revised naina presentation

69
1  The Navi Mumbai Airpor t Influence Notified Area (NAINA) 7 th  AUGUST 2014 9/16/2014

Upload: lunarvip

Post on 10-Oct-2015

272 views

Category:

Documents


12 download

DESCRIPTION

Navi mumbai airport Revised NAINA Presentation

TRANSCRIPT

  • 5/20/2018 Revised NAINA Presentation

    1/69

    1

    The Navi Mumbai Airport

    Influence Notified Area

    (NAINA)

    7thAUGUST 2014

    9/16/2014

  • 5/20/2018 Revised NAINA Presentation

    2/69

    2

    AGENDA

    9/16/2014

    Project Background Planning Approach

    Vision

    Strategy

    Phasing

    Interim Development Plan preparation Time-lines for IDP

    Pilot Project

    NAINA Scheme

    Non-participants in NAINA Scheme

    Gaothans

    Areas upto 200m around Gaothan

    Special Township policy

    Rental Housing

  • 5/20/2018 Revised NAINA Presentation

    3/69

    3

    BACKGROUND

    9/16/2014

  • 5/20/2018 Revised NAINA Presentation

    4/69

    APPOINTMENTOFCIDCO

    Special Planning Authority (SPA) vide Govt.

    Notification dated 10.1.2013 u/s 40.1 (b) of

    MR&TP Act, 1966

    Total project area @ 600 Sq. KM

    256 villages in Raigad District

    14 villages in Thane District

  • 5/20/2018 Revised NAINA Presentation

    5/69

    NAINA VILLAGES

    Name ofDistrict Name ofTahsil No. Of Villages RemarksEntire Part Total

    Raigad

    Uran 5 0 5

    Panvel 74 37 11137 Villages partly in Matheran

    Eco-sensitive Zone (MESZ)

    Karjat 3 3 6Area of 3 Villages east of Karjat-Khopoli Rail line excluded

    Khalapur 41 15 56

    10 Villages partly within MESZ

    Area of 5 Villages east of Karjat-

    Khopoli Rail line excluded

    Pen 78 0 78Thane Thane 14 0 14

    Total 215 55 270

  • 5/20/2018 Revised NAINA Presentation

    6/69

    NMMC

    AREA

    NAVI MUMBAI

    JNPT

    Proposal to

    include part

    of AKBSNA inNAINA under

    consideration

    of GoM MATHERANECOSENSITIVE

    ZONE

  • 5/20/2018 Revised NAINA Presentation

    7/69

    7

    PLANNING APPROACH

    9/16/2014

  • 5/20/2018 Revised NAINA Presentation

    8/69

    8

    VISION

    NAINA a Economic Powerhouse of MMR,

    an Inclusive City and

    a Sustainable City

  • 5/20/2018 Revised NAINA Presentation

    9/69

    STRATEGY

    9

    Synergize growth impulses of national and regional infra.

    NMIA, JNPT, DFC (Mumbai Delhi and Mumbai Bengaluru) MTHL, Multi-modal corridor, MumbaiVadodra Expressway

    (SPUR)

    Promote diversified economic base by developing local infra.

    Planned, regulated and smart urbanism for inclusive city

    Efficient public transportation,

    World-class infrastructure for all and

    Recourse to inclusionary housing for low income

    Sustainable city

    Financial sustainability through minimum land acquisition andadopting growth pays for growth principle

    Environmental sustainability by conservation of the unique

    landscape, comprising coastal and terrestrial environments,

    natural and cultural heritage, and fertile agriculture

  • 5/20/2018 Revised NAINA Presentation

    10/69

    1

    0

    Development Plan: Shall be prepared for entire notified area and

    shall have two Phases. Out of 600 sqkm. Of NAINA ,about

    160.04 sqkm area has been identified for Phase-I development

    Phase-I (Areas with potential for development)

