Page 1: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Update Scenarios

V1 December 2015

1

Page 2: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Update Scenarios

for Meter Removals

Page 3: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Meter Removals Overview

Where actual reads are recorded since the requested effective date of the

asset removal the request to remove the meter will be rejected

except if the read is related to an asset update e.g. meter removal.

Where the meter is recorded on UKLink, allocation processes will cease

on D+3 days from the date of the accepted request to remove the meter

Where the update is to amend the effective date or removal read of

the meter, allocation processes would have ceased from the original

update.

Reconciliation process will take account of the period from the request

acceptance date to D+3 (allocation)

For Class 1 & 2, if the updates are received within GFD+5 the daily

allocations will be re-calculated to zero.

Page 4: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a change of date to the original meter removal

date recorded, no change in Shipper. No reads recorded

between revised removal date & original removal date.

Read

Shipper submits a

change to the

effective date of

Meter removal

Reconciliation

Revised Meter

Removal Date -

Read mandatory

4

Recorded Meter

Removal Date

Page 5: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

with Shipper Transfer

Request for a change of date to the original meter removal

date recorded. No reads recorded between revised removal

date & original removal date.

Read

Shipper submits a

change to the

effective date of

Meter removal

Reconciliation

(held)

Revised Meter

Removal Date

5

Recorded Meter

Removal Date

Estimated

Transfer Read

Shipper

Transfer Reconciliation

Note: - If an actual transfer read recorded the request would

be rejected

Page 6: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a change to the removal read of the recorded

meter removal details, no change in Shipper.

Read

Shipper submits a

change to the

removal read

Re- Reconciliation

6

Meter

Removal

Note: revised removal read must be equal to or greater than the last

recorded actual read

Page 7: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a retrospective meter removal, change in

Shipper, only estimated transfer read recorded.

Read

Shipper submits a retrospective

Meter removal

Reconciliation

Meter

Removal

Shipper

Transfer

Estimated

Transfer Read

7

D+3 Financial Adjustment

Note: - If an actual transfer read recorded the request would be rejected

- Previous Shipper will need to request the financial adjustment

Page 8: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a meter removal where a meter exchange exists

after the requested removal. No reads recorded between

removal date & request date.

Read

Shipper submits

Meter removal for

meter 123

Reconciliation

Meter

Removal

8

Meter exchange

from 123 to 456

D+3

Re-Reconciliation

Note: Meter 456 will no longer be recorded at the meter point.

Page 9: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal with

multiple meter exchanges recorded

Request for a meter removal where a meter exchange exists

after the requested removal. No reads recorded between

removal date & request date.

Read

Shipper submits

Meter removal for

meter 123

Reconciliation

Meter

Removal

9

Meter exchange

from 456 to 789

D+3

Re-Reconciliation

Note: Both meters 456 and 789 will be removed and no longer recorded against

the SMP. If any actual cyclic reads are recorded post the retro removal date the

request will be rejected

Meter exchange

from 123 to 456

Page 10: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a retrospective meter removal, no change in

Shipper. No reads recorded since the removal date.

Not a retro update, would reject if submitted via Retro file

Read

Shipper submits a

retrospective

Meter removal

Reconciliation

10

Meter

Removal

Note: Request must be submitted via RGMA flows

Page 11: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a retrospective meter removal, no change in

Shipper. Reads recorded since the removal date.

Request would be rejected as reads exist after the requested

removal date

Read

Shipper submits a

Meter removal for a

date prior to a read

11

Requested Meter

Removal

Actual

Read

Note: Removal would need to be submitted for an effective

date after the last read recorded

Page 12: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal

Request for a retrospective meter removal, where an

exchange was previously recorded for the update date.

Read

Shipper submits a

Meter removal with

an effective date

equal to the

recorded exchange

12

Meter exchange

Recorded. Exchange

removed and meter removal

recorded

Note: removal request would be rejected if subsequent actual reads were

recorded.

The installed meter as part of the exchange will no longer be recorded

Reconciliation Reconciliation

Page 13: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Update Scenarios

for Convertor Removals

Page 14: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Removal

Request for an update to the removal read of the Convertor, no

change in Shipper.

Shipper must submit a reading from the meter at time of Convertor

removal in order for Reconciliation to take place following

submission of later reads following the update

Read

Shipper submits a

change to the

removal read

Re- Reconciliation

14

Convertor

Removal

Note: revised removal read must be equal to or greater than the last

recorded actual read

Latest

Read Reconciliation

Based on meter

Page 15: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Removal

Request for a change of date to the original Convertor removal date

recorded, no change in Shipper. No reads recorded between revised

removal date & original removal date.

Shipper must submit a reading from the meter at time of Convertor

removal in order for Reconciliation to take place following submission of

later reads following the update

Read

Shipper submits a

change to the

effective date of

Convertor removal

Reconciliation

Revised Convertor

Removal Date

15

Recorded Convertor

Removal Date

Latest

Read

Reconciliation based on meter

Page 16: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Removal

Request for a change to the removal read of the recorded Convertor

removal details, no change in Shipper.

Meter may still be installed in which case reads from the meter will be

submitted & accepted, subject to validation.

Shipper must submit a reading from the meter at time of Convertor

removal in order for Reconciliation to take place following submission of

later reads following the update

Read

Shipper submits a

change to the

removal read

Re- Reconciliation

16

Convertor

Removal

Note: revised removal read must be equal to or greater than the last

recorded actual read

Read

Reconciliation

based on meter

Page 17: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Removal

Request for a retrospective Convertor removal, change in Shipper, only estimated

transfer read recorded. User will be required to supply an opening meter reading

for the meter in addition to the removal corrected & uncorrected reads

Read

Shipper submits a retrospective

Convertor removal

Re-Reconciliation

Convertor

Removal

Shipper

Transfer

Estimated

Transfer Read

17

Latest

read

Note: - If an actual transfer read recorded the request would be rejected

- Previous Shipper will need to request the financial adjustment

- the estimated transfer reading will be re-estimated

Reconciliation based on meter

Page 18: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Removal

Request for a retrospective Convertor removal, no change in

Shipper. Reads recorded since the removal date.

Request would be rejected as reads exist after the requested

removal date

Read

Shipper submits a

Convertor removal for

a date prior to a read

18

Requested Convertor

Removal

Read

Note: Removal would need to be submitted for an effective

date after the last read recorded

Page 19: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Meter Exchange Overview

Meter removal reads will be subject to full read validations. Only

the ‘Outer Tolerance’ (Market breaker) check will be applied to

removal read. If the read fails the check the update will be rejected.

This has been logged as an issue at PN UNC as no facility in

the RGMA files to provide the ‘override flag for the read’.

The removal read will be mandatory on the Retro Update file (RTO)

if the update is in the current Shippers ownership.

The removal read will be optional on the Retro Update file (RTO) if

the update is in the previous Shippers ownership. Where a read is

not provided the removal read will be estimated.

The accepted retro meter exchange will be deemed to be the latest

position. Should any additional updates be required a further retro

update (via the RTO or RGMA file) will need to be submitted

Page 20: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

Request for a meter exchange, no change in Shipper.

Subsequent actual reads recorded

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation

Meter 123 exchanged

for 456

20

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read Latest

‘A’ Read

Page 21: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

with Transfer of Ownership

Current Shipper submits a retro meter exchange in a previous

Shippers ownership. Subsequent actual reads recorded

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation – Released

Meter 123 exchanged

for 456

21

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read Latest

‘A’ Read

CoS

Reconciliation – held

‘’A’ CoS

Read

‘S’ Read

Page 22: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

with Transfer of Ownership

Current Shipper submits a retro meter exchange in a previous

Shippers ownership. Subsequent actual reads recorded

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation – Released

Meter 123 exchanged

for 456

22

‘A’ Read ‘S’ Read

Latest

‘A’ Read

CoS

Reconciliation – held

‘’A’ CoS

Read

‘S’ Read

‘A’ Read

‘S’ read

‘A’ Read

‘S’ read

Page 23: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective backdated Meter Exchange

Original meter exchange input for the incorrect date, retro

update to amend the effective date of the meter exchange

‘A’ Read

Shipper submits a

Change to the

effective date of the

meter exchange

Reconciliation

Meter 123 exchanged

for 456 – Actual On/Off state

Reads Mandatory

23

Latest

‘A’ Read Meter exchange

Recorded

Page 24: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective backdated Meter Exchange

Original meter exchange input for the incorrect date, retro

update to amend the effective date of the meter exchange,

reads recorded between the original & updated exchange

‘A’ Read

‘S’ Read

Shipper submits a

Change to the

effective date of the

meter exchange

Reconciliation

Meter 123 exchanged

for 456

24

Latest

‘A’ Read Meter exchange

Recorded

‘A’ Read

‘S’ Read

‘A’ Read

‘S’ Read

Page 25: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange with Transfer of

Ownership and replace read

Current Shipper submits a retro meter exchange in a previous

Shippers ownership. Transfer read replaced & latest read

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation – Released

Meter 123 exchanged

for 456

25

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read

Latest

‘A’ Read

CoS

A CoS Read

Rec

– held

Replaced

Read (SAR)

Rec –

Released

Page 26: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

No read history

Current Shipper submits retro exchange, no subsequent

reads recorded – Rejected

‘A’ Read

Shipper submits a

Retro Meter

exchange

Meter 123 exchanged

for 456

26

Page 27: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

with Check Reads

Request for a meter exchange, no change in Shipper. AMR

installed. Subsequent reads recorded and Check Read

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation

Meter 123 exchanged

for 456

27

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read Latest

‘A’ Read Check

Read

Check

Read

Check to Check Reconciliation

Rec

Note: The removal read / install read on the meter exchange will be recorded

as a Check Read where daily read equipment (AMR) is installed

Page 28: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

with Check Reads and Transfer of Ownership

Request for a meter exchange, no change in Shipper. AMR

installed. Subsequent reads recorded and Check Read

‘A’ Read

Shipper submits a

Retro Meter exchange

Reconciliation - Released

Meter 123 exchanged

for 456

28

‘CoS A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read Latest

‘A’ Read Check

Read

Check

Read

Check to Check Reconciliation

Rec - held

Note: The removal read / install read on the meter exchange will be recorded as a

Check Read where daily read equipment (AMR) is installed. All ‘drift’ will be allocated

to the Incoming Shipper

CoS

Page 29: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange with

Transfer of Ownership, Suspect Reads Replaced

Current Shipper submits retro meter exchange in previous

Shippers ownership. Subsequent reads recorded, Suspect

reads replaced

‘A’ Read

Shipper submits a

Retro Meter

exchange

Individual Reconciliations Released

Meter 123 exchanged

for 456

29

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read

Replaced

‘S’ Read

Replaced

‘S’ Read

Replaced

CoS

Rec - held

‘’A’ CoS

Read

‘S’ Read

Page 30: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective meter exchange correction

Meter exchange recorded, should have been a meter removal

with a meter installation for a later date

‘A’ Read

Shipper submits a

Retro Meter removal (123)

Reconciliation

Meter 123 exchanged

for 456 recorded

30

Latest

‘A’ Read

Rec

Note: the retro meter removal will replace the exchange. This will be meter-less for a

period until install receive. Commodity deeming will cease +2 days of removal.

Meter 456 installed

Rec

Page 31: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro update Scenarios

for Convertor Exchange

Page 32: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Exchange

Request for a Convertor exchange, no change in Shipper.

Subsequent actual reads recorded

‘A’ Read

Shipper submits a

Retro Convertor

exchange

Reconciliation

Convertor

exchanged

32

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read Latest

‘A’ Read

Note: Both the Convertor and meter reads will be marked as ‘suspect’, if replacing

these reads, corrected, uncorrected and meter reads are required.

Page 33: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Exchange

with Transfer of Ownership

Current Shipper submits a retro convertor exchange in a

previous Shippers ownership. Subsequent actual reads

recorded

‘A’ Read

Shipper submits a

Retro Convertor

exchange

Reconciliation – Released

Convertor

exchanged

33

‘A’ Read ‘A’ Read ‘A’ Read

‘S’ Read ‘S’ Read ‘S’ Read Latest

‘A’ Read

CoS

‘’A’ CoS

Read

‘S’ Read

Reconciliation – held

Page 34: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Update Scenario for

Meter Installation

Page 35: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Meter Install Overview

UNC G.7.3.7 and Modifications 410A/424/425 already for provide the

rules regarding the installation of a meter prior to the confirmation or

following isolation and the transportation charges to be applied.

Retro updates will allow for asset installation to be recorded for the correct

date.

The accepted retro meter install will be deemed to be the latest position

A meter installation date cannot be changed to a date after a read is

recorded.

Page 36: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Installation

Shipper submits a retrospective meter installation, no change in Shipper

A Read

S Read

Shipper submits a retrospective

Meter Installation

Reconciliation

Meter

Installation

Meter

Installed

36

Latest Read

Page 37: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Installation with

Transfer of Ownership

Shipper submits a retrospective meter installation, pre-dates Transfer of

Ownership effective date.

Shipper submits a retrospective

Meter Installation

Reconciliation

Meter

Installation

CoS

37

Reconciliation – Held

Read

Note: as the SMP was meter-less at CoS event no Transfer of Ownership read

will exist and therefore cannot be replaced.

Page 38: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Installation

Shipper submits a retrospective meter installation, pre-dates Confirmation

Effective Date (CED) (410A)

Shipper submits a retrospective

Meter Installation

Reconciliation

Meter

Installation

CED

38

Transportation charges

Read

Note: as the SMP was meter-less at registration no ‘Opening’ read will exist for the

Confirmation Effective Date and therefore cannot be replaced.

The Meter Installation read can be replaced.

Page 39: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Update Scenarios

for Convertor Installation

Page 40: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Convertor Install Overview

The process and rules are the same for a convertor exchange and

installation as for a meter therefore all scenarios have not been

duplicated.

When requesting a retro installation for a convertor a meter reading must

also be provided.

