Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the complete project Cycle for UP Rural Roads Project -II (PMGSY) effective 3 rd September 2013 This is an indicative revised procurement plan prepared by the Project for the complete project cycle The Project shall update the Procurement Plan annually or as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. I. General Bank’s approval Date of the procurement Plan 3 rd September 2013 1. 2. Date of General Procurement Notice issued for Consultancies only: September 14, 2010. Period covered by this procurement plan: June 2013 onwards.. II. Goods and Works 1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Expenditure Category Procurement Method Prior Review Threshold US$ Comments GOODS, EQUIPMENT & MACHINERY 1. Goods and Equipment estimated to cost equivalent of US$ 300,000 or more per contract ICB All contracts World Bank SBD will be used and the procurement will be as per procedures described in World Bank Guidelines 2. Goods and Equipment estimated to cost less than US$ 300,000 and greater than US$ 100,000 equivalent per contract NCB First contract for goods for each state , irrespective of value and all contracts estimated to cost more than US$ 200,000 equivalent per contract The NCB bidding document agreed with GOI will be used and the procurement will be as per procedures described in the Procurement and Contract Management Manual. 95067 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized

Upload: others

Post on 26-Dec-2019

12 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

1

Revised Procurement Plan for the complete project

Cycle for UP Rural Roads Project -II (PMGSY)

effective 3rd

September 2013

This is an indicative revised procurement plan prepared by the Project for the complete project cycle The Project shall update the Procurement Plan annually or

as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional

capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank.

I. General

Bank’s approval Date of the procurement Plan 3rd

September 2013 1.

2. Date of General Procurement Notice issued for Consultancies only: September 14, 2010. Period covered by this procurement plan:

June 2013 onwards..

II. Goods and Works

1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in

Appendix 1 to the Guidelines for Procurement.

Expenditure Category Procurement Method Prior Review Threshold

US$

Comments

GOODS, EQUIPMENT & MACHINERY

1. Goods and Equipment

estimated to cost equivalent of

US$ 300,000 or more per

contract

ICB

All contracts World Bank SBD will be used and the

procurement will be as per procedures

described in World Bank Guidelines

2. Goods and Equipment

estimated to cost less than

US$ 300,000 and greater than

US$ 100,000 equivalent per

contract

NCB

First contract for goods for

each state , irrespective of

value and all contracts

estimated to cost more than

US$ 200,000 equivalent per

contract

The NCB bidding document agreed with

GOI will be used and the procurement will

be as per procedures described in the

Procurement and Contract Management

Manual.

95067 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

2

3. Goods and Equipment

estimated to cost less than

US$ 100,000 equivalent per

contract

Shopping procedure with at

least three quotations from

qualified bidders in

accordance with the

provisions of paragraph 3.5

of procurement Guidelines.

Procurement through

DGS&D rate contracts will

be considered equivalent to

shopping procedure.

All post review

4. Goods and Equipment that

meet the requirements of

paragraph 3.6 and 3.7 of

Procurement Guidelines.

Direct Contracting Upto US$ 10000 post review

and balance prior review

CIVIL WORKS

5.

.

Civil works contracts

estimated to cost more than

US$ 10,000,000 equivalent

per contract

ICB *

All contracts World Bank SBD will be used and the

procurement will be as per procedures

described in World Bank Guidelines.

6.

Civil works contracts

estimated to cost up to US$

10,000,000 equivalent per

contract

NCB

First contract for works for

each state, irrespective of

value and all contracts

estimated to cost more than

US$ 5,000,000 equivalent

per contract will be subject

to prior review by the Bank.

All other works contracts

will be subject to post

review.

The procurement will be done as per

procedures described in the Procurement

cum Contract Management Manual and

using the « Model Bidding Document »

cleared by the Bank

* As per current planning, no ICB contracts are envisaged for civil works.

Page 3: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

3

2. Pre-qualification. Not Applicable

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable

4. Reference to (if any) Project Operational/Procurement Manual: A Procurement cum contract Management Manual is already circulated

by NRRDA after taking WB into confidence. All procurement in the project will be done as per procedures described in it. .

5. Any Other Special Procurement Arrangements:

The following provisions constitute additional provisions applicable for purposes of National Competitive Bidding (NCB). NCB will be

conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:

Only the model bidding documents for procurement of works/ goods or non consulting services through NCB agreed with the Bank (and

as amended for time to time), shall be used for bidding;

No special preference will be accorded to any bidder either for price or for other terms and conditions when

competing with foreign bidders, state-owned enterprises, small scale enterprises or enterprises from any given State;

Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated

bidder;

The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project;

Page 4: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

4

However, as an exception in this project, two part bidding for NCB

works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards(e-

procurement system and complaint handling mechanism acceptable to the Bank)

All procurement of works through NCB in the seven participating states will be done through a standardized e-procurement system

acceptable to the Bank.

As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's right to inspect the accounts and records of

bidders, suppliers and contractors will be included in the bidding documents.

III. Selection of Consultants

1. Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix 1 to

the Guidelines Selection and Employment of Consultants:

Expenditure

Category

x

Value threshold per contract

Selection Method Prior Review Threshold

Consultancy

contracts to be

awarded to

Consultant firms

including

selection of

training institutes

by

NRRDA/SRRDAs

Each contract estimated to cost

US$ 200,000 equivalent or

more per contract

-Quality and Cost Based (QCBS) method

-REOI to be published in UNDB on line

All prior review.

Each contract estimated to cost

less than US$ 200,000

equivalent per contract

-Quality and Cost Based (QCBS) method

-Quality Based (QBS) method of selection

in accordance with the provisions of

paragraph 3.1 to 3.4 of Consultant’s

Guidelines.

-Consultant’s Qualifications (CQS) method.

-Least Cost Method (LCS).

-Fixed BudgetMethod.

-Single Source Selection

All single source selection of

consultants with estimated cost

of more than US$ 30,000

equivalent per contract will be

subject to prior review. All

other contracts will be subject to

post review but with TORs

subject to prior review by the

Bank

Page 5: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

5

Individual Consultant

estimated to cost less than US$

30,000 or equivalent per

contract

-Through comparison of qualifications of at

least three candidates.

-Sole Source Selection

All cases subject to post review

but with TORs subject to prior

review by the Bank.

All contracts for single source

d\selection of individual

consultant will be subject to

prior review.

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent

per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Any Other Special Selection Arrangements: NIL

Page 6: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

6

Rural Roads Project II (P124639) Procurement Packages with Methods and Time Schedule

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP0151 1 Nagla Swarop To Nagla Girdhar Road 1.600 53.68 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0151 2 Barhan Murthar alipur Road(Km-6) To Yadavgarhi 1.250 41.51 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0152 1 ABK Road To Nahi ka pura via Nagla imli 2.400 83.89 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0152 3 PPT Seha Manona Road To Pura Kaptan 0.810 26.99 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0153 1 Bah Bateswar Road To Chhotapura Road 2.200 70.78 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0153 2 Bah Kenjra Road To Patkuiyapura Road 1.000 33.13 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0153 3 Jarar Harlalpura Road To Sunsarpura Road 1.000 33.62 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0153 4 Pura Kanera Basoni Road (Talpura) To Parvatpura Road 1.150 39.82 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0154 1 Bharatpur-Dholpur Road To Nagla Subdal Road 1.350 38.08 NCB POST 31-Mar-12 Awarded

Page 7: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

7

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP0154 2 CATK Road to Nagla Musalpur To Nagla Jhawahar 1.200 46.62 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0154 3 Jagner Bhainskhuri To Shahpur Jagner Road 1.950 60.69 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0155 1 Saiyan Iradatnagar Road To Chaknupura 0.500 17.92 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0155 2 ADI-Kurra Chitrapur Road To Godupura No.2 0.650 19.89 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0155 4 ASR to Garhi Parsa Road To Garhi Dandura 1.000 30.69 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP03119 1 Bhitar Minor Pakki road to Bhatauli link road 0.675 34.07 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP03119 2 Rewa road to Dulam ka pura link road 1.400 86.27 NCB POST 2-Jul-13 Awarded

1 Tr-1 UP0461 1 Hajpur to Tajupur Khanupur 2.800 120.05 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0461 2 Saspana Road to Saitapur Chamrauti 1.000 42.65 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP0462 1 Akbapur Faizabad Road to Choti Seehmai Karirat 0.500 24.40 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP0462 2 B.F.A. Road Km.5 to Surari 0.675 29.67 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP0462 3 S.T Road Km.8 to Usmapur 3.375 142.67 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP0462 4 Akbarpur Iltifatganj Road Km.3 to Chandan Para 2.625 109.13 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP0462 5 Akbarpur Iltifatganj Road Km.7 to Sultanpur Khas 2.000 85.71 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP0462 6 Akbarpur Iltifatganj road Km.3 to Saraiya 1.125 50.01 NCB POST 9-Jul-13 Awarded

Page 8: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

8

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP0463 1 Akbarpur Jalalpur Road Km.2 to Sikrohar Khas 0.650 34.35 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP0463 2 Jainapur Road Km.2 to Harijan Basti, Gosiyana, 1.000 43.32 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP0463 3 L.D. Road Km.6 to Samaisa 3.500 139.68 NCB POST 1-Jul-13 Awarded

1 Tr-1 UP0464 1 Jahangirganj Kamhariya Road Km. 6.00 to Bangalpur 1.350 56.43 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0464 2 Jahangirganj Rajesultanpur Road to Etauri Khurd 2.000 86.98 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0464 3 Jahangirganj Kamhariya Road Km. 6.00 to Kotiya

Asrafpur

2.000 87.52 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0465 1 Ainwa Bhadsari Road to Dashrathpur Harinathpur 1.700 73.01 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0465 4 Maya Tanda Road to Sudama 0.600 31.75 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0465 5 Maya Tanda Road to Maheripur 0.575 29.40 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0465 6 Barua Mohiddinpur Nandapur to Nandapur Bihari 0.650 35.17 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP0466 1 Tanda Bariyawan Road to Pipri Malpura Saidpur 1.400 60.16 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0466 2 Rajipur Inamiya to Mukundpur Dawatpur 2.425 106.82 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0466 3 Kedarnagar Saddapur to Odra 1.350 60.75 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0466 4 Akbarpur Iltifatganj road to Kisunpur Danpur 1.200 50.29 NCB POST 2-Dec-12 Awarded

1 Tr-1 UP0467 1 Basahiya Gangasagar Road Basahiya Crossing to

Mirzapur Jangal

2.050 86.08 NCB POST 31-Mar-12 Awarded

Page 9: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

9

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP0467 2 Ramnagar Jathahwa Road to Ramnagar Kewtahi 1.000 41.00 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0467 3 Hanswar Mansoorganj Road Bidhar Crossing to Ramkola 1.350 57.12 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0467 4 Baskhari Jahangirganj Road Km.17 to Tahapur 1.600 68.32 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP0468 1 Heerapur Akbelpur Km-7.00 to Daulatpur 1.725 69.17 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0468 2 Heerapur Akbelpur Hardaspur to Nakdarpur 1.875 87.46 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0468 4 Baskhari Hanswar Road to BaMehoiya Harijan Basti 0.600 29.35 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0468 5 Hanwar Mehndi Ghat Sadipur Road to Dhekwa 1.950 89.38 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0468 6 Baskhari Hanswar Road to Harnideeh Khas 1.400 60.85 NCB POST 2-Dec-12 Awarded

1 Tr-1 UP0681 1 ASJ Road to Angania 1.100 57.95 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0681 2 PSS RoadKm4 to Arazi Amani 2.300 119.14 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0681 3 Lalganj Lahua to Bheelalpur 1.200 50.87 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0978 1 DNP road to Adharipurwa-Bahrampurwa 3.335 172.50 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0978 2 DNP- Bhaktapur road to Duttapurwa 1.860 93.51 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0978 3 BM road to Turabgaon 1.125 56.38 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0979 1 Muse Patti road to Baheliya -Balchandpurwa 4.300 224.88 NCB POST 31-Mar-12 Awarded

Page 10: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

10

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP0979 2 Kundasar-Jaitapur road to Darehra (Darehta) 1.200 62.87 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0979 3 Khevhar road to Lakhwapur Bahraicha 1.600 83.05 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0979 4 Kundasar-Jaitapur road to Rasulpur Darehta(Rehta) 0.700 36.64 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP0980 1 Kundasar Maneri road to Amwa Tetarpur 2.500 129.50 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0980 2 Kundasar Maneri road to 'Akbarpur Bujurg 0.750 38.79 NCB POST 2-Dec-12 Awarded

2 Tr-1 UP0980 3 Kundasar-Maneri road to Bemiyari 2.100 128.96 NCB POST 2-Dec-12 Awarded

1 Tr-1 UP0981 1 Matera Nawabganj road to Sanmangaon Dharamnagar 4.800 246.88 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0981 2 Dhannigaon to Chhedagaon 0.950 47.00 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0981 3 B.M. road to Viraigaon 1.700 95.99 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0981 4 B.M. road Kalyanpur to Gulharia 0.800 40.99 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0982 1 Itaha road to Gurgujpurwa 1.200 61.72 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0982 2 Tikuri Narayanpur road to Mohanpur 2.100 105.91 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0982 3 N.R. road to Bhaluhiya Bharat 0.800 41.38 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0982 4 N.R. road to Prem Nagar 1.400 72.64 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0982 5 Lalpur Shivpur road to Bargadiya 2.200 111.60 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0983 1 P.H.K. road - Gangwal to Jaisaura 1.900 99.17 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0983 2 B.F.A. road (km-32) to Raghu Rampur 2.100 107.34 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0984 1 Khaira bajar Kodahi road Jihuramafi to Ranipurwa 1.200 61.82 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP0984 2 Khaira Bajar kodahi road to Jihura Mafi to Thakurpurwa 1.800 92.06 NCB POST 31-Mar-12 Awarded

Page 11: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

11

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP0984 6 Khaira Dokari-kodahi road to Tinghai 1.300 66.93 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP1147 1 Mankaura Kashiram Road To Mankaura Kashiram 2.500 110.87 NCB POST 18-Jan-13 In Process

1 Tr-1 UP1148 1 Upc Road Parsauna To Gamrahwa 2.250 158.14 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP1148 2 F.J. Road to Lackmin To Sehrwa to Paiki 1.000 62.03 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP1149 1 Tiwari Dih Road To Dundra 1.700 87.06 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP1149 3 Bhamari Road To Singahi 2.000 99.50 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP1149 4 Bardvulilya To Piperhava 0.700 35.61 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP1149 5 H.n.k. Road To Lal Bojhi 3.500 202.86 NCB POST 27-Nov-12 Awarded

3 Tr-1 UP1150 1 Belha Gaura To Khajuria 1.700 71.98 NCB POST 23-Jun-13 In Process

3 Tr-1 UP1150 2 Godipur To Subanjo 1.000 47.91 NCB POST 19-Jun-13 In Process

1 Tr-1 UP13144 1 Baba Bazar to Said Pur Marg To Usrawa L-034 2.700 140.66 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP13144 2 Mavai patranga Marg To Sipahiya L-063 1.750 95.06 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2038 1 Basdeela Mainuddin PMGSY Road To Harpur 1.000 40.99 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2038 2 Saonda To Parsia 1.450 63.17 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2038 3 T 05 To Barwa Semra 0.800 30.65 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2175 1 ETAH ALIGANJ Rd. To AMRITPUR 0.850 34.73 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2175 2 ETAH ALIGANJ RD BAGHAULI To DANDA 1.825 67.68 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2175 3 Ng. BHABHUTI Rd. To TELIBHAMORA 1.360 53.96 NCB POST 31-Mar-12 Awarded

Page 12: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

12

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP2175 4 MALAWAN SONHAR To Ng. BHOOPAL 1.000 42.54 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2176 1 ALIGANJ MAINPURI To NG. PARAM 0.975 39.26 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2176 2 SARAI RAMNAGAR ROAD To Ng. PATTI

(LADAMPUR )

1.480 60.94 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2176 3 ETAH KAYAMGANJ ROAD To NAGLA JAMUNAI 1.220 46.02 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2177 1 NAURI To NAGLA KESHARI RD.(NG. BADAM ) 1.650 66.74 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2177 2 AMARTPUR RD To NARRAI 0.680 23.68 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2177 3 MOHANPUR SIDHPURA RD To THATHI 1.180 46.60 NCB POST 20-Jan-13 Awarded

1 Tr-1 UP2177 4 SIDHPURA BAGHWALA RD To HIRAPUR 1.585 63.33 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2177 5 KASGANJ-SALEMPUR BIBI TO NAGLA. PARMOR

TO To NAGLA. MAQSUDABAD

0.865 33.23 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2178 1 GANJDUNDWARA LAHRA RD To LAXMAN

NAGLA

0.675 25.57 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2178 3 BHIKAMPUR To NAGLA WAJEER 0.985 40.59 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2178 4 NARDOLI To NAGLA HANSHI 2.750 123.62 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2179 1 BAHORENPUR ROAD TO NAGLA DHARU. To 0.950 46.18 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2179 2 AWAGARH-JALESAR ROAD TO NAGLA .RUNI. To 0.900 33.21 NCB POST 28-Nov-12 Awarded

Page 13: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

13

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP2179 3 SARKARI-MISAKHURD ROAD TO NAGLA .BAKALI

BAG (NAGLA .BHAKTI BAG) To

1.460 53.64 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2179 4 JALESAR-AGRA ROAD TO NAGLA .LAL

SINGH.(RLY.STATION RD.TO NAGLA .LAL SINGH)

To

1.000 34.87 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2179 5 JALESAR-AGRA ROAD TO NAGLA . BEERI To 2.230 84.55 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2180 1 NIDHAULI ETAH ALIGANJ RD. TO To NG.

CHHATTAR SINGH

0.550 22.66 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2180 2 KARTALA SIDHPURA RD. TO To MUBARAKPUR) 1.570 60.96 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2180 3 KARTALA SIDHPURA RD. TO To MIRJAPUR 1.620 63.04 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2180 4 NG. FAREED TO To KALYANPUR 1.100 40.52 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2180 5 NARAYANPUR TO To JANGALPUR 2.450 90.83 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2180 6 NEORAI TO To CHUNNUPUR 1.150 43.52 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2181 1 MARTHARA-MOHANPURA ROAD TO NAGLA.

INDU. To

2.450 112.98 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2181 2 MOHANPURA-MARTHARA RD. TO BHATPURA

(NAGGLA .DEVSEN) To

1.150 42.23 NCB POST 28-Nov-12 Awarded

2 Tr-1 UP2356 1 T05 To Dobhiyara Khas L-032 1.100 50.88 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP2358 1 Kumar Ganj Kandasa Jauka purwa To Emamganj Link

Road T-09A

1.700 71.94 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP2358 2 Kumar Ganj Kandasa Jhuka purwa To Pure Rustam Link

Road T-09 B

1.950 90.85 NCB POST 4-Jul-13 Awarded

Page 14: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

14

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP2359 1 Chaman Ganj To Pure Vijay Pathak Link Road. L-035 3.150 131.98 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2359 2 Chure Bazar To Jamolikhurd L-69 1.050 106.52 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2359 3 Khajurahat milkipur haringtonganj To Sendhutara L-34 1.400 56.98 NCB POST 28-Nov-12 Awarded

2 Tr-1 UP2360 1 T01 To Kashiram Ka Purwa L-100 4.465 172.08 NCB POST 22-Jun-13 Awarded

2 Tr-1 UP2360 2 T-07 (Chirauli) To Misrapur L -126 1.400 64.69 NCB POST 25-Jun-13 Awarded

4 Tr-1 UP2455 1 Bahoricpur Mohammadabad Road to Surajpur Se Bhojapur 2.700 128.61 NCB POST 27-Jun-13 In Process

4 Tr-1 UP2455 2 Jahanganj Mohammadabad Road to Nagla Charag 1.400 64.38 NCB POST 27-Jun-13 In Process

3 Tr-1 UP2459 1 Fatehgarh - Gursahaiganj - Kaitaha To Pahla 1.600 71.65 NCB POST 8-Jul-13 In Process

1 Tr-1 UP2478 1 Farrukhabad - Ugarpur To Wajidpur 2.450 127.48 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2478 2 Farrukhabad - Roshnabad To Lohapani 0.650 29.23 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2478 3 Bareilly - Etawah - Karhal - Khadouli To Nahariya 1.425 64.81 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP2478 4 Maohammadabad - Nawabganj To Nagla Rawatpatti 1.350 61.21 NCB POST 28-Nov-12 Awarded

2 Tr-1 UP2550 1 Narauli to Sangaulipar 2.000 82.00 NCB POST 14-Jun-13 Awarded

2 Tr-1 UP2550 2 Samrehta to Andra 0.950 45.38 NCB POST 17-Jun-13 Awarded

2 Tr-1 UP2550 3 Dhata Vijaipur Road Km 22.00 to Palwa 1.200 48.89 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP2551 1 H.H.A.A.J. to Baba Ka Purwa Km.-23 Salepur Ist 1.900 78.85 NCB POST 2-Jul-13 Awarded

Page 15: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

15

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP2551 2 Malaon to Kharsola 1.200 49.24 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP2551 3 Kurka Road Km.3.00 to Kondarwar 2.000 79.57 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP2552 1 H.A.A.A.J.Patti Shah Km.-12 to Akhari 3.300 131.66 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP2552 2 Hathgaon Pattishah Road Km.-7 to Mohibi Alipur 0.950 40.31 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP2553 1 G.T.Road Km.114 to Rajput Nagar 0.830 35.05 NCB POST 26-Jun-13 Awarded

2 Tr-1 UP2553 2 Khaga Dampur Road Km.9.00 to Rasulpur Sani 2.000 81.75 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP2554 1 H.H.Road Km.40.00 to Diwara 1.000 42.77 NCB POST 29-Jun-13 Awarded

2 Tr-1 UP2554 2 Ijura Road to Nihalpur, Orma 3.250 139.05 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP2555 1 JamrawaRoadKm.-3 to Matiyara 2.500 105.03 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP2555 2 Lalikapurwa to Shivmangal Ka Purwa 0.600 26.13 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP2555 3 Bharsari Mod to Matin Ka Purwa 1.500 62.37 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP2556 1 B.B.RoadKm.-245 to Konerwa 1.500 51.33 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP2556 2 Lakhpura to Nayapurwa 2.750 96.60 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP2556 3 Palnaha to Bahlolpur 1.600 52.64 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP2557 1 G.T.Road Chhichani Via Ramua Panthuwa Road Km.4 to

Basawanpur

2.800 90.89 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP2557 2 Pilkhini Road Km.-3 to Patariya 1.100 38.78 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP2557 3 JamrawaRoadKm.-2 to Ranjitpur 0.700 25.23 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP2557 4 Haibatpur to Jalalpur Itauli 1.700 57.33 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP2558 1 H.H.A.A.J.Road to kotla Road to Makdoompur 1.100 37.86 NCB POST 26-Jun-13 Awarded

2 Tr-1 UP2558 2 H.H.Road Km.36.00 to Patarian Ka Purwa via Bhikampur 1.250 44.31 NCB POST 3-Jul-13 Awarded

2 Tr-1 UP2558 3 Kurra Sadat Misa Road to Babdarpur 1.200 38.73 NCB POST 26-Jun-13 Awarded

Page 16: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

16

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP2558 4 Thariyaon Malaon Road Km.2 to Kutabpur 1.100 36.12 NCB POST 26-Jun-13 Awarded

