Reliable, outgoing, hard working Bachelor of Architecture graduate who is goal oriented and thrives in a challenge, and is eager to take the initiative and learn from every opportunity. [EDUCATION] [PROFILE STATEMENT] NEWSCHOOL OF ARCHITECTURE + DESIGN, SAN DIEGO, CA -Bachelor of Architecture [Graduated June 2012] [SKILLS + SOFTWARE] 3D MODELING + RENDERING -Revit, Rhino, Sketchup, Artlantis, and V-Ray 2D DESIGN + PRESENTATION -Autocad, Hand Drafting, Adobe InDesign, Illustrator, and Photoshop ADDITIONAL PROGRAMS -Microsoft Office TEAM/COLLABORATION -Extensive team project experience, multiple projects done in teams of various sizes ADDITIONAL SKILLS -Model Making, Communication, Leadership, Quick Learner, Takes Initiative, and Hard Working [EMPLOYMENT HISTORY] TOMARO DESIGN GROUP, MANHATTAN BEACH, CA [5/2014-8/2014] JUNOIR DRAFTSMAN -A small to midsize firm where I was involved in multiple projects, and multiple aspects of each. I worked closely with my project manager developing construction documents. I worked on redline for remodel and edits to designs, communication with consultants regarding interiors and landscaping plans, and also dealt with the redline corrections we received from city building departments. EL CAMINO COMMUNITY COLLEGE, TORRANCE, CA [9/2004-6/2007] REUTER & REUTER INC., TORRANCE, CA [9/2012-5/2014] ASSOCIATE - DRAFTER/DESIGNER -A small firm where I am given the opportunity to learn about all aspects of the firm and industry. I help with the designs of spaces, and then take the design and hard line it to be further analyzed. I check drawings, and redline them to be corrected. I do code research to make sure that what needs to be done is in compliance. We do office design charettes to figure out design issues that the office runs into. I create design solution packets; including plans, elevations and 3D renderings, for our clients or contractors so they can better understand what we are trying to accomplish. I also deal with the building department to get our plans reviewed and approved. SUNSERI DESIGNS, TORRANCE, CA [9/2012-PRESENT] AS-BUILTS - AUTOCAD -I started my own business doing as-built projects. I take the redlined plans and correct the autocad drawings according to how they were actually built on the site. I also go to sites and take measurements to create the as-builts from scratch. 20448 Reynolds Dr. Torrance, Ca 90503 [email protected] (310)938-6640 MATTHEW SUNSERI

Upload: mattsunseri

Post on 02-Apr-2016

213 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Reliable, outgoing, hard working Bachelor of Architecture graduate who is goal oriented and thrives in a challenge, and is eager to take the initiative and learn from every opportunity.

[EDUCATION]

[PROFILE STATEMENT]

NEWSCHOOL OF ARCHITECTURE + DESIGN, SAN DIEGO, CA -Bachelor of Architecture [Graduated June 2012]

[SKILLS + SOFTWARE] 3D MODELING + RENDERING -Revit, Rhino, Sketchup, Artlantis, and V-Ray 2D DESIGN + PRESENTATION -Autocad, Hand Drafting, Adobe InDesign, Illustrator, and Photoshop ADDITIONAL PROGRAMS -Microsoft Office TEAM/COLLABORATION -Extensive team project experience, multiple projects done in teams of various sizes ADDITIONAL SKILLS -Model Making, Communication, Leadership, Quick Learner, Takes Initiative, and Hard Working

[EMPLOYMENT HISTORY]

TOMARO DESIGN GROUP, MANHATTAN BEACH, CA [5/2014-8/2014] JUNOIR DRAFTSMAN -A small to midsize firm where I was involved in multiple projects, and multiple aspects of each. I worked closely with my project manager developing construction documents. I worked on redline for remodel and edits to designs, communication with consultants regarding interiors and landscaping plans, and also dealt with the redline corrections we received from city building departments.

