    GAUTAM PRAKASH JHA

    Instrumentation EngineerTel. (mobile) +919552002072, +919922477832

    Email:[email protected]

    Looking for a position in the field of Instrumentation & Control Engineering and

    construction where my knowledge and experience in the industry will be best utilized for

    the growth of the organization.Professional Profile:

  • 7/31/2019 Resume Gautam MBA

    2/10

    Graduate Engineer in Electronics with about 2.8 years of experience in Process

    Control based Industrial Automation handling Distributed Control Systems (DCS),

    Programmable Logic Controller (PLC) in Design Engineering, Commissioning, Start up

    Services in BMS, Distillery & Co-generation Projects.

    Designated as Site Engineer with M/s Orbit infotech on behalf of M/s Honeywell

    Automation India Limited, DELHI forDMRC (Delhi Metro Railway Corporation) BMSproject.

    Currently designated as Instrumentation Engineer with M/s Gangakhed sugar and

    energy ltd sister Concern Company of M/s Sunil Hi-tech Engineers Ltd parbhani,

    Maharashtra.

  • 7/31/2019 Resume Gautam MBA

    3/10

    Qualification:

    Perusing (2ndyear) MBA in Technology and Management from K.S.O.U. B.E. In Electronic Engineering from Priyadarshani College of Engineering and

    Architecture, Nagpur (M.H.). With Good Second class degree.

    Intermediate (12th) from B.I.E.C.Board Patna with First division.

    High School (10th) from B.S.S.E.Board Patna with First division.

    Certification:

  • 7/31/2019 Resume Gautam MBA

    4/10

    Certified as an Automation Engineer and specially trained on PLC(Allen-Bradley,

    Modicon,Mitsubish,Siemens),DCS,SCADA,VFD,Industrial process management and

    panel designing from International Institute of Trained Professionals NOIDA(UP)

    Skill Summary: Review of P&ID, Instrument list , DCS I/O list, Control logics ,Trip logics & Interlocks

    Preparation of Overall plant cable schedule.

    Project Execution:

    Checking of Erected instruments as per Hook-up diagram Checking of Erected instruments ranges with instrument data sheet.

  • 7/31/2019 Resume Gautam MBA

    5/10

    Checking of Cable terminated between Field to JB , JB to DCS by loop checking

    Commissioning of Instruments like interfacing the instruments with DCS.

    Communicating the Instruments with HART

    Checking of Hardware & Software Spares in DCS

    Contractor & Vendor Management.

    Materials Estimation, Procurement & Reports Generation.

    Commissioning Operations:

    Manage the troubleshooting and preventive / breakdown maintenance of FieldInstruments and Equipment so as to reduce downtime to minimum.

  • 7/31/2019 Resume Gautam MBA

    6/10

    Calibrating Field Instruments and Equipment to enable optimum performance atall times.

    Domain Knowledge: Detailed Engineering for the Communication & logics Implementation between the DCS and

    Subsystem by Using MODBUS RTU Protocol Using RS485

    Communication Check between the DCS and the Subsystem like

    MOV - Motor operated Valves by Rotor Packscan

    CV- Control valves by Dembla, Mil, Forbes marshall.

    Engineering, Configuration & Communication of Foundation Field (FF) Devices to DCS

  • 7/31/2019 Resume Gautam MBA

    7/10

    Organisational Exeperience:

    From 05 may 2009 to 15 Jun 2010

    From 16 July 2010 to Till date

    Site Engineer (Instrumentation).

    Engineer (Instrumentation).

    Major Projects Handled: Erected & commissioned 30MW Steam Turbine (condensing type) of M/S Siemens.

    150TPHTravelling Grate Boiler, of M/S IJTand fully automated the complete power

    plant with DCS: ABB XA of M/S ABB. Erected & commissioned 66 KLPD Distillery &24TPH Spent Wash Boiler from M/S Praj

  • 7/31/2019 Resume Gautam MBA

    8/10

    Industries Ltd & M/S Thermodyne Techonalogy. DCS: ABB XA, from M/S ABB.

    Primary Challenge:The following challenges has been faced to achieve the milestone

    supervising of the erected instruments as per Hook-up diagram

    Supervising of the cable loop checking between Field to JB ,JB to DCS

    supervising the termination in both the Field end & DCS end with proper ferruling

    as per cable schedule.

    Simulating all the transmitters (PT,TT,FT,LT etc ) from field with 4-20maSimulator

  • 7/31/2019 Resume Gautam MBA

    9/10

    Hands On HART communicator to communicate with HART compatible devices

    IT Skill: Well versed with, Windows, & MS Office.

    Personal Details:

    Name : Gautam Prakash Jha

    S/O : Mr. Siyaram Jha

    D.O.B : 10-02-1985Address : Room no.3 Murkute complex,Gangakhed

  • 7/31/2019 Resume Gautam MBA

    10/10

    Dist. Parbhani M.H.

    Languages Known :English,Hindi,

    Nationality :Indian

    Place: Signature

    Date: