6
CUADRO DE PRESUPUESTO ANALITICO GLOBAL ENTIDAD EJECUTORA : EJERCITO ( BTN ING. COMB BLIN Nº 241 ) FUNCIÓN : TRANSPORTES OBRA : CONTRUCCION DEL CAMINO VECINAL CHALHUANI COTARMA, PISCAYA Y LUCUCHANGA DEL DISTRITO DE PICHIRHUA, PROVINCIA DE ABANCAY - APURIMAC ACT/ DESCRIPCION Unid. Cant. COSTO COSTO COSTO GASTOS FU PR.F. SPR.F. Nemoni PROY META CLASIFIC. UNIT. PARCIAL DIRECTO GENERALES 9002 26.22.23 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-PERSONAL 2150862 Residente de Obra MES 5.00 6,000.00 30,000.00 30,000.00 Tecnico Cadista MES 5.00 2,000.00 10,000.00 10,000.00 Asistente Tecnico MES 5.00 3,000.00 15,000.00 15,000.00 Almacenero de Obra MES 5.00 1,000.00 5,000.00 5,000.00 Topografo MES 5.00 2,500.00 12,500.00 12,500.00 Maestro de Obra MES 5.00 2,500.00 12,500.00 12,500.00 Guardian MES 5.00 1,000.00 5,000.00 5,000.00 Administrador MES 5.00 3,500.00 17,500.00 17,500.00 Asistente Administrativo/Logistico MES 5.00 2,000.00 10,000.00 10,000.00 Especialista en Contrataciones MES 3.00 2,500.00 7,500.00 7,500.00 MANO DE OBRA OPERARIO HH 4714.87 8.68 40925.03 40925.03 OFICIAL HH 5271.88 7.92 41753.31 41753.31 PEON HH 12245.48 6.67 81677.36 81677.36 MOVILIDAD, VIATICOS, PAGOS PERSONAL MILITAR TROPA GLB 1.00 32,500.00 32,500.00 32,500.00 TECNICOS Y SUB OFICIALES GLB 1.00 27000.00 27000.00 27,000.00 OFICIALES GLB 1.00 18750.00 18750.00 18,750.00 VISITA COAC GLB 2.00 3,350.00 6,700.00 6,700.00 MOVILIDAD COAC GLB 1.00 3,200.00 3,200.00 3,200.00 26.22.24 MATERIALES DE OFICINA Y ESCRITORIO PAPEL CARBON T A/4 X 100 HOJAS CAJA 1.00 19.90 19.90 19.90 LAPIZ TIPO PORTAMINAS UND 4.00 5.00 20.00 20.00 PERFORADOR TAMAÑO MEDIANO PARA 15 A 20 HOJAS UND 1.00 15.00 15.00 15.00 ENGRAPADOR TIPO ALICATE UND 1.00 59.00 59.00 59.00 SOBRES MANILA TAMAÑO OFICIO PQUE 2.00 15.00 30.00 30.00 GRAPAS 26/6 X 5000 CAJA 1.00 220.00 220.00 220.00 LIBRETA DE CAMPO UND 6.00 6.00 36.00 36.00 ARCHIVADOR CON PALANCA UND 4.00 5.00 20.00 20.00 FASTENER X 50 UNIDADES CAJA 2.00 5.00 10.00 10.00 MEMORIA USB DE 4GB UND 5.00 30.00 150.00 150.00 PAPEL BOND A-4 75 GRS MILLAR 6.00 27.00 162.00 162.00 CUADERNO DE OBRA DE 100 HOJAS( LEGALIZADO) UND 2.00 120.00 240.00 240.00 CUADERNO CUADRICULADO A-4 DE 100 HOJAS UND 6.00 4.00 24.00 24.00 CAMARA FOTOGRAFICA DIGITAL UND 1.00 800.00 800.00 800.00 SELLOS POS FIRMA TRODAT UND 4.00 20.00 80.00 80.00 FOLDER MANILA (100 UND) SOBRE 4.00 5.00 20.00 20.00 ESCALIMETRO UND 1.00 30.00 30.00 30.00 BOTIQUIN UND 1.00 500.00 500.00 500.00 CARDEX MILLAR 0.50 280.00 140.00 140.00 CONTROL VISIBLE MILLAR 0.50 260.00 130.00 130.00 OTROS GLB 1.00 1,200.00 1,200.00 1,200.00 ESCRITORIOS DE MELAMINA INC/SILLA ROTATORIA GLB 1.00 3,000.00 3,000.00 3,000.00 STAND DE 02 PUERTAS UND 2.00 420.00 840.00 840.00 VESTUARIO (ELEMENTOS DE SEGURIDAD) A.