EL CAMINO COMMUNITY COLLEGE, TORRANCE, CA [9/2004-6/2007]

REUTER & REUTER INC., TORRANCE, CA [9/2012-5/2014] ASSOCIATE - DRAFTER/DESIGNER -A small firm where I am given the opportunity to learn about all aspects of the firm and industry. I help with the designs of spaces, and then take the design and hard line it to be further analyzed. I check drawings, and redline them to be corrected. I do code research to make sure that what needs to be done is in compliance. We do office design charettes to figure out design issues that the office runs into. I create design solution packets; including plans, elevations and 3D renderings, for our clients or contractors so they can better understand what we are trying to accomplish. I also deal with the building department to get our plans reviewed and approved.

SUNSERI DESIGNS, TORRANCE, CA [9/2012-PRESENT] AS-BUILTS - AUTOCAD -I started my own business doing as-built projects. I take the redlined plans and correct the autocad drawings according to how they were actually built on the site. I also go to sites and take measurements to create the as-builts from scratch.

20448 Reynolds Dr. Torrance, Ca [email protected]

(310)938-6640

MATTHEW SUNSERI

20448 Reynolds Dr. Torrance, Ca [email protected]

(310)938-6640

MATTHEW SUNSERI

ARCHITECTURE PORTFOLIO

MATTHEW SUNSERI

WORK EXPERIENCE[REUTER & REUTER INC.]

CHIROPRACTIC OFFICESMITH CHIROPRACTIC

MEDICAL CENTERKHALEELI MEDICAL CENTER

INTERIOR REMODELSOUTH BAY CHILDREN’S HEALTH CENTER

WOMEN’S SHOWER ROOMSAN PEDRO YMCA

FREELANCE EXPERIENCE[SUNSERI DESIGNS]

AS-BUILTSMARCO RESIDENCE[FULL HOUSE]

AS-BUILTSANTROBUIS RESIDENCE[SECOND FLOOR]

AS-BUILTSCONDREN RESIDENCE[FULL HOUSE]

SCHOOL WORK[NEWSCHOOL OF ARCHITECTURE + DESIGN]

LIVING CITY[PUBLIC INTERACTION WITHIN A STADIUM DEVELOPMENT]

THE MONORAIL CONNECTIONPRIVATE JET TERMINALTHE COMMUNITY TOWER

TABLE OF CONTENTS

WORK EXPERIENCE[REUTER & REUTER INC.]

INTERIOR REMODELSOUTH BAY BROKERS

NEW RAMP/AWNINGSURF MANAGEMENT

CHURCH EXPANSIONATHERTON BAPTIST CHURCH

MATTHEW SUNSERI

CHIROPRACTIC OFFICESMITH CHIROPRACTIC[24510 HAWTHORNE BLVD.][September 2013-December 2013]

PROJECT DESCRIPTIONThis project was a interior build. The building was recently built, but was left with an open floor plan. My firm created a floor plan that fit our clients’ needs; five exam rooms, an X-ray room, offices, a reception area with seating, restrooms, and a break room. In this project I did site visits to get the exact measurement for our drawings. I was in charge of coordinating the construction documents, and seeing them through plan check. I coordinated with our mechanical and electrical contractors to make sure they had the correct drawings they needed to complete the job. I made sure we had every detail needed to complete the project.

DRAWINGS- Autocad/Illustrator/InDesign

CONSTRUCTION PLAN

RECEPTION DESK ELEVATIONS

SITE PLAN

MATTHEW SUNSERI

MEDICAL CENTERKHALEELI MEDICAL CENTER[2243 SEPULVEDA BLVD.][March 2013- June 2013]

PROJECT DESCRIPTION

SE

PU

LVE

DA

BLV

D

A6.0

3

2 5

4

A6.0

3

5 2

4

ADDRESS2245

ADDRESS2243

In this project we gutted a small comerical building, and designed two small medical offices. We dealt with many design changes by the client, and we finally came to this final product. We also reworked the front facade and made it more modern with full height glass walls, and frameless glass doors.

DRAWINGS- Autocad/Illustrator

4-5A-1.1

BUTT GLAZEMULLION BLUSHED ALUMINUM PPG 1/2” FLOAT(COLOR)

DBL MULLION BRUSHED ALUMINUM REVEAL GORDON RD-5810

NEW STUCCO

08 4210 WEDGE-LOCK DRY GLAZE DOOR RAILS

FINISH- SMOOTH TROWL

NEW PAINT EXISTING AWNING

ELEVATIONS

FRONT FACADEFLOOR PLAN

SITE PLAN

MATTHEW SUNSERI

CR

AV

EN

S

AV

E.