Page 41: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Convertor Installation

Shipper submits a retrospective meter installation, no change in Shipper

A Read

S Read

Shipper submits a retrospective

Convertor Installation

Reconciliation

Meter

Installed

41

Latest Reads inc

Corrected /

uncorrected

Reconciliation

Note: a meter read must be provided in addition to the convertor installation

reads in order to carry out reconciliation

Page 42: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

SUPPLY POINT UPDATES

Page 43: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Supply Meter Point Updates Overview

A non-standard Correction Factor (CF) is applicable to Supply Meter

Points with an AQ above 732,000 kWh. A default is applied (1.02264) for

Supply Meter Points with an AQ less than 732,000 kWh

A CF is applied to the volume of gas passed through the meter and is

used to calculate the consumption.

For meter points above 732,000 kWh; where the CF is not supplied with

the meter installation notification a standard CF of 1.02264 will be applied

Shipper must amend the CF via;

ONJOB where the CF will be applied from the meter installation date

ONUPD where the CF will be applied from the effective date of the

acceptance of the update

Retrospective update file (RTO) where the CF will be applied from meter

installation date or the effective date provided

Page 44: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Supply Meter Point Updates Overview cont.

An update to the CF with an effective date other than the

meter installation date must be aligned to a read recorded

All reads recorded following the effective date of the update

will be marked as ‘Suspect’

No validation is applied to the Correction Factor against the

AQ, so any valid positive value would be accepted (except 0):

If the request to update the CF to the standard value or less but the

AQ for the meter point is greater than 732,000 kwh the request would

be accepted

Page 45: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Correction Factor Update - Billable attribute

Shipper submits a retrospective update to the correction factor

Update applied from the installation date of the meter

Reads recorded since the update will be marked as ‘Suspect’. Shipper

can replace the ‘suspect’ reads or submit a later read in order for

Reconciliation to be carried out

Shipper submits a retrospective

Update to the CF effective from

meter installation

Reconciliation

Meter

Installation

Read

‘Suspect’

Read

‘Suspect’

45

Latest

Read

Page 46: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Correction Factor Update

- Billable attribute

Shipper submits a retrospective update to the correction factor

Update applied from the effective date provided (must align to a read

recorded)

Reads recorded since the update will be marked as ‘Suspect’. Shipper

can replace the ‘suspect’ reads or submit a later read in order for

Reconciliation to be carried out

Shipper submits a retrospective

Update to the CF with an effective

Date aligned to a read

Reconciliation

Meter

Installation

Read Read

‘Suspect’

46

Latest

Read

Page 47: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

ASSET UPDATE ATTRIBUTES

Page 48: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Meter Asset Updates Overview

The update will be applied from the latest Meter installation

date (where post LiS)

If an asset billing attribute update was supplied on the RGMA

file (ONJOB/ONUPD) the existing functionality would be

performed: outcome would be a ‘cosmetic exchange’ only

and not a retrospective adjustment or an automatic financial

adjustment

All asset updates will be subject to MDD validations & the

update will reject if the update fails the validations

Note: An update to the ‘Read Units’ is not applicable as this is

derived from the ‘Multiplication Factor’ & ‘Units of Measure’.

Page 49: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

More than one asset update can be submitted at one time

(same file), billable & non- billable. The effective date will be

for the same date for all updates submitted – installation date

(does not apply to asset removals or exchanges)

Meter Asset Updates Overview

Page 50: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Billable or Non Billable Asset Updates

Data Item Non-Billable

Attribute

Update

Billable

Attribute

Update

Meter Metric/Imperial indicator Yes

Read Factor (also updates ‘Read Units’) Yes

Read Units (derived by the ‘Units of Measure’ &

‘Multiplication Factor’) N/A

Meter Status (clamped/capped) Yes

No. of dials

Meter Model Yes

Meter mechanism Yes

Manufacturer & Year Yes

Meter Serial Number Yes

Page 51: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Meter Mechanism, Meter Model, Meter Manufacturer &

Year of Manufacturer Update - Non-Billable attribute

Shipper submits a retrospective non-billable meter asset

update. No impact to reads or consumption. Update effective

from latest asset installation date. No financial adjustment.

Shipper submits a retrospective

update

(original) Reconciliation

Meter

Installation

Read Read

51

Note: If the Meter Model or Manufacturer updates any of the billable attributes of

the asset, e.g. number of dials, the update will be rejected

Page 52: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Meter Serial Number Update

- Non-Billable attribute

Shipper submits a retrospective non-billable asset update:

change to the meter serial number. No change to the billable

attributes, no impact to reads or consumption. No financial

adjustment

Shipper submits a

retrospective update

(original) Reconciliation

Meter

Installation

Read Read

52

Note: If submitted via RGMA flow, the correct effective of the update will not be

recorded.