2 Tr-1 UP2559 1 Naraini Road to Paliya via Ratanpur 1.850 59.57 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP2559 2 Tharion Ashothar Road Km.10 to Subedar Ka Purwa 2.450 89.75 NCB POST 28-Jun-13 Awarded

1 Tr-1 UP2947 1 Saidpur Chiraiya kot Road to Nathupur Link Road 1.000 35.50 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2947 3 Saidpur Chiraiya kot Road to Besanda Link Road 1.000 38.04 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2947 4 Saidpur Chiraiya kot Palwar Road to Tisani Link Road 1.500 57.88 NCB POST 31-Mar-12 Awarded

3 Tr-1 UP2948 1 Jamania Darauli to Darauli Machchhar Mara Link Road 1.600 58.80 NCB POST 4-Jul-13 Awarded

3 Tr-1 UP2948 2 Malsa Dharani Utrauli to Basuhari Chak pyareLink Road 1.400 49.19 NCB POST 30-Jun-13 Awarded

3 Tr-1 UP2948 3 Suhawal Dharani Tajpur to Andhyara Link Road 1.200 39.06 NCB POST 25-Jun-13 Awarded

3 Tr-1 UP2948 4 N.H. 97 to Garahi Chak Jahirullah Link Road 1.200 39.23 NCB POST 28-Jun-13 Awarded

1 Tr-1 UP2949 1 N.H. 97 to Sabbalpur Ban (Ghatampur) Link Road 4.600 180.22 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2949 2 Jamaniya Darauli to Rampur Salempur Link Road 3.500 183.66 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2950 1 Mau Yousufpur Road to Toder 2.000 72.34 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2950 2 Asna Mahipal Road to Gopalpur 1.000 42.82 NCB POST 31-Mar-12 Awarded

Page 17: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

17

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP2951 1 Jasdevpur Firozpur to Kathar to Amghat 1.200 49.10 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP2951 2 Saidpur Chiraiya kot Road to Kalirpur Link Road 1.500 53.37 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP2951 3 Saidpur Chiraiya kot Road to Baretha Link Road 1.500 57.69 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP2951 4 Saidpur Chiraiya kot Road to Mahursa Link Road 0.800 27.16 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP2953 1 Saidpur Sadiyabad to Dihwa Bharampur Link Road 3.000 105.69 NCB POST 17-Jan-13 Awarded

1 Tr-1 UP2953 2 Saidpur Sadiyabad to Karmadapur Samougar Link Road 2.500 82.99 NCB POST 17-Jan-13 Awarded

1 Tr-1 UP2953 4 Saidpur Sadiyabad to Kaithwaliya Bhagirathpur Link Road 1.500 55.12 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP2954 1 Ghazipur Azamgarh to Kundanpur Link Road 3.100 116.34 NCB POST 18-Jan-13 Awarded

1 Tr-1 UP2954 2 Puniksha to Kritsinghpur Link Road 1.200 48.44 NCB POST 18-Jan-13 Awarded

1 Tr-1 UP2954 3 Husainpur to Thakurbasti Link Road 1.100 44.26 NCB POST 18-Jan-13 Awarded

1 Tr-1 UP2955 1 Dullahpur Tirkaripur to Lalpur Hari Khas Link Road 2.000 88.46 NCB POST 27-Nov-12 Awarded

4 Tr-1 UP2956 1 Ghazipur Ballia to Nasratpur Road 1.500 126.10 NCB POST 22-Jun-13 In Process

1 Tr-1 UP3045 1 Mallapurwa To Terhwa Gulam 1.250 59.60 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP3045 2 Deoria Khas Road To Ishwardeenpurwa 1.150 52.55 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP3045 3 Gosendrapur Road To Biratiha 0.680 29.84 NCB POST 27-Nov-12 Awarded

1 Tr-1 UP3045 4 Sankisa Road To Mei Pathak 0.750 34.41 NCB POST 27-Jan-13 Awarded

Page 18: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

18

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP3046 1 Mangura Bazar To Susunda 2.700 108.38 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP3046 2 C B N Road To Thakurainpurwa 1.025 53.53 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP3046 3 Balpur Paraspur Road To Salpur Dhautal 1.500 82.04 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP3047 1 Farenda - Jarwal Road To Parasauli 0.575 28.94 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP3047 2 Karnailganj - Fatehpur - Kotehana Road To Basuha 1.500 106.07 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP3047 3 Ramapur Kataua Nala Road To Saraiya 1.300 59.60 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP3047 4 Karnailganj - Katra Road To Khajuha 0.540 23.39 NCB POST 2-Jul-13 Awarded

1 Tr-1 UP3048 1 Gaura Chauki Chandradeep Ghat To Farenda Buzurg

Mannijot

1.850 86.18 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3048 2 Sothiya To Nathpur 1.900 89.07 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3048 3 Daulatpur Grant To Chainpur 3.650 186.39 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3049 1 Gonda I T I Road To Jogapur 1.000 44.21 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3049 2 Gonda I T I Road To Imiliya 2.100 94.16 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3049 3 Itaila Road To Pure Marjadpurwa 2.150 96.81 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3050 1 Allanpur Grant To Mahpurwa 0.900 43.62 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3050 2 P D Dam Bahadurpur Road To Pure Pramod 1.120 60.87 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3050 3 Gonda Belsar Road - Gora Ghat To Pachchimpurwa 1.950 93.19 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3184 1 Itauwa-Mahuarkol Road to Shikargarh Link Road 2.000 91.49 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3374 1 Audhapur Link Route to Suhedhi 1.900 90.13 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3375 1 Ahmadi Road to Belhiya 1.750 82.40 NCB POST 29-Nov-12 Awarded

Page 19: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

19

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP3375 2 NH 24 Manikpur to Bhethwa 1.500 80.19 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3376 1 Amtara Pataura to Bhabhar To 2.400 108.30 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3376 2 Behta Gokul Pihani Road to Masfana To 3.200 141.47 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3377 1 Sandi Harpalpur to Nand Khera 3.250 137.55 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3377 2 Mahsoolapur to Pithnapur 2.650 121.33 NCB POST 29-Nov-12 Awarded

1 Tr-1 UP3538 1 Kanth Kasimpur Mev Road To Nalukhurd 1.080 61.26 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP3538 2 Naugawon Bijnore Canal Patri Alipur Kalan To

Chamrawwa

1.225 46.15 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP3538 3 Amroha Noorpur Road To Bijra 2.000 91.50 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4052 1 Niboli Buzurg to Budhia 2.125 129.40 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4052 2 Gaholiya Road to Achali ka purwa 1.425 63.37 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4052 3 Mati Rura Road to Jarailapurwa 2.575 126.13 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4052 4 Alapur to Nandpur 1.325 59.62 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4053 1 Kishanpur to Khartala Bangar 1.000 45.72 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4053 2 Antapur to Purwa Mallahan 2.925 160.28 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4054 1 Bahri Umri to Ranjitpur 1.150 54.54 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4054 2 R/P of SJR Road to Vichauli 2.350 117.66 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4054 3 R/P of SJR Road to Karonda 0.850 41.37 NCB POST 24-Jan-13 Awarded

1 Tr-1 UP4055 1 Naugoan Road to Sangrampur 1.325 74.09 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4055 2 Kashipur Gahira Road to Bujhawa 2.350 116.12 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4055 3 S.H.68 to to Adhanpur 0.800 49.92 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4056 1 N.H.2/25 to to Haidarapur 2.575 106.52 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4056 2 Sarotha to Mallahanpurwa 3.025 144.35 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4452 1 S. K. G. Road to Dhakia Madan 0.900 45.51 NCB POST 28-Nov-12 Awarded

Page 20: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

20

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP4452 2 Neemgaon Serua Via Mura Bujurg Road to Dhumra 1.800 87.49 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4452 3 Sisanwah Road to Ainta 3.300 175.54 NCB POST 28-Nov-12 Awarded

3 Tr-1 UP4453 1 LBB (SH 90) KM. 40 to Rajapur 1.225 57.73 NCB POST 22-Jun-13 In Process

3 Tr-1 UP4453 2 LBB (SH 90) Road to Sonaripur 0.600 31.36 NCB POST 25-Jun-13 In Process

3 Tr-1 UP4453 3 LBB (KM-90)Km.46 to Bathera 3.500 174.32 NCB POST 25-Jun-13 In Process

3 Tr-1 UP4453 4 LBB (SH -90) Bajhera to Kuwarpur(upto Dubaha) 3.800 178.60 NCB POST 22-Jun-13 In Process

1 Tr-1 UP4454 1 GS Road Km.11 to Nayagaon 1.350 55.48 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4454 2 AmirNagar Saraiyan Road to Bahadurganj 0.700 30.97 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4454 4 LMP Maigalganj Road to Marhoya Road to Kusumi 0.600 30.23 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4454 5 Kassta Mamri Road to Rampur Purwa Road to Ramnagar 2.700 152.65 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4455 1 Mohmmadi Pawayan Road to Jaria 2.600 119.27 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4455 2 Mohmaadi Gangapur Road to Baskhera 2.100 93.61 NCB POST 28-Nov-12 Awarded

3 Tr-1 UP4456 1 NH-24 to o Chapartala 0.550 24.11 NCB POST 2-Jul-13 Awarded

3 Tr-1 UP4456 2 NH-24 to Pipraula Kuwarpur 0.600 26.88 NCB POST 2-Jul-13 Awarded

3 Tr-1 UP4456 3 Sitapur - Gola to Mudiya Churaman 3.500 157.80 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP4457 1 Karanpur khujua link Rd. to jaganathpur 5.200 221.83 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP4457 2 SKG Rd. (Km 44) to Vyaspur 1.440 73.90 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP4457 3 Piparjhala hargaon to Manpur Rd. 1.300 69.46 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP4457 4 FK Rd. to Chanwa Rd 0.550 28.51 NCB POST 27-Jun-13 Awarded

Page 21: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

21

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP4458 1 L.b.b.(sh-90) Tanshupurwa Nayapurwa to Hajurpurwa 3.000 134.13 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4458 2 L.b.b (sh-90)Mehandi to Muriya 2.450 112.59 NCB POST 28-Nov-12 Awarded

2 Tr-1 UP4459 1 Gulali Baudhi khurd Rd. to Parchiyabela 2.100 105.63 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP4459 2 NH-24 to Dharampur Road to Behra Jorawar 0.700 33.42 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP4459 3 Gola Bankey Ganj Rd. to Kopwa 0.800 38.39 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP4459 4 LM Road to Gangpur grant 1.800 74.90 NCB POST 22-Jun-13 Awarded

2 Tr-1 UP4459 5 Naya Gaon Rd. to Uddainpur 0.850 38.05 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP4459 6 Muriya Khera to Pipari 1.200 49.32 NCB POST 22-Jun-13 Awarded

2 Tr-1 UP4459 7 NH-24 to Badarpur 2.490 96.98 NCB POST 2-Jul-13 Awarded

1 Tr-1 UP4460 1 Purviyanpurwa-gauri road to Odara 1.450 78.63 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4460 2 Nakaha Vazzirpurwa to Kolapurwa 3.080 145.70 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4461 1 Pbroadgauriyabhelam to Koraiyal 1.500 67.55 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4461 2 Bhatpurwa Kala to Arahipurwa 1.200 52.41 NCB POST 28-Nov-12 Awarded

1 Tr-1 UP4461 3 P.b.Road to Mahtepurwa 0.700 35.00 NCB POST 28-Nov-12 Awarded

3 Tr-1 UP4462 1 Bhartiya Farm Link Road to Chandarpur 0.800 36.21 NCB POST 26-Jun-13 Awarded

3 Tr-1 UP4462 3 Bijua -Gola Rd to Larenganj 0.920 39.76 NCB POST 26-Jun-13 Awarded

3 Tr-1 UP4462 4 Daudpur-pakaria-mirzapur-korara-muriamishra-deokali

Aliganj Rd. to Giridharpur

0.700 34.34 NCB POST 26-Jun-13 Awarded

3 Tr-1 UP4462 5 Deokali Aliganj Rd. to Guliria Khurd 1.200 51.78 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP4658 1 Sisendi to Marvi 2.075 101.44 NCB POST 24-Jun-13 Awarded

2 Tr-1 UP4658 2 Sisendi - Marvi Road to Rahimnagar 0.900 43.34 NCB POST 27-Jun-13 Awarded

Page 22: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

22

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP4659 1 Pahadpur - Behta to Bhainsi 1.025 62.39 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP4659 2 Sisendi to Kesri Kheda 1.100 48.53 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP4659 3 Dayalpur Road to Madankheda 2.025 98.17 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP4660 1 Lucknow - Rae Bareli Road to Kalanderkheda 0.600 45.27 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP4660 2 Lucknow - Rae Bareli Road to Madarikheda 0.775 40.20 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP4661 1 Nandauli Road to Kalimatan Kheda 0.575 29.21 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP4661 2 Lucknow - Nagram Road to Mahesh Kheda 1.050 50.82 NCB POST 19-Jun-13 Awarded

2 Tr-1 UP4661 3 Meeraknagar Kanta Karaundi Road to Vishunpur 0.900 46.99 NCB POST 14-Jun-13 Awarded

2 Tr-1 UP4661 4 Nagram - Nogoha Road to Gadariyankheda 1.300 59.35 NCB POST 24-Jun-13 Awarded

2 Tr-1 UP4662 1 Kurri Sudauli Road to Suryabali Kheda 1.450 62.09 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP4662 2 Nigoha -Rati-Beiganj Road to Anghemau 0.900 43.53 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP4662 3 Nigoha - Beniganj Road to Naharkheda 0.605 33.29 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP4755A 1 Rampur To Karanautiya 0.700 33.83 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP4755A 2 Bhathat Ghorahawa To Koailahiya 1.125 45.39 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP4755A 3 Maulaganj Mujuri To Tenuahiya 1.100 50.27 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP4755B 1 Monapur Rajdhani Surpar To Pokharbhinda 2.300 98.17 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP4755B 3 Khalikgarh To Sonardiha 0.950 43.61 NCB POST 19-Jun-13 Awarded

1 Tr-1 UP4756A 1 Adda Kajari To Dhotiyahawa 0.650 31.07 NCB POST 31-Mar-12 Awarded

Page 23: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

23

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP4756A 2 Dhotiahawa Kajari To Musarapurawa 1.375 60.22 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4756B 1 Dogahara Bishunpur (Piparahiya) To Jahari 2.850 189.20 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4757A 1 Farenda Brijmanganj To Chauri 0.700 29.67 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP4757A 2 Farenda Brijmanganj To Ramdayalpur 1.500 61.75 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP4757B 1 Orhawaliya Barhaipurawa To Amarikhas 1.500 64.28 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP4757B 2 Chandithan laxminagar To Belahiya 0.625 26.05 NCB POST 24-Jun-13 Awarded

2 Tr-1 UP4757B 3 S N G To Kharakbarawa 1.370 61.91 NCB POST 14-Jun-13 Awarded

1 Tr-1 UP5149 1 MUGMANS to HASANPUR 0.700 33.65 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5149 2 RAINI to RAINI SONBARSA 0.800 34.78 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5149 3 NAHAR KI PATARI to DHAKWARA 0.950 38.28 NCB POST 26-Jan-13 Awarded

1 Tr-1 UP5150 1 BABHANPURA DAKHIN to CHAINPUR 0.900 39.58 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5150 2 KARAHA JAHANAGANJ MARG to SADDHUPUR 0.650 29.57 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5150 3 RAKAR to GULLI GHAR 0.850 37.26 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5151 1 SHAHID MARG to SARWANPUR 1.300 53.98 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5151 2 NAKTA MUGMAS to MUGMAS ARUSABHAR 1.300 55.62 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5151 3 EATAURA DORIPUR to KHUNSHEKHPUR RAJBHAR

BASTI

0.500 21.53 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5151 4 ITAURA DORIPUR to HARDASPUR 2.000 89.75 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5151 5 N.H.-29 to BHATAULI MALLIK 1.000 46.80 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5152 1 FATEHPUR CHANDAPAR to BHITIYA MAFI 1.800 73.65 NCB POST 29-Jan-13 Awarded

Page 24: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

24

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP5153 1 KATHATRAW to GAEE GAVA 1.250 55.50 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5153 2 MADHUBAN DUBARI ROAD to TAL TAROY 2.000 83.81 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5153 3 MADHUBAN DOHARI GHAT to SARASO 1.800 73.91 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5154 1 BAHRAMPUR (BHAIROPUR) to BAKHRIYA 3.500 227.88 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5154 2 DARGAH AMILA ROAD to GULERI KALA 1.000 43.70 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5154 3 MADHUBAN DOHARI GHAT to MAHABALPUR

CHAK

0.700 31.50 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5154 4 MADHUBAN DOHARI GHAT to PANCH MEHALA 0.700 31.87 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5154 5 N.H.-29 to GOTHA to GOTHA YADAV BASTI 0.650 31.01 NCB POST 29-Jan-13 Awarded

1 Tr-1 UP5374 1 Lalganj kalwari To Chak M 65 2.900 85.80 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP5374 2 Dhasda Road To Viratiya 1.900 64.52 NCB POST 31-Mar-12 Awarded

4 Tr-1 UP5375 1 Zigna Bampur Road To Bhawan ka Pura 2.500 70.91 NCB POST 25-Jun-13 In Process

4 Tr-1 UP5375 2 Nahar ki Patri To Bhisa Harjan Basti 1.250 34.15 NCB POST 22-Jun-13 In Process

1 Tr-1 UP5376 1 Devri Karondia Road To Porirampur 3.950 133.66 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP5376 3 Adwa Road To Veerpur 0.900 28.06 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP5376 4 Adwa Songara To Madhoe Kalan 2.450 64.48 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP5377 1 Banwa Road To Nawada 2.000 60.22 NCB POST 2-Dec-12 Awarded

1 Tr-1 UP5377 2 Baidur Road To Subhaw kalan 3.550 149.51 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5377 3 Banwa Road To Kothi Khurd 1.800 53.58 NCB POST 31-Mar-12 Awarded

Page 25: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

25

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP5377 4 Sarahara Road To Bardiha Khurd 1.500 54.60 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5657 1 Mujhakala Road To Rudrapur 1.800 75.67 NCB POST 29-Nov-12 Awarded

3 Tr-1 UP5779 1 MDR-98 Km 24 To Dhandhar 1.450 50.55 NCB POST 3-Jul-13 In Process

3 Tr-1 UP5779 2 AD Road km-4 To Pure Shiva 1.550 53.94 NCB POST 29-Jun-13 In Process

1 Tr-1 UP5785 1 LK Road km 31 To Trilochanpur(Sarpata) 1.000 35.21 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5785 3 Manikpur Lala Bazar Road km6 To Ainthu(Koharan ka

Purwa)

1.000 39.21 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5785 4 JK Road km 28 To Shergarh 1.200 44.19 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5786 1 JK Road km 23 To Tikariya Khurd 5.500 185.28 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5786 2 Bihar Babaganj To Pure Uttrar 1.000 33.24 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5786 3 Jhingur Jalesarganj Road To Raghunathpur Atthaisa 2.000 65.41 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5787 1 Jathwara Mandhata Road KM 12 To Bashupur Linkpur 0.925 29.75 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5787 2 Jethwara Katra Gulab Singh Road km 4 To Pure Basawan 1.150 39.25 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5787 3 UFA Road Km 110 To Akaripur Dadwa link road 1.200 42.32 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5788 1 PJL Road BSB To dhanipur 1.300 44.18 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5788 2 L-92 To Rasoolpur 0.930 32.53 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5788 3 LJ Road km 16 To Panidit ka purwa (Belamai) 1.050 38.07 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5790 1 DRP Road km 4 To Kaulapur Nand Patti 1.150 43.28 NCB POST 1-Dec-12 Awarded

Page 26: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

26

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP5790 2 DRP Road to km 8 To Chaube Patti Gokula 1.800 58.66 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5790 3 LBRoad Km 196 To Bairampur 1.100 39.99 NCB POST 1-Dec-12 Awarded

2 Tr-1 UP5794 1 LB Road km 177 To Khatanpur 1.400 52.30 NCB POST 1-Jul-13 In Process

2 Tr-1 UP5794 2 DRPK Road km 17 To Yadav Basti (Lacchipur) 1.100 43.25 NCB POST 27-Jun-13 In Process

2 Tr-1 UP5794 3 Fatanpur Veerapur Road km To Dhanaupur (Pal Basti) 1.750 65.80 NCB POST 22-Jun-13 In Process

2 Tr-1 UP5794 4 Rakhaha Kanhai Road To Chauhan Basti (Rakhaha) 0.900 41.60 NCB POST 27-Jun-13 In Process

2 Tr-1 UP5869B 1 T-04 To Pure Mathiya 1.775 80.61 NCB POST 2-Jul-13 In Process

2 Tr-1 UP5869B 2 L-05 To Itaha 0.900 52.36 NCB POST 26-Jun-13 In Process

2 Tr-1 UP5869B 3 Bhatnaousa To Fathehabad ( Upto Gothiya ) 1.025 43.13 NCB POST 29-Jun-13 In Process

2 Tr-1 UP5870 1 Kesrawa road To Pure Jhanjhata 2.725 123.11 NCB POST 22-Jun-13 Awarded

2 Tr-1 UP5870 2 Dalmau Unnao road To Pure Naya 2.025 81.97 NCB POST 25-Jun-13 Awarded

1 Tr-1 UP5871 1 Rajapur To Pure Triloki 1.200 51.22 NCB POST 27-Jan-13 Awarded

1 Tr-1 UP5871 2 Nithus Achhai Road To Sahpur 2.225 94.20 NCB POST 27-Jan-13 Awarded

2 Tr-1 UP5871B 1 L-024 (Pure Karam) To Dighia (L/R L-025) (Singhpur) 0.575 27.19 NCB POST 9-Jul-13 In Process

1 Tr-1 UP5872 1 Haidergarh - Raebareli Road To Majhgaon 1.500 64.08 NCB POST 28-Jan-13 Awarded

1 Tr-1 UP5873 1 L-06 Dulampur To Paharakheda 1.625 91.07 NCB POST 28-Jan-13 Awarded

1 Tr-1 UP5873 2 L-065 Aghaura Road Harchandpur Road To Bakhwara

(Rampur)

1.425 58.90 NCB POST 28-Jan-13 Awarded

1 Tr-1 UP5873 3 T-08 To Pure Jawahir (L-064) 0.850 47.97 NCB POST 28-Jan-13 Awarded

Page 27: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

27

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP5874 1 L023 To Sawaiya Meera (L-137) 0.950 51.09 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5874 2 Saray hardo (L-081) To Bhelampur 1.850 76.03 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5874 3 Unchahar-Khrauli Marg To Pure Nankoo (L-61) 2.050 115.81 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5874 4 Jagatpur - Unchahar Road To Sarvhada waya Miyapur

Tiwaripur (L-102)

3.000 150.36 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5875 1 Sareni-Lalganj Road Shital Khera Road To Madai Khera

Link Road (L-023 )

1.200 59.48 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5875 2 Bhojpur To Tiwaripur Khurd Link Road (Tiwaripur Kalan

L-048 )