    Areas witnessing developments and contiguous to Panvel and

    supported by major existing & prop. transportation links

    Detailed Development Plan indicating reservations for roads,

    social facility , public utilities and Growth Centre

    Phase-II Areas not experiencing pressure of development

    Dumping ground, road widening connecting PhaseI with the

    hinterland, etc

    To be reviewed every five years for bringing under

    DEVELOPMENTPLAN

  • 5/20/2018 Revised NAINA Presentation

    11/69

    Phase I

    Description Zone -1 Zone - 3

    Developable

    Lands

    Irrigated Agri. land 0 0

    Non- Irrig Agri. Land 785 5975

    Barren Land 1011 401

    Non-

    Developable

    Lands

    Built-up Land 284 875

    Creeks 0 5

    Forests 303 3129

    Hill 0 818

    Industrial 0 0

    National Park/Sanctuary 0 0Quarry 0 47

    Village Settlement 21 132

    Water Bodies 0 83

    Others 0 2135

    Total 2404 13600

    Zone 1 Zone 3 Total

    Area (Ha) 2404 13600 16004

    Developable Area

    (Ha)1796 6376 8172

    % 74.7 46.9 51.1

    Zone - I

    Zone - 3

  • 5/20/2018 Revised NAINA Presentation

    12/69

    12

    BASIC PRINCIPLES OF NAINA SCHEME

    Participatory Approach

    Minimise compulsory acquisition

    Incentivise Land Assembly

    Inclusionary housing

  • 5/20/2018 Revised NAINA Presentation

    13/69

    13

    Project success depends on NAINA Scheme

    Necessary to demonstrate NAINA Scheme on

    smaller scale

    Area close to Panvel experiencing developmental

    pressures, where existing infrastructure of CIDCOcan be extended and where land aggregations of

    more than 10ha. are probable considered suitable

    for demo

    3770 ha. broadly equal to size of two self-contained townships been indentified for Pilot

    project

    Interim Development Plan preparation of Pilot

    project

    INTERIMDEVELOPMENTPLAN

  • 5/20/2018 Revised NAINA Presentation

    14/69

    14

    Area of IDP is categorized as

    Gaothan

    Congested Areas/Urban Village -200 m around gaothan

    Land assembly > 10 ha

    Other areas

    DCRs will cover for above categories

    Permissible uses

    FSI

    Ground coverage and building heights Assembly regulationsland to be contributed for roads,

    city-scale infrastructure and land bank

    Layout and sub-division regulations including means of

    access, local open spaces and amenities

    INTERIMDEVELOPMENTPLAN

  • 5/20/2018 Revised NAINA Presentation

    15/69

    15

    MAP OF IDP AREA

    Slno. Village names

    1 Nevali

    2 Adai

    3 Akurli

    4 Koproli

    5 Nere

    6 Palidevad

    7 Shilottar Raichur

    8 Chipale

    9 Bonshet

    10 Vihighar

    11 Devad

    12 Vichumbe

    13 Shivkar

    14 Moho

    15 Pali kh

    16 Usarli Kh

    17 Chikhale18 Kolkhe

    19 Palaspe

    20 Derawali

    21 Kon

    22 Borle

    23 Sangade

    24 Balavali

  • 5/20/2018 Revised NAINA Presentation

    16/69

    16

  • 5/20/2018 Revised NAINA Presentation

    17/69

    17

    TIME LINES FOR SUBMISSION OF IDP

    Task Target Remarks

    Preparation of ELU 15.7.2014 Not required to be published

    Prepare Draft IDP 15.8.2014 Submit to CIDCO Board

    Publish IDP (U/S -26)Invite Suggestions

    30.8.2014 to30.9.2014

    30 Days

    Hearing1.10.2014

    31.10.2014

    3 Members of SPA +

    4 by Dir. Town Plg.

    Submission of PC Report to SPA 30-11-2014 One Month

    Incorporating PC Report 31-12-2014 One Month

    Approval by CIDCO Board 31-1-2015 One month

    Submission of Draft IDP to Govt 31.1.2015 -

  • 5/20/2018 Revised NAINA Presentation

    18/69

    18

    9/16/2014

    PILOT PROJECT

  • 5/20/2018 Revised NAINA Presentation

    19/69

    Plan preparation for area of 3770 ha.