Page 53: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Metric/Imperial Indicator, Read Factor Update -

Billable attribute

Shipper submits a retrospective billable asset update. Impact to

consumption only, reads deemed to still be valid therefore not marked as

‘Suspect’. Update effective from latest Meter installation date.

Reads marked as ‘Suspect’

Shipper must replace ‘Suspect’ reads or submit a later read in order for

Reconciliation to be calculated & financial adjustment processed

Shipper submits a

Retrospective update

Reconciliation

Meter

Installation

Read

‘Suspect’

53

Read

‘Suspect’ Latest

Read

Note: Above example shows receipt of a read after the update,

Suspect reads not replaced

Page 54: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Number of Dials Update

- Billable attribute

Shipper submits a retrospective billable asset update: change to

the number of dials for the asset with subsequent reads loaded.

Shipper will need to submit installation read with update

Suspect reads can either be replaced or latest read submitted

which will reconcile back to the installation read

Shipper submits a retrospective

update to the number of dials,

Installation read mandatory

Reconciliation

Meter

Installation

Read

Suspect

54

Latest Read Read

Suspect

If Suspect read

replaced

If Suspect read

replaced If Suspect read

replaced

Page 55: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Asset Status Update – to Clamped / Capped

Shipper submits a retrospective update to the status of the

asset: updated status of the meter to clamped / capped.

Update will only be accepted if subsequent reads are non-

advancing

Shipper submits a retrospective

update to the status of the asset:

clamped/capped

Reconciliation

following update

Meter

Status update

Non Advancing

Read

55

D+2 of the

notification date Non Advancing

Read

Note: Where only estimates exist, reconciliation will take

place between D+2 of the notification & status update

Rec

Page 56: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Asset Status Update –

to Live from Clamped / Capped

Shipper submits a retrospective update to the status of the

asset: update the status of the meter from clamped / capped

to Live.

Shipper submits a retrospective

update to the status of the asset: to

Live, previously capped / clamped

Reconciliation following update

Meter

Status update

56

Latest Read

(must be equal to

status update read)

Note: Any advancing reads received when the meter is clamped / capped will be

rejected. Only non-advancing reads will be accepted.

Page 57: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Updates Prior to

Code Cut Off Date (LiS)

Page 58: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Overview for Retro Updates Prior to Line in the

Sand (LiS)

Effective date of the exchange and the removal / installation reads will

need to be estimated by the Shipper if the exchange pre-dates LiS.

Effective date of the removal and the removal read will need to be

estimated by the Shipper if the removal pre-dates LiS.

Effective date of the installation and the installation read will need to

be estimated by the Shipper if the installation pre-dates LiS.

Shipper must submit for effective date equal to or greater than LiS date

If the effective date is not within the User’s period of ownership

removal reads are not mandatory.

If update date is equal to LiS date there will not be a reconciliation

from the removal read back to the pre LiS read.

For updates to billable attributes, the update will be applied to the live

asset recorded from the asset installation date. The financial

adjustment will only apply from LiS (variance created)

Page 59: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

Effective Date Prior to LiS

Shipper identifies a missing meter exchange for an effective date prior to

LiS.

The example below shows the effective date requested by the Shipper

to be not equal to LiS date.

Reconciliation will be calculated from the read prior to LiS but the

financial adjustment released from LiS only

59

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation

Retro Meter

Exchange

‘A’ Read

‘Suspect’

‘A’ Read

‘Suspect’

Latest

‘A’ Read

LiS

Page 60: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

Effective Date Prior to LiS

Shipper identifies a missing meter exchange for an effective date prior to

LiS.

The example below shows the effective date requested by the Shipper is

equal to LiS date.

Reconciliation will be calculated from the installation read and the

financial adjustment released from LiS

Suspect reads replaced

60

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation

Retro Meter

Exchange

‘A’ Read

‘Suspect’

Replaced

‘A’ Read

‘Suspect’

Replaced

Latest

‘A’ Read

LiS

Page 61: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Installation Prior to LiS

Shipper identifies a meter installation prior to LiS date

The effective date of the installation is shown as LiS date

A Read

S Read

Shipper submits a

retrospective

Meter Installation

Reconciliation

Meter

Installation

Meter

Installed

61

Latest Read LiS

Page 62: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal Prior to LiS

Shipper identifies that the meter removal was actually

removed for an earlier date prior to LiS date

The effective date of the removal will need to be for LiS date

or a date post LiS

Example below shows the effective date equal to LiS

Read

Shipper submits a

change to the

effective date of the

Meter removal

Reconciliation

Meter

Removal

62

LiS Recorded

Meter removal

Page 63: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Removal Prior to LiS with a

Shipper Transfer

Shipper identifies a meter removal prior to LiS date and

transfer of ownership has taken place.

The effective date of the removal, in the example below, is

shown to be post LiS date.