INTERIOR REMODELSOUTH BAY CHILDREN’S HEALTH CENTER[1617 CRAVENS STREET][January 2013-April 2013]

1617

PROJECT DESCRIPTIONIn this project there needed to be an ADA accessiable entrance into the lobby, and the orignal enterance was not a viable option. We put an ADA ramp in the back lot and put additional door in the front area of the the health center facing the back lot. We made a brand new lobby area and reconfigured ten offices. We also had an issue with the city with the parking lot, and had to figure out a way to make it work, so we created tandem parking for the employees while still keeping the correct amount of spaces needed foe the site.

DRAWINGS- Autocad/Illustrator

SITE PLAN

FRONT ELEVATION

ELEVATION 3ELEVATION 2ELEVATION 1

101

100

102

103

WAITING ROOM

RECEPTION

FILING AREA

ADA RESTROOM

120HALLWAY

1’-0” MIN

30” x 48”CLEAR SPACE

CAN OVER LAP WITH 60” CIRCLE

18”EXACT

18”MIN.

COUNTER AT 34”

COUNTER AT 45”

48” C

LEAR

LOBBY FLOOR PLAN

1

2

3

MATTHEW SUNSERI

WOMEN’S SHOWER ROOMSAN PEDRO YMCA[301 S. BANDINI STREET][December 2012-March 2013]

Scale 3/16” = 1’-0”

Project numberDateDrawn byChecked by

SAN PEDRO YMCA301 S. BANDINI STREET SAN PEDRO, CA 90731

REUTER & REUTER, INC.ARCHITECTURE/INTERIORS PROJECT MANAGEMENT

23001 HAWTHORNE BLVD. STE. 204 TORRANCE, CA 90505

FLOOR PLAN SPECIFICATIONS

SK-6.5125601/16/13Matt SunseriDR

TRANSITION AS NEED WITH EXISITING TILE FLOOR

N.I.C.N.I.C.

N.I.C.N.I.C.

DEMO ALL FLOORING, REMOVE ALL WALL & CEILING TILE, AND REMOVE ALL PLUMBING FIXTURES.

UP

WOMEN’S LOCKER ROOM

LOCKERS

SHOWER ROOM

DRYTOILET

3 HOOKS

9 HOOKS

SK-4

SK-8.4

UP

CO

UN

TER

CO

UN

TER

LOCKERS

SK-4SK-8.4

4 HOOKS

SK-4SK-8.4

TYP.

TYP.

EXISTING WALLS

NEW CONSTRUCTION WALLS

LEGEND N

BRICK WALL

Scale

Project numberDateDrawn byChecked by

SAN PEDRO YMCAREUTER & REUTER, INC.ARCHITECTURE/INTERIORS PROJECT MANAGEMENT

23001 HAWTHORNE BLVD. STE. 204 TORRANCE, CA 90505

HANDICAP SHOWER SEAT DETAIL

SK-4.1125601/17/13Matt SunseriDR

301 S. BANDINI STREET SAN PEDRO, CA 90731

4” METAL STUDS@ 12” O.C.

5/8” BACKER BOARD

VAPOR BARRIER

CERAMIC TILE ON MORTAR BED

1 1/2” = 1’-0”

CONCRETE FOOTINGS

TRACKS

SLOPE

Scale 1 1/2” = 1’-0”

Project numberDateDrawn byChecked by

SAN PEDRO YMCAREUTER & REUTER, INC.ARCHITECTURE/INTERIORS PROJECT MANAGEMENT

23001 HAWTHORNE BLVD. STE. 204 TORRANCE, CA 90505

SHOWER ROOM WALL SECTION

SK-10.0125601/16/13Matt SunseriDR

301 BANDINI STREET, SAN PEDRO, CA90731

METAL STUD - STRUCTURAL [20 GA.]

