Page 1: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

SWEP Annual Conference

April 13, 2017

Restoration Projects in PennsylvaniaKatie Wolff

Regional Regulatory Manager

Page 2: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Company Snapshot

40,400 acres of restored and protected wetlands

180+ miles of streams restored and conserved

3,700 acres of endangered species habitat restoration and preservation

Resource Environmental Solutions (RES) delivers comprehensive ecological restoration and water resource solutions that help project developers obtain required permits and stay in compliance when projects impact wetlands, streams and habitats.

MissionOverview

RES Nursery – Eighty Four, PA

Page 3: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

3

Page 4: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Identify Site-Specific Impairments

4

Page 5: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Identify Site-Specific Impairments

5

2.5-foot head cut Horizontal bank migration/erosionExposed stream bank

Page 6: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Identify Site-Specific Impairments

6

Page 7: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Collect Baseline Data

7

• Professional survey of easement boundary• Remote sensing of historic land uses• Landowner interviews relative to

historic/present site conditions• Geotechnical investigation• Topographic survey• 2D shear stress modeling• Bed stability and habitat pebble counts• Water quality data• Large woody debris• Bank Erosion Hazard Index (BEHI) assessment• Preliminary Jurisdictional Waters of the U.S.

Delineation• Benthic macro-invertebrate sampling• Fish sampling• Flora community composition data• Rare, threatened and endangered species

consultation• Cultural resources consultation• Photo and field note documentation

Page 8: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Restoration Approach Design

8

Page 9: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Project Examples

9

Page 10: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Robinson Fork Mitigation Bank Washington County, PA

10

Page 11: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Robinson Fork Mitigation Bank - Data Validation

11

Pre-restoration 2-year storm event

Post-restoration 2-year storm event

Page 12: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

12

Robinson Fork Mitigation Bank – Pre. vs. Post-Construction533.29 Total Site / 150,168.27 linear feet – Stream Restoration / 53.65 acre – Wetland Restoration

Before & After

Page 13: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

UNT 4D – Quantifiable Results

Measurable Results Stream channel post-restoration

Vernal Floodplain Pool

13

• Streams

□ Pre-restoration – 894 lf□ Post-restoration – 1,242 lf

• Wetlands

□ Pre-restoration - 0.059 ac□ Post-restoration – 0.70 ac

• Increased stream stability

□ Measured against 100-year storm events

• Improved water quality

□ Reduced bank erosion□ Reduction of sediment from upstream waters

Page 14: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Pennsylvania Statewide Bat Conservation BankGreene County, PA

14

Page 15: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

High Quality Forested Habitat

15

High Value Indiana Bat Roost Tree Species (USFWS, 2017)

Page 16: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Habitat Enhancement

16

Page 17: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

Questions

17

Page 18: Restoration Projects in Pennsylvania...Apr 13, 2017  · 2.5-foot head cut Horizontal bank migration/erosion. Identify Site-Specific Impairments. 6. Collect Baseline Data. 7 ... Katie

website wetlands photo here

18

Katie [email protected]