- ELEMENTOS DE PREVENCION CASCOS PARA INGENIEROS Y TECNICOS 3M UND 5.00 35.000 175.00 175.00 CASCOS PARA OBREROS UND 20.00 20.00 400.00 400.00 RESPIRADOR DESCARTABLE CONTRA POLVO UND 20.00 20.000 400.00 400.00 GUANTES DE JEBE DE USO INDUSTRIAL PAR 30.00 5.000 150.00 150.00 GUANTES DE CUERO NITRILO UND 20.00 12.000 240.00 240.00 PROTECTORES DE OIDO TIPO TAPON UND 20.00 45.00 900.00 900.00 CHALECOS DE IDENTIFICACION (PERSONAL TECNICO) UND 6.00 60.00 360.00 360.00 CHALECO REFLECTIVO UND 30.00 40.00 1,200.00 1,200.00 GORRAS CON LOGOTIPO UND 30.00 12.00 360.00 360.00 BOTAS DE JEBE PAR 30.00 30.00 900.00 900.00 FRAZADAS UND 10.00 30.00 300.00 300.00 COLCHON ESPUMA UND 5.00 80.00 400.00 400.00 BOTAS CAT PUNTA DE ACERO (PERSONAL TECNICO) PAR 5.00 350.00 1,750.00 1,750.00 B.- ELEMENTOS DE PREVENCION CINTA SEÑALIZADORA ROLLO 2.00 100.000 200.00 200.00 CONOS DE SEÑALIZACION UND 5.00 30.000 150.00 150.00 SOGA NYLON DE 5/8" MT 200.00 5.00 1,000.00 1,000.00 EXTINTOR DE INCENDIOS UND 3.00 180.00 540.00 540.00 COMBUSTIBLE COMBUSTIBLE GASOLINA DE 84 OCTANOS GLN 500.00 13.50 6,750.00 6,750.00 PETROLEO GLN 17,000.00 13.50 229,500.00 229,500.00 LUBRICANTES GLN 450.00 50.00 22,500.00 22,500.00 HERRAMIENTAS PICO CON MANGO UND 12.00 45.00 540.00 540.00 PALA UND 12.00 45.00 540.00 540.00 RASTRILLO UND 5.00 25.00 125.00 125.00 BARRETA EXAGONAL PESADO UND 3.00 80.00 240.00 240.00 COMBA DE 16 LB. (CON MANGO) UND 1.00 90.00 90.00 90.00 COMBA DE 12 LB. (CON MANGO) UND 2.00 90.00 180.00 180.00 COMBA DE 4 LB. (CON MANGO) UND 3.00 25.00 75.00 75.00 DISCO DE CORTE DE CONCRETO UND 2.00 20.00 40.00 40.00 ARCO DE SIERRA UND 2.00 10.00 20.00 20.00 CARRETILLA BUGGI CON NEUMATICO UND 4.00 190.00 760.00 760.00 HOJA DE SIERRA SAMPLEX UND 50.00 5.00 250.00 250.00 NIVEL DE MANO DE ALBAÑIL UND 2.00 25.00 50.00 50.00 WINCHA DE 50M UND 1.00 50.00 50.00 50.00 FLEXOMETRO DE 5M UND 5.00 25.00 125.00 125.00 CORDEL DE NAYLON METRO 50.00 0.15 7.50 7.50 ALICATES DE CORTE UND 2.00 28.00 56.00 56.00 MARTILLO UND 3.00 18.00 54.00 54.00 ROMANA UND 1.00 35.00 35.00 35.00 CANDADO MEDIANO Y GRANDE UND 2.00 20.00 40.00 40.00 CINCEL UND 3.00 12.00 36.00 36.00 INFLADOR UND 1.00 18.00 18.00 18.00 LLANTAS DE BUGUI CON CAMARA UND 3.00 35.00 105.00 105.00

