retrofitting pump stations - wef home · marketing manager. 6/11/2015 2 option #1 in-pipeline...

15
6/11/2015 1 www.jwce.com www.jwce.com Sponsor eShowcase: What Role Does New Technology Play in Resolving the NonDispersibles Issue? Part 2 Thursday, June 11, 2015 1:00 - 1:45 pm ET www.jwce.com www.jwce.com Retrofitting Older Pump Stations Alec Mackie Marketing Manager

Upload: others

Post on 10-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

1

www.jwce.comwww.jwce.com

Sponsor eShowcase: What Role Does New Technology Play in

Resolving the NonDispersibles

Issue? Part 2

Thursday, June 11, 20151:00 - 1:45 pm ET

www.jwce.comwww.jwce.com

RetrofittingOlder

Pump StationsAlec MackieMarketing Manager

Page 2: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

2

www.jwce.com

Option #1 In-Pipeline Grinders for Dry Wells

Deragging Went from 2-3/Week to 0/Week

Case Study

Orange County,California

400 HP Pumps

40K SeriesMuffin Monsters

Installed on inletside of pumps

Each grinder capable of 3.5 MGD

Option #1 In-Pipeline Grinders for Dry Wells

Page 3: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

3

www.jwce.com

Option #2 In-Channel Grinders

Sliced Annual Pumping Energy Costs by $78k

Option #2 In-Channel Grinders

Case Study

Orange County,California

Channel Monster

“This upgrade cost significantly less than new pumps. Plus, this solution will completely

eliminate the pump clogging problemswe were having.”

- Plant Superintendent

Page 4: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

4

Grinder Reduced Total Pump Run Time to 2 Hours/Day

Option #2 In-Channel Grinders

Case Study

Virginia Beach,Virginia

30K SeriesMuffin Monster

Immersible motor

Grinder can handle 700,000 GPD

www.jwce.com

Option #2 In-Channel Grinders

Case Study

Virginia Beach,Virginia

Station needed frequent deragging

After Muffin Monster Installation –No Deragging

Page 5: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

5

www.jwce.com

Option #3 Wall Mounted Grinders

Deragging Was a Three Hour Process

Option #3 Wall Mounted Grinders

Case Study

Red Rock Amphitheater,

Colorado

30K SeriesMuffin Monster

Poorly performing comminutor could not

handle debris load

Maintenance crews used salad tongs to remove debris from the old comminutor

Page 6: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

6

Muffin Monsters Fit Almost Anywhere

Option #3 Wall Mounted Grinders

www.jwce.com

Option #4 Wall Mounted Auger Screen

Page 7: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

7

Vertical Auger Monster Removes Debris from Pump Station

Option #4 Wall Mounted Auger Screen

Case Study

Georgia State Prison

Vertical AugerMonster model AGV

Removes trash and debris inmates flush

down the drain

www.jwce.com

Option #5 Manhole Grinder

Page 8: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

8

In Many Cities Prisons Are Required to Pre-Treat Sewage

Option #5 Manhole Grinder

Case Study

State PrisonMoore Haven, FL

30KMuffin Monster

Pre-FabricatedManhole

www.jwce.com

Designed to Retrofit Any Pump Station

In-PipelineIn-Channel

or Wall MountedVertical

Auger Screen

Page 9: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

9

www.jwce.com

Are These Long-Term Solutions?

www.jwce.comwww.jwce.com

New WipesReady Technology

Kevin BatesGlobal Marketing Director

Page 10: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

10

www.jwce.com

JWC Is Proud to Support Our Industry

Research & Development

www.NoMoreWipes.com

2014 Wipes Research Project (report pending)

www.jwce.com

Search for Technical Solutions• Wipes Material Types• Particle Size• Grinder Bypass• Reweaving

Page 11: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

11

www.jwce.com

patent pending

CAPTURE: DELTA P™ Side Rails

www.jwce.com

• ½” (12mm) perforated drum

• 59% better capture than coil drum

CAPTURE: Perforated Drums

Patented

Page 12: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

12

www.jwce.com

JWC:cuts 2 ways

Other grinders andcomminutors: cut 1 way

Wipes Ready Cutters=

No Reweaving

CUT: Wipes Ready Cutters Make the Difference

www.jwce.com

Wipes Ready Muffin MonsterOther Grinders

• Serrated edges

• Knurled Spacers

• Cuts in 2 directions

• 51% Reduction in Long Strips

patent pending

CUT: 17 Tooth Wipes Ready Cutters

Page 13: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

13

www.jwce.com

New drive gearing optimizes shaft speeds• Closer relative speed

• Better cutter clean-out

• Better cutting to small strips

• Reducers remain the same

patent pending

CUT: Optimized Cut Control™

www.jwce.com

Finescreen Monster® technology

Last Stop: REMOVE Headworks Fine Screens

Page 14: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

14

www.jwce.com

Bandscreen Monster® technology

Last Stop: REMOVE Headworks Fine Screens

www.jwce.com

Aftermarket Wipes Ready Options

Easy Factory Upgradesfor Currently Installed Units

• 30004T/30005• 2.0 CMD/CDD up to 60”• Contact Service Team for a quote

Page 15: Retrofitting Pump Stations - WEF Home · Marketing Manager. 6/11/2015 2 Option #1 In-Pipeline Grinders for Dry Wells Deragging Went from 2-3/Week to 0/Week Case Study Orange County,

6/11/2015

15

Your Turn – Are You Wipes Ready Now?

Kevin Bates

Global MarketingDirector

(714) 428-4647

[email protected]

www.JWCE.com

Josh Dragon

Manager

Jensen Pumps

[email protected]

www.JensenPumps.com

www.jwce.com

How to Participate Today

• Audio Modes

• Listen using Mic & Speakers

• Or, select “Use Telephone” and dial the conference (please remember long distance phone charges apply).

• Submit your questions using the Questions pane.

• A recording will be availablefor replay shortly after thiswebcast.