1.750 75.00 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP5875 3 T-06 (Sareni Behariya Khera-Gangapur) To Pure Parigahin

(Chak Chaurdina) (L-056)

2.050 75.42 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP6384 1 Kanth Madnapur Road To Bhitia Pauki 1.800 84.16 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6384 2 Bhargawan Bareng Road To Hausa Jaju 1.450 81.62 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6385 1 Tilhar Jaitipur (Doshpur) Sondha To Banthara Banthari 5.900 279.68 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6386 1 Nigohi Khudagan Barbara Road To Bhartapur Road 1.000 48.83 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6386 2 Lipulekh Bhind Road To Unkhurd 2.450 123.75 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6387 1 Kakrela To Khande Diuria 2.600 137.13 NCB POST 30-Nov-12 Awarded

2 Tr-1 UP6388 1 Kasrak To Nausana (Pahanpur Bidyapur) 0.500 25.93 NCB POST 27-Jun-13 In Process

Page 28: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

28

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP6388 2 Kasrak To Nausana(Mawaiya Khas) 5.000 230.09 NCB POST 27-Jun-13 In Process

1 Tr-1 UP6389 1 Powayan Nigohi Road To Jaswantpur Naugawan 1.700 95.20 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6389 2 Sekhupur To Pasiganpur 2.000 98.16 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6390 1 Banda Puranpur To Fatehpur Bhagwant Nagar 1.800 98.26 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6390 2 Powayan Nahil To Gudhni 0.850 43.68 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6391 1 Kalan Paror Road To Abdullapur Milkia 1.200 58.82 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6391 2 Hetampur To Pihua 1.200 61.11 NCB POST 30-Nov-12 Awarded

2 Tr-1 UP6559 1 Shapur Singarjot Road To To Manijot 0.850 35.53 NCB POST 19-Jun-13 Awarded

2 Tr-1 UP6559 2 Kharika Dube To To Kharchaula Nankar 1.160 47.82 NCB POST 14-Jun-13 Awarded

2 Tr-1 UP6559 3 Pathara Road To To Nishar 0.900 33.77 NCB POST 25-Jun-13 Awarded

2 Tr-1 UP6559 4 Mannijot - Bharwatiya - Mushtakam Road To Dumaria 1.450 60.92 NCB POST 17-Jun-13 Awarded

1 Tr-1 UP6560 1 D D Road To Khairi Sheetal Prasad 1.500 94.58 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6560 2 L D Road Via Kapiya Shukla To Newsa 1.135 45.88 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6560 3 Dohariya Buzurg To Patiyapur 1.600 44.59 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6561 1 B T I B Road To Ajgara 1.200 60.21 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6561 2 Udaulia (Misraulia Khalsa) To Karonda Khalsa 1.450 77.27 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6561 3 Pipari Buzurg To Pipari Lagri(Suhelwa) 1.400 77.38 NCB POST 30-Nov-12 Awarded

Page 29: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

29

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP6562 1 Kakrahwa-Bardahwa Road To Leeladih(Bhujauli) 2.030 105.26 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6562 2 Karimpur-Rampur Road To Gulabgarh Hasnapur 1.250 58.84 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6562 3 Naugarh-Birdpur Road To Daulatpur-Daya Nagar 1.375 64.16 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6563 1 Babhani To Dabra 0.950 46.53 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6563 2 Telawra - Rithia Road To Kunauna 1.850 101.24 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6563 3 Majhgawan Road To Ahra 1.125 63.89 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6563 4 Majhgawan Road To Jogibari (Deorchiawa) 1.525 60.47 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6564 1 Dhobha To Semara Kala 2.200 126.99 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6564 2 Puraina To Mahadewa 1.300 73.41 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6564 3 Sehari To Gaura Panchhgoti 2.100 109.69 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6565 1 Gangti To (Nagpara) Sikhuiya 3.000 111.20 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6565 2 Marwatiya To Marwatiya 1.875 89.90 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6565 3 Sandaljot (Sangaljot) To Durga Jot 0.950 46.28 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6566 1 Khurhuria To Hasuri (Gajahri) 1.500 77.29 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6566 2 Sensari To Baria 2.150 108.68 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6566 3 Pakrihawa Pakki Road To Mithwania Tola 1.125 59.95 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6566 4 Paneri To Mahadewa 1.675 87.76 NCB POST 31-Mar-12 Awarded

3 Tr-1 UP6657 1 NH-24 Km 393 To Kaimehra Raghubar Dayal 5.200 226.61 NCB POST 4-Jul-13 In Process

3 Tr-1 UP6657 2 Hargaon Maholi Road km 17 To Banjariya 0.600 44.20 NCB POST 4-Jul-13 In Process

Page 30: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

30

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP6658 1 Atariya Neilgaon Road Km5 Saraura To Pashchim gaon 1.000 73.25 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6658 2 Sidhauli Mahmoodabad km 2 To Tadai khurd 1.750 98.16 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6658 3 City Station xing To Nagra 2.000 109.62 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6658 4 Parsada Khairabad Machrehta Road km 2.3 To Dharawa 1.100 72.26 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6659 1 Hathiya Gajipur Road To Gedapur 1.500 71.68 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6659 2 Jamrkha To Kazi Sarai 0.750 48.86 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6659 3 Telwa Road To Kharaila 0.600 39.80 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6659 4 Biswan Laharpur Road Kamhariya Khunkhun Road km 4

To Shekhwapur

1.250 68.67 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6660 1 Sitapur Bahraich Road To Ruknapur 2.130 108.51 NCB POST 30-Nov-12 Awarded

1 Tr-1 UP6660 3 Sidhauli Biswan Road km-15 To Bheera 2.250 123.87 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6660 4 Biswan Mahmoodabad km-5 - Mochkala Canal Rd To

Rusahan

0.530 33.29 NCB POST 30-Nov-12 Awarded

3 Tr-1 UP6661 1 Gurusanda Dhakiya Road km 4 To Baj Nagar 1.300 67.06 NCB POST 7-Jul-13 In Process

3 Tr-1 UP6661 2 Bargawan Piswan Road km 6 To Sahiyapur 0.700 37.33 NCB POST 7-Jul-13 In Process

3 Tr-1 UP6661 3 Piswan Bargawan Road km1 To Mohammdapur 1.950 96.83 NCB POST 4-Jul-13 In Process

3 Tr-1 UP6661 4 Bargawan Piswan Road km 4 To Pipari Shadipur 1.000 48.60 NCB POST 3-Jul-13 In Process

Page 31: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

31

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP6662 1 Bilraya Panwari Road Km.94 To Saidapur 2.300 106.21 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP6662 2 Marubehar To Bajha 2.100 128.09 NCB POST 28-Jun-13 Awarded

2 Tr-1 UP6662 3 Narhariyapur Road To Naurangpur 0.850 45.20 NCB POST 28-Jun-13 Awarded

1 Tr-1 UP6663 1 Sidhauli Mishrikh Road To Jallabad 2.125 109.68 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6663 3 Sidhauli Mishrikh Akohara To Kazikola 1.750 86.40 NCB POST 31-Mar-12 Awarded

2 Tr-1 UP6664 1 Nh-24 to Sandila Road To Kasimpur 0.900 53.02 NCB POST 29-Jun-13 Awarded

2 Tr-1 UP6664 2 Nh-24 Gulalpur Road Road To Chandesua 0.600 35.51 NCB POST 2-Jul-13 Awarded

2 Tr-1 UP6664 3 NH-24 Km434 To Salempur 0.825 54.27 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP6664 4 Biswan Mahmoodabad Road To Meer Nagar 0.800 43.51 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP6664 5 Bilrayan Panwari Road To Khapura 1.550 86.13 NCB POST 26-Jun-13 Awarded

3 Tr-1 UP6665 1 Saktapur - Hariharpur Jamrakha To Budhnapur 0.800 48.50 NCB POST 28-Jun-13 Awarded

3 Tr-1 UP6665 2 Sitapur Bahraich Road to Kaimehra To Kharaundipur 1.150 57.31 NCB POST 28-Jun-13 Awarded

3 Tr-1 UP6665 4 Bilrayan Panwari Road To Kanja 1.500 77.97 NCB POST 3-Jul-13 Awarded

2 Tr-1 UP6666 1 Badagaon Maholi Road km2 To Surajkund 2.100 123.41 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP6666 2 Ratausiya Km2 To Pipari 1.200 60.10 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP6667 1 Biswan Laharpur Hargaon Road km40 To Chandpur 3.500 173.86 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP6667 2 Bilrayan Panwari Road To Khedrapur Via Armi 1.200 68.00 NCB POST 4-Jul-13 Awarded

1 Tr-1 UP6668 1 Pisawan Gopamau km7 To Prempur 2.000 96.13 NCB POST 31-Mar-12 Awarded

Page 32: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

32

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-1 UP6668 2 Pisawan Gopamau km4 To Sejkala 1.900 91.58 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6668 3 Chandra Bargawan Kulhaghat Km9 To Saitiyapur 0.600 32.03 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP68108 1 Rudauli To Alipur 1.050 45.77 NCB POST 2-Jul-13 Awarded

1 Tr-1 UP68108 2 Arjunpur via Saraikola To Dhariya mau 2.600 104.71 NCB POST 28-Jun-13 Awarded

1 Tr-1 UP68108 3 PP Kamaicha Ojhapur via Shahpur To Retwa 1.400 57.89 NCB POST 2-Jul-13 Awarded

1 Tr-1 UP68109 1 Kadipur Dostpur Road To Dhaturha 1.900 81.31 NCB POST 23-Jun-13 Awarded

2 Tr-1 UP68112 1 Dehli Bazar Baghauna Road To Satahari Link Road 1.950 88.38 NCB POST 30-Jun-13 Awarded

2 Tr-1 UP68112 3 Bahabharpur To Harkhipur 1.500 62.73 NCB POST 4-Jul-13 Awarded

1 Tr-1 UP68113 1 Lakhnepur To Pali 3.350 138.30 NCB POST 26-Jun-13 Awarded

1 Tr-1 UP68113 2 Bahubara Basantpur Tiwaripur To Khwajapur 2.100 85.97 NCB POST 26-Jun-13 Awarded

1 Tr-1 UP68113 3 Dewalpur Hasanpur Road To Raipurwa 1.350 60.57 NCB POST 26-Jun-13 Awarded

1 Tr-1 UP68113 4 Enayatpur Ghopa To Tandwa 1.000 48.88 NCB POST 3-Jul-13 Awarded

2 Tr-1 UP68116B 1 Ramganj To Mihirganj 1.550 64.93 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP68116B 2 Piparpur kalyanpur road To Rewra Dhagupur 1.200 51.81 NCB POST 9-Jul-13 Awarded

2 Tr-1 UP68116B 3 Piparpur kalyanpur road To Rawanipur 1.500 86.16 NCB POST 4-Jul-13 Awarded

2 Tr-1 UP68117B 1 Munshiganj Korari Saintha road To Narsinghbhanpur 0.650 32.96 NCB POST 4-Jul-13 In Process

Page 33: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

33

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP68117B 3 Thaura Bhetua Gurha road To Gangahua 1.000 45.57 NCB POST 4-Jul-13 In Process

2 Tr-1 UP68118B 1 Pure Fajil Rd To Paiga 0.550 27.82 NCB POST 28-Jun-13 In Process

2 Tr-1 UP68118B 2 M.G. Road To (Harakhpur) Pure Kanak 1.150 53.66 NCB POST 28-Jun-13 In Process

2 Tr-1 UP68118B 3 PURE LOBHI To Sarauli 1.175 52.98 NCB POST 3-Jul-13 In Process

2 Tr-1 UP68118B 4 J.G.A.P. Rd. To PURE LONIA 1.100 50.22 NCB POST 3-Jul-13 In Process

2 Tr-1 UP68118B 5 Pathak Ka Purwa To Oripur 0.800 38.02 NCB POST 7-Jul-13 In Process

2 Tr-1 UP68118B 6 Hargawn Suratgarh Pure Chhatta To Pure Thakurain 2.075 92.91 NCB POST 7-Jul-13 In Process

2 Tr-1 UP68119B 1 Mahemau Link Road To Mahmadpur 1.150 47.84 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP68119B 2 Road No.1 (Chandgarh Link Road) To Narhar Garh 1.250 56.61 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP68119B 4 Faizabad - Raibareli Road to Dadupur 1.030 52.55 NCB POST 1-Jul-13 Awarded

2 Tr-1 UP68119B 5 Inhauna Rudauli To Kalandar Garh 2.300 96.60 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP68120B 1 Amethi Antu Sangrampur To Paware 0.800 35.11 NCB POST 25-Jun-13 In Process

2 Tr-1 UP68120B 2 Sultanpur Amethi Durgapur Rd. To Tola 0.550 28.72 NCB POST 27-Jun-13 In Process

Page 34: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

34

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP68120B 3 Amethi Antu Sangrampur To Parashu Rampur 2.150 84.22 NCB POST 2-Jul-13 In Process

2 Tr-1 UP68120B 4 MUSAFIR KHANA-GAURIGANJ RD To PURE

MISHIRA KA PURWA

1.100 47.94 NCB POST 25-Jun-13 In Process

2 Tr-1 UP68120B 5 SHAHGARH-CHIBILLI To PURE EBADULLA 1.625 67.27 NCB POST 22-Jun-13 In Process

2 Tr-1 UP68120B 6 RAJAPUR KASARAWAN To JAMO-BHADAR RD 2.450 91.70 NCB POST 22-Jun-13 In Process

1 Tr-1 UP6968 1 L053 Bangarmau Sandila Roshanabad To Jatpur Belthara 4.680 282.00 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6968 2 L026 Ganjmuradabad Ranipur Grant Road To Azampur 0.650 35.96 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6969 1 L021 SRC Rd. Km 28 To Nauhai Buzurg 2.100 113.33 NCB POST 31-Mar-12 Awarded

1 Tr-1 UP6969 2 L084 SRC Km 27 Kanigawan RD To Khanpur Nevada Via

JahnageerNagar

2.950 176.52 NCB POST 31-Mar-12 Awarded

3 Tr-1 UP6970 1 L038 SRC Rd Km 37 Madarpur Kailiya To Budhanpur 3.925 185.56 NCB POST 1-Jul-13 Awarded

3 Tr-1 UP6970 2 L069 Hasanganj Miyaganj To Meerpur Bhambhau 1.000 60.04 NCB POST 1-Jul-13 Awarded

3 Tr-1 UP6970 3 L 074 Hasanganj Munshiganj To Tegapur 2.300 116.92 NCB POST 1-Jul-13 Awarded

1 Tr-1 UP6972 1 L061 Jamalnagar Kalimitti Dabauli Road To Mahiparapur 1.150 58.29 NCB POST 1-Dec-12 Awarded

1 Tr-1 UP6972 3 L065 Safipur Pariyar To Muradpur 0.650 33.68 NCB POST 1-Dec-12 Awarded

2 Tr-1 UP6974 1 L057 LBB Road To Hasanpur Sagora 0.725 43.51 NCB POST 25-Jun-13 Awarded

Page 35: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

35

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-1 UP6974 2 L090 LBB Road To Ganj Moradabad To Tatiyapur 2.550 143.07 NCB POST 27-Jun-13 Awarded

2 Tr-1 UP6974 3 L091 LBB Road To Jhartera To Vairi (Bilind Khera) 3.300 151.30 NCB POST 24-Jun-13 Awarded

1 Tr-1 UP6988 1 L070 Hafizabad Bangarmau Road To Lakhanpur 1.900 92.27 NCB POST 24-Jun-13 Awarded

1 Tr-1 UP6988 3 L042 Kalimitti Dabauli Road To Hayaspur 0.875 45.46 NCB POST 29-Jun-13 Awarded

1 Tr-1 UP6988 4 L072 Hafizabad Bangarmau Road Manikpur To Kazipur

Katchch

1.580 86.00 NCB POST 29-Jun-13 Awarded

2 Tr-1 UP6990 1 Mauranwa Gurbuxganj To Dhonokhar via Akbarkhera 3.200 161.37 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP0469 1 B F A Road to Bajdaha 0.925 40.42 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0469 2 B F A Road to Piyarepur 1.200 51.78 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0469 3 Pahtipur to Bandhandeeh 2.300 98.01 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0469 4 Tiwaripur to Bisunpur 0.725 33.28 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0469 5 Tiwaripur to Bakhopur 0.600 26.60 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0469 6 Akbarpur Mahrua to Bharpur 1.800 76.45 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0469 7 Raipur-Senpur to Juva 1.200 48.87 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0470 1 Hafijpur to Gauri Barah 0.800 31.69 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0470 2 Jalalpur to Chilvaniya 2.000 144.24 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0470 3 Kichaucha to Bahadurpur 0.600 24.36 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0470 4 Akbarpur Jalalpur to Ibrahimpur 1.600 61.32 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0985 1 Kaisergunj Ikauna road to Dhanpara 2.000 103.65 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0985 2 Budhawanpurwa road to Raghunathpur 2.200 115.10 NCB POST 27-Nov-12 Awarded

Page 36: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

36

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP0985 3 Sarwa road to Pipariya Mahipal 3.350 172.26 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0985 4 Shivdaha road to Ghopia 1.200 61.49 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0986 1 Bahraich- Huzoorpur road to Tepra Madrahi 1.200 64.23 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0986 2 Khasha Moh. Pur to Tarapur kalan 1.800 101.81 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0986 4 B.B.B. road to Arai Kalan 1.300 70.08 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0987 1 Khandha bhari road to Imrati 1.675 87.45 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0987 2 Charniya Cot road to Jamunahi 0.650 34.45 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0987 3 Dapauli road to Parsiya 0.850 44.91 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0987 4 Ikauna Pyagpur road to Teliyani (Paduna) 1.300 73.39 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0987 5 Kandbhari panditpurwa to Khusbhauna 0.600 35.86 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0987 6 Padri Road to Parsiy Pandit 1.000 53.90 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0988 1 RDV road to Bhajjapurwa Bakshiyapurwa 1.850 97.89 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0988 2 P.B.B. road to Amwa Husainpur 0.950 53.34 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0988 3 Barkhariya road to Anand Nagar 1.650 93.86 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0988 4 Maharaj Singh Nagar to Harijan Basti 2.175 129.23 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0989 1 Hardi Thana road to Lakhanapur 0.900 49.44 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0989 2 B.K. road to Asmanpur 0.700 37.90 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0989 3 Miusallampur road to Pathakpurwa Rakhauna 1.000 57.48 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0989 4 R.T.I. road to Raghujot 0.550 27.88 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0989 5 R.T.I. road to Bhagwanpur 1.750 89.39 NCB POST 27-Nov-12 Awarded

2 Tr-2 UP0990 1 P.B.B. road to Bhaisha. 2.100 110.78 NCB POST 2-Dec-12 In Process

2 Tr-2 UP0990 2 Katelia Gututti road to Mahrath 2.050 106.35 NCB POST 30-Jun-13 In Process

Page 37: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

37

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-2 UP0990 5 Matera Itha road to Amrit Lalpur Sarania 2.225 114.06 NCB POST 4-Jul-13 In Process

1 Tr-2 UP0991 1 Rampurwa Baundi road to Boundi Shukul 0.850 48.65 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0991 2 RSI road (Kharcha Chauraha) to Suphalpurwa via

Udwapur.

3.575 187.89 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0991 3 Rampurwa Baundi road to Unchgaon 1.500 84.49 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0991 4 Newada Khasha Moh. Pur road to Bhogiapur 1.850 100.06 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0992 1 Gillaula Bhilaura road to Dargi purwa 0.650 34.98 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0992 3 Badagaon Dokkuwan road to Beshiya 1.350 73.29 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP0992 4 Ganga Jamuni road to Maruthiya 2.025 103.41 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1151 1 Rehra Kalan to Rehra Khurd 0.600 30.43 NCB POST 27-Nov-12 In Process

1 Tr-2 UP1151 2 Mudila Madh Nagar Road to Mahdayia Gosain 0.750 33.86 NCB POST 27-Nov-12 In Process

1 Tr-2 UP1151 3 Andhari to Cheddipurva 2.000 104.48 NCB POST 27-Nov-12 In Process

2 Tr-2 UP1152 1 Rani Jot Deoria to bannri Jot 1.200 58.51 NCB POST 25-Jun-13 In Process

1 Tr-2 UP1153 1 Gonda Uttaraula Patiyala Grant to Bhar Purwa 1.100 52.29 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1153 2 Bangwa Peher to Jhabbar Jot 0.900 42.55 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1153 3 Utraula Tulsiplur to Rajapur Mafi 2.500 108.28 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP13119 1 Mahadeva Kadakapur road to Tihurki 0.650 47.88 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1864 1 T-03Road to Budhwar 3.500 140.72 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1864 2 L-043 Road to Jeonathpur 0.750 34.56 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1865 1 T-03 to Lehra 3.500 151.89 NCB POST 31-Mar-12 Awarded

Page 38: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

38

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP1865 2 L-015 to Naganpur 1.200 41.40 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1866 1 T-04 to Mahadevpur 1.750 72.12 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1866 2 L-007 to Saruhakalan 1.000 34.55 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1867 1 T-01 to Nawapor 1.300 55.90 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1867 2 T-03 to Gurehookmarari 1.250 53.67 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1867 3 T-02 to Rampur 1.000 44.50 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1867 4 T-02 to Madhan H. Basti 1.050 43.64 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1867 5 T-10 to Negura Bind Basti 0.750 31.22 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1868 1 T-11 to Sabal jalalpur 1.500 61.13 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1868 2 L-076 to Sirkalpur 2.000 83.62 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1868 3 L-91 to Kunshaha 3.850 156.01 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1868 4 T-10 to Bhaisaur Railwayline Mohan Bhiti Shivkhari 2.000 83.10 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1868 5 Tulsi Ashram Sakaldiha Road to Bhaisaur 2.850 113.65 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1869A 1 T-04 to Tanda Khurd 1.000 37.44 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1869A 3 T-032 to Mustafapur 1.600 73.67 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1869B 1 L-034 to Khandipur 1.500 53.70 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1869B 2 T-02 to Parasia 1.100 42.29 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1870 1 T-01 to Semarakhusi 1.750 77.67 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1870 2 T-05 to Laltapur 2.600 108.60 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1870 3 T-03 to Narmadapur 4.000 168.99 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1870 4 T-05 to Amdaha Charanpur 4.400 179.91 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1872 1 T02 to Khalgarh 1.475 82.40 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1872 2 T02 to Dihwa 1.050 53.15 NCB POST 31-Mar-12 Awarded

