISTING INFILL WITH NEW GLAZING TO MATCH ADJACENT WINDOWS.

C. Sheet ME6.01

1. Delete Note By Symbol #5 in its entirety. Replace with new note as follows: PROVIDE AND INSTALL NEW CEILING IN CORRIDOR. PROVIDE AND INSTALL NEW LIGHT FIXTURES, METALUX MODEL 2GC8-232-A125-EB81 OR EQUAL, AS INDICATED. PROVIDE EMERGECNY BATERY PACKS FOR (4) OF

Page 3: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

IEG, LTD. 2015 Addendum No. 1 14-1047 04-MAR-15 Page -3

THESE FIXTURES PER MANUFACTURES RECOMMENDATIONS. CIRCUIT ON EXISTING CIRCUIT AND CONTROL WITH EXISTING SWITCHES. REINSTALL ALL EXISTING SYSTEMS INCLUDING, BUT NOT LIMITED TO, FIRE ALARM DEVICES, PA SYSTEMS AND LOW VOLTAGE CABLING.

D. Delete Sheet ME2.01 in its entirety. Replace with new Sheet ME2.01.

E. Delete Sheet ME5.01 in its entirety. Replace with new Sheet ME5.01.

End of Addendum End of Addendum End of Addendum End of Addendum No. No. No. No. 1111

Page 4: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax
Page 5: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

1 14-1047 BISD-HVAC IMPRVM 14-1047 BISD-HVAC IMPRVMT @ N OAKS MS

# SETS ORDERED COMPANY CONTACT EMAIL ADDRESS CITY STATE ZIP PHONE FAX

1 2/25/2015 ENCORE MECHANICAL KEITH KEITH WOODLEE [email protected] 2838 MARKET LOOP, SUITE 100 SOUTHLAKE TX 76092 817-583-3034

1 2/25/2015 3D MECHANICAL/SERVICE COMPANY ALISON LUNDY [email protected] P.O. BOX 501 KAUFMAN TX 75142 972-472-8469

1 2/26/2015 SPAETH MACHINE SHOP, INC. STEPHEN SPAETH [email protected] P.O. BOX 560564 DALLAS TX 75356 214-876-4194

1 2/26/15 INTEGRITYTEXAS CONSTRUCTION ALBERT VASQUEZ [email protected] 4712 MCNUTT STREET HALTOM CITY TX 76117 817-925-2613

1 2/26/15 SCOTT BECK CONSTRUCTION MIKE NANCE [email protected] 4028 RUFE SNOW DRIVEN RICHLAND

HILLS TX 76180 817-616-3277

1 2/26/2015 TRANE KAREN MIDDLETON [email protected] 1400 VALWOOD PKWY #100CARROLLTO

N TX 75006 972-973-6224

1 2/26/2015 CMD CONSTRUCTION MARKET DATA DAVID EATON [email protected] 333 EAST BITTERFIELD ROAD LOMBARD IL 60148 630-288-7904

1 3/2/2015 SKIHI TRAVIS SHERRELL [email protected] 2943 Stuart Drive Fort Worth TX 76104 817-923-0292

1 3/3/2015 BLACKMON MOORING OJ SIEPERDA [email protected] 315 N. Great Southwest Parkway ARLINGTON TX 76011 214-212-9272

1 3/3/2015 DMI CORP,DECKER MECHANICAL LOU MCLEOD [email protected] 1002 KCK Way CEDAR HILL TX 75106 972-291-9907

1 3/4/2015 CATES CONSTRUCTION RANDY CATES [email protected] 6640 FRIENDSWAY DR FT WORTH TX 76137 817-729-2992

PLANROOMSIsqft Plan Room in Association with

AGC TEXO [email protected] 14305 Inwood Road Dallas TX 75244 888-601-5761 866-570-8187Builders Exchange [email protected] 3 Lincoln Ctr 5430 LBJ Fwy, Suite Irving TX 75063 214-687-9000 214-687-9003

McGraw-Hill Construction Dodge [email protected] 4300 Beltway pl, Suite 180 Arlington TX 75018 817-375-2959Dallas/Ft Worth Minority Business

Development [email protected] N Stemmons Fwy North Tower,

Suite 900 Dallas TX 75207 214-630-0747 214-637-2241

Page 6: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

HVAC REPLACEMENTS AT NORTH OAKS MIDDLE SCHOOL

RFCSP NO. 027-15

PROPOSAL FORM

We, the undersigned, propose to enter into a Contract with the Birdville Independent School District to

furnish labor, material, tools, transportation, insurance, permits, and all incidentals necessary for the

completion of the subject project, in accordance with the specifications and plans included in this

proposal package.