Upload: alberto-tupa-ortiz

Post on 15-Jan-2016

4 views

Category:

Documents


2 download

DESCRIPTION

costos de obra

TRANSCRIPT

Page 1: resumen de costos de una obra

CUADRO DE PRESUPUESTO ANALITICO GLOBAL ENTIDAD EJECUTORA : EJERCITO ( BTN ING. COMB BLIN Nº 241 )

FUNCIÓN : TRANSPORTES

OBRA : CONTRUCCION DEL CAMINO VECINAL CHALHUANI COTARMA, PISCAYA Y LUCUCHANGA DEL DISTRITO DE PICHIRHUA, PROVINCIA DE ABANCAY - APURIMACNº ACT/

DESCRIPCION Unid. Cant.COSTO COSTO COSTO GASTOS COSTO

FU PR.F. SPR.F. NemoniPROYMETA CLASIFIC. UNIT. PARCIAL DIRECTO GENERALES TOTAL

9002 26.22.23 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-PERSONAL 125,000.00

2150862 Residente de Obra MES 5.00 6,000.00 30,000.00 30,000.00

Tecnico Cadista MES 5.00 2,000.00 10,000.00 10,000.00

Asistente Tecnico MES 5.00 3,000.00 15,000.00 15,000.00

Almacenero de Obra MES 5.00 1,000.00 5,000.00 5,000.00

Topografo MES 5.00 2,500.00 12,500.00 12,500.00

Maestro de Obra MES 5.00 2,500.00 12,500.00 12,500.00

Guardian MES 5.00 1,000.00 5,000.00 5,000.00

Administrador MES 5.00 3,500.00 17,500.00 17,500.00

Asistente Administrativo/Logistico MES 5.00 2,000.00 10,000.00 10,000.00

Especialista en Contrataciones MES 3.00 2,500.00 7,500.00 7,500.00

MANO DE OBRA 164,355.70

OPERARIO HH 4714.87 8.68 40925.03 40925.03

OFICIAL HH 5271.88 7.92 41753.31 41753.31

PEON HH 12245.48 6.67 81677.36 81677.36

MOVILIDAD, VIATICOS, PAGOS PERSONAL MILITAR 88,150.00

TROPA GLB 1.00 32,500.00 32,500.00 32,500.00

TECNICOS Y SUB OFICIALES GLB 1.00 27000.00 27000.00 27,000.00

OFICIALES GLB 1.00 18750.00 18750.00 18,750.00

VISITA COAC GLB 2.00 3,350.00 6,700.00 6,700.00

MOVILIDAD COAC GLB 1.00 3,200.00 3,200.00 3,200.00

26.22.24 MATERIALES DE OFICINA Y ESCRITORIO 7,745.90

PAPEL CARBON T A/4 X 100 HOJAS CAJA 1.00 19.90 19.90 19.90

LAPIZ TIPO PORTAMINAS UND 4.00 5.00 20.00 20.00

PERFORADOR TAMAÑO MEDIANO PARA 15 A 20 HOJAS UND 1.00 15.00 15.00 15.00

ENGRAPADOR TIPO ALICATE UND 1.00 59.00 59.00 59.00

SOBRES MANILA TAMAÑO OFICIO PQUE 2.00 15.00 30.00 30.00

GRAPAS 26/6 X 5000 CAJA 1.00 220.00 220.00 220.00

LIBRETA DE CAMPO UND 6.00 6.00 36.00 36.00

ARCHIVADOR CON PALANCA UND 4.00 5.00 20.00 20.00

FASTENER X 50 UNIDADES CAJA 2.00 5.00 10.00 10.00

MEMORIA USB DE 4GB UND 5.00 30.00 150.00 150.00

PAPEL BOND A-4 75 GRS MILLAR 6.00 27.00 162.00 162.00

CUADERNO DE OBRA DE 100 HOJAS( LEGALIZADO) UND 2.00 120.00 240.00 240.00

CUADERNO CUADRICULADO A-4 DE 100 HOJAS UND 6.00 4.00 24.00 24.00

CAMARA FOTOGRAFICA DIGITAL UND 1.00 800.00 800.00 800.00