Page 39: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

39

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP1872 3 Chandauli - Baburi Road to Dighwar Harijan Basti 1.100 44.56 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1872 4 Lakshamanpur- Mainpur Road Minor Mod to Hinoti 2.000 97.11 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP1873 1 Akoda Kala - Shivpur Road to Degra 0.925 40.88 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1873 2 Gharauli - Baburi Road to Jarkhor Harijan Basti 1.050 42.02 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP1873 3 Rampur Urf Karanpur Link Road 2.775 122.47 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2560 1 Kot Garha Road to Awdhootpur 0.850 41.39 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2560 2 Raghopur via Afjalpur to Kot Garha Road 2.750 123.31 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2560 3 Kot Dariamau to Chandanmau 2.000 100.04 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2561 1 Alipur Road to Hardaspur 1.000 46.12 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2561 2 G.T.Road Km.115 to Jawahar Nagar 0.950 46.91 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2561 3 G.T.Road Km.120.00 to Korha 1.500 62.99 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2561 4 Khaga Vijaipur Road to Bhawanipur 1.550 65.16 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2562 1 G.T.Road Km.100 to Hanumanpur 0.850 38.64 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2562 2 Ekari T.C. to Mohanpur 1.050 46.74 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2562 3 Ranjitpur Road Km.-2 to Shivpur 1.400 62.28 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2563 1 H.H.A.A.J.Road Km.-22 to Gohtipur 2.250 98.45 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2563 2 H.H.A.A.J.Road Km.-23 to Baba Ka Purwa 1.800 81.55 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2564 1 NH to Badahar road to Suganapur 3.000 142.19 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2564 2 GT Road km 65 (NH to Ashapur Abhaypur road) to

Jadepurwa

3.250 144.41 NCB POST 28-Nov-12 Awarded

Page 40: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

40

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP2564 3 Govindpur Rupali Road(NH to Govindpur Rupali Road to

Chandipur) to kakarabad

2.700 123.26 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2565 1 BMK Road Km. 7 to Pasiyapur 0.600 28.16 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2565 2 Paharipur Road to Gag 0.600 33.53 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2565 3 Gadhi ( Ghatampur- Rajwaha) road to Bairahra 0.550 26.67 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2565 4 G.T.Road N.H.Km 41.00 to Holapur 1.150 49.09 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2566 1 Urauli Road (Adhawal Urauli Road ) to Dhandhua ka Dera 2.700 117.72 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2566 2 Adhawal Road (Bahua Lalauli Road to Adhawal Road) to

Pathari

0.800 38.07 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2567 1 Banda Bahraich Road Km 272 to Chhiet 1.150 48.83 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2567 2 Bahuwa Yamuna Approach Road to Lodhan Dera 2.000 82.58 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2568 1 Itra Road to Banitala 2.600 106.16 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2568 2 Amauli Baripal Road Km. 3.00 (Amauli to Sarhan

Kahizara Road) to Itra

0.700 37.92 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2568 3 Itra Road (Amauli Sarhan Kahizara (Itra) Road) to

Atmadpur

2.050 90.68 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2569 1 Itra Road (Kahizara Itra ) to Narayanpur 1.500 67.63 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2569 2 Banthara Road to Aliyapur 1.800 74.61 NCB POST 20-Jan-13 Awarded

1 Tr-2 UP2569 3 Makrandpur Dhana Road Km. 7.00 to Sikandarpur 2.300 104.61 NCB POST 31-Mar-12 Awarded

Page 41: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

41

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP2570 1 Behta Road to Gaderianpurwa 1.900 75.64 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2570 2 Bindki Lalauli Road to Kunnuha ka Dera 1.900 84.47 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2570 3 Harkishanpur Road to Godhaiya 0.525 23.12 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2571 1 Amena Road to Jabrapur 1.000 47.64 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2571 2 Barahamanpur (Dilawalpur) to Muswapur 0.775 34.05 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2571 3 Dhaurahra Road to Korauli 2.500 104.51 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2571 4 Bharatpur (Amauli Dada road Bharatpur) to Habibpur 1.000 50.20 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2571 5 Mansoorpur (Amauli Dada road Gaherukhera) to Awar

khera

0.700 31.23 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP2572 1 Laxmanpur Road ( Asother Laxmanpur bye pass )

to Kausiapur

0.850 40.36 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2572 2 Bahuwa to Gajipur Road 7 Km. to Chak meerpur 0.800 34.39 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2572 3 Sakha (Gajipur Augasi Road Km 3) to Kudwari 3.250 129.87 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2573 1 GT ROAD to MANIKPUR 3.675 154.75 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2573 2 KARANPUR to PURANI KATARI 3.125 135.34 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2574 1 QASIMPUR to RAJABAD 2.250 105.85 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2574 2 HHAJJ ROAD SITHAURA to KAMAPUR 1.000 53.42 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2574 3 HHAJJ ROAD SITHAURA to KESUPUR 3.000 136.42 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP2575 1 K.K ROAD RARI to RAGHURAJPUR 1.750 86.90 NCB POST 28-Nov-12 Awarded

Page 42: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

42

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP2575 2 KOT-DARIYAMAU to KHARKHAR 1.725 80.54 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2576 1 AYAH-PAHARPUR to BHAGWANPUR 4.200 182.54 NCB POST 28-Nov-12 Awarded

1 Tr-2 UP2576 2 GT ROAD CHHICHHANI to GHANGHAULI VIA

RAMUWA

3.500 148.59 NCB POST 28-Nov-12 Awarded

2 Tr-2 UP33100 1 Harpalpur Arjunpur to Luth purwa 1.450 63.26 NCB POST 29-Jun-13 In Process

2 Tr-2 UP33100 2 Palia Barijor to Bran 2.000 107.31 NCB POST 2-Jul-13 In Process

2 Tr-2 UP33100 3 Parcholi Khaddipur Road to Barijor 0.650 32.68 NCB POST 9-Jul-13 In Process

1 Tr-2 UP33102 1 P L Road km 120 to Behta kola 1.700 106.45 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33102 2 P L Road Km 133 To Khwajgipur 1.200 59.29 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33102 3 Pasigawan Road To Husainpur Dhaukal 1.350 65.52 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33102 4 S.P. Road KM 5 To Hardaspur 4.000 178.16 NCB POST 29-Nov-12 Awarded

2 Tr-2 UP33103 1 Kadhar -Dahelia to Behso (Brahmanpurwa) 1.450 77.37 NCB POST 4-Jul-13 In Process

2 Tr-2 UP33103 2 Palia Parchauli to Pooratta 0.800 47.51 NCB POST 9-Jul-13 In Process

2 Tr-2 UP33103 3 Palia Parchauli to Ismailpur 1.100 47.37 NCB POST 9-Jul-13 In Process

1 Tr-2 UP33104 1 Chhitramau to Janiamau 3.800 163.91 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33104 2 Bhadar Road to Majhra 0.600 30.09 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33104 3 Shahabad Sandi Km 4 to Bhadevni 1.850 95.13 NCB POST 29-Nov-12 Awarded

2 Tr-2 UP33105 1 Hardoi Sitapur Road to Aureni 3.500 161.68 NCB POST 7-Jul-13 In Process

2 Tr-2 UP33105 2 Aija Link to Khutehna 1.750 88.13 NCB POST 4-Jul-13 In Process

2 Tr-2 UP33105 3 H.P.C Km 38 to Sidhuria 1.000 49.40 NCB POST 4-Jul-13 In Process

1 Tr-2 UP33106 1 Rawal Road to Baskhel 0.550 26.21 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33106 2 Achhuapur to Jafarpur 1.500 79.38 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33106 3 Jafarpur to Behra 0.650 36.34 NCB POST 29-Nov-12 Awarded

Page 43: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

43

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP33106 4 Pihani Kulhawar road to Amar Nagar 1.800 93.74 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33107 1 Canal patri to Girjikheda 2.125 101.65 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33107 2 Bane Kuiyan to Pattipur 3.100 147.14 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33107 3 Barkherva to Deoria 2.500 141.17 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33108 1 Sirauli Road to Kanjora 2.150 101.79 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33108 2 Sandila Gausganj Km-7 to Nigohiya 0.700 36.18 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33109 1 Bijauli Road to Gathiya 3.400 161.65 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33109 2 Gathiya Road to Kherwa 1.400 75.15 NCB POST 21-Jan-13 Awarded

2 Tr-2 UP33110 1 Shankerpur to Madnapur (Madhwapur) 1.400 82.62 NCB POST 7-Jul-13 In Process

2 Tr-2 UP33110 2 Ramgarh road to Govindpur 0.900 54.10 NCB POST 3-Jul-13 In Process

2 Tr-2 UP33110 3 Rani khera Road to Kulman Khera 2.100 110.84 NCB POST 3-Jul-13 In Process

1 Tr-2 UP33111 1 Bahuti khurd to Dalelpur 1.200 62.09 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33111 2 Atraulli Bhattpur (Kothawan mall road) road Km 21 to

Barethi

1.900 89.25 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33111 3 Atraulli mall road road Km 16 to Berwa 1.775 81.89 NCB POST 21-Jan-13 Awarded

1 Tr-2 UP33112 1 Heerapur Gotaiya road to Mahesuwa 1.700 98.41 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP33112 2 Sanda road to Jamunipur 1.575 77.60 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP33112 3 Auna road to Bhobhwa 1.450 83.15 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP33113 1 Atraulli Bhattpur Road km 2 LHS to Lalpurkhera 1.800 95.41 NCB POST 1-Jul-13 In Process

2 Tr-2 UP33113 2 Jeewan khera to Padariya 1.425 68.76 NCB POST 1-Jul-13 In Process

2 Tr-2 UP33113 3 Ram Madarpur to Rampur 1.375 80.22 NCB POST 28-Jun-13 In Process

2 Tr-2 UP33113 4 Rampur Road to Chhatiha 1.375 70.55 NCB POST 28-Jun-13 In Process

1 Tr-2 UP33114 1 Bakwa road to Kaidla 1.450 75.27 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP33114 2 Parsa road(Atraulli Sandila road) to Peeran khera 1.000 53.20 NCB POST 31-Mar-12 Awarded

Page 44: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

44

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP33114 3 Atraulli Sandila road km 11 LHS to Khitauli

khera(kharrati khera)

1.800 84.76 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP33114 4 Khitauli khera(kharrati khera) to Lauly 1.900 87.61 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP33115 1 Pindari Road to Daghela Purva 1.700 77.90 NCB POST 27-Jun-13 In Process

2 Tr-2 UP33115 2 Sandi Baghauli Road to Bhairampur 1.150 54.99 NCB POST 22-Jun-13 In Process

2 Tr-2 UP33115 3 CNN Road Km 13 to Bhau Purva 1.000 47.79 NCB POST 1-Jul-13 In Process

2 Tr-2 UP33115 4 B.S.A. Road Km 8 to Masoodpur 0.900 41.48 NCB POST 27-Jun-13 In Process

1 Tr-2 UP33116 1 BNN road Birni Km 4 to Naya Purva 1.300 62.01 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33116 2 Ban Road to Karehka 0.550 28.18 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33116 3 B.P.Road to Paidhapur 1.100 66.66 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33117 1 B.U.A. road Km 13 to Bheikhapur 0.750 35.42 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33117 2 Jujwamau to Mahmoodpur 1.050 52.89 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33117 3 B.U.A. road Km 4 to Gaduapur 2.875 131.65 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33118 1 GMM Road to Meer Nagar 2.325 106.76 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33118 2 GMM Road to Mahimpur 1.000 56.44 NCB POST 29-Nov-12 Awarded

2 Tr-2 UP33119 1 Atrauli Road Km 3 to Makhdoompur 0.675 35.75 NCB POST 25-Jun-13 In Process

2 Tr-2 UP33119 2 Atrauli Road Km 9 to Mankapur 2.675 120.86 NCB POST 25-Jun-13 In Process

2 Tr-2 UP33119 3 Barahi Road Km 5 to Purwaman 2.500 122.37 NCB POST 22-Jun-13 In Process

1 Tr-2 UP33120 1 Gadaura to Beremau 0.600 31.68 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33120 2 Rampur to Shanti Khera 0.675 37.81 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33120 3 Bhagat Khera to Laxman Khera 1.200 56.70 NCB POST 29-Nov-12 Awarded

2 Tr-2 UP33121 1 Anangpur Pipria Km 7 to Nasa 1.900 90.48 NCB POST 2-Jul-13 In Process

2 Tr-2 UP33121 2 Hasnapur to Daulatpur 2.600 113.59 NCB POST 2-Jul-13 In Process

1 Tr-2 UP33122 1 Gorai (Chakoti) to Sai 0.900 42.13 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP33122 2 Swaizpur Gauria road to Barhauli 1.500 77.88 NCB POST 29-Nov-12 Awarded

Page 45: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

45

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP33122 3 Arjunpur Pratipal pur Km 3 to Bhawanipur 1.100 50.70 NCB POST 29-Nov-12 Awarded

2 Tr-2 UP3378 1 Mansoorpur to Antwa 0.600 29.19 NCB POST 3-Jul-13 In Process

2 Tr-2 UP3378 2 Dhaurahar karanpur Matani to Ranikhera 2.100 97.72 NCB POST 26-Jun-13 In Process

2 Tr-2 UP3378 3 Kuchila Road to Pandeola 1.200 68.74 NCB POST 26-Jun-13 In Process

2 Tr-2 UP3378 4 Kaikhai to Bandh purwa 1.200 75.05 NCB POST 23-Jun-13 In Process

2 Tr-2 UP3378 5 Bandh purwa to Nikari 1.200 67.18 NCB POST 26-Jun-13 In Process

1 Tr-2 UP3379 1 B.S.A Road Km-48 to Kankapur 4.000 204.27 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3379 2 B.S.A Road Km-53 to Tera 3.200 137.47 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3379 3 Pali Pachdevra Km 10 to Jamalpur 1.300 71.03 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3379 4 Bahutai Road to Devrapurwa 1.300 64.17 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3380 1 Lukha Hathaura Km 6 to Rampur Tigra 1.000 44.98 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3380 2 Lukha Hathaura Km 48 to Tharia 1.750 76.05 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3380 3 Kamalpur to Dibannapur 2.400 95.99 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3381 1 Pasigawan Road to Jharsa Alampur 2.750 126.33 NCB POST 31-Mar-12 In Process

1 Tr-2 UP3381 2 Shahabad to Mishripur 2.000 93.53 NCB POST 31-Mar-12 In Process

1 Tr-2 UP3381 3 Aigawan to Kachoora 2.200 111.23 NCB POST 31-Mar-12 In Process

1 Tr-2 UP3382 1 Kachhaliya to Purwa 1.600 87.10 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3382 2 Purwa to Kewalpur 1.450 65.90 NCB POST 22-Jan-13 Awarded

1 Tr-2 UP3382 3 Nasauli Damar Road to Naushara 1.500 78.81 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3382 4 Pali Gadhiya Naktaura Km 7 Tp Laluapur to Pali Gadhiya

Naktaura Km 7 Tp Laluapur

1.000 48.04 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3383 1 Mansoorpur to Harbansapur 1.000 47.68 NCB POST 31-Mar-12 Awarded

Page 46: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

46

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP3383 2 B.S.A road to Sanfara 3.100 176.17 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3383 3 Sandi shahabad road to Santoshpurva 2.100 92.38 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3383 4 Sandi Shahabad road to Ghesapur 1.100 53.37 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3383 5 Sandi By Pass to Chittarpurwa 0.500 27.77 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3384 1 Sandi Shahabad Road to Pahelia 1.200 50.71 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3384 2 Pakari to Soneypur Road 2.500 114.20 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3384 3 BSA Road to Pakari 4.000 195.97 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3384 4 Palia Lko Road to Gulari Pokhari(via Sissitali Road) 0.600 29.40 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP3385 1 BP Road Km 148 to Baldevpurva 2.150 94.69 NCB POST 29-Jun-13 In Process

2 Tr-2 UP3385 2 BP Road Km 145 to Biharipurva 0.925 45.59 NCB POST 27-Jun-13 In Process

2 Tr-2 UP3385 3 Lalpur Ahirori Road to Tilakpurva 1.150 62.62 NCB POST 24-Jun-13 In Process

1 Tr-2 UP3386 1 Bhikhpur Aima Road to Shankarpur 3.100 128.22 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3386 2 Rampur Road to Dharauli Road 2.600 116.50 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3387 1 Sandila Beniganj road km 26 to chapertala(Ch3.000-

5.000)

2.000 92.54 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP3387 2 Chapartala to Muakola 1.750 73.32 NCB POST 27-Nov-12 Awarded

2 Tr-2 UP3388 1 Samodha Inayatpur Road to Baghadanda 1.450 70.13 NCB POST 2-Jul-13 In Process

2 Tr-2 UP3388 2 Ghughera Road Km 4 to Gondwabhoop 0.625 34.67 NCB POST 25-Jun-13 In Process

2 Tr-2 UP3388 3 Sandila Gausganj Km 9 to Gausapur 0.700 37.84 NCB POST 25-Jun-13 In Process

2 Tr-2 UP3388 4 Gopalpur Bridge to Husainpur 1.875 94.57 NCB POST 25-Jun-13 In Process

1 Tr-2 UP3389 1 Atrauli Bhattpur Km 8 to Terwa 5.000 238.36 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP3389 3 Mandauli Road (Kaudiya) to Beerpur 0.700 35.62 NCB POST 22-Jan-13 Awarded

Page 47: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

47

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP3389 4 Katki Road to Dewari 0.725 37.47 NCB POST 22-Jan-13 Awarded

1 Tr-2 UP3390 1 Herwal Mehadi Khera road to Bhagtoopurwa 3.025 148.92 NCB POST 22-Jan-13 Awarded

1 Tr-2 UP3390 2 G.M.M. road km 37 to Mahneypur 3.600 171.92 NCB POST 22-Jan-13 Awarded

1 Tr-2 UP3390 3 Sewalapurwa to Karainpurwa 1.600 74.97 NCB POST 22-Jan-13 Awarded

1 Tr-2 UP3391 1 BNN road to Jalera Link Road 5.900 329.41 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3392 1 BSA road to Sawan Khera(Shama Khera) Link Road 0.700 31.75 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3392 2 BP road to Haroiyapur Link Road 2.200 98.70 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3392 3 CNN road to Mit Mit Pur 1.000 46.53 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3393 1 Parchal Rasoolpur to Jailal Purwa Link Road 1.150 56.13 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3393 2 Noorpur Hathaura to Bahtheria Link Road 2.400 106.72 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3394 1 Muriya Khera to Neyouli(Remaining Portion) 0.550 30.38 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3394 2 Gaura to Saraiuad 2.500 112.72 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3395 1 Chhanoiya to Baruhar 1.800 86.70 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3395 2 Chhanoiya to Masoodha 1.700 76.59 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3395 3 Hatyaharan to Narendrapur 1.000 49.01 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP3396 1 Gangabux Khera to Shalilamau 1.000 47.77 NCB POST 23-Jun-13 In Process

2 Tr-2 UP3396 2 Maghiyawan Km 11.50 to Gahira 2.500 123.38 NCB POST 28-Jun-13 In Process

2 Tr-2 UP3396 3 Maghiyawan Km 11.50 to Akbarpur 1.050 54.26 NCB POST 28-Jun-13 In Process

1 Tr-2 UP3397 1 P. L. Road km 198 to Arakhteli 3.200 139.60 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3397 2 P. L. Road km 187 to Panua 1.510 67.96 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP3397 3 P. L. Road km 190 to Semra Khurd 2.350 99.76 NCB POST 29-Nov-12 Awarded

Page 48: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

48

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP3398 1 Atrauli Bhattpur Km 2 to Chhatiha 3.700 170.81 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP3399 1 Lilwal Road to Medaipurva 0.750 35.70 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3399 2 Katighara Road to Gopalpur 1.200 71.39 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3399 3 Rahimpur road to Suraiyan 4.050 172.95 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3399 4 Sirsa to Amona 4.300 209.22 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP3399 5 Abdullah Nagar Road to Fulha 1.150 56.75 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4057 1 Sarriyan Barigaon Marg to Rampur Taluka Marg 1.200 52.38 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4057 3 Bijehara Canal Patari Sampark Marg to Bijehara 2.225 110.52 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4057 4 Kaklapur Sampark Marg to Kaklapur 1.100 48.22 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP44100 1 Lakhimpur-Shardanagar-Dhakherwa Road km.-12 to

Shyamdash Purwa

1.500 77.29 NCB POST 28-Jun-13 Awarded

2 Tr-2 UP44100 2 B.P. Road (SH-21) to Kakerpeetha 1.000 49.25 NCB POST 3-Jul-13 Awarded

2 Tr-2 UP44100 3 L.B.B. Km.-9 To Belihan to Mirzapur 0.900 41.65 NCB POST 3-Jul-13 Awarded

2 Tr-2 UP44100 4 Daudpur-Pakariya-Mirzapur-Korara-Murdiamishra-

Devkali-Aliganj Road to Khanpur

1.500 70.72 NCB POST 28-Jun-13 Awarded

1 Tr-2 UP4478 1 JBG-Mohammadi Road Km-10 to Chhapaura 3.500 174.32 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4478 2 JBG-Mohammadi Road To Dhandel Road Km-1 to

Sonaura

2.400 119.88 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP4479 1 Dhandel to Nevada 1.500 77.43 NCB POST 26-Jun-13 In Process

2 Tr-2 UP4479 2 Ukermuhan to Bhogipur-Sewaram 0.700 37.91 NCB POST 26-Jun-13 In Process

2 Tr-2 UP4479 3 JBG-Mohammadi Road Km-11 to Sarauniya 3.900 181.61 NCB POST 3-Jul-13 In Process

Page 49: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

49

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP4480 1 SJP (SH-93) Road Km-49 to Gauhaniya Aalam 0.700 36.01 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4480 2 Barhiya to Khadasara 2.000 98.89 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4480 3 Jahanikhera-Barwar-Mohammadi Road Km-4 to

Chakpihani

3.600 174.59 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4481 1 Jahanikhera-Barwar-Mohammadi Road Km-4 to Dulhapur 4.700 218.77 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4481 2 Pakariya to Bargadiya 1.600 77.60 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4482 1 N.H.-24 (Km-368) To Dandaura road to Semarghat 5.800 268.05 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4482 2 Barwar To Dulhapur Kisan Road Km-2 to Sahupur 1.000 49.35 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4483 1 Ratanpur to Karmuliya 3.500 167.86 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4483 2 Mullapur to Dariyabad Bhanpur 2.300 112.75 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4484 1 LM Rd. To MDR-86(KM-51) to Nauakhera 1.100 53.65 NCB POST 27-Nov-12 Awarded

1 Tr-2 UP4484 2 LM Rd/ Km-49 to Muzaffarpur 0.700 38.81 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4484 3 Mohammadpur to Barhiyakhera 4.200 186.51 NCB POST 24-Jan-13 Awarded

1 Tr-2 UP4485 1 Saria Rd. to Jigna 2.800 130.25 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP4485 2 Sariya Rd. to Bagdhuan 1.200 61.99 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP4485 3 Ganeshpur-Devapur to Harriya 0.900 44.12 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP4485 4 LM Rd. To MDR-86(KM-46) to Yasinpur 2.000 87.20 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP4486 1 P.B. Rd. to Bijokhar 0.900 44.82 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4486 2 Gola-Bankeyganj-Kukra-Baroncha to Dhakia 1.650 72.75 NCB POST 26-Jan-13 Awarded

Page 50: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

50

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP4486 3 Mamri-Rosannagar to Banbudheli Nankar 1.350 55.05 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP4486 4 Khojiapur to Mukarimpur 1.450 69.22 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP4487 1 Dayanathpur Link Road to Dayanathpur 3.975 168.32 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4487 2 Raipur to Raipur 3.500 168.82 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4488 1 Hariharapur Link Road to Hariharapur 1.000 52.23 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4488 2 Chhatiya Sarainya Link Rd. to Chhatiya Sarainya 1.450 74.42 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4488 3 Teela Link Road to Teela 1.000 53.21 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4488 4 Barwar To Dulhapur Kisan Road Km-6 to Kashipur 2.500 125.45 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4489 1 Belhara Link Road to Belhara 2.125 102.69 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4489 2 Hathaila Link Road to Hathaila 4.000 186.94 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4490 1 Badhwari undhon Link Rd. to Badhwari undhon 2.700 131.55 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4490 2 Khargapur Rd. to Pipra via Bharatpur 3.200 153.97 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP4491 1 Dehua Link Road to Dehua 2.025 88.98 NCB POST 29-Jun-13 In Process