    Broad land-use distribution shall be as below:

    Roads 10%

    Open Space 10%

    Social Facilities 5%

    Growth Centre 15%

    Land for development 60%

    Land under reservations (Roads, Open Space, Social

    Facilities) including Growth Centre proposed to

    be acquired by LARR Act, 20131

    9

    IMPLEMENTATIONOFPILOTPROJECT

  • 5/20/2018 Revised NAINA Presentation

    20/69

    2

    0

    IMPLEMENTATIONOFPILOTPROJECT

    Intention for acquisition u/s 11 of LARR Act,2013to be served for all lands under reservations and

    Growth Centres

    Such land Owners affected by LARR Act, 2013 have

    option to participate in NAINA Scheme.

    Land owners participating in scheme shall

    surrender land through consent agreement

    without monetary compensation to Authority. NAINA Scheme to remain open for four months

    Reservation lands shall be acquired as per LARR

    Act, 2013 ; if owners do not participate in NAINA

    scheme

  • 5/20/2018 Revised NAINA Presentation

    21/69

    To participate in NAINA Scheme, minimum landaggregation of 10 ha. is required

    Scheme involves surrendering 40% land to Authority

    free of cost and retaining balance 60% land . 40%

    land to be surrendered shall be inclusive of roads,

    open spaces, amenities, growth centre

    FSI of 1.7 on balance 60% land

    Additional, 20% BUA over & above BUA generated on

    60% land shall necessarily be constructed for

    EWS/LIG housing that shall be handed over to CIDCO

    at a pre-determined rates ( as per MHADA formula)

    2

    1

    NAINA SCHEME( >10 HA.)

  • 5/20/2018 Revised NAINA Presentation

    22/69

    In no case, shall land owner lose more 40% of land

    Land owner surrendering more than 40% land can be

    compensated by

    Equivalent land with 1.7 FSI

    Monetary Compensation for equivalent land

    TDR for equivalent land

    Development Charges as per 124 (B) of MR&TP Act

    (equivalent to Rs 500/m2) shall only be charged.

    OSDCshall not be made applicable for participants in NAINA

    Scheme

    CIDCO shall bear cost of provision of City & Peripheral level

    Infrastructure2

    2

    NAINA SCHEME( >10 HA.)

  • 5/20/2018 Revised NAINA Presentation

    23/69

    2

    3

    NAINA SCHEME( >10 HA.)

    Reservations within NAINA Cluster shall be flexible

    (excluding roads) and will be allowed to move in the

    cluster (for those who participate in the scheme)

    FSI incentive for larger land pooling

    CIDCO to frame DCR that shall include permissibleuses, minim. & max. permissibility of

    commercial/other uses etc,

    Deemed NA status proposed to be granted for the

    participants

    Environmental clearances proposed to be granted by

    CIDCO

  • 5/20/2018 Revised NAINA Presentation

    24/69

    2

    4

    FSI calculation for 10 ha. (60/40 model)

    Land owner = 6.0ha.

    Land owner to surrender ( for roads, open

    spaces, amenities, growth centre) = 4.0 ha.

    Owner

    - FSI is 1.70 ( 10.00 ha. available for sale)

    - Residential, Comm., R+C, Hotels, Offices,

    etc. permitted- 10.00 ha. bua includes FSI for layout

    Amenities

    - Internal roads and layout open spaces to be

    provided as per norms without losing FSI

    NAINASCHEME( >10 HA.)

  • 5/20/2018 Revised NAINA Presentation

    25/69

    2

    5

    FSI calculation for 10 ha. (60/40 model)

    Owner

    - Proposed to have graded percentage of

    Amenities in proportion to size of holding

    - Amenities along with scheme roads & OS

    necessarily to be developed (in a fixed time-

    frame) and maintained by the owner

    - In case, owner surrenders developed

    Amenity to the Authority 'FSI equivalent to

    amenity land area plus construction value based

    FSI of developed amenity' to be given

    NAINASCHEME( >10 HA.)

  • 5/20/2018 Revised NAINA Presentation

    26/69

    2

    6

    Free FSI - EWS/LIG Component

    - 20% of saleable component to be developed

    (BuA = 2.0 ha.)

    - Hand over constructed tenements to CIDCO at

    pre-determined rates ( as per MHADA formula)

    CIDCO component (Growth Centre)

    - FSI1.70 (BuA = 2.51ha.)

    - No amenities, only internal roads and layout

    open spaces

    City level Amenities :

    - FSI of amenities to vary from 0.5 to 2.0

    - 5% amenities with avg. 1.0 FSI (5000 sqm.)

    NAINASCHEME( >10 HA.)

  • 5/20/2018 Revised NAINA Presentation

    27/69

    2

    7

    Total BuA generated on Scheme

    => 10.00 ha. + 2.0 ha. + 2.51 ha. + 0.5ha. = 15.01

    ha.

    Gross FSI (on 10 ha. Land) = 1.50

    Net FSI ( on 7.5 ha.(6 +1.5 + 0.5) Land) = 2.00

    NAINASCHEME( >10 HA.)

  • 5/20/2018 Revised NAINA Presentation

    28/69

    2

    8

    CIDCOs share of 15% land (Growth Centre)

    To be main source of revenue for funding City &

    Peripheral level infrastructure Not to be used for EWS/LIG/MIG housing

    Not to be used for Social facilities

    Not to be allotted for any request of land by

    Govt./Semi-Govt. Agency.

    GROWTHCENTRE

  • 5/20/2018 Revised NAINA Presentation

    29/69

    2

    9

    Obtaining lands for Growth Centre

    CIDCO to acquire lands reserved for Growth

    Centre

    Taking up NAINA Scheme within Growth Centrewill not be permissible

    NAINA Scheme lands lying partially in Growth

    Centre will be adjusted against their 40% contri.

    In such cases, CIDCO need not acquire theselands

    GROWTHCENTRES

  • 5/20/2018 Revised NAINA Presentation

    30/69

    Lands under reservations shall be acquired thro

    LARR, 2013 (monetary + land compensation)

    Balance private Lands not under reservation and

    not participating in NAINA scheme shall continue

    to have base FSI of 0.5

    NO provision to increase FSI on payment of

    additional premium for such lands

    D.C. as per Section 124(B) (equivalent to

    Rs. 500/m2) + Off-site Service Delivery Charges

    (OSDC)* (Rs 3234 /sqm minus DC paid) to be

    paid

    3

    0

    NONPARTICIPANTSINNAINASCHEME

    * - OSDC shall be worked out every year

  • 5/20/2018 Revised NAINA Presentation

    31/69

    For lands given to land owners as per

    requirements of LARR, 2013 , base FSI will be

    0.50

    OSDC shall be charged in phases (25% at CC,25% at OC and 50% at the time of seeking

    connection to infra.)

    City Level & Peripheral infrastructure to be

    provided by CIDCO

    3

    1

    NONPARTICIPANTSINNAINASCHEME

  • 5/20/2018 Revised NAINA Presentation

    32/69

    Layout amenities + Int roads + int Open spacesto be provided as per DCR provisions

    Lands above 4000m2 shall attract norms of 20%

    of BUA for EWS/LIG. EWS/LIG housing stock to

    be returned to CIDCO at pre-determined rates

    (as per MHADA formula)

    3

    2

    NONPARTICIPANTSINNAINASCHEME

  • 5/20/2018 Revised NAINA Presentation

    33/69

    3

    3

    COMPARISON

    NAINA SCHEME NONNAINA SCHEME

    Max. Permissible FSI : 1.70 Max. Permissible fsi- 0.5

    OSDC not payable OSDC applicable

    40% contribution towardsinfra.

    Infra. Land to beacquired under LARR Act

    Proposed to given

    deemed NA status

    NA permission required

    >40% voluntary surrenderto be compensated by

    giving additional land with

    same FSI potential

    Land to be acquiredunder LARR Act

  • 5/20/2018 Revised NAINA Presentation

    34/69

    34

    9/16/2014

    OTHER ASPECTSOF

    PILOT PROJECT

  • 5/20/2018 Revised NAINA Presentation

    35/69

    3

    5

    Capital Expenditure ( for 1000 ha.)

    Total cost = Rs. 3234.0 crores*

    Cost of City level infrastructure : Rs. 2311/ sqm

    -Water Supply, Sewerage, Power, Open Spaces, SocialFacilities Amenities, Metro

    Cost of peripheral infrastructure : Rs. 851/ sqm

    Local level infrastructure : Rs. 72 /sqm

    DEVELOPMENTCOSTCALCULATIONS

    Above calculations are as per CSR FY 2013-14.OSDC shall be worked out every

    year

  • 5/20/2018 Revised NAINA Presentation

    36/69

    3

    6

    Recovery of Expenditure

    Sale of land under Growth Centre

    Dev. charges as per MR&TP Act sec 124B

    Collection of Off-site Service Delivery Charges

    DEVELOPMENTCOSTCALCULATIONS

    LIST OF RESERVATIONS TO BE SHOWN ON DP AT

  • 5/20/2018 Revised NAINA Presentation

    37/69

    3

    7

    1. School (limited

    reservations. Rest to be

    obtained through layout

    Permission)

    2. Degree College

    3. General Hospital

    4. Primary Health Centre

    5. Community Centre

    6. Hawkers Market/ Daily

    Bazaar

    LISTOFRESERVATIONSTOBESHOWNONDP AT

    TOWNSHIPLEVEL

    1. Police station

    2. Fire station

    3. Post Office

    4. Burial Ground5. Receiving station

    6. Sub-station

    7. ESR/GSR

    8. Pumping Station

    9. Sewage Treatment Plant10. Sewage Pumping House

    11. Petrol Pump

    12. LPG / godown

    SOCIAL FACILITIES PUBLIC UTILITIES

    Utilities viz. Solid waste disposal sites, etc. to be shown in PhaseII

    Norms adopted for Reservations shall be as per Navi Mumbai Std.

  • 5/20/2018 Revised NAINA Presentation

    38/69

    3

    8

    AMENITIESATLAYOUTLEVEL

    Layout Size Optional permissible

    upto 20ha School and Community Centre

    20 ha. - 90 ha. School, Comm. Centre, Nursing Home

    >90 ha. School, Comm. Centre, Nursing Home, College,

    Hospital, Hostel

    MANDATORY

    Balwadi

    Crche

    Multipurpose Halls

    Library

    Health Club & Gymnasium

    Clinic, Nursing Homes

    For Layouts above 10 ha. , min. size of Garden/PG shall not be less than 3000 sqm each

    For layouts; 2 ha. To 10 ha.Min. size of open space at each location not less than 2000sqm.

  • 5/20/2018 Revised NAINA Presentation

    39/69

    3

    9

    DEVELOPMENTOFRESERVATIONS

    Reservation such as School, College, Gen Hospital,

    Super Specialty Hospital shall have base FSI of 1.0.

    Addl. FSI can be granted on payment of addl. LeasePremium to be worked out by CIDCO. ONLY for

    participants of 10 ha plus (NAINA Scheme)

    FSI of other reservations shall be indicated in the DCRs

  • 5/20/2018 Revised NAINA Presentation

    40/69

    40

    9/16/2014

    GAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    41/69

    41

    For developments in Gaothan following

    options onsidered :

    Urban Renewal Scheme for Gaothans

    similar to one in Navi Mumbai Regulations about height, ground

    coverage, access width

    DEVELOPMENTOFGAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    42/69

    42

    9/16/2014

    AREASAROUND

    200MOFGAOTHAN

    CONGESTEDAREAS

    /URBANVILLAGES

  • 5/20/2018 Revised NAINA Presentation

    43/69

    MMR provisions

    Permit FSI of 1.00 within and upto 200m of

    Gaothans

    Height is restricted to 13.50m.

    Incentive FSI of 0.2 on land so surrendered free of

    cost for main roads, SF, PU, amenities

    Standardized DCRs for RP in Maharashtra

    10% Open Spaces for plots > 4000sqm

    5% amenities for layout >2.0ha. 43

    AREASUPTO200MAROUNDGAOTHANS

    A 200

  • 5/20/2018 Revised NAINA Presentation

    44/69

    PROPOSAL

    Areas @ Gaothans upto 200m earmarked asCongested Areas

    Layout plans for congested areas to be prepared

    showing proposals for road widening, new

    roads, reservations for social facilities & open

    spaces

    These reservations shall include Hospital,

    Dispensary, School, Nhood market, Gardens,

    Playgrounds, etc. 44

    AREASUPTO200MAROUNDGAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    45/69

    PROPOSAL

    FSI permissible is 1.0

    Permissible height of 15.0m as against present

    provision of 13.5m

    Plots abutting on 12m wide existing roads or roads

    possible for widening upto 12.0m permitted

    heights upto 24.0m subject to fire fighting and

    aviation clearances

    No relaxations in marginal open spaces or in

    parking norms permitted under hardship cases4

    5

    AREASUPTO200MAROUNDGAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    46/69

    PROPOSAL

    Incentive FSI of 1.0 (presently 0.2 FSI) on land so

    surrendered free of cost for main roads, PU,

    amenities

    Authority may acquire these reservations if the

    owners not willing to accept incentive FSI, under

    LARR, 2013

    Lands above 4000m2 shall attract norms of 20%

    of BUA for EWS/LIG . Constructed housing stockto be returned to CIDCO at pre-determined rates

    (as per MHADA formula)4

    6

    AREASUPTO200MAROUNDGAOTHANS

    AREAS UPTO 200M AROUND GAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    47/69

    PROPOSAL

    D.C. as per {Section 124(B)} (equivalent to Rs of

    Rs. 500/sqm)

    PLUS

    Off-site Service Delivery Charges (OSDC) *(Rs.3234/sqm to be paid minus DC received

    OSDC shall be charged in phases (25% at CC,

    25% at OC and 50% at the time of seekingconnection to infra.)

    * - OSDC shall be worked out every year4

    7

    AREASUPTO200MAROUNDGAOTHANS

    AREAS UPTO 200M AROUND GAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    48/69

    HOLDING SIZE AMENITIES OPEN SPACES

    For plots upto

    4000sqm

    - -

    4000sqm1ha - 10%

    1ha. -2ha 3% 10%

    2ha. - 10ha. 5% 10%

    >10ha. NAINA scheme shall be applicable

    Provision for OS and Amenities

    4

    8

    Layout amenities necessarily to be developed (in a fixed time-

    frame) and maintained by the owner

    Development of amenities shall be on pro-rata basis and linkedwith O.C.

    In case, owner surrenders developed Amenity to the Authority

    FSI equivalent to amenity land area plus construction value

    based FSI of developed Amenityto be given

    Amenities shall include: Balwadi, Creche, Multipurpose Hall,

    Library, Primary Health Centre, Health Club & Gymnasium

    AREASUPTO200MAROUNDGAOTHANS

  • 5/20/2018 Revised NAINA Presentation

    49/69

    49

    9/16/2014

    Special Township Proposals

    CASESFORINTEGRATION

    SPECIAL TOWNSHIP PROPOSALS

  • 5/20/2018 Revised NAINA Presentation

    50/69

    Location Clearance Granted

    Surrender of 15% developed land, at one location, above

    12m wide road OR Payment of eqvt. OSDC* {(Rs.

    2311/sqm (Cost of city level infra.) }minus {D.C. of

    Rs.500/sqm.) }

    OSDC shall be charged in phases (25% at CC, 25% at OCand 50% at the time of seeking connection to infra.)

    D.C. as per {Section 124(B)} (eqvt. to Rs. 500/sqm)

    Constructed EWS/LIG hsg. handed over to CIDCO at

    predetermined rates

    Applicable premiums on optional FSI of 0.3 (in case of

    schemes in U1 & U2) payable to CIDCO and not MMRDA

    (requires Govt. consent)

    Consultation from Jt. Director, Konkan Division, shall NOT

    be required

    5

    0

    SPECIALTOWNSHIPPROPOSALS

    * - OSDC to be worked out every year

    SPECIAL TOWNSHIP PROPOSALS

  • 5/20/2018 Revised NAINA Presentation

    51/69

    5

    1

    SPECIALTOWNSHIPPROPOSALS

    Location Clearance yet to be granted

    Surrender of 15% developed land, at one location,selected by the SPA, above 12m wide road

    D.C. as per {Section 124(B)} (eqvt. to Rs. 500/sqm)

    Constructed EWS/LIG hsg. handed over to CIDCO at

    predetermined rates Applicable premiums on optional FSI of 0.3 (in case

    of schemes in U1 & U2) payable to CIDCO and not

    MMRDA (requires Govt. consent)

    Consultation from Jt. Director, Konkan Division, shallNOT be required

    * - OSDC to be worked out every year

  • 5/20/2018 Revised NAINA Presentation

    52/69

    52

    9/16/2014

    Rental Housing Proposals

    CASESFORINTEGRATION

  • 5/20/2018 Revised NAINA Presentation

    53/69

    5

    3

    Dev. Charges as per 124 B (eqvt. Rs.500/sqm) Developer to provide all reqd. infra. within the

    scheme

    Transfer of amount collected by MMRDA for

    improvement of infrastructure to CIDCO

    Payment of Off-site Service Delivery Charges*

    (OSDC) by the Developer. (OSDC being 2 X {(Rs.

    2311/sqm (Cost of city level infra.)}minus {D.C. paid

    & amount transferred by MMRDA to CIDCO }

    OSDC shall be charged in phases (25% at CC, 25%

    at OC and 50% at time of seeking connection to

    infra.)

    RENTALHOUSINGPROPOSALS

    * - OSDC to be worked out every year

  • 5/20/2018 Revised NAINA Presentation

    54/69

    THANKYOU

    5

    4

  • 5/20/2018 Revised NAINA Presentation

    55/69

    THANE DISTRICT

  • 5/20/2018 Revised NAINA Presentation

    56/69

    PANVELADJ. MIDC AREA

  • 5/20/2018 Revised NAINA Presentation

    57/69

    PANVEL

  • 5/20/2018 Revised NAINA Presentation

    58/69

    URAN ANDPANVEL

  • 5/20/2018 Revised NAINA Presentation

    59/69

    KHALAPUR

  • 5/20/2018 Revised NAINA Presentation

    60/69

    PEN

  • 5/20/2018 Revised NAINA Presentation

    61/69

    KHOPTA

    P

  • 5/20/2018 Revised NAINA Presentation

    62/69

    6

    2

    Calculation of Open Space

    Total notified area = 600 sqkm.

    Gross area identified for PhaseI = 160.04 sqkm.

    Passive recreational spaces = 43.85 sqkm.

    (Forest, Hill Slopes ,Water Bodies & Irrigated/Multi-crop lands)

    Net Developable Area for PhaseI = 81.72 sqkm.

    Active Open Spaces (From D.P.) = 8.17 sqkm.

    (10% of net developable area )

    Layout Open Spaces = 6.13( 10% of (75% of net developable area in 60/40 model))

    % of active OS on net PH-I area = 17.5%

    % of active & passive OS on Gross PH-I area = 36.3%

    PHASE- I

    P

  • 5/20/2018 Revised NAINA Presentation

    63/69

    6

    3

    Calculation of Amenities

    Total notified area = 600 sqkm.

    Gross area identified for PhaseI = 160.04 sqkm.

    Net Developable Area for PhaseI = 81.72 sqkm.

    Amenities (From D.P.) = 4.09 sqkm.(5 % of net developable area )

    Amenities = 3.06 sqkm

    ( 5% of (75 % of net developable area in 60/40 model))

    Total amenities = 7.15 sqkm.

    % of Amenities on net PH-I area = 8.7%

    PHASE- I

  • 5/20/2018 Revised NAINA Presentation

    64/69

    NATURAL PROPENSITY FOR DEVELOPMENT IN NEXT 5-10 YEARS

    Current Development Trends within the Area

    Surrounding Development Context

    Locational advantage in MMR

    TRANSPORT CONNECTIVITY

    Existing National and State Highways

    Proposed Transport Connectivity in MMR

    Proposed Transport Connectivity with Potential Planning UnitI

    Proposed DFC and BMEC

    PROXIMITY TO NAVI MUMBAI

    Proximity to Developed Areas in Navi Mumbai

    Potential Synergy between NMIA, JNPT and Belapur CBD

    Existing Public Transport Corridors

    CRITERIAFORIDENTIFICATIONOFPHASE-I

    C FO I C O O P S I

  • 5/20/2018 Revised NAINA Presentation

    65/69

    DEVELOPMENT PROVISIONS IN THE REGIONAL PLAN-2011 MMR

    Areas marked for U-1 and U-2

    Areas marked for G-1 and G-2

    Proposed Transport Connectivity

    PROTECTED ENVIRONMENTAL AND NATURAL AREAS

    Forests, Hills, Water Bodies

    CRZ Areas

    Gaothans

    AVAILABILITY OF DEVELOPABLE LAND

    Adequate Developable Land

    Contiguity of Developable Land

    PROXIMITY TO EXISTING AND FUTURE ECONOMIC NODES IN MMR

    NMIA, JNPT, Belapur CBD

    CRITERIAFORIDENTIFICATIONOFPHASE-I

    LAND AVAILABLE FOR DEVELOPMENT

  • 5/20/2018 Revised NAINA Presentation

    66/69

    66

    Zone-1 Zone-2 Zone-3 Zone-4 Zone-5 NAINA KNT Total

    Developable Lands

    Irrigated Agri. land 0 0 0 145 18 163 0 163

    Non - Irrig Agri. Land 785 434 5975 8459 930 16583 4487 21070

    Barren Land 1011 148 401 637 0 2197 588 2785

    Sub Total 1796 582 6376 9241 948 18943 5075 24018

    Non-Developable

    Lands

    Built-up Land 284 182 875 782 280 2403 581 2984

    Creeks 0 5 0 652 657 191 848

    Forests 303 807 3129 5525 888 10652 2052 12704

    Hill 0 187 818 0 347 1352 0 1352

    Industrial 0 55 0 97 0 152 0 152

    National

    Park/Sanctuary0 0 0 148 0 148 62 210

    Quarry 0 26 47 90 153 316 23 339

    Village Settlement 21 67 132 235 218 673 59 732

    Water Bodies 0 137 83 1373 0 1593 13 1606

    Others 0 4956 2135 1417 10863 19370 1238 20608

    Sub Total 608 6417 7224 9667 13401 37316 4221 41538

    Total 2404 6999 13600 18908 14350 56260 9296 65556

    SUMMARY OF LAND AVAILABLE

  • 5/20/2018 Revised NAINA Presentation

    67/69

    67

    Z 1 Z 2 Z 3 Z 4 Z 5NAINA

    TotalKNT

    Zone Area (Ha) 2404 6999 13600 18908 14350 56260 9296

    Jurisdiction NAINA KNT

    Area Available

    for Development(Ha)

    1796 582 6376 9241 948 18943 5075

    % Area Available

    for Development

    to the Zone Area

    75% 8% 47% 49% 7% 33% 55%

    NAINA : 33% of area is developable(18381 Ha)

    KNT : 55% of area is developable (5076 Ha)

  • 5/20/2018 Revised NAINA Presentation

    68/69

    6

    8

  • 5/20/2018 Revised NAINA Presentation

    69/69

    69