APPLIED ANTI CORROSION MATERIAL

5/8” BACKER BOARD

6” CONCRETE CURB

VAPOR BARRIER

CERAMIC TILE ON SETTING BED

TRACK

EXISTING SLAB

NOTE:

BEFORE INSTALLATION OF UNGALVANIZED STUD APPLY 3M SCOTCHKOTE LIQUID EPOXY 323.

COVE - C-833

UNIVERSAL TRIM - S-832

OUT CORNER ROUNDCAP - SC-816

OUT CORNER ROUNDCAP BASE - SC-813

TOP OF SEAT TILE

FLOOR TILE

WALL TILE

WALL OF SEAT TILE

T1,T2TR2

TR1

TR3

TR1

T1

TB1

TR2

TR2

TR3

TR1

T1

TB1

TR1

T3

T1,T2TB1

TB1

TR1

TR2

TR3

T1,T2

T1

T1,T2

T3

PROJECT DESCRIPTIONIn this project we are in the proccess of reworking the women’s shower room, tearing out all rotted out walls and replacing them. We have designed an all new ADA shower seat, and are specifing every material that will be put in this brand new shower room, from the tile floor to ceiling to the shower heads and grab bars.

DRAWINGS- Autocad/Illustrator

HANDICAP SHOWER SEAT DETAIL SHOWER WALL DETAILSHOWER ELEVATION

SHOWER ROOM PLAN

TILE SPECIFICATION SHOWER ELEVATIONS MATTHEW SUNSERI

AAF STANDARD COMMERICAL ANODIZED CLEAR METAL FRAME

WOOD DOOR- STAIN TBD

1/4” TEMPERED GLASS

DOOR HARDWARE TBD8’-0

”7’

-9”

6’-0”

11’-3 1/2”

1

1

2

3

2 3

INTERIOR REMODELSOUTH BAY BROKERS[2501 SEPLUVEDA BLVD.][October 2012-]

PROJECT DESCRIPTIONFor this project I worked closely with my boss, constantly reworking the remodelled areas. I have visited the site multiple times to make sure the as-builts we were provided were correct.

DRAWINGS- Autocad/Illustrator

CONFERENCE ROOM REPLACEMENT OF DOUBLE DOOR KITCHEN/COPY ROOM

MATTHEW SUNSERI

NEW RAMP/AWNINGSURF MANAGEMENT[2440 CARSON STREET][September 2012-]

1:12 SLOPEMAX.

1:12 SLOPEMAX.

DN

LANDINGELEVATION

2’-6”

LANDINGELEVATION

1’-3”

N

SK-1.4NEW TINTED GLAZING IN ALUMINUM STOREFRONT SYSTEM IN TILT-UP WALL

FUTURE CANOPY

NEW CURB WITH 1 1/2” DIA. PIPE HANDRAIL

NEW CONCRETE STAIRS

NEW STOREFRONT WITH DOOR

SK-2.1

WT 6 x 7

EXISTING CONCRETE WALL

C 8 x 18.75

HSS 5 X 2

SK-3.2

6” OC

4’-0”

11/9/12

RAMP PLAN

RAMP ELEVATION

AWNING SECTION

PROJECT DESCRIPTIONIn this project I helped develope an ADA ramp on the site. I reworked the remaining parking around the ramp. Also for the client I created a 3D rendering of our idea so he could get a better understanding on what we were planning on doing for him. Also we created three awnings that will go on two corners of the building and the other over the ADA ramp.

DRAWINGS- Revit/Autocad/IllustratorDIGITAL MODEL- RevitRENDER- Revit/Photoshop

MATTHEW SUNSERI

For this project we were creating a bunch of presentation drawings for the Paster of this church so he could present them to his congregation, so that he could help raise money for the new importments he wanted to impliment. I used revit to create the 3D model and develope the plans and elevations.

DRAWINGS- Revit/IllustratorDIGITAL MODEL- RevitRENDER- Revit/Photoshop

CHURCH EXPANSIONATHERTON BAPTIST CHURCH[2627 116TH STREET][September 2012-]

N

NN

N

DEMO STAIRS

DEMO WALLS

ELEVATOR

NEW FACADE

N

NEW STAIRS

SECOND FLOOR LANDING

SECOND FLOOR LANDING

1 HR. FIRE RATEDCONCRETE BLOCK

INFILL TYP.