2 Tr-2 UP4491 2 Kheriamishra Link Rd. to Kheriamishra 3.650 170.01 NCB POST 29-Jun-13 In Process

2 Tr-2 UP4492 1 Mahewaganj Baidanapur to Gaurtara 3.500 169.97 NCB POST 24-Jun-13 In Process

2 Tr-2 UP4492 2 Mahewaganj Baidanapur to Koriyadhara 0.800 38.19 NCB POST 24-Jun-13 In Process

2 Tr-2 UP4492 3 P.B. Road GauriyaBhelam to Belhari 1.400 66.07 NCB POST 27-Jun-13 In Process

2 Tr-2 UP4492 4 Mazara to Tippanpurwa 1.900 89.02 NCB POST 27-Jun-13 In Process

1 Tr-2 UP4493 1 NDS-20 Rani Purwa to Gulari Purwa/ Parsa Purwa 1.000 52.56 NCB POST 31-Mar-12 Awarded

Page 51: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

51

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP4493 2 Jatpurwa gosiapurwa to Laukahi 1.200 63.22 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4493 3 Sujanpur to Bengali colony I 3.500 165.67 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4493 4 Teliyar (left) to Raghunath Purwa 0.900 47.61 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP4494 1 Amethi Dihuakala to Madhavpurwa 2.025 99.11 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4494 2 Bharetha-II to Bharetha-II 1.500 92.47 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4494 3 Vashudevpurwa to Maila 0.925 48.83 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4494 4 Shahbazpur to Shahbazpur 1.350 63.19 NCB POST 29-Nov-12 Awarded

2 Tr-2 UP4495 1 Koniya to Lokaipurwa 2.125 95.97 NCB POST 23-Jun-13 Awarded

2 Tr-2 UP4495 2 Gaildas Purwa to Gaildas Purwa 0.950 43.82 NCB POST 19-Jun-13 Awarded

2 Tr-2 UP4495 3 Mitaula to Mitaula 1.000 47.85 NCB POST 14-Jun-13 Awarded

2 Tr-2 UP4495 4 Dubepurwa to Bhadhaiya 1.000 48.12 NCB POST 27-Jun-13 Awarded

2 Tr-2 UP4496 1 Hasanapur to Hasanapur 1.000 52.41 NCB POST 28-Jun-13 In Process

2 Tr-2 UP4496 2 Mohanpurwa to Mohanpurwa 1.100 54.92 NCB POST 1-Jul-13 In Process

2 Tr-2 UP4496 3 L.B.B Basaigapur X-ing To Barawla Tendwa

Phoolbehar Road to Madhavpur

0.700 33.63 NCB POST 25-Jun-13 In Process

2 Tr-2 UP4496 4 RAJA MANDI to KAPRAN KUNWA 1.900 76.97 NCB POST 17-Jun-13 In Process

1 Tr-2 UP4497 1 Manjaha to Manjaha 0.700 35.13 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4497 2 Kharagapur to Kharagapur 2.000 101.62 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4497 3 Ramuwapur to Ramuwapur 1.000 53.20 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4497 4 Jahanpur to Jahanpur 0.700 36.20 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4498 1 Lauka to Lauka 2.000 97.32 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4498 2 Tikariya to Tikariya 1.100 53.65 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4498 3 Gopalapur to Umarapur 2.100 105.44 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4498 4 Jhala to Jhala 0.500 26.65 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4499 1 Ghannpurwa to Paharpur 3.100 153.44 NCB POST 29-Nov-12 Awarded

Page 52: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

52

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP4499 2 Pautheypurwa to Pautheypurwa 3.300 151.10 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP4757C 1 Pakadiar to Khuta Maidan 1.400 69.86 NCB POST 26-Jan-13 In Process

1 Tr-2 UP4944 1 Bhogaon rajwana Road to Nagla Jogpur Via Durgapur 1.200 61.13 NCB POST 26-Jan-13 Awarded

1 Tr-2 UP5386 1 Gortutawa Gulalpur Road to Haraura Pal basti 1.400 50.53 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP5386 3 LD Road to Devara 1.050 36.78 NCB POST 31-Mar-12 Awarded

2 Tr-2 UP57100 1 BUA Road to Bhitari 0.700 36.87 NCB POST 7-Jul-13 In Process

2 Tr-2 UP57100 2 Ramnagar Janvamau to Shervanipur 0.600 28.42 NCB POST 7-Jul-13 In Process

2 Tr-2 UP57100 3 KGM Road Km-3 to Panahnagar 1.700 72.96 NCB POST 3-Jul-13 In Process

1 Tr-2 UP57101 1 AR Road Km-5(Ranjitpur) to Purejhurhi rd 1.300 55.52 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP57101 2 L-037 To to Rathy Road 1.200 53.12 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP57101 3 Chamanganj Sarai Mathia to dhnaur Rd 1.550 67.73 NCB POST 29-Nov-12 Awarded

1 Tr-2 UP5795 1 Dilip pur Raja ka kot road km 1 to khauhatpur 1.050 48.86 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5795 2 Dilip pur Chauharjan ghat km-3 to Chamrauti(Bashirpur) 1.700 82.26 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5795 3 Diwanganj Sonahi bazar km-3 to Digurpur

(bibiyakaranpur)

1.750 67.74 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5795 4 Shitalganj Sonahi Bazar golapur to Golapur Dari

(Palbasti)

0.675 32.14 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5795 5 DRPK Road Km-13 Sarai Bharatrai to Chaksara

(Sarojbasti) via Purechan link road

1.100 42.27 NCB POST 27-Jan-13 Awarded

Page 53: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

53

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP5796 1 Duhia Newari to Duhia Newari 0.800 36.63 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5796 2 Shivganj link road to Shivganj 1.100 50.20 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5796 3 Bakulahi link road to Bakulahi 1.150 50.32 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5797 1 JK Road to kasiya 1.550 61.17 NCB POST 27-Jan-13 In Process

1 Tr-2 UP5797 2 PJL Road to Thakurain ka purwa 1.050 44.37 NCB POST 27-Jan-13 In Process

1 Tr-2 UP5797 3 PJL Road to Nagariya 1.050 46.15 NCB POST 27-Jan-13 In Process

1 Tr-2 UP5798 1 BSB Road to Harbanspur 1.100 42.22 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5798 2 PJL Road to Dhudhulki ka purwa 1.500 59.34 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5798 3 L-047 to Sadin Ka Purwa 0.980 42.74 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5799 1 Bihar babaganj to Siyariya 4.800 188.67 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5799 2 JK Road to Babu ka Purwa 1.100 50.40 NCB POST 27-Jan-13 Awarded

1 Tr-2 UP5876 1 RGKS Road to Batauwa . 0.800 30.02 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5876 2 Raj Ghat - Lalganj Road to Pure Darai (Tiwaripur ) . 0.725 35.68 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5876 3 L - 076 ( Ataura Buzurg ) to Pure Mahipat . 1.825 75.25 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5876 4 RBL-Lalganj Road to Pure Bawana . ( Upto Itaura Khurd

Or Pure Kachwahan )

2.425 111.62 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5876 5 Aihar road to Jagannathpur 0.800 34.71 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5877 1 Maou Market Rajapur to Baribara 2.375 91.57 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5877 2 Maharajganj Haidergarh Road to Kamalpur Awadeeh 1.875 72.82 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5878 1 Haidergarg Raebareli Maharajpur to Satorpur 2.675 111.68 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5878 2 Maharajganj Inhaun (T-02) to Jiyapur via Shivgarh 1.300 53.08 NCB POST 1-Dec-12 Awarded

Page 54: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

54

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP5879 1 Raibareli Sultanpur road - Sarai mugla to Imamganj (upto

Gauchara Rahi )

1.200 55.70 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5879 2 L-071 Dhighara Somau to AudanSingh Ka Purwa 3.200 120.19 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5879 3 L-116 Aghaura Harchandpur to Kakkepur 1.000 43.78 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5880 1 T-02 (Kheeron) to Shaguni 2.800 109.99 NCB POST 1-Dec-12 In Process

1 Tr-2 UP5880 2 T-05, Lalganj Semari Road to Thakurain Kheda (L-096) 1.200 50.25 NCB POST 1-Dec-12 In Process

1 Tr-2 UP5880 3 T-04, Khiron dukanaha Lalganj to Chandi (L-050 ) 1.500 71.91 NCB POST 1-Dec-12 In Process

1 Tr-2 UP5881 1 Unnao Road to Pure Naseeran (L-051) 0.800 32.40 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5881 2 L-066 Unchahar - Kharauli Marg to pure Fazil Mahuwa

(up to pure ganj)

1.950 69.37 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5881 3 L-032 to Pure Kodar (up to Basuhi) 3.400 123.80 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5882 1 Yoosuphpur to Thakurain Khera (L-029) 1.300 49.47 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5882 2 (L-042) Lalganj Fatehpur Road to Raghunath Ganj Road

To Naubasta (L-083)

0.700 27.72 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5882 3 Kanjas to Beeta (L-061) 1.100 42.71 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5882 5 Saray Bairiyakhera-Gngapur Marg to Odrahar (L-086) 0.650 25.88 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5882 6 T-010 to Kazi Khera (L-079 ) 0.950 36.43 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5882 7 L-093 (Sareni Behariya Khera-Gangapur) T-06 to Pure

Ahiran L-093

1.250 45.86 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5883 1 L-085 to Khubchand 2.700 98.15 NCB POST 1-Dec-12 Awarded

Page 55: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

55

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP5883 2 T-05 to Chaubeypur 0.900 37.31 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP5884 1 Raibareli Lalganj Road to Madoodpur 1.780 72.14 NCB POST 1-Dec-12 In Process

1 Tr-2 UP5884 2 L-076 to Sharerdazpur 1.820 67.19 NCB POST 1-Dec-12 In Process

1 Tr-2 UP5884 3 Munshiganj Dalmau Road to Pure Mohan Singh ( UPTO

Medoali )

0.600 25.37 NCB POST 1-Dec-12 In Process

1 Tr-2 UP5884 4 R.G.K.S.Road to Kiratpur (upto kodar) 1.980 87.57 NCB POST 1-Dec-12 In Process

3 Tr-2 UP5978 1 Sikandrabad To to Majra Raseed 0.900 37.80 NCB POST 24-Jun-13 In Process

3 Tr-2 UP5978 2 L-87 To to Kesho Nagli Tanda 0.900 31.49 NCB POST 27-Jun-13 In Process

3 Tr-2 UP5978 3 L-63 To to Soharia Narpat 0.575 20.38 NCB POST 24-Jun-13 In Process

3 Tr-2 UP5978 4 Swar Kashipur Road To to Mohabbat nagar 0.550 19.53 NCB POST 27-Jun-13 In Process

1 Tr-2 UP63102 1 Rasoolpur (Ghusyari) to Khriya Udit 1.350 72.05 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63102 2 Bakhtiyapur road to Kohni 0.900 46.16 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63102 3 Shahbaj Nagar to Rajjab Nagar 2.850 133.99 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63102 4 Piprauli to Siura 1.900 99.11 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63103 1 Kanth Azmabad to Aliapur 1.600 78.99 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63103 2 Marena road to Jhabra 3.000 120.55 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63103 3 Marena road to Khapti 2.100 123.44 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63104 1 L.B. Road To Chamar Gautia to Arua Khanpur 1.000 52.55 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63104 2 Katra Jalalabad road to Behta Pathak 2.200 99.74 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63104 3 Kanth Chauhanpur to Bhitauli 1.800 81.02 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63104 4 Kanth Chauhanpur to Nikra 1.800 96.00 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63104 5 Kanth Chauhanpur to Prahladpur 0.550 31.22 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63104 6 Kanth Madnapur to Sajjapur 1.300 59.98 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63104 7 Palrai to Nagla Jaju 1.800 86.43 NCB POST 31-Mar-12 Awarded

Page 56: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

56

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP63105 1 Bichaula to Gadar Gautia 1.650 62.77 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63105 2 Mudia Khurd to Mudia Kalan 0.500 23.05 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63105 4 Katra Jalalabad Road to Rajpuri 0.600 28.44 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63106 1 Audapur to Saidapur 3.500 182.66 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63106 2 Mathena to Hukum Nagla 1.800 81.86 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63106 3 Jaura to Harnarayanpur 1.100 50.27 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63106 4 Katra Jalalabad to Nagla Bannu Saidapur Pahari 2.400 103.80 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63107 1 Babauri to Piparia Prahlad 1.800 81.58 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63107 2 Gahria Pilkhana Road to Kirthapur 1.500 70.52 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63107 3 Inta Roora to Manuwari via Muzzaffarpur 3.800 200.24 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63107 4 Powayan Nigohi Road to Hariya Ganpatpurna 1.400 62.70 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP63108 1 Hariya Ganpatpur to Mudia Jamkhana 1.000 45.98 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63108 2 Khiriya Rasoolpur Road an to Kathpura via Palhanpur,

Nagla Shahjah

6.600 357.52 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63108 3 Mahurian to Dilawarpur Khurd 2.800 123.55 NCB POST 31-Mar-12 Awarded

3 Tr-2 UP63109 1 Hetampur Road to Mudia Khera Gyan 0.900 47.36 NCB POST 30-Jun-13 In Process

3 Tr-2 UP63109 2 M.F. Road to Choti Sarai 0.950 46.40 NCB POST 25-Jun-13 In Process

3 Tr-2 UP63109 3 M.F. Road To Singha to Budhau 1.650 82.69 NCB POST 28-Jun-13 In Process

3 Tr-2 UP63109 4 Mirzapur Paror Road to Mohiddinpur Nagar Gautia 2.850 129.21 NCB POST 4-Jul-13 In Process

1 Tr-2 UP63110 1 Habiubullapur Road to Choti Nagla 1.675 76.84 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63110 2 M.F. Road (Mirzapur Block) to Naraura 3.300 200.76 NCB POST 31-Mar-12 Awarded

Page 57: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

57

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP63110 3 M.F. Road to Sithauli 0.600 33.66 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63110 4 Mirzapur Paror Road (Km.2) Gazipur Chakhtia to

Bharatapur

2.100 113.26 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63110 5 Tharia Paror Road (Km.5) to Basai to Natthi Nagla 1.300 72.75 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63111 1 M.F. Road to Lakhanpur Giuri 0.600 29.14 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63111 2 Kalan Paror Road to Siuri 0.875 41.51 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63111 3 Kalan Paror Road to (Km.11) Bakemai 1.400 61.70 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63111 4 Kalan Paror Road To (Km.11 Kauhi Gram) to Naya

Gaown, Pachdeora Via Bahangi Khera

3.100 170.10 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63111 5 Kaln Andidai Charnokha Road to Sukhnaiya 1.350 64.94 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63111 6 M.F. Road to Noorpur 1.400 63.82 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63112 1 Kalan Paror road to Hathini Nagariya 3.700 226.05 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63112 2 Dhauna Khera Pohap Nagla to Dhaka 3.600 205.53 NCB POST 31-Mar-12 Awarded

3 Tr-2 UP63113 1 Nakayiya (Ratuli) to Chak Baraincha 1.000 40.76 NCB POST 3-Jul-13 In Process

3 Tr-2 UP63113 2 Nigohi Tilhar Road to Raati 0.700 31.28 NCB POST 29-Jun-13 In Process

3 Tr-2 UP63113 3 Ratauli (Nibiapur) to Khargapur 2.200 113.05 NCB POST 24-Jun-13 In Process

3 Tr-2 UP63113 4 Burhanpur to Hata Dalelpur 2.400 109.56 NCB POST 27-Jun-13 In Process

3 Tr-2 UP63114 1 Bihari dharampur to Kunja via nizampur 1.800 78.53 NCB POST 25-Jun-13 In Process

3 Tr-2 UP63114 2 Bihari road to Harbanpur 2.700 127.51 NCB POST 25-Jun-13 In Process

3 Tr-2 UP63114 3 Rajwari Road to Allahadapur 0.800 32.48 NCB POST 25-Jun-13 In Process

3 Tr-2 UP63114 4 Ranikhiria Chakuliya road to Pakadiya 1.000 48.94 NCB POST 2-Jul-13 In Process

3 Tr-2 UP63115 1 Bandha Road to Bandhiya 1.700 78.20 NCB POST 23-Jun-13 In Process

Page 58: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

58

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

3 Tr-2 UP63115 2 Shivdaspur Road to Tahbanaras 2.100 100.01 NCB POST 26-Jun-13 In Process

3 Tr-2 UP63115 3 Beerampur Road to Marena 1.400 60.53 NCB POST 28-Jun-13 In Process

3 Tr-2 UP63115 4 Biharipur Munda to Husainpur 2.200 101.36 NCB POST 28-Jun-13 In Process

3 Tr-2 UP63116 1 Behta Khas to Gokulpur Nawadiya 1.300 56.51 NCB POST 29-Jun-13 In Process

3 Tr-2 UP63116 2 Majhla Khiriya to Talke Hardeni Link Road 1.200 61.51 NCB POST 2-Jul-13 In Process

3 Tr-2 UP63116 3 Majhla Khiriya to Via Raheempur Datauniya Link Road 3.500 176.99 NCB POST 9-Jul-13 In Process

3 Tr-2 UP63116 4 Katra Khudaganj Road to Mawaiya Patti Link Road 0.700 32.49 NCB POST 9-Jul-13 In Process

3 Tr-2 UP63116 5 Itaua Milakia Road to Gautia 2.400 121.20 NCB POST 9-Jul-13 In Process

1 Tr-2 UP63117 1 NH-24 Km.331 to Paintapur 2.000 95.17 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63117 2 Kanth Kamalnayanpur Road to Parvatpur 3.500 190.13 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63117 3 Toni Road to Darapur Chatia 1.000 45.18 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63118 1 JallapurGariya Rengeen to Sunaura 2.500 141.60 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63118 2 Tilhar Jaitipur Khera Bajhera to Bamiyana 1.200 56.48 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63118 3 Fatehganj Dataganj Gohapur to Binaura Binauri 0.800 40.30 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63119 1 Nagariya Priyagpur (Sirkhari) to Baaskhera Khurd 2.000 90.33 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP63119 2 Powayan Mohammadi Itauli road to Balrampur Mohanpur 1.200 55.99 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP63119 3 Powayan Jewan road (Gangai) to Meerpur 1.000 46.99 NCB POST 30-Nov-12 Awarded

Page 59: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

59

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP63119 4 Kandharpur to Rajpur (Rampur) 2.300 108.53 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP63120 1 Bisalpur Powayan road (Km-26) to Subhanpur 1.050 55.58 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP63120 2 Banda Gahuiya Road (Km-10) to Ram Deori 1.100 53.00 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP63120 3 Powayan Bisalpur Road (Km-42) to Jalalpur 1.500 69.65 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP63120 4 Sikanderpur to Dhermapur 1.000 46.27 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP63120 5 Khutar Sehramau Road to Barahipur 2.100 96.18 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66100 1 L 051 to Bardaha 1.425 61.21 NCB POST 31-Mar-12 In Process

1 Tr-2 UP66100 2 T 07 Nibadehara to Amba 1.750 58.90 NCB POST 31-Mar-12 In Process

1 Tr-2 UP66100 3 T 07 to Snivpurdevri to Sheopur 2.225 113.48 NCB POST 31-Mar-12 In Process

1 Tr-2 UP66100 7 L-051 to Ramdwari 0.525 26.47 NCB POST 31-Mar-12 In Process

1 Tr-2 UP66101 1 T 01 km 10 to Purwanut to Sarraiyan Mahipatpur 1.900 89.95 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66101 2 T 03 to Mahimapur to Kandhai Mahimapur 1.200 60.66 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66101 3 T 02 to Mirzapur to Rampur Bhujang 1.500 73.66 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66101 4 L 071 to Fatehpurwa to Jamunadin 0.700 36.00 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66101 5 T -02 to Itala 3.000 149.72 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66102 1 T -02 to Chak Bhagwa to Madarui 0.700 37.70 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66102 2 L 025 to Damduwa to Khamharia 1.700 82.83 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66102 3 T-01 to Tajpur 1.400 67.77 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66102 4 L-062 to Ramnagra to Wazidnagar 0.650 35.48 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66102 5 T-03 to Bhwanipur to Mawaiya 0.800 41.31 NCB POST 28-Jan-13 Awarded

Page 60: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

60

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP66103 1 Madhwara Rambag Road to Madhwara Rambag 2.500 104.79 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66103 2 L 049 to Arsehra 0.675 40.45 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66103 3 T 03 km 41 to Kesaripur 1.700 88.73 NCB POST 28-Jan-13 Awarded

1 Tr-2 UP66104 1 T 01 to Khandri 3.425 155.19 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66104 2 L 074 to Raipur 1.000 50.74 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66104 3 L 049 to Birahimpur 1.500 68.81 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66105 1 BPSH Road km 90 to Karaundi 1.150 57.90 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66105 2 T 06 Km 94 to Mubarakpur 2.200 106.20 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66105 3 Jeetamau-Talgaon Road to Madarpur 1.500 71.70 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66105 4 T 01 km 17 to Madnapur 2.050 104.18 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66106 1 Gujara Road to Udayapur 1.475 69.61 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66106 2 L 057 to Udaibhanpur 1.075 48.59 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66106 3 T 03 to Bhavanipur 1.050 50.86 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66106 4 Parsendi-Khairabad via Bhawana to to Kurwakola via

Hazoorpur

3.125 127.54 NCB POST 30-Nov-12 Awarded

2 Tr-2 UP66107 1 Gursanda to Buxapur 1.775 76.98 NCB POST 8-Jul-13 In Process

2 Tr-2 UP66107 2 Bandia to Etova Kishunpur 1.675 77.72 NCB POST 4-Jul-13 In Process

2 Tr-2 UP66107 3 P.g. Road km 9 to Chaukhadia 1.150 58.26 NCB POST 1-Jul-13 In Process

2 Tr-2 UP66107 4 Munda Khurd km 6 to Dubawan 1.000 49.20 NCB POST 28-Jun-13 In Process

2 Tr-2 UP66108 1 Sej Kala to Mainia 3.250 155.15 NCB POST 25-Jun-13 In Process

2 Tr-2 UP66108 2 CBK road km 4 to Karodia 0.700 35.58 NCB POST 28-Jun-13 In Process

2 Tr-2 UP66108 3 Fareedpur Road Km-2 to Mussawalpur 0.900 44.95 NCB POST 3-Jul-13 In Process

2 Tr-2 UP66108 4 SMPN RD km 64 to Saidapur 0.675 33.46 NCB POST 30-Jun-13 In Process

2 Tr-2 UP66109 1 Chahelia to Pyarepur 1.650 75.27 NCB POST 25-Jun-13 In Process

2 Tr-2 UP66109 2 SMPN rd km 58 to Daulatiyapur 1.175 57.48 NCB POST 27-Jun-13 In Process

Page 61: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

61

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-2 UP66109 3 CBK road km 13 to Pendari 2.000 86.67 NCB POST 24-Jun-13 In Process