LiS

Shipper submits a

Retrospective Meter removal

Reconciliation

Meter

Removal

Shipper

Transfer

Estimated

Transfer Read

‘Suspect’

63

D+3 Financial Adjustment A Read

Page 64: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Billable Attribute Update where

the Asset is Installed Prior to LiS

Shipper identifies a billable attribute for the latest meter installation is

incorrect. Installation date of the meter is prior to LiS.

The effective date of the update will be applied from the latest ‘live’ asset

installation date

Shipper can replace ‘suspect’ read or submit a later read, read will be

validated back to the read prior to LiS

The financial adjustment will be calculated back to the read prior to LiS

and a reconciliation variance from LiS created

Shipper submits a

Retrospective update

Reconciliation

LiS

64

Read

‘Suspect’ Latest

Read Read

Asset

Installation

Page 65: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Number of Dials Update

- where the Asset is Installed Prior to LiS

The effective date of the update will be applied from the latest asset

installation date

Shipper can replace ‘suspect’ read or submit a later read, read will be

validated back to the read prior to LiS

The financial adjustment will be calculated back to the read prior to LiS

and a reconciliation variance from LiS created

Shipper submits a retrospective

update to the number of dials,

Installation read mandatory

Reconciliation

Meter

Installation

LiS

65

Latest Read Read

Suspect

If Suspect read

replaced

variance

Page 66: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Asset Status Update – to Clamped / Capped,

Prior to LiS

Shipper identifies the asset was clamped/capped for an effective

date prior to LiS.

The effective date of the status update must be for LiS date or later

Reconciliation performed to latest read

Shipper submits a retrospective

update to the status of the asset:

clamped/capped

Reconciliation

following update

Meter

Status update

66

D+2 of the

notification date Non Advancing

Read LiS

Page 67: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Updates

for iGT Meter Points

Page 68: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Updates for iGT Meter Points Overview

Data for iGT meter points is being sent from iGTs to Xoserve

in preparation for the migration to UKLink.

Valid reads received with a read date upto the 31st July 2016

in the iGT database will be migrated to UKLink.

For Smaller Supply Points (SSP);

a valid read received post go-live will trigger a reconciliation back to

the last read pre go-live. However, only the charges associated with

the post go-live period will be issued.

For Larger Supply Points (LSP);

a valid read received post go-live will trigger a reconciliation back to

the last read pre go-live and the charges for the period will be issued

for the whole period (read to read).

Does not apply to existing (at data migration) DM CSEPs

Page 69: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Updates for iGT Meter Points Overview

cont.

Updates to data can only be made for an effective date post

the last read held on UKLink at migration

The Shipper will need to estimate the reads and effective

date of the update if the actual effective date is earlier

Asset installation, asset exchange and asset billable updates

can only be applied from a date post the last read held on

UKLink at migration.

Meter removal will only be accepted if no actual reads exist

post the effective date of the removal date.

Page 70: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Diagram to Show Data Migration

for iGT Meter Points

Go-Live

Read 1 Read 2 Read 3 Read 4

1st August

Read 3 will not be migrated to UKLink

1st October

Note: Below diagram based on 1st October delivery

Page 71: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange on iGT Meter

Point: Effective Date Prior to Go Live - SSP

Shipper identifies a missing meter exchange on a SSP for an effective

date prior to go-live.

The effective date of the exchange will need to be for a date post the

last read recorded at migration

Reconciliation charges only released from go-live date (variance

created)

71

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation Released

Retro Update

‘A’ Read

‘Suspect’

‘A’ Read

‘Suspect’

Latest

‘A’ Read

Go Live

Page 72: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange on iGT Meter

Point: Effective Date Prior to Go Live - LSP

Shipper identifies a missing meter exchange for an LSP with an effective

date prior to go-live.

The effective date of the exchange will need to be for a date post the

last read recorded at migration

Reconciliation calculated from latest read to read migrated (prior to 1st

August)

72

‘A’ Read

Shipper submits a

Retro Meter

exchange

Reconciliation Released

Retro Update

‘A’ Read

‘Suspect’

‘A’ Read

‘Suspect’

Latest

‘A’ Read

Go Live

Page 73: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Updates on a Meter Point where

Check Read Obligations Apply

Page 74: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Updates on a Meter Point where Check

Read Obligations Apply Overview

Where daily read equipment is installed (AMR / datalogger) and recorded

on UKLink;

At transfer of ownership the transfer/opening read will be treated as a

Check Read for reconciliation purposes

Where asset updates are received it is assumed that the meter & daily

read equipment have been re-synchronished therefore the reads

received will be treated as a Check Read

The Check Read will trigger reconciliation back to the previous Check

Read/installation read/asset update read.

The Transfer read/Opening read/asset update read will be the start read

for the next Check Read received.