NEW SHED

N

LEGENDEXISITING WALLS

NEW CONSTRUCTION WALLS

NEW BLOCK WALLS

DEMO WALLS

CMU WALLSN

SK-8.1

SK-4.0

Scale

Project numberDateDrawn byChecked by

ATHERTON BAPTIST CHURCH2627 116TH ST. HAWTHORNE, CA

REUTER & REUTER, INC.ARCHITECTURE/INTERIORS PROJECT MANAGEMENT

23001 HAWTHORNE BLVD. STE. 204 TORRANCE, CA 90505

FACADE ELEVATIONS

1/8" = 1'-0"

SK-4.01211011/15/12Matt SunseriDR

EXISITNG BUILDING FRAME

NEW METAL CLADDING(PAC-CLAD PETERSON

ALUMINUM- INTEGRAL STANDING SEAM)

CONCRETE BLOCK(SIENNA BROWN)

CONCRETE BLOCK(SANDSTONE)

EXISITNG BUILDING

NEW DOOR

STUCCO TO MATCH EXISTING BUIDINGNEW DOOR

CONCRETE BLOCK INFILL

ELEVATOR

FRONT ELEVATION SIDE ELEVATION

Scale

Project numberDateDrawn byChecked by

ATHERTON BAPTIST CHURCH2627 116TH ST. HAWTHORNE, CA

REUTER & REUTER, INC.ARCHITECTURE/INTERIORS PROJECT MANAGEMENT

23001 HAWTHORNE BLVD. STE. 204 TORRANCE, CA 90505

2 STORY BUILDING FRONT ELEVATION

1/4" = 1'-0"

SK-8.11211011/26/12Matt SunseriDR

GLASS CLEARSTORY

GLASS SIDE LIGHT

CONCRETE BLOCK WALL

CONCRETE BLOCK WALL

PROJECT DESCRIPTION

FIRST FLOOR PLAN

SANCTUARY FACADE ELEVATIONS

NEW TWO STORY FRONT ELEVATIONMATTHEW SUNSERI

MATTHEW SUNSERI

AS-BUILTSMARCO RESIDENCE[2100 THE STRAND, MANHATTAN BEACH][MARCH 2013]

CEILING HEIGHT8’-0”

LIVING ROOM

CHILDREN’S BEDROOM

DINING ROOM

KITCHENFOYER

CLOSET

BATHROOM/LAUNDRY MASTER BEDROOM

MASTERBATHROOM

CLOSET

GARAGE

SOFFIT

SOFFIT

SOFFIT

DN HALLWAY

UP

DN

GRILL

JACUZZI

UP

CEILING HEIGHT8’-0”

CEILING HEIGHT7’-11”

CEILING HEIGHT7’-11”

CEILING HEIGHT8’-0”

CEILING HEIGHT8’-0”

CEILING HEIGHT7’-0”

CEILING HEIGHT7’-11” CEILING HEIGHT

8’-0”

CEILING HEIGHT8’-0”

CEILING HEIGHT8’-4 3/8”

LIVING ROOM BEDROOM

CLOSET

BATHROOM

KITCHEN

DECK

UP

CEILING HEIGHT8’-0”

CEILING HEIGHT8’-0”

CEILING HEIGHT8’-0”

CEILING HEIGHT8’-0”

FAMILY ROOM

UP

DN

STRAND DECK

BAR

CLOSET

WINE SELLER

BATHROOM

CEILING HEIGHT8’-1”

CEILING HEIGHT8’-1”

MAIN FLOOR PLAN

BOTTOM FLOOR PLAN ROOF PLAN

SECOND FLOOR PLAN

DRAWINGS- Autocad/Illustrator

MATTHEW SUNSERI

AS-BUILTSANTRIBUIS RESIDENCE[2412 SILVERSTRAND AVE., HERMOSA BEACH][FEBUARY 2013]

SKYLIGHT36” x36”

SKYLIGHT24” x24”

SKYLIGHT24” x24”

UP DN

DN

DN

CEILING HEIGHT10’-2”

CEILING HEIGHT9’-0”