2 Tr-2 UP66109 4 Km 7 of T003 to Palhariya 1.075 49.19 NCB POST 29-Jun-13 In Process

1 Tr-2 UP66110 1 L 063 to Banianpurwa to Baqar Nagar 1.300 63.69 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66110 2 L-056 km 4 to Murtiza Nagar to Sahara 1.050 44.41 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66110 3 L-046 km 5 to Dhandhar to Haithi 1.100 53.29 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66110 4 Saraiyan Masoodpur to Masoodpur 1.850 90.66 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66111 1 Alampur Road to Alampur 2.600 125.48 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66111 2 L-065 to Ranni Nagar 1.200 62.23 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66111 3 T-03 km 12 Noharipurwa to Ishrauli 1.500 74.18 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66111 4 L-022 km 2 to Afseria 2.600 123.54 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66112 1 L 032 Dalpatpur to Nagrauli 1.375 71.84 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66112 2 T 02 to Rangwa 2.500 117.67 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66112 3 L 063 km 3 to Jhisni 4.425 236.30 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66112 4 T 01 km 26 to Jagdishpur Hajariya 4.350 210.01 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66113 1 T 03 km 11 (Thaura) to Mangalpurwa 0.875 44.60 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66113 2 T -03 km 8 to Sikri Mafi to Bejwari 1.525 77.32 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66113 3 L 032 km 8 to Koliacharia 2.000 97.75 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66113 4 L-32 Km 9 to Mewadi Cholaha 2.825 116.20 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66114 1 L-35 to Baraideeh 1.400 72.78 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66114 2 T 03 km 4 to Pasinpurwa 0.700 36.74 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66114 3 T 01 Kharohan to Pureni to Bohra 3.000 145.96 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66114 4 L 022 km 5 to Belha Dariyana to Sisya Dariyana 2.500 119.87 NCB POST 30-Nov-12 Awarded

1 Tr-2 UP66114 5 T 03 km 4 to Naseerpur Sarkar 3.000 144.60 NCB POST 30-Nov-12 Awarded

2 Tr-2 UP66115 1 Bapu Nagar Khanpur marg km 3 to Rudrapur 2.000 92.03 NCB POST 25-Jun-13 Awarded

Page 62: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

62

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-2 UP66115 2 Ullah Mahadiyan to Mahatiyan 1.100 58.54 NCB POST 25-Jun-13 Awarded

2 Tr-2 UP66115 3 Sanda Jitamau Road Km 8 to Padaria 1.630 88.88 NCB POST 2-Jul-13 Awarded

1 Tr-2 UP6682 1 Kamlapur Masterbagh ke Kasmanda Churahe to Kursenda 1.300 58.85 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6682 2 Basantpur Marg km.2 to Kamoliya 3.075 141.53 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6682 3 Sidhauli Mahmoodabad km. 7.800 to Bakipur 0.750 38.41 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6682 4 Sidhauli Mahmoodabad Marg km.17 to Dularpur 0.700 34.33 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6682 5 Biswan sidhauli Marg Cannal Patri to Khanjanpurwa 1.100 53.21 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6683 1 Bisawan - Sidhouli road to Nipaniya Mafi 1.200 59.25 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6683 2 Jalalpur Machharehata marg to Musepur Baldev Singhpur 1.100 46.62 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6683 3 Baljati Ghat marg to Chandpur link road 1.600 64.03 NCB POST 2-Dec-12 Awarded

2 Tr-2 UP6684 1 Chandra Kulhagaht -Baragawan marg to Amaraiya 1.950 76.15 NCB POST 3-Jul-13 In Process

2 Tr-2 UP6684 2 Pisawan Gopamau marg - Rouna marg to Khajurouna 0.500 21.74 NCB POST 1-Jul-13 In Process

2 Tr-2 UP6684 3 Pisawan Sej Khurda marg to Kherawa 0.650 29.18 NCB POST 28-Jun-13 In Process

2 Tr-2 UP6684 4 Chandra Pisawan marg-Allipur marg to Sekhawadeih 1.500 56.93 NCB POST 1-Jul-13 In Process

2 Tr-2 UP6684 5 Pisawan Gopamau marg to Karpal Kuniya 3.450 134.73 NCB POST 28-Jun-13 In Process

Page 63: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

63

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-2 UP6684 6 Pisawan Gopamau road km-3 to Dhakhiya Khurda 1.400 56.00 NCB POST 1-Jul-13 In Process

2 Tr-2 UP6685 1 Badagaon Mitouli road km -2 - Chaturaiya km-2 to

Chathiya

1.100 45.52 NCB POST 29-Jun-13 In Process

2 Tr-2 UP6685 2 Koloura - Masandapur Km-3 to Kunwarpur Gaddi 1.125 52.61 NCB POST 24-Jun-13 In Process

2 Tr-2 UP6685 3 Nansoha to Musaha Link road 1.550 67.40 NCB POST 24-Jun-13 In Process

2 Tr-2 UP6685 4 Hargaon - Maholi road to Kalwari Khurda 0.500 24.07 NCB POST 29-Jun-13 In Process

2 Tr-2 UP6686 1 Mishirikh Binoura marg to Sadiyapur 1.225 57.90 NCB POST 27-Jun-13 In Process

2 Tr-2 UP6686 2 Anta Patounja marg to Malikyanpur 0.750 35.47 NCB POST 27-Jun-13 In Process

2 Tr-2 UP6686 3 Ant Vrindavan marg to Baherawa 2.400 109.59 NCB POST 27-Jun-13 In Process

2 Tr-2 UP6687 1 Nakaila Link road to Nakaila 0.500 24.60 NCB POST 14-Jun-13 In Process

2 Tr-2 UP6687 3 Hasanapur Link road to Hasanapur 1.825 82.64 NCB POST 19-Jun-13 In Process

2 Tr-2 UP6687 4 Bilariya Link road to Bilariya 1.525 73.48 NCB POST 23-Jun-13 In Process

1 Tr-2 UP6688 1 Bhithoura Link road to Bhithoura 0.600 28.14 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6688 2 Virsinghpur Link road to Virsinghpur 0.950 42.81 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6688 3 Saraiyan Link road to Saraiyan 2.400 102.00 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6688 4 Firojpur Link road to Firojpur 1.525 65.68 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6688 5 Marari Link road to Marari 1.150 50.36 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6688 6 Balpur Link road to Balpur 1.250 51.63 NCB POST 2-Dec-12 Awarded

1 Tr-2 UP6688 7 Gopouli Link road to Gopouli 1.025 42.92 NCB POST 29-Jan-13 Awarded

2 Tr-2 UP6689 1 L-058 to Rojha 0.700 37.80 NCB POST 25-Jun-13 In Process

2 Tr-2 UP6689 2 T-03 to Lalattoopur 3.450 153.47 NCB POST 17-Jun-13 In Process

2 Tr-2 UP6689 3 T 03 to Ataria Kiratpur 1.900 82.87 NCB POST 28-Jun-13 In Process

2 Tr-2 UP6690 1 Km 8 of L 035 to Laximanpur 1.000 49.38 NCB POST 1-Jul-13 In Process

Page 64: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

64

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-2 UP6690 2 Km 5 of L 035 to Sitarampur 0.750 36.53 NCB POST 8-Jul-13 In Process

1 Tr-2 UP6691 1 T-04 to Lodh Purwa to to Pashurabelwa 2.775 145.03 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6691 2 T-04 to Muri Khera 1.350 65.81 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6691 3 L-047 to Bothwa 0.950 54.67 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6691 4 T -01 to Auchakapurwa 0.900 46.28 NCB POST 29-Jan-13 Awarded

1 Tr-2 UP6692 1 T-06 to Manjri Pasi to Bahia Bahrampur 1.450 71.48 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP6692 2 T-02 to Keharka 1.100 56.91 NCB POST 3-Jan-00 Awarded

1 Tr-2 UP6692 3 T-02 to Sikrohar Kala to Suropara 1.600 80.19 NCB POST 31-Mar-12 Awarded

1 Tr-2 UP6693 1 T 04 to Kesaria 1.000 53.81 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6693 2 T 03 to Mirzapur 1.200 61.23 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6693 3 L 064 to Badrikhera 0.800 41.16 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6693 4 T 02 to Kaimhara 0.900 45.26 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6693 5 L091 to Khapraila 0.600 35.12 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6694 1 T -3 to Pipra Khurd Anant Singh 0.600 29.51 NCB POST 21-Jun-13 Awarded

1 Tr-2 UP6694 2 Sitapur Bahraich to Meenapur 2.255 87.34 NCB POST 21-Jun-13 Awarded

1 Tr-2 UP6694 3 T -04 to Shekhwa khurd 1.500 71.63 NCB POST 21-Jun-13 Awarded

1 Tr-2 UP6694 4 T 02 Km -19 to Faridpur 1.500 69.66 NCB POST 24-Jun-13 Awarded

1 Tr-2 UP6695 1 L 023 to Khalapurwa 0.900 48.19 NCB POST 24-Jun-13 In Process

1 Tr-2 UP6695 3 L 027 to Narshinghpur 0.900 59.88 NCB POST 24-Jun-13 In Process

1 Tr-2 UP6696 1 L 053 to Taharpur 0.500 38.90 NCB POST 24-Jun-13 Awarded

1 Tr-2 UP6697 1 T 04 to Krishna Nagar 0.925 52.13 NCB POST 20-Jun-13 Awarded

1 Tr-2 UP6697 2 L 041 to Narbirpur 0.900 50.24 NCB POST 20-Jun-13 Awarded

1 Tr-2 UP6697 3 T 10 to Urdha 2.525 98.60 NCB POST 20-Jun-13 Awarded

1 Tr-2 UP6698 1 Km 2 of L 079 to Puraini 2.000 83.99 NCB POST 27-Jun-13 Awarded

Page 65: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

65

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP6698 2 Km. 3.00 of L 088 to Saraiya 1.450 67.74 NCB POST 20-Jun-13 Awarded

1 Tr-2 UP6698 3 Km. 6.8 of T 06 to Mansoorpur 1.300 62.06 NCB POST 20-Jun-13 Awarded

1 Tr-2 UP6698 4 Bijuamau to Garhi 1.400 64.80 NCB POST 27-Jun-13 Awarded

1 Tr-2 UP6699 1 T -03 km 12 to Sarraiya Baldeosingh 0.675 28.05 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6699 2 T- 06 Km 44 to Heer Pur 1.500 67.39 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6699 3 Kasraila Khairabad Road to Bedaura 0.850 43.42 NCB POST 22-Jun-13 Awarded

1 Tr-2 UP6699 4 Laharpur-Khairabad Road Km. 11 to Kaimahara 0.500 26.18 NCB POST 27-Jun-13 Awarded

2 Tr-2 UP68147 1 L-044 to Pure Rathaur 1.400 65.91 NCB POST 29-Jun-13 Awarded

2 Tr-2 UP68147 2 T-04 to Ashrafgarh (upto Chakmirjapati) 0.800 34.62 NCB POST 3-Jul-13 Awarded

2 Tr-2 UP68147 3 L-059 to Pure Mansha 0.575 24.07 NCB POST 26-Jun-13 Awarded

2 Tr-2 UP68147 4 T-04 to Quazipur Gosain 1.025 49.53 NCB POST 26-Jun-13 Awarded

2 Tr-2 UP68147 5 T-01 to Paramganj 1.475 68.29 NCB POST 28-Jun-13 Awarded

2 Tr-2 UP68147 6 T-11 to Pure Bhatan 0.550 25.59 NCB POST 26-Jun-13 Awarded

2 Tr-2 UP68147 7 T-11 to Pure Subedar 0.775 37.86 NCB POST 29-Jun-13 Awarded

2 Tr-2 UP68147 8 L-062 to Pure Faijulal . 0.650 28.13 NCB POST 23-Jun-13 Awarded

2 Tr-2 UP68148 1 L-123 Mau Nasirabad to Pure Shiva 1.500 73.34 NCB POST 24-Jun-13 Awarded

2 Tr-2 UP68148 2 L-105 Deeh Pardeshpur to Madanpur 1.200 58.35 NCB POST 24-Jun-13 Awarded

2 Tr-2 UP68148 3 L-048 Pardeshpur Amethi Road to Bachhaul Khurd 1.125 56.15 NCB POST 27-Jun-13 Awarded

2 Tr-2 UP68149 1 Jayas Salon Road to Pure Bakshi 0.750 32.40 NCB POST 27-Jun-13 Awarded

2 Tr-2 UP68149 2 T-07-L80(Matarawan to Manimanohar 3.450 151.58 NCB POST 27-Jun-13 Awarded

2 Tr-2 UP6971 1 L082 Jamal Nagar Kali Mitti Road to Mudha 2.400 143.73 NCB POST 29-Jun-13 Awarded

2 Tr-2 UP6971 2 L083 Jamal Nagar KaliMitti Road to Khairichandela 0.800 39.89 NCB POST 3-Jul-13 Awarded

Page 66: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

66

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-2 UP6971 3 L042 S.R.C. Km 53 Hazikhera to HasanKhera 1.700 84.74 NCB POST 28-Jun-13 Awarded

2 Tr-2 UP6971 4 L089 Hulasi Kuan Jamal Nagar Kalimitti Road to Jujharpur 2.350 120.03 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6973 1 L062 U.K. ROAD SAFIPUR To S.R.C. ROAD to

BANDHAWA

4.275 217.24 NCB POST 1-Dec-12 Awarded

1 Tr-2 UP6989 1 L055-Jabraila Mangat Khera to Malihagarha 1.575 71.87 NCB POST 24-Jun-13 Awarded

1 Tr-2 UP6989 2 L091 Bani MohanLal Ganj to Chilauli 0.725 37.17 NCB POST 27-Jun-13 Awarded

1 Tr-2 UP6989 3 L051 Jabraila Mangat Khera to Baruali 1.160 57.24 NCB POST 27-Jun-13 Awarded

1 Tr-2 UP6989 4 L071 Achalganj Purwa Mohaddinpur Road to Rahahar 1.925 88.70 NCB POST 27-Jun-13 Awarded

1 Tr-2 UP6991 1 L082 LBB Road Via Bahlolpur Mahrajpur to Umarpur

Bakhtauri

0.775 40.38 NCB POST 14-Jun-13 Awarded

1 Tr-2 UP6991 2 L040 Bangarmau Sandila Road to Tikkankhera upto Ghara 3.150 150.84 NCB POST 23-Jun-13 Awarded

1 Tr-2 UP6991 3 L044 Bangarmau Sandila Road to Madarpur 2.325 120.63 NCB POST 19-Jun-13 Awarded

2 Tr-2 UP6992 1 L032 Bangarmau Sandila Road to Raghunath

Kheda(Sambhar Khera)

1.225 62.42 NCB POST 28-Jun-13 Awarded

2 Tr-2 UP6992 2 L052 Bangarmau Sandila Roshanabad to Vishramkhera 1.375 66.29 NCB POST 2-Jul-13 Awarded

2 Tr-2 UP6992 3 L022 LBB Road Roori Sadikpur to Kumerkheda 1.775 90.47 NCB POST 25-Jun-13 Awarded

2 Tr-2 UP6992 4 L037 Bangarmau Sandila Rd. Pasiyan khera to

Pohpikhera

1.350 71.26 NCB POST 28-Jun-13 Awarded

Page 67: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

67

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP6993 1 L038 SRC Rd. Km 37 Madarpur Kailiya to Kamalapur 1.200 54.60 NCB POST 28-Jun-13 Awarded

1 Tr-2 UP6993 2 L073 Makhikotara to Gopikhera 3.200 164.33 NCB POST 17-Jun-13 Awarded

1 Tr-2 UP6993 3 L085 SRC Km-27 Kanigawn Road (Makhdumpur Shah

Safi) to Paharpur

3.000 123.37 NCB POST 25-Jun-13 Awarded

2 Tr-2 UP6994 1 L031 LBB Road Km 46 (Faridipur Road) to Nizamkheda 1.500 75.98 NCB POST 27-Jun-13 In Process

2 Tr-2 UP6994 2 L029 LBB Road Km 49(Awaghojha Chauraha) to

Dubeygarhi

1.850 90.82 NCB POST 23-Jun-13 In Process

2 Tr-2 UP6995 1 L042 Kalimitti Dabauli Road to Khoajagipur-Pahalawn 1.600 74.13 NCB POST 28-Jun-13 In Process

2 Tr-2 UP6995 2 L058 JagatNagar Sahjani Road to Manna Nagar 2.400 110.77 NCB POST 2-Jul-13 In Process

2 Tr-2 UP6995 3 L060 JagatNagar Sahjani Road to Nekpur 1.165 57.83 NCB POST 25-Jun-13 In Process

2 Tr-2 UP6995 4 L062 JagatNagar Sahjani Road to Durgapur 2.200 103.16 NCB POST 25-Jun-13 In Process

2 Tr-2 UP6995 5 L068 Hafizabad Bangarmau Road to Shahpur Buzurg 1.400 76.50 NCB POST 25-Jun-13 In Process

2 Tr-2 UP6996 1 L027 Bangarmau Sandila Gauriya Road to Tamaurya

Khurd via Pasiyan Kheda

1.400 71.19 NCB POST 28-Jun-13 In Process

2 Tr-2 UP6996 2 L029 Ugo Guariya Kala Road to Asharfabad 2.950 159.43 NCB POST 23-Jun-13 In Process

1 Tr-2 UP6997 1 L 088 Jagat Nagar Sahjani Rd to Chaugama 3.100 136.08 NCB POST 1-Jul-13 Awarded

Page 68: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

68

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-2 UP6998 1 L45 KaluKheda Asrenda road to Lohali 1.150 60.99 NCB POST 28-Jun-13 Awarded

1 Tr-2 UP6998 2 L092 Hilauli Kadhara Khanpur to Jagat Khera 1.150 59.18 NCB POST 4-Jul-13 Awarded

1 Tr-2 UP6998 3 L115 Maurawa Gubux Ganj Road to Bhawani Nagar 1.125 58.05 NCB POST 8-Jul-13 Awarded

1 Tr-2 UP6998 4 L075 Purwa Soharamau to Kewna 1.900 80.25 NCB POST 30-Jun-13 Awarded

1 Tr-2 UP6998 5 L075 Purwa Soharamau to Kewni 3.060 141.04 NCB POST 25-Jun-13 Awarded

1 Tr-2 UP6999 1 L047 Harha Balai Padmara to Chharauwa Khera 1.900 82.34 NCB POST 3-Jul-13 Awarded

1 Tr-3 UP0448 1 DAULATPUR to PHOOLPUR 6.875 212.68 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0453 1 RAFIGANG to AMDAHI 9.125 253.13 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0454 1 Kichhochha to Shukulbazar 7.700 244.82 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0455 1 AKBARPUR to ILTIFATGANJ (00.0TO9.00) 9.000 269.31 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0456 1 AKBARPUR to ILTIFATGANJ PART ll (9.000 TO

18.050)

9.050 284.46 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0458 1 Akbarpur - Iltifatganj - Asharafpur (Chandaini to

Khanjawa road)

7.600 227.98 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0459 1 Maharua to Bela 6.000 180.54 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP0460 1 DULHUPUR to JOLHAPUR 11.500 363.81 NCB POST 15-Jan-13 Awarded

1 Tr-3 UP09100 1 PBB road to Argorwa 7.550 261.17 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP09100 2 PBB road to Mangauriha 6.900 259.29 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP09101 1 Gilaula to Bilarwa 8.425 301.01 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP09101 2 Ikauna Pyagpur road (km-12) to Dhauli 3.225 115.99 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP09101 3 Ikauna Pyagpur road (km-10) to Dhnuhi 3.200 115.30 NCB POST 17-Jan-13 Awarded

Page 69: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

69

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP0993 1 PBB to Musgarha 9.750 352.71 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0994 1 Marucha Baundi road to Bhirwa 6.075 209.99 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0994 2 Fakharpur Jaitapur road to Muse Patti 0.900 32.74 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0994 3 Fakharpur Jaitapur road to Nandwal 3.450 139.47 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0995 1 BH road to Harihar pur 10.500 386.19 NCB POST 17-Jan-13 In Process

1 Tr-3 UP0995 2 RHI road to Mohamadpur 2.800 94.98 NCB POST 17-Jan-13 In Process

1 Tr-3 UP0996 1 DNP Bargadiha to Risia bajar 5.050 182.33 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0996 2 DNP road to Guttuti 3.800 141.01 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0996 3 BM road to Dhaukal purwa 3.400 119.17 NCB POST 17-Jan-13 Awarded

1 Tr-3 UP0997 1 Kaisergunj road to Pyarepur 5.850 237.13 NCB POST 17-Jan-13 In Process

1 Tr-3 UP0997 2 Kaiseganj Malauna Ghat to MahuriKhurd 5.000 182.68 NCB POST 17-Jan-13 In Process

1 Tr-3 UP0998 1 Jarwal Bazar road to Sugar Factory 5.600 204.65 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP0998 2 Dhansari LR to Harchanda 4.600 173.26 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP0999 1 HJ road to Meerpur 4.200 147.58 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP0999 2 PHK road to Katka 5.200 181.05 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP1154 1 U.P.C.Road to Vijayi Nagar 21.150 715.31 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP1156 1 Balapur to Bhojpur Tharu 14.100 483.37 NCB POST 27-Nov-12 Awarded