Where reconciliation has taken place following receipt of a Check Read,

reads can not be replaced or a consumption adjustment can not be

processed in the Check Read reconciliation period

Page 75: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retrospective Meter Exchange

with Check Reads and Transfer of Ownership

Request for a meter exchange, change in Shipper. AMR

installed. Subsequent reads recorded and Check Read

‘A’ Read

Shipper submits a

Retro Meter exchange

Reconciliation - Released

Meter

Exchange

75

‘CoS

A’ Read

‘Suspect’

‘A’ Read ‘A’ Read ‘Suspect’ ‘Suspect’

Latest

‘A’ Read

Check

Read

Check

Read

Check to Check Reconciliation

Rec - held

Note: The removal read / install read on the meter exchange will be recorded as a

Check Read where daily read equipment (AMR) is installed. All ‘drift’ will be allocated

to the Incoming Shipper

Shipper Transfer

Check to Check Rec

- Check Read anniversary date set

Page 76: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Updates where the Effective Date

is Forward Dated

Page 77: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Forward Dating the Recorded Meter Exchange

with Transfer of Ownership

Current Shipper identifies that the meter exchange recorded should

actually be effective for a later date.

Shipper will need to submit the following updates in order to correct the

effective date of the exchange:

Scenario: Meter exchanged on 9th March 2015. Meter 123 removed

(reading 7500). Meter 456 installed (reading 0000). Meter exchange

actually took place on 18th August 2015.

Steps:

Remove meter 456 for 10th March 2015 reading 0000

Install meter 123 for 11th March 2015 reading 7500

Meter exchange 123 (remove reading 7500) to 456 (install reading

0000) for 18th August 2015

77

Page 78: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Forward Dating the Recorded Meter Exchange

with Transfer of Ownership

‘A’ Read

Shipper submits

following updates

Reconciliation

Meter Exchange

Recorded Remove

123, install 456

‘A’ Read

Suspect

Latest

‘A’ Read

Reconciliation

09/03/2015

11/03/15

Remove

456

10/03/15

Install

123

18/08/15

Meter exchange

Remove 123

Install 456

Reconciliation

Page 79: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Retro Updates on ‘Unique Sites’

Page 80: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

What is a Unique Site?

Current classification of a Unique Site:

Telemetered (NTS & LDZ)

Shared Supply Meter Points (SSMP)

Shorthaul

DM CSEP

Variable Pressure

Interconnector

The existing population of Unique Sites will be migrated and managed on

UKLink.

Retro Updates will apply to all of the existing population of ‘Unique Sites’

with the exception of;

Telemetered Sites

Interconnectors

Shipper can not update asset data where they are not responsible for the

asset

Page 81: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Telemetered & Interconnectors

Retro Updates will not apply to Telemetered (NTS & LDZ)

meter points & Interconnectors because;

Asset data is not held for Interconnectors

Asset data may not be correct for Telemetered sites, not required as

asset data not used to calculate energy

Energy is calculated by National Grid Transmission and not Xoserve.

Consumption & energy does not use the asset or Supply Point data

held.

Where the energy recorded for the day is not correct a consumption

adjustment used to adjust the energy for the day / period

Page 82: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Shared Supply Meter Points

Where a retro update is received (from one of the sharing

Users) the validation applied to the update will be the same

as any other site.

Following the update, when reconciliation is calculated, the

energy will be apportioned;

Based on the original allocation, default values for non-Agent sites

Based on the allocation advised by the Agent

Energy is apportioned to all Registered Users on the day for

each day in the period of the reconciliation

Page 83: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Shorthaul (NTS & LDZ)

Where a retro update is received the validation applied to the

update will be the same as any other site.

Following the update, reconciliation is calculated, the energy

will be apportioned and the relevant charges applied to the

daily revised energy

Page 84: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

DM CSEP & Variable Pressure Sites

Where a retro update is received the validation applied to the

update will be the same as any other DM site.

Following the update reconciliation is calculated, the energy

will be apportioned and adjustment issued

For variable Pressure the correction factor applied for the day

would be used to calculate the energy

Page 85: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Read Replacement

Page 86: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Read Replacement Overview

Scope of retro read replacement;

Class 1 & 2, estimated reads after GFD+5

Class 1 & 2, actual reads via a consumption adjustment (unless a

transfer read)

Class 3 & 4, actual meter reads

Transfer read via the Shipper Agreed Read (SAR) process

Asset installation read

Meter isolation read

Asset removal read

Check Reads can not be replaced once they have been processed

Replacement reads will be subject to read validation rules including the

tolerance checks

The replacement read must be equal to or greater than a previous read

and equal to or less than a later read

Page 87: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Shipper can only replace reads in their period of ownership

Reads provided by the GT can not be replaced by the Shipper, e.g. Must

Reads

Where the read is associated with an asset (removal/installation) only the

Shipper registered at the meter point on the effective date of the asset

update can update the read.