SELLOS POS FIRMA TRODAT UND 4.00 20.00 80.00 80.00

FOLDER MANILA (100 UND) SOBRE 4.00 5.00 20.00 20.00

ESCALIMETRO UND 1.00 30.00 30.00 30.00

BOTIQUIN UND 1.00 500.00 500.00 500.00

CARDEX MILLAR 0.50 280.00 140.00 140.00

CONTROL VISIBLE MILLAR 0.50 260.00 130.00 130.00

OTROS GLB 1.00 1,200.00 1,200.00 1,200.00

ESCRITORIOS DE MELAMINA INC/SILLA ROTATORIA GLB 1.00 3,000.00 3,000.00 3,000.00

STAND DE 02 PUERTAS UND 2.00 420.00 840.00 840.00

VESTUARIO (ELEMENTOS DE SEGURIDAD) 7,535.00

A.- ELEMENTOS DE PREVENCION

CASCOS PARA INGENIEROS Y TECNICOS 3M UND 5.00 35.000 175.00 175.00

CASCOS PARA OBREROS UND 20.00 20.00 400.00 400.00

RESPIRADOR DESCARTABLE CONTRA POLVO UND 20.00 20.000 400.00 400.00

GUANTES DE JEBE DE USO INDUSTRIAL PAR 30.00 5.000 150.00 150.00

GUANTES DE CUERO NITRILO UND 20.00 12.000 240.00 240.00

PROTECTORES DE OIDO TIPO TAPON UND 20.00 45.00 900.00 900.00

CHALECOS DE IDENTIFICACION (PERSONAL TECNICO) UND 6.00 60.00 360.00 360.00

CHALECO REFLECTIVO UND 30.00 40.00 1,200.00 1,200.00

GORRAS CON LOGOTIPO UND 30.00 12.00 360.00 360.00

BOTAS DE JEBE PAR 30.00 30.00 900.00 900.00

FRAZADAS UND 10.00 30.00 300.00 300.00

COLCHON ESPUMA UND 5.00 80.00 400.00 400.00

BOTAS CAT PUNTA DE ACERO (PERSONAL TECNICO) PAR 5.00 350.00 1,750.00 1,750.00

B.- ELEMENTOS DE PREVENCION 1,890.00

CINTA SEÑALIZADORA ROLLO 2.00 100.000 200.00 200.00

CONOS DE SEÑALIZACION UND 5.00 30.000 150.00 150.00

SOGA NYLON DE 5/8" MT 200.00 5.00 1,000.00 1,000.00

EXTINTOR DE INCENDIOS UND 3.00 180.00 540.00 540.00

COMBUSTIBLE 258,750.00

COMBUSTIBLE GASOLINA DE 84 OCTANOS GLN 500.00 13.50 6,750.00 6,750.00

PETROLEO GLN 17,000.00 13.50 229,500.00 229,500.00

LUBRICANTES GLN 450.00 50.00 22,500.00 22,500.00

HERRAMIENTAS 8,140.00

PICO CON MANGO UND 12.00 45.00 540.00 540.00

PALA UND 12.00 45.00 540.00 540.00

RASTRILLO UND 5.00 25.00 125.00 125.00

BARRETA EXAGONAL PESADO UND 3.00 80.00 240.00 240.00

COMBA DE 16 LB. (CON MANGO) UND 1.00 90.00 90.00 90.00

COMBA DE 12 LB. (CON MANGO) UND 2.00 90.00 180.00 180.00

COMBA DE 4 LB. (CON MANGO) UND 3.00 25.00 75.00 75.00

DISCO DE CORTE DE CONCRETO UND 2.00 20.00 40.00 40.00

ARCO DE SIERRA UND 2.00 10.00 20.00 20.00

CARRETILLA BUGGI CON NEUMATICO UND 4.00 190.00 760.00 760.00

HOJA DE SIERRA SAMPLEX UND 50.00 5.00 250.00 250.00

NIVEL DE MANO DE ALBAÑIL UND 2.00 25.00 50.00 50.00

WINCHA DE 50M UND 1.00 50.00 50.00 50.00

FLEXOMETRO DE 5M UND 5.00 25.00 125.00 125.00

CORDEL DE NAYLON METRO 50.00 0.15 7.50 7.50

ALICATES DE CORTE UND 2.00 28.00 56.00 56.00