3 Tr-3 UP1157 1 Tulsipur to Itwa 9.900 347.82 NCB POST 14-Jun-13 In Process

1 Tr-3 UP1158 1 Badalpur to Hasainbad 7.450 233.97 NCB POST 27-Nov-12 In Process

2 Tr-3 UP1159 1 Utraula to Tulsipur 4.300 153.98 NCB POST 28-Jun-13 In Process

2 Tr-3 UP1159 2 Madhupur Gaindas Bujurg to Sadhullah Nagar 5.000 186.65 NCB POST 26-Jun-13 In Process

2 Tr-3 UP1266 1 Devrar Anathua Road (Nauhai) to Naraini Attra Road Via

Nandwara Hadaha Kabouli Kal

11.150 453.32 NCB POST 29-Jun-13 In Process

Page 70: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

70

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

3 Tr-3 UP1268 1 Nagnedhi to Baheri Road 8.700 355.05 NCB POST 17-Jun-13 In Process

3 Tr-3 UP1269 1 Jaurahi to Tindwari Road 9.200 332.03 NCB POST 25-Jun-13 In Process

3 Tr-3 UP1272 1 Anathua to Devrar Road 12.300 439.84 NCB POST 28-Jun-13 In Process

3 Tr-3 UP1273 1 Khurhand to Bansi Road 11.300 386.36 NCB POST 1-Jul-13 In Process

2 Tr-3 UP1274 1 Barchha to Sada Road 6.000 183.29 NCB POST 2-Jul-13 In Process

2 Tr-3 UP1275 1 Jhansi Mirzapur Road to Kapsa Road 10.100 369.78 NCB POST 9-Jul-13 In Process

2 Tr-3 UP13107 1 Subeha to Chakaura Road(L-045) 11.900 494.81 NCB POST 28-Nov-12 In Process

2 Tr-3 UP13108 1 Barabanki Siddhor Road to Raisanda 3.700 148.11 NCB POST 28-Nov-12 In Process

2 Tr-3 UP13108 2 Barabanki Haidergarh Road to Digawan 4.000 152.00 NCB POST 28-Nov-12 In Process

2 Tr-3 UP13108 3 Dariyabad Siddhaur Rod to Gorpur 2.500 93.48 NCB POST 28-Nov-12 In Process

2 Tr-3 UP13109 1 BHITARIYA-DARIYABAD ROAD to DHIKOLIHA 2.400 84.19 NCB POST 1-Jul-13 In Process

2 Tr-3 UP13109 3 DEVIGANJ-SUBEHA ROAD to DHAUNAULI VIA

GAIRIYA

1.400 56.60 NCB POST 1-Jul-13 In Process

2 Tr-3 UP13109 4 BHITARIYA-HAIDERGARH ROAD to Wajauddinpur 1.000 44.92 NCB POST 1-Jul-13 In Process

2 Tr-3 UP13110 1 Barabanki Haidergarh Road to Magrawal 2.000 79.89 NCB POST 27-Jun-13 In Process

2 Tr-3 UP13110 2 Haidergarh Road to Paradeepu 3.400 117.86 NCB POST 27-Jun-13 In Process

2 Tr-3 UP13111 1 Subeha Shukul Bazaar to Sindhiyawan 3.100 108.79 NCB POST 22-Jun-13 In Process

2 Tr-3 UP13111 3 Haidergarh Awsaneshwar Road to Dhobia(L-026) 1.600 58.14 NCB POST 22-Jun-13 In Process

2 Tr-3 UP13112 1 Jaidpur Road to Tand Purwa via Barayan 5.300 176.63 NCB POST 25-Jun-13 In Process

2 Tr-3 UP13112 2 BALCHAT to BARAIYA 4.080 142.93 NCB POST 25-Jun-13 In Process

Page 71: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

71

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-3 UP13113 1 Lucknow Faizabad Road to Sarsanda 2.300 84.85 NCB POST 27-Jun-13 In Process

2 Tr-3 UP13113 2 Shabpur to Jahangeerabad Road 6.200 212.45 NCB POST 2-Jul-13 In Process

2 Tr-3 UP13113 3 Shabpur Jahangeerabad Road to Piprauli 2.000 79.17 NCB POST 2-Jul-13 In Process

2 Tr-3 UP13114 1 Lucknow Faizabad road to Deva Chinhut road via Kewari 6.250 205.97 NCB POST 19-Jun-13 In Process

2 Tr-3 UP13114 2 Gadiya road to Basti 3.300 110.95 NCB POST 23-Jun-13 In Process

2 Tr-3 UP13115 1 Barabanki City to Darhara 4.300 149.62 NCB POST 14-Jun-13 In Process

2 Tr-3 UP13115 3 Starikh Chinhut Road to Manera 2.850 99.44 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13116 1 Sirauli Udhauli to Karaua ,Chaila Khalsapur , khajuri 7.600 362.80 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13116 2 Mahmoodabad Road to Agehara Dalpurwa 1.800 69.50 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13117 1 Ram Nagar Tikait Nagar Road to Kintoor 3.000 109.76 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13117 2 Kintoor to Amra Katehara Road 3.000 120.33 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13120 1 Rani Bazar Trilokpur road to Pure Jabar 1.020 37.61 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13121 1 Mohamadpur Khala- JhanjjharaRoad to Khadera 2.600 110.76 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13122 1 Dewa Fatehpur Road to Salehnagar 3.000 142.61 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13122 2 Dewa Nahar Patri to Vinoba Gram 3.675 145.78 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13122 3 Saddipur Sihali Road to Berahra 0.690 23.60 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13123 1 Dewa Chinhut Road to Gwari to Alipur 3.700 139.84 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13124 1 LKO Mahmoodabad Road to THAKURAMAU

GANGAULI

2.800 116.97 NCB POST 24-Nov-12 In Process

Page 72: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

72

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-3 UP13124 3 Tikaitganj to Chakiya Road 4.050 164.71 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13125 1 Lucknow Mahmoodabad Road to Padri 3.800 153.61 NCB POST 24-Nov-12 In Process

2 Tr-3 UP13125 2 Padri Road to Mahmoodpur Banuga 4.200 164.34 NCB POST 2-Jul-13 In Process

2 Tr-3 UP13126 1 BABAGANJ ROAD to SARAI SHAHBAZ DADERA 2.300 89.82 NCB POST 23-Jun-13 In Process

2 Tr-3 UP13126 2 NIGOHA ATAHARA ROAD to DEWARA 2.000 80.67 NCB POST 27-Jun-13 In Process

2 Tr-3 UP13126 3 LUCKNOW MAHMOODABAD ROAD to

BAKSOLIYA VIA PEPARSAND

5.400 236.01 NCB POST 2-Jul-13 In Process

2 Tr-3 UP13127 1 ETAUNJA ROAD to DEDPRAI PARWAR BHARI 3.200 122.02 NCB POST 19-Jun-13 In Process

2 Tr-3 UP13129 1 fatehpur Suratganj Ramnagar Kusbehta Road to Moshandi 0.500 20.14 NCB POST 14-Jun-13 In Process

2 Tr-3 UP13130 1 Bindaura to Dariyamau via Bahamau 4.150 144.52 NCB POST 24-Jun-13 In Process

2 Tr-3 UP13137 1 Haidergarh Road via to Gulhamau (Galhamau) 5.600 262.74 NCB POST 27-Jun-13 In Process

1 Tr-3 UP13139 1 Dulla Umapur road to Saidpur 11.840 494.95 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP13141 1 Dulapur to Umapur Part 1 (CH 0.000 To 10.00) 10.000 435.73 NCB POST 28-Nov-12 In Process

1 Tr-3 UP13142 1 Dulapur to Umapur Part 2(Ch 10.00 to 19.00) 9.000 380.82 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP1463 1 Bara Baraur Road (Km. 16) To to Bara Baraur Road (Km.

30)

14.000 389.79 NCB POST 27-Nov-12 In Process

1 Tr-3 UP1464 1 Semikhera Baraur Road(Km. 0.00) To to Semikhera

Baraur Road(Km. 12.000)

12.000 309.87 NCB POST 27-Nov-12 In Process

Page 73: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

73

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP1465 1 Nawabganj Kundra Bhadurganj Road (Km. 0.00) To to

Nawabganj Kundra Bhadurganj Road (Km. 12.00)

12.000 280.45 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1466 1 Tanda Sadat Bara Baraur Road To (Km. 30. To to Tanda

Sadat Bara Baraur Road To (Km. 39.20)

10.200 266.85 NCB POST 31-Mar-12 In Process

2 Tr-3 UP1468 1 Baheri Bahpur Nadeli Sighan Khera Road (Km. 0.00)T to

Baheri Bahpur Nadeli Sighan Khera Road (Km.16-800

16.800 444.69 NCB POST 28-Jun-13 In Process

2 Tr-3 UP1469 1 Aonla to Aliganj -Gaini Road 14.000 433.34 NCB POST 28-Jun-13 In Process

1 Tr-3 UP1470 1 Akkha Rahmanpur Road (Km. 0.00) To to Akkha

Rahmanpur Road (Km. 9.900)

9.900 284.94 NCB POST 31-Mar-12 In Process

2 Tr-3 UP1471 1 Sahasa To to Gohor Road 9.000 267.32 NCB POST 23-Jun-13 In Process

1 Tr-3 UP1472 1 Aonla To to Usaita Road 6.000 145.11 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1473 1 Pilibhit Bypass Road to to Nawadia Brahmnan 11.500 265.69 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1474 1 Shahi Baheri Road Km.4 (Agras) to Bhojipura 10.000 291.27 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1549 1 Karcholiya Farm to Ramjanki Road 15.450 708.93 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP1550 1 Parsurampur to Kushmaur Ghat Road 6.275 258.37 NCB POST 26-Jun-13 In Process

2 Tr-3 UP1551 1 Rudhouli-Bakhira Road to Paidi Via Hanumanganj Road

(Raunahia)

13.900 606.06 NCB POST 29-Jun-13 In Process

1 Tr-3 UP1556 1 Vikramjot (Dhusainiya) to Shringinari 10.000 428.27 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP1557 1 Waltarganj to Gaur 9.750 399.66 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP1559 1 Mahanua to Dasiya 9.900 434.64 NCB POST 2-Jul-13 In Process

1 Tr-3 UP1560 1 Bhanpur to Tenua Asanahar 11.050 455.62 NCB POST 31-Mar-12 In Process

Page 74: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

74

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP1568 1 Basti-Mehdawal Road to Teliyadeeh 6.400 270.30 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1568 2 Basti - Mehdawal to Havellia 7.000 256.88 NCB POST 31-Mar-12 In Process

2 Tr-3 UP1569 1 SH-26 to Ahirauli 10.550 408.32 NCB POST 9-Jul-13 In Process

2 Tr-3 UP1570 1 Hallaurnagar Road to Jigina 7.000 228.57 NCB POST 9-Jul-13 In Process

1 Tr-3 UP1571 1 Bankati Block to Bardand 9.850 337.56 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP1881 1 Chandauli to Dharauli 11.200 222.34 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1882 1 T-07 to T-08 (Pachvaniya) Via Tiyari 5.000 117.45 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1883 1 Chahaniya to Nairahi(T-01) 14.000 332.60 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1884 1 T-03 to Tiwaripur(T-02) 8.500 195.59 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1885 1 T-14 to Dhunnu 5.000 118.07 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1886 1 T-05 to Sahjaur 15.500 338.13 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1887 1 T-01 to Kodochak 9.000 224.29 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1888 1 T-05 to Mahuji Mallah Basti 5.000 112.50 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1889 1 T-05 to Chilbili 3.000 74.88 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1890 1 T-03 to Marwai 4.000 91.94 NCB POST 31-Mar-12 In Process

1 Tr-3 UP1893 1 T-07 to Tiwaripur Ka Sesh Bhag 5.500 125.77 NCB POST 31-Mar-12 In Process

1 Tr-3 UP2361 1 MAYA TANDA ROAD 5.10KM DILASIGANJ

CHAURAHA to KASBA GOSAINGANJ

8.500 381.10 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2362 1 SH-50 FAIZABAD AKBARPUR ROAD DARSHAN

NAGAR to HANUMAT NAGAR

14.500 602.55 NCB POST 28-Nov-12 Awarded

2 Tr-3 UP2363 1 Faizabad Raibareily Road to Nauwa Kuan Bhadarsa 12.150 546.09 NCB POST 19-Jun-13 Awarded

1 Tr-3 UP2365 1 Chaure bazaar to Haiderganj 11.350 461.74 NCB POST 28-Nov-12 Awarded

Page 75: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

75

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP2366 1 Jana Bazaar nansa Barehta Marg(L-065) to Khalwa 12.700 557.08 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2368 1 Raunahi(NH-28) to Dyodhi Bazar 8.850 391.36 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2369 1 L-130 to ShahGanj via Barun Chaurah 10.350 441.04 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2577 1 Khajuha Amouli Road Km 4.5 to Km 23 18.000 590.97 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2578 1 Jahanabad Garhi via Digharwa to Basantkhera 15.800 536.27 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2579 1 Bakewar to Karbigaon via Musafa 15.000 434.32 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2580 1 KHAJUA AMAULI KM.16.0 (PURE RAHAT ALI ) to

BABAI ROAD KM 5

4.000 99.35 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2581 1 Bahrampur to Naraini 11.000 414.71 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2582 1 GT Marg km 81 to Chichni via Ramava Panthua 13.000 385.17 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2583 1 Hathgaon to Sadiapur 4.175 141.25 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2584 1 Hathgaon Sadia Km 3 to Mahicha via Sanwat Km 1 to

Hathgaon Sadia Km 4

7.000 217.52 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2585 1 Lalauli to Muttaur 9.000 280.03 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP2586 1 Faridpur to Katilaha 11.100 335.15 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP3244 1 Dhagwan to Chakamrpura 4.050 154.15 NCB POST 28-Jun-13 In Process

2 Tr-3 UP3247 1 Rath to Dhamna 5.000 186.79 NCB POST 28-Jun-13 In Process

2 Tr-3 UP3253 1 Gahbra Chauki to Karhiya 7.500 202.18 NCB POST 23-Jun-13 In Process

2 Tr-3 UP3254 1 Karhiya to Urdana 7.000 193.21 NCB POST 26-Jun-13 In Process

3 Tr-3 UP3259 1 Parchhachh to Chilla Dera 5.150 135.58 NCB POST 3-Jul-13 In Process

1 Tr-3 UP33101 1 Sandi Baghauli Road to Baghauli 10.600 319.85 NCB POST 29-Nov-12 In Process

1 Tr-3 UP33123 1 Itauli Pihani to Gopamau 16.500 623.75 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33124 1 Behta Gokul Pihani Road to 7.000 204.69 NCB POST 29-Nov-12 Awarded

Page 76: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

76

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP33125 1 Anjhi to Alamnagar 19.000 704.57 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33126 1 Harpalur pur to Chausar Road 7.500 254.62 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33127 1 Sharda Canal Sandi Road to Majhila Bridge 8.000 292.59 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33128 1 Harrai to Alinagar 9.300 265.99 NCB POST 29-Nov-12 Awarded

2 Tr-3 UP33129 1 Hardoi to Sakatpur Barkhera 10.000 298.95 NCB POST 28-Jun-13 In Process

1 Tr-3 UP33130 1 Pihani Hardoi to Behta Gokul Mansoor nagar 7.000 205.71 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33131 1 Shaijana Kurshath Parauli to Band 8.000 273.54 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33132 1 Pihani to Kulhawar 8.000 238.38 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33133 1 Meora Bhadar to Simaria Road 14.000 454.31 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33134 1 Kachhona Hathaura to Hathora 9.500 315.11 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33135 1 ASAI AJAM PUR ROAD to GHUGHERA HIYA

(SANDILA GAUSGANJ)

6.200 211.66 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP33136 1 Pali Garia Naktora Road km 0.00 to km 5.00 , km to 12.000 441.23 NCB POST 29-Nov-12 Awarded

2 Tr-3 UP3945 1 Chibaramau to Bishungarh 10.000 453.93 NCB POST 26-Jun-13 Awarded

2 Tr-3 UP3946 1 Tirwa-Khairnagar - Auser-Hameerpur road(0KM) to

Tirwa-Khairnagar - Auser-Hameerpur road(10.0KM)

10.000 418.68 NCB POST 29-Jun-13 Awarded

2 Tr-3 UP3947 1 Tirwa-Khairnagar - Auser-Hameerpur road(11KM) to

Tirwa-Khairnagar - Auser-Hameerpur road(21.300KM)

11.300 479.14 NCB POST 2-Jul-13 Awarded

Page 77: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

77

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-3 UP3948 1 SNTTM Road to Jankhat Auser roadch(0.0km) to SNTTM

Road to Jankhat Auser roadch(-10km)

10.000 415.05 NCB POST 9-Jul-13 Awarded

1 Tr-3 UP3949 1 SNTTM Road to Jankhat Auser roadch(0.0km) to SNTTM

Road to Jankhat Auser roadch(19.025km)

9.025 377.41 NCB POST 24-Jan-13 Awarded

1 Tr-3 UP4058 1 KM 405 OF N.H.2A to MUNGISHAPUR ROAD 9.500 240.13 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4059 1 KM 435 OF N.H.2/25 to KM 22 OF BARA SIKANDRA

ROAD

14.200 449.90 NCB POST 31-Mar-12 Awarded

3 Tr-3 UP4060 1 KM 434 OF N.H.2/25 to KM 29 OF RAIPUR GAJNER

MOOSANAGAR ROAD

18.100 495.86 NCB POST 27-Jun-13 In Process

1 Tr-3 UP4061 1 KM 428 OF N.H.2/25(Bhudhauli) to KM 3 OF

MUNGISHAPUR SHAHJAHANPUR ROAD

14.500 399.93 NCB POST 31-Mar-12 Awarded

3 Tr-3 UP4062 1 NABIPUR to GAJNER ROAD 8.700 241.82 NCB POST 27-Jun-13 In Process

2 Tr-3 UP4063 1 B.G.B. ROAD (Km 13) to MURLIPUR 9.000 243.57 NCB POST 9-Jul-13 In Process

1 Tr-3 UP4064 1 KHANCHANPUR to BEWAIN 6.500 186.83 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4065 1 N.H.-2/25 to JAGDISHPUR ROAD 5.000 147.33 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP43100 1 Mansurganj to Bodarwar 6.700 312.96 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP43100 2 Piparaich Kaptanganj-Km-6 to Mahuwakhurd 4.050 172.86 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP43100 3 Kaptanganj Patawal Road (Imalia) to Barwa Khas 3.300 143.35 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP43100 4 Karitin to Suhiyan 4.200 182.87 NCB POST 24-Jan-13 Awarded

Page 78: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

78

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP43101 1 Padarauna Kasia Road to Dumarbhar 5.600 254.59 NCB POST 24-Jan-13 Awarded

1 Tr-3 UP43101 2 Mahadiganj to Tekuatar 6.000 266.37 NCB POST 24-Jan-13 Awarded

1 Tr-3 UP43102 1 Rajpur to Badahara Laxmipur 7.350 336.97 NCB POST 24-Jan-13 Awarded

1 Tr-3 UP43103 1 Mathauli to Sekhawaniya Pitch Marg 7.250 338.08 NCB POST 24-Jan-13 Awarded

1 Tr-3 UP43103 2 Hata-kaptanganj Road Km. 4 to Pokhar Vinda 4.000 185.07 NCB POST 24-Jan-13 Awarded

2 Tr-3 UP43104 1 N.h.28 to Goshai Patti 5.725 268.62 NCB POST 4-Jul-13 In Process

2 Tr-3 UP43104 3 Siswa Nahar to Baank 3.250 140.90 NCB POST 9-Jul-13 In Process

1 Tr-3 UP43105 1 N.H.-28 to Dewapokhar 5.000 236.48 NCB POST 24-Jan-13 Awarded

1 Tr-3 UP43105 2 Khardar to Mahason 4.500 199.22 NCB POST 28-Nov-12 Awarded

2 Tr-3 UP43106 1 Gauri Sraram Chauraha to Pandey Patti Rampurpatti 5.100 232.60 NCB POST 4-Jul-13 In Process

2 Tr-3 UP43106 2 Domath to Zero Bundh 5.725 264.04 NCB POST 4-Jul-13 In Process

1 Tr-3 UP4383 1 Piparaich Partawa Road to Sugga Pakar 2.150 80.05 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4383 3 Hata Piparaich Road Parsa to Haskhor 2.650 103.72 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4384 1 Padrauna Khadda to Dharampur 1.290 57.39 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4384 2 Padrauna Khadda Road Ghoortola to Bhujauli Shukla to

Singhorwa Tola (Kukurha Khas)

3.500 139.11 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4384 3 Kaptanganj Indrapur Road (Kotawa) to Majhila Pokhra 3.975 158.50 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4385 1 Basdeela Doman Chhapara to Kardah Tiwari Tola 1.200 47.86 NCB POST 28-Nov-12 Awarded

Page 79: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

79

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP4386 1 Gulelaha Sapaha Road to Dharni Chhapar Khas 2.025 77.49 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4386 2 Padarauna Kubersthan to Matihinia 1.750 65.45 NCB POST 28-Nov-12 Awarded

2 Tr-3 UP4387 1 Padarauna Road Janki Nagar to Baijnathpur Khas 4.875 181.43 NCB POST 7-Jul-13 In Process

2 Tr-3 UP4387 3 Padarauna Tamkuhi Road to Dharmpur Bharpatia Tola 0.800 33.54 NCB POST 7-Jul-13 In Process

1 Tr-3 UP4389 1 Nh Fursatpur to Laukush Pachim Patti Dew Pakar 4.050 157.49 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4389 2 Hata - Piparaich Road Km.-6 to Sikata 1.000 37.33 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4399 1 Mathia to Bhedi Jungle 6.650 312.88 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4399 3 Balkuriya Pipara Marg to Pipara Goitha 6.700 335.02 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4399 4 Laxmiganj to Rambag 9.250 420.73 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4464 1 Oel Behjam Road To Bhaddura Road Km 13 to Oel

Behjam Road To Bhaddura Road Km 24.40

11.500 547.19 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4465 1 Neemgaon to Shehrua Via Mura Bujurag Km 1 to

Neemgaon to Shehrua Via Mura Bujurag Km 6.35

6.350 238.85 NCB POST 28-Nov-12 Awarded

2 Tr-3 UP4466 1 Gola to Bnkeyganj 5.500 223.43 NCB POST 28-Jun-13 In Process

2 Tr-3 UP4466 2 Gola To Kukra Via Bankeygang Km1 to Gola To Kukra

Via Bankeygang Km 6.35

2.500 107.20 NCB POST 23-Jun-13 In Process

Page 80: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

80

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP4467 1 Gola To Kukra Via Bankeygang (Km 2.5 ) to Gola To

Kukra Via Bankeygang (Km 10.25)

7.750 313.17 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4471 1 Keswapur Sisanwan Kalan Road to Lakhimpur

Mohammadi Road

11.050 438.75 NCB POST 28-Nov-12 Awarded

2 Tr-3 UP4472 1 Karanpur Khajuha to Lakhimpur Moh. Road 8.000 322.71 NCB POST 26-Jun-13 In Process

1 Tr-3 UP4473 1 Lakhimpur to Devkali Aliganj Road 15.000 660.94 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4474 1 Lmp to Aligang 5.000 260.03 NCB POST 28-Nov-12 Awarded

1 Tr-3 UP4474 2 Deokali Aliganj Road to Kishoripurwa 5.600 254.80 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP4555 1 Bar to Rampura Kathwar via Bhalonisuba Road Ch. 0.00

to 5

5.450 247.46 NCB POST 8-Jul-13 In Process

2 Tr-3 UP4556 1 Bar to Rampur Kathwar Ch. 5.45 To 7.50 Km. 2.050 85.24 NCB POST 30-Jun-13 In Process

2 Tr-3 UP4556 2 Bar to Rampura Kathwar Ch. - 7.50 To 12.00 Km. 4.500 185.93 NCB POST 4-Jul-13 In Process

2 Tr-3 UP4557 1 Bamhorikalan to Dhorisagar Road Ch. 0.00 to 8.00 Km. 8.000 349.03 NCB POST 25-Jun-13 In Process

2 Tr-3 UP4558 1 Bamhorikalan to Dhorisagar Road Ch. 8.00 to 16.00 Km. 8.000 355.64 NCB POST 28-Jun-13 In Process

1 Tr-3 UP4563 1 Birdha to Khitwans (Ch. 0.00 to 9.50 Km.) 9.500 389.50 NCB POST 29-Nov-12 In Process

2 Tr-3 UP4586 1 Lalitpur to Jakhora Road ( Ch.0.00 to 12.00 K 12.000 534.69 NCB POST 3-Jul-13 In Process

2 Tr-3 UP4587 1 Lalitpur to Jakhora Road (Ch.12.00 to 22.80 Km. ) 10.800 455.38 NCB POST 29-Jun-13 In Process

Page 81: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

81

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP4758 1 Pakri to Khutha Paniyara 6.000 259.47 NCB POST 26-Jan-13 Awarded