HVAC REPLACEMENTS AT NORTH OAKS MIDDLE SCHOOL

HVAC replacement including Classrooms, Kitchen, Cafeteria, and Band Hall areas.

We have carefully reviewed and understand the “Instructions to Proposers”, the specifications and have

aquatinted ourselves with the existing and anticipated conditions that might affect the Work.

We understand that if we are the Successful Vendor, a Contract will be prepared and if that Contract is

in excess of $25,000, we will furnish satisfactory payment and performance bonds each in the full amount

of the Contract covering all parts of the Work.

We attach a bid bond in the sum of 5% of the amount of our proposal executed by:

Surety;

Attorney-in-fact, Agent.

CONTRACTOR NAME (FIRM): __________________________________________________________

1.0 Pricing

The following pricing includes the following: Provide all items, articles, materials, labor and incidentals

required for the completion of site work for a new greenhouse as per the attached instructions to

proposers and plans.

BASE PRICE DESCRIPTION PROPOSAL AMOUNT

(Dollars)

BASE PRICE (including Allowances per 2.0) $

2.0 Allowances

Page 7: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

HVAC REPLACEMENTS AT NORTH OAKS MIDDLE SCHOOL

RFCSP NO. 027-15

The following allowances are to be included in the Base Prices (above). Allowances shall include

Contractor’s overhead and profit. To adjust allowance amounts, Contractor will be asked to prepare a

proposal based on the difference between the actual allowance expenditure and the amount of the

allowance.

ALLOWANCE

NUMBER

ALLOWANCE

DESCRIPTION FACILITY NAME

ALLOWANCE AMOUNT

(Dollars)

1 Contingency

Allowance

HVAC Replacements at

North Oaks Middle School $10,000

3.0 Alternates

The Contractor proposes the following all inclusive price for the items/tasks listed in the table below in the

event that the Owner should elect to add one or more of these Alternates to the project after receipt of

bids and during contract negotiations.

ALTERNATE

NO.

ALTERNATE

DESCRIPTION FACILITY NAME

ALTERNATE AMOUNT

(DOLLARS)

N/A N/A N/A N/A

4.0 Unit Prices

The Contractor proposes the following all inclusive unit prices for the items/tasks listed in the table below

in the event that unforeseen conditions are encountered and additional work is needed. Unit prices

include all necessary material, delivery costs, installation, insurance, overhead and profit. Failure to

provide unit pricing for each item may result in the Proposal being deemed as non-responsive.

UNIT PRICE

NO. UNIT PRICE ITEM

UNIT OF

MEASURE UNIT PRICE (ADD)

N/A N/A N/A N/A

5.0 Schedule

The Contractor understands that BISD desires that the Project be completed within the expected

durations listed below. Contractor agrees to base their price on the proposed completion schedule as a

minimum, but may, at their option, propose a duration that is of less duration and indicate this duration in

the table below:

FACILITY NAME

OWNER’S EXPECTED

DURATION

(CALENDAR DAYS)

CONTRACTOR’S PROPOSED

DURATION

(CALENDAR DAYS)

North Oaks Middle School 60 DAYS

Company Name______________________________________________________________________

Name of Person Responsible for Proposal

Page 8: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax

HVAC REPLACEMENTS AT NORTH OAKS MIDDLE SCHOOL

RFCSP NO. 027-15

Title of Person Responsible for Proposal

Signature of Person Responsible for Proposal

Address

City/State/Zip Code

Phone/Fax Numbers

E-Mail Address

Date

Page 9: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax
Page 10: REVISED RFCSP 027-15 - birdvilleschools.net · 1 14-1047 bisd-hvac imprvm 14-1047 bisd-hvac imprvmt @ n oaks ms # sets ordered company contact email address city state zip phone fax