CEILING HEIGHT9’-0”

FIREPLACE

SECOND FLOOR PLAN

DRAWINGS- Autocad/Illustrator

MATTHEW SUNSERI

UP UP DN

UP

UP

DN

MASTER BEDROOM

MASTERBATHROOM

GARAGE

BEDROOM BEDROOMBATHROOM

KITCHEN

LIVING ROOM

DINING ROOM

STORAGE

BATHROOM

BEDROOMDECK

CLOSET

CLOSET

CLOSET

CLOSET

BATHROOM/LAUNDRY

POOL

FIRST FLOOR PLAN

SECOND FLOOR PLAN ROOF PLAN

AS-BUILTSCONDREN RESIDENCE[2127 POWER STREET, HERMOSA BEACH][JANUARY 2013]

DRAWINGS- Autocad/Illustrator

MATTHEW SUNSERI

MATTHEW SUNSERI

LIVING CITY[PUBLIC INTERACTION WITHIN A STADIUM DEVELOPMENT][THESIS 2011-2012]

By placing a stadium development in an urban setting with a pedestrian-oriented site, it can become an interactive and lively area enhancing the life of the city. Stadiums today are vibrant destinations, but only during events. By creating a more accessible stadium the area can become active year-round. The new development will create a more walkable and tangible space for the pedestrian, by creating a pedestrian flow allowing access to the whole site, whether it be visual or physically tangible.

Stadiums today are extremely underutilized With the amount of land that these massive developments take up they should have more uses than just be a mere sporting or event venue. A stadium needs to become a place where people want to be on a day there is no event happening. With no other uses for the public, the stadium and immediate area go unused for a majority of the year, thus creating a dead zone within the city. Stadiums create a disconnect between the surrounding areas. Most stadiums are built on the public’s dollar, and are not public venues. Stadiums today do not create a sense of place, just a destination for people going to a given event. Stadiums and their immediate surroundings never realize their full potential. Placing a stadium development in a urban setting jump starts a budding area, and creates a “living city.” The possibilities are endless.

DRAWINGS- Revit/IllustratorDIGITAL MODEL- RevitDIAGRAMS- Illustrator/SketchupRENDER- Revit

THESIS STATEMENT

DN

DN

DN

DN

DN

K STREET

IMPERIAL AVE.

PARK

BLV

D. 16TH

STR

EET

MATTHEW SUNSERI

MATTHEW SUNSERI

THE MONORAIL CONNECTION[STUDIO PROJECT 2011]

2050 PLAN

For this project I picked the site on 7th & Market which is a parking lot right now. My proposal for the site is a mixed use building with a transportation hub. I proposed a monorail stop to travel through the building, which then creating a open space/plaza, thus created a gathering area. With my design I wanted to create connections to major nodes of the city, like the gaslamp and petco park. By creating connection throughout the city i hope this creates a city center which then creates another area in downtown of congestion.

DRAWINGS- RevitDIGITAL MODEL- RevitRENDER- RevitDIAGRAMS- Illustrator

PROJECT DESCRIPTION

25’ 100’SECTIONS

DN

DN

-

-

P

C

H

MATTHEW SUNSERI

25’ 100’SECTIONS

PRIVATE JET TERMINAL[STUDIO PROJECT 2010]

DN

DN

-

-

P

C

H

The private jet terminal designed for the northeast corner of lindburgh field. where the current private terminal is. The design focuses on connecting the surounding community through the transparency and creating a new interaction between airplane and terminal.

DRAWINGS- RevitDIGITAL MODEL- RevitRENDER- Artlantis

PROJECT DESCRIPTION

MATTHEW SUNSERI

THE COMMUNITY TOWER[STUDIO PROJECT 2010]

The whole premise of my project was surrounded by the community spaces. I made the building to function as one big community. I started with minor common areas between dorm rooms, then into a larger scale; between two floors. Then to go even further i made even larger community spaces to bring the whole building together.

DRAWINGS- RevitDIGITAL MODEL- Sketchup/RevitRENDER- V Ray/RevitDIAGRAMS- Illustrator

PROJECT DESCRIPTION

MATTHEW SUNSERI