MARTILLO UND 3.00 18.00 54.00 54.00

ROMANA UND 1.00 35.00 35.00 35.00

CANDADO MEDIANO Y GRANDE UND 2.00 20.00 40.00 40.00

CINCEL UND 3.00 12.00 36.00 36.00

INFLADOR UND 1.00 18.00 18.00 18.00

LLANTAS DE BUGUI CON CAMARA UND 3.00 35.00 105.00 105.00

Page 2: resumen de costos de una obra

CUADRO DE PRESUPUESTO ANALITICO GLOBAL ENTIDAD EJECUTORA : EJERCITO ( BTN ING. COMB BLIN Nº 241 )

FUNCIÓN : TRANSPORTES

OBRA : CONTRUCCION DEL CAMINO VECINAL CHALHUANI COTARMA, PISCAYA Y LUCUCHANGA DEL DISTRITO DE PICHIRHUA, PROVINCIA DE ABANCAY - APURIMACNº ACT/

DESCRIPCION Unid. Cant.COSTO COSTO COSTO GASTOS COSTO

FU PR.F. SPR.F. NemoniPROYMETA CLASIFIC. UNIT. PARCIAL DIRECTO GENERALES TOTAL

MANGUERA REFORZADA 3/4" 100 MT. ROLLO 1.00 1.50 1.50 1.50

PARCHE PARA CAMARA CAJA 1.00 10.00 10.00 10.00

REGLA DE ALUMINIO 1"x4"x6 UND 1.00 80.00 80.00 80.00

PEGAMENTO ADHESIVO UND 1.00 22.00 22.00 22.00

LINTERNA DE MANO PEQUEÑA UND 3.00 14.00 42.00 42.00

ESPATULAS DE 3" CAMASA UNID 2.00 9.50 19.00 19.00

ESPATULA DE 2" CAMASA UNID 2.00 6.50 13.00 13.00

MASCARILLA PARA PINTURA FILTRO - ANLUC UNID 20.00 28.00 560.00 560.00

ARO PARA BUGUI TROOPER UNID 2.00 55.00 110.00 110.00

DESINFECTANTE DE BAÑO PINO GLN 1.00 25.00 25.00 25.00

ESCOBA DE FIBRA CLORINDA GLN 3.00 12.00 36.00 36.00

PLASTICO 5 MTS DE ANCHO X 100 DE LARGO METRO 50.00 4.00 400.00 400.00

PONCHO IMPERMEABLE UNID 35.00 25.00 875.00 875.00

BALDE DE 18 LT UNID 5.00 8.00 40.00 40.00

TIMBOS DE PLASTICO UNID 4.00 60.00 240.00 240.00

CINTA DE SEÑALIZACION (HOMBRES TRABANDO) ROLLO 1.00 80.00 80.00 80.00

ARPILLERA ROLLO 1.00 150.00 150.00 150.00

MENAJERIA GLB 1.00 2,000.00 2,000.00 2,000.00

MATERIALES 200,226.00

CLAVOS PARA MADERA CON CABEZA DE 2" KG 30.00 5.00 150.00 150.00

CLAVOS PARA MADERA CON CABEZA DE 2 1/2" KG 60.00 5.00 300.00 300.00

CLAVOS PARA MADERA CON CABEZA DE 3" KG 60.00 5.00 300.00 300.00

CLAVOS PARA MADERA CON CABEZA DE 4" KG 60.00 5.00 300.00 300.00

ALAMBRE NEGRO N°16 KG 200.00 5.00 1,000.00 1,000.00

ALAMBRE NEGRO N°8 KG 200.00 5.00 1,000.00 1,000.00

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Ø=3/4" VARILLA 20.00 60.00 1,200.00 1,200.00

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Ø=5/8" VARILLA 30.00 52.00 1,560.00 1,560.00

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Ø=1/2" VARILLA 140.00 33.00 4,620.00 4,620.00

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Ø=3/8" VARILLA 50.00 18.50 925.00 925.00

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Ø=1/4" VARILLA 20.00 8.00 160.00 160.00