1 Tr-3 UP4758 2 Pakri-Khutha to Paniyara 5.000 213.78 NCB POST 26-Jan-13 Awarded

1 Tr-3 UP4759 1 Sahjanwa Boobu to Kharkhori 11.600 498.98 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4760 1 Maharajganj to Chowk 11.450 470.16 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4761 1 Bhuwana (C.S.N.T.N. Km. 13) to Captanganj 9.000 373.45 NCB POST 31-Mar-12 In Process

2 Tr-3 UP4762 1 BMCT to GKP-MRJ. 6.000 252.48 NCB POST 25-Jun-13 In Process

2 Tr-3 UP4762 2 G M Road to Siswa Munshi 4.600 195.75 NCB POST 25-Jun-13 In Process

1 Tr-3 UP4763 1 Brijmanganj to Dhani 9.000 366.94 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4763 2 Brijmanganj to Dhani Bazar 1.500 60.66 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4764 1 Mohanapur to Samardheera 2.500 83.70 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4764 2 Madahaewa to Sahapur Jangal Khas 10.000 333.95 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP4765 1 Khairatti Nahar Pitch to Karmahawa 7.100 289.59 NCB POST 31-Mar-12 In Process

2 Tr-3 UP4766 1 Odvaliya to Bakuldeeha 6.275 276.49 NCB POST 25-Jun-13 In Process

1 Tr-3 UP4767 1 Mishrawaliya to Khoriya 6.000 236.83 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP4768 1 Siswa to Sinduriya 12.000 518.85 NCB POST 2-Jul-13 In Process

1 Tr-3 UP4769 1 Sinduriya Baloo to Shikarpur 12.000 531.10 NCB POST 26-Jan-13 In Process

2 Tr-3 UP4945 1 Alow to Nagla Devi Via Ratanpur Bara 4.000 117.69 NCB POST 28-Jun-13 Awarded

2 Tr-3 UP4945 2 Ratanpur Bara marg to Dayarampur 0.725 29.55 NCB POST 28-Jun-13 Awarded

2 Tr-3 UP4945 3 Shikohabad Bhogaon to Lalpur Merapur road to

Jaswantpur

4.000 138.27 NCB POST 23-Jun-13 Awarded

1 Tr-3 UP4946 1 Auchha Jasrana Marg to Shajadpur 9.000 229.26 NCB POST 26-Jan-13 Awarded

1 Tr-3 UP4947 1 Mainpuri Baipass to Bichhiya Dharmangadpur 10.000 277.13 NCB POST 26-Jan-13 Awarded

2 Tr-3 UP4949 1 Kurawali to Lahra Salempur 10.000 284.45 NCB POST 26-Jun-13 Awarded

Page 82: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

82

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-3 UP4950 1 Bichhwan Hannukheda Marg to Devganj 1.000 32.16 NCB POST 29-Jun-13 Awarded

2 Tr-3 UP4950 2 Devganj to Lahra Via Nagla Semar 5.000 147.63 NCB POST 2-Jul-13 Awarded

2 Tr-3 UP4950 3 G. T. Marg to Sahara (Simarai Sahara road) 3.450 105.77 NCB POST 9-Jul-13 Awarded

2 Tr-3 UP4951 1 NH-91 to Todarpur Marg 6.000 166.81 NCB POST 9-Jul-13 Awarded

2 Tr-3 UP4951 2 L -52 (Todarpur road) to Jot 4.400 145.32 NCB POST 9-Jul-13 Awarded

2 Tr-3 UP4952 1 T-02 (mainpuri Itawa Marg) to Ninauli Sahan Patara 9.900 278.01 NCB POST 4-Jul-13 Awarded

1 Tr-3 UP4953 1 Bhogaon Baipass - Moholikheda- Govindpur to Harising 4.200 143.99 NCB POST 26-Jan-13 Awarded

1 Tr-3 UP4953 2 Bhogaon Baipass to Salempur Padhunroad 3.000 97.98 NCB POST 26-Jan-13 Awarded

1 Tr-3 UP4954 1 Chhachha Alipur Patti Road to N. Banjaram Via

Sulkhanpur

5.850 157.96 NCB POST 26-Jan-13 Awarded

2 Tr-3 UP4955 1 Lekhrajpur to Kasad Vaya Veerpur Kala 5.000 140.80 NCB POST 4-Jul-13 Awarded

1 Tr-3 UP4956 1 Jagir Kushmra Road to Nawada Via Husainpur 5.000 162.95 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP4956 2 Bhawant Pul Jagir to Baghiura 3.000 100.21 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP5369 1 kalwari Km 8 ( Madihan Ghorawal) to Raikara 11.000 265.92 NCB POST 29-Jan-13 Awarded

1 Tr-3 UP5370 1 Mirzapur to Newadya 5.000 141.30 NCB POST 29-Jan-13 Awarded

1 Tr-3 UP5371 1 Jhingura to Barkachcha 14.000 325.03 NCB POST 29-Jan-13 Awarded

1 Tr-3 UP5372 1 Khamawa to Banimiliya 11.000 282.63 NCB POST 29-Jan-13 In Process

1 Tr-3 UP5373 1 Halia Adwa colony to Songarha 11.000 329.93 NCB POST 31-Mar-12 In Process

Page 83: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

83

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP5378 1 Padari to Chandrika 5.000 126.48 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP5379 1 Bharpura to Gehira 4.000 107.79 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP5380 1 Barkachcha Jingura Road to Umaria 10.100 256.16 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP5381 1 Jalalpur Maphi to Baluaghat Chunar 6.200 151.20 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP5382 1 Sindhora Ghat to Jaithinai Pahari 12.000 336.96 NCB POST 4-Jul-13 In Process

1 Tr-3 UP5383 1 kailahat to Jalalpur Mafi 7.500 181.03 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP5384 1 Padari to Darhiram 9.500 363.85 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP5385 1 Narayanpur Imalliya Chatti to NH7 5.300 157.22 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP5387 1 Mirzapur Bhatauli Road to Jasaura 4.750 140.60 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP57102 1 Rakha Kohandaur Km 7 to Meeranpur Road 3.500 127.30 NCB POST 29-Nov-12 Awarded

2 Tr-3 UP57103 1 T01(Naurangpur) Km. 6 to Dhaurahra Road 4.900 165.12 NCB POST 3-Jul-13 In Process

1 Tr-3 UP57104 1 Uraideeh to Prithiviganj Road 7.000 244.08 NCB POST 29-Nov-12 Awarded

1 Tr-3 UP57105 1 Jamtaali to Najiyapur 4.700 136.38 NCB POST 31-Mar-12 In Process

1 Tr-3 UP57106 1 L.V. Rd. Km. 175 to Jamuari Rd 6.400 185.26 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP57107 1 Jethwara to Katragulab Singh Road 9.300 317.08 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP57108 1 MDR 98 Km. 34 Amargarh to Rajabajar Road 5.000 145.66 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP57109 1 P.J.L. Km. 11 to Nawbasta Umraura Road 6.500 184.63 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP57110 1 B.B.B. Rd. to Gajraji Road 3.200 89.11 NCB POST 27-Nov-12 Awarded

2 Tr-3 UP57111 1 L.V. Rd Km. 136 to Udharanpur 4.000 112.30 NCB POST 28-Jun-13 In Process

1 Tr-3 UP57112 1 Bihar Babaganj Km 18 to Gujwar Road 4.000 131.29 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP57113 1 L.K. Road Km. 26 to Bakaul Road 1.500 46.97 NCB POST 27-Nov-12 Awarded

Page 84: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

84

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP57113 2 Bihar Babaganj Km. 15 to Mohammadpur Sohag Rd. 1.500 44.81 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP57113 3 L.J. Road Km. 16 to Purmau Sultanpur Road 2.000 63.70 NCB POST 27-Nov-12 Awarded

2 Tr-3 UP57114 1 P.J.L. Rd to Pattupur Road 3.000 99.65 NCB POST 28-Jun-13 In Process

2 Tr-3 UP57115 1 Kunda Benti Haudeshwarnath Km 4 to Mauli Maszid Rd 4.000 109.91 NCB POST 1-Jul-13 In Process

1 Tr-3 UP57116 1 Manikpur to Adlabad Road 5.000 143.93 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP57117 1 L.A. Rd. Km. 07 to Pure Shiva Singh Road 3.000 96.22 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP57118 1 Babhan ki Bakhri to Pure Sonkar Rd. 3.500 104.69 NCB POST 1-Dec-12 Awarded

2 Tr-3 UP57119 1 L.V. Road Km. 190 to Amapur Berra Road 4.000 117.00 NCB POST 1-Jul-13 In Process

1 Tr-3 UP58101 1 T-01 to T-07 (NASIRABAD) 7.500 327.86 NCB POST 29-Jun-13 Awarded

1 Tr-3 UP58102 1 T-01 to TEKARI 8.000 338.27 NCB POST 24-Jun-13 In Process

1 Tr-3 UP58103 1 T-01(Nigoha) to Maharajganj (T-02) 7.650 322.74 NCB POST 27-Jun-13 Awarded

1 Tr-3 UP58104 1 NASIRABAD to MAKDOOMPUR 15.000 678.14 NCB POST 25-Jun-13 In Process

1 Tr-3 UP58105 1 SALON JAYAS ROAD to SANHIYA 8.700 398.49 NCB POST 25-Jun-13 In Process

1 Tr-3 UP58106 1 DEEH to BIRGANJ BIRNAWA ROAD 12.000 514.09 NCB POST 25-Jun-13 Awarded

1 Tr-3 UP58107 1 DEEH to TIKARI PHURSATGANJ ROAD 8.400 366.53 NCB POST 2-Jul-13 In Process

1 Tr-3 UP58108 1 SEMRAUTA to KATHAURA ( T-03) 15.550 651.61 NCB POST 4-Jul-13 In Process

1 Tr-3 UP58109 1 TILOI SEMAUTA to P. BAHELIA 10.800 480.73 NCB POST 30-Jun-13 Awarded

1 Tr-3 UP58110 1 TILOI to SEMAUTA 12.700 546.06 NCB POST 25-Jun-13 In Process

3 Tr-3 UP5885 1 Kuslikhera to Gosekhera (Kurri Soudli Road) 6.675 321.81 NCB POST 29-Jun-13 In Process

Page 85: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

85

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-3 UP5886 1 Dalmau Unnao Road to Chak 7.825 321.99 NCB POST 25-Jun-13 In Process

2 Tr-3 UP5886 2 Kodau to Salraha Road (Up to Guru ka Purwa) 3.200 140.07 NCB POST 2-Jul-13 In Process

1 Tr-3 UP5887 1 Maharajganj Bacharawan Road to Maharajganj Shivgarh

Road

9.300 411.79 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5887 2 Maharajganj Bacharawan Road to Harchandpur 3.320 143.01 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5888 1 Aghaura to Harchandpur 11.750 491.11 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5889 1 U.A. Road to Pure Lalai 7.200 329.31 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5890 1 Dalmau Jagatpur Road (Paderian Chauraha) to Bargadia 6.400 310.35 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5891 1 T-06 (On Munshiganj Dalmau Road from Maneharu) to

Belatakai

9.010 428.04 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5892 1 Bhuaimau to Raebareli Parshdepur Road (Bharatganj) 15.150 747.12 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5893 1 Kheero to Usraha 12.400 612.24 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5894 1 B.B Road to Bardar 3.800 152.67 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5895 1 Satawan to Govindpur Kothiya 6.300 292.22 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5979 1 Ahro Bangali (Colony-Sua Nagla Road To to Bidhua

Nagla, Hazratpur

1.000 26.29 NCB POST 1-Dec-12 Awarded

3 Tr-3 UP5980 1 Bilaspur Milak (Km.7) To Samsabad to Samsabad , Taal

Mahawar

2.800 71.57 NCB POST 23-Jun-13 In Process

3 Tr-3 UP5980 2 Bilaspur Milak (Km. 7) To to Kuiyyan, Majra Quila 1.700 40.20 NCB POST 19-Jun-13 In Process

3 Tr-3 UP5980 3 Dhawani Hasanpur Lala Nagla Road via Dohariya Mun to

Dankari

2.500 62.86 NCB POST 27-Jun-13 In Process

Page 86: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

86

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

2 Tr-3 UP5981 1 NH-87(Km.35) To to Alinagar Kota 3.530 74.92 NCB POST 23-Jun-13 In Process

2 Tr-3 UP5981 2 NH-87 To (Km.35) To to Lalpur 1.450 36.53 NCB POST 2-Jul-13 In Process

2 Tr-3 UP5981 3 NH-87 To (Km.39) To to Temra 2.350 50.49 NCB POST 28-Jun-13 In Process

2 Tr-3 UP5982 1 NH-87 (Km.24) To Tah Khurd (Km.3) To to Alipur Theka 2.200 52.63 NCB POST 26-Jun-13 In Process

2 Tr-3 UP5982 2 NH-87 (Km.20) To Kemri (Km.5) To to Vidhupura 1.300 36.68 NCB POST 26-Jun-13 In Process

1 Tr-3 UP5983 1 B.M. Road To (KM.17) To to Hinga Nagla 1.950 41.42 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5983 3 Bhoujipura Road To to Mujhana 1.000 33.69 NCB POST 1-Dec-12 Awarded

2 Tr-3 UP5984 1 Patwai Milak Road (Km.1) To to Patriya 3.100 78.32 NCB POST 26-Jun-13 In Process

2 Tr-3 UP5984 3 Patwai Milak Road (Km.2) To to Niswa 2.060 50.21 NCB POST 3-Jul-13 In Process

2 Tr-3 UP5985 1 Oshi To to Pachtaur 0.800 27.62 NCB POST 29-Jun-13 In Process

2 Tr-3 UP5985 3 Shahbad Tanda Road (Km.11) To to Oshi 6.300 144.71 NCB POST 24-Jun-13 In Process

2 Tr-3 UP5985 4 Rampur Shahbad Road (Km.2) To to Bharatpur 0.550 15.95 NCB POST 29-Jun-13 In Process

1 Tr-3 UP5986 1 Shahbad Karati Road (Km.7) To to Majhra Karati 1.400 30.56 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP5987 1 NH-87 to Mominpur Ahmdabad 5.450 124.95 NCB POST 1-Dec-12 Awarded

2 Tr-3 UP5988 1 Panjab Nagar Joulpur Road (T-05) to Thakurdwara 3.400 92.61 NCB POST 24-Jun-13 In Process

3 Tr-3 UP5989 1 Lalpur Tanda Road (T-08) to Sahariya Jawaher 2.350 77.16 NCB POST 14-Jun-13 In Process

3 Tr-3 UP5989 2 Badli to Mohabbat Ganj 5.200 125.70 NCB POST 17-Jun-13 In Process

Page 87: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

87

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

3 Tr-3 UP5992 1 SMK Road to Akanagar Via Sarkari 3.200 77.37 NCB POST 25-Jun-13 In Process

3 Tr-3 UP5993 1 Bilaspur Ahro Sheesgarh (Km.7) To to Siras Khera 0.700 16.46 NCB POST 28-Jun-13 In Process

3 Tr-3 UP5993 2 Bilaspur Suar (Km-6) To to Kachnal 1.750 39.43 NCB POST 1-Jul-13 In Process

3 Tr-3 UP5993 3 L-44 (Singra Road ) To to Sirsa (Remaining Part) 0.900 22.44 NCB POST 8-Jul-13 In Process

1 Tr-3 UP63100 1 T-01 (Powayan) to Nigohi Road 5.240 228.01 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP63100 2 T-01 (Powayan) to Nigohi Road 2.885 169.02 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP63101 1 Tilhar (T-04) to Jaitipur 3.300 124.00 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP63101 2 Jalalabad Khandhar to Garhia Rangeen 10.050 423.39 NCB POST 1-Dec-12 Awarded

1 Tr-3 UP6392 1 Tilhar (T-03) to BariKhas 6.000 246.78 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6392 2 T-02 to (Chaharpur) L024) 5.000 204.21 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6393 1 Katra Khudaganj (T01) to Bhunda Hanbanspur 8.000 311.37 NCB POST 30-Nov-12 In Process

1 Tr-3 UP6394 1 Katra Khudaganj (T01) to Bhunda Hanbanspur 10.400 417.84 NCB POST 30-Nov-12 Awarded

2 Tr-3 UP6395 1 powayan (T-02) to Jenwan Road 9.000 363.41 NCB POST 27-Jun-13 In Process

1 Tr-3 UP6396 1 Tilhar (T-04) to Jaitipur 8.000 313.80 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6397 1 Tilhar (T-04) to Jaitipur 5.000 192.28 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6397 2 Tilhar (T-04) to Jaitipur 4.000 177.07 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6398 1 T-01 (Powayan) to Nigohi Road 11.000 520.42 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6399 1 T-01 (Powayan) to Nigohi Road 4.760 245.73 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6430 1 Nasirganj to Dikoli 10.600 339.43 NCB POST 30-Nov-12 Awarded

2 Tr-3 UP6441 1 P B B Road to Dasiyapur 7.000 317.85 NCB POST 23-Jun-13 In Process

1 Tr-3 UP6442 1 Bhinga to Lakshmanpur 13.000 474.36 NCB POST 30-Nov-12 Awarded

Page 88: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

88

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP6443 1 Pandeypur to Ikauna 10.200 402.36 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6444 1 Lakshmanpur to Ikauna 4.000 144.12 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6445 1 Gilaula to Suvikha 16.000 787.47 NCB POST 30-Nov-12 Awarded

1 Tr-3 UP6669 1 Matua to Sakaran Road 5.000 163.10 NCB POST 31-Mar-12 Awarded

2 Tr-3 UP6670 1 Lakhimpur Road (CH 19.00 km) to Laharpur Road (CH

28.175 km)

9.175 284.31 NCB POST 7-Jul-13 In Process

1 Tr-3 UP6671 1 Jitamau to Talgaon Road 6.000 191.11 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP6672 1 Khairabad Machrehta Road km1 to Khairabad Machrehta

Road km5

5.000 181.62 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP6672 2 Khairabad Machrehta Road km6 to Khairabad Machrehta

Road km17

11.000 400.59 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP6672 3 Machrehta Neemsar Road km1 to Machrehta Neemsar

Road km3

3.000 140.65 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP6672 4 Machrehta Neemsar Road km2.5 to Machrehta Neemsar

Road km13.225

10.725 356.79 NCB POST 2-Dec-12 Awarded

1 Tr-3 UP6673 1 Bahraich Sitapur Road Km 49 to Sujatpur 11.000 438.41 NCB POST 2-Dec-12 Awarded

1 Tr-3 UP6674 1 Sitapur Gola Road to Sitapur Badagaon Road 12.000 504.38 NCB POST 2-Dec-12 Awarded

1 Tr-3 UP6675 1 Sitapur Baharaich road (SH 88) to NH-24 km 422 (from

L.K.Rd to NH-24)

4.000 155.58 NCB POST 2-Dec-12 Awarded

1 Tr-3 UP6676 1 B.P.Road km 93 to Rikhouna Road 11.550 381.70 NCB POST 2-Dec-12 Awarded

2 Tr-3 UP6677 1 Mishirikh Sidhouli Road km 23.20 (from Ramgarh Sug to

Kakarghata

7.000 242.13 NCB POST 7-Jul-13 In Process

2 Tr-3 UP6678 1 Chandra Bargavan Khulaghat km-3 to Pisawan 8.700 263.54 NCB POST 3-Jul-13 In Process

Page 89: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

89

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP6679 1 Bisawan Laharpur Rd to Sanda Jeetamau Rd 9.500 305.34 NCB POST 2-Dec-12 Awarded

1 Tr-3 UP6680 1 Nimsar to Aurangabad Saraiyan Road 6.450 210.68 NCB POST 2-Dec-12 Awarded

1 Tr-3 UP68142 1 Kalyanpur to Ghatampur 10.450 426.25 NCB POST 28-Jun-13 Awarded

1 Tr-3 UP68143 1 Uchagawn to Para Makdoompur 8.625 354.64 NCB POST 3-Jul-13 Awarded

1 Tr-3 UP68145 1 Chaudhi Achalpur to Jamo 9.500 400.11 NCB POST 29-Jun-13 Awarded

2 Tr-3 UP68146 1 Kadu Nala to Thauri 9.150 378.15 NCB POST 2-Jul-13 In Process

1 Tr-3 UP68151 1 Amethi Sangrampur to Chandrikan 10.700 468.08 NCB POST 24-Jun-13 Awarded

1 Tr-3 UP68152 1 Thengaha to Ambarpur Chhachha 6.450 271.11 NCB POST 27-Jun-13 Awarded

1 Tr-3 UP68153 1 Bhadar to Dhaurahra via Parsoiya 9.000 384.43 NCB POST 25-Jun-13 In Process

1 Tr-3 UP68154 1 Madhupur Khadri to Keshavpur 4.600 208.11 NCB POST 25-Jun-13 In Process

1 Tr-3 UP69100 1 Maurawan to Bihar 7.000 288.65 NCB POST 27-Nov-12 In Process

1 Tr-3 UP69101 1 Bihar to Barua 11.000 434.97 NCB POST 27-Nov-12 In Process

1 Tr-3 UP69102 1 Patan to Bihar Bakser 12.000 480.33 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP69103 1 Patan to Bihar Bukser Part-2 chainage 12.000 to 24.150

Km

12.150 480.09 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP69104 1 Purwa to Soharamau Part-1 (chainage 0.000 to 9.000Km) 9.450 381.57 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP69105 1 Purwa to Soharamau Part-2 (09.00-18.450 KM) 9.450 389.08 NCB POST 27-Nov-12 Awarded

1 Tr-3 UP69106 1 Piprisar to Purwa 4.825 193.32 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69107 1 Purwa to Bighapur 9.175 364.15 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69108 1 SRC Road to Kanigaon 10.200 428.05 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69109 1 Ajgain to Munsi Gunj 6.550 269.29 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69110 1 Ajgain to Munsi Ganj 12.250 495.06 NCB POST 31-Mar-12 Awarded

Page 90: Revised Procurement Plan for the complete project …documents.worldbank.org/curated/en/663191468251407582/...Procurement Plan, RRP-II: U.P Aug 13 1 Revised Procurement Plan for the

Procurement Plan, RRP-II: U.P Aug 13

90

Procurement Plan with Methods & Time Schedule for 18 Months period starting December,2012 - for CIVIL WORKS

Call WB

RRP-2

Tranche

Pkg_no Sl

No

Contract (Description) Length

(Km)

Estimate

d Cost

(Rs. In

Lakh)

Procure

ment

Method

Review

by Bank

(Prior /

Post) *

Expected

bid

opening

date

Comments

1 2 3 4 5 6 7 8 9 10 11

1 Tr-3 UP69111 1 UK road Safipur to Patari Link Road 7.075 329.76 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69112 1 Hafizabad to Bangarmau via Baruaghat 10.500 469.33 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69113 1 Jamal Nagar to Kalimitti Dabauli road via Dadlaha 8.000 464.92 NCB POST 31-Mar-12 Awarded

1 Tr-3 UP69114 1 Jamal Nagar to Kalimitti Dabauli road via Dadlaha

chainage 8.000

8.250 364.35 NCB POST 31-Mar-12 Awarded

Chief Engineer

UPRRDA

Lucknow