Where the transfer read is replaced via the SAR process, a reconciliation

will be triggered to both Shippers

A read can not be replaced within the period of a consumption adjustment

A read can not be replaced within the period of the Check to Check

reconciliation

A consumption adjustment will be rejected if within the Check to Check

reconciliation period

Read Replacement Overview cont.

Page 88: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Read Replacement – Class 1 & 2

26th 27th 28th 29th 30th 1st 2nd

1600

E Read

B Read

1314

1800

E Read

B Read

1428

2000

E Read

B Read

1542

2200

E Read

B Read

1656

2400

E Read

B Read

1770

2800

E Read

B Read

1884

3000

E Read

B Read

1998

Received today (3rd)

For GFD of 2nd

3rd

2000

A Read

25th

1200

A Read

‘Better Estimate’ created

& feeds allocation processes

‘Better Estimate created

& triggers Reconciliation

Note:

• Actual read on the 8th must be equal to or greater than the

previous actual read on the 31st

• Reads within D+5 would feed allocation processes,

• Reads outside D+5 will trigger reconciliation

Page 89: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Read Replacement – Class 3

1st 2nd 3rd 4th 5th 6th 7th

Read Read

Replaced

Read Read Read Read

Replaced Read

8th

Read

31st

Read

• Shipper replaces read for the 2nd & 6th

Re-Reconciliation Re-Reconciliation

Note: Replacement read must be equal to or greater than

previous read & equal to or less than later read

Page 90: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Read Replacement – Class 4

Read Read

Replaced Read Read

Reconciliation

Note: Replacement read must be equal to or greater

than previous read & equal to or less than later read

4th Jan 12th Mar 24th Dec 17th Feb

Page 91: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Read Replacement – String of Reads

1st 2nd 3rd 4th 5th 6th

Read 2 Read 3

Replaced

Read 6

Replaced Read 7

7th

Read 8

31st

Read 1

• Shipper replaces read for the 2nd to the 5th

Re-Reconciliation

Read 4

Replaced

Read 5

Replaced

Re-Reconciliation Note:

• Replacement read must be equal to or greater than previous

read & equal to or less than later read

• Each read replaced will validate to the previous & latest valid

read:

• Therefore: Read 3 validated against Read 2, Read 4

validated against Read 3 etc. If read 3 rejected, Read 4

validated against Read 2.

Page 92: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Consumption Adjustments

1st 2nd 3rd 4th 5th 6th 7th

Read Read Read Read Read Read Read

8th

Latest

Read

31st

Read

• Shipper submits a consumption adjustment for the period 2nd to the 7th

• Consumption Adjustment replaces the consumption for the 2nd through

to the 7th

Note:

• Read received on the 8th would be validated back to the read

on the 7th

• Read can not be replaced within the period of the consumption

adjustment

Consumption Adjustment

Page 93: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Check Read Period

Read Read Read Read Check

Read Check

Read

• Shipper submits Check Read details which will create a reconciliation

to the previous Check Read

• ‘Drift’ will be allocated to all days within the Check to Check period

Note:

• Reads can not be replaced within a period of the Check to

Check reconciliation

• Above example fpr Class 3 & 4. Reconciliation for Class 1 and

2 only where actual received following estimate after GFD+5

Check to Check Reconciliation

Reconciliation Reconciliation Reconciliation Reconciliation

Page 94: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Replacing a Transfer Read –

Shipper Agreed Read Process (SAR)

Shipper transfer

Estimated Read

Replaced with SAR

Read 1 Read 2

Reconciliation from

Estimated transfer read

Reconciliation from

Estimated transfer read

Re-Rec triggered by SAR Re-Rec triggered by SAR

Note: The SAR read must be equal to or greater than Read 1 and

Equal to or less than read 2

Page 95: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Update to the Removal Read

on an existing Meter Exchange

Shipper identifies the removal read of the meter exchange recorded was

incorrect

Shipper submits an updated removal read on the retro file (RTO)

95

‘A’ Read

Shipper submits an update

to the removal read on an

existing meter exchange

Reconciliation

Retro Meter

Exchange

‘A’ Read ‘A’ Read A’ Read

Page 96: Retrospective Update Scenarios V1 December 2015...Retrospective Meter Removal Request for a retrospective meter removal, no change in Shipper. Reads recorded since the removal date

Update to the Installation Read

on an existing Meter Exchange

Shipper identifies the installation read of the meter exchange recorded

was incorrect

Shipper submits an updated installation read on the retro file (RTO)

96

‘A’ Read

Shipper submits an update

to the installation read on

an existing meter exchange

Reconciliation

Retro Meter

Exchange

‘A’ Read

Suspect

‘A’ Read

Suspect

A’ Read