ARENA FINA M3 15.00 220.00 3,300.00 3,300.00

PIEDRA ZARANDEADA DE 3/4" M3 120.00 180.00 21,600.00 21,600.00

PIEDRA MEDIANA DE 6" - 8" M3 160.00 150.00 24,000.00 24,000.00

AFIRMADO M3 20.00 100.00 2,000.00 2,000.00

ARENA GRUESA M3 50.00 180.00 9,000.00 9,000.00

HORMIGON M3 220.00 200.00 44,000.00 44,000.00

CEMENTO PORTLAND TIPO I BLS 2,900.00 22.50 65,250.00 65,250.00

ASFALTO RC 250 GLN 10.00 25.00 250.00 250.00

ROLLIZOS DE EUCALIPTO D=6" X 3.10M UNID. 20.00 8.00 160.00 160.00

MADERA TORNILLO DE 1"X 4" X10 UNID. 40.00 14.70 588.00 588.00

MADERA TORNILLO DE 1"X 8" X10 UNID. 60.00 28.90 1,734.00 1,734.00

MADERA TORNILLO DE 2"X 2" X10 UNID 20.00 14.70 294.00 294.00

MADERA TORNILLO DE 2"X 4" X10 UNID 20.00 29.00 580.00 580.00

THINER GLN 10.00 60.00 600.00 600.00

PINTURA ESMALTE SINTETICO (NEGRO, BLANCO, ROJO , AMARILLO NARANJA) GLN 20.00 60.00 1,200.00 1,200.00

TEKNOPORT DE 1" PLANCHA 5.00 20.00 100.00 100.00

BROCHA DE 4" UND 5.00 10.00 50.00 50.00

º BROCHA DE 3" UND 5.00 10.00 50.00 50.00

BROCHA DE 2" UND 5.00 10.00 50.00 50.00

BROCHA DE 1" UND 5.00 8.00 40.00 40.00

PINCEL UND 3.00 5.00 15.00 15.00

RODILLO DE 12" UND 2.00 15.00 30.00 30.00

YESO BOL 5.00 6.00 30.00 30.00

TUB. PVC UF 8" UNID 30.00 120.00 3,600.00 3,600.00

TRIPLAY LUPUNA CC DE 4MM PLANCHA 30.00 24.00 720.00 720.00

TRIPLAY LUPUNA CC DE 8MM PLANCHA 10.00 60.00 600.00 600.00

CABLE MELLIZO Nº 14 ROLLO 1.00 90.00 90.00 90.00

CINTA AISLANTE ROLLO 10.00 3.00 30.00 30.00

CALAMINA GALVANIZADA DE 3.00 X0.83 M X0.60 MM PLANCHA 80.00 25.00 2,000.00 2,000.00

IMPREVISTOS GLB 1.00 6,750.00 6,750.00 6,750.00

26.22.25 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-SERVICIOS 1,082,680.77

ALQUILER DE OFICINA MES 5.00 1,500.00 7,500.00 7,500.00

ALQUILER DE IMPRESORA MES 5.00 200.00 1,000.00 1,000.00

ALQUILER DE COMPUTADORA I3, I7 MES 5.00 1,200.00 6,000.00 6,000.00

ALQUILER COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP MES 4.00 700.00 2,800.00 2,800.00

MEZCLADORA DE CONCRETO TAMBOR 18 HP 9 p3 MES 4.00 1,200.00 4,800.00 4,800.00

ALQUILER NIVEL TOPOGRAFICO MES 3.00 800.00 2,400.00 2,400.00

ALQUILER ESTACION TOTAL MES 5.00 3,600.00 18,000.00 18,000.00

ALQUILER VIBRADOR DE CONCRETO 3/4" - 2" MES 5.00 600.00 3,000.00 3,000.00

REFORMULACIÓN DEL EXPEDIENTE TÉCNICO GLB 1.00 7,000.00 7,000.00 7,000.00

LIQUIDACION DE OBRA GLB 1.00 15,000.00 15,000.00 15,000.00

SERVICIO DE FOTOCOPIAS GLB 1.00 600.00 600.00 600.00

PLOTEO DE PLANOS A-1, A-2 A-3 GLB 1.00 400.00 400.00 400.00

ALQUILER DE MOTOSIERRA MES 5.00 400.00 2,000.00 2,000.00

ALQUILER RODILLO LISO VIBRATORIO AUTOPROPULSADO 135 HP 10-12 TN HR 420.00 160.00 67,200.00 67,200.00

ENSAYO A LA COMPRESION SIMPLE UND 50.00 50.00 2,500.00 2,500.00

DISEÑO DE MEZCLA FC=210 KG/CM2 , FC=175 KG/CM2 CON HORMIGONUND 2.00 450.00 900.00 900.00

TRANSPORTE DE MATERIAL - FLETE TERRESTRE GLB 1.00 14,000.00 14,000.00 14,000.00

ALQUILER DE CAMIONETA 4X4 DOBLE CABINA MES 5.00 6,000.00 30,000.00 30,000.00

ALQUILER DE ECLIMETRO MES 4.00 80.00 320.00 320.00

ENSAYO DE DENSIDAD DE CAMPO GLB 1.00 1,000.00 1,000.00 1,000.00

ALQUILER CAMION CISTERNA 1220HP Hr 240.00 150.00 36,000.00 36,000.00

GLB1.00 26,000.00 26,000.00 260,000.00

UND25.00 80.00 2,000.00 2,000.00

ALQUILER DE MAQUINARIA RETROEXCAVADORA 140 HP Hr360.00 150.00 54,000.00 54,000.00

ALQUILER DE VOLQUETE 15 M3Hr 520.00 100.00 52,000.00 52,000.00

GLB 1.00 38,000.00 38,000.00 38,000.00

SERVICIO DE TRASLADO DE EQUIPOS MENORES GLB 1.00 3,500.00 3,500.00 3,500.00

HABILITACION DE ALMACEN DE MATERIALES Y EQUIPO GLB 1.00 3,000.00 3,000.00 3,000.00

SERVICIO DE OPERACIÓN Y MANTENIMIENTO DE MAQUINARIAS (INC. REPUESTOS)

SERVICIO DE ELABORACION DE SEÑALES (PREVENTIVAS, INFORMATIVAS, REGLAMENTARIAS

SERVICIO DE ALQUILER DE PLATAFORMA CAMA BAJA PARA TRASLADO DE MAQUINARIA PESADA

Page 3: resumen de costos de una obra

CUADRO DE PRESUPUESTO ANALITICO GLOBAL ENTIDAD EJECUTORA : EJERCITO ( BTN ING. COMB BLIN Nº 241 )

FUNCIÓN : TRANSPORTES

OBRA : CONTRUCCION DEL CAMINO VECINAL CHALHUANI COTARMA, PISCAYA Y LUCUCHANGA DEL DISTRITO DE PICHIRHUA, PROVINCIA DE ABANCAY - APURIMACNº ACT/

DESCRIPCION Unid. Cant.COSTO COSTO COSTO GASTOS COSTO

FU PR.F. SPR.F. NemoniPROYMETA CLASIFIC. UNIT. PARCIAL DIRECTO GENERALES TOTAL

GLB 1.00 3,000.00 3,000.00 3,000.00

GLB 1.00 444,760.77 444,760.77 444,760.77

TOTAL REQUERIMIENTO GLOBAL S/. 1,944,473.37

PRESUPUESTO A EJECUTAR POR EJERCITO (A-B)

PRESUPUESTO BASE - GASTOS DE CAPACITACION

(S/. 1,967,989.90 - S/. 23,516.56 ) S/. S/. 1,944,473.37 TRANSFERENCIA DEL GOBIERNO REGIONAL AL EJERCITO

PRESUPUESTO A EJECUTAR POR GOBIERNO REGIONAL APURIMAC

GASTOS DE SUPERVICION S/. S/. 99,635.10

CAPACITACION S/. S/. 23,516.53

PRESUPUESTO TOTAL S/. 2,067,625.00

RESIDENTE DE OBRA SUPERVISOR DE OBRA

ELABORACION CARTEL DE OBRA CON BANER, MARCO DE MADERAS Y ROLLIZOS DE EUCALIPTO (INC SU INSTALACION)

SERVICIO A TODO COSTO (MATERIALES, MANO DE OBRA) DE VOLADURA DE ROCAS (ROCA FIJA Y ROCA SUELTA) EN LAS PROGRESIVAS DEL KM 00+00 AL KM 00+00 SEGÚN LAS CANTIDADES DEL KM 1+00 